Professional Documents
Culture Documents
Sports, Tourism, Archaeology & Museums and Youth Affairs Department, Government of Khyber Pakhtunkhwa
Sports, Tourism, Archaeology & Museums and Youth Affairs Department, Government of Khyber Pakhtunkhwa
2nd Revision
PC-I
OF THE
ADP 2014-16
SCHEME NAMELY
Establishment of Engineering Wing for Sports, Archeology, Museums, Tourism and Youth Affairs Department ADP 2013-14 (R-DDWP).
1|Page
Revised 2005
GOVERNMENT OF PAKISTAN
PLANNING COMMISSION
PC-I FORM
(SOCIAL SECTORS)
1.
2.
Location
Khyber Pakhtunkhwa
3.
ii. Execution
4.
Plan provision
5.
6.
Establishment of Engineering Wing for Sports, Archeology, Museums, Tourism and Youth Affairs Department ADP 2013-14 (R-DDWP).
2|Page
7.
NAME OF COMPONENT
1.
Director/Chief Engineer
BPS-20 Fix Pay of 100,000
2.
3.
4.
ADP 2014-15
Rs. In Million(December
2014 to June 2015)
0.7
Funds Available
One Architecture/Designer,
BPS-17 fix pay of 45,000/- Per Month.
Two Assistant Directors/ Civil Engineer,
BPS-17 fix pay of 45,000/- Per Month.
do
do
5.
do
6.
Two Supervisor,
BPS-16 on fix pay @ Rs. 30,000/- Per Month.
do
7.
8.
Two Draftsman,
BPS-15 on fix pay @ Rs. 15,000/- Per Month
Computer Operator,
BPS-15 on fix pay @ Rs. 15,000/- Per Month.
do
do
9.
Assistant
BPS-11 on fix pay @ Rs. 15,000/- Per Month.
do
10.
Clerk
BPS-09 on fix pay @ Rs. 10,000/- Per Month.
do
11.
do
12.
do
13.
do
14.
do
15.
Others
do
16.
0.300
Total Rs.
1.000M
7.2
(A)
ToRs
Director
*Award of Technical
sanction.
*Director will work
as Chief Engineer
like C&W Department.
Establishment of Engineering Wing for Sports, Archeology, Museums, Tourism and Youth Affairs Department ADP 2013-14 (R-DDWP).
3|Page
Incharge engineer
*Responsible for
overall activities
(Planning to
Execution).
*I/C will work as in
charge like C&W
Lead Engineer
Department.
*Formation of PC-1
(Responsible for all
Assistant Engineers
Monitoring &
Evaluation Officer
Sub-Engineer
report
*Checking the site
done on site.
*Checking/verifying
the Bill submitted.
7.3
Establishment of Engineering Wing for Sports, Archeology, Museums, Tourism and Youth Affairs Department ADP 2013-14 (R-DDWP).
4|Page
Chief Engineer
Lead
Engineer
Assistant
Engineer
Assistant
Engineer
7.4
Establishment of Engineering Wing for Sports, Archeology, Museums, Tourism and Youth Affairs Department ADP 2013-14 (R-DDWP).
5|Page
Establishment of Engineering Wing for Sports, Archeology, Museums, Tourism and Youth Affairs Department ADP 2013-14 (R-DDWP).
6|Page
Establishment of Engineering Wing for Sports, Archeology, Museums, Tourism and Youth Affairs Department ADP 2013-14 (R-DDWP).
7|Page
7.5
List of Schemes Requiring Technical Sanction
Establishment of Engineering Wing for Sports, Archeology, Museums, Tourism and Youth Affairs Department ADP 2013-14 (R-DDWP).
8|Page
S.No.
ADP.NO
1
2
741-10027
NON-ADP
637-120214
636-120212
637-120214
625-120647
625-120647
625-120647
625-120647
10
626-120890
11
626-120890
12
626-120890
13
634-110562
14
633-110103
15
640-120096
16
NON-ADP
Project Name
Abdal Hockey stadium
Olympic plaza
Rehibilitation Of Kalabat Township
Stadium,District Harripure
Provision Of Hockey Turf At Sports
Complex Mardan
Rehibilitation Of Kohat Sports Complex,
Kohat
Rehabilitation of Rest House and
Construction of cottages at Batakundi,
Naran
Construction of Rest House at Nathya
Gali
Rehabilitation of Rest House at Tandyani
Rehabilitation of Rest House & Children
Park at Bahrain
Day Time facility at Lake Saifal Maluk
Tourists facility and family Cottages at
Batta Kundi Narran
Rehabilitation of Chitral Rest House at
Garam Chasma
Establishment Of Water Sports
Recreational Facilities In Sardaryab
Rehabilitation of Hayatabad Sports
Complex Peshawar
Youth center at chitral
Apartment and Shopes at Qayyum
Stadium Peshawar
Estimated
cost
15.48M
45.4M
10M
50M
20M
21.03 M
26.017M
6.409 M
6.456 M
15.28 M
50.16 M
8.76M
50M
127.9M
20M
24.324M
8.
9.
Establishment of Engineering Wing for Sports, Archeology, Museums, Tourism and Youth Affairs Department ADP 2013-14 (R-DDWP).
9|Page
10.
II
NONE
NONE
NONE
Rs.1.000M (on the revenue side)
Establishment, O&M expenses will be borne by
Finance
Department
after
successful
completion of the PC-I.
(c)
Private Investment
NONE
(d)
NONE
(e)
Non-Government borrowing.
NONE
(f)
Other sources
(e.g. Recoveries)
NONE
(a)
(b)
11.
Grant
Loan
Equity Investment
Direct Government
Expenditure
Establishment of Engineering Wing for Sports, Archeology, Museums, Tourism and Youth Affairs Department ADP 2013-14 (R-DDWP).
10 | P a g e
13.
14.
Certified that the project proposal has been prepared on the basis of guidelines provided by
the Planning Commission for the preparation of PC-I for Social Sectors.
The cost estimates are according to the open market rates.
PREPARED BY:
_________________________
Khalid Khan
Section Officer (General)ADMN / PLANNING OFFICER,
TOURISM CORPORATION, KHYBER PAKHTUNKHWA
CHECKED BY:
_________________________
Hayat Ali
CHIEF PLANNING OFFICER
SPORTS & YOUTH AFFAIRS DEPARTMENT
APPROVED BY
______________________________
(Aftab Ahmad Ali Shahzada)
SECRETARY TO GOVERNMENT OF KHYBER PAKHTUNKHWA
SPORTS, TOURISM ARCHEOLOGY,
MUSEUMS AND YOUTH AFFAIRS DEPARTMENT
Establishment of Engineering Wing for Sports, Archeology, Museums, Tourism and Youth Affairs Department ADP 2013-14 (R-DDWP).
11 | P a g e