Professional Documents
Culture Documents
Fme Procedure
Fme Procedure
:
Title:
PMP-2220-001-001
FOREIGN MATERIAL EXCLUSION (FME)
Alteration Cat.:
CDI/50.59:
Minor Revision
N/A
N/A
N/A
N/A
N/A
Approvals
Name
Review/Approval Type/Capacity
Date
Wendzel, Regan
Hicks, Roger
Ball, Vince R
Wygant, Richard
Oneal, Gary
Main, Troy
Rumpf, David
Krycka, Joseph A
Thompson, Steven N
Valadez, Roberto
7 Approval Authority
3 Technical Review
1 Cross-Discipline Review
1 Cross-Discipline Review
1 Validation Review
1 Cross-Discipline Review
1 Cross-Discipline Review
1 Cross-Discipline Review
1 Cross-Discipline Review
1 Cross-Discipline Review
06/20/2013 07:16
06/14/2013 15:17
06/14/2013 08:23
06/10/2013 07:31
06/07/2013 07:29
06/04/2013 13:46
05/31/2013 09:28
05/30/2013 15:26
05/30/2013 06:57
05/30/2013 06:14
Signature Comments
Approved per Acting Plant Manager Toby Woods.
Approved as written.
None
Approved with comments addressed
Change to figure2 - ? Adding "system" to pressurizer. The pressurizer IS part of the Reactor
Coolant System. Its a component NOT a system by itself.
PMP-2220-001-001
Rev. 25
Page 1 of 90
SPG
Maintenance
Document Owner
Cognizant Organization
TABLE OF CONTENTS
1
DETAILS................................................................................................. 8
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
REFERENCES.........................................................................................40
PMP-2220-001-001
Rev. 25
Page 2 of 90
SPG
Maintenance
Document Owner
Cognizant Organization
Attachment 1:
Attachment 2:
Attachment 3:
Data Sheet 1:
Data Sheet 2:
Data Sheet 3:
Data Sheet 4:
Data Sheet 5:
Data Sheet 6:
Data Sheet 7:
Figure 1:
Figure 2:
Figure 3:
Figure 4:
Information
PMP-2220-001-001
Rev. 25
Page 3 of 90
1.1
1.2
Incorporating Lessons Learned into the FME Program from on-site and
off-site sources
1.2.2
This procedure does not apply to removing items, such as pipe caps, plugs
or blank flanges, when flushing, filling, draining, sampling, or venting
systems. (If system/component is breached with a foreign object this
procedure shall apply).
Information
PMP-2220-001-001
Rev. 25
Page 4 of 90
Meaning
Buffer Zone
Fail Safe
Foreign Material
(FM)
Foreign Material
Exclusion (FME)
Foreign Material
Exclusion Area
(FME Area)
Information
PMP-2220-001-001
Rev. 25
Page 5 of 90
Meaning
Foreign Material
Exclusion (FME)
Barrier
Foreign Material
Exclusion (FME)
Boundary
FME Device
Foreign Material
Exclusion (FME)
Guideline
Foreign Material
Exclusion Monitor
(FMEM)
Foreign Material
Exclusion (FME)
Project Plan
Foreign Material
Exclusion (FME)
Requirements
Foreign Material
Intrusion
Information
PMP-2220-001-001
Rev. 25
Page 6 of 90
Meaning
The highest rating for an FME Area. The highest level of foreign
material awareness and control is desired, or a final inspection for FM is
not possible, or removal of foreign material may not be possible or
difficult. This includes the spent fuel pool and immediate adjacent areas,
and the area immediately adjacent to the containment recirculation sump.
FME Area Requirements are classified as high risk. Additionally, highrisk FME controls should be applied based on risk to systems and
components for which the introduction of FM could be irreversible.
Immediately
Retrievable
Foreign Material that can be removed without the need for additional
resources, further equipment disassembly and or use of removal
equipment.
Job Supervisor
Lanyard
Loss of FME
integrity
Non-Fail Safe
Any item that does not meet the Fail Safe definition.
Personnel
Tool/Material
Accountability Log
(PMAL)
A log sheet used to track entry and exit of personnel tools and materials
in an FME Area for accountability purposes.
PMAL Review
Reconcile PMAL
Verify items in FME area not failsafe are listed on the PMAL. All items
logged on PMAL are actually in the FME Area at completion of job or
as required by Data Sheet 1, Standard Risk FME Area Requirements,
Data Sheet 2, High Risk FME Area Requirements, and Data Sheet 5,
FME Area Inspections.
Information
PMP-2220-001-001
Rev. 25
Page 7 of 90
Meaning
Roving Monitor
Selected Plant
Systems and/or
Components
The equipment which benefits from the protection resulting from this and
sub-tier procedures. In general, this includes all equipment covered by
licensing documents and the equipment important to the operation of the
power plants.
Site FME
Coordinator
The minimum rating for an FME Area. A high level of foreign material
awareness and control is desired and an inspection to verify cleanliness
of the protected system or equipment is possible. FME Area
Requirements are classified as standard risk.
System Boundary
Breach
Un-recovered
Foreign Material
(FM)
Information
PMP-2220-001-001
Rev. 25
Page 8 of 90
DETAILS
3.1
3.2
b. Inspect:
NOTE:
Tape is not a means of FME protection, however tape can be used to secure
personal items or FME covers if necessary.
c.
All non fail-safe items to ensure that they are secure prior to
entering an FME Area (i.e. tools tethered, remove jewelry or
secured with tape (if allowed), or empty pockets, etc.)
Information
PMP-2220-001-001
Rev. 25
Page 9 of 90
f.
3.3
Discussion
a.
Information
PMP-2220-001-001
Rev. 25
Page 10 of 90
3.3.2
Identify the Job Supervisor on Data Sheet 1, Standard Risk FME Area
Requirements; or Data Sheet 2, High Risk FME Area Requirements and
ensure that the Supervisor identification is posted at the job site. [Ref 5.2.1hh]
a.
Implementation
a.
NOTE:
Information
PMP-2220-001-001
Rev. 25
Page 11 of 90
Information
PMP-2220-001-001
Rev. 25
Page 12 of 90
Responsibility
a.
Information
PMP-2220-001-001
Rev. 25
Page 13 of 90
Information
PMP-2220-001-001
Rev. 25
Page 14 of 90
e.
Information
PMP-2220-001-001
Rev. 25
Page 15 of 90
f.
Information
PMP-2220-001-001
Rev. 25
Page 16 of 90
Ensure you are an FME Ready Worker (See Figure 4, The FME
Ready Worker) prior to entering and FME Area.
i.
Training Department
Information
PMP-2220-001-001
Rev. 25
Page 17 of 90
Boundaries
a.
The FME Area boundary and the equipment breach may be the same.
b. IF the FME Area boundary and equipment breach are not the same,
THEN the FME Area boundary shall be established and posted.
c.
3.4.2
Barriers
a.
External barriers that can not physically enter a High Risk FME Area
opening do not have to be listed on Data Sheet 4, Personnel Tool and
Material Accountability Log (PMAL) (Example: cover over screen
house grating).
NOTE:
Information
PMP-2220-001-001
Rev. 25
Page 18 of 90
NOTE:
Isolation valve leakage may cause pressure build-up behind the FME barriers.
3.5
All work shall be evaluated for applicability of the FME Program. The
following statements shall be used in this determination:
a.
Information
PMP-2220-001-001
Rev. 25
Page 19 of 90
3.5.2
For task specific job activities under a large FME Area project (i.e.
Turbine, Main Condenser, Ice Condenser, etc.) the Project Manager and/or
Site FME Coordinator will ensure development of FME Area Risk Level to
capture all FME requirements for that project. [CR 04298002]
a.
3.5.3
If the project FME Area requirements do not capture the job specific
activities, create a Data Sheet 1, Standard Risk FME Area
Requirements or Data Sheet 2, High Risk FME Area Requirements, for
the specific job/task activities. [CR 04298002]
EDG fuel injection pump, pump supply manifold and duplex filter work
require cleanliness practices approaching clean room techniques in order
to be successful. To prevent particle-initiated fuel pump seizures, EDG fuel
injector pump work requires awareness, special skills and methods above
and beyond the control measures of the basic plant-wide FME Program.
These control measures are best established, enforced and adjusted
appropriately as the work progresses, by the experienced responsible EDG
Maintenance Supervisor and their crew. Based on the scope of the work,
the Job Supervisor may develop a detailed FME Task Plan identifying the
specific FME controls required.
a.
3.6
IF developing a FME Task Plan, THEN use the provided Task Plan
Template of Data Sheet 6, FME Project Plan, or an equivalent
(i.e., covers the same attributes).
Creating FME Area Requirements and Use of Guidelines [NRC Commitment 7164]
NOTE:
3.6.1
Requirements for posting include posting the level of control for the area.
Location of postings include: Listing from Figure 2, List of Area Levels, at
job site and or as directed by the Job Supervisor.
FME Area Requirements
a.
Information
PMP-2220-001-001
Rev. 25
Page 20 of 90
FME Guidelines (See Desk Top Guide High Risk FME guide)
a.
Information
PMP-2220-001-001
Rev. 25
Page 21 of 90
3.7
3.8
Jobs shall be reviewed to determine if the task is part of the FME Program,
Refer to Figure 1, FME Risk Assessment Chart. For jobs covered by FME
Program, it should be determined if the job will be conducted in an area
covered by the pre-established FME Area Standard (Refer to Figure 2, List
of Area Levels). IF the Figure 2, List of Area Levels, provides the needed
level of control, THEN establish FME Area Requirement using pre-existing
level. [Ref 5.2.1hh]
3.7.2
3.7.3
3.8.2
Information
PMP-2220-001-001
Rev. 25
Page 22 of 90
b. Continuing FME controls shall be applied for removed items that are
transported to shops or otherwise removed from normal areas.
c.
3.8.4
Figure 2, List of Area Levels and Data Sheet 1, Standard Risk FME Area
Requirements, or Data Sheet 2, High Risk FME Area Requirements should
be discussed as part of post-job critiques, when applicable. Adjustments to
the Figure 2, List of Area Levels, can be considered for future work.
3.8.5
Only Site FME Coordinator or the FME Program Owner can make changes
to a pre-established listing of Figure 2, List of Area Levels.
[Ref 5.2.1hh]
NOTE:
3.8.6
Only items that are designed for the environment and controlled by an
approved procedure may be stored in the Spent Fuel Pool or Transfer Canal.
Examples of this equipment include Fuel, Fuel Handling Tools, Ultrasonic
Test Equipment, RCA Test Fixtures, tools used for removal of debris and so
forth. Items that degrade or decompose are prohibited from storage in the
Spent Fuel Pool, or Transfer Canal.
Material storage in spent fuel pool or transfer canal is performed as
follows:
a.
Filters and other similar items SHALL not be stored in the Spent Fuel
Pool or Transfer Canal.
Information
PMP-2220-001-001
Rev. 25
Page 23 of 90
Objects that inadvertently fall into the Spent Fuel Pool, transfer canal
or reactor cavity shall be documented in accordance with PMI-7030,
Corrective Action Program.
d. Material stored in the Spent Fuel pool SHALL be stored away from the
suction and discharge line openings for Spent Fuel Pool Cooling. The
method of attachment SHALL be annotated on Data Sheet 3, Request
for Transfer or Storage of Foreign Material to SFP or Transfer Canal,
for review and approval.
3.9
Items PROHIBITED from entering any High Risk FME Area including the
Reactor Cavity, Containment and the Spent Fuel Pool FME Areas.
Paper clips
Fabric with cut edges that may be susceptible to unraveling [Ref. 5.2.1nn]
Information
PMP-2220-001-001
Rev. 25
Page 24 of 90
IF the tool card(s) cannot be removed, THEN the tool card shall
be attached to a lanyard and clipped or taped to the workers outer
garments and each card logged on the PMAL.
3.9.2
The use of wire or steel brush devices for work in High Risk FME Areas
requires the approval of the AEP Mechanical Maintenance Manager.
Barriers SHALL be used to contain or prevent bristles from entering uninspectable areas of a component or system.
3.9.3
Work activities that generate loose debris such as wire brushing, grinding,
cutting, etc., are restricted near High Risk FME Areas. Establish a buffer
zone between the debris generating activity and the High Risk FME Area or
erect a barrier or tent to capture the material.
3.9.4
Exceptions are allowed for items or activities that do not pose a threat to the
breached system.
a.
FME Inspections
NOTE:
3.10.1
Information
PMP-2220-001-001
Rev. 25
Page 25 of 90
A note in comments.
A recorded step.
3.10.2
NOTE:
Information
PMP-2220-001-001
Rev. 25
Page 26 of 90
2. The Job Supervisor may waive this Internal Parts Inspection (step
3.10.2b) IF no components have been introduced. Document on
Data Sheet 1, Standard Risk FME Area Requirements, or Data
Sheet 2, High Risk FME Area Requirements.
NOTE:
b. Inspect items leaving the FME area, items shall have no missing parts
or fasteners, except for missing parts or fasteners that were identified
and documented upon entry.
Information
PMP-2220-001-001
Rev. 25
Page 27 of 90
b. Prior to removing any FME barrier, the area around the barrier shall
be free of foreign material.
c.
3.11
NOTE:
Inside Containment, the FME Program interfaces closely with PMP-5020RTM-001, Restraint of Transient Material, 1-OHP-4030-001-002,
Containment Inspection Tours, 2-OHP-4030-001-002, Containment
Inspection Tours, and PMP-4010-CAC-001, Containment Access Control. In
many instances, the restraint of loose tools, bags, and equipment for the
purposes of PMP-5020-RTM-001, Restraint of Transient Material will also
achieve protection to the Recirculation Sump from foreign material, since the
foreign, transient material is not free to travel to a place where it can affect
system operation.
NOTE:
3.11.1
Information
PMP-2220-001-001
Rev. 25
Page 28 of 90
NOTE:
3.12.1
Buoyant consumables are easy to retrieve should they inadvertently enter the
spent fuel pool.
Use buoyant consumables items (Floating Tie Wraps and Floating Rags) in
and around the spent fuel pool area where possible.
3.13
Obtain Floating Tie Wraps and Floating Rags from the Auxiliary
Building FME Supply Cabinet (outside the Hot Tool Crib) or the FME
Coordinator.
3.13.2
Information
PMP-2220-001-001
Rev. 25
Page 29 of 90
Covers are found damaged or missing when the area has been
left unattended
3.14.3
Information
PMP-2220-001-001
Rev. 25
Page 30 of 90
3.14.4
Description
Approximate location
Approximate amount
Method of introduction
The method for locating material should be performed up to the lesser of:
Information
PMP-2220-001-001
Rev. 25
Page 31 of 90
3.14.7
3.15
3.16
Information
PMP-2220-001-001
Rev. 25
Page 32 of 90
WHEN all items listed on the PMAL have been accounted for, THEN
the Job Supervisor, Site FME Coordinator or FME Monitor shall
ensure the PMAL is closed out.
3.16.3
Disposition Codes
a.
Code
R
Descriptor
Removed
Installed*
Exchanged
Left
Verified
Transferred
Found
Use the following codes, on Data Sheet 4, Personnel Tool and Material
Accountability Log (PMAL), to indicate the disposition of items
discovered, removed or left in the FME Area.
Explanation
The item was removed from the FME Area.
Example, a tool is brought into the area and removed upon completion
of the job.
The item was installed in the FME Area.
Example, a new hanger is installed inside the area.
The item was exchanged for a similar item installed in the FME Area.
The exchanged item is the item being logged out.
Example, a valve disc or light bulb is replaced inside the area.
The item was found or dropped in FME Area and was left there.
Reference the Action number in Remarks.
The item was verified in the FME Area during FME close out.
Example, an item is in the reactor cavity FME Area and will remain
there upon FME closeout. The V Code does not apply until Closeout
Accountability
Item is still in the FMEA and has been transferred to a another Data
Sheet 4, Personnel Tool and Material Accountability Log (PMAL).
This allows the closure of a PMAL with a few items remaining while
still tracking the item in the FMEA.
Found during initial breach and removed from area. Reference the
Action number in Remarks.
* For small pieces of weld rod not installed, add a note to remarks stating small pieces not
used and removed from the FME Area, include quantity of weld rod.
Information
PMP-2220-001-001
Rev. 25
Page 33 of 90
For some FME Areas and often in conjunction with the PMAL, an FME
Control Point should be established with an FME Monitor performing the
duties identified in the General Instructions.
a.
3.16.5
NOTE:
Logging Material
NOTE:
The PMAL shall be used to log items entering an FME Area WHEN
required by a Data Sheet 1, Standard Risk FME Area Requirements or
Data Sheet 2, High Risk FME Area Requirements.
Items with missing parts or fasteners shall be logged with the location
of the missing part or fastener noted.
Information
PMP-2220-001-001
Rev. 25
Page 34 of 90
Logging instructions:
1. Independent Monitor shall document the date, name, initials, badge
number. N/A section if self monitoring.
2. Provide all information (e. g., name, quantity, detailed description)
requested as completely, legibly and accurately as possible.
3. Record time in 24-hour format.
4. Record as applicable, the FME Monitors initials on each FME
area entry and exit, IF FME Self Monitoring, THEN record the
FME Monitors initials.
5. Additional information associated with the entry may be entered in
the Remarks Section and cross-referenced to a reference number in
the Description Column.
6. To help find an item in the FME Area, enter its location on the
PMAL when practical. General location information may be used
as well as specific column numbers or alphanumeric coordinate
information.
NOTE:
The use of the T code allows the closeout of the original PMAL with a few
items remaining while the FMEA and WO are still active.
7. IF item is still in the FMEA and accountability is transferred to a
new PMAL, THEN enter T Transferred in the Code column
of the original PMAL and enter in the remarks section of the
PMAL that an item has been transferred to another PMAL.
8. Upon job closeout, shift end, or as specified in the Data Sheet 1,
Standard Risk FME Area Requirements or Data Sheet 2, High
Risk FME Area Requirements or final exit from the FME Area,
account for all items logged into the area.
a)
Information
PMP-2220-001-001
Rev. 25
Page 35 of 90
Logging Personnel
a.
TLD shall be secured to the badge lanyard and the TLD clip
attached to personal clothing
Information
PMP-2220-001-001
Rev. 25
Page 36 of 90
3.16.7
Personnel entering the Standard Risk FME Area shall: (See Figure 4,
The FME Ready Worker)
1. Remove or secure all personal and items such as tie clasps, coins,
keys, knives, jewelry, watches, etc. Tape all pockets containing
items not removed.
2. Secure eyeglasses, hearing protection, badges, or dosimetry worn
outside clothing using lanyards, Velcro or other suitable manner.
b. Personnel entering the High Risk FME Area shall: (See Figure 4, The
FME Ready Worker)
1. Remove all personal items, (i.e. jewelry, change, wallets, etc.) or
restrained/controlled as noted below from person and pockets.
NOTE:
If supervisor determines hard hat meets fail-safe criteria, then securing hard
hat is not required
2. Secure eyeglasses, hard hats, badges, or dosimetry worn outside
clothing using lanyards, chin straps, Velcro, buttons or other
suitable manner.
Information
Rev. 25
PMP-2220-001-001
Page 37 of 90
Information
PMP-2220-001-001
Rev. 25
Page 38 of 90
3. At least once per week for the Spent Fuel Pool FME Area.
c.
Tools and materials are stored in bags or bins when not in use
e.
ALL items inside an FME Area that are NOT fail safe are logged
on the PMAL
All items logged on the PMAL are actually in the FME Area
Information
PMP-2220-001-001
Rev. 25
Page 39 of 90
Training Requirements
3.17.1
3.17.2
3.17.3
The FME Program Owner or the Site FME Coordinator (FMEC) may
approve deviations from the training requirement provided the individual is
familiar with the requirements of this procedure and FME Area
Requirements and is accompanied with an individual that is FME qualified
before they engage in FME work or access a FME Area.
a.
Jobs planned after the effective date shall address FME as required by this
instruction.
3.18.2
Jobs that were planned prior to the Effective Date of this procedure will
normally be reviewed as part of the near-term planning/scheduling efforts
as well as job package quality reviews. Adjustments should be made as
necessary to convert the existing job package into the current Foreign
Material Exclusion rules.
Information
PMP-2220-001-001
Rev. 25
Page 40 of 90
FINAL CONDITIONS
4.1
There is no required reporting as part of this procedure, however, jobs which require
FME controls are expected to have a Data Sheet 1, Standard Risk FME Area
Requirements or Data Sheet 2, High Risk FME Area Requirements, which describes
the expected worker behavior and FME controls/requirements for the job task.
4.2
All applicable data sheets are completed and retained as appropriate (an electronic
form of the data sheets may be used).
REFERENCES
5.1
Use References:
5.2
5.1.1
5.1.2
5.1.3
5.1.4
5.1.5
5.1.6
5.1.7
5.1.8
5.1.9
Writing References:
5.2.1
Source References:
a.
Information
PMP-2220-001-001
Rev. 25
Page 41 of 90
f.
j.
s.
t.
Information
PMP-2220-001-001
Rev. 25
Page 42 of 90
Information
PMP-2220-001-001
Rev. 25
General References
a.
None
Page 43 of 90
Information
PMP-2220-001-001
Rev. 25
Page 44 of 90
1.1
Work Practices
Pages:
44 - 60
Work Practices
1.1.1
1.1.2
1.1.3
Housekeeping
Shop Practices
Job Preparations
Inspect the work area. IF FME controls are required for the job,
THEN inspect the work area to verify that the levels of controls
specified in the work order are correct.
Information
PMP-2220-001-001
Rev. 25
Page 45 of 90
1.1.4
Work Practices
Pages:
44 - 60
Review the work scope to determine if any changes are needed for
the FME Area designation and special requirements.
Create a log with all items that remain within the FME AREA.
Information
PMP-2220-001-001
Rev. 25
Page 46 of 90
Work Practices
Pages:
44 - 60
Ensure that items are logged into the FME AREA with a detailed
description of the item and quantity, when required.
Inspect the FME AREA and adjacent area for loose debris.
Clean the FME AREA and adjacent areas to provide the required
level of pretask cleanliness according to the cleanliness program.
Information
PMP-2220-001-001
Rev. 25
Page 47 of 90
c.
Work Practices
Pages:
44 - 60
Inspect tools for parts that may fall off, and confirm the existence
and/or tightness of a positive retention mechanism on all such
parts.
Do not use tools and equipment that contain lead, steel, or other
types of shot (for example, diver weight belts and dead blow
hammers) that have a potential for the shot to come loose and
become foreign material.
Clean all tools entering the FME AREA of all dirt, debris, and
excess lubricant that could be introduced into the system or
component.
Ensure that hoses and tubing used for venting or draining are
routed to prevent debris from being siphoned into a system.
Information
PMP-2220-001-001
Rev. 25
Page 48 of 90
Work Practices
Pages:
44 - 60
Verify that lanyards are strong enough to resist breaking if the item
does drop.
Inspect and test lanyards to ensure that they are securely attached
and are not likely to become detached during use. Stainless steel
lanyards should be checked for fraying and removed from service
if frayed
Do not suspend items by their lanyards, and never use power cords
or air hoses as lanyards.
Information
PMP-2220-001-001
Rev. 25
Page 49 of 90
Work Practices
Pages:
44 - 60
Work Activities
1. Perform pre-cleaning, as follows
Create a log with all items that remain within the FME AREA
after the zone is established, and continue to log all items that
enter or leave the area.
Information
PMP-2220-001-001
Rev. 25
Page 50 of 90
Work Practices
Pages:
44 - 60
Record all tools, parts, hoses, and tubing in the PMAL before
these enter and exit the FME AREA.
Information
PMP-2220-001-001
Rev. 25
Page 51 of 90
Work Practices
NOTE:
Pages:
44 - 60
If supervisor determines hard hat meets fail-safe criteria, then securing hard
hat is not required.
Ensure that items are logged into the FME AREA with a
detailed description of the item and quantity. It is
unacceptable to log toolbox or bag of nails, for example.
Instead, each tool in the toolbox and the number of fasteners to
be taken into the FME AREA are logged, and the minimum
quantity of each item should enter the FME AREA.
Information
PMP-2220-001-001
Rev. 25
Page 52 of 90
NOTE:
Work Practices
Pages:
44 - 60
Tape is not a means of FME protection, however tape can be used to secure
personal items or FME covers if necessary.
Avoid the use of tape inside the FME area. If its use is
necessary, the amount should be accounted for and controlled.
Remove tape residue from piping and plant systems after tape
is removed per chemical permit.
Information
PMP-2220-001-001
Rev. 25
Page 53 of 90
NOTE:
Work Practices
Pages:
44 - 60
Tape is not a means of FME protection, however tape can be used to secure
personal items or FME covers if necessary.
WHEN high air flow conditions exist, THEN secure the FME
covers with tape. Authorized tape includes Fiberglass or glass
cloth tape (See Chemical Permits 2554 and 2566)
Cat ID
Width
0463947000
0463947080 1 1 1/2
04639446690
6
04639446690
8
Ensure that the FME device will not allow the introduction of
foreign material into the system when the covers are installed
or removed. Brightly colored FME covers are preferred, to
prevent them from being left installed.
Information
PMP-2220-001-001
Rev. 25
Page 54 of 90
Work Practices
Pages:
44 - 60
Ensure that all welding residue such as slag, grinding dust, and
spatter is removed during welding or grinding inside a system.
Information
PMP-2220-001-001
Rev. 25
Page 55 of 90
Work Practices
Pages:
44 - 60
Clean all tools and parts of any excess lubricant that could be
introduced into the system.
Information
PMP-2220-001-001
Rev. 25
Page 56 of 90
Work Practices
Pages:
44 - 60
Use FME covers on vents and drains that could allow foreign
material intrusion if oriented between the 8 oclock and 4
oclock positions and if they are to be left open and
unattended. Vents and drains with drain lines that divert the
fluid to drains do not require covers.
Information
PMP-2220-001-001
Rev. 25
Page 57 of 90
Work Practices
Pages:
44 - 60
Ensure that all tools and materials have been removed from the
FME AREA and adjacent areas upon overall task completion.
Information
PMP-2220-001-001
Rev. 25
Page 58 of 90
Work Practices
Pages:
44 - 60
Ensure all wire end stripping, tie-wrap ends, and other incidental
debris are captured when the task is complete
Information
PMP-2220-001-001
Rev. 25
Page 59 of 90
Work Practices
Pages:
44 - 60
Use caution when removing fill or sample ports and sight glasses,
being sure to clean these before removal so as not to introduce
paint chips or debris into reservoirs
Clean grease fittings and verify that the grease gun injection end is
free of grit and debris when greasing motor bearings. If storing or
transporting motors, ensure air intake ports are covered
Use the proper thread sealant, ensuring that excessive sealant does
not restrict flow or contaminate the system
Secure bolts, fasteners, and clips, and inspect them to verify they
are in good shape before instrumentation is reinstalled
Information
PMP-2220-001-001
Rev. 25
Page 60 of 90
1.1.6
Work Practices
Pages:
44 - 60
Ensure the controls are rigorous enough for the entire duration if
work areas are inactive for an extended period. Perform an
inspection before resuming the work activity
Stop the work activity and implement the foreign material intrusion
actions if FME integrity is lost or if items are discovered with
undocumented missing parts or fasteners
Non-maintenance Activities
a.
Information
PMP-2220-001-001
Rev. 25
Page 61 of 90
1.1
Work Instructions
Pages:
61 - 65
This section is meant to assist Planners, Supervisors and craft in establishing proper
controls to prevent foreign materials from entering plant systems or components.
Work Order Tasks should be structured appropriately to ensure that the integrity of
the system or component is maintained by considering the following:
1.1.1
Special cutting methods when cutting into piping systems, especially for
vertical components where debris may not be visible after piping is
breached.
1.1.2
1.1.3
Should the area surrounding the work activity be posted and roped off? IF
yes, THEN define the work area and consider the following when defining
the FME boundary requirements:
1.1.4
Posting signs
Installing barriers
Can the ventilation cause dirt and debris to be introduced into the
system/component or become contaminated and spread dirt and debris to
other areas of the station? IF yes, THEN consider securing or redirecting
ventilation; installing temporary filters on supply and exhaust ducts; or
installing clean enclosures, such as glove bags or tents (with or without selfcontained ventilation systems), at the work site or in adjacent areas.
Information
PMP-2220-001-001
Rev. 25
Page 62 of 90
Work Instructions
Pages:
61 - 65
1.1.5
1.1.6
1.1.7
1.1.8
1.1.9
1.1.10
Does the work area need to be cleaned before work begins? IF yes, THEN
include instructions for cleaning the area of dirt and debris, removing
material, and cleaning overhead.
NOTE:
1.1.11
The work planner should work with Engineering to identify alternatives to the
use of lock wire installed internal to components in fluid systems such as
systems with feed water check valves.
Is lock wire being used or removed during the work activity? IF yes,
THEN include special notes to control the lock wire and trimmings when
the lock wire is installed or removed.
Information
PMP-2220-001-001
Rev. 25
Page 63 of 90
Work Instructions
Pages:
61 - 65
1.1.12
1.1.13
When gaskets are to be replaced in piping systems, restrict the use of wirewound gasket types that are likely to degrade and release wire-like debris
into fluid systems. Some gasket types are known to degrade and, in some
cases, to introduce wire-like debris into systems. Gasket material has been
directly linked to fuel failures and steam generator tube breaks.
1.1.14
In general, do not use wire or steel brush devices for work in FME highrisk areas. Mechanical Maintenance Manager management approval is
required for the use of wire or steel brush devices in these areas. Controls
over their use should include actions to retain control of any loose bristles,
as well as a thorough closeout inspection following the work.
1.1.15
Evaluate the potential spread of loose bristles from a wire or steel brush
device being used outside of an FME high-risk area. IF the bristles could
be directed into the area, THEN erect barriers or tents to capture the
bristles. Consider similar controls for frayed wire ends, stud hole cleaning
tools, and other devices that could create small, metallic, wire-like debris.
1.1.16
Specify the use of buoyant consumables in and around the spent fuel pool
area where applicable/practical.
1.1.17
1.1.18
Add controls for management personnel to periodically inspect the SFP and
surrounding FME high-risk area for cleanliness. Inspection criteria should
include the following:
Information
PMP-2220-001-001
Rev. 25
Page 64 of 90
Work Instructions
1.2
Pages:
61 - 65
1.1.19
1.1.20
1.1.21
1.1.22
1.1.23
The handling of new fuel and reload fuel can increase vulnerability to
debris intrusion. The following are appropriate practices for fuel-handling
activities:
High-Risk FME controls shall be in effect for new fuel from the
moment the shipping containers are opened on site. Perform
receipt inspection of new fuel, because fabrication and preparation
for shipment may have resulted in debris intrusion into the new
fuel.
When obtaining previously discharged fuel from the spent fuel pool
for reinsertion into the reactor core, visually inspect the assembly
to ensure it is free of debris.
Include operating experience in the work instructions, and use it during pre-job
briefings to reinforce expectations and to ensure that stations not only learn from
others but do not repeat similar occurrences. Relevant OE can be found on the
INPO Web site.
Information
PMP-2220-001-001
Rev. 25
Page 65 of 90
NOTE:
1.3
Work Instructions
Pages:
61 - 65
FME plans are developed to define specific FME requirements but should not
supersede any FME programmatic guidance.
Develop FME plans for more complex and critical activities commensurate with the
probability and consequences of foreign material intrusion. When determining if a
plan is required consider the following questions:
Does the work generate particulate where a visual closeout inspection would
not ensure all debris has been removed and the material would be difficult
to retrieve?
Does the work entail multiple work groups, large component replacement,
or multiple system breaches?
1.3.1
Information
PMP-2220-001-001
Rev. 25
Page 66 of 90
1.1
1.2
Material Storage
Pages:
66 - 67
Warehouse Practices
1.2.1
NOTE:
Tape is not a means of FME protection, however tape can be used to secure
personal items or FME covers if necessary.
Use only caps, plugs, tapes, or adhesives that are made of materials
that enable them to perform their intended function without causing
deleterious effects on items or in systems operation.
Information
PMP-2220-001-001
Rev. 25
Page 67 of 90
NOTE:
1.3
Material Storage
Pages:
66 - 67
Tape is not a means of FME protection, however tape can be used to secure
personal items or FME covers if necessary.
Ensure that stored items have all covers, caps, plugs, and other
closures intact. If covers are removed for internal access, at any time
and for any reason, perform an inspection. Following inspection,
replace the covers and reseal openings to preserve FME integrity.
Tape is not a method for FME protection. However, tape can be used
to hold or attach, or secure FME protection. Dependent on the type
used, tape can leave a residue that may have detrimental affects on
components. Remove any tape residue after use.
Inspect hoses and hose fittings for foreign material during bulk
chemical deliveries before connecting to plant piping, to prevent
foreign material from being introduced.
Maintain the warehouse free of debris and possible foreign objects that
could enter material. Check for cleanliness and orderliness on a
continuing basis to meet program requirements. Do not permit trash to
accumulate in receipt or storage areas.
Issued Material
Materials delivered to the plant must meet the FME requirements, with
covers installed. Store materials properly until installed in the plant or
returned to the warehouse. Materials being returned to the warehouse
should have the proper FME covers installed while being transported and
when returned to inventory. If security searches are required, FME covers
should be reinstalled after the search.
Information
PMP-2220-001-001
Rev. 25
Page 68 of 90
Material Storage
Pages:
66 - 67
Prior to sending equipment off site for service or repair, implement proper
FME controls. Ensure that the equipment is properly packaged for
transportation and that controls are in place while the equipment is at the
service facility
Information
PMP-2220-001-001
Rev. 25
Page 69 of 90
NOTE:
Pages:
69 - 69
Location:_____________________________________________________________________________________
Work Order Task /Procedure: ____________________________________________________________________
Job Description: _______________________________________________________________________________
Check each box as applicable:
Yes
No
Yes
No
FME-job brief
Personnel Tool and Material Accountability Log
(PMAL)
Secure/Redirect ventilation
FME barriers/devices used
Remove nonessential materials from area
Check hoses for cleanliness prior to use
Clean area prior to starting work
No Clear, unlabeled plastic
Clean overhead areas
Examine Tools Prior to Entering FME Area
Install Boundaries around area
Remove or Secure personal objects from pockets
Post Signs
Lanyard tools, badges, TLDs or other items
Control Access/Control Point
Monitor T
Self Monitor T
(Step 3.16.8a, b, c) FME Area Walkdown:
(Step 3.16.8c, d) PMAL Accuracy Review:
(Step 3.16.8e) PMAL Reconciliation Review: Yes T Waived T Shiftly T Other ________
Additional Requirements/Remarks: ______________________________________________________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
Approved by: _________________________________________________________________________________
Job Supervisor/Designee or Site FME Coordinator: Print
Signature
Date
Change Approval: _________________________________________ / ________________
Job Supervisor or Site FME Coordinator
Date
(Step 3.10.2a) As Found Breach Inspection Performed by: ____________________________ Date: __________
(Step 3.10.2b) Internal Part(s) Inspection
(Step 3.10.2d) System has been inspected for foreign material and results recorded in the Additional Requirements/Remarks
section. [NRC Commitment 1222]
Job Supervisor_________________________
Date _________
Signature
Final conditions:
Tools, Materials, FME Area Postings and Boundaries, etc. removed (and PMAL closed if Applicable)
Job Supervisor ________________________ Date _________
Signature
Information
PMP-2220-001-001
Rev. 25
Page 70 of 90
Pages:
70 to 70
Location: ____________________________________________________________________________________
Work Order Task /Procedure: ____________________________________________________________________
Job Description: _______________________________________________________________________________
Check each box as applicable:
Yes
No
Yes
No
FME brief at
Personnel Tool and Material Accountability
Job site T Alternate Location T
Log (PMAL)
(CR 04218086)
Secure/Redirect ventilation
Remove nonessential materials from area
Clean area prior to starting work
Clean overhead areas
Install Boundary around area
Post Signs
Control Access/Control Point
Monitor T
Self Monitor T
(Step 3.16.8a, b, c) FME Area Walkdown:
(Step 3.16.8c, d) PMAL Accuracy Review:
(Step 3.16.8e) PMAL Reconciliation Review: Yes T Waived T Shiftly T Other ________
(Step 3.16.5e)All lifting/rigging equipment has been inspected for loose or missing parts prior to entering FMEA
____________________________________________
Inspection Performed by
(Step 3.16.5e)All lifting/rigging equipment has been inspected for loose or missing parts upon removal from the FMEA
____________________________________________
Inspection Performed by
Additional Requirements/Remarks: ______________________________________________________________
_____________________________________________________________________________________________
AEP Manager Approval: ____________________________________________________________________________
AEP Manager Review and approval [CR 04218086]: Print
Signature
Date
Change Approval: _________________________________________ / ________________
AEP Manager
Date
(Step 3.10.2a) As Found Breach Inspection Performed by: ____________________________ Date: __________
(Step 3.10.2b) Internal Part(s) Inspection
(Step 3.10.2d) System has been inspected for foreign material and results recorded in the Additional Requirements/Remarks section.
Information
PMP-2220-001-001
Rev. 25
Page 71 of 90
Data Sheet 3
NOTE:
Pages:
71
Use N/A for steps that do not apply. Material stored in the Spent Fuel pool SHALL be
stored away from the suction and discharge line openings for Spent Fuel Pit Cooling.
Determined by:
Date
If the materials in step 1 have been found acceptable for storage, the requester is to initiate an Action
Request for removal of the materials prior to the end of the approved storage period listed in step 4.
AI #
Dept.
Date
T Not Approved
Engineer
8.
Date
Materials transferred to the SFP or Transfer Canal were tagged appropriately, AND
Storage Location:
Transfer By:
Date:
Date
10 Forward these data sheets or copies of, to Containment/SFP System Engineering and Reactor Engineering
for documentation.
Received By:
Date
PMP-2220-001-001
Information
Rev. 25
Page 72 of 90
Data Sheet 4
Pages:
72 - 72
Location or Component
* Logging responsible individuals name indicates that the individual is a FME Ready Worker prior to entering FMEA (See Figure 4)
Date
In
Time In
Responsible
Individuals
Last Name
Monitor
Initials
OCA #
Location
Date
Out
**Codes: R-Removed from area I-Installed and will remain L-Found or dropped in the area and left E-Exchanged for a
like item in the area V-Verified in the FME area T-Transferred to another PMAL F- Found during initial breach and
removed from area
Date
Monitor Name (print)
Initials
Time
Out
Monitor
Initials
Badge #
Reviewed By:
Date:
Page
of
FME Coordinator/Supervisor/Monitor
Retain completed forms with the WOT until the job is closed out, then form can be discarded. Retained by the Job Supervisor or Site FME
Coordinator for large areas during outages.
(Note: An Equivalent Electronic PMAL form may be used. Reference section 3.16.5)
**
Code
Information
Rev. 25
PMP-2220-001-001
Page 73 of 90
Page:
73
Location
Unit #:
Outage:
Page:
of
Continued T Yes
T NO
Shift
1
1
1
2
2
2
3
3
3
Time
Activity
FME Area Walkdown
Performers Name
OCA Badge #
PMAL Accuracy
Review
PMAL Reconciliation
Review
FME Area Walkdown
PMAL Accuracy
Review
PMAL Reconciliation
Review
FME Area Walkdown
PMAL Accuracy
Review
PMAL Reconciliation
Review
Remarks
Walkdown includes an evaluation of FME area housekeeping and FME barrier integrity.
Retain completed forms with the WOT until the job is closed out, then form can be discarded. Retained by the Job Supervisor or
Site FME Coordinator for large areas during outages.
(Note: An Equivalent or Electronic Walkdown, Review, and Reconciliation form may be used.)
Information
Rev. 25
PMP-2220-001-001
Page 74 of 90
Pages:
74 - 78
*Guidance to determine if an FME Project Plan is required can be found on the last page of this form.*
Title:
Revision Number:
Sign
Date
Project/HIT Lead
Project Mgmt
Sponsor
FME Coordinator
Maintenance Mgr.
Approved FME Project Plan will be included in the Work Package and is required to be at the worksite
with the FME Monitor.
Information
PMP-2220-001-001
Rev. 25
Page 75 of 90
Pages:
74 - 78
Work Order:
2.
3.
(This will help understand Potential FME Risks from other work in area and
to schedule FME support.)
4.
References:
5.
Work Scope:
(Briefly describe the work activities and the areas/actions that have the
potential to introduce foreign material.)
6.
General Requirements:
7.
8.
Housekeeping:
9.
FME Inspections/Closeout:
10.
Contingency
Plan/Recovery Plan:
11.
Responsibilities:
(Define who has ownership and their responsibilities specific to the FME
Plan.)
Information
PMP-2220-001-001
Rev. 25
Page 76 of 90
Pages:
74 - 78
12.
(Describe the FME boundary and how it will be established. How access will be
controlled. Include area maps or sketches as applicable.)
13.
FME Monitor or
Oversight
Requirements:
(This should list what Monitor, Roving Monitor (if applicable), Job Supervisor
and Oversight your project will require and who is providing.)
14.
(List all known devices needed and identify special needs materials to ensure
timely procurement. Ensure all required FME devices are staged prior to start
of project/task)
15.
Training Requirements:
16.
Wire Wheel/Brush
Control:
(Wire Wheel and Brushes are only to be used if there is not a suitable substitute
for the job being performed. If a suitable alternative product is not available
then the necessary measures need to be put in place to ensure all debris is
controlled and a complete closeout inspection has been done. Those measures
need to be listed in the plan.)
17.
Debris Generating
Activity Controls:
(Description of the controls to prevent FMI during activities like welding, drilling
and machining.)
18.
Material Storage
Controls:
19.
Rigging Material
Accountability:
20.
Other Specific
Requirements:
(Use for any additional controls or requirements that are being used to ensure
success but not covered by other sections. Examples may be contractors gang
boxes, special control measures during breaches or specific task scheduling
requirements.)
21.
Emergency Response:
In the event of an emergency FME controls are not to interfere with emergency responders. Job Supervisor and
Monitor will make an attempt to observe the evolution for evidence that integrity may have been lost. After the
response to the event is complete then the area will be inspected and verified free of foreign material. IF the area is
verified clean THEN continue with established logging requirements. IF unaccounted debris is identified THEN
carry out the procedural requirements of PMP-2220-001-001 for a loss of foreign material integrity.
Information
PMP-2220-001-001
Rev. 25
Page 77 of 90
Pages:
74 - 78
1.
2.
3.
4.
5.
6.
Complete the following checklist to determine the need for an FME Project Plan. The
criterion comes from PMP-2220-001-001, Foreign Material Exclusion (FME).
Is the work to be performed in a continuously exposed High Risk FMEA like the Spent
Fuel Pool or Refueling Cavity, as shown on Figure 2 of PMP-2220-001-001?
Yes
No
Do existing procedures lack specific FME controls for each breach, opening or removal
evolution to be performed during the activity?
Yes
No
Is the work to be performed on equipment, such as control oil systems and close tolerance
equipment, extremely sensitive to foreign material intrusion?
Yes
Based on work scope, consider the use of a FME Project Plan or continue
to next question.
No
Does the work generate particulate where a visual closeout inspection would not ensure all
debris has been removed and the material would be difficult to retrieve?
Yes
Based on work scope, consider the use of a FME Project Plan or continue
to next question.
No
Does the work entail multiple work groups, large component replacement/overhaul, major
plant modification or multiple system breaches?
Yes
No
Uncertain
IF question 5 above is uncertain, THEN the FME Program Owner or Site Coordinator
determines the need for FME Project Plan.
Yes
No
Information
PMP-2220-001-001
Rev. 25
Page 78 of 90
Pages:
74 - 78
3.
Complete the FME Project Plan Data Sheet 6. Each predefined section shall be included in
the plan. If a section does not apply, then you must provide justification for its exclusion in
the affected section.
4.
Review and approval of the plan must be done prior to work start. If the plan requires
revision it must go thru the same approval process unless otherwise determined by the FME
Program Owner or Site FME Coordinator.
5.
The approved FME Project Plan should be covered in the pre-job brief to ensure
understanding from all workers who will be performing functions in the area.
6.
A copy of the approved FME Plan will be at the FME Area access for review as required.
Information
PMP-2220-001-001
Rev. 25
Page 79 of 90
Purpose:
Pages:
79 - 79
Document the approval of a waiver for the site FME Qualification per step 3.16.2 of
PMP-2220-001-001, Foreign Material Exclusion (FME) procedure. Personnel
granted this waiver will be allowed entry into FME Areas without completing the site
FME Qualification per this waiver and if meeting the stated conditions.
5 Must sign that they acknowledge and accept these conditions for waiver.
6 Host/Sponsor signs this form accepting the responsibility to brief and control the
waived visitor and accepts accountability for their actions and for maintaining the
requirements of the FME Area and the FME Procedure.
Applicant:
Name
Affiliation/Company
Name
Department
Sponsor:
Location(s)/Activity: (Provide description of location and planned activity)
I agree to and understand the conditions stated above. I understand that compliance with these
conditions is the basis for this waiver approval.
Applicant (Sign/Date)
Sponsor (Sign/Date)
Sign/ Date
This waiver will expire seven days after approval unless an extension is granted.
Extension
approved:
Title / Sign / Date
Forward a copy of the signed form to Site FME Coordinator. (PDF is preferred)
Title
Expires
Information
Rev. 25
PMP-2220-001-001
Page 80 of 90
No
Implement Housekeeping
controls per PMP-2220-HSK-001
and good FME awareness
Pages:
80
Yes
Yes
No
Is it possible to
inspect all areas of the
breach prior to closeout?
No
Yes
If FM is introduced
into the system/equip, can it
be easily located and
immediately
retrieved?
Yes
No
NOTE: Activities considered normal operations (vent, drain, tank sounding, etc) are exempt from the controls in this procedure,
step 3.2.3.a.1. However, good housekeeping and FME awareness should be utilized to prevent FM introduction to plant systems
and components.
Information
PMP-2220-001-001
Rev. 25
Page 81 of 90
Page:
81 - 83
Information
PMP-2220-001-001
Rev. 25
Page 82 of 90
Page:
81 - 83
[CR 02175037]
Information
PMP-2220-001-001
Rev. 25
Page 83 of 90
Page:
81 - 83
Information
PMP-2220-001-001
Rev. 25
Page 84 of 90
NOTE:
1.1
Pages:
84 - 89
The following information is covered during the pre-job briefings for all High
Risk work and work requiring a PMAL.
1.1.2
1.1.3
1.1.4
Unpacks parts, tools, material, etc. prior to entering the FMEA, when
possible.
1.1.5
1.1.6
1.1.7
1.1.8
Ensures the designated FME Monitors are aware of parts, tools, and
materials taken into and removed from the FME High Risk areas and Peer
Checks the FME Monitor for PMAL accuracy for the entry and exit.
1.1.9
1.1.10
1.1.11
Ensure you are an FME Ready Worker (See Figure 4, The FME Ready
Worker) prior to entering and FME Area.
Information
PMP-2220-001-001
Rev. 25
Page 85 of 90
Pages:
84 - 89
1.2.2
Provides oversight and coaching to ensure FME controls and practices are
implemented for activities within their area of responsibility.
1.2.3
1.2.4
1.2.5
1.2.6
1.2.7
1.2.8
1.2.9
1.2.10
1.2.11
1.2.12
Ensures Actions are initiated, if FME requirements have not been met.
1.2.13
Information
PMP-2220-001-001
Rev. 25
Page 86 of 90
Pages:
84 - 89
1.3.2
1.3.3
1.3.4
1.3.5
Inspects all personnel and material for conditions that could result in a loss
of FME controls prior to authorizing entry into an FME High Risk area or
FME Standard Risk area.
Ensure that the person entering the FME Area has Work Supervisor
authorization to enter the FME Area and the person has been briefed on
required FME controls.
Personnel entering the Standard Risk FME Area shall: (See Figure 4,
The FME Ready Worker)
Remove or secure all personal and items such as tie clasps, coins,
keys, knives, jewelry, watches, etc. Tape all pockets containing
items not removed.
Information
PMP-2220-001-001
Rev. 25
Page 87 of 90
Pages:
84 - 89
Personnel entering the High Risk FME Area shall: (See Figure 4,
The FME Ready Worker)
1.3.6
Authorizes personnel entry into FME High Risk area or FME Standard
Risk area when a FME Monitor is being utilized.
1.3.7
Provides guidance to personnel who are not familiar with the job specific
FMEA controls and have not attended a pre-job brief for entry into the
FMEA.
1.3.8
Logs all tools and material on Data Sheet 4, Personnel Tool and Material
Accountability Log (PMAL).
1.3.9
Monitors work activities, exercises Stop Work authority and notifies the
FME Coordinator and Work Group Supervisor of any unresolved problems.
Information
PMP-2220-001-001
Rev. 25
Page 88 of 90
1.3.11
1.3.12
Pages:
84 - 89
Performs periodic review of the FMEA to ensure standards are being met.
Check items inside the FME Area to ensure Data Sheet 4, Personnel
Tool and Material Accountability Log (PMAL) is accurate at least once
per shift.
Enter old page and line number of transferred item in the remarks
section of the new page.
Enter note in the remarks section of the Data Sheet 4 page being closed
stating new page and line number of transferred item.
Ensure that items have been properly logged out of the Data Sheet 4.
Information
PMP-2220-001-001
Rev. 25
Page 89 of 90
1.3.13
1.3.14
Pages:
84 - 89
Ensure that all items are accounted for by reviewing the Data
Sheet 4 and FME Area walk down.
Information
PMP-2220-001-001
Rev. 25
Page 90 of 90
Pages:
90 - 90
REVISION SUMMARY
Procedure No.: PMP-2220-001-001
Title: Foreign Material Exclusion (FME)
Rev. No.:
25
Alteration
Section 2 added definition of Roving Monitor
Justification
Recommendation from Program Owner
Page 1 of 4
REVISION SUMMARY
Procedure No.: PMP-2220-001-001
Title: Foreign Material Exclusion (FME)
Alteration
3.16.6c added 2 bullets describing how TLDs
and Electronic Dosimetry (ED) are secured
Rev. No.:
25
Justification
Recommendation from Program Owner
Page 2 of 4
REVISION SUMMARY
Procedure No.: PMP-2220-001-001
Title: Foreign Material Exclusion (FME)
Rev. No.:
25
Alteration
Data Sheet 4 added Date In and Date Out
Columns; Removed M-Moved code; Added FFound code
Added Date Column next to Monitors Name
( no marginal marking)
Justification
Recommendation from Program Owner
GT 2013-1470-1
GT 2013-6287-1
These changes involve administrative procedures governing the conduct of facility operations. There
are no systems, structures or components affected by this procedure or its revision. The governing
process covers all aspects of these proposed activities therefore a 50.59 review is NOT required.
Page 3 of 4
REVISION SUMMARY
Procedure No.: PMP-2220-001-001
Title: Foreign Material Exclusion (FME)
Rev. No.:
25
IMPLEMENTATION PLAN
Summary of Change
See Rev Summary
Reason for Change
See Rev Summary
Implementation Schedule
Approved and effective after 8/18/2011
Training Needs
None
Expiration Date
N/A
Required Basis Documents Update
None
Related Processes and Procedures
None
Transition Plan
Previous revisions of Procedure Forms may be used in accordance with
PMP-2010-PRC-003 requirements.
Related Equipment Modifications
None
Communication Plan
Change to be communicated by program owner to plant.
Special Tools, Aids, Permits, Etc.
None
Related Action Requests
GT 2013-1470-1, GT 2011-7342 18, GT 2013-6287-1