Creating A Setup Standard Operation - SPD
Creating A Setup Standard Operation - SPD
Department
Responsibility/Role
File Name 27760445.doc
Revision
Document Generation Date 18/01/2010 09:39:00
Date Modified 1/18/2010 09:39:00 AM
Last Changed by
Status
Concept
You can create a setup standard operation only when specifying the standard operation used
during a changeover in the Changeover Times page. You cannot use a setup standard operation
as a routing operation.
You can create a setup standard operation the same way you create a standard operation but using
the Setup Standard Operations page.
In this topic, you will create a setup standard operation and add resources to that operation.
Additional Information
Procedure
Step Action
1. Begin by navigating to the Setup Standard Operations page.
Step Action
2. Click the Manufacturing and Distribution Manager link.
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Setup Standard Operations link.
Step Action
5. Use the Organizations page to select your organization.
Step Action
6. Click the M1 Seattle Manufacturing list item.
Step Action
7. Click the OK button.
or Press [Alt+O].
Step Action
8. Use the Setup Standard Operations page to set up standard operation only when
specifying the standard operation used during a changeover in the Changeover
Times page.
Step Action
9. Click in the Code field.
Step Action
10. Enter the desired information into the Code field. Enter "AS10".
Step Action
11. Click in the Department field.
Step Action
12. Enter the desired information into the Department field. Enter "ASSEMBLY".
Step Action
13. Click the horizontal scrollbar.
Step Action
14. Click in the Yield field.
Step Action
15. Enter the desired information into the Yield field. Enter "0.415".
Step Action
16. Click the Operation Resources button.
Step Action
17. Use the Resources page to enter operation resources for the department.
Step Action
18. Click in the Seq field.
Step Action
19. Enter the desired information into the Seq field. Enter "10".
Step Action
20. Click in the Resource field.
Step Action
21. Enter the desired information into the Resource field. Enter "ASM_LBR_1".
Step Action
22. Click the Scheduling tab.
Step Action
23. Click in the Assigned Units field.
Step Action
24. Enter the desired information into the Assigned Units field. Enter "50".
Step Action
25. Click the Save button.
Step Action
26. You have completed the Creating a Setup Standard Operation procedure.
End of Procedure.