Submitting The Bill of Material Structure Report - SPD
Submitting The Bill of Material Structure Report - SPD
Submitting The Bill of Material Structure Report - SPD
Department
Responsibility/Role
File Name 27762470.doc
Revision
Document Generation Date 18/01/2010 09:40:00
Date Modified 1/18/2010 09:40:00 AM
Last Changed by
Status
Concept
The Bill of Material Structure Report enables you to report the details for all levels of an
engineering or manufacturing bill of material. You can multiply the component usage by an
explosion quantity to get an extended quantity. You can restrict the details of the report by
entering the values of parameters in the Parameters page.
Additional Information
Procedure
Step Action
1. Begin by navigating to the Bill of Material Reports page.
Step Action
2. Click the Manufacturing and Distribution Manager link.
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Bills link.
Step Action
5. Use the Organizations page to select your organization.
Step Action
6. Click the M1 Seattle Manufacturing list item.
Step Action
7. Click the OK button.
or Press [Alt+O].
Step Action
8. Use the Submit a New Request page to enter either a single request or a set.
Step Action
9. Click the OK button.
or Press [Alt+O].
Step Action
10. Use the Bill of Material Reports page to enter the name of the report that you
want to run.
Step Action
11. Click in the Name field.
Step Action
12. Enter the desired information into the Name field. Enter "Bill of Material
Structure Report GUI".
Step Action
13. Use the Parameters page to enter the parameters for the Bill of Material Structure
Report.
Step Action
14. Click in the Item field.
Step Action
15. Use the System Items page to enter the item for which you want to run the
structure report.
Step Action
16. Click in the Item field.
Step Action
17. Enter the desired information into the Item field. Enter "RT_MODEL".
Step Action
18. Click the OK button.
or Press [Alt+O].
Step Action
19. Click the vertical scrollbar.
Step Action
20. Click in the Implemented Only REQUIRED field.
Step Action
21. Enter the desired information into the Implemented Only field. Enter "No".
Step Action
22. Click in the Component Item Detail field.
Step Action
23. Enter the desired information into the Component Item Detail REQUIRED field.
Enter "Yes".
Step Action
24. Click in the Assembly Detail field.
Step Action
25. Enter the desired information into the Assembly Detail REQUIRED field. Enter
"Yes".
Step Action
26. Click in the Leadtime and Other Detail field.
Step Action
27. Enter the desired information into the Leadtime and Other Detail REQUIRED
field. Enter "Yes".
Step Action
28. Click the OK button.
or Press [Alt+O].
Step Action
29. Click the Submit button.
or Press [Alt+m].
Step Action
30. Use the Decision page to note the request ID.
Step Action
31. Click the No button.
or Press [Alt+N].
Step Action
32. Use the Navigator page to navigate to the Find Requests page.
Step Action
33. Click the View menu.
or Press [Alt+V].
Step Action
34. Click the Requests menu.
or Press [R].
Step Action
35. Use the Find Requests page to enter the request ID.
Step Action
36. Click the Specific Requests option.
Step Action
37. Click in the Request ID field.
Step Action
38. Enter the desired information into the Request ID field. Enter "5597442".
Step Action
39. Click the Find button.
or Press [Alt+i].
Step Action
40. Use the Requests page to find the status of the request submitted.
Step Action
41. Click the View Output button.
or Press [Alt+p].
Step Action
42. The Bill of Material Structure Report displays the detail for all levels of a
manufacturing bill of material.
Step Action
43. Click the vertical scrollbar.
Step Action
44. You have completed the Submitting the Bill of Material Structure Report
procedure.
End of Procedure.