DRU 1 NS ARPOADOR

71-3068

Date : 12 Apr 2014

Attendees:
S.No.

Minute No : JSPL-DRU1-004/14

Mr. Sabapathi, Mr. P Sankar, Mr. Kenneth Quah, Mr. Varun Chandra
Discussion

Action By

Mr. Prabir has provided the Pre-as built drawing status.


(Refer below)

Info

This version of As built drawing will not issue to owner at this stage.
Official submission to DRDU will be at the time of vessel delivery.

Info

Mr. P Sankar will co-ordinate with all discipline to update the progress of
as-built drawings.

Info

Engineering will start to prepare the As-built drawings to suits above


schedule.
Engineering provided the list of as-built drawings of each discipline
which are required.
(See attachment)

Engineering

For the progress in piping as built drawings updates, Engineering needs


feedback from PF section and also to engage more man-power to
update the status.

PF

E&I arrangement - JEA need to feedback the onsite changes to update


as built status. Engineering will inform officially to JEA Section HODs
Mr. Ang Keng Peow & Mr. Emmon Luo to provide the necessary
information.

JEA

Mr. P Sankar will check with the piping section lead to confirm the asbuilt status of piping arrangement.

Engineering

All disciplines (Mechanical, HVAC & E&I) need to concentrate more


towards the completion before vessel departs.
Also Engineering confirmed the cut-off date for completion of as-built
drawings is 25 Apr 14.

Engineering

Next Meeting schedule on 23 Apr 14

Page 1 of 3

Target Date

05 Mar 14

Remarks

DRU 1 NS ARPOADOR
71-3068

Date : 12 Apr 2014

Minute No : JSPL-DRU1-004/14
Updated as on 12 Apr 14

DRU#1 NS ARPOADOR 71-3068

Total Drawings

As-Built
Total
drawings

12Apr2014Completed as ofDrawings

Percent Completed

PRE-AS BUILT DRAWING STATUS

STRUCTURE

CAO

15-Feb

01-Mar

15-Mar

25-Mar

EJA

25-Mar

666

406

381

93.84%

MECHANICAL

HUI YENG

15-Feb

01-Mar

15-Mar

EJA

NA

EJA

196

81

35

43.21%

PIPING-P&ID

HC ZHU

PIPING-ARGNT

HC ZHU

15-Feb

01-Mar

15-Mar

NA

EJA

EJA

LQ

KW
WONG

NA

NA

15-Mar

NA

EJA

EJA

225

100.00%

OUTFITTING

HZ ZHU

15-Feb

01-Mar

15-Mar

EJA

EJA

PARTIAL

650

528

88

16.67%

Drilling
Arrangement

MUTHU

15-Feb

01-Mar

15-Mar

EJA

NA

EJA

HVAC-P&ID

SHENG

HVACARRANGEMENT

SHENG

EJA

EJA

416

269

83

30.86%

10

E&I - SLD

CS MOK

EJA

EJA

421

146

34.69%

Hull

Sno

11
12

Discipline

E&I ARRANGMENT
E&I TERM/CONN

In-charge
Person

CS MOK
CS MOK

Aft

Mid

Fwd

DF

LQ

Exposed
Weather
Deck
(19.5M~2
5M)

01-Mar to 15-Mar

Remarks

33
503

127

As much
installed
(Partial)
As much
installed
(Partial)

01-Mar to 15-Mar
15-Feb

01-Mar

15-Mar

EJA

As much
installed
(Partial)

01-Mar to 15-Mar
15-Feb

01-Mar

15-Mar

EJA

EJA

EJA

Page 2 of 3

1976
Done at
EJA

DRU 1 NS ARPOADOR
71-3068

Date : 12 Apr 2014

Minute No : JSPL-DRU1-004/14

Recorded by:
(Varun Chandra G)

Page 3 of 3