Five Level Sections
Station 3 + 000
1er Problme
2me Problme
It is required to determine the earthwork Given the following cross-sections:
volume on a portion of road construction
grading work based on the following crossStation 3 + 000
section notes:
5.48
0
5.0
Station 7 + 460
+0.98
+3.05
+0.50
4.14
3.50
0
3.50
6.14
+0.32
+0.60
+1.92
+1.52
+1.32
3.50
3.50
8.30
+2.70
+3.20
+1.60
+2.00
+2.40
1.92
0.60
4.80
-3.42
+0.60
+1.80
6.76
4.63
-1.84
-1.22
-0.42
2.46
0.39
1.8
0.6
2.64
3 + 060
3 + 000
ground
5.04
road
Fill
3.05
6.14
1.02
Station 3 + 060
Station 7 + 500
8.90
5.82
1.22
Cut
4.8
1.52
60 - x
1.32
0.32
0.60
3.5
0.64
3.5
2.64
1.02
3.42
5.82
8.9
8.3
2.0
3.2
2.7
5.4
2.4
1.6
3.5
3.5
1.80
1.38
4.8
3me Problme
The following data are cross-sections of
segment of road grading network. The road
bed is 6 m wide in cut and 4.8 m in fill. The side
slopes for both cut and fill is 1:1.
Station 2 + 980
5.04
0.60
5.46
-2.64
+0.39
+2.46
4me Problme
From Station 0 + 200 with center height of 1.4
m in fill, the ground line makes a uniform slope
of +5% to station 0 + 260 whose center height
is 2.8 m in cut. Assuming both sections to be
trapezoidal with a roadway of 10 m and side
slope of 2:1
1. Compute the grade of the finished
roadway.
2. How far from Station 0 + 200 will the filling
extend?
3. What is the area of the section at Station 0
+ 250?
0 + 260
ground
+5%
0 + 200
1.4
road
Cut
2.8
C = 10.8 m D = 6.8 m
E = 7.6 m
F = 9.2 m
G = 10.6 m H = 8.6 m
I = 7.2
J = 10.2
K = 9.4 m
M = 7.2
N = 6.2
O = 9.6 m P = 8.9 m
Fill
1.2
B
3.3
0.2
L = 6.9 m
C
2.9
D
5.8
1.8
30
E
60
F
2.6
G
4.2
H
5.6
3.6
30
I
0 + 260
0 + 250
J
2.2
5.2
2.8
L
4.4
1.9
30
N
2.2
0 + 200
30
O
1.2
3.9
4.6
30
30
1.4
60 - x
4.2
10
2.1
2
4.2
2.1
10
Exercise
1r Problme
From station 10 + 100 with center height of 3.4
m in cut has a ground line which makes
uniform slope of -4% to station 10 + 180 whose
center height in fill is 1.2 m. Assume both
sections to be trapezoidal having a width of
roadway of 8.0 m and side slope of 1:1 for
both cut and fill. If the shrinkage factor is 1.3,
compute the difference in volume of cut and
fill in cu. m. (Ans: 996.18 sq m.)