Bill 2.0 Structure

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 23

GMI Hotel Condominium Project

Kota Deltamas

BILL OF QUANTITIES
BILL NO. 2 : STRUCTURE WORKS

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.1 : EARTH WORK

Code

Description

Quantity Unit

Rate

EARTH WORK (ALL PROVISIONAL)


(a) The unit rates include for excavation in any ground
condition encountered. It is the responsibility of the
tenderer to visit the site and judge for himself the
nature of the material to be excavated.
(b) For the purposes of the measurement of quantities
in this Bill of Quantities it is assumed one cubic metre
of material excavated forms one cubic metre of
compacted fill. No allowance is made for bulking or
shrinkage. Any allowance for bulking or shrinkage
which the tenderer feels is necessary based on his
experience and on his examination of the material to
be excavated at the site shall be made in the unit rates
on the tenderer's sole responsibility.
(c) For the purposes of the measurement of this Bill of
Quantities it is assumed the cut material is used in
filling to make up levels. However, the actual method
of construction is entirely at the discretion of the
contractor, (Whichever construction method is chosen,
the unit rates are deemed to include for all costs
incurred)
General
A

Survey & setting out

ls

Clearing & grubbing

7,661

m2

Topsoil stripping

7,661

m2

11,662

m3

Excavation
D

Excavation to form building platform


Soil disposal and backfilling

Filling using excavated material and including


compaction in layers to trenches

1,048

m3

Remove surplus excavated material from site

10,614

M3

To Summary Bill 2.0

SUB BILL NO. 2.1 : EARTH WORK

Bill 2 page 1

Rp.

Rupiahs

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.2 : PILING

Code

Description

Quantity Unit

Rate

Rupiahs

PILING WORKS
A

Supply precast concrete piles for foundation


Precast concrete piles 400 mm, L = 21m (12+9)
Precast concrete piles 500 m, L = 21m (12+9)

966
6,216

LM
LM

Driving precast concrete piles for foundation


Precast concrete piles 400 mm, L = 21m (12+9)
Precast concrete piles 500 m, L = 21m (12+9)

966
6,216

LM
LM

46
296

Nos
Nos

Joint splices including welding to pile 400 mm


To piles 400 mm
To piles 500 mm
Dolly (provisional)
Pile 400 mm, max 2m length
Pile 500 mm, max 2m length

Nos
Nos

Cut off precast spun pile heads including integration of


reinforcement into pilecaps, including cutting, bending
rebar, filling top of pile and cleaning, and disposal off
site
To piles 400 mm
To piles 500 mm

46
296

Nos
Nos

Pile testing
PDA Test to pile 400 mm
PDA Test to pile 500 mm

1
3

Nos
Nos

Mobilization and demobilization

LS

SUB BILL NO. 2.2 : PILING

To Summary Bill 2.0

Bill 2 page 2

Rate only
Rate only

Rp.

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.3 : BASEMENT

Code

Description

Quantity Unit

Rate

Rupiahs

Excavation
Note: The quantities given are the net volume,
allowance for additional excavation and backfilling to
provide working space shall be included in the unit
rates
A

Excavation for basement commencing from existing


ground level

include Bill 2.1

Ditto for basement slab

include Bill 2.1

Ditto for pile caps

465

m3

Ditto for tie beams

402

m3

867

m3

Soil disposal and backfilling


E

Remove surplus excavated material from site

Backfilling including compaction in layers to trenches

m3

Not Used

Compacted sand bed


G

100mm Thick compacted sand layer under basement


slab

Ditto for pile caps

m2

include basement slab

Ditto for tie beams

m2

include basement slab

4,848

m2

Lean concrete
J

50mm Thick blinding layer under basement slab

Ditto for pile caps

m2

include basement slab

Ditto for tie beams

m2

include basement slab

4,848

m2

Dewatering
M

Allow for keeping the excavations free from water by


pumping or other means until such time as the
basement structure is complete

ls

To Collection

Bill 2 page 3

Rp.

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.3 : BASEMENT

Code

Description

Quantity Unit

Rate

Termite treatment as specified


A

Apply anti termite to excavated surface area

ls

Vibrated reinforced concrete K-350


B

Pile caps

394

m3

Tie beams

181

m3

Basement slab

1,071

m3

Basement wall (RW)

253

m3

Pit lift

21

m3

Suspended ramp slab

16

m3

Suspended ramp beam

m3

Suspended basement roof slab (ground slab)

566

m3

Suspended basement roof beams (ground floor


beams)

300

m3

Columns (from basement to ground floor)

122

m3

To Collection

Bill 2 page 4

Rp.

Rupiahs

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.3 : BASEMENT

Code

Description

Quantity Unit

Rate

Bar reinforcement; deformed high tensile BJTD-40,


including bending, cutting to length and supplying and
installing all tying wire, accessories and consumable
A

General reinforcing bars in pile caps; 22mm diameter

8,748

kg

Ditto; 19mm diameter

34,666

kg

Ditto; 16mm diameter

3,551

kg

Ditto; 13mm diameter

3,345

kg

General reinforcing bars in tie beams; 22mm diameter

20,651

kg

Ditto; 19mm diameter

7,292

kg

Ditto; 13mm diameter

2,294

kg

Stirrups in tie beams 10 mm diameter

7,710

kg

General reinforcing bars in basement slabs; 12mm


diameter

106,214

kg

Ditto; 10mm diameter

23,554

kg

General reinforcing bars in basement walls; 13mm


diameter

14,555

kg

Ditto; 10mm diameter

26,055

kg

General reinforcing bars in pit lift; 13mm diameter

2,696

kg

General reinforcing bars in ramp slabs; 10mm


diameter

1,234

kg

General reinforcing bars in ramp beams; 19mm


diameter

791

kg

Stirrups in ramp beams 10 mm diameter

231

kg

To Collection

Bill 2 page 5

Rp.

Rupiahs

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.3 : BASEMENT

Code

Description

Quantity Unit

Rate

Bar reinforcement; deformed high tensile BJTD-40,


including bending, cutting to length and supplying and
installing all tying wire, accessories and consumable
(Cont'd)
A

General reinforcing bars in suspended basement roof


slabs (ground floor slab); 10mm diameter

49,848

kg

General reinforcing bars in suspended basement roof


beams (ground floor beam); 22mm diameter

28,234

kg

Ditto; 19mm diameter

10,630

kg

Ditto; 16mm diameter

1,764

kg

Ditto; 13mm diameter

kg

Stirrups in suspended basement roof beams (ground


floor beam); 13 mm diameter

25

kg

Ditto; 10mm diameter

19,286

kg

General reinforcing bars in columns; 25mm diameter

4,622

kg

Ditto; 22mm diameter

30,098

kg

Ditto; 19mm diameter

2,474

kg

Stirrups and ties in columns 13 mm diameter

3,044

kg

Ditto; 10mm diameter

11,462

kg

To Collection

Bill 2 page 6

Rp.

Rupiahs

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.3 : BASEMENT

Code

Description

Quantity Unit

Rate

Rupiahs

Formwork
A

To sides of pile caps

771

m2

To sides of tie beams

974

m2

To edges of basement slab 200~250mm high

422

To sides of basement walls

2,804

m2

To sides of pit lift walls

200

m2

To soffit of supended ramp slabs

133

m2

To sides of suspended ramp beams

45

m2

To soffit of supended basement roof slabs

4,652

m2

To edges of suspended basement roof slab


120~150mm high

To sides of suspended basement roof beams

To sides of columns

m
413
1,903

m2

922

m2

Supply and install approved integral waterproofing in


accordance with the manufactures instructions as
specified
L

To pile caps

394

m3

To tie beams

181

m3

To basement wall

253

m3

To basement slab

1,071

m3

To pit lift

21

m3

405

Waterstop
Q

Water stop to basement wall and lift pit

To Collection

Bill 2 page 7

Rp.

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.3 : BASEMENT

Code

Description

Quantity Unit

Rate

COLLECTION
Page 3

Rp.

Page 4

Rp.

Page 5

Rp.

Page 6

Rp.

Page 7

Rp.

SUB BILL NO. 2.3 : BASEMENT

To Summary Bill 2.0

Bill 2 page 8

Rp.

Rupiahs

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.4 : HOTEL

Code

Description

Quantity Unit

Rate

Rupiahs

Vibrated reinforced concrete K-350


A

Column

414

m3

Suspended beam

840

m3

Suspended slab

1,375

m3

Suspended swimming pool slab (2nd floor)

26

m3

Suspended swimming pool wall (2nd floor)

19

m3

Suspended hot water bath slab (2nd floor)

m3

Suspended hot water bath wall (2nd floor)

m3

Suspended lift separator beam (BL)

15

m3

Bar reinforcement; deformed high tensile BJTD-40,


including bending, cutting to length and supplying and
installing all tying wire, accessories and consumable

General reinforcing bars in columns; 25mm diameter

5,547

kg

Ditto; 22mm diameter

71,679

kg

Ditto; 19mm diameter

10,750

kg

Stirrups and ties in columns 13 mm diameter

1,881

kg

Ditto; 10mm diameter

43,936

kg

General reinforcing bars in suspended beams; 22mm


diameter

44,713

kg

Ditto; 19mm diameter

70,504

kg

Ditto; 16mm diameter

42

kg

Ditto; 13mm diameter

2,812

kg

Stirrups and ties in suspended beams 13 mm diameter


3,513

kg

58,013

kg

Ditto; 10mm diameter

To Collection

Bill 2 page 9

Rp.

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.4 : HOTEL

Code

Description

Quantity Unit

Rate

Rupiahs

Bar reinforcement; deformed high tensile BJTD-40,


including bending, cutting to length and supplying and
installing all tying wire, accessories and consumable
(cont'd)
A

General reinforcing bars in suspended slabs; 10mm


diameter

126,543

kg

General reinforcing bars in swimming pool slabs;


13mm diameter

3,364

kg

General reinforcing bars in swimming pool walls;


13mm diameter

1,406

kg

Ditto; 10mm diameter

571

kg

General reinforcing bars in hot water bath slabs;


10mm diameter

280

kg

General reinforcing bars in hot water bath walls; 10mm


diameter

295

kg

General reinforcing bars in lift separator beams; 19mm


diameter

3,427

kg

Stirrups and ties in lift separator beams 10 mm


diameter

820

kg

Formwork
I

To sides of columns

3,063

m2

To sides of supended beams

5,512

m2

To soffit of supended slabs

11,187

m2

To edges of suspended slab 120~150mm high

2,287

To soffit of swimming pool supended slabs

128

m2

To sides of swimming pool walls

149

m2

To Collection

Bill 2 page 10

Rp.

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.4 : HOTEL

Code

Description

Quantity Unit

Rate

Rupiahs

Formwork (cont;d)
A

To soffit of hot water bath supended slabs

18

m2

To sides of hot water bath walls

27

m2

To sides and soffit of lift separator beams

202

m2

Supply and install approved waterproofing system in


accordance with the manufactures instructions as
specified
D

To swimming pool slab

128

m2

To swimming pool wall

75

m2

To hot water bath slab

18

m2

To hot water bath wall

14

m2

30 mm thick protective cement and sand (1:5) screed


laid to falls over waterproof membrane as specified

To swimming pool slab

128

m2

To swimming pool wall

75

m2

To hot water bath slab

18

m2

To hot water bath wall

14

m2

71

Waterstop
L

Water stop to swimming pool dan hot water bath

To Collection

Bill 2 page 11

Rp.

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.4 : HOTEL

Code

Description

Quantity Unit

Rate

COLLECTION
Page 9

Rp.

Page 10

Rp.

Page 11

Rp.

To Summary Bill 2.0

SUB BILL NO. 2.4 : HOTEL

Bill 2 page 12

Rp.

Rupiahs

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.5 : APARTMENT

Code

Description

Quantity Unit

Rate

Rupiahs

Vibrated reinforced concrete K-350


A

Column

261

m3

Suspended beam

554

m3

Suspended slab

1,016

m3

Suspended lift separator beam (BL)

14

m3

Bar reinforcement; deformed high tensile BJTD-40,


including bending, cutting to length and supplying and
installing all tying wire, accessories and consumable

General reinforcing bars in columns; 22mm diameter

51,525

kg

Ditto; 19mm diameter

4,012

kg

Ditto; 13mm diameter

121

kg

Stirrups and ties in columns 10 mm diameter

29,112

kg

General reinforcing bars in suspended beams; 22mm


diameter

73,162

kg

Ditto; 19mm diameter

12,997

kg

Ditto; 16mm diameter

597

kg

Ditto; 13mm diameter

1,143

kg

Stirrups and ties in suspended beams 13 mm diameter

1,592

kg

Ditto; 10mm diameter

39,562

kg

General reinforcing bars in suspended slabs; 10mm


diameter

93,412

kg

General reinforcing bars in lift separator beams; 19mm


diameter

2,926

kg

Stirrups and ties in lift separator beams 10 mm


diameter

726

kg

To Collection

Bill 2 page 13

Rp.

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.5 : APARTMENT

Code

Description

Quantity Unit

Rate

Rupiahs

Formwork
A

To sides of columns

1,896

m2

To sides of supended beams

3,730

m2

To soffit of supended slabs

8,454

m2

To edges of suspended slab 120~150mm high

1,187

To sides and soffit of lift separator beams

176

m2

To Collection

Bill 2 page 14

Rp.

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.5 : APARTMENT

Code

Description

Quantity Unit

Rate

Rupiahs

COLLECTION
Page 13

Rp.

Page 14

Rp.

To Summary Bill 2.0

SUB BILL NO. 2.5 : APARTMENT

Bill 2 page 15

Rp.

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.6 : STAIRS

Code

Description

Quantity Unit

Rate

Rupiahs

Vibrated reinforced concrete K.350


A

Staircase and landing slabs

42

M3

Stair beam

M3

Formworks
C

Soffit of landing

84

M2

Sloping soffit of staircases

129

M2

Raking sides of stair over 300 mm but not exceeding


350 mm high including cutting to profile of treads and
risers

215

LM

To riser over 150 mm but not exceeding 200 mm high

432

LM

Side and soffit stair beam

41

M2

Reinforcement Works
H

General reinforcing bars in staircase and landing;


13mm diameter

26,829

KG

General reinforcing bars in staircase and landing;


10mm diameter

1,772

KG

General reinforcing bars in stair beam; 16mm diameter

631

KG

Stirrups in stair beam; 10mm diameter

166

KG

To Summary Bill 2.0

SUB BILL NO. 2.6 : STAIRS

Bill 2 page 16

Rp.

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.7 : GROUND WATER TANK AND PONDS

Code

2.7.1

Description

Quantity Unit

Rate

Rupiahs

GROUND WATER TANK


Excavation
Note: The quantities given are the net volume, allowance for
additional excavation and backfilling to provide working space shall
be included in the unit rates

Excavation commencing from existing level

340

M3

340

M3

100

m2

100

M2

Soil disposal and backfilling


B

Remove surplus excavated material from site


Compacted sand bed

100mm Thick compacted sand layer under slab


Lean Concrete

50mm thk lean concrete under slab


Vibrated reinforced concrete K.350

Ground slab

25

M3

Wall

79

M3

Suspended slab

16

M3

Suspended Beam

0.3

M3

Formworks
I

Edges of ground slab 250mm high

85

LM

Sides of wall

788

M2

Soffit of suspended slab

106

M2

Edges of suspended slab 150mm high

95

LM

Sides of suspended beam

M2

To Collection

Bill 2 page 17

Rp.

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.7 : GROUND WATER TANK AND PONDS

Code

2.7.1

Description

Quantity Unit

Rate

Rupiahs

GROUND WATER TANK (CONT'D)


Reinforcement Works

General reinforcing bars in ground slab, 13 mm


diameter

2,504

KG

General reinforcing bars in wall, 13 mm diameter

8,523

KG

Ditto; 10mm diameter

1,906

KG

General reinforcing bars in suspended slab, 10 mm


diameter

2,731

KG

Ditto; 10mm diameter

1,963

KG

General reinforcing bars in beam, 16 mm diameter

51

KG

Stirrups and links in beam, 10 mm diameter

25

KG

Supply and install approved waterproofing system in


accordance with the manufactures instructions as
specified
H

To GWT slab

206

m2

To GWT wall

426

m2

30 mm thick protective cement and sand (1:5) screed


laid to falls over waterproof membrane as specified

To GWT slab

206

m2

To GWT wall

426

m2

95

Waterstop
L

Water stop

To Collection

Bill 2 page 18

Rp.

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.7 : GROUND WATER TANK AND PONDS

Code

Description

Quantity Unit

Rate

Rupiahs

COLLECTION

2.7.1

Page 15

Rp.

Page 16

Rp.

To Summary Bill 2.7

GROUND WATER TANK

Bill 2 page 19

Rp.

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.7 : GROUND WATER TANK AND PONDS

Code

Description

Quantity Unit

Rate

Rupiahs
-

2.7.2

POND
Vibrated reinforced concrete K-350

Suspended pond slab (ground floor)

26

m3

Suspended pond wall (ground floor)

m3

2,184

kg

Bar reinforcement; deformed high tensile BJTD-40,


including bending, cutting to length and supplying and
installing all tying wire, accessories and consumable

General reinforcing bars in pond slabs; 10mm


diameter

General reinforcing bars in pond walls; 13mm diameter

409

kg

Ditto; 10mm diameter

285

kg

Formwork
F

To soffit of pond supended slabs

168

m2

To sides of pond walls

62

m2

Supply and install approved waterproofing system in


accordance with the manufactures instructions as
specified
H

To pond slab

168

m2

To pond wall

31

m2

30 mm thick protective cement and sand (1:5) screed


laid to falls over waterproof membrane as specified

To pond slab

168

m2

To pond wall

31

m2

2.7.2

To Summary Bill 2.7

POND

Bill 2 page 20

Rp.

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUB BILL NO. 2.7 : GROUND WATER TANK AND PONDS

Code

Description

Quantity Unit

Rate

Rupiahs

SUMMARY
2.7.1

GROUND WATER TANK

Rp.

2.7.2

POND

Rp.

SUB BILL NO. 2.7 : GROUND WATER TANK AND PONDS

Bill 2 page 21

To Summary Bill 2.0

Rp.

GMI Hotel Condominium Project


Kota Deltamas

BILL NO. 2 : STRUCTURE WORKS


SUMMARY
Code

Total

Description

(Rp)

SUMMARY
SUB BILL NO. 2.1 : EARTH WORK

Rp.

SUB BILL NO. 2.2 : PILING

Rp.

SUB BILL NO. 2.3 : BASEMENT

Rp.

SUB BILL NO. 2.4 : HOTEL

Rp.

SUB BILL NO. 2.5 : APARTMENT

Rp.

SUB BILL NO. 2.6 : STAIRS

Rp.

SUB BILL NO. 2.7 : GROUND WATER TANK AND


PONDS

Rp.

BILL NO. 2 : STRUCTURE WORKS

To Final Summary

Bill 2 page 22

You might also like