V100R001
Installation Guide
Issue
06
Date
2007-12-30
Part Number
31501910
Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service. For any
assistance, please contact our local office or company headquarters.
Website:
http://www.huawei.com
Email:
support@huawei.com
Notice
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but the statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Contents
Contents
About This Document.....................................................................................................................1
1 Before You Start..........................................................................................................................1-1
1.1 Installation Flow..............................................................................................................................................1-2
1.2 Preparing Documents and Tools ....................................................................................................................1-2
1.2.1 Documents..............................................................................................................................................1-2
1.2.2 Tools.......................................................................................................................................................1-3
1.3 Checking Installation Conditions....................................................................................................................1-3
1.3.1 Checking the Installation Conditions of the IDU...................................................................................1-3
1.3.2 Checking the Installation Conditions of the ODU.................................................................................1-4
1.3.3 Checking the Lightning-Proof and Grounding System..........................................................................1-4
1.3.4 Checking the Power System...................................................................................................................1-5
1.3.5 Checking Auxiliary Devices and Cables................................................................................................1-6
1.4 Unpacking the Equipment...............................................................................................................................1-7
1.4.1 Checking the Equipment........................................................................................................................1-7
1.4.2 Unpacking Crates...................................................................................................................................1-9
1.4.3 Unpacking Cartons...............................................................................................................................1-11
1.4.4 Unpacking Boards................................................................................................................................1-12
Contents
Issue 06 (2007-12-30)
Contents
F Glossary.......................................................................................................................................F-1
G Acronyms and Abbreviations............................................................................................... G-1
Issue 06 (2007-12-30)
iii
Contents
Index.................................................................................................................................................i-1
iv
Issue 06 (2007-12-30)
Figures
Figures
Figure 1 Wearing an ESD wrist strap......................................................................................................................5
Figure 1-1 Straightening the tongue...................................................................................................................1-10
Figure 1-2 Removing the cover .........................................................................................................................1-10
Figure 1-3 Removing the surrounded wooden boards.......................................................................................1-11
Figure 1-4 Unpacking the carton........................................................................................................................1-12
Figure 1-5 Unpacking the boards.......................................................................................................................1-13
Figure 2-1 IDU 610..............................................................................................................................................2-2
Figure 2-2 IDU 620..............................................................................................................................................2-2
Figure 2-3 IDU 610 chassis with wall-mounting holes........................................................................................2-3
Figure 2-4 IDU 620 chassis with wall-mounting holes........................................................................................2-3
Figure 2-5 IDU 610 chassis without wall-mounting holes...................................................................................2-4
Figure 2-6 IDU 620 chassis without wall-mounting holes...................................................................................2-4
Figure 2-7 Rack-mounting ears for the 19-inch cabinet.......................................................................................2-5
Figure 2-8 Rack-mounting ears for the ETSI cabinet of the IDU 610.................................................................2-6
Figure 2-9 Rack-mounting ears for the ETSI cabinet of the IDU 620.................................................................2-6
Figure 2-10 Fastening the captive nuts.................................................................................................................2-7
Figure 2-11 Installing the rack-mounting ears for the ETSI cabinet....................................................................2-7
Figure 2-12 Installing the protection grounding cable (using the grounding point at the left side of the chassis)
...............................................................................................................................................................................2-8
Figure 2-13 Installing the protection grounding cable (using the grounding point on the left rack-mounting ear of
the chassis)............................................................................................................................................................2-8
Figure 2-14 Fastening the chassis........................................................................................................................2-9
Figure 2-15 Appearance of the IDU 620 after it is installed in the cabinet..........................................................2-9
Figure 2-16 Rack-mounting ears for the ETSI cabinet of the IDU 610.............................................................2-10
Figure 2-17 Installing the rack-mounting ears for the ETSI cabinet of the IDU 610 (wall-mounting).............2-11
Figure 2-18 Fastening the IDU 610 that has wall-mounting holes on the wall..................................................2-11
Figure 2-19 Appearance of the IDU 610 that has wall-mounting holes after it is installed on the wall............2-12
Figure 2-20 Installing the rack-mounting ears for the 19-inch cabinet of the IDU 620 (wall-mounting).........2-13
Figure 2-21 Fastening the IDU 620 that has wall-mounting holes on the wall..................................................2-14
Figure 2-22 Appearance of the IDU 620 that has wall-mounting holes after it is installed on the wall............2-15
Figure 2-23 Wall-mounting ears........................................................................................................................2-16
Figure 2-24 Installing the wall-mounting ears...................................................................................................2-16
Figure 2-25 Fastening the IDU 620 that does not have wall-mounting holes on the wall.................................2-17
Issue 06 (2007-12-30)
Figures
Figure 2-26 Appearance of the IDU 620 that does not have wall-mounting holes after it is installed on the wall
.............................................................................................................................................................................2-18
Figure 2-27 Sticking the plastic feet at the bottom of the bracket......................................................................2-19
Figure 2-28 Fastening the chassis onto the bracket............................................................................................2-19
Figure 2-29 Sticking the plastic feet at the bottom of the IDU 620...................................................................2-20
Figure 2-30 Fastening the captive nuts...............................................................................................................2-22
Figure 2-31 Fastening the E1 panel ...................................................................................................................2-22
Figure 2-32 Appearance of the E1 panel after it is installed in the cabinet........................................................2-23
Figure 3-1 Installing the protection grounding cable of the E1 panel .................................................................3-3
Figure 3-2 Installing the power cables.................................................................................................................3-5
Figure 3-3 Installing the IF jumper...................................................................................................................... 3-6
Figure 3-4 Installing the fiber jumper.................................................................................................................. 3-9
Figure 3-5 Installing the STM-1e cable.............................................................................................................3-10
Figure 3-6 Installing the E1 cable......................................................................................................................3-11
Figure 3-7 Installing the E1 cable that is connected to the E1 panel ................................................................3-12
Figure 3-8 Installing the Ethernet service network cable...................................................................................3-14
Figure 3-9 Installing the network management cable........................................................................................3-15
Figure 3-10 Installing the external clock cable/wayside service cable..............................................................3-17
Figure 3-11 Installing the orderwire line............................................................................................................3-18
Figure 3-12 Installing the external alarm cable..................................................................................................3-19
Figure 3-13 Installing the asynchronous data cable...........................................................................................3-21
Figure 3-14 Bundling cables..............................................................................................................................3-23
Figure 4-1 ODU interfaces...................................................................................................................................4-2
Figure 4-2 One ODU using one antenna configuration .......................................................................................4-2
Figure 4-3 Two ODUs sharing one antenna configuration..................................................................................4-3
Figure 4-4 Vertically polarized antenna...............................................................................................................4-4
Figure 4-5 Horizontally polarized antenna...........................................................................................................4-5
Figure 4-6 Gasket of the feed boom on antenna...................................................................................................4-6
Figure 4-7 Installing the ODU on the antenna (vertically polarized)...................................................................4-7
Figure 4-8 Installing a horizontal polarizer .........................................................................................................4-9
Figure 4-9 Gasket of the feed boom on antenna...................................................................................................4-9
Figure 4-10 Installing the hybrid coupler on the antenna...................................................................................4-10
Figure 4-11 Gasket of the feed boom on coupler...............................................................................................4-11
Figure 4-12 Installing the ODU on the hybrid coupler......................................................................................4-12
Figure 4-13 Separate mount parts......................................................................................................................4-14
Figure 4-14 Installing the ODU adapter.............................................................................................................4-14
Figure 4-15 Gasket of the feed boom on antenna...............................................................................................4-15
Figure 4-16 Gasket of the flange........................................................................................................................4-16
Figure 4-17 Installing the flexible waveguide....................................................................................................4-16
Figure 5-1 Appearance of a 6 GHz ODU.............................................................................................................5-2
Figure 5-2 Interfaces of a 6 GHz ODU................................................................................................................5-2
Figure 5-3 One ODU using one antenna configuration........................................................................................5-3
Figure 5-4 Two ODUs sharing one antenna configuration..................................................................................5-3
vi
Issue 06 (2007-12-30)
Figures
vii
Figures
viii
Issue 06 (2007-12-30)
Tables
Tables
Table 1-1 Installation flow................................................................................................................................... 1-2
Table 1-2 Tool list................................................................................................................................................ 1-3
Table 1-3 Checklist for IDU installation conditions............................................................................................ 1-4
Table 1-4 Checklist for ODU installation conditions...........................................................................................1-4
Table 1-5 Checklist for the lightning-proof and grounding system..................................................................... 1-5
Table 1-6 Checklist for the power system............................................................................................................1-6
Table 1-7 Checklist for the auxiliary devices and cables.....................................................................................1-6
Table 6-1 Description of grounding the IF cable (the ODU is mounted on a tower)...........................................6-7
Table 6-2 Description of grounding the IF cable (the ODU is mounted on the roof-top)....................................6-8
Table 7-1 Check items for the cabinet and the IDU.............................................................................................7-2
Table 7-2 Check items for the IDU cables...........................................................................................................7-3
Table 7-3 Check items for the cabinet power cables and grounding cables.........................................................7-4
Table 7-4 Check items for the antenna, hybrid coupler, and ODU......................................................................7-6
Table 7-5 Check items for separate mount components.......................................................................................7-6
Table 7-6 Check items for the ODU cables..........................................................................................................7-7
Table D-1 Information on the label affixed to the power cable...........................................................................D-7
Table D-2 Information on the label affixed to the fiber that connects two pieces of equipment........................D-8
Table D-3 Information on the label affixed to the fiber that connects the equipment and the ODF...................D-8
Table D-4 Information on the label affixed to the trunk cable that connects two pieces of equipment............D-10
Table D-5 Information on the label affixed to the trunk cable that connects the equipment and the DDF.......D-10
Table D-6 Information on the label affixed to the IF jumper............................................................................D-12
Table D-7 Information on the label affixed to the network cable.....................................................................D-13
Table D-8 Information on the label affixed to the external alarm cable............................................................D-14
Table E-1 Information on the label bound to the IF cable................................................................................... E-2
Issue 06 (2007-12-30)
ix
Purpose
This document is an operation guide provided for installation engineers. It describes the
installation flow, methods, and procedures of the OptiX RTN 600, including the IDU installation,
ODU installation, cable installation, and grounding specifications.
Related Versions
The following table lists the product versions related to this document.
Product Name
Version
V100R001
V200R005C01
Intended Audience
This document is intended for installation engineers. Before reading this document, you need
to:
l
Know safety precautions during installation (For details, refer to the OptiX RTN 600 Radio
Transmission System Compliance and Safety Manual.)
Organization
This document is organized as follows.
Issue 06 (2007-12-30)
Chapter
Content
Chapter
Content
3 Installing IDU
Cables
4 Installing the 7
GHz - 38 GHz ODU
Describes how to install the 7 GHz - 38 GHz ODU and its accessories.
5 Installing the 6
GHz ODU
6 Installing ODU
Cables
Describes how to install the ODU protection grounding cable and the
IF cable, and how to ground the IF cable.
7 Checking the
Installation
Provides the check items for the installation of the OptiX RTN 600.
A Terminating the
IF Cable with
Connectors
B Waterproofing
Outdoor
Connectors
C Checking the
Cable Circuit
D Engineering
Labels for Indoor
Cables
Describes the engineering labels for cables and how to fill and affix
labels.
E Engineering
Labels for Outdoor
IF Cables
F Glossary
G Acronyms and
Abbreviations
Conventions
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Issue 06 (2007-12-30)
Symbol
Description
DANGER
WARNING
CAUTION
NOTE
TIP
Indicates a tip that may help you solve a problem or save your
time.
General Conventions
Convention
Description
Boldface
Italic
Courier New
Safety Precautions
This section describes parts of the safety precautions. Read and follow these safety precautions
before installing and maintaining the OptiX RTN 600.
CAUTION
Before performing any operation, go through the instructions and precautions carefully to
minimize the possibility of accidents. The Caution, Warning and Danger items in other
documents do not cover all the safety precautions that must be followed. They are only
supplements to the safety precautions for operations as a whole. The personnel in charge of
the installation and maintenance must be trained to learn the proper operating methods and
all safety precautions. Only the trained and qualified personnel can install or maintain the
device.
Issue 06 (2007-12-30)
When operating the device, abide by the local safety regulations. The precautions listed in this
chapter are in compliance with the local safety regulations.
When operating the Huawei device, follow the full precautions and special safety instructions
from Huawei.
The personnel in charge of installation and maintenance must understand the basics of the safety
operations. Only trained and qualified personnel can install or maintain the device.
High Voltage
DANGER
l
The high voltage power supply supplies power for the device operation. Direct or indirect
contact (through damp objects) with high voltage and AC mains supply may result in
fatal accident.
Non-standard and improper high voltage operations can result in fire and electric shock.
Therefore, you must abide by the local rules and regulations when bridging and wiring
AC cables through a certain area. The personnel who perform high voltage operations
must be qualified for performing high voltage and AC operations.
Do not wear conducting articles, such as watches, chains, bracelets and rings while
performing high voltage operations.
Switch off the power supply immediately if you find water in the rack or if the rack is damp.
Make sure that the device is kept away from water when being operated in a damp
environment.
Power Cable
DANGER
Do not install or remove a live line. Transient contact between the core of the power
cable and the conductor might generate electric arc or spark, which can cause fire or
damage to the human body.
During high voltage and AC operations, special tools must be used instead of common
tools.
Before installing or removing the power cable, turn off the power switch.
Before connecting the power cable, make sure that the power cable and label conform to
the requirements of the actual installation.
Issue 06 (2007-12-30)
Thunderstorm
DANGER
High voltage and AC operations, or operations on a steel tower and a mast on a thunderstorm
day are prohibited.
On a thunderstorm day, the electromagnetic field generated in the thunderstorm area may cause
damage to electronic parts. To prevent the device from being damaged by lightning, use proper
grounding.
Electrostatic Discharge
CAUTION
The static electricity generated by the human body can damage the electrostatic sensitive
components on the circuit board, such as the large-scale integrated circuit (LIC).
Electrostatic discharge (ESD) is caused by body movement, friction between shoes and floor,
friction between clothes, and contact with plastic objects. ESD remains in the human body for
a long time.
Before touching the device or holding the boards, circuit boards, or ASICs, wear a grounded
ESD wrist strap. It can prevent the sensitive components from being damaged by the static
electricity in the human body.
Figure 1 Wearing an ESD wrist strap
Issue 06 (2007-12-30)
Microwave
WARNING
Strong radio frequency can harm the human body.
Do not stay too close to the antenna in the emitting direction of the antenna when the microwave
communication equipment is working. Before installing or maintaining an antenna in a steel
tower or a mast with a large number of transmitter antennas, the operator should coordinate all
parties concerned to shut down the transmitter antennas.
Laser
WARNING
Laser radiation can cause injury to your eyes.
When handling optical fibers, do not stand close to or look into the optical fiber outlet directly
with naked eyes.
High Temperature
WARNING
When the ambient temperature is higher than 55, the surface temperature of the IDU boards
may exceed 70. In this case, wear protective gloves before touching the IDU boards.
Working at Heights
WARNING
When working at heights, prevent objects from falling down.
Working at high altitude shall comply with the following requirements:
The operating machines and tools should be carried and handled safely to prevent them
from falling.
Safety measures, such as wearing a helmet and a safety belt, should be taken.
In cold areas, warm clothes must be worn before performing any high-altitude operation.
Huawei Technologies Proprietary
Issue 06 (2007-12-30)
Appliances used for lifting objects must be checked and ensured to be intact before
performing any high-altitude operation.
DANGER
During hoisting heavy objects, do not stand or walk under the boom or the objects.
Sharp Objects
WARNING
When carrying the device with hands, wear protection gloves to avoid injuries caused by
sharp objects.
IF Cable
WARNING
Before installing or removing the IF cable, turn off the ODU-PWR power switch on the IF
board.
CAUTION
Issue 06 (2007-12-30)
When inserting a board, handle it gently to avoid distorting the pins on the backplane.
Insert the board along the slot guide. Do not allow the board interfaces to come in contact
with that of another board as this can cause short-circuit or can damage the board.
When holding a board in hand, do not touch the board circuit, components, connectors,
or the connection slots.
CAUTION
Bundle the signal cables separately from the strong current cables or high voltage cables.
The space between two adjacent ties must be at least 150 mm.
Update History
Updates between document versions are cumulative. Therefore, the latest document version
contains all updates made to previous versions.
Issue 06 (2007-12-30)
Two wrenches
File
Installation Materials
l
IF cable
Precautions
This procedure is provided only as an example. Always follow the proper instructions packed
with the connector.
Procedure
Step 1 Use the safe edge knife to strip back the cable sheath of 16 mm.
Figure A-1 Stripping back the cable sheath and the insulating layer
Issue 06 (2007-12-30)
A-1
CAUTION
l
During the operation, take care not to damage the core wire of the cable.
f the length of the stripped sheath in Step 1 is more than 16 mm, cut the cable wire to
expose only a length of 6 mm.
Step 2 Fit the lock nut and the clamp 1 on the cable.
Figure A-2 Fitting the lock nut and the clamp 1
2.
Tidy the braided shield and then use the clamp 2 to bind the braided shield.
3.
Step 4 Use the safe edge knife to strip back the dielectric insulating layer in front of the clamp 2.
During the operation, the exposed cable wire should be 6 mm long.
Figure A-4 Stripping back the insulating layer
NOTE
If the length of the stripped sheath is more than 16 mm, cut the cable wire in Step 4.
Step 5 Use a file to taper the edge of the core wire about 0.5 mm to make the top in an arc shape, and
clean out the metal filings.
Step 6 Fit the connector.
A-2
Issue 06 (2007-12-30)
Step 7 Connect the connector and the lock nut. Use a wrench to tighten the connection.
Use the wrench 1 to rotate the lock nut and the wrench 2 to keep the body of connector standing.
The recommended torque is 152 Nm.
Figure A-6 Fastening the connector
----End
Postrequisite
After making the connectors, use the multimeter to check the cable circuit. Only after you make
sure that there is no short circuit or open circuit in the cables can you use the cables.
Related Topics
C Checking the Cable Circuit
Issue 06 (2007-12-30)
A-3
All outdoor IF cable connectors and grounding clips must be strictly waterproofed.
Prerequisite
The outdoor connector or the grounding clip must be installed.
Installation Materials
l
Issue 06 (2007-12-30)
PVC tape
B-1
Precautions
To facilitate future removal of tapes, first wrap a layer of PVC tape and then wrap the waterproof
insulation tape over the first layer.
Procedure
Step 1 Clean the connector or the grounding clip.
Step 2 Uncoil the waterproof insulation tape.
Step 3 Stick one end of the tape to the IF cable 2 to 5 cm away from the connector or the grounding
clip.
The sticky side should face inwards.
Step 4 Stretch the tape until it is 3/41/2 as wide as its original size and always keep this stretching
strength in the following steps.
Step 5 From the point that is 2 to 5 cm away from the connector or the grounding clip, wrap the cable
spirally towards the connector or the grounding clip. Make sure that the overlapping area of
adjacent tape layers is 1/2 of the stretched width.
Step 6 When the tap runs to the point that is 2 or 5 cm away from the connector or the grounding clip
at the other side, reverse the wrap direction to let the tape go back to the starting point.
Step 7 When the tape reaches the starting point, reverse the wrap direction to let the tape run to the
other ending point.
That is, there are three layers of waterproof insulation tape.
Step 8 After wrapping, squeeze the tape until it sticks to the cable to make sure that no air remains
between tape layers.
Step 9 Similarly, wrap three layers of PVC tape over the waterproof insulation tape.
During the wrapping, maintain the stretching strength to keep the width of the PVC tape 3/4
1/2 as wide as the original size.
Step 10 After waterproof processing, use the outdoor bundling strap to bind the PVC tape tight at the
positions 1 cm away from the wrapping edges at both ends, to avoid aging and falling off of the
PVC tape.
----End
B-2
Issue 06 (2007-12-30)
Result
Figure B-3 Appearance of waterproofed outdoor connector
Issue 06 (2007-12-30)
B-3
During the cable routing, bundling and connector installing, there may be short circuits or open
circuits in cables. Hence, it is necessary to test cables after the above-mentioned procedures are
complete. This section describes how to use a multimeter to test a cable with the DB44 connector
at one end and one group of SMB connectors at the other end.
Multimeter
Short-circuiting line
Procedure
Step 1 According to the pin assignment of the DB44 connector, use the short-circuiting line to shortcircuit two pins that correspond to an SMB connector.
Step 2 Use the multimeter to measure the resistance between the internal and external conductors of
the SMB connector.
Figure C-1 Checking the cable circuit
Short-circuiting
pins 23 and 38
IDU side
Issue 06 (2007-12-30)
R1
DDF side
C-1
C-2
Issue 06 (2007-12-30)
Engineering labels for indoor cables should be filled in and affixed in accordance with this
specification, unless the customer has different requirements.
D.1 Introduction to Labels
There are two types of engineering labels, labels for power cables and labels for signal cables.
D.2 Preparing Labels
The label contents can be printed or written on labels. Printing is recommended for the sake of
high efficiency and eye-pleasant layout.
D.3 Affixing Labels
The procedure for affixing a label to a power cable is different from that for affixing a label to
a signal cable.
D.4 Common Engineering Labels
Common engineering labels include labels for the cabinet power cable, the optical fiber, the
trunk cable, the IF jumper, the network cable, and the external alarm cable. For other unspecified
labels, handle them according to the onsite requirements.
Issue 06 (2007-12-30)
D-1
R1.0
10
11
12.2
TO:
25
0.6
Label
1.5
Cable tie
100
0.6
Dividing line on the label
Unit: mm
Issue 06 (2007-12-30)
5.5
10.0
11.0
11.0
TO:
1.5
Dividing line
Dividing line
0.6
5.5
5.5
1.0
7.0
7.5
Dotted line
2.0
37.0
Unit: mm
When you modify the information on the template, do not modify the settings of centered
characters, direction, fonts, and others.
When there are too many characters to be filled in, zoom out the characters.
Issue 06 (2007-12-30)
D-3
Before printing a label, cover an ordinary blank paper (both sides are blank) onto the whole
page of label paper to try the printing.
Feed in labels one after another by hand as the label paper is made of a material different
of that of the ordinary blank paper.
If the warning "One or more margins are set outside the printable area of the page" appears
before printing, click Ignore to continue the printing.
The font in handwriting should be close to the standard typeface as much as possible.
Write characters in proper size depending on the number of digits and letters.
1 A01 2
A 06
1 B02 1
TO:
5 05
Prerequisite
l
Procedure
Step 1 Remove a label from the paper. Affix it to the rectangular flute on only one side of the
identification plate on the cable tie.
Step 2 Determine the position of the cable tie.
In general, bind the cable tie 2 cm away from the connector. To avoid bending the cable or
making the installation of other cables inconvenient, you can bind the cable tie to other places.
Step 3 Use the cable tie to bind the cable.
D-4
Issue 06 (2007-12-30)
After the bundling, all identification plates should face right or upward and all labels should face
outside.
----End
Result
Figure D-4 Appearance of labels affixed on power cables
Cable
TO:
-48V2
TO:
B03
B03
-48V2
Cable
Prerequisite
l
Procedure
Step 1 Determine the position of the label.
In general, affix the label 2 cm away from the connector. To avoid bending the cable or making
the installation of other cables inconvenient, you can affix the label to other places.
Step 2 Remove a label from the paper.
Step 3 Affix the label to the cable.
After the bundling, all labels should face right or upward.
Issue 06 (2007-12-30)
D-5
Cable
Cable
Stick side
TO:
1 B02 1
Part
05
----End
Result
A 06
A 06
A01 2
TO:
A01 2
TO:
D-6
Issue 06 (2007-12-30)
Label Content
Table D-1 Information on the label affixed to the power cable
Content
Meaning
MN(BC) - -48V1
At the side of the loaded cabinet, MN identifies the row number and
column number of the power distribution equipment. BC identifies
the row number and column number of the 48 V connector (if there
is no row number or column number, or the connector can be
identified without them, BC can be omitted). Write BC just under
MN. BGND and PGND have no row number or column number for
identification.
At the side of the power distribution cabinet: Only MN is used to
identify the cabinet.
MN(BC) - -48V2
MN(BC) - BGND
MN(BC) - PGND
NOTE
The above table lists the cable content of two 48 V power supplies. For other DC voltages, the label
contents are similar.
Example
Figure D-7 Example of the label on a power cable
TO:
A01
B08
TO:
B03
-48V2
-48V2
At the side of the loaded cabinet, the label marked with "A01/B08-48V2" on the cable indicates
that the cable supplies 48 V2 power, which is from the eighth connector on the second row of
48 V bus bar in the cabinet on Row A, Column 1 in the equipment room.
At the side of the power distribution cabinet, the label marked with "B03-48V2" on the cable
indicates that the cable supplies 48 V2 power, which is from the loaded cabinet on Row B,
Column 03 in the equipment room.
Issue 06 (2007-12-30)
D-7
Label Content
Table D-2 Information on the label affixed to the fiber that connects two pieces of equipment
Content
Parameter
Meaning
MN-B-C-D-R/T
B: subrack number
Table D-3 Information on the label affixed to the fiber that connects the equipment and the ODF
Content
Parameter
Meaning
MN-B-C-D-R/T
B: subrack number
D-8
Issue 06 (2007-12-30)
Content
Parameter
Meaning
ODF-MN-B-CR/T
Example
Figure D-8 Example of the label on a fiber that connects two pieces of equipment
A01 01 05 05 R
G01 01 01 01 T
TO:
"A0-01-05-05-R" indicates that the local end of the fiber is connected to the optical receiving
interface 05 on Slot 5, Subrack 01 in the cabinet on Row A, Column 01 in the equipment room.
"G01-01-01-01-T" indicates that the opposite end of the fiber is connected to the optical
transmitting interface 01 on Slot 01, Subrack 01 in the cabinet on Row G, Column 01 in the
equipment room.
Figure D-9 Example of the label on a fiber that connects the equipment and the ODF
ODF G01 01 01 R
A01 01 05 05 R
TO:
"ODF-G01-01-01-R" indicates that the local end of the fiber is connected to the optical receiving
terminal on Row 01, Column 01 of the ODF on Row G, Column 01 in the equipment room.
"A01-01-05-05-R" indicates that the opposite end of the fiber is connected to the optical
receiving interface 5 on Slot 05, Subrack 01 in the cabinet on Row A, Column 01 in the equipment
room.
Issue 06 (2007-12-30)
D-9
Label Content
Table D-4 Information on the label affixed to the trunk cable that connects two pieces of
equipment
Content
Parameter
Meaning
MN-B-CD-R/T
B: subrack number
D: cable number
R: receiving interface
T: transmitting interface
MN-B-CD-R/T
D: cable number
R: receiving interface
T: transmitting interface
Table D-5 Information on the label affixed to the trunk cable that connects the equipment and
the DDF
D-10
Content
Parameter
Meaning
MN-B-CD-R/T
B: subrack number
D: cable number
Issue 06 (2007-12-30)
Content
Parameter
Meaning
R: receiving interface
T: transmitting interface
DDF-MNB-C-D/R/
T
D: direction A or B
R: receiving interface
T: transmitting interface
Example
Figure D-10 Example of the label on a trunk cable that connects two pieces of equipment
G01 01 05 12 T
D02 01 01 01 R
TO:
"G01-01-05-12-T" indicates that the local end of the trunk cable is connected to the transmitting
terminal of Trunk Cable 12 on Slot 05, Subrack 01 in the cabinet on Row G, Column 01 in the
equipment room.
"D02-01-01-01-R" indicates that the opposite end of the trunk cable is connected to the receiving
terminal of Trunk Cable 01 on Slot 01, Subrack 01 in cabinet on Row D, Column 02 in the
equipment room.
Figure D-11 Example of the label on a trunk cable that connects the equipment and the DDF
A01 03 01 01 R
DDF G01 01 01 AR
TO:
"A01-03-01-01-R" indicates that the local end of the trunk cable is connected to the receiving
terminal of Trunk Cable 01 on Slot 01, Subrack 03 of the cabinet on Row A, Column 01 in the
equipment room.
Issue 06 (2007-12-30)
D-11
"DDF-G01-01-01-AR" indicates that the opposite end of the trunk cable is connected to the
receiving terminal of Direction A (connected to the optical transmission equipment) on Row 01,
Column 01 of the DDF on Row G, Column 01 in the equipment room.
Label Content
Table D-6 Information on the label affixed to the IF jumper
Content
Parameter
Meaning
MN-B-CD
MN-M/S
B: subrack number
D: IF interface number
Always 01
Example
Figure D-12 Example of the label on an IF jumper
A01 02 05 01
A01 M
TO:
"A01-02-05-01" indicates that the local end of the IF jumper is connected to the IF interface 01
on Slot 05, Subrack 02 in the cabinet on Row A, Column 01 in the equipment room.
"A01-M" indicates that the other end of the IF jumper is connected to the active ODU of the
first antenna on the mast A.
D-12
Issue 06 (2007-12-30)
Label Content
Table D-7 Information on the label affixed to the network cable
Content
Parameter
Meaning
MN-B-CD-R/T
MN-Z
B: subrack number
Z: position number
Example
Figure D-13 Example of the label on a network cable
A01 03 10 05
B02 03 12
TO:
"A01-03-10-05" indicates that the local end of the network cable is connected to the network
port 05 on Slot 10, Subrack 03 in the cabinet on Row A, Column 01 in the equipment room.
Issue 06 (2007-12-30)
D-13
"B02-03-12" indicates that the opposite end of the network cable is connected to the network
port 12 on Subrack 03 in the cabinet on Row B, Column 02 in the equipment room. It is
unnecessary to specify the slot number.
Label Content
Table D-8 Information on the label affixed to the external alarm cable
Content
Parameter
Meaning
MN
Example
Figure D-14 Example of the label on an external alarm cable
A01
TO:
"A01" indicates that the alarm cable connects the power distribution cabinet and the cabinet on
Row A, Column 01 in the equipment room.
D-14
Issue 06 (2007-12-30)
Issue 06 (2007-12-30)
E-1
Parameter
IF CABLE
MAIN/STD BY N
Issue 06 (2007-12-30)
Prerequisite
l
Procedure
Step 1 Determine the place where the label for the IF cable is to be bound.
Generally, bind the label 20 cm away from the connector of the IF cable.
Step 2 Use outdoor cable ties to bind the label with the IF cable.
The label surface with letters should face outwards. All the cable ties should face the same
direction.
----End
Result
Figure E-2 Appearance of the label after it is bound with the IF cable
Issue 06 (2007-12-30)
E-3
F Glossary
Glossary
Numerics
1U
1+1
protection
I
IDU
IF
IF board
Issue 06 (2007-12-30)
ODU
Orderwire
F-1
D
DC
Direct Current
DDF
E
ESD
Electrostatic discharge
ETSI
G
GPS
I
IDU
Indoor Unit
IF
Intermediate Frequency
M
MDI
N
NM
Network Management
O
ODU
Issue 06 (2007-12-30)
Outdoor Unit
Huawei Technologies Proprietary
G-1
R
RF
Radio Frequency
RTN
S
STM-1e
G-2
Issue 06 (2007-12-30)
Index
Index
A
antenna
installation, 4-3, 4-8, 4-13, 5-4, 5-9
polarization, setting, 4-3
antenna adapter, installation, 4-13
asynchronous data cable, installation, 3-20
H
hybrid coupler, installation
on the antenna, 4-8
on the ODU adapter, 4-16
B
binding the labels for IF cables, E-2
bundling regulation
fiber jumpers, 3-23
IDU cable, 3-22
IF cable, 6-6
C
cabling regulation
IDU cable, 3-22
IF cable, 6-6
checking the cable circuit, C-1
E
E1 cable
from the PO1/PH1 board to the E1 Panel,
installation, 3-12
from the PO1/PH1 board to the external equipment,
installation, 3-10
E1 panel installation, 2-21
E1 panel PGND cable, installation, 3-2
engineering labels for IF cables, E-2
engineering labels for outdoor IF cables, E-1
Ethernet cable
NM cable, installation, 3-14
service cable, installation, 3-13
external alarm cable, installation, 3-18
external clock cable, installation, 3-16
F
fiber jumper, installation, 3-7
flexible waveguide, installation, 4-13
Issue 06 (2007-12-30)
IDU installation
IDU 610 with wall-mounting holes, on the wall,
2-10
IDU 610, on a Desk, 2-18
IDU 620 with wall-mounting holes, on the wall,
2-12
IDU 620, on a Desk, 2-20
in a cabinet, 2-4
on the wall, IDU without wall-mounting holes,
2-15
IDU PGND cable, installation, 3-2
IDU, introduction, 2-2
IF cable
bundling regulation, 6-6
cabling regulation, 6-6
grounding operation, 6-9
Grounding Point, 6-6
installation, 6-3
installing connector, A-1
IF jumper, installation, 3-5
installation check
IDU, 7-2
ODU, 7-5
installation condition
auxiliary device and cable, 1-6
IDU, 1-3
lightning-Proof and grounding, 1-4
ODU, 1-4
power system, 1-5
installation flow, 1-2
installation preparation
i-1
Index
S
setting the antenna polarization, 4-8, 4-13, 5-4, 5-9
STM-1e cable, installation, 3-9
label
Ethernet cable, D-13
external alarm cable, D-14
IF jumper, D-12
network cable, D-13
optical fiber, D-7
power cable, D-6
trunk cable, D-10
label, indoor cable
affixing, D-4
introduction, D-2
printing, D-3
writing, D-4
unpacking
board, 1-12
carton, 1-11
crate, 1-9
description, 1-7
procedure, 1-7
W
waterproofing outdoor connector, B-1
wayside service cable, installation, 3-16
N
network cable
NM cable, installation, 3-14
service cable, installation, 3-13
O
ODU adapter, installation, 4-13
ODU installation
connecting the ODU to the antenna, 6 GHz ODU,
5-6
connecting the ODUs to the antenna, 6 GHz ODU,
5-11
installing a 6 GHz ODU on a pole, 5-4
installing two 6 GHz ODU on a pole, 5-9
on the Antenna, 4-5
on the hybrid coupler, 4-10
on the ODU adapter, 4-16
one ODU on one antenna, direct mount, 4-3
one ODU using one antenna, 6 GHz ODU, 5-4
separate mount, 4-12
two ODUs on one antenna, direct mount, 4-7
two ODUs sharing one antenna, 6 GHz ODU, 5-9
ODU PGND cable, installation, 6-2
ODU, introduction, 4-2
ODU, introduction, 6 GHz ODU, 5-2
orderwire line, installation, 3-17
P
polarization
horizontal, 4-3
vertical, 4-3
power cable, installation, 3-4
i-2
Issue 06 (2007-12-30)
2.
3.
4.
Issue 06 (2007-12-30)
1-1
Description
NOTE
The installation of the ODU and ODU cables is independent from the installation of the IDU and IDU
cables. There is no precedence relationship between them. You can carry out them at the same time.
1.2.1 Documents
Required documents include two categories, engineering design documents and installation
guide documents.
Engineering design documents are as follows:
l
XX Network Plan
XX Engineering Design
1-2
OptiX RTN 600 Radio Transmission System IDU Quick Installation Guide
Huawei Technologies Proprietary
Issue 06 (2007-12-30)
OptiX RTN 600 Radio Transmission System ODU Quick Installation Guide
1.2.2 Tools
Required tools include common tools, special tools and instruments.
Table 1-2 Tool list
Category
Common
tools
Description
Measuring
and
marking
50-m tape, 5-m measuring tape, 400-mm level meter, marking pen
Drilling
Fixing
Bench
work
Raising
Auxiliary
Brush, tweezers, paper knife, hand bellows, electric iron, tin wire,
crowbar
Special tools
ESD gloves, ESD wrist strap, torque spanner, wire stripper, cable
clamp, clamp for crystal connectors, wire punchdown tool,
telescope, socket-head wrench
Instruments
Issue 06 (2007-12-30)
1-3
Item
Requirement
Construction
The equipment room should be large enough for the installation and
expansion. The floor should meet the requirements for load bearing.
The wiring trough, the ladder and holes should be in place. The
equipment room should be decorated. The earthquake-proof
measures of the equipment room should meet the requirements for
construction and long-term safe operation.
Location
The equipment room should be far away from any strong electric
field, intense magnetic field, powerful electric wave, and high heat
source. It also should meet the electromagnetic requirements.
Temperature
and humidity
Dust-proof
measures
Fire-proof
measures
Antistatic
measures
Item
Requirement
Tower
The height and rigidity of the tower should meet the indexes
specified in the tower design document.
2
3
4
The mast length should be more than 1.5 m. The mast diameter
should be between 50 mm and 115 mm.
The mast should be installed to the specified height.
1-4
Issue 06 (2007-12-30)
Item
Requirement
Lightningproof
measures for
the equipment
room
Grounding
network in the
equipment
room
Lightningproof
measures for
the antenna
Outdoor
grounding
network
Outdoor
grounding
copper bar
Grounding
resistance
Grounding
lead-in
Lightning
current leaddown of the
mast or the
guyed tower
Issue 06 (2007-12-30)
1-5
Item
Requirement
AC voltage
The AC input voltage of the primary power supply should meet the
design requirements. The AC power distribution switch and the AC
power cable should be installed.
AC grounding
The neutral line of the equipment rooms power cable should not
be connected to the protection ground of any communication
equipment.
AC lightningproof
measures
DC voltage
Power cable
DC lightningproof
measures
Fuse
The fuse for limiting the current from the DC distribution cabinet
(or the DC distribution box) and the primary power supply should
meet the operating requirement of the equipment.
1-6
No.
Item
Requirement
DDF
The DDF should be installed and the terminal capacity should meet
the engineering requirement. The grounding cable should be
reliably connected to the indoor grounding bar, with a sectional area
not less than 6 mm2.
Issue 06 (2007-12-30)
No.
Item
Requirement
ODF
The external optical cable should be installed. The ODF or the fiber
distribution box should be installed. The fibers should be spliced.
The wire for increasing rigidity in the ODF and fibers should be
connected to the protection ground.
Wiring frame
The wiring frames include the indoor wiring frame and the outdoor
wiring frame. The installation and grounding of the wiring frame
should meet the design requirements.
External clock
Outdoor cables
Trunk cables
Prerequisite
l
Issue 06 (2007-12-30)
1-7
Procedure
Step 1 Print the packing list according to the electronic ship order.
Step 2 According to the packing list, check the number of the packing boxes and the delivery
destination.
Step 3 Check the outer package. If any of the following cases is identified, stop unpacking immediately.
l
Find the damage causes and report the situation to the local representative office of Huawei.
CAUTION
To protect the equipment and find out the cause, place the unpacked equipment indoor for
proper storage and shot the site storage environment, the rusted or corroded equipment/
packing boxes/packaging materials. Then, properly keep these photos and store the
unpacked packing boxes as well as packaging materials.
Step 4 Refer to 1.4.2 Unpacking Crates or 1.4.3 Unpacking Cartons to open the crates or cartons.
NOTE
It is recommended that you open another packing box after you complete the inspection of the equipment
in a box.
Step 5 Compare the equipment inside the packing boxes with the packing list.
Check the following points:
l
Check whether the amount and type of articles are consistent with the packing list.
Check whether the articles and their inner package are damaged.
Check whether the cabinet, NM computer and other equipment are short of components, or
the components are damaged.
Postrequisite
After the inspection, if no problem is found, both parties should sign the Packing List. The
equipment is then handed over to the customer.
During the inspection, if some equipment is stated undelivered in the packing list, directly report
the situation to the order management engineer of the local office of Huawei and sign the Packing
List. If there is any short, deficient, wrong, extra or damaged equipment found, both parties
should sign the Unpacking Memo and the Packing List. The project supervisor has to fill in the
Equipment Problem Report and send it to the order management engineer of the local office of
Huawei. The supervisor also should properly keep the concerned equipment (including the outer
and inner packages) for verification.
1-8
Issue 06 (2007-12-30)
Prerequisite
l
Precautions
CAUTION
The crate is direction-oriented and should not be placed upside down. Otherwise, fatal
damages would be caused to the equipment.
CAUTION
l
During the transportation and handling of the equipment, spare parts or components,
make sure to avoid the collision of such things against doors, walls or shelves.
Procedure
Step 1 Insert one end of the spanner into the hold for the tongue of the crate cover. Turn the spanner to
straighten the tongue.
Issue 06 (2007-12-30)
1-9
Steel edge
Tongue Spanner
Step 4 Straighten all the tongues that join the wooden boards around the crate and remove the wooden
boards.
1-10
Issue 06 (2007-12-30)
Prerequisite
The carton must not be severely damaged or wetted.
Procedure
Step 1 Optional: Cut the strapping band using diagonal pliers.
Step 2 Split the tape along the seam between the cover and box body using a paper knife.
Step 3 Take out the board box from the carton.
Issue 06 (2007-12-30)
1-11
Foam plate
Label on the
card box
Foam plate
Strap
Card box
Carton label
For the goods such as ODU that need hoisting and mounting, check the types of the goods according to
the label on the carton and the packing list. It is recommended that hoisting is done before the carton is
unpacked, to avoid the goods being damaged during hoisting.
----End
Prerequisite
The board package must not be damaged.
1-12
Issue 06 (2007-12-30)
Precautions
CAUTION
l
Wait for at least 30 minutes before unpacking if the board is just moved from a cold, dry
place to a warm, damp place. Otherwise, moisture will condense on the board surface
and damage the components.
The boards are packed in a plastic bag and an ESD bag. Keep the bags properly. They
may be used later for keeping the boards or packing the damaged boards returned for
repair.
In each ESD-preventive bag there is a small bag of desiccant, which shall not be thrown
away.
Procedure
Step 1 Wear an ESD wrist strap.
Step 2 Open the board box and take out the boards.
Figure 1-5 Unpacking the boards
Card
ESD bag
Card box
Postrequisite
l
If you are going to install the board right after unpacking, place the board on an antistatic
surface to discharge the static electricity.
If you are going to install the board at a later time, pack the board using the original materials
and place them at a cool dry place without direct sunshine or strong electromagnetic
radiation.
Issue 06 (2007-12-30)
1-13
Issue 06 (2007-12-30)
2-1
Description
The IDU is of two types:
l
IDU 620: 2U; one to four IF boards; supporting 1+0 non-protection configuration and 1+1
protection configuration.
Size of the IDU 610: 442 mm x 220 mm x 44 mm (width x depth x height) The IDU 610 is in a
two-layer structure. Heat from the IDU 610 can be naturally dissipated. Size of the IDU 620:
442 mm x 220 mm x 87 mm (width x depth x height) The IDU 620 is in a four-layer structure.
It can be air cooled.
Both IDU chassis can be installed:
2-2
In an open rack
On the wall
On a desk
Huawei Technologies Proprietary
Issue 06 (2007-12-30)
Installation holes
for the open rack
Installation holes
for cabinet
Installation holes
for wall-mouting
Installation holes
for the open rack
Installation holes
for cabinet
Installation holes
for wall-mouting
Issue 06 (2007-12-30)
2-3
Installation holes
for the open rack
Installation holes
for cabinet
Installation holes
for the open rack
Installation holes
for cabinet
Prerequisite
l
2-4
Issue 06 (2007-12-30)
The chassis and installation materials must be shipped to the installation site.
CAUTION
l
As the IDU 610 applies the air convection method, there must be a space of 1 unit at the
top and bottom of the IDU chassis for heat dissipation and prevention of the high
temperature air from other equipment from entering the chassis.
As the IDU 620 supports wind-cooling, there must be enough space around the air intake
vent at the left side of the chassis and around the air exhaust vent at the right side to
ensure no blocking of the cooling air.
Installation Materials
l
Issue 06 (2007-12-30)
2-5
Figure 2-8 Rack-mounting ears for the ETSI cabinet of the IDU 610
Installation holes for the
ETSI cabinet
Figure 2-9 Rack-mounting ears for the ETSI cabinet of the IDU 620
Installation holes for the
ETSI cabinet
An example of installing the IDU 620 chassis that has wall-mounting holes in a cabinet is provided. In the
case of other types of chassis, the installation procedure is similar.
Procedure
Step 1 Determine the place where the chassis is to be installed in the cabinet. Fit the captive nuts into
the corresponding installation holes in the upright posts of the cabinet.
Fit two captive nuts at each side. All the captive nuts should be level.
2-6
Issue 06 (2007-12-30)
Captive nut
Installation hole
Step 2 Optional: Replace the rack-mounting ears for the 19-inch cabinet at both sides of the IDU with
the rack-mounting ears for the ETSI cabinet packed with the IDU.
CAUTION
Use the corresponding installation holes on the ears according to the type of the cabinet.
Figure 2-11 Installing the rack-mounting ears for the ETSI cabinet
Step 3 Remove the two M4 screws on the left side of the chassis.
Step 4 Use the removed screws to fasten the grounding cable to the grounding point of the chassis.
Issue 06 (2007-12-30)
2-7
If ...
Then ...
NOTE
a: The compact outdoor cabinet is a type of 19-inch cabinet. Hence, a compact outdoor cabinet should use
the rack-mounting ears for a 19-inch cabinet.
Figure 2-12 Installing the protection grounding cable (using the grounding point at the left side
of the chassis)
Figure 2-13 Installing the protection grounding cable (using the grounding point on the left rackmounting ear of the chassis)
Step 5 Use the four M6 panel screws to fasten the rack-mounting ears on the cabinet.
2-8
Issue 06 (2007-12-30)
----End
Result
Figure 2-15 Appearance of the IDU 620 after it is installed in the cabinet
2-9
2.3.2 Installing the IDU 620 That Has Wall-Mounting Holes on the Wall
To install an IDU 620 that has wall-mounting holes on the wall, use the matching rack-mounting
ears for the 19-inch cabinet.
2.3.3 Installing the IDU That Does Not Have Wall-Mounting Holes on the Wall
To install an IDU that does not have wall-mounting holes on the wall, use separate wall-mounting
ears.
2.3.1 Installing the IDU 610 That Has Wall-Mounting Holes on the
Wall
To install an IDU 610 that has wall-mounting holes on the wall, use the matching rack-mounting
ears for the ETSI cabinet.
Prerequisite
l
The chassis and installation materials must be shipped to the installation site.
Installation Materials
l
Procedure
Step 1 Remove the two rack-mounting ears for the 19-inch cabinet on both sides of the IDU chassis.
Step 2 Use the removed screws to install the matching rack-mounting ears for the ETSI cabinet into
the wall-mounting holes on the IDU 610 chassis.
2-10
Issue 06 (2007-12-30)
Figure 2-17 Installing the rack-mounting ears for the ETSI cabinet of the IDU 610 (wallmounting)
Step 3 Determine the place where the IDU 610 is to be installed on the wall. Place the chassis on the
wall and use a pencil to draw the position of the four installation holes of the ears.
Step 4 Remove the chassis. Use a percussion drill equipped with a 10 drill bit to make four 52 mm
to 60 mm deep holes on the marked position. Hammer the expansion bolts into the wall.
Step 5 Use expansion bolts and nuts to fasten the chassis on the wall.
Figure 2-18 Fastening the IDU 610 that has wall-mounting holes on the wall
----End
Issue 06 (2007-12-30)
2-11
Result
Figure 2-19 Appearance of the IDU 610 that has wall-mounting holes after it is installed on the
wall
2.3.2 Installing the IDU 620 That Has Wall-Mounting Holes on the
Wall
To install an IDU 620 that has wall-mounting holes on the wall, use the matching rack-mounting
ears for the 19-inch cabinet.
Prerequisite
l
The chassis and installation materials must be shipped to the installation site.
Issue 06 (2007-12-30)
Installation Materials
l
Procedure
Step 1 Remove the two rack-mounting ears for the 19-inch cabinet on both sides of the IDU chassis.
Step 2 Rotate the removed ears 90 degrees and install the ears into the wall-mounting holes on the IDU
620 chassis.
Figure 2-20 Installing the rack-mounting ears for the 19-inch cabinet of the IDU 620 (wallmounting)
Step 3 Determine the place where the IDU 620 is to be installed on the wall. Place the chassis on the
wall and use a pencil to draw the position of the four installation holes of the ears.
CAUTION
When installing the IDU 620 chassis, to ensure no blocking of the cooling air, make the air
intake vent of the fan box (the side where the ESD jack is) face downward.
Step 4 Remove the chassis. Use a percussion drill equipped with a 10 drill bit to make four 52 mm
to 60 mm deep holes on the marked position. Hammer the expansion bolts into the wall.
Step 5 Use expansion bolts and nuts to fasten the chassis on the wall.
Issue 06 (2007-12-30)
2-13
Figure 2-21 Fastening the IDU 620 that has wall-mounting holes on the wall
----End
2-14
Issue 06 (2007-12-30)
Result
Figure 2-22 Appearance of the IDU 620 that has wall-mounting holes after it is installed on the
wall
2.3.3 Installing the IDU That Does Not Have Wall-Mounting Holes
on the Wall
To install an IDU that does not have wall-mounting holes on the wall, use separate wall-mounting
ears.
Prerequisite
l
The chassis and installation materials must be shipped to the installation site.
2-15
Installation Materials
l
Wall-mounting ears
Figure 2-23 Wall-mounting ears
1
2
3
NOTE
The IDU 610 and the IDU 620 use the same wall-mounting ears but use different holes of the ears.
l
Four M6 screws
An example of installing the IDU 620 chassis that has wall-mounting holes on the wall is provided. In the
case of the IDU 610 chassis, the installation procedure is similar.
Precautions
Procedure
Step 1 Use four M6 screws to fasten the wall-mounting ears on the existing ears at both sides of the
chassis.
Figure 2-24 Installing the wall-mounting ears
TIP
You can exchange the wall-mounting ears on both sides to change the horizontal orientation of the front
panel of the IDU.
2-16
Issue 06 (2007-12-30)
Step 2 Determine the place where the IDU is to be installed on the wall. Place the chassis on the wall
and use a pencil to draw the position of the four installation holes of the ears.
CAUTION
When installing the IDU 620 chassis, to ensure no blocking of the cooling air, make the air
intake vent of the fan box (the side where the ESD jack is) face downward.
Step 3 Remove the chassis. Use a percussion drill equipped with a 10 drill bit to make four 52 mm
to 60 mm deep holes on the marked position. Hammer the expansion bolts into the wall.
Step 4 Use expansion bolts and nuts to fasten the chassis on the wall.
Figure 2-25 Fastening the IDU 620 that does not have wall-mounting holes on the wall
----End
Issue 06 (2007-12-30)
2-17
Result
Figure 2-26 Appearance of the IDU 620 that does not have wall-mounting holes after it is
installed on the wall
Prerequisite
l
The chassis and installation materials must be shipped to the installation site.
Issue 06 (2007-12-30)
Installation Materials
l
Plastic feet
Bracket
Procedure
Step 1 Stick the four plastic feet packed with the chassis onto the four round notches at the bottom of
the bracket.
Figure 2-27 Sticking the plastic feet at the bottom of the bracket
Plastic foot
Bracket
Step 2 Remove the ears for a 19-inch cabinet at both sides of the chassis.
Step 3 Use the four M4 sunk screws to fasten the chassis onto the bracket at both sides of the chassis.
Figure 2-28 Fastening the chassis onto the bracket
Issue 06 (2007-12-30)
2-19
CAUTION
To help an IDU to dissipate heat, do not place any stuff in the space of one unit over the
chassis or between the chassis and the bracket.
----End
Prerequisite
l
The chassis and installation materials must be shipped to the installation site.
Installation Materials
Plastic feet
Procedure
Step 1 Fix the four plastic feet packed with the chassis into the four round notches on the bottom of the
IDU 620.
Figure 2-29 Sticking the plastic feet at the bottom of the IDU 620
Plastic foot
Issue 06 (2007-12-30)
CAUTION
To ensure no blocking of the cooling air, do not place any stuff around the air intake vent
at the left side of the chassis and around the air exhaust vent at the right side.
----End
Prerequisite
l
The E1 panel and installation materials must be shipped to the installation site.
As the E1 cable that connects an E1 panel to an IDU is 1.5 meters long, do not install the E1 panel far
away from the IDU.
Installation Materials
l
Procedure
Step 1 Determine the place where the E1 panel is to be installed in the cabinet. Fit the captive nuts into
the corresponding installation holes in the upright posts of the cabinet.
Fit two captive nuts at each side. All the captive nuts should be level.
Issue 06 (2007-12-30)
2-21
Captive nut
Installation hole
Step 2 Use the four M6 panel screws to fasten the E1 panel on the cabinet.
Figure 2-31 Fastening the E1 panel
----End
2-22
Issue 06 (2007-12-30)
Result
Figure 2-32 Appearance of the E1 panel after it is installed in the cabinet
Issue 06 (2007-12-30)
2-23
Issue 06 (2007-12-30)
3-1
Prerequisite
l
The dual-hole OT terminal of the protection grounding cable must be fixed at the left side
of the IDU.
Installation Materials
IDU protection grounding cable
Precautions
If the IDU is installed on the wall or on a desk, refer to 2.2 Installing the IDU in a Cabinet to
first fix the dual-hole OT terminal of the protection grounding cable on the grounding point of
the IDU.
Procedure
Step 1 Cut the protection grounding cable to the correct length and connect the OT terminal, depending
on the distance to the grounding point.
Step 2 Connect the protection grounding cable to the grounding point provided by the cabinet (for
example, the grounding bar).
Step 3 Bind the cable.
----End
Related Topics
3.7 Cabling and Bundling
Prerequisite
The E1 panel must be correctly installed in the cabinet.
3-2
Issue 06 (2007-12-30)
Installation Materials
Protection grounding cable of the E1 panel
Procedure
Step 1 Fix the OT terminal of the protection grounding cable onto the grounding stud of the E1 panel.
Figure 3-1 Installing the protection grounding cable of the E1 panel
Step 2 Cut the protection grounding cable to the correct length and connect the OT terminal, depending
on the distance to the grounding point.
Step 3 Connect the protection grounding cable to the grounding point provided by the cabinet (for
example, the grounding bar).
Step 4 Bind the cable.
----End
Related Topics
3.7 Cabling and Bundling
Issue 06 (2007-12-30)
3-3
Prerequisite
l
The protection grounding cable of the IDU must be connected to grounding terminal.
The switch that controls the IDU power on the power box must be turned off.
Common tools
Engineering labels
Installation Materials
Power cable
Precautions
If the IDU is powered by external power supplies such as power cabinet, properly make a
terminal for the power cable end that connects to the external power supply according to electrical
power cable processing specifications. When installing the connector, connect it firmly with the
cable and equip it with a heat shrink tube so as not to expose the bare core and the handle of the
connector.
Procedure
Step 1 Route the ends with cord end terminals to the output terminals of the power box and fasten them.
Ground the black cable and connect the blue one to the -48 V power.
Step 2 Route the power cables to the IDU.
Step 3 Connect the type-D connectors of the cables into the sockets on the PXC board and fasten them.
3-4
Issue 06 (2007-12-30)
Related Topics
3.7 Cabling and Bundling
D Engineering Labels for Indoor Cables
Prerequisite
l
Common tools
Multimeter
Installation Materials
l
IF jumper
Issue 06 (2007-12-30)
3-5
Precautions
CAUTION
If the IDU is installed in an outdoor cabinet, meet the requirements of the outdoor cabinet
when installing the jumper. Waterproof the connection between the jumper and the IF cable.
CAUTION
Leave enough slack when connecting the IF jumper to the board, to facilitate insertion,
removal, and replacement of boards and the fan tray assembly.
Procedure
Step 1 Affix temporary labels to both ends of the IF jumper.
Step 2 Pass the IF jumper through the cable hole from outside of the cabinet and route the jumper to
the IDU.
Step 3 Connect the TNC connector of the jumper to the IF interface of the IF1A/IF1B board and leave
enough slack.
Figure 3-3 Installing the IF jumper
Issue 06 (2007-12-30)
Step 7 Reconnect the connector of the jumper to the IF board and tighten it.
Step 8 If the IF cable is installed, connect the jumper to the IF cable on the wiring frame and tighten
the connection.
Step 9 Remove the temporary labels and affix the engineering ones.
----End
Related Topics
6.2 Installing the IF Cable
3.7 Cabling and Bundling
D Engineering Labels for Indoor Cables
Prerequisite
l
Installation Materials
l
Fiber jumpers
Corrugated pipes
When routed outside a cabinet, fiber jumpers must be placed in a corrugated pipe or a
winding pipe. You can place 12 to 15 fiber jumpers in a corrugated pipe. Before using a
pipe, cut it to a proper length depending on the routing distance between an IDU and the
ODF.
Issue 06 (2007-12-30)
3-7
Precautions
WARNING
Avoid direct eye exposure to optical interfaces of optical interface boards and fiber jumpers.
The laser beams inside optical interface boards and optical fibers will damage your eyes.
CAUTION
The SL1/SD1 board can be equipped with different types of optical modules. When the
optical module is of the Ie-1 type, use multi-mode fibers; when the optical module is of
other types, use G.652 fibers.
Procedure
Step 1 Affix temporary labels to both ends of the fiber jumpers.
Step 2 Pass the fiber jumpers through the corrugated pipe.
Wrap the adhesive tapes around the cuts of the corrugated pipe. It is forbidden to force the fiber
jumpers in to avoid wearing them.
TIP
To ease the passing of fiber jumpers through a pipe, drop the jumpers at a high place and let the jumpers
fall by its gravity.
Step 3 Route the corrugated pipe from the ODF to the cabinet. Pass the pipe through the fiber hole and
bind the pipe onto the hole.
If the fiber hole cannot provide enough space for the pipe to pass through, pass the pipe through
the cable hole and fasten the pipe.
Step 4 Route the fiber jumpers to the IDU.
Step 5 Remove the protective caps from the fiber connectors and insert the connectors into the optical
interfaces on boards.
CAUTION
3-8
Well keep the removed protective caps, which will be used to cover fiber connectors in
future maintenance.
Issue 06 (2007-12-30)
Related Topics
3.7 Cabling and Bundling
D Engineering Labels for Indoor Cables
Prerequisite
l
Installation Materials
l
STM-1e cables
Procedure
Step 1 Affix temporary labels to both ends of the cables.
Issue 06 (2007-12-30)
3-9
Step 2 Route the cables from the DDF to the cabinet, pass them through the cable hole, and finally route
them to the IDU.
Step 3 Connect the cables to the SMB sockets on the SLE/SDE board.
Figure 3-5 Installing the STM-1e cable
Related Topics
3.7 Cabling and Bundling
D Engineering Labels for Indoor Cables
Prerequisite
3-10
Issue 06 (2007-12-30)
Installation Materials
l
Procedure
Step 1 Affix temporary labels to both ends of the cables.
Step 2 Route the cables from the DDF to the cabinet, pass them through the cable hole, and finally route
them to the IDU.
Step 3 Connect the DB44 connectors of the cables to the E1 interfaces of the PO1/PH1 board.
Figure 3-6 Installing the E1 cable
Related Topics
3.7 Cabling and Bundling
D Engineering Labels for Indoor Cables
Issue 06 (2007-12-30)
3-11
Prerequisite
l
The protection grounding cable of the IDU and the protection grounding cable of the E1
panel must be installed.
Installation Materials
l
Procedure
Step 1 Affix temporary labels to both ends of the cable.
Step 2 Connect the DB44 connector of the cable to the E1 interfaces of the PO1/PH1 board, and connect
the DB37 connector to the E1 interfaces of the E1 panel.
Figure 3-7 Installing the E1 cable that is connected to the E1 panel
Issue 06 (2007-12-30)
Related Topics
3.7 Cabling and Bundling
D Engineering Labels for Indoor Cables
Prerequisite
l
Installation Materials
l
Network cables
Procedure
Step 1 Make network cables of a proper length according to the distance between the Ethernet
equipment and the IDU. Make connectors for both ends of the cables.
NOTE
The FE interface of the EFT4 board supports the MDI/MDI-X auto sensing function. Hence, you can make
the network cable into either crossover cable or straight through cable. The latter is recommended.
Issue 06 (2007-12-30)
3-13
Related Topics
3.7 Cabling and Bundling
D Engineering Labels for Indoor Cables
Prerequisite
l
Installation Materials
l
3-14
Network cable
Huawei Technologies Proprietary
Issue 06 (2007-12-30)
Procedure
Step 1 Depending on the distance between the IDU and the network management computer or the data
communications equipment, cut off a length of network cable. Make connectors for both ends
of the network cable.
NOTE
As the network management interface of the SCC board supports the MDI/MDI-X adaptive function, both
the crossover cable and the straight-through cable can be used. It is recommended to make a straight-through
cable.
CAUTION
Do not connect the ETH and the ETH-HUB ports to external network connections.
Otherwise, the communication between the network management computer and the SCC
board will be affected.
The ETH and the ETH-HUB ports are at the same HUB. It is recommended to use the ETH
port to connect the network management computer and use the ETH-HUB port to connect
the ETH port of a lower-level NE.
Network cable
Extension network cable
3-15
Step 6 Remove the temporary labels and affix the engineering ones.
----End
Related Topics
3.7 Cabling and Bundling
D Engineering Labels for Indoor Cables
Prerequisite
l
Common tools
Multimeter
Installation Materials
l
Procedure
Step 1 Affix temporary labels to both ends of the cables.
Step 2 Route the cables from the DDF or the opposite equipment to the cabinet, pass them through the
cable hole, and finally route them to the IDU.
Step 3 Insert the SMB connectors of the cables into the CLKI and CLKO interfaces of the PXC board.
The CLKI is the input interface and the CLKO is the output interface.
3-16
Issue 06 (2007-12-30)
Related Topics
3.7 Cabling and Bundling
D Engineering Labels for Indoor Cables
Prerequisite
l
3-17
Installation Materials
Phone line
Procedure
Step 1 Insert one end of the phone line into the orderwire phone.
Step 2 Route the phone line from the orderwire phone to the IDU.
Step 3 Insert the other end of the orderwire line into the PHONE port at the SCC board.
Figure 3-11 Installing the orderwire line
Related Topics
3.7 Cabling and Bundling
Prerequisite
l
Issue 06 (2007-12-30)
Installation Materials
l
Procedure
Step 1 Affix temporary labels to both ends of the external alarm transit cable.
Step 2 Route the external alarm cable from the external alarm equipment (for example, the power
distribution cabinet) to the cabinet, pass it through the cable hole, and finally route it to the IDU.
Step 3 Insert the DB26 connector of the external alarm and asynchronous interface cable into the ALM/
S1 port of the SCC board, and connect the DB37 connector to the external alarm transit cable.
Figure 3-12 Installing the external alarm cable
ALM
NOTE
The external alarm transit cable and the serial port cable share the same external alarm and asynchronous
interface cable.
3-19
Step 8 Remove the temporary labels and affix the engineering ones.
----End
Related Topics
3.7 Cabling and Bundling
D Engineering Labels for Indoor Cables
Prerequisite
l
Installation Materials
l
Procedure
Step 1 Affix temporary labels to both ends of the serial port cable.
Step 2 Route the serial port cable from the external equipment that uses the asynchronous data service
(for example, the environment monitoring equipment) to the cabinet, pass it through the cable
hole, and finally route it to the IDU.
Step 3 Insert the DB26 connector of the external alarm and asynchronous interface cable into the ALM/
S1 port of the SCC board, and connect the DB9 connector to the serial port cable.
3-20
Issue 06 (2007-12-30)
S1
Serial port cable
NOTE
The external alarm cable and the serial port cable share the same external alarm and asynchronous interface
cable.
Related Topics
3.7 Cabling and Bundling
D Engineering Labels for Indoor Cables
Issue 06 (2007-12-30)
3-21
3.7.1 Cabling
Ensuring reliable transmission of signals and facilitating future maintenance are two rules in
cabling.
The cabling requirements are as follows:
l
Signal cables should be routed separately from power cables, fiber jumpers, and jumpers.
The specifications and cross-sectional area of the cable, and the route and position for the
cabling should be designed beforehand. All cables should be arranged neatly.
Cable turns should be smooth. The bending radius of cable turns should be larger than 60
mm, and the bending radius of fiber turns should be larger than 40 mm.
Cables that are routed along the wiring frame must be bundled.
They should be bundled closely with appropriate tightness. The spacing between cable ties
should be even.
Cables in troughs do not need to be bundled. They should be placed tidily and straight with
no crossover. No overflow is allowed. At inlets, outlets, and turns of the trough, cables
should be bundled with cable ties.
IDU cables should be routed both right and left to facilitate operations and maintenance
and not to cover board indicators.
In other words, the cables of the boards in left slots should be routed to the left of the cabinet
and those in right slots should be routed to the right of the cabinet.
Leave enough slack when connecting cables to the IDU to facilitate insertion and removal
of boards and the fan box. For the IDU 620, the cables of the left half boards must have
enough slack to be routed away from the front of the fan box.
3.7.2 Bundling
Cables must be tightly bundled. The cables bundled should be tidy, clear and elegant.
The bundling requirements are as follows:
3-22
Do not connect two or more cable ties and use them as one to bundle cables in case the
tightness is reduced.
After cable ties are fixed, the remaining part should be trimmed with no burrs.
The spacing between cable ties should be even and should be three or four times the
diameter of the bundle.
When making turns for bundled cables, keep the bending radius as big as possible to avoid
breaking cable cores.
Issue 06 (2007-12-30)
1
2
1-4
2. Cable tie
3. Burr
4. Trimmed
The mat side, not the hook side, of the binding strap contacts fiber jumpers.
Bundle fiber jumpers with appropriate tightness. Do not bind them too tight.
The spacing between two binding straps should not exceed 40 cm.
Issue 06 (2007-12-30)
3-23
Issue 06 (2007-12-30)
4-1
IF interface
Antenna
interface
4-2
Issue 06 (2007-12-30)
2.
3.
Prerequisite
The antenna must be installed.
Common tools
Socket-head wrench
Issue 06 (2007-12-30)
4-3
Precautions
This procedure is provided only as an example. Always follow the proper polarization
instructions from the provisioned antenna manufacturer.
Procedure
Step 1 Check if the antenna is vertically polarized.
Figure 4-4 Vertically polarized antenna
Step 2 Loosen the fixing bolts enough to allow the feed boom to rotate freely.
NOTE
Depending on the type of the antenna, the position and type of the bolts may be different. Carry out
operations following the antenna instructions.
Step 3 Rotate the feed boom 90 degrees to the right or left until its positioning pin plugs into the
positioning slot in the base.
4-4
Issue 06 (2007-12-30)
Prerequisite
l
The ODU must be raised to the installation platform and must not be damaged.
Installation Materials
Lubricant
Procedure
Step 1 Remove the protective caps from the feed boom of the antenna and from the ODU antenna
interface. Apply appropriate lubricant to the gasket of the feed boom.
Issue 06 (2007-12-30)
4-5
CAUTION
l
Do not apply lubricant to the face of the feed boom. Otherwise, transmission of signals
will be affected.
Do not apply lubricant to the internal surface of the antenna interface on the ODU.
Otherwise, transmission of signals will be affected.
Gasket of the
feed boom
Step 2 Keep the V-mark on the ODU pointing to the polarization direction of the antenna (when the
antenna is vertically polarized, keep the V-mark pointing up or down; when the antenna is
horizontally polarized, keep the V-mark pointing right or left). Place the ODU antenna interface
against the feed boom. Slowly fit the feed boom in to make the four ODU latches engage the
four antenna hooks.
4-6
Issue 06 (2007-12-30)
ODU
Latch
Hook
Feed boom
WARNING
The latches on the ODU are strongly elastic. Take care when closing the latches to avoid
possible injury to fingers.
----End
2.
3.
4.
Issue 06 (2007-12-30)
4-7
Prerequisite
l
The hybrid coupler must be raised to the installation platform and must not be damaged.
The type of the hybrid coupler must be in accordance with the plan.
Common tools
Socket-head wrench
Installation Materials
Lubricant
Procedure
Step 1 Check the polarization direction of the antenna.
If ...
Then ...
Go to Step 3.
Remove the protective cap from the antenna interface on the coupler.
2.
3.
4.
Install the polarization component back onto the antenna interface on the coupler.
NOTE
When you install the polarization component, make the waveguide cavity of the polarization
component face the same direction as the waveguide cavity of the feed boom.
4-8
Issue 06 (2007-12-30)
Polarization
converter
Horizontal
polarizer
Step 3 Remove the protective caps from the feed boom and the antenna interface. Apply appropriate
lubricant to the gasket of the feed boom.
CAUTION
l
Do not apply lubricant to the face of the feed boom. Otherwise, transmission of signals
will be affected.
Do not apply lubricant to the internal surface of the antenna interface on the hybrid
coupler. Otherwise, transmission of signals will be affected.
Gasket of the
feed boom
Step 4 Apply appropriate anti-seize grease to the four captive screws of the coupler.
Step 5 Align the antenna interface of the coupler over the feed boom. Slowly let the feed boom fit in
to make the four latches engage the antenna hooks.
Issue 06 (2007-12-30)
4-9
When connecting the hybrid coupler and antenna, keep the ODU interface identifiers marked
on the hybrid coupler such as "MAIN" and "STD BY" in the upward direction.
Figure 4-10 Installing the hybrid coupler on the antenna
Hybrid coupler
Hook
Latch
Captive screw
Feed boom
WARNING
The latches on the coupler are strongly elastic. Take care when closing the latches to avoid
possible injury to fingers.
Step 7 Rotate the four captive screws of the coupler about 70% and tighten them cornerwise.
----End
Postrequisite
Well keep the horizontal polarizer or the removed polarization converter.
Prerequisite
4-10
The ODU must be raised to the installation platform and must not be damaged.
Issue 06 (2007-12-30)
Installation Materials
Lubricant
Precautions
CAUTION
The main ODU must be installed on the MAIN interface of the coupler and the standby
ODU must be installed on the STD BY interface of the coupler. Otherwise, transmission of
signals will be affected.
Procedure
Step 1 Remove the protective caps from the feed boom of the coupler and from the ODU antenna
interface. Apply appropriate lubricant to the gasket of the feed boom.
CAUTION
l
Do not apply lubricant to the face of the feed boom. Otherwise, transmission of signals
will be affected.
Do not apply lubricant to the internal surface of the antenna interface on the ODU.
Otherwise, transmission of signals will be affected.
Gasket of the
feed boom
Issue 06 (2007-12-30)
4-11
Step 2 Keep the V-mark embossed on the ODU pointing right or left. Place the ODU antenna interface
against the feed boom of the coupler. Slowly let the feed boom fit in to make the four ODU
latches engage the coupler hooks.
The main ODU must be installed on the MAIN interface of the coupler and the standby ODU
must be installed on the STD BY interface of the coupler.
Figure 4-12 Installing the ODU on the hybrid coupler
Hook
ODU1
Latch
Hybrid coupler
ODU2
WARNING
The latches on the ODU are strongly elastic. Take care when closing the latches to avoid
possible injury to fingers.
----End
4-12
1.
2.
Issue 06 (2007-12-30)
4.
Prerequisite
The antenna must be installed.
Installation Materials
l
ODU adapter
Antenna adapter
Flexible waveguide
Issue 06 (2007-12-30)
4-13
ODU adapter
Antenna adapter
Flexible waveguide
Precautions
As ODU adapters and flexible waveguides have a variety of types, the installation method
described in this section is for reference only. In real installation scenarios, follow the installation
instructions packed with the devices.
Procedure
Step 1 Install the ODU adapter onto a proper position on the antenna pole.
Figure 4-14 Installing the ODU adapter
Step 2 Choose the installation procedure according to the type of the antenna.
If ...
Then ...
Go to Step 4.
4-14
Remove the protective caps from the antenna interfaces on the antenna feed boom and
antenna adapter. Apply appropriate lubricant to the gasket of the feed boom.
Issue 06 (2007-12-30)
CAUTION
l
Do not daub the front face of the feed boom with lubricant. Otherwise, signal
transmission will be affected.
Do not daub the inside of the antenna interface on the antenna adapter with
lubricant. Otherwise, signal transmission will be affected.
Gasket of the
feed boom
2.
Keep the polarization direction of the antenna adapter consistent with that of the antenna,
by referring to the direction of the rectangular waveguide cavity of the feed boom. Slowly
and carefully insert the antenna interface of the waveguide adapter into the feed boom until
the four hooks on the antenna respectively meet the four latches on the waveguide adapter.
3.
WARNING
The latches on the coupler are strongly elastic. Take care when closing the latches to
avoid possible injury to fingers.
Step 4 Use the flexible waveguide to connect the waveguide interface at the antenna side to that at the
ODU side.
1.
Issue 06 (2007-12-30)
Apply appropriate lubricant to the gasket of the flanges at both ends of the flexible
waveguide.
4-15
2.
Keep the direction of the waveguide cavity of the flexible waveguide consistent with that
of the adapter. Then install the flexible waveguide onto the waveguide interfaces of the
ODU and of the antenna using screws.
Figure 4-17 Installing the flexible waveguide
----End
Issue 06 (2007-12-30)
Procedure
Step 1 Choose a proper method for installing the ODU according to the installation mode.
If ...
Then ...
Issue 06 (2007-12-30)
4-17
Issue 06 (2007-12-30)
5-1
IF interface
Antenna
Grounding interface RSSI
bolts
interface
A 6 GHz ODU supports the separate mount mode. There are two types of antenna configurations:
l
5-2
Issue 06 (2007-12-30)
Issue 06 (2007-12-30)
5-3
2.
3.
4.
Prerequisite
l
Installation Materials
l
ODU bracket
The ODU bracket is comprised of the ODU support, fastening support, and matching bolt
and screw.
5-4
Issue 06 (2007-12-30)
M5 screws
ODU
bracket
Fastening
supports
Procedure
Step 1 Use the four M5 screws to install the ODU onto the ODU bracket.
Figure 5-6 Installing the ODU bracket
Step 2 Use the fastening supports and bolts to install the ODU on the pole. The installation position
must be proper.
CAUTION
The IF interface and RF interface of the ODU must face downwards.
Issue 06 (2007-12-30)
5-5
----End
Installation Materials
l
Waveguide-to-coaxial converter
Figure 5-8 Waveguide-to-coaxial converter
5-6
One RF cable
Issue 06 (2007-12-30)
Lubricant
Procedure
Step 1 Apply appropriate lubricant to the gasket on the flange interface of the antenna.
Figure 5-10 Applying appropriate lubricant to the gasket on the flange interface of the antenna
Step 2 Use the matching bolts to install the waveguide-to-coaxial converter onto the feed boom of the
antenna.
Step 3 Connect one type-N connector of the RF cable to the coaxial interface of the waveguide-tocoaxial converter.
Issue 06 (2007-12-30)
5-7
Step 4 Connect the other type-N connector of the RF cable to the ANT interface of the ODU.
Figure 5-12 Installing the RF cable to the ODU
Step 5 Refer to B Waterproofing Outdoor Connectors to waterproof the connection between the RF
cable and the waveguide-to-coaxial converter and the connection between the RF cable and the
ODU.
----End
5-8
Issue 06 (2007-12-30)
2.
3.
4.
Prerequisite
l
Installation Materials
l
ODU bracket
The ODU bracket is comprised of the ODU support, fastening support, and matching bolt
and screw.
Issue 06 (2007-12-30)
5-9
M5 screws
ODU
bracket
Fastening
supports
Procedure
Step 1 Use the four M5 screws to install the main ODU onto the ODU bracket.
Figure 5-14 Installing the ODU bracket
Step 2 Use the fastening supports and bolts to install the main ODU on the pole. The installation position
must be proper.
CAUTION
The IF interface and RF interface of the ODU must face downwards.
5-10
Issue 06 (2007-12-30)
Step 3 Refer to steps 1 and 2 to install the standby ODU on the pole.
----End
Installation Materials
l
Issue 06 (2007-12-30)
Two RF cables
5-11
Lubricant
Procedure
Step 1 Apply appropriate lubricant to the gasket on the flange interface of the antenna.
Figure 5-18 Applying appropriate lubricant to the gasket on the flange interface of the antenna
Step 2 Use the matching bolts to install the 6 GHz hybrid coupler onto the feed boom of the antenna.
Step 3 Connect one type-N connector of the RF cable to the coaxial interface of the 6 GHz hybrid
coupler.
5-12
Issue 06 (2007-12-30)
Step 4 Connect the other type-N connector of the RF cable to the ANT interface of the ODU.
CAUTION
When you connect the RF cables, the main ODU must be connected to the MAIN interface
of the hybrid coupler and the standby ODU must be connected to the STD BY interface of
the hybrid coupler. Otherwise, transmission of signals will be affected.
Issue 06 (2007-12-30)
5-13
Step 5 Refer to B Waterproofing Outdoor Connectors to waterproof the connection between the RF
cable and the hybrid coupler and the connection between the RF cable and the ODU.
----End
5-14
Issue 06 (2007-12-30)
Issue 06 (2007-12-30)
6-1
Prerequisite
The ODU must be installed.
Installation Materials
ODU protection grounding cable
Procedure
Step 1 Fasten the OT terminal of the protection grounding cable to the grounding stud of the ODU.
Figure 6-1 Connecting the protection grounding cable to the ODU
Step 2 Fix the grounding clip base at the other end of the protection grounding cable on the tower.
Pay attention to the following points:
l
6-2
Before the connection, first remove the anticorrosion paint and the oxidizing layer at the
grounding points.
Huawei Technologies Proprietary
Issue 06 (2007-12-30)
----End
Prerequisite
The protection grounding cable of the ODU must be installed.
Common tools
Torque wrench
Installation Materials
IF cable
Precautions
l
Manually fasten the type-N connector or use a torque wrench with a force moment of 1.7
Nm, to avoid damaging the type-N connector.
When routing or bending the IF cable, do not use the type-N connector of the IF cable or
the IF port of the ODU as the stress point or pivot point, to avoid damaging the type-N
connector or IF port.
Procedure
Step 1 Depending on the distance between the IDU and the ODU, cut off a length of IF cable with a
slack of 3 m to 5 m.
Step 2 Refer to A Terminating the IF Cable with Connectors. Make a connector for the end that is
connected to the ODU.
Issue 06 (2007-12-30)
6-3
Take protective measures for the connector to avoid damage to the connectors during hoisting
and routing of the IF cables.
Step 3 Affix temporary labels to both ends of the IF cable.
Step 4 Leave enough slack of the IF cable for routing and binding it along the mast, wiring ladder and
wiring frame.
CAUTION
Before the IF cable enters the IDU room, make waterproof curves with the IF cable.
Figure 6-3 Waterproof curves before the IF cable enters the IDU room
IF cable
IDU
Waterproof curve
Step 5 Connect the type-N connector of the IF cable to the IF port of the ODU, and tighten the connector.
Manually fasten the type-N connector or use a torque wrench with a force moment of 1.7 Nm,
to avoid damaging the type-N connector.
CAUTION
6-4
First bind the IF cable to avoid its type-N connector being pulled.
Issue 06 (2007-12-30)
IF cable
Waterproof curve
TIP
Coil the IF cable into a circle with a diameter of 60 cm and bind it onto the mast after the IF cable passes
the waterproof curve for future adjustment of the antenna position.
Step 6 Refer to B Waterproofing Outdoor Connectors. Waterproof the connection between the ODU
and the IF cable.
Step 7 Refer to A Terminating the IF Cable with Connectors. Make a connector for the end that is
connected to the IF jumper.
Step 8 If the IF jumper is installed, connect the IF cable to the IF jumper in the cabinet.
Issue 06 (2007-12-30)
6-5
On the IDU 620 systems configured with the IF 1+1 protection, the IF cable of the main ODU
must be connected to the IF jumper of the working IF board, and the IF cable of the standby
ODU must be connected to the IF jumper of the protection IF board.
----End
Related Topics
3.4 Installing the IF Jumper
6.3 Routing and Bundling the IF Cable
A Terminating the IF Cable with Connectors
The IF cable should be routed from top downwards and be bound at the same time routed.
The specifications and cross-sectional area of the cable, and the route and position for the
cabling should be designed beforehand. The cable should be arranged neatly without any
overlapping or crossover.
The IF cable should be curved for waterproof consideration under the ODU and before
entering the IDU room.
The IF cable routed along the wiring frame must be bundled. It should be bundled closely
with appropriate tightness. The spacing between cable ties should be even.
The IF cable should be bound using cable ties for outdoor use every one meter.
Cable ties should face the same direction. There should be a slack of 3 mm to 5 mm before
cutting cable ties.
6-6
Issue 06 (2007-12-30)
NOTE
a: If the distance between the grounding point 2 and the grounding point 3 (or the grounding point 5) is
smaller than 20 m, cancel the grounding point 3 (or the grounding point 5).
Issue 06 (2007-12-30)
6-7
Figure 6-6 Grounding points of the IF cable (the ODU is mounted on a tower)
45
ODU
1
IDU
1,2,3,4: Grounding points of the IF cable
6-8
Groundi
ng Point
No.
Issue 06 (2007-12-30)
Figure 6-7 Grounding points of the IF cable (the ODU is mounted on the roof-top)
45
ODU
1
IDU
Related Topics
6.4.2 Grounding the IF Cable
Prerequisite
The IF cable must be installed.
Installation Materials
Grounding clips and relevant installation accessories
Procedure
Step 1 Depending on the installation mode and the length of the IF cable, determine the places where
the grounding clips will be installed.
Issue 06 (2007-12-30)
6-9
CAUTION
l
Within the range of about 0.5 m around the installation position of the grounding clip,
the IF cable should not bend.
When installing the grounding clip near the ODU, install it at the side of the waterproof
curve that is farther away from the ODU than the other side.
When installing the grounding clip outside the cable entry, install it at the side of the
waterproof curve that is farther away from the cable entry than the other side.
Step 2 Refer to section 6.4.3 Installing the Grounding Clip to install the grounding clips.
Step 3 Connect the grounding cable to the grounding points.
Pay attention to the following points:
l
Before the connection, first remove the anticorrosion paint and the oxidizing layer at the
grounding points.
The angle resulting from the grounding wire of the clip and the IF cable should not be larger
than 15 degrees. When the IF cable is vertically routed, the grounding wire of the clip should
be led downwards.
----End
Related Topics
6.4.1 Grounding Points of the IF Cable
Prerequisite
l
Installation Materials
Grounding clips and relevant installation accessories
Procedure
Step 1 Depending on the installation position of the grounding clip and the clip size, strip the cable
sheath at the position and expose the external conductor.
6-10
Issue 06 (2007-12-30)
Step 2 Clip the cable using the grounding clip and press the clip tight.
The angle resulting from the grounding wire of the clip and the IF cable should not be larger
than 15 degrees. When the IF cable is vertically routed, the grounding wire of the clip should
be led downwards.
Figure 6-9 Installing the grounding clips
Step 3 Refer to section B Waterproofing Outdoor Connectors to waterproof the grounding clips.
Figure 6-11 Waterproofing the grounding clip
----End
Related Topics
6.4.1 Grounding Points of the IF Cable
6.4.2 Grounding the IF Cable
Issue 06 (2007-12-30)
6-11
6-12
Issue 06 (2007-12-30)
Issue 06 (2007-12-30)
7-1
7-2
Serial
No.
Check Point
The bolts that are used to fix the supports to the floor and to the cabinet should
be correctly and firmly installed. The installation sequence of the insulating
washer, the big flat washer, the spring washer, and the nut (bolt) should be correct.
The expansion bolts should be well fit into the installation holes of the base
(support leg).
The connection between the cabinet and the support should meet insulation
requirements. The installation of the customer-made base should meet the
customer's requirements.
The connecting bolts of the cabinet should be correctly and reliably installed. The
installation sequence of the flat washer and spring washer should be correct.
The cabinets in each row should be aligned and the error should be less than 5
mm.
10
The surface of the cabinets in a row should be in the same plane, and the cabinet
should be closely and tidily arranged.
11
There should be no paint drop, damage, dirt, or other phenomena that affect the
appearance of each cabinet component. Otherwise, paint again and clean out the
dirts.
12
All cable holes of the cabinet should be sealed. The gap should not be more than
1.8 cm. The bag mouth should be bound tight. The cable holes on the plastic should
be cut to appropriate openings. The tidy, beautiful, insulated, and fire retardant
materials can also be used to seal holes.
13
There should be no unused cable tie, screw or other sundries in the cabinet, under
the cabinet and on the top of the cabinet.
Issue 06 (2007-12-30)
Serial
No.
Check Point
14
The row and column labels of cabinets should be clean and tidy. If the label
position is marked out on the cabinets, labels should be affixed on the marked
position.
15
The gap around a cabinet should be sealed in accordance with the requirements.
Under the floor, there should be no cut-off cable ties, screws, or other sundries.
16
The equipment room should be clean and tidy. Unused packing boxes and other
sundries should be cleaned out. The spare parts should be tidily and reasonably
stored.
17
The installation position of the IDU should be in accordance with the engineering
design document.
18
19
The boards should be able to be smoothly inserted and removed. The screws on
the board panel should be tightened.
20
All vacant slots of the IDU should be installed with blank filler panels.
Issue 06 (2007-12-30)
Serial
No.
Check Point
The route of cables should be in accordance with the engineering design document
and should facilitate future maintenance and expansion.
The cables should not be routed on the heat-sinking mesh of the cabinet.
The cables should be bundled closely with appropriate tightness. The spacing
between cable ties should be even. After cable ties are fixed, the remaining part
should be trimmed with no burrs.
When a wiring ladder is used, cables should be tidily bound onto the ladder
beam. If the wiring frame is 0.8 m or more higher than the cabinet top, a wiring
ladder should be available on the cabinet top to support the cables.
When routed under the antistatic floor, cable bundles should not be higher than
3/4 of the height below the floor.
7-3
Serial
No.
Check Point
Cables should be stripped in an orderly manner at the place where they are to be
led out from a subrack if required.
When routed outside the cabinet, fiber jumpers should be protected by a protective
tube or trough.
10
The protective tube for fiber jumpers should be led into the cabinet and bound
tight.
11
Cuts of the protective tube for fiber jumpers should be smooth. Otherwise, they
should be wrapped by the insulating tape.
12
Fiber jumpers should not be bound too tight. Any fiber jumper in the bundle should
be able to be pulled out.
13
14
The excess slack of fiber jumpers in a cabinet should be tidily worked into the
fiber management tray, or coiled into circles with a diameter more than 8 cm and
fixed.
15
The connecting points of fiber jumpers should be clean and without any dust.
Unused fiber connectors and optical interfaces should be protected by protective
caps (plugs). If required, they should be cleaned in accordance with Huawei
cleaning specifications.
16
Cable turns should be smooth and have a big bending radius if possible.
17
Cable labels should be correctly filled and reliably affixed. They should be aligned
and face the same direction. It is recommended that labels be affixed 2 cm away
from connectors. Labels can be made according to customer requirements.
18
The signal cables should be routed separately from the power cables and the
grounding cables.
19
The IDU protection grounding cable should be correctly and reliably installed.
20
The signal cables for expansion should be bound to the reserved places in cabinets
to facilitate future expansion and void loss.
21
Table 7-3 Check items for the cabinet power cables and grounding cables
7-4
Serial
No.
Check Point
The route of cabinet power cables and grounding cables should be in accordance
with the engineering design document and should facilitate future maintenance
and expansion.
Issue 06 (2007-12-30)
Serial
No.
Check Point
The cabinet power cables and grounding cables should be correctly and reliably
installed.
The diameter of cabinet power cables and grounding cables should meet the power
distribution requirements.
The cabinet power cable and grounding cable must be whole copper core cables
without any connector in between.
When cabinet power cables and grounding cables are connected to the primary
power supply or the power distribution box, the cable slack should be cut off and
should not be coiled.
Cabinet power cables and grounding cables should be routed separately from
signal cables, and the distance should be more than 3 cm.
The cabinet power cable (-48 V or -60 V power) should be in blue, the working
grounding cable (BGND) should be in black or red, and the PGND protection
grounding cable should be in yellowish green or in yellow.
Cabinet power cables and grounding cables should be straight and tidily bundled.
10
The lugs for cabinet power cables and grounding cables made on site should be
soldered or firmly crimped.
11
The lug handle and bare wire of a power cable or grounding cable should be
wrapped with the tube or insulating tape. There should be no bare copper wire on
the lug or terminal. The flat washers and spring washers should be correctly
installed.
12
The equipment with entire or part of metal shell in a cabinet should be correctly
grounded and reliably connected.
13
The grounding cable of the cabinet door should be correctly and reliably installed.
14
Cable labels should be correctly filled and reliably affixed. They should be aligned
and face the same direction. It is recommended that labels be affixed 2 cm away
from connectors. Labels can be made according to customer requirements. The
switches on the power distribution box should be clearly marked.
Issue 06 (2007-12-30)
7-5
Table 7-4 Check items for the antenna, hybrid coupler, and ODU
Serial
No.
Check Point
The installation position and direction of the antenna should be in accordance with
the engineering design document.
The antenna should be correctly installed (the side with a bigger shield should
face upward and that with a smaller shield should face downward).
The antenna support should be reliably installed on the mast. The connection
should meet the wind loading requirements.
The four latches of the ODU should tightly engage on the antenna or the hybrid
coupler.
The four latches of the hybrid coupler should tightly engage on the antenna. The
four screws should be fastened tight.
The antenna, the hybrid coupler, and the ODU should be in the protection range
of the lightning arrester (the protection angle of the lightning arrester should be
smaller than 45 degrees. In mountain and thunder areas, the angle should be
smaller than 30 degrees).
7-6
Serial
No.
Check Point
The ODU adapter should be firmly and reliably connected to the pole. The
connection should comply with the requirements for wind resistance.
The four latches of the antenna adapter should firmly lock the antenna.
The flange of the flexible waveguide should be firmly and reliably connected to
the ODU adapter and antenna adapter (or antenna).
The flexible waveguide should have a bending radius not bigger than 90 degrees.
The antenna, hybrid coupler, and ODU should be within the protection scope of
the lightning rod. Note that the protection angle of the lightning rod should be
smaller than 45, and in mountainous areas and heavy lightning areas, the
protection angle of the lightning rod should be smaller than 30 degrees.
Issue 06 (2007-12-30)
Issue 06 (2007-12-30)
Serial
No.
Check Point
All outdoor connectors and the grounding clips of the IF cable should be
waterproofed.
The connectors of the IF cable should be correctly made and should be tight.
The IF cable should not be obviously broken or twisted. Its braided shield should
not be bare.
After being led out from the ODU, the IF cable should be curved for waterproof
consideration.
Before entering the room, the IF cable should be curved for waterproof
consideration and should be grounded.
The minimum bending radius of the IF cable should be more than 30 cm.
When the IF cable is bound on the wiring ladder or the wiring frame, the spacing
between cable ties should be about 1 m.
10
The labels of the IF cable should be affixed in accordance with the specifications.
They should be tidily aligned and face the same direction.
11
The excess slack of the IF cable should be coiled into circles with a diameter not
less than 60 cm and be bound onto the mast or tower.
12
13
Within the range of about 0.5 m around the installation position of the grounding
clip, the IF cable should not bend.
14
The grounding wire of the clip should be led downwards. The angle resulting from
the grounding wire of the clip and the IF cable should not be larger than 15 degrees.
15
7-7