Six Sigma Green Belt Certification Workshop


LECTURE 5: Organizational Goals and Six Sigma Projects

___________________________________
___________________________________

ASQ Body of Knowledge I.A.3


I. Overview: Six Sigma and the Organization
A. Six Sigma and organization goals
3. Organizational Goals and Six Sigma Projects

___________________________________
___________________________________

Copy Right RS OTIFAS (P) Ltd

___________________________________
Aim of Six Sigma Projects

___________________________________

Aim is to achieve the metric of 3.4 DPMO or


99.999966% quality for all critical processes

___________________________________

But how?

___________________________________

By proper management system and


organisation of apex council,
champions, black belts, green belts
and teams

&

___________________________________

These teams select problems


organisation wide and solve it using
DMAIC approach to achieve 3.4
DPMO or 99.999966% quality

___________________________________
___________________________________

Copy Right RS OTIFAS (P) Ltd

Copy Right RS OTIFAS (P) Ltd

2/11

___________________________________
Project as Problem Solving Methodology

___________________________________

Operations Manager of some XYZ company was facing some routine problems at two
different dimension; problems at home and at factory.

___________________________________
___________________________________

Problems at home: studies


of children, going for
vacation, completion of
house construction

Problems at factory:
machine breakdowns,
rejections, customer
complaints..

Problem solving: simple, take decision


yourself or with consensus of family. No
complicacy or much data collection required.

Problem solving: complex, need to inform Factory


Manager, CEO. Much data collection involved, team
work required. Need a structured problem solving
approach.

___________________________________
___________________________________
___________________________________

Six Sigma projects are the problems assigned to a team for solving

Copy Right RS OTIFAS (P) Ltd

Copy Right RS OTIFAS (P) Ltd

3/11

___________________________________
Structured Problem Solving (DMAIC)

Define

Measure

Analyse & Improve

Control

Roughly work out the


impact in monetary
terms
Define problem & put
up to Manager/CEO in
a charter
If CEO sees the
viability, he approves to
solve the problem,
allocates resources and
team members
Problem and mission
are communicated in a
statement
You are given authority
to go ahead with the
problem

Team measures the


current state of problem
and find out base
performance measure
The process is studied
with process flow
mapping
Team identifies the
factors that causes the
problem by
brainstorming
Analyse the
measurement system
and collect data
Identify critical input
and process
parameters that causes
variation

Critical input and process


parameters are analysed
with the help of Pareto
graph, histogram, FMEA,
Fish bone, why why
analysis etc to find out the
root causes that lead to
problems and validate
Team brainstorm
solutions, rank the
solution, evaluate it and
plan for implementation

Check whether the


solutions worked or not
Put control measures
like control charts,
training, motivational
rewards, in order to
sustain the gains.

___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________

Copy Right RS OTIFAS (P) Ltd

Copy Right RS OTIFAS (P) Ltd

4/11

___________________________________
Selecting the right project

___________________________________
___________________________________

Brainstorm problems

___________________________________

Calculate impact in
money terms

___________________________________

Prioritise based on
impact

___________________________________

Identify project priority


index (PPI)

___________________________________
Select project based on
(PPI)

Copy Right RS OTIFAS (P) Ltd

Copy Right RS OTIFAS (P) Ltd

5/11

___________________________________
Project Priority Index (PPI)

___________________________________
___________________________________

PPI for a project is calculated based on:


Estimated saving (S) by solving the particular problem
Initial and recurring cost of solving the problem (C)

___________________________________

Time (T) to complete the project


Probability (P) of solving the problem successfully
Savings (S)
PPI

Cost (C)

___________________________________

Probability (P)
X

___________________________________

Time (T)

___________________________________

Copy Right RS OTIFAS (P) Ltd

Copy Right RS OTIFAS (P) Ltd

6/11

___________________________________
PPI Example

Project

Potential
savings (S)

___________________________________

Cost to
complete (C)

Probability of
success (P)

Time to
complete (T)

PPI

Lead time
reduction

2 lacs

1.5 lacs

60%

.75 years

1.06

Rework
reduction

9 lacs

3 lacs

70%

.3 years

Inventory
reduction

60 lacs

5 lacs

65%

.5 years

15.6

___________________________________
___________________________________
___________________________________
___________________________________

Based on PPI inventory reduction project will be selected first