Tactical
Technology
Office
Artists concept
Launching satellites without fixed ground facilities is the key to tactical space access.
27 Mar 2012
2012
2006
2000
1994
1988
1982
1976
0
1970
Ride-share
10
1964
Dedicated
15
1958
20
27 Mar 2012
Artists concept
Artists concept
Ground Launch
Payload (lbm)
Air Launch
Payload (lbm)
Falcon 1e
2,200
2,749
25.0%
Taurus
2,910
4,562
56.8%
Athena II
4,550
5,662
24.4%
System
35
30
2011 NASA/DARPA
Horizontal Launch study
1st gen vision vehicles
25
Existing domestic
launch vehicles
20
Delta II Variants
(retiring)
15
10
5
0
0
10
15
20
Payload to LEO (klbm)
25
30
5
System
Payload
(lbm)
Benefit
(%)
Falcon 1e
2,200
0%
2,749
25.0%
3,567
60.7%
17
Cost (M$)
19
Miscellaneous
18
16
15
14
13
12
11
10
Conventional
Horizontal Launch
Source: Buckley, S, AIAA/Utah State Small Satellite Conference, 2004
Category
Definition
Equipment provided by
agency, mission assurance
Miscellaneous
27 Mar 2012
Thousands
11
10
9
8
7
6
5
10
10
Market demand
(number of launches)
12
20
25
30
15
8
6
2015
2020
4
2
0
27 Mar 2012
5,000
10,000
15,000
20,000
25,000
100
Conventional
Launch Vehicle
Trendline
Small Solid
Launchers
10
ALASA
trendline
Delta II
variants
EELV
variants
Streamlined
Development Launch
Vehicle Trendline
ALASA
Demo
System
Future
Medium
Launch
Vehicle
1
0.01
0.1
1
Payload to LEO (klbm)
10
100
Payload
Integration
Forward
base ground
operations
Range outages/
weather delay
Additional
booster
processing
Delay for
launch pad
clearance
Total time
to process
Atlas V
8-9
0-5
21
0-45
30-80
Falcon 9
10
0-5
20-35
0-60
30-110
Minotaur IV
0-5
24-39
0-60
30-110
ALASA
0-2
2-4
System
Times in days. Totals for existing systems are minimum figure one-time estimates (not sustainable)
Source: NASA/DARPA HL study, 2011
Call-up
Full turn-around
27 Mar 2012
12
18
24
Hours
30
36
42
48
Assumptions:
Payload is on-site and fitted with adapter
ring.
Not feasible to swap mission of vehicle
already in queue (i.e. being processed for
next slated launch).
Mission of next vehicle in queue does not
outweigh COCOM request.
A spare mobile launch platform for Atlas is
not available.
Manning to support round-the-clock is
available.
Pre-integration of payload with
launcher is desirable to achieve < 1
day goal.
10
11
12
Enhancing
Technology
Payload
increase (%)
Cost increase
(%)
Airborne Propellant
Manufacture
35.1%
-17.8%
Airborne Propellant
Loading
36.1%
-20.4%
Improved
Hydrocarbon Fuel
38.6%
21.2%
Improved RP Engine
24.4%
-8.5%
4.6%
-2.0%
13
Schedule
FY
11
FY 12
FY 13
FY 14
Several performers
DARPA/NASA HL Study
FY 15
Technology And
System Definition
Program Milestone
Quarterly Reviews
Up to two performers
Technology Maturation and
System Demonstration
Kickoff
Now
27 Mar 2012
PIM
CDR
PIM
FRR
Flight Test
PIM
~36 Launches
JanJun 15
14
Artists concept
Artists concept
concept
Artists
The Obvious Solution defines the characteristics alternative solutions must have.
27 Mar 2012
15
www.darpa.mil
16