Professional Documents
Culture Documents
Ayoun CV Process Safety
Ayoun CV Process Safety
OBJECTIVE:
Seeking for a quality environment where my knowledge and experience can be shared and enriched subsequently, to
learn and improve my personal traits and can be used to improve organizations quality
Having an overall 07 years of experience in process safety, risk management and fire protection system in a large
petrochemcial complex during project commisioning and operation.
CAREER
HISTORY
: Exxon)
Engro
Corp.
(formerly
Key Responsibilities:
Alignment & Compliance towards Du Pont Process Safety & Risk Management and Personnel Safety
Management Systems
Carry out Internal audit for safety management system including (PSRM/PSM/OHIH) highlighting deficiencies
and improvement plan
Prepare Road maps and improvement plans for all safety related internal/external audits
SMIS tracking and updation
Ensure that Management of Change protocol is followed for any changes in the facility
Facilitate PHA / PHR and Pre-Start up Safety reviews. Responsible to ensure compliance to PHA plans.
Develop, implement and steward Risk Assessment Plans and conduct audits
Carry out Environmental Aspect and Impact Study and ensure compliance to EPA Regulations
Develop programs and conduct Safety Orientation of newly inducted employees and manpower during
Projects and annual Turn-Around
Responsible for developing and implementing HSE Core training plan and monitoring its compliance.
Prepare management review meeting agenda, organize management review meetings and prepare minutes of
meeting, represented HSE department independently
Imparting formal HSE and Operations core training to various levels including contractor work force as
per plan.
Participate in day to day incidents / near misses investigations and recommendations follow-up
Emergency handling system audit and updating
Coordination with neighboring industries to have impact assessment studies during major release of toxic
materials from surrounding plat sites to establish safety protocols incase of any of the plant gets effected
PROJECTS (EPCL):
Errection, Commissioning & Startup of EDC/VCM Petrochemical Plant:
Involved in the basic and detailed designing of EPCL safety critical devices as per OSHA and EPA guidelines
and later also devised monitoring protocol of these devices as per LHO (Low Hazard Operation) and HHP
(High Hazard Process) criteria.
Conducted and led base line, detailed and cyclic PHA of EPCL expansion and back integration project
utilizing what if, FMEA, HAZOP and RCA techniques of PHA
Represented HSE department in multiple HSE meetings of vendors, clients, supplier and in house covering
safety incidents, progress and future HSE plans
Prepare and conducted LOPA for EDC VCM plant site including hazardous facilities
Assisted in the preparation and revision of HSE documentation (such as manual, systems, standards &
procedures and other documentation).
Proactively coordinate with the certifying body on all HSE audit requirements
Prepare management review meeting agenda, organize management review meetings and prepare minutes of
meeting, represented HSE department independently
Updated process safety information (PSI) packages of EPCL expansion and back integrated project of PVC
and VCM on the basis of equipment design, process design and material hazards
Identify HSE hazards, assess risks and propose mitigation measures during operational activities and report
noncompliance to the management
Developing Commissioning safety manual for the site
Develop communication and safety protocol during commissioning and installation of Ethylene line from
EVTL to EPCL
Training and refresher of emergency protocols in case of level I and II to multiple departments and
contractors
Prepare and present agenda, progress and safety stats for management committee
Carrying out safety reviews, PHR and PSSR for major facilities prior to commissioning
Carry out analysis for safety incidents related to similar sites and train personnel
SIL and SIS studies for Plant site instrumentation verification with third party done for ESD system SIL 3
certification
Review of all procedures (S/U, S/D, Commissioning, Emergency, Trouble shooting)
Safety audits for Multiple jobs in area
Studies and point out gap in design of vent gas scrubber which lead to poor performance of the scrubber
resulting in environmental release of HCL(gas) to atmosphere
Prepare position paper and MOC for changes in sparger size and sizing of control valve on emergency fire
water system
Post implementation no environmental release occur during utilization of VGS in emergency cases causing
zero personnel exposure
PSRM (Process safety Risk Management) system certification, implementation and audit clearance all 14
modules
PSM (Personnel safety management) all 14 module certification
Knowledge and utilization of multiple safety standards like NFPA, ANSI, API, ASME, ISA, DuPont, OSHAS
Possess knowledge of OHSAS 18001, IS0 14001, ISO 9001 and ISO 27001 standards
Custodianship of PSI (Process safety information) package
Conducted more than 5 PHAs using What if, HAZOP, FTA,FMEA and Human interface checklist
PHA knowledge using HAZOP, What If, FMEA techniques
HAZCOM preparation and implementation
HAZID knowledge and experience
Knowledge of ALARP risk assessment
LOPA, SIL, SIS knowledge and implementation in project phase
Safety KPI tracking along with PSTIR
On-site emergency plan, dispersion modeling for difference scenarios
Lead Emergency Squad in 03 major Emergencies of Plant (Level I &II)
Fire Hydrant and Sprinkler System requirements and designing
Incidents Investigation Methodologies FTA, FMEA, Fish Bone, RCA , 5 whys
Knowledge of Safety critical devices system
Fire protection system design (active passive mitigation, sprinkler system fire water pump design)
TECHNIAL EXPERTISE:
Regarding designing and trouble shooting
Knowledge, understanding and utilization of standards codes API 520/620/2000/14E, ASME VIII etc
RV/RD sizing
Pipe sizing
Orifice sizing
Pump sizing and performance
Control valve sizing and selection
Scrubber designing
Sparger sizing
Distillation columns troubleshooting
Operation and Process knowledge of furnace cracker, efficiency material and energy balance
APTITUDES:
Ethical
Interpersonal Savvy
Intellectual
Effective Leadership
Teamwork and Collaboration
Strategic Insight
Entrepreneurship
Developing Others
Presentation skills
SOFTWARE KNOWLEDGE:
ASPEN Plus
Chem Cad
Slab (Dispersion modeling software)
InstruCalc
HTRI
HTFS
ACHIEVEMENTS:
PROFESSIONALLY
Successfully planned and effectively implemented PSRM (process safety and risk management) system at
parent organization. Remained part of team to get certification from DuPont
PSRM score of 3.4 achieved in 2012 by external body audit
Highlighted Process safety Issues regarding ESD installation on Furnaces which could lead to failure of
Furnace Tubes received appreciation from management
Suggested online steam flushing of VCM line which was resulting in personnel exposure due to choking,
steam hose utilization and opening of line having a 2 day frequency also hose installation causing hazard in
area by implementing the idea plant load was maximized and hazards were removed from area, resulting in
saving of 25k USD/day resulting in saving of 8.2 million USD per annum
ACADEMICALLY
2nd Position in 1st & 3rd Year B.E Chemical
Overall 5th position in BE chemical cumulative percentage 76.34%
Shield and Certificate for securing A+ Grade in Matriculation
OTHERS
Winner of All Engro Football tournament 2011as captain of EPCL football team
Remain President of Staff club for EPCL 2011-2012 (getting highest ever votes in history of staff club
election) utilizing effectively 3.5-4.0 million budget for employees entertainment and event organization
E-special Engro magazine Editorial Team member
QUALIFICATION:
ASP (Associate safety Professional)*
BCPS
MS (safety & risk Management )**
Heriot - Watt UNniversity UK
2014
B.E (CHEMICAL)
Dawood College of Engineering & Technology
2003-2007
H.S.S.C
PAF Intermediate College Malir Cantt
2001 -2003
S.S.C
ASF Public School
1999-2001
*ASP preparation in progress exam in jan-2015
** Expected to be completed by 2017
PERSONAL DETAILS:
Date of Birth
Marital Status
N.I.C.no
:
:
:
INTERESTS:
Playing/watching Football
Managing own local football team grooming youngsters
Watching Movies
Net surfing / Reading