MATERIAL MANAGEMENT
MANUAL
PTS 30.451
1991
PREFACE
PETRONAS Technical Standards (PTS) publications reflect the views, at the time of publication,
of PETRONAS OPUs/Divisions.
They are based on the experience acquired during the involvement with the design, construction,
operation and maintenance of processing units and facilities. Where appropriate they are based
on, or reference is made to, national and international standards and codes of practice.
The objective is to set the recommended standard for good technical practice to be applied by
PETRONAS' OPUs in oil and gas production facilities, refineries, gas processing plants, chemical
plants, marketing facilities or any other such facility, and thereby to achieve maximum technical
and economic benefit from standardisation.
The information set forth in these publications is provided to users for their consideration and
decision to implement. This is of particular importance where PTS may not cover every
requirement or diversity of condition at each locality. The system of PTS is expected to be
sufficiently flexible to allow individual operating units to adapt the information set forth in PTS to
their own environment and requirements.
When Contractors or Manufacturers/Suppliers use PTS they shall be solely responsible for the
quality of work and the attainment of the required design and engineering standards. In
particular, for those requirements not specifically covered, the Principal will expect them to follow
those design and engineering practices which will achieve the same level of integrity as reflected
in the PTS. If in doubt, the Contractor or Manufacturer/Supplier shall, without detracting from his
own responsibility, consult the Principal or its technical advisor.
The right to use PTS rests with three categories of users :
1)
2)
3)
Subject to any particular terms and conditions as may be set forth in specific agreements with
users, PETRONAS disclaims any liability of whatsoever nature for any damage (including injury
or death) suffered by any company or person whomsoever as a result of or in connection with the
use, application or implementation of any PTS, combination of PTS or any part thereof. The
benefit of this disclaimer shall inure in all respects to PETRONAS and/or any company affiliated
to PETRONAS that may issue PTS or require the use of PTS.
Without prejudice to any specific terms in respect of confidentiality under relevant contractual
arrangements, PTS shall not, without the prior written consent of PETRONAS, be disclosed by
users to any company or person whomsoever and the PTS shall be used exclusively for the
purpose they have been provided to the user. They shall be returned after use, including any
copies which shall only be made by users with the express prior written consent of PETRONAS.
The copyright of PTS vests in PETRONAS. Users shall arrange for PTS to be held in safe
custody and PETRONAS may at any time require information satisfactory to PETRONAS in order
to ascertain how users implement this requirement.
TABLE OF CONTENTS
1.0
INTRODUCTION
1.1
SCOPE OF MANUAL
1.2
OBJECTIVE OF QUESTIONNAIRE
1.3
STRUCTURE OF QUESTIONNAIRE
1.4
1.5
REPORTING
2.0
MATERIALS APPRAISAL
2.1
PURPOSE
2.2
OBJECTIVE
2.3
INTERNAL AUDIT
2.4
APPRAISAL TEAM
2.5
FACILITIES
3.0
3.1
PRE-VISIT PREPARATION
3.2
3.3
3.4
MANAGEMENT CONTROLS
3.5
INVENTORY MANAGEMENT
3.6
PROCUREMENT
3.7
ADMINISTRATION
3.8
OPERATIONS
3.9
OTHER
3.10
CLOSE-OUT/REPORTING
4.0
APPRAISAL PREPARATION
4.1
4.2
INFORMING EMPLOYEES
5.0
5.1
GENERAL
5.2
STRUCTURE
5.3
RESPONSIBILITIES
5.4
5.5
MANNING LEVELS
5.6
STAFF EXPERIENCE
5.7
TRAINING
5.8
SAFETY
6.0
INVENTORY MANAGEMENT
6.1
GENERAL
6.2
STRUCTURE
6.3
6.4
INVENTORY CONTROL
6.5
7.0
PROCUREMENT
7.1
GENERAL
7.2
STRUCTURE
7.3
PROCUREMENT COORDINATION
7.4
PROJECT PROCUREMENT
7.5
PURCHASING
7.6
AGREEMENTS
7.7
CONTROLS
8.0
ADMINISTRATION
8.1
GENERAL
8.2
STRUCTURE
8.3
8.4
STOCK CHECKING
8.5
8.6
9.0
MATERIALS OPERATIONS
9.1
GENERAL
9.2
STRUCTURE
9.3
9.4
WAREHOUSES
9.5
YARDS
9.6
SPECIAL STORAGE
9.7
MOVABLES
9.8
MATERIALS HANDLING
9.9
9.10
WASTE DISPOSAL
10.0
TRANSPORT
10.1
GENERAL
10.2
STRUCTURE
10.3
LAND TRANSPORT
10.4
WATER TRANSPORT
10.5
AIR TRANSPORT
11.0
11.1
PERSONNEL
11.2
FINANCE
11.3
ENGINEERING
11.4
PROJECTS
11.5
MAINTENANCE
11.6
PETROLEUM ENGINEERING
11.7
DRILLING
11.8
OPERATIONS
11.9
1.0. INTRODUCTION
The Materials Appraisal Manual provides the general information and describes ESU led Materials
Appraisals of PETRONAS operating Units materials activities. The primary intention is to make clear
the scope of work and responsibilities for preparation, execution and follow-up of an ESU led
appraisal, for the information of management and participants. The questionnaire is primarily intended
as an aide memoir for the appraisal team members.
The objective of the Materials Appraisal Questionnaire is to provide a basis for the execution of the
described Materials Appraisals of PETRONAS OPUs materials activities. It aims to ensure that
appraisals are conducted effectively and in a structured manner.
Users of this Manual are reminded that, though the intention is to embrace every eventuality, existing
and potential, no publication of this type can be complete. It should be edited and amended to suit the
type and size of the OPU and to ensure coverage of any special subjects raised by the OPU.
The questionnaire does not only cover the basic materials activities such as
Inventory Management
Procurement
Coding and standardisation
Administration
Operations
but also covers the interfaces with related activities, organisation, staffing and training matters.
The questionnaire is divided into various chapters and has been construed in such a way that
individual chapters can be allocated to specific team members.
It is useful to spend sufficient time in editing the questionnaire before starting the interviews. The
team leader will need to endorse any such amendments.
A top-down approach of the interviews has the risk of getting a distorted picture, i.e. information may
be obtained on how things should run, rather than how it is happening in actual practice. It is
therefore recommended to conduct the interviews from the bottom up and check findings on the
higher levels.
A primary general question is how and where the Materials service could be improved (rather than
asking for complaints). The key element is to define how both parties (Materials and Users) can
contribute to improving the business.
Make the interviewed party do the talking and steer where necessary. Summarise the key points after
each interview and ask whether points have been missed.
Ideally, the interviews are held in the direct working environment of the individuals, so that physical
examples are at hand. In certain instances though, it may be required to divert to a quiet interview
room. The important thing is to keep the interviewer at ease and in an atmosphere of mutual trust in
order to ensure a reliable flow of information.
Duration of interviews should generally be kept to approximately one hour. Interviews combined with
visits to e.g. yards or workshops can take longer. The programme should allow for sufficient time in
between the scheduled interviews to allow for small overruns and for writing of initial findings for the
draft report. The programme should also have room for follow-up visits when required.
Interviews with senior staff in Materials and other departments are often of mutual interest to more
members of the appraisal team. When tailoring the questionnaire, it should also be decided which
sessions will be carried out jointly.
1.5 REPORTING
1.5.1
General
The report should present the findings and recommendations of the Materials Appraisal carried
out on request of OPU in MONTH YEAR of the materials activities of OPU. The Appraisal, being
led by ESU as a specific service including staff from ESU and OPUs.
The team carried out an Appraisal to determine whether a sound basis is in place for contributing
to the OPUs objectives and profitability, by reviewing the quality, effectiveness and efficiency of
the way in which the OPUs materials activities are performed.
The questions raised by the appraisal team were discussed with OPU Materials staff and Users
Departments staff during a X day visit of OPUs Operations.
Preliminary findings and conclusions were discussed with OPU specialist staff, to agree on
factual findings and the feasibility of recommendations.
The summary of the findings and recommendations were presented to OPU management on
DATE.
Sensitive issues should always first be checked on sufficient high level, before going into print.
It will save time to have the section "Back ground" written by a competent staff of the Materials
and Services department.
The information in this section could be :
-
Company structure
main activities/locations
Scope and size of Materials and Services department (incl. staff, stock, procurement figures)
Each chapter (5 to 10) starts with a section "General", followed by a section on "Structure". it is
the intention to have the objective, policies and related aspects covered under "General". The
section on "Structure" includes questions on how these are implemented, i.e. how is the
department/section operating.
In many cases it will be useful send a draft copy of the report to the OPU for comments (but main
findings and action points should already have been agreed). A date for return with comments
should be agreed to avoid delays in issuing the final report. The report is normally issued by ESU
under covering letter. Distribution of the report in the OPU is left to the discretion of the OPU
senior management, to which extent sufficient copies will be made available.
1.5.2
Overall Rating
Each appraisal report will typically contain a large number of detailed findings or apparent
shortcomings each of which can individually be explained or even justified. In some cases the
shortcomings may result from a structural problem rather than individual aberrations so that there
is a need for an OVERALL RATING to indicate the quality of the performance of the materials
activities, as either
Satisfactory
Unsatisfactory
according to the definitions :
1.5.3
SATISFACTORY -
UNSATISFACTORY -
Main Findings
The main findings not only summarise the major concerns, but also areas that are particularly
well managed or reflect innovative approached. They should include positive comments as well
as those concerns which may require urgent action, a major cost or a change in practices.
1.5.4
Action Items
Action : OPU should appoint a coordinator to progress resolution of the recommended actions
items.
Action : The first progress report should be issued by DATE and thereafter quarterly until all
recommended action items have been closed out.
Actions are recommended to help identify the problem as well as indicate solutions. For brevity,
these are identified in text as 'ACTION' rather than 'Recommended Action' but this should not be
taken to imply that they are mandatory. OPU should explore alternatives to find the optimum
solution for each problem.
If these alternatives differ significantly from the appraisal recommendations, the considerations
underlying OPUs decision should be discussed with ESU.
1.5.5
Where appropriate, a separate chapter should be drafted to cover the interfaces with the user
departments (see chapter 11), however if the relevant findings are adequately covered in the
other chapters and to avoid unnecessary repetition, chapter 11 can be omitted from the report.
1.5.6
Appendices
2.1 PURPOSE
To appraise the materials activities from a professional viewpoint. The appraisal includes topics like
Materials Management, optimum use of modern tools and techniques, effective use of computer and
coding systems and procedures, controls and identify any potential areas for improvement.
2.2 OBJECTIVE
To determine whether a sound basis is in place for contributing to the OPU's objectives and
profitability of the way in which the OPU's materials activities are performed.
To assess the potential for performance improvement by evaluating whether adequate use is
made off - and attention is paid to - professional human resources, tools systems and
procedures.
Duplication or overlap with internal audits is to be avoided. The basic objective of an auditor is to
appraise whether the correct business controls are in place and applied, which should lead to an
effective and efficient operation.
This implies that the auditor is not auditing whether activity is performed in a sound and efficient way,
but whether management has sufficient possibilities to control the activities.
In other words, the Materials Appraisals are to be focussed on the business side, and meant to form
an opinion on how efficiently and effectively the materials activities are carried out.
The appraisal team would consist of 2-3 persons and preferably be composed as follows :
a) Team leader with organisational/staffing/ operational experience to be provided by PETRONAS
b) Staff member from ESU
c) Inventory management specialist with user know-how of computer systems provided by
PETRONAS
The team would be supplemented by an appraisal focal point to be nominated by the OPU
concerned.
In practice, the persons selected for position (a) and (c) should be an executive member of a
PETRONAS OPU nominated by ESU. The team set up will be assisted by focal points established by
respective OPUs concerned. The focal point will also serve as facilitator and should be accessible for
the duration of the appraisal to ensure that timely action can be taken when problems surface. He
must, of course, be sufficiently senior to be able to sort out problems during appraisal.
2.5 FACILITIES
a) Office Accommodation
An office which is large enough to hold all the members of the appraisal team will be required
throughout the duration of the exercise. The office should be equipped with a telephone, conference
table, one lockable filing cabinet or cupboard, flip-chart, and appropriate stationery. A black or whiteboard will also be useful. Team members should be able to have access to the office outside normal
working hours.
b) Secretarial service
Word-processors with operators are required throughout the exercise. Members should have access
to these facilities outside office hours and on week-ends. The operators must also be available at all
times when required. During the last few days of appraisal, it is envisaged that a number of viewgraphs will be required for presentation purposes. The team should be given priority access to
draughtsmen, the drawing office, and other relevant facilities.
c) Accommodation And Transportation
All team members should be put up in the same accommodation. A vehicle should be reserved for
use of team members at all times, even outside of normal working hours.
Collect and study all data pertinent to the appraisal of relevant OPU. When possible obtain statistical
data and performance indicators of similar companies.
Management and User perception of the role and responsibilities of the Materials Department.
(Strengths and Weaknesses). What are the relevant policies of OPU concerned.
What is the policy and how is it applied? (service level, standardisation, spare parts selection,
surplus/non-moving stock write-off)?
Evaluate stock turnover (non-moving items, insurance spares, contingency items, authorized
reserves). Is MESC used in a professional manner?
Are stockist, call-off agreements used in an optimum way? To what extend do "squirrel? stores exist?
3.6 PROCUREMENT
3.7 ADMINISTRATION
3.8 OPERATIONS
Are materials properly stored, handled and transported (efficiency, preservation, safety)?
Are receiving and despatch procedure properly implemented?
Are security arrangements adequate?
Is storage capacity sufficient to cover (future) demands?
Are direct charge and project materials properly managed?
3.9 OTHER
Are possible other tasks/responsibilities of the Materials Function properly managed. (e.g. Transport,
General Service Contracts, office services, lease contracts).
3.10
CLOSE-OUT/REPORTING
Main findings will be presented to Management and Materials Management Steering Committee.
The OPUs coordinator for the appraisal is responsible for ensuring that the following information is
available to the team on the first day of the appraisal.
In some cases an index is required listing the information itself is required from the beginning.
The information listed is the basic minimum. The appraisal can still be carried out with incomplete or
outdated information but this would itself lead to a negative observation.
(a) Company Business Plan
The Company's business plan and/or data book.
(b) Targets and 0bjectives
Company, department and individual targets and objectives that relate to the Materials activities
of the OPU in the widest sense.
(c) Health, Safety and Environmental Policy
The published policy on Health, Safety and Environmental Matters.
(d) Purchasing Policy
The purchasing policy describes how to obtain maximum total value, both in the short and the
long term, for expenditures on materials and equipment.
(e) Stocking Policy
The stocking policy defines what materials are to be stocked, for what purpose, and the required
availability of stocked materials for users.
(f) Standardisation Philosophy
This lays down the philosophy with regard to the standardisation of facilities, equipment and
material.
(g) External Requirements
A list in index form, of the requirements of government, partners, ministry, custom authorities or
other official bodies that affect the materials activities of the Company.
(h) Procedures
A copy of the materials and services procedure manual, including relevant parts of procedures
from other department from other departments or disciplines (e.g. maintenance, project
engineering) affecting the materials activities. If not included in the above mentioned manual the
tender board procedures and a list of financial authorities should be included.
(i) Reports
Report of the latest internal or external audits covering all or part of the materials activities, with
any follow-up or progress reports.
(j) Organisation
A chart showing the organisational relationship of the Materials and Services Department and of
their main customers together with a list of their names.
A list of materials and services staff with age, job groups, formal training courses attended for the
past two years and planned for the next two years.
Details of changes in the organisation which have been accepted, but not yet implemented.
(k) Contracts
A sample of a standard contract, stockist - or supply agreement with details of the terms and
conditions.
A list of current stockist -, price agreements indicating (main) commodity, supplier and yearly
turnover.
(l) Claims
A list of claims or criticism of materials handled during the past 12 months and its current status.
(m) Statistics and Performance Indicators
Statistics and indicators over the past two years, used in the OPU to manage and measure the
efficiency and effectiveness of the materials activities.
(n) Geographical Information
Maps of the area/country is which the operations take place, indicating main fields, facilities,
warehouses, yards, ports, airports, etc.
All those directly involved in the materials activities should be informed before the appraisal starts. All
concerned should be asked to give their full support and co-operation to the appraisal, in particular,
they should be asked to list their current problems in relation to materials in their field of activities for
discussion with the appraisal team.
The duration of the appraisal visit is 3-4 working days. Roughly of the time available is to be
planned for interviews and visits to the stores, yards and possibly other facilities.
In line with the purpose and objectives of the appraisal the emphasis will be on feed-back from the
people who know, from the bottom of the pyramid to those at the top. The programme for the
interviews is to be arranged accordingly.
5.1 GENERAL
Is distribution controlled?
5.2 STRUCTURE
Was there a major re-organisation in the department over the last 4 years?
Were there minor re-organisations in the department over the last three years?
Are there new systems introduced in the department over the last 3 years?
Has the introduction of new systems lead to a reduction of staff and/or costs.
Reduction in staff?
Reduction in costs?
Reorganisation =
Reduction in staff?
Reduction in costs?
5.3 RESPONSIBILITIES
Is there adequate time available for the individual to carry out the job?
Are there information filters in the organisation e.g. information not or not completely reaches the
relevant?
Is there a OPU plan to ensure regular review of the adequacy of the business controls?
Are the main areas (inventory control, procurement, administration, e.d.p and operations)
covered?
Project meetings?
Pipespec meetings?
Tenderboard?
Is workload monitored?
Are the abilities of individuals equal to, in excess or below the requirement to exercise their job?
Is there an appropriate working environment with suitable supporting aids to efficient work?
Dates of issues?
5.7 TRAINING
5.8 SAFETY
Has one person been designated as safety and health control coordinator?
How frequently does senior management make a safety tour through department?
How often does department head make a safety tour through department?
6.1 GENERAL
What are the objectives of the section responsible for the inventory management?
6.2 STRUCTURE
Is "distribution controlled?
What is percentage of the total stock value of the total capital replacement value of the OPU?
What is percentage of the total stock value of the spare parts of the capital replacement value of
the equipment?
Are there focal points in User Departments for Programme Materials stock control?
Are there focal points in under department for Project Materials stock control?
Are users aware that there is a target service level for different categories of items?
How many Standard MESC CD-ROMs are distributed within the OPU?
To which departments?
How many Local MESC catalogues are distributed within the OPU?
To which departments?
Is there up to date management information to provide them with the costs of maintaining
materials stocks?
Does Materials play an active (anticipating and challenging) role in inventory control?
What is the stock turnover and where are the black spots?
Total Stock?
Programme Materials?
Spare Parts?
General Consumables?
Process Chemicals?
Total Stock?
Programme Materials
Spare Parts
General Consumables?
Process Chemicals
Dead Stock?
Excess Stock?
Project Stock?
7.0 PROCUREMENT
7.1 GENERAL
Central Purchase?
Regional Purchase?
Local Purchase?
Are the OPU's general terms and conditions of purchase orders regularly reviewed?
Is there a letter send to suppliers specifying the policy of the OPU on business ethics and gifts?
7.2 STRUCTURE
Are Purchasing methods structured towards efficient handling of different types of order e.g.
Simplified orders, price agreements/offtake orders?
How many staff members are, as a rule, present in negotiating agreements and/or contracts?
Is there an effective filing and retrieval system for the purchasing files?
Are various stages of a purchase order (including enquiries being monitored and reported?
At what intervals?
Do requests for enquiries and orders, clearly describe requirements, including necessary test,
inspection and documentation requirements?
Are claims dealt with in accordance with the procedures and properly progressed?
Is there a working agreement with another OPU to cater for regional purchasing?
What is "mark-up"?
Is confidentiality secured?
Which commodities?
Are the standard duties of the Project Materials Coordinator known and executed?
o
(co)-responsible for approved equipment list and for approved vendor list
Has a policy/procedure been agreed on acceptance of initial spares for the operational phase?
accounting?
transferring?
write-off?
Are there contractual repercussions (by construction contractor) in case of late delivery of free
issue materials?
7.5 PURCHASING
Is there periodically a re-allocation of buyers' responsibilities for the various commodity groups
purchased?
from stockists?
from manufacturer?
7.6 AGREEMENTS
Are the company's general terms and conditions of contract regularly reviewed?
Are your using these agreements for price comparison or for purchasing?
What is benefit and/or added value by using the Centrally made Price Agreements?
quality is maintained?
Have economics been evaluated by Materials Dept. in conjunction with local Finance Dept.
Are there other Agreements, such as Supply and Repair and Supply and Service Agreements?
7.7 CONTROLS
Is this monitored/reported?
Is this monitored/reported?
Is there a TenderBox?
Is there a Tenderboard?
Is membership rotating?
Is there evidence in the order files why (if) a single source is used?
Local orders?
Telephone orders?
8.0 ADMINISTRATION
8.1 GENERAL
Who is checking?
Is there local legislation or company rule pertaining registration of staff details in a manual or
computerised record?
Are staff aware of these regulations and are they adhered to?
this year?
last year?
next year?
this year?
last year?
next year?
Which statistics and/or reports are distributed to OPU Management and/or Management Users
Departments?
What is the inflation over the past year and how are statistics affected?
Who is responsible?
8.2 STRUCTURE
PMAG revisions?
MESC revisions?
Authority manuals?
Are there conditions for sale of materials to ensure that the company is not liable for sold
materials?
Is there a simple administration for returnable packing such as cable reels, containers, pallets
etc.?
Are timely advices sent to parties concerned when a contract is due for review?
How long is average processing time for documents such as MIV's, MRV's, MTV's and MRS's?
At which intervals?
How many
o
Annual?
Semi-annual?
Perpetual?
Are the write-on and write-off vouchers routed via the Ordering sections?
Is there a proper balance between the stock check plan and those MESC groups which are vital
to companies operations?
Do warehouse personnel know in advance which groups and when will be checked?
Do stock checkers have prior experience in warehouse-operations and/or with the materials
under their responsibility?
theft?
damage?
lost materials?
Are f0or the systems in use following documents available and up-to-date?
o
Functional Specifications?
Operating Instructions?
Construction Guide?
Operators Guide?
User Guide?
Audit report?
Flowcharts?
Fallback procedure?
How many and which housekeeping jobs were done during last 12 months?
Have Material Staff been reduced after the introduction and full working of the systems?
Did Staff reductions form part of the economic justification for the computer systems?
Are Users departments, Finance and Head Materials satisfied that in event of a break down,
adequate arrangements exist for processing work?
Are or can Materials Systems, with advantage, be integrated with systems for other departments?
input ?
retrieval?
Have Materials staff attended training courses aimed at improving the efficiency by better use of
computers?
Are there established procedures to ensure that analyses and financial reports are
o
up to date?
Is there a departmental plan to ensure regular review of the adequacy of the procedures?
Is it documented?
Is there a focal point responsible for the distribution of all internal procedures?
Is mastercopy available?
Are procedures such that, where possible, routine work is in front of non-routine work?
authorisation
receiving
safeguarding
clearly segregated?
-
If segregation of duties is impossible or impractical, are areas of possible risk identified and are
reasonable alternative controls in operation?
9.1 GENERAL
Is there a OPU policy which defines who is responsible for storage of which categories of
materials and equipment?
What is the policy on inspection of goods on arrival, during storage and at issue?
Are adequate work instructions prepared and implemented for handling, receiving, storage and
delivery of materials?
chemicals?
explosives?
gasses?
Are designated quantities of materials required for emergencies such as fire, explosion, oilwell
blowouts etc. separately stored in the warehouse and not drawn on for normal issues?
Are these materials regularly and frequently examined to ensure good condition and readiness for
immediate use?
What is average time lapse between arrival of goods in port and delivery to the Company?
9.2 STRUCTURE
Which types of administration are carried out by this section (e.g. movables, contracts, customs
clearance)?
Are there any obvious shortcomings in the location of warehouse and/or yards which hinder
efficient materials handling?
Are there procedures and regular schedules for the inspection of materials and products in
storage?
Is there an effective filing and duplicating system for materials and equipment certificates?
Are documents such as MIV, MRV, MTV and MRS processed into the computer system by
warehouse personnel?
Centralised or decentralised?
Receiving?
Inspection?
Issue/despatch?
Returns?
Claims?
Salvage?
Scrap?
Waste?
Are fast moving items and slow moving items stored separately?
Are there free issues for materials stocks of low value fast moving items?
Are there free issues points on plant site for low value fast moving items?
How is it organised?
Are stock-outs followed up and are User Departments properly advised of stock-outs and action
taken?
Does Materials Dept. play an active role in discovering and eliminating unnecessary squirrel
stores?
Are OPU owned materials and goods stored with third parties, if any, clearly identified as OPU
property?
Are incoming materials counted, measured and weighed to the extent necessary on receipt?
Is checked and approved material identified and segregated from that not checked and
approved?
Is there central control to ensure clearance of all items of each Bill of lading?
Is there a documented procedure in case "direct charge" materials cannot be collected by client
departments for a protracted period of time?
How are Users Departmental advised that material has been received?
Shipping line?
Transporter?
Insurance Company?
If on-line is not real time but via Users Departments systems how is actual stock position known
to Users?
Is there a system by which frustrated issues are issued upon receipt of new stock?
9.4 WAREHOUSES
Are storage facilities appropriate for climate conditions and type of operation?
Does available space between racks, storage bays etc. allow for effective manoeuvring with the
available handling equipment?
Are warehouse floors in good conditions and constructed to bear the loads of full racks and fully
loaded handling equipment?
large gaskets?
stud bolts?
Is there a "partition-off" in the warehouse for the safe keeping of "attractive" items?
Is security adequate?
9.5 YARDS
Are storage facilities appropriate for climate conditions and type of operation?
Are they built to bear the loads and fully loaded trucks and handling equipment?
Timber (baulks)?
Rock/Sand/Gravel bins?
Industrial gasses?
Cables?
Ropes?
Marine hoses?
Are items stored in the yard properly preserved against corrosion/weather conditions?
Is it well controlled?
Are there procedures and working instructions for discharging and handling of hazardous
cargo's?
Are there adequate controls on adherence to procedures and safe work instructions for these
materials?
bulk materials
chemicals
carbide
explosives
Bulk storage
-
Are stacks of large items and bulk material carefully stacked and is there a reasonable selection
possibility?
Is a drive-in racking system used for slow moving items like insurance items or bulk storage
where selectivity is less important and the first-in, first-out principal is not critical?
Is suitable auxiliary equipment for the safe and easy handling of drums and containers available?
Chemicals
-
Are there planned procedures for safe handling, storage, issuing and transport of chemicals?
Is the operation of the procedures monitored by supervisory staff and are deviations investigated?
Are there emergency exits other than those afforded by the main doors?
If there is an offices and/or chaining rooms in the warehouses are they separated from the
warehouse by fire walls and self closing fire doors?
Are products which may produce flammable atmospheres during handling or storage defined and
classified?
Is there, in case of spillage, adequate protective clothing and equipment (including air supplied or
self contained breathing apparatus) readily available?
Is the whole area free of dirt, rags, rubbish and any redundant machinery?
Carbide
-
Explosives
-
Are there written procedures on receiving, storage, handling and issuing of Explosives?
Are Explosives stored in a dedicated well ventilated building away from other buildings?
Are special shoes (without nails soles of heels? or suitable overshoes readily available?
9.7 MOVABLES
Is purchasing, receiving, storage (until use) and surplus controlled by Materials Department?
Where are back-up spares and small tools for movable equipment stored?
own stock?
rented?
leased?
order reference
acquisition value?
book value?
inspection scheme?
Is Materials Dept. involved in materials movements outside the warehouses and yards?
(if so refer also to section 10 Transportation)
What equipment is available for materials handling inside the warehouses and yards?
Is there a planning for efficient handling to avoid delays and extra costs?
Is there a good planning to ensure a quick turn around of containers to avoid excessive rental
rates?
Is there a good selection of slings available for warehouse and yard operations?
Are there adequate and enough general accessories available and utilised such as
o
spreader bars
Is the use avoided of packing materials which could harm the environment (e.g. expanded
polystyrene)?
Are special regulations for the safe handling of hazardous materials known?
Is there a procedure for wearing gloves, safety helmets, safety glasses and safety shoes?
Is only authorised and trained personnel allowed to operate mechanical devices for materials
handling?
Are there departmental safety audits on Materials handling in warehouses and yards?
Is the yard
fenced?
properly drained?
Salvage
-
Are the materials differentiated between repairable and/or foreseen use and not repairable and/or
not foreseen use?
Is the Salvage yard also used for temporary storage of Surplus used equipment awaiting
disposal?
Does the pricing system for salvage materials encourage the usage?
Scrap
-
Is the re-use possibility for the original purpose of the material being prevented?
Are the defined areas sub-divided so that accumulation and storage can continue while sold
scrap is awaiting removal?
Is special attention given to security measures for high value scrap such as alloy and precious
metals?
sales of scrap?
other sales?
Is there a Salvage/Scrap procedure for material and equipment which has been used in
connection with hazardous substances?
Is the returning department responsible for making the material safe for handling?
Are there special procedures for disposal of contaminated scrap and/or other materials?
9.10
WASTE DISPOSAL
Are there detailed OPU procedures and Guidelines for the handling and storage of waste
material?
Are there departmental instructions and procedures for handling waste materials?
Are different types of (hazardous) waste materials properly labelled and segregated?
10.0 TRANSPORT
10.1
GENERAL
water?
air?
Are there general and/or national guidelines on policies, standards and procedures for transport
by :
o
land?
water?
air?
Are these regulations known within Transport Dept. and are regulations adhered to?
Is distribution controlled?
Is update/revision available?
Are there written instructions for handling and transportation of hazardous materials?
10.2
STRUCTURE
drilling programme?
shutdowns?
maintenance?
new construction?
Is planning and are contract commitments flexible enough to be adjusted when drastic changes in
activities occur?
Are, apart, from your basic requirements, your contracts linked with operational activities such as
drilling contracts?
10.3
LAND TRANSPORT
Is Land Transport responsible for the planning and the execution of rig moves?
last year?
this year?
Are rig moves carried out, where possible, with current fleet (own and contracted)?
Is there, at short notice, sufficient capacity in the region if additional capacity is required?
haulage fleet?
light fleet?
passenger transport?
Which part of the transport fleet and handling equipment is company owned?
Are minimum requirements for carrying capacity of dry and liquid bulk laid down?
Is there a good planning for efficient handling to ensure a fast turn around of equipment and
optimum utilisation?
What other performance indicators are used for measuring performance of both operators and
users?
How are Opex costs such as fuel and tyres monitored and controlled?
Are returns of pallets, baskets and containers monitored and marked as OPU property?
Are there adequate and enough general accessories available and utilised?
Is there a checklist of equipment to be carried in the event of driving under extreme conditions?
10.4
WATER TRANSPORT
Standby Vessel
-
Is there inspection of the agreed outfit of the vessel prior to being contracted?
Supply Vessels
-
Are there general guidelines on the minimum specification of the supply vessels?
Are minimum requirements for carrying capacity of dry and liquid bulk laid down?
How many nationalities are the flags under which they operate?
Is there a planning for efficient handling to avoid delays and extra costs?
Is there a good planning to ensure a quick turn around of containers to avoid excessive rental
rates?
Are returns of pallets, baskets and containers monitored and marked as Company property?
Are there adequate and enough general accessories available and utilised?
Who has final decision as to weather a vessels sails or not, e.g. in adverse or forecast adverse
whether?
masters?
rig personnel?
Who is responsible for the planning and the execution of rig moves and anchor handling?
last year?
this year?
Are rig moves carried out, where possible, with current fleet (own and chartered)?
Is there, at short notice, sufficient capacity in the region if additional capacity is required?
10.5
AIR TRANSPORT
Are the aircraft being used more than one engine aircraft?
How is the aviation fuel provided and what quality control has been adopted?
What other yardsticks are used for measuring performance of both operators and users?
PERSONNEL
Is there investigation of the background and reference of applicants to a Materials Dept. job
carried out?
Are all Materials job descriptions up to date and recently formally emulated?
Department Head?
Section Heads?
Individual employees?
Is there compared with other depts. more or less overtime in Materials Dept.?
organisation plans?
career development?
job rotation?
staff reporting?
appraisals?
merit increases?
interfunctional moves?
external postings?
training?
Services of ESU?
What is general impression of the impact of the functioning of the Materials Department within the
OPU?
11.2
FINANCE
How often do senior members of Materials Dept. meet senior members of Finance?
Is Finance satisfied that in event of a breakdown of the Materials computer system adequate
arrangements exist for progressing work?
Is there any duplication of work through both functions carrying out the same clerical/accounting
activities?
Is Materials Dept. carrying out work which would be better done by Finance?
Is Finance function carrying out work which would be better done by Materials?
services of ESU?
What is general impression of the impact of the functioning of the Materials Department within the
OPU?
11.3
ENGINEERING
How often do senior members of Materials Dept. meet senior members of Engineering Dept.?
What is done by Materials to make policies and procedures well-known in Engineering Dept.?
Is Engineering satisfied that in event of a breakdown of the materials computer system adequate
arrangements exist for progress work?
Is Engineering Dept. satisfied with the accuracy of the Stock Inventory figures?
expediting?
services of ESU
Flexibility
low?
fulfils?
high?
services in general
low?
fulfils?
high?
price levels
low?
fulfils?
high?
information flow
low?
fulfils?
high?
Standardisation
low?
fulfils?
high?
technical know-how
low?
fulfils?
high?
What is general impression of the impact of the functioning of the Materials Department within the
OPU?
11.4
PROJECTS
How often do senior members of Materials Dept. meet senior members of Project/New
Construction Dept.?
What is done by Materials to make policies and procedures well known in Project/New
Construction Dept.?
Are Project Engineers aware of the delivery times for equipment and bulk materials?
Are requisitions routed through Materials Dept. for screening availability ex surplus and/or excess
materials?
Are Project Engineers satisfied with the accuracy of the Stock Inventory figures?
Is the integration of standard project material with standard MRO materials understood and
appreciated?
11.5
services of ESU
flexibility
low?
fulfils?
high?
services in general
low?
fulfils?
high?
price levels
low?
fulfils?
high?
status of requisition
low?
fulfils?
high?
expediting
low?
fulfils?
high?
documentation
low?
fulfils?
high?
information flow
low?
fulfils?
high?
handling surplus
low?
fulfils?
high?
standardisation
low?
fulfils?
high?
technical know-how
low?
fulfils?
high?
What is general impression of the impact of the functioning of the Materials Department within the
OPU?
MAINTENANCE
How often do senior members of Materials Dept. meet senior members of Maintenance Depts.?
Are they any major overhauls planned which may have an impact on materials resources?
What is done by Materials to make policies and procedures well known in Maintenance Depts.?
Is the selection of spare parts a joint effort between Materials and Maintenance Staff?
Is Maintenance Dept. satisfied that in event of a breakdown of the materials computer system
adequate arrangements exist for progress work?
Is Maintenance staff satisfied with the accuracy of the Stock Inventory figures?
Is the integration of standard MRO material with standard project material understood and
appreciated?
Have the squirrel stores been subject of discussions with Materials Dept.
expediting?
services of ESU
flexibility
low?
fulfils?
high?
services in general
low?
fulfils?
high?
price levels
low?
fulfils?
high?
status of requisition
low?
fulfils?
high?
expediting
low?
fulfils?
high?
documentation
low?
fulfils?
high?
information flow
low?
fulfils?
high?
handling surplus
low?
fulfils?
high?
standardisation
low?
fulfils?
high?
technical know-how
low?
fulfils?
high?
What is general impression of the impact of the functioning of the Materials Department within the
OPU?
11.6
PETROLEUM ENGINEERING
Is Programme material system in use with Materials Dept. meeting the complexity of Company's
operations?
How often do senior members of Materials Dept. meet senior members of Petroleum Eng. Dept.?
Is involvement from Materials Dept. in the Petr. Eng. meetings of a good standard?
How is Petr. Eng. advised on stock and or order position and consumption data of programme
materials?
quality is maintained?
Are Petr. Eng. computers systems interfaced with Materials computers systems?
Is Petr. Eng. Dept. satisfied that in event of a breakdown of the materials computer system
adequate arrangements exist for progress work?
expediting?
services of ESU
flexibility
low?
fulfils?
high?
services in general
low?
fulfils?
high?
supply agreements
low?
fulfils?
high?
stock values
low?
fulfils?
high?
information flow
low?
fulfils?
high?
handling certificates
low?
fulfils?
high?
handling returns
low?
fulfils?
high?
standardisation
low?
fulfils?
high?
technical know-how
low?
fulfils?
high?
What is general impression of the impact of the functioning of the Materials Department within the
OPU?
11.7
DRILLING
How often do senior members of Materials Dept. meet senior members of Drilling Dept.?
What is done by Materials Dept. to make policies and procedures well known in Drilling Dept.?
Is there a change in drilling activity foreseen which has an impact on Materials resources?
Are Drilling Dept. computers systems interfaced with Materials computers systems?
Is Drilling Dept. satisfied that in event of a breakdown of the materials computer system adequate
arrangements exist for progress work?
expediting?
services of ESU
flexibility
low?
fulfils?
high?
services in general
low?
fulfils?
high?
information flow
low?
fulfils?
high?
handling returns
low?
fulfils?
high?
Standardisation
low?
fulfils?
high?
technical know-how
low?
fulfils?
high?
What is general impression of the impact of the functioning of the Materials Department within the
OPU?
11.8
OPERATIONS
How often do senior members of Materials Dept. meet senior members of Operations Dept.?
What is done by Materials Dept. to make policies and procedures well known in Operations
Dept.?
Are service agreements with a materials content made with or without Materials Dept.
involvement ?
Vital or
Essential or
Has Materials Dept. (together with Maintenance Dept.) used this classification to classify the
required spare parts?
Are Operations Dept. computers systems interfaced with Materials computers systems?
Is Operations Dept. satisfied that in event of a breakdown of the materials computer system
adequate arrangements exist for progress work?
services of ESU
flexibility
low?
fulfils?
high?
services in general
low?
fulfils?
high?
information flow
low?
fulfils?
high?
handling returns
low?
fulfils?
high?
standardisation
low?
fulfils?
high?
technical know-how
low?
fulfils?
high?
What is general impression of the impact of the functioning of the Materials Department within the
OPU?
11.9
How often do senior members of Materials Dept. meet senior members of Safety Dept.?
What is done by Materials Dept. to make policies and procedures well known in Safety Dept.?
Does the organisation have a purchasing policy statement or senior management directive that
includes safety control requirements?
Are purchases with occupational safety and health implications checked with the safety dept.
prior to the purchasing action?
o
-
flexibility
low?
fulfils?
high?
services in general
low?
fulfils?
high?
information flow
low?
fulfils?
high?
What is general impression of the impact of the functioning of the Materials Department within the
OPU?