Professional Documents
Culture Documents
Enviro Engineering
Enviro Engineering
Enviro Engineering
Iberdrola WF
Telecommunications: Spain,
Europe, Mexico, USA, UK
Iberdrola: Fiber Optics
and Telecom Solutions
Spain
META Project
STAR Project
CORE Toledo
PRODITEL
CORE Palermo
BCC
Constantin
Smart Grids Qatar
Algeria: BCC
Constantine
Environmental engineering:
Spain, UK, Peru and more
SCADA Kenia
SCADA Distribution
SEAL- Peru
Tunisia: Distribution
delegate dispatch
Telecommunication
solutions for
operation of
electrical
installations
Telecommunications
network deployment
Telecom Solutions
for other industries:
Transportation, etc.
Feasibility studies:
technical analysis
and CBA (costbenefit analysis)
Definition &
implementation of
pilot projects
Definition &
implementation of
roll-out projects
I+D+I projects
Types of projects:
Engineering studies, EPC, EPCM
Telecontrol
Control &
Regulation
Renewable energy
control center
Generation delegate
dispatch
SCADA Systems
Dam emergency
plans
Electrical market
access systems
Hardware/Software
Development
Solutions
Country
Customer
Description
Scope
Start-up
Qatar
Kahramaa
Smart grids
2015
Algeria
Sonelgaz
EPC
2013
EPCM
2011
EPC
Since 2010
EPCM
2010
EPC
2010
EPCM
Since 2010
UK
Spain
CORE USA
USA
Scottish Power
Renewable energy control center
Renewables
Energy remote control and
ADIF
telecommunication
Iberdrola
Renewable Energy Control Centre
Renewables
Upgrading of the control system of
Kengen
the main HPs
Iberdrola
Smart grids
Distribution
SCADA system
HPPs
Kenya
STAR Project
Spain
Spain
MINTRA
EPC
2007
Delegate Dispatch
Spain
Iberelica
EPC
2008
Spain
EON
EPC
2009
Tunisia
STEG
EPC
2005
EPC
Since 2003
EPCM
2003
EPCM
2002
EPC/EPCM
Since 1995
National Distribution
Centre
Voltage & speed
regulators
CORE Toledo - SCADA
system
Spain
Spain
Meta Project
Spain
Telecommunications
Spain
Iberdrola
Generation
Iberdrola
Renewables
Iberdrola
Generation
Iberdrola
Toledo (Spain)
Client:
Iberdrola
Start Date:
2002
Commercial Operation
2003
It was developed by Iberdrola Engineering and Construction in 2003 and is now installed in more
than 150 wind farms with real-time supervision of more than 1,200,000 data
55
Portland y Phoenix
(USA)
Client:
Iberdrola Renewables
Start Date:
2009
Commercial Operation
2010
Whitelee, y Cathcart
(Scotland)
Client:
Scottish Power
Renewables
Start Date:
2010
Commercial Operation
2011
It was developed by Iberdrola Engineering and Construction in 2010 and is now installed in more than
20 wind farms with real-time supervision of more than 250,000 data, controlling 0.8 GW
77
Palermo (Italy)
Client:
Start Date:
2011
Commercial Operation
2013
It was developed by Iberdrola Engineering and Construction in 2011 and is now installed in more than
20 wind farms with real-time supervision of more than 70,000 data, controlling 0.4 GW
88
Kenya
Client:
KenGen
Start Date:
2007
Commercial operation:
2009
Complex project in remote location. Iberdrola Engineering applied its wide experience in diverse fields (hydro
plants upgrade, communications and control).
99
BASIC DATA
Location:
Arequipa (Peru)
Client:
Southern Western
Electricity (SEAL)
Start Date:
2004
Commercial Operation:
2005
A project with actions in many sites accomplished in consortium with locals companies.
10
10
Cartagena (Spain),
Bizkaia (Spain)
Client:
CC GDF Cartagena
CC Bizkaia Energia
Start Date:
2005, 2009
Commercial operation
2005, 2009
11
11
Santiago de
Compostela (Spain)
Client:
CESA-Acciona
Start Date:
2005
Commercial operation:
2007
Spain
Client:
Iberelica, Avanzalia,
etc.
Start Date:
2008
Commercial operation:
2011
13
13
Wan Development
BASIC DATA
Location:
Spain
Client:
Start Date:
1998
Commercial
operation:
Currently running
Client:
Start Date:
1999
Commercial
operation:
Currently running
Spain
Client:
Iberdrola
Start Date:
2010
Commercial operation:
Currently running
16
16
Qatar
Client:
Kahramaa
(Iberdrola)
Start Date:
2013
Commercial operation:
Currently running
17
17
Spain
Client:
IBERDROLA
Start Date:
2010
Commercial operation:
Currently running
18
18
Spain
Client:
Ministerio Fomento /
ADIF
Start Date/
Commissioning Fase1
(section Santiago
Corua):
Start Date/
Commissioning Fase2
(section Vigo
Corua):
March 2013 /
Currently developing
19
19
BASIC DATA
Location:
Tunisia
Client:
STEG
Start Date:
April 2004
Commercial operation:
June 2008
20
20
BASIC DATA
Location:
Algeria
Client:
ABB / Sonelgaz
Start Date:
June 2005
Commercial operation:
January 2013
Spain
Client:
Iberdrola
Starting Date:
1996
Commercial operation:
1996-2001
Scope:
EPC
22
22
Spain
Client:
Iberdrola
Starting Date:
2002
Commercial operation:
2007
Scope:
EPC
23
23
BASIC DATA
Location:
Spain
Client:
Iberdrola
Starting Date:
2003
Commercial operation:
2013
Scope:
EPC
24
24
Spain
Client:
EON Generacin
Starting Date:
2005
Commercial operation:
2005-2009
Scope:
EPC
25
25
Spain
Client:
Iberdrola
Starting Date:
2012
Commercial operation:
2014
Scope:
EPC
26
26
Environmental
management and
sustainability
Analysis of
environmental
requirements
Environmental
Impact Studies
Weather
measurement and
forecast
Environmental Risk
Analysis
Surveillance plans
and environmental
control
Advanced modelling
& monitoring of air
water & noise quality
Biodiversity
management plans
Environmental
permissions
Photochemical
modeling
Sustainability
management plans
Implementation of
environmental
monitoring systems
Environmental
control & modelling
system in real-time
Inventories and
management systems &
emissions reporting
Environmental
assessment
Preliminary and
feasibility
environmental studies
Projects technical
assistance
Country
MeteoFlow
13 countries
ARIES, PRESA
Spain
SUMO
UK
UK
Damhead Creek 2
CCGT
UK
Projects C-10,
ADI-1000 y CARPU
Spain
Environmental
Impact Studies
Spain
SGAI
Global management
model
Meteorology &
diffusion factors
Noise modeling
Several
Spain
Peru
Client
Description
Scope
Iberdrola
Wind production forecast
System
Renovables
Iberdrola, Repsol,
Atmospheric Environment
System
GDF, Gas Natural
Monitoring
European Space Help and support system in marine System. Innovation and
Agency
operations
evidence project
ScottishPower
Impact studies and
Environmental Impact Study
Renewables
processing
ScottishPower
Environmental studies prior to the
Field studies and
Generation
construction of the plant
processing
Impact studies on the expansion of
Impact studies and
Repsol/Petronor Cartagena, Muskiz and Puertollano
processing
refineries.
In more than:
- 100 Wind farms
Impact studies and
Iberdrola-Several
- 200 Lines and Substations
processing
- 40 in Industry and Generation
Comprehensive Environmental
Study, design and
Iberdrola
Management System and Global
implementation
Model for Iberdrola
assistance
Nuclear Plant
Instrumentation monitoring and
Studies and technical
Almaraz. Enresa
annual diffusion studies
assistance
Noise modeling on the expansion of Studies and technical
Repsol
'La Pampilla refinery
assistance
Start-up
Since 2004
2003-09
Start-up 2009
2014-2016(*)
2013-14
2012-14
2007-2012
2000-2014
2005-2009
Since 1987
2012
(*) in negotiations
28