Circulating Fluidized Bed Technology
Circulating Fluidized Bed Technology
FW Worldwide Offices
A global business with approximately 12,000 highly-skilled people
FW Worldwide Offices
N. D. de Gravenchon
Teesside
Glasgow
Zug/Geneva
Varkaus
Helsinki
Des Plaines, IL
Norrkping
Clinton, NJ
Reading
Paris
Calgary
McGregor, TX
Milan
Madrid
Atlanta, GA
Melbourne, FL
Houston
Basel
Philadelphia, PA
Emeryville, CA
Denver, CO
Moscow
Vitrolles
Warsaw
Sosnowiec
Istanbul
New Delhi
Al-Khobar
Kolkata
Abu Dhabi
Bangkok
Trinidad
Chennai
Caracas
Tarragona
So Paolo
Santiago
Kuala
Lumpur
Singapore
Beijing
Shanghai
Xinhui
Hanoi
Manila
Sriracha
Ban Chang
Brune
i
Jakarta
Midrand
Auxiliary Equipment
-
Condensers
Feedwater Heaters
Biomass Gasifiers
Aftermarket Services
-
Environmental Products
-
Plant Operation
3
MWe
PC
325
106,770
CFB
385
28,037
323
41,537
HRSG
355
18,476
Industrial
963
13,591
PC Boilers
2,351
208,681
Total
800
Others
8%
Others
28%
FW
72%
500
Samcheok
USC
4 Units
FW
92%
Lagisza
400
All CFB's
300
200
Turow 1
Nova Scotia
Tri State
100
Pilot Plant
Oriental Chem
0
1979
1981
JEA
1984
1986
Vaskalouden
General Motors
1987
1990
1993
1998
2001
2009
2015
Unit Start-up Year
Coal
Woody
Biomass
Coal
Wood residue
Anthracite
Bark
Anthracite
Bark
Bituminous
Bituminous
Chips
Wood Chips
Sub-bituminous
Wood
dust
Subbituminous
Sawdust
Lignite
ForestResidues
residue
Lignite
Forest
Willow/Salix
Waste Coal
Waste coal
Anthracite Culm
Bituminous gob
Bituminous Gob
Anthracite culm
Coal
Slurry
Coal
slurry
Oil Shale
Petroleum coke
Delayed
Fluid Peat
Agricultural waste
Agricultural
Straw
Residues
Olive waste
Olive Waste
Straw
Bagasse
Rice Husk
Sludge
Sunflower
Paper
mill
De-inking
Dried Fruits
Municipal
etc.
Waste Derived
Recycled
Wood Fuels
Recycled
Wood/Paper
Tire Derived
Fuel
Plastics
Solid
SolidRecovered
Recovered Fuel
Fuel
Tire Derived Fuel
Waste paper
Sludge
Pulp and Paper Mill
Gas Municipal
Natural
Gas
Off gases
Oil
Oil
Petroleum Coke
Oil shale
Peat
80
70
60
1983
1987
1988
1989
1990
1992
1993
1995
1996
1997
1998
2000
2002
2003
2004
2005
2006
2007
2007
2008
2009
2009
2010
2012
2012
2015
Waste
4%
Biomass
9%
Peat
5%
Petcoke
12%
Oil-shale
1%
Coal
69%
50
40
30
20
10
Delivery year
2009 Lagisza 460 Mwe Project in Poland in Commercial Operation Worlds first Super
Critical CFB and Worlds Largest CFB
2011 Kospo Samcheok Green Power Project Korea 4 x 550 Mwe Supercritical CFBC
Units _ Construction Begins
12
15
A New Era for Green Power 4 x 550 MWe CFB Supercritical Units
Launches the CFB Super
Critical platform to compete on
a 1000 MWe Scale
Features State-of-the-art
Utility CFB Technology
4 x 550 MWe CFBs powering
2 x 1000 MWe steam turbines
Advanced supercritical vertical
tube steam technology
603/603 C Steam
Temperatures
Firing a wide range of import
and domestic coals including
biomass
Commercial Operation expected
English
Metric
Steam Capacity
Unit Steam Flow
(SH/RH)
Main Steam
Pressure (SH/RH)
Main Steam Temp.
550 MWe
3,461 / 2,820
kpph
1,600 MWth
437 / 354
kg/s
Full Load
Emissions
Fuel : Coal
17
Boiler Performance
State of the art supercritical steam values
Main steam 436.7 kg/s, 256.5 bar(a), 603oC
Reheated steam 356.4 kg/s, 53.1 bar(a), 603oC
=> Estimated plant net efficiency (LHV) 42.4%
Fuel Flexibility
Wide coal range:
Moisture
20 43%
Ash in dry fuel 1.2 17.0% in dry fuel
Sulfur in dry fuel
0.1 - 1.0% in dry fuel
Biomass co-firing (5%)
Low emissions
SOx 50 ppmv achieved with limestone injection to furnace
No separate DeSOx plant needed
NOx 50 ppmv with SCR plant
18
Fuel Price
Differential
600 MWe (Net) Supercritical CFB Coal Power Plant Operating at 90% Capacity Factor
Potential Value
of Fuel
Flexibility
20
Conclusions
The CFB boiler has long been viewed and accepted in the industry as viable
technology in the 20 -350 MWe sub critical class units.
30 Million plus hours of CFB operating experience with high availability
demonstrated
CFBs ability to burn low rank and waste coals available at lower economical
pricing
Secure future fuel contracts based on price not technology
Co-fire biomass to satisfy renewable (green) programs if neccessary
Foster Wheeler CFB units are offered in larger sizes up to 800 MWe with super
critical steam values.
Proven track record with Lagisza in commercial operation tied to Polish National
Grid for 3 years
Kospo Samcheok Super Critical CFBs competed head to head and were selected
over PC due to the multiple fuel capability which allows for more favorable
emission flexibility as well as reduced variable O&M costs.
FW is developing a 300 Mwe oxy fire CFB for the Compostilla CCS power plant in
Spain. The project is funded by the EUs EEPR program