Vol. 2-BoQ, Tech. Spec. & Drawings-Landscape and Irrigation-NCSCM
Vol. 2-BoQ, Tech. Spec. & Drawings-Landscape and Irrigation-NCSCM
of
TENDER DOCUMENTS
Technical Specification,
Bill of Quantities and Drawings for
Landscape
WORKS at
NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT
CHENNAI
Architects
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
DESCRIPTIONOFSITEANDPROJECT
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
1.BRIEFPROJECTDESCRIPTION
CLIMATE:
(a)
TEMPERATURE:
TheprojectliesintheStateofTamilnadu.LocatedontheCoromandelCoastoffthe
Bay,Chennaihasatropicalwetanddryclimate.Thecityliesonthethermal
equatorandisalsoonthecoast,whichpreventsextremevariationinseasonal
temperature.ThehottestpartoftheyearislateMaytoearlyJune,knownregionally
asAgniNakshatram("firestar")orasKathiriVeyyil,withmaximumtemperatures
around3540C(95104F).ThecoolestpartoftheyearisJanuary,withminimum
temperaturesaround1522C(5972F).Thelowesttemperaturerecordedis13.8C
(56.8F)andthehighestrecordedtemperatureis45C(113F)
.
(b)
RAINFALL,HUMIDITY:
Theaverageannualrainfallisabout140cm(55in).Thecitygetsmostofitsseasonal
rainfallfromthenortheastmonsoonwinds,frommidOctobertomid
December.CyclonesintheBayofBengalsometimeshitthecity.Thehighestannual
rainfallrecordedis257cm(101in)in2005.PrevailingwindsinChennaiareusually
southwesterlybetweenAprilandOctoberandnortheasterlyduringtherestofthe
year.Historically,Chennaihasreliedonannualmonsoonrainstoreplenishwater
reservoirs,asnomajorriversflowthroughthearea.Chennaihasawatertableat2
metresfor60percentoftheyear.
(c) ACCESSTOSITE:
The site is Located within the Campus of Anna University, The university's main
campusissituatedinthesouthernpartofChennaiandextendsover110acres(45,154
m)adjoining theAdyar Riverand theRaj Bhavan. It contains the College of
Engineering,Guindy,AlagappaCollegeofTechnology,andSchoolofArchitectureand
Planning.
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
(d) PROJECTLAYOUT:
Projectlayoutforthecontractsisgiveninthedrawings.
(e) EXPECTEDCONSTRUCTIONPERIOD:
Expectedconstructionperiodfromcontractsis4monthsfromthedateofblockcivil
workcompletion.
(f)
FACILITYANDSERVICESPROVIDEDBYTHEEMPLOYER:
FreeaccesstotheworksiteswillbeassuredbytheEmployer.
The appointed contractor will organize for the supply of water and electricity during
theperiodofworkscompletion.Subsequently,duringtheperiodofmaintenance,the
employerwillprovideforthesame.Contractortopriceaccordingly.
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
SCOPEOFWORKS
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
SCOPEOFWORKS
AlltheSoftcapeworks,pertainingtotheLandscapeworks,willhavetobedoneatNCSCM
campus,AnnaUniversityChennai.asperthespecialconditionsofthecontract.Theentire
projectareaisprimarilylowfertilewiththebasicnatureofthesoilbeinghighlysalineand
almost zero percolation which allows selective vegetation. While utmost care has been
takenonlandscapeproposalfortheareabutplantationworksrequirededicatedeffortfor
ensuring survivability of the planting materials requires appropriate level of expertise and
experiencesinhandlingofthework.Thelandscapeshallbeinstages,primarilyasperthe
availabilityofthesiteaftercompletionoftheCivilWorksonthedesiredstretch.Thebroad
scopeofworkismentionedasbelowwhilethedetailedperformanceofthecontractorshall
be gauged based on the schedules as provided in the Conditions of Contract and
Specification.
1.SPEEDYWORK:
FollowupwiththeCivilContractorsforhandingoverofthesiteindesiredstateforspeedy
landscape works. Owner shall not be responsible for any delay on account of the said
reasonswhatsoever.
2.SITECLEARANCE:
ThelandscapeContractorshallensuretheareaofconcerntobeclearedofalltheunwanted
materialslikecementmix,aggregates,debris,andwastesofanytypeorleftoverofthecivil
contractorsbeforestartinghiswork.Thesameshouldbeclearedoffbythecivil
contractor and to be followedup by the landscape contractor. Inevent of the same not
being
removedoffthesitebythecivilcontractors,LandscapeContractorshallberequiredtoget
the
undesirablewasteincludingwildvegetationsclearedofftheoffthesiteasperinstructionof
the
SiteInCharge. The site clearance and preparation shall be at no additional cost but form
thepartandparcelofthelandscapeworks.Thesiteshallbesignedofforlandscapeworks
onlyaftersignoffbytheSiteInChargeonjointinspectionwiththeLandscapeContractor.
3.SOILPREPARATION:
Roughgradingandearthworkspersection2ofthespecification.Thisworkshallincludethe
supply, placement, shaping of earth worms, and or excavation and removal of unwanted
soilstotip,asmayberequiredandasindicatedinthegradingdrawings,detailsandtender
documents. This section includes the setting and formation of rough grading to plus or
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
minus 15cm with suitable materials to achieve the level, worms and earth contouring as
indicated in the drawings and documents. This section includes the fine grading to finish
levels to plus or minus 25mm. The contractor shall be responsible for plantation works in
the right soil medium (pHvalue not exceeding 7.5) besides other chemical composition
suitable forplanting materials.The contractorshall be required toget the proposed good
soiltestedasrecommended&acceptedbytheownerforentireLandscapesiteatdefinite
intervals (As per instruction of the siteincharge) as per instruction of the SiteInCharge.
Alsothesoiltestshallbeforthefinalmixturereadyforplantationandshouldbereported
appropriateforplantationworks.Thetestwillbeconductedonbehalfofthecontractorby
the owner and shall be liable for deduction form the landscape bill as raised by the
contractor on plantation works. Also the contractor shall be required to create landforms
(mounds&worms)asperdrawingandinstructionofthesiteinchargeforfacilitationofthe
drainageandaestheticvalueinthelandscapearea.Thissectionincludesthefinegradingto
finishlevelstoplusorminus25mm.Thepaymentshallbeonthebasisofthetotalvolumeof
theearthworkspayableincu.mt.
4.PLANTATIONWORKS:
The landscape contractor shall be required to complete the plantation works as per the
plantingschedule
5.MAINTENANCEWORKS:
ThecontractorshallberesponsibleformaintenanceofthePlantationsworksforaperiodof
one year after handover. The cost of fertilizer, pesticides, manure, and labour will be
includedinthequotation.
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
CONTRACTCONDITIONSAND
SPECIFICATION
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
CONDITIONSOFCONTRACTANDSPECIFICATION
1.GENERALTERMSOFREFERENCEFORWORKEXECUTION
TermsofReferenceDescription
a)Design&Details
Contractor has to work as per the designs and lineout details provided by Landscape
Consultant.Difficultyonsiteinexecutionaspertheplan/designhastobebroughttothe
noticeofsiteinchargeimmediately.
Anydiscrepanciesinthedesignsubjecttoexecutionhurdlesandalterationrequiredshould
be reported to siteincharge and the same should be improvised by the landscape
consultantorasperinstructionofthesiteinchargeandcontractorshallhavetoworkonly
afterdueapprovalofthemodification.
b)LandscapeSite
Preparation
ThelandscapesiteshouldbefreeofanyConstructionDebrisorwildvegetation.Itshallbe
responsibility of the contractor to ensure that the site is in working condition as per
instruction of the siteincharge. The contractor shall also ensure proper grading of the
landscapesiteintermsofaestheticsaswellasdrainageprovidingmountsandslopeswitha
gentleslopetowardsnaturaldrainagedirectionAllrubblesanddebrisifanyanddisposeit
of in the suitable location possibly in low lying areas as identified by the contractor and
approvedbysiteincharge.
c)SoilTesting
TheSoiltobeusedasTopSoil(GoodSoil/earth)forallplantationworksshallbeprimarily
imported fertile soil from agriculture fields off the site. The contractor should get the soil
test reportand accordingly with experts and consultantswould meet the requirement for
additives
and soil conditioner to possibly maintain pH value of the soil between 7.0 7.5 before
plantation works. Also after every 6 months or as required on poor performance of the
plantationshall
accordingly get the soil tested and measures taken for maintaining the pH value within
acceptablerange.AlsoContractorshallundertaketreatmentasperadviceoftheexpertsto
soil
conditioningduringtheentiremaintenanceperiod
d)ManpowerEmployment
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
Contractor should employ qualified & experienced garden supervisors and adequate
number of gardeners to maintain the quality of garden and tree plantation to the
satisfaction of Horticulture Department. A senior supervisor [M. Sc. (Horticulture) or
B.Sc(Agriculture)with810Yearsofrelevant&similarworkExperiences.shouldbedeputed
asanoverallinchargeofthewholecontractwhowillultimatelyreporttotheSiteInCharge
The deployment of the maintenance staff should be adequately provided as per the
ScheduleoftheMaintenanceStaff.
e)HandingOver
Thecompleteworkcanbechosenforcompletioninstagesprovidedthesameissubmitted
asastructuredscheduleforworkcompletionshowingstagecompletionasmilestonebefore
start of the work and hence approved by the siteincharge. The stage completion of the
workshallbedeemedaspartcompletionandliableformaintenanceperiodofthecontract
agreement.However,finalcompletionliableforissueofthevirtualcompletionofthework
shallbeonlyaftercompletionofthetotalwork.
f)Billing
Running Bill shall be raised based on virtual completion of the partial scope of work as
milestonecompletionoftheworkordervalue.
Finalbillingwillbedoneonthebasisofactualquantumofworkdone.
For evaluation of maintenance work, a joint inspection will be carried out on 25th day of
everymonthorthe1stworkingdayafterthescheduledate.
a)Damagetolawn/hedges/edges/groundcoversetc.:TermDamagerepresentsanykind
of unhealthiest or unacceptable look to the garden features. A fine of Rs.600/per sq.mt
shallbe
imposed on unhealthiness /mortality of the shrubs on basis of the plantation bed. The
contractor shall be required to attend special care to the plantation bed. In absence of
propercareandattention,theplantationbednotinstateofacceptancebySiteInCharge,
furtherfineofRs.60/per/Sq/mt/weekshallbeleviedtilltheperiodthestateisreinstated
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
h)DisposalofWasteGeneralCleanlinessofLandscapeSite
Thearrangementoftransportfordisposalofwaste,shiftingofplants,etc.hastobemade
bythecontractor.Thegeneratedwastehastobedisposedoffwithin48hrsofgenerationor
asinstructed.Failingwhicharrangementshallbemadefordisposalofthesame
bytheowneratriskandcostofthelandscapecontractor.Itisthecontractorsresponsibility
tokeepthegardeningreen,healthyandinproperconditionallthetime.ownerwillprovide
the place for disposal of garden waste within premises for Vermicomposting to be
compulsorilyadoptedbytheContractor
i)ProvisionforWater
ForTrees@20ltrs/everyalternatedayofwateringshouldbeprovidedtoeachofthetree
planted.
For Shrubs@15 ltrs/sq.mt/every alternate day of watering should be provided by the
contractor
For Lawns@ 25 ltrs/sq.mt/weekly requirement of watering should be provided by the
contractor
Themaintenanceoftankersoranyappropriatesystemshallbeintegralresponsibilityofthe
Contractor to meet the watering requirements of the Trees, shrubs and lawns under any
circumstancesduringtheplantingperiod.
j)Electricity
k)Maintenance
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
10
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
TheContractorshalladheretothemaintenancescheduleDuringthemaintenanceperiodof
allthePlants,contractorshallberesponsibleforanyreplacementtowardsmortalityandthe
trees or the area of the plantation under shrubs/creepers/ground covers etc should be in
healthyconditionduringtheinspectionconductedbythesiteinchargeonevery25thday
ofthemonthtoavoidthepenaltyclause(g)andalsosubsequentlyamountingtoholdingof
thepaymentdueforquarterlyinstalment..Contractorshallmaintainrecordofmaintenance
&operationsonsiteandsubmitdailyreportforalltheareascertifiedforvirtualcompletion
ofthework.AlsothecontractorshalltakenoteoftheobservationofthesiteinChargeor
his representative/Horticulturist and seek compliance of the same at the earliest before
nearestscheduletoavoidanypenaltyasperpenaltyterms
l)Reports
The Contractor shall maintain daily report on the deployment details as well as work
plannedforthedaytotheSiteInChargeinprescribedformat.Allinstructionsandactivities
shallberecordedasperthedesiredformat.Anyproblemorhindranceshallbebroughtto
noticeinthedailyreportalongwithevidenceinformofphotographs.Alsothecontractor
shallberequiredtomaintainStockRegisteratalltimesfortheplantingmaterialsourcedto
OwnerssiteandSupplyforplantationintheNurserymaintainedbytheContractor.
m)NurseryMaintenance
OfficeSetup
TheContractorshallberequiredtosetupOfficeforitsstaffandNurserywithgoodmicro
climatetostorethesupplyoftheplants.Incaseofpropagationoftheplantsinthenursery,
thesameshallbeusedonsiteonly.
n)VermiComposts
The Payment shall be processed on the basis of the area handed over after development
and planting as completion of the milestone .The certificate and the date there in for the
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
11
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
virtual completion of the work shall entitle the contractor for continuance of the
maintenancefor12months.PaymentTermsbasedontheitemratesforthequantumofthe
certifiedvirtualcompletionoftheworkshallbeasfollows
30%AgainstMobilizationofmaterialandlabour
30%OnVirtualCompletionoftheWORK
20%After6MonthsoftheVirtualCompletion
20%After12MonthsoftheVirtualCompletion
ThesiteInChargeshallbefullyempoweredtoholdthepaymentincasethecontractoris
observed negligent to the maintenance works, mortality of plants not attended by the
contractorforimmediatereplacementofthesamebyhealthyplants.
2.PLANTINGSCHEDULE
TREEPLANTATIONS
Sl.NoTermsofReferenceInstruction&Procedures
A.SupplyofTrees
1PhysicalCondition
Allplantmaterialsshallbehealthy,sound,vigorouswithgoodfoliage,Plantssuppliedshall
beconformingtothenameslistedontheplantlist.Noplantmaterialswillbeacceptedif
branchesaredamagedorbroken.Allmaterialmustbeprotectedfromthesunandweather
untilplanted
2HealthofTrees
All plant materials shall be free from plant diseases, insect pests, or their eggs, and shall
havehealthywelldevelopedrootsystems.Plantmaterialshallbewellformedandshaped
true to type and free from disease, insect and defect such as knots, windburn, sun-cold,
injuries, abrasion or disfigurement.
3SpecificationofTrees
Innocase,thespecificationofthematerialintermsofheight,Girth&Foliageasmentioned
intheBoQshallbeacceptableforplantationworks.Incaseofinavailabilityoftheparticular
speciesortheplantingmaterialasperspecificationinBoQ,thealternatespeciesorlower
specificationasthecasemaybeshallhavetobeapprovedbysiteinchargeinspecialcase
afterdueconfirmationofthelandscapeconsultant.
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
12
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
LowerSpecificationasmentionedintheBOQacceptedbythesiteinchargeunderspecial
conditionshallberenegotiatedforalowerratedependinguponthespecificationofthe
plantssourcedbythecontractor.
B.PlantingofTrees
1PitSize:
Minimum Pit Size for all trees should be of the size as specified in BOQ. In case of larger
treespitsizeshouldbeofasspecifiedinBOQ.
2SoilPreparation:
Preparationoftreepits:
ThesoilshallbeessentiallygoodEarthmixedwith1/3rdofdecomposedfarmyardmanure
alongwithadditiveslikeGypsum,sulphur,ZincSulphide(ZnS)etcorasspecifiedinBOQto
maintainphvalueofthesoilbetween77.5.
3Plantingoftrees:
Plantingoftreesandstacking/proppingtoprotectthetreesfromwindandirrigateonneed
basis.Maintainthetreebasinsfreeofweedsbyregularhoeing.Plantingthetreewithroot
ballinthepit(tingrown/polybaggrown)afterremovingcarefullyandwithoutdisturbing
the root. Pressing the soil firmly around the tree planted. Preparing the basin around the
treeandwateringafterstakingandtying.Theplantshouldbewellmaintained,diseasefree,
welltrimmedatthetimeofhandingover.Incaseofdeathoftheplantthecontractorneed
toreplacethesame
withequallywellgrownhealthyplant.
4Stacking/Propping:
ToensureprotectionfromWindsstaking/proppingitwithbambootripodusingjutestring.
In all condition, tree should be standing in erect position The staking should have anti
termitetreatment.
5Fertilizers/organicsolidmanuresandliquidmanures,spraybioinsecticides,parasites,
predators:
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
13
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
Alltheplantingmaterialsshallbeperiodicallyexaminedfortermiteattacksorplantdisease
and appropriate measure (application of liquid manures/ growth regulators/ pesticides as
perneed,weedingregularlysoastokeeptheplanthealthyallthetime)shallbeundertaken
forentireperiodofthecontract...RequiredatthetimeofPlantationandentireperiodof
maintenanceasperMaintenanceSchedule
6WateringArrangement
MakingbasinaroundTrees(1mtrdiaclearspace)andmaintainingToolsandTackles/Hose
pipes, tractor mounted Water Tankers or as required in sense all arrangement for water
distribution and watering equipments/manpower to be managed by the Contractor for
wateringthetrees.
C.HandingOverofTrees
1NamePlateforTrees
AllTeesplantingshouldhaveNameTagwithnameoftherelevantspeciesandwellplaced
on trees with good visual characteristics .In case of row plantation of similar species, the
samecanberepeatedatdefiniteintervalsmaybeonevery5thtreefromthestart.
D.MaintenanceofTrees
1MaintenanceofTrees
Apartfromtheessentialwateringoftheplantsasperthemaintenancemanual,Nurturethe
trees with organic solid manures and liquid manures, spray bio insecticides, parasites,
predatorstoprotectthetreesfrompestanddisease.Amendthesoilonregularbasiswith
proper soil amendments to keep the pH level between 7 7.5 after completion of
(12)Twelvemonthmaintenanceperiodtheplantsshouldbemaintainedbyregularwatering,
weeding, replacing dead plants, applying pesticides, Use of plant physical protection
measuresetc.soastogrowthemvigorously.NewlyPlantedshouldbemaintainedby
1)Wateringeveryalternatedays@20litres/wateringcycle
2)ApplyingFYM@10kg/tree/annum
3)TheTreesshouldhaveproperstakingsoasthetreeshouldstanderecttilltheTreesettles
withnopossibilityofbendingduetoWindorRain
4)Trimming,pruningas&whenrequiredunderguidanceofthesiteinchargeetc.
SHRUBSPLANTATIONS
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
14
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
Sl.NoTermsofReferenceDescription
A.SupplyofShrubs,Creepers,GroundCovers
HealthofShrubs/GroundCover/Creepersetc
Plant materialshall bewellformed andshapedtruetotype and freefromdisease,insect
anddefectsuchasknots,windburn,suncold,injuries,abrasionordisfigurement.
PhysicalCondition
Allplantmaterialsshallbehealthy,sound,vigorouswithgoodfoliage,andfreefromplant
diseases, insect pests, or their eggs, and shall have healthy welldeveloped root systems.
Plantssuppliedshallbeconformingtothenameslistedontheplantlist.Noplantmaterials
will be accepted if branches are damaged or broken. All material must be protected from
thesunandweatheruntilplanted.
SpecificationofShrubs
Thespeciesshouldbeinappropriatespecificationintermsofheight&Foliageasprovided
inBOQ.Speciesbelowspecificationshallbeliablefordeductionoftheitemrateasagreed
upon.
B.PlantingofShrubs,Creepers,GroundCovers
BedSizes
Asperthespecificationanddepthshouldbeminimum300mmdeepexclusiveofthetop
50mmwheretopedgeisdefinedforwateringandflooding.Theplantationbedshallbethe
basisofallbillingpurposeincludingmaintenancechargestobepaidtothecontractor
SoilPreparation
Dig and remove all weeds, debris, rubbles, and stones from 18" depth of the surface soil
level to be maintained in due course. The soil shall be essentially good Earth mixed with
1/3rd of decomposed farmyard manure along with additives like Gypsum, sulphur etc to
maintainphvalueofthesoilbetween77.5.
Preparationofsoilforgrass,groundcover,edges,shrubsandflower
beds:.Thenpreparethesamesoilwith23"thicklayerofwelldecomposed,weedfreefarm
yard manure or vermicompost. Treat the soil with chloriphyriphos / Lindane / Neemcake
depends upon the infestation of soil borne pests. Treat the soil with proper herbicide to
control the weeds only on need basis. Finally level thesoil as per thedrawing or planting
details.
Preparationofpitsforshrubs,creepersandhedges:Thebedshallbepreparedwithgood
earth mixed with 1/3rd quantity of decomposed farmyard manure along with Planting a
saplingofshrubs,groundcovers,lilies,suckeringplantsetc.asperdesignplantspacing30
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
15
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
16
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
C.HandingOverofShrubs
DateofHandingOver
The Shrubs planting should be done in the selected stretch as released complete /partial
scopeofworkNamePlateforShrubsTheShrubsplantingshallbeprovidedwithNamePlate
to specify the type of shrubs planted as per the bed and in case of longer beds at
appropriateintervalssothatthesamecanbeidentifiedatdistantobservations.
D.MaintenanceofShrubs
Aftercompletionof12(Twelve)monthmaintenanceperiodtheplantsshouldbemaintained
byregularwatering,weeding,replacingdeadplants,applyingpesticidesetc.soastogrow
themvigorously.
b) Trees & plants: should show regular healthy growth through regular maintenance by
manuring,fertilizing.Useofplantprotectionmeasures,adequatewateringetc.
1. Maintenance of all developed features ground cover, hedges and shrubs etc. of the
complex.Maintenanceworkincludestimelypruning,weedingandcuttingofgroundcover
plants, hedges, edges, plants planted in the areas mentioned above. Application of
fertilizers,manure,etctothelawn,plantandsprayingpesticideetc.asandwhenrequired.
2.Seasonalflowerbedshavetobereplacedasandwhenrequired(approximatelythriceina
year). Plant species can be changed w.r.t. season only in consultation with horticulture
department.
3.Removalofwildgrassnormallyfoundgrowinginrainyseasonbycuttingand/oruprooting
soastokeeptheareasfreeofgrass.
A.SupplyofLawns
17
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
SoilPreparation
Top200mmdepth:ThesoilshallbeessentiallygoodEarthmixedwith1/3rdofdecomposed
farmyardmanurealongwithadditiveslikeGypsum,sulphuretctomaintainphvalueofthe
soilbetween77.5.PlantingDibblingofgrass:Finelevelthesoil,applythinlayerofsand,
vermicompost and Neemcake mixture of 1" thickness and dibble the grass at 3" distance.
Rollthelawnafterplanting.Irrigatethelawnregularly.Removeweedsonperiodicalbasis.
Nurture the lawn with organic, bioinsecticides, parasites, predators to protect the lawn
frompestanddisease.Mowthelawnregularlyandmaintainthegrassat50mm(2")height.
Trimalltheedgesaftermovingkeeptheedgeswithtrees,shrubberyandflowerbedsclean.
The Carpet Grass primarily Japonica would be brought in Rolled carpet form in healthy
condition and shall be placed on the already prepared surface and Light roller should be
usedforsettingoftheedgesforsmoothcarpetlawns.Thewateringofthelawnshouldbe
sufficientforthrivingofthelawntogrowthenvigorouslyFertilizers/organicsolidmanures
and liquid manures, spray bio insecticides, parasites, predators Required at the time of
PlantationoraspermaintenancescheduleWateringRequirementsToolsandTackles/Hose
pipes,tractormountedWaterTankersorasrequiredtobemanagedbytheContractorfor
wateringthetrees.
C.HandingOverofLawns
Thelawnareasshouldbeconsideredfitforhandingoveroncethelawnshavesettledand
thesurfacestartsshowingthelawneffect.
D.MaintenanceofLawns
For 12 (Twelve) month maintenance period the Lawns should be maintained by regular
watering, weeding, replacing dead Spots, applying pesticides etc. so as to grow them
vigorously.TheLawnshouldberegularlymowedandmaintainedasgoodgreencarpettill
thefinalcompletionofthemaintenanceperiodasperthemaintenanceschedule.
3.MAINTENANCESCHEDULE
3.1GENERALOBLIGATIONS
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
18
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
a. The Landscape Contractor shall maintain the works for the maintenance period. The
Employerreservestherighttoterminatethemaintenanceperiodatanytime,wherebyno
additionalchargesaretobemadebytheLandscapeContractortotheEmployer.
c.TheLandscapeContractorsHorticulturistshallinspectthesiteeverydayandshallsubmit
reporttotheownerontheiractionsandclosureofthependingworks.Alsoonweeklybasis,
theContractorsHorticulturistshallprepareabriefscheduleofoperationsplannedforthe
weekwithtargetdates.
d.Thedailyreportandtheweeklyscheduleshallberunningrecordofproposedoperations
whichwouldbecheckedatthemaintenanceinspectionseverymonth.Ifintheopinionof
the Landscape Architect/Site-In- Charge, the maintenance works have not been satisfactorily
carried out according to site conditions and the specifications, the quarterly payment will be
withheld until the works have been satisfactorily carried out besides the penalty as in the
penalty clause.
e. The Landscape Contractor shall take all necessary measures to ensure that all pot plants,
trees and shrubs and other plants shall thrive and become established within this period. All
landscape areas will be inspected and list of remedial works issued after each inspection. All
items on the remedial lists are to be carried out by the time of the next inspection.
f. The Landscape Contractor shall keep the landscape areas clean and tidy at all times and
dispose of all waste materials arising from the cleaning.
g. If the Landscape Contractors works are found to be unsatisfactory, payment shall be
withheld and the maintenance period extended for the period of time that the landscapes
maintenance has not been satisfactory. All cost associated with the extension of time shall be
borne by the contractor.
3.2MAINTENANCEOFPLANTEDAREAS:TREES,SHRUBS,CLIMBERS,HERBACEOUSPLANTS
ANDGROUNDCOVERS
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
19
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
a.TheLandscapeContractorshallwateralltrees,palms,shrubs,groundcover,herbaceous
plantsandotherplantingareasasoftenasnecessarytokeepthegroundmoistallaround
andtothefulldepthoftheroots.
b.OnlyfreshwatershallbeusedfortheWorks.TheOwnershallprovidewaterrequirement
oftheplantingmaterialsbutwateringshallbealltime(WorkpresenceoftheContractoron
site)responsibilityoftheContractortillthetimepropersystem(Irrigation)isplacedbythe
Owner. Landscape Contractor shall supply all water requirements at his own costs. The
LandscapeContractorshallsupplyhisownhosesandsprinklerstodistributethewater.
c.Watershallbeappliedusinganapprovedroseorsprinklersoasnottocausecompaction
orwashoutsofthesoilorlooseningofplants.TheLandscapeContractorshallimmediately
makegoodanysuchdamage.
d.Allplantingbedsaretobekeptinaweedfreeconditionwithaweedingoperationasper
maintenance schedule or more regularly as required. All weeds, stones and rubbish
collectedfromthisoperationshallberemovedfromthesitebytheLandscapeContractor.
e. Firming up and adjusting of stakes/ties shall be carried out monthly to ensure that the
trees and shrubs are firmly held in ground. If required, guy ropes or tree ties shall be
adjusted,tightenedorloosened.Iftreetiesorropesarerubbingthebarkofthetrees,the
tiesaretobetakenoffandretied.Anydamagedbranchesaretobecarefullyprunedand
thewoundssealed.
f.Allprotectivefencingistobemaintainedandkeptingoodconditionaslongasrequired
onsite.
g.Allshrubsandgroundcoversaretobereviewedmonthlyandprunedaspermaintenance
scheduleorasandwhenrequiredduringtheMaintenancePeriodtopromotebushygrowth
andgoodfloweringcharacteristics.Theshrubsshallbecheckedandalldeadwood,broken,
damagedorcrossedbranchesshallbecutback,dependingonspecies.
h.Pruningforallplantsshallbecarriedoutasfollows:
20
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
Composting.
i.Allhedges,matformingherbaceousplantsandgroundcoverplantsshallbeclippedwith
shearsasoftenasnecessary(atleastmonthly)tomaintainatidyappearance.Tallhedges
aretobecuttoformsshownonthedrawings.
j.Selectivepruningoffloweringplantsshallbedonewherespecialfloweringcharacteristics
arerequiredsuchasforIxoras,Hibiscus,andBougainvilleaetc
k. The Landscape Contractor shall on continual basis supervise and attend to fertilizer
needs/disease control/termite or fungus control as maintenance operations during the
entire period of contract An approved fertilizer/insecticides/pesticides shall be applied to
each plant at the rate provided in the maintenance schedule or as suggested by the
HorticultureAdvisortotheOwner.Fertilizershallapplythefertilizerevenlyspreadoverthe
entireareaandlightlyforkedintothesoils.Allareasshallbewellwateredimmediatelyafter
applicationoffertilizer.
l.Thehorticulturalrequirementsofdifferentplantsorareasmayinvolvevariationstothose
techniques(suchastheuseoforganicliquidfertilizersforsensitiveplants)andvariationsin
methodwillbeauthorizedasrequired.
m.Mulching.Anadditional25mdeepmulchinglayeristobespreadoverallplantedareas
(except groundcover and turf), once every 6 months or as specified in Maintenance
Schedule.
n. The Landscape Contractor shall make regular weekly checks to ensure that the plant
materialisinsectandpestandfree.
3.3MAINTENANCEOFLAWNAREAS
a)TheLandscapeContractorshallmowalllawnareasusingapprovedcuttingequipmentto
maintainacloseswardtoaheightofnotlessthan20mmandnotmovethan45mmforall
grasstypes.Mowingshallbecarriedoutweekly,exceptindryweatherandgrassshallnot
beallowedtoflowerbetweencuts.Allclippingstobegatheredupandremoved.
b)Allgrassareasaretobewateredduringdryweatherasoftenasisrequiredtokeepthe
grassgreenandthesoilmoist.TheLandscapeContractorshallmakeweeklyinspectionsare
tobemadetodeterminetheneedforwater.
c)FertilizerofNPKvalue101515orsimilarapprovedbespreadatarateof40gm/m2over
allgrassareasat6monthsintervalsusingapprovedspreadingequipmenttogiveanoverall
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
21
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
evenspread.EverythreemonthsbetweentheNPKapplicationthegrassareaswillreceive
and application of 4600 at 1kg/100m2.Grass areas that have been fertilizer shall be
wateredimmediately.IfthetopsoftheAnoxopusturnredalightapplicationoflimeusing
magnesium,limestoneoragriculturallimeinpowderformistobeappliedindryweatherat
arateof50g/m2.Afterapplicationthisistobewellwateredintothesoil.
d)TheLandscapeContractorshallapplytopdressingofnotmorethan15mmdepthoffine
sandandgranulatedcompostrakedandspreadevenlyoverthelawnareastofillinthelow
spotsandlevelthegrassareas.Thenexttopdressingshallbeappliedonlyafterthegrass
hasgrowntoamowableheight.
e)Thereshallbeatleasttwoapplicationsoftopdressingduringthemaintenanceperiod.If
depressionsorbumpsover25mmdeeporhighoccurinturfareasduringhemaintenance
period these are to be levelled out by lifting the turf and raising the soil level with
sand/compostmixortrimmingsoiltolevelgrades,followedbyreturfing.
f)Grassareasaretobekeptfreefromweeds,annualgrasses,fungusandinsectattack,and
stones or other debris throughout the maintenance period as often as is required.
Assessmentoftheseoperationsistobepreparedonthebasisofthebiweeklymaintenance
inspectionchart.
g)Ifcompactionorconsolidationtakesplaceorhardpanningorbakingofthesoiloccurs,
thesoilareasaretobewellwateredfirstandlightlyloosenedbymechanicalmeanssuchas
spiking,slittingorhollowtinningusingequipmentapprovedbytheLandscapeArchitect.
3.4DETAILSOFPERIODICMAINTENANCEACTIVITIES
Sl.NoOperationFrequency
(Times)Period/DurationafterHandingOver
1IrrigationAsperDemandorasspecifiedunder
(a)InSummer15MonthEveryAlternateDay
(b)InrainySeason5to7monthlyorasperclimaticcondition
(c)Inwinter10Monthly
2Weeding2Monthly
3ForkingofthePlants&Shrubs2Monthly
4EdgingOnceMonthly
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
22
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
5GrassCutting2Monthly
6TrimmingofShrubs/GroundCovers:
OnceMonthlyorasperinstructionoftheSiteincharge.
7PruningofBigTrees2Yearly
8Mulchingi.e.,50mmthicklayerfinepowderedFYMorCocopit/vermincompostOnce
inamonth.
9Fertilizing
(a) Lawn (NPK value 101515)250 Grm/sq.mt at interval of after planting with enough
wateringOnceQuarterly/HalfYearlyasinstructedbySiteInCharge
(b)Shrubs & Ground Covers etc @ 50 grm per sq.mt with enough watering Once
Quarterly/HalfYearlyasinstructedbySiteInCharge
(c)Trees@50gramsperTreeOnceQuarterly/HalfyearlyasinstructedbySiteInCharge.
10Gypsum+SulphurformaintainingpHValueat7to7.5@200grm/sq.mtoras
instructedbySiteInChargeinconsultantwithHorticulturistorLandscapeConsultantOnce
Yearly.
11SiteCleaning&maintenanceofGeneralAppealoftheSiteDailyas&whenrequiredbut
siteshouldbemaintainedclean.
3.5DETAILSOFMAINTENANCESTAFFREQUIREMENT
Aspertheminimumneedofthemaintenancerequirementtothelandscapedevelopedarea
ongrossbasisasperthemaintenanceschedule,thefollowingnumberofthepersonshallbe
requiredfordesiredactivitiesbasednonthe5Acres(20235sq.mt)areaunderlandscape.
Sl.NoManpowerDescriptionNos:
1TrainedGardeners+laborers12
2Supervisor01
3TractorDriver&Helper02
4.TotalManpower(per5Acres)15Nos
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
23
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
Besides,thecontractorshallhavetodeployahorticulturistaspercriteriaspecifiedinthe
Section5:SpecialConditionsofContractClause1(d)
4.SOILTESTING
TheContractorshallberequiredtogetthesoiltestdoneasperinstructionandsupervision
oftheSiteInChargeforensuringthesoilcorrectionbeforetheplantationworks.Thesoil
test shall be done @ minimum 20 Nos, the location selected randomly by the Site In
Charge.
Sl.NoParametersAcceptancevalue
1)pHValue7.5
2)NitrogenBetween2560ppm
3)TotalSolubleSolids0.01%
4)Chloride20mg/kg
5)CarbonatesBetween1&60%
6)OrganicMatterBetween1&60%
7)PhosphorousBetween4&5ppm
8)CalciumBetween150&250ppm
9)MagnesiumBetween11&20%Between7and10pap
10)SalinityBetween420&12Months0ppm
11)SodiumLessthan5%
12)PotassiumBetween90&125ppm
13)SodiumAdsorptionRatio(SAR)Between12%to15%
14)SulphureasSulphateBetween7&12ppm
15)IronBetween5&20ppm
16)BoronBetween0.5&1.0ppm
17)ZincBetween1.2&3.5ppm
18)CopperBetween0.3&1.0ppm
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
24
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
5.PLANTINGPRACTICESAPPLICATION
A.REQUIREMENTOFSOILPREPARATION,PLANTINGANDMAINTENANCE
MATERIALS
a.SoilConditioner
Soil Conditioner shall be Peat Moss, organic compost composted rice hulls or other
approvedfibrousorganicmattersuitableformixingwithtopsoiltomakeafriablegrowing
medium for plants. It shall be resistant to rapid decay, free from soluble salts (below
900ppm),pH67,freefromlargelumpsordebris.CocoPeatwillnotbeaccepted.Asample
shallbesubmittedtoandapprovedbytheLandscapeArchitectpriortoinstallation.
b.OrganicCompost
Organiccompostshallbeanorganicvegetablecompostproducedthoroughahorticultural
orindustrialcompostingprocess.Compostistobeclean,decomposed,smellfree,andfree
ofanydebris,refuse,clayorvisiblefungus.Asampleandtestdataistobesubmittedfor
approvalbeforeuse.Allcompostistobesterilizedbeforebeingpackedfortransport.Any
odorous materials delivered to site will be rejected. Any vermin resulting from use of
organiccompostwillhavetobecontrolledbytheLandscapeContractorwithin12hours.
c.PeatMoss
PeatMossshallbefibrousfreshwaterpeatfromvegetablefibre.PeatwillhaveapHof5.8
6.5andshallbefreeofsolublesaltsgreaterthan900micromos;Peatshallbefreeoflumps,
sticksorstonesgreaterthan5mm.
d.CompostedRiceHulls
Ricehullsshallbepartiallycompostedandfreefromlivericeorweedseeds.Thericehull
compostshallbenitrogenstabilizedandfreeofparticlesgreaterthan5mm.
e.Sand
Sand shall be clean, coarse, well graded material, free from soluble salts. Particles shall
rangeinsizesothat80100%passesthe1mmsieveand050%passesthe250micronsieve.
f.Fertilizers
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
25
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
Chemicalfertilizersshallbeapprovedgranularfertilizers.Fertilizermaybesingleelementor
compound,normalorslowreleasecompoundfertilizers.Theyshallbestoredinwaterproof
sealedbagsundershelterawayfromwateranddirectsunlight.Samplesshallbesubmitted
to, and approved by the Landscape Architect, before use in the Works. Organic fertilizers
shallbeorganicproductssuchasorganicliquidfertilizer,pelletsorgranulesmanufactured
primarily from organic materials. These products are to be from accredited sources and
technical data indicating sources of origin and manufacturing process must be submitted
and approved before use. Animal byproducts must be sterilized before being packed for
transportandodorous
materialsusedonsitewillberejected.
g.Mulches
Mulches shall be an approved friablecomposted organic material such as Oil Palm husks,
organic compost or an approved mix. Cocopeat will not be allowed unless mixed in a
proportion of 5050 with another mulching material free from soluble salts or toxic
materialsandresistanttorapiddecay.MulchesshallhaveapHof5.57.0.Samplesareto
submittedtotheLandscapeArchitectandapprovedbeforeuse.Mulchesaretobeapplied
ina50mmthicklayerovertheentiresurfaceofshrubandgroundcoverareas.Mulchingisto
be reapplied to expose soil in planting areasevery 3 months after initial installation until
the end of the maintenance period or until complete surface cover by vegetation is
achieved.Initialmulchingistotakeplacewithintwodaysofinstallationofplanting.
B.STAKING&SUPPORTS
a.General
i.Stakesshallalwaysbeusedwhenplantinginstanttrees,standardsandsinglestempalms
andfortallshrubsasindicatedinthedrawings.
ii.Stakesshallbemangrovepoles,bambooorequalandshallbeappropriatetothesizeof
theplanttobesupported.
b.Guying
i.Guyingshallbeusedforlargetreesorpalms.Aminimumofthreewireguysaretobeused
pertree.Eachguywireistobefastenedbyalooparoundthelowestbranchesofthetreeat
the junction with the main trunk or stem. Loops are to have protective rubber or plastic
hosetopreventchafingandaretobefastenedbacktotheguywirebymeansofUclamps.
Wire shall be 2.5mm PVC coated GI wire, green colour. Palms shall have 5mm x 3mm x
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
26
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
30mmbatonsfastenedaboutthetrunkwithGIwireattheheightwheretheguywiresare
tobesecured.Guywireswillfastentothebatonsandnottothemaintrunk.
ii.Guywiresaretobefastenedatgroundleveltoshortstakesfirmlydrivenatanangleinto
theground.Stakesshallbe5mmGIcoatedangleironor75mmmangrove.Stakesshallbea
minimumlengthof600mmandaretobedrivendeepenoughtoresistmovement.Anotch
istobemadenearthetopofeachstakeforthefasteningoftheguywire.Stakesshallbe
positioned equally around the tree and shall extend at least 300mm beyond the tree pit.
Distance away from the tree shall be gauged on site to provide firm and secure guying.
Distance of stakes and final positions shall be finalized on site to provide firm and secure
guying.
iii. Each guy wire is to have one turnbuckle located near the fastening to the stake. Guy
wiresaretobekeptproperlytensionandadjustedtomaintainthetreeinaverticalposition
withoutguywiresbeingrigid.
c.DoubleStaking
i.Doublestakingshallbeusedforstandardtrees.Two50mmx50mmstakesshallbedriven
intothegroundverticallyoneithersideofandoutsidetherootballofthetreesoastoform
astraightlinewiththestematthecentre.Stakesshallbedrivenintopenetratethebottom
ofthetreepitandbedeepenoughtoresistlateralmovementwhentested.Stakesshallnot
extendbeyondthelowestbranchofthetreeandifnecessaryaretobesawnoffatthetop.
ii.Fasteningorsecuringofthetreemaybecarriedoutbyusingeither:
a)Crossbarawoodencrossbarofsamesectionasthestakesisfastenedinahorizontal
positiontotheoutsideofthestakesby nailsortyingsecurelyatalevelbelowthelowest
branch. The tree is fastened to the cross bar with a single adjustable tie of an approved
rubberized or plastic type with a spacer and shall be fastened to prevent any chafing or
abrasionofthebark.Nailsorfittingsarenottobedrivenintothetreetrunk.
b)Wire/HoseloopsTwoseparatewireorropeloopsaremadeaboutthestemjustbelow
the
lowestbranchwitheachbeingfastenedbacktooneoftheverticalstakes.Eachloopisto
haveaprotectiveoutercoveringorsheathofrubberhosetopreventchafingorabrasionof
thebark.Thewireistobefastenedtothestakesinamannerthatallowsadjustmentofthe
tension to be made easily. Tension on each wire to be equal to maintain the tree in a
verticalposition.Thewireshallbe2.5mmPVCcoatedGIwire,greencolour.
iii.WheredirectedbytheLandscapeArchitectthetreemaybesecuredwithasecondsetof
loopsatalowerlevel.
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
27
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
d.SingleStaking
SingleStakingshallbeusedforfieldtrees.Asingle50mmx50mmstakeisdrivenvertically
intotheground150mm250mmawayfromthetree.Thestakeisdrivendownbeyondthe
base of the tree pit and shall be firm when tested. The top of the stake shall be 100mm
belowthetopofthetree.Tiesaretobefastenedtoavoidrubbing,chafingorabrasionof
thebark.
e.DeadManGuying
Dead Man Guying shall be usedwhere directed by Landscape Architect. This method of
supportingtreesisforuseinareaswhereotherconventionalmethodsofsupportarenot
feasible. Prior to backfilling two pairs of preservation treated hardwood planks, minimum
100mmx50mm,arelaidacrossthetopoftherootballatrightanglessothatthetrunkor
stemisenclosedinasquare.Thetimberplanksshouldbepositionedasfarouttowardsthe
edgeoftherootballaspossiblebutkeptapproximately100mminfromtheedge.Twopairs
ofgalvanizedorstainlesssteelcablesarethenledoveratrightanglestothetimberplanks
and the ends firmly fastened into the ground at the base of the rootball or preferably
fastenedtoastructurenearby.Twinbucklesatthemidpointofeachcableareinstalledto
tightenthecablestoasuitabledegree.Cablesshouldbetightenedonlytoholdtherootball
firm.Overtighteningmaycausetherootballtosettledeeperintothegroundthandesired.
WhereverDeadManguyingisdirectedrefertotheSubContractdrawingsforparticulars.
IfDeadManguyingisdirectedwithoutadrawingtheLandscapeContractoristonotifythe
LandscapeArchitect.
f.ClimberWires
Climber wire for training climbing plants against walls shall be approved lightweight PVC
coated wire mesh, fixed at 600mm intervals to GI screw eyes. Maximum mesh coverage
shallbe12Months0mmhighx2400mmwide.Theclimbingplantsshallbetrainedthrough
thewiremeshwiththeshootsdirectedupwardsandtied.
C.WATERINGOFALLPLANTS
After planting of all plants are to be thoroughly watered using enough water to soak the
ground all around the rootball. After the water has percolated away leaving the surface
relativelydrythesoilistobelightlycultivatedtogiveanevensoiltilt.
D.MULCHING
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
28
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
Aftercompletionofplanting,wateringandlightcultivationoperations,a50mmdeeplayer
ofapprovedmulchshallbespreadoverallplantingareasexceptturfandgroundcoverbeds.
Mulchingistobedonewithin
2daysofcompletingplantingandwateringin.Thecostofmulchingisclearedtobeincluded
intheunitratesforplanting.
E.FERTILIZING
Afterplantingandbeforethecommencementofmaintenanceoperationsallplantingareas
willbefertilizedatthreemonthintervals.Plantingbedsandpitsshallbefertilizedwithan
approvedslowreleasefertilizerattherateof:
Trees:250gmpertree
Shrubs/Climbers:50gmperplantor50gms/m2
Groundcover:50gmpersquaremeter
Herbaceous/Rootedshoots:spreadaroundthebaseoftheplants
Turf areas shall receive area 46.0.0 at a rate of 1kg/100m2. All fertilized areas are to be
wateredimmediatelyafterfertilizerapplication
F.DISEASECONTROL
TheLandscapeContractorshalltakeallnecessary precautionstopreventoreradicateany
outbreakofdiseaseorinsectattack.
G.PLANTINGINTOTURFAREAS
Whereplantingistobecarriedoutinareasofturf,theturfshallbecarefullycuttothesize
ofthetreeorshrubpit,rolledandstoredforreuse,beingkeptmoistandinshade.After
planting,turfshallberelaidaroundthebaseoftheplant.TheLandscapeContractorshall
replace any turf, which is damaged during planting operations. Trees in turf areas shall
receive a 15cm high plastic trunk collar to protect the trunk from damage during turf
cutting.
H.PROTECTIONOFPLANTEDAREAS
The Landscape Contractor shall be responsible for protecting all planted areas. If it is
necessary for the Landscape Contractor to erect temporary protective fencing, the
LandscapeContractor shall be responsible for keeping the fencing in position and in good
repairuntiltheendofthemaintenanceperiod.Fencingproposalsshallbesubmittedtothe
LandscapeArchitectforapproval.
I.MAINTENANCEPRIORTOCOMPLETION
i.Afterplantingandpriortotheonsetofthemaintenanceperiod,theLandscapeContractor
shall be responsible for carrying out all necessary measures to ensure that the plant
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
29
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
materialthrivesandbecomesestablishedandthatthelandscapeareasarekeptinaclean
andtidycondition.
ii. The Landscape Contractor shall allow for carrying out the following maintenance
operationswhennecessarypriortotheonsetofthemaintenanceperiod,allasspecifiedin
section7ofthisspecification.
Replacementofdead/missingplants
Grasscutting
Watering
Cultivationandlooseningofsoil
Weeding
Pruningandclipping
Firmingupandadjustmentstakesandties
Eradicationofpestorinsectattack
Topdrawingandmulching
Fertilizing
iii. The Landscape Contractor shall be responsible for replacing any plants which fail to
survive as a result of inadequate maintenance operations, poor workmanship or poor
qualityofplantmaterialpriortocompletion
iv.TheCertificateofcompletionwillnotbeissueduntilallplansscheduledontheDrawings
andScheduleofWorksareinstalledinahealthyconditioninthemannerspecified.
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
30
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
OTHERCONDITIONS
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
31
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
GENERALHORTICULTURAL&LANDSCAPINGSPECIFICATIONS
A)
GENERAL
Horticultural operationsshallbestartedon groundpreviouslylevelled and dressed
torequireformationlevelsandslopes.
Incasewhereunsuitablesoilismetwith,itshallbeeitherremovedorreplacedorit
shall be covered over to a thickness decided by the EngineerinCharge with good
earth.
MATERIAL
a) Grass
1) CynodonDactylonDoob,Calcutta,RajghatBermuda
2) Improved/hybridstrainsofBermudagrass
3) Zoyasiagrasses.
The grass shall be fresh, free from weed and rank vegetation but having
#Rhizome#withsufficientnodesandshallbeapprovedbyEngineerinCharge
beforeplanting.
b) Farm yard manure : It shall be well decayed free from grits and any other
unwantedmaterials.
c) GoodEarth:Thesoilshallbesuitableforgardeningfreefromkanker,Moorum,
shingle,rocks,stones,brickbats,buildingrubbishandanyotherforeignmatter.
The earth shall be free from clods or lumps of sizes bigger than 75 mm in any
direction.ItshallhaveP.H.Valuerangingfrom6to8.5.
d) Oil Cake (Neem/Castor) : The cake shall be free from husk, dust, grit and any
otherforeignmatter.
e) Sludge:Itshallbeobtainedfromapproveddisposalworks.
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
32
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
C)
EXECUTION
a) Trenching:Trenchingshallconsistofthefollowingoperations:
1) Thewholeplotshallbedividedintonarrowrectangularstripsofabout1.5m.
widthorasdirectedbytheEngineerinCharge.
2)
These strips shall be subdivided lengthwise into about 1 m. long
sections. Such sections shall be excavated serially and excavated soil
depositedintheadjacentsectionprecedingit.
3)
Inexcavationanddepositingcareshallbetakenthatthetopsoilwith
allpreviousplantgrowthincludingroots,getburiedinthebottomlayersof
trenched area, the dead plants so buried incidentally being formed into
humus.
4)
The excavated soil shall be straight away dumped into the adjoining
sections so that double handling otherwise involved in dumping the
excavated stuff outside and in back filling in the trenches with leads is
practicallyeliminated.
b) ROUGHDRESSINGTHETRENCHEDGROUND:
Rough dressing the area shall include making kiaries for flooding. The trenched
ground shall be levelled and rough dressed and if there are any hollows and
depressionsresultingfromsubsidencewhichcannotbesolevelled,theseshallbe
filledproperlywithearthbroughtfromoutsidetobringthedepressedsurfaceto
the level of the adjoining land and to remove discontinuity of slope and then
rough dressed again. The supply and spreading of soil in such depressions is
payable separately. In rough dressing, the soil at the surface and for 75 mm
depthbelow,shallbebrokendowntoparticletosizenotmorethan10 mmin
anydirection.
c) SPREADINGGOODEARTH
Goodearthsludgeshallberemovedfromstacksbyheadloadandspreadevenly
overthesurfacetothethicknessorderedbytheEngineerinCharge.Itshallbe
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
33
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
spreadwithatwistingmotiontoavoidsegregationandtoensurethatspreading
isuniformovertheentirearea.
d) UPROOTINGWEEDSFROMTRENCHEDAREAS
After10daysandwithin15saysoffloodingtheroughdressedtrenchedground
withwater,theweedsappearingontheground,shallberootedoutcarefullyand
therubbishdisposedoffasdirectedbytheEngineerinCharge.
e) FINEDRESSINGTHEGROUND
Slight unevenness, ups and downs and shallow depressions resulting from the
settlement of the flooded ground, in drying and from the subsequent weeding
operations,shallberemovedbyfinedressingthesurfacetotheformationlevels
of the adjoining land as directed by the EngineerinCharge, and by adding
suitablequantitiesofgoodearth,broughtfromoutside,ifnecessary.Suchsupply
and spreading of good earth stacked at site is however, payable separately. In
finedressing,thesoilatthesurfaceandfor40mmdepthbelowshallbebroken
downtoparticlesofsizenotexceeding6mminanydirection.
f) MIXINGOFGOODEARTHANDSLUDGE/MANURE
Thestackedearthshall,beforemixing,bebrokendowntoparticlesofsizesnot
exceeding 6 mm in any direction. Good earth shall be thoroughly mixed with
sludgeormanureinspecifiedproportionasdescribedintheitemorasdirected
bytheEngineerinCharge.Themixingshallbespread asdescribedin18.5.1to
thethicknessorderedbytheEngineerinCharge.
g) GRASSINGWITHDOOBGRASS
Theareafromwherethegrassrootsaretobeobtainedshallbespecifiedbythe
EngineerinChargeatthetimeofexecutionoftheworkandnoroyaltyshallbe
chargedonaccountfromthecontractor.Thesoilshallbesuitablymoistenedand
then the operation of planting grass shall be commenced. The grass shall be
dibbled at 10 cm, 7.5 cm., 5cm., apart in any direction or other spacing as de
scribed in the item. Dead grass and weeds shall not be planted.The contractor
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
34
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
stallberesponsibleforwateringandmaintenanceoflevelsandthelawnfor30
days or till the grass forms a thick lawn free from weeds and fit for moving
whicheverislater.Generallyplantingineitherdirectionat15cm.,10cm,spacing
isdoneinthecaseoflargeopenspaces,at7.5cm.spacinginresidentiallawns
andat5cm,spacingforTennisCourtsandsportsgroundlawns.
D)PRECAUTIONS:
During the maintenance period, any irregularities arising in ground levels due to
watering or due to trampling by labour, or due to cattle straying thereon, shall be
constantly made upto the proper levels with earth as available or brought from
outside as necessary. Constant watch shall be maintained to ensure that dead
patchesarereplantedandweedsareremoved.
E)MEASURMENT
Length, breadth and depth shall be measured correct to a cm., where unit of
measurementiscumandthevolumeshallbecalculatedincumcorrecttotwoplaces
ofdecimal.
Lengthandbreadthshallbemeasuredcorrecttoacm.,whereunitofmeasurement
issqmandtheareashallbecalculatedinsqmcorrecttotwoplacesofdecimal.
Lengthshallbemeasuredcorrecttoacm.,whereunitofmeasurementismeter.
Theitemsshallbeenumerated,wheretheunitofmeasurementeach.
Fortheitemsofsupplyofmaterialthestacksmeasurementshallbetakenforlength
breadthanddepthcorrecttoacm.Thevolumeofstacksshallbereducedforvoids,
asgivenbelow,toarrivedatthenetquantityforpayment:
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
35
LANDSCAPEANDPLANTATIONWORKATNCSCM,CHENNAI.
FARMYARDMANURE
8%
GOODEARTH
20%
8%
SLUDGE
____________________________________________________________________________
FlyingElephantStudio;withVagishNaganurSignatureofContractor
36
BILL OF QUANTITIES
Project : NCSCM
GENERAL NOTES COVERING BILL OF QUANTITIES
Contractors should factor in prices for DG power / water / storage etc. None will be provided
for at site.
Unless otherwise specified the rates quoted shall be inclusive of the following ~ Cost of
material, transport, labor, overheads and profit, etc.,
No wastages shall be paid separately. The same shall be factored in the quoted rate.
Quoted rates to exclude taxes and added separately in grand summary sheet.
37
Signature of Contractor
Sl.No.
Description Of Work
Unit
Quantity
sq.m.
2400.00
cu.m.
1440.00
cu.m.
1530.00
cu.m.
175.00
cu.m.
175.00
sq.m.
2400.00
sq.m.
2400.00
8.00
sq.m.
2400.00
cu.m.
1390.00
Rate
Total Cost
(Rs.)
(Rs.)
9.00
Signature of Contractor
Sl.No.
Description Of Work
11.00
11.01
11.02
11.03
Unit
Quantity
cu.m.
1390.00
sq.m.
sq.m.
sqm
100.00
230.00
260.00
sq.m.
590.00
sq.m.
1690.00
Rate
Total Cost
Signature of Contractor
Sl.No.
14.00
14.01
14.02
14.03
Description Of Work
Unit
each
each
each
50.00
700.00
1600.00
cu.m.
317.00
Quantity
Rate
Total Cost
Signature of Contractor
Sl.No.
Description Of Work
Unit
Quantity
16.01
16.02
16.03
16.04
16.05
16.06
16.07
16.08
16.09
16.10
16.11
Pentas,
Mussaenda,
Acaalypha,
Brunfelsia,
Aphelandra,
Eranthemum,
Pseuderanthemum,
Crossandra,
Daedlacanthus,
Cestrum,
Crotons.
each
each
each
each
each
each
each
each
each
each
each
2.00
2.00
1.00
2.00
3.00
26.00
30.00
1.00
2.00
3.00
4.00
16.12
16.13
16.14
16.15
16.16
16.17
16.18
16.19
each
each
each
each
each
each
each
each
40.00
26.00
30.00
30.00
30.00
30.00
40.00
26.00
16.20
16.21
16.22
16.23
16.24
each
each
each
each
each
30.00
1.00
26.00
30.00
2.00
17.00
17.01
17.02
17.03
17.04
17.05
17.06
17.07
17.08
17.09
17.10
17.11
17.12
17.13
17.14
17.15
17.16
17.17
17.18
17.17
17.20
17.21
17.22
17.23
Supplying of Ornamantal
-stendat cassia
-Vinca Hybrid
Bougainvilla
Nerium variety
-Nicodevia
-yucca
Dahelia
-Lowsonia
-Canna hybrid
-Gladioles
-Calliandra
-Coleus
Cassia BIflora
-Caramada
-Duranta variety
-Russelia
-Acalypha variety
-Hebiscus Rosea variety
-Zerbera
-Opiopogum
-verbina
-Office flowers
-Potato creeper
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
2.00
500.00
2.00
3.00
2.00
1.00
26.00
2.00
3.00
5.00
5.00
1.00
30.00
2.00
4.00
500.00
5.00
2.00
1.00
30.00
500.00
500.00
500.00
Rate
Total Cost
Signature of Contractor
Sl.No.
17.24
17.25
17.26
17.27
17.28
17.29
17.30
17.31
17.32
17.33
17.34
17.35
17.36
17.37
17.38
17.39
17.40
17.41
17.42
17.43
17.44
17.45
17.46
17.47
17.48
17.49
17.50
17.51
17.52
a
b
c
d
e
f
g
h
i
j
Description Of Work
-Tecoma variety
-Ratrani(Nyctanthus arboratuas)
-Chandni(Taebernamontana )
-Hamelia
-Chrysanthemum
-Rose
-Rose Hybrid
-Thumbergia varity
-Alternenthera
-Asparagus
-Crotons variety
-Dracena variety
-Areca palm
-Areca Palm clusters
-Pedilanthus
-Jatropha
-Ficus Blackie
-Ficus Panda
-Ficus blackie (Other)
-Ficus Panda (other)
-Euphorbia Other
-Ixora variety
-Gazenia
-Magnolia champa variety
-Magnolia champa Red
-Golden bamboo
-Wedelia variety
-Lily variety
Climbers
Jasmine
Bignonia
Madhumalati
Alamanda
Ipomea
Tecoma
Passiflora
Rose wood
Ixora
Curtain creeper.
Unit
Quantity
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
500.00
2.00
50.00
3.00
2.00
4.00
5.00
3.00
4.00
5.00
2.00
5.00
30.00
30.00
100.00
100.00
20.00
20.00
40.00
30.00
4.00
5.00
500.00
1.00
1.00
20.00
500.00
500.00
each
each
each
each
each
each
each
each
each
each
1.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
each
50.00
Rate
Total Cost
Signature of Contractor
Sl.No.
Description Of Work
20.00
20.01
20.02
20.03
20.04
20.05
20.06
20.07
IRRIGATION WORK
Providing, Laying, Joining & Commissioning of Rigid
PVC pipe as per IS 1432 of following sizes with
necessary fittings, adhesives etc. complete
(Supreme / Finolex / Jain/ Kisan / Prince/
Equivalent Makemake)
PVC Pipe 90 mm X 6 kg/cm2
PVC Pipe 75 mm X 6 kg/cm2
PVC Pipe 63 mm X 6 kg/cm2
PVC Pipe 50 mm X 6 kg/cm2
PVC Pipe 40 mm X 6 kg/cm2
PVC Pipe 25 mm X 10 kg/cm2
PVC Pipe 20 mm X 10 kg/cm2
Unit
Quantity
each
each
each
each
each
each
each
each
each
each
6.00
6.00
6.00
6.00
6.00
4.00
4.00
4.00
4.00
4.00
each
50.00
each
53.00
Mtrs.
Mtrs.
Mtrs.
Mtrs.
Mtrs.
Mtrs.
Mtrs.
390.00
248.00
210.00
120.00
210.00
120.00
90.00
Nos.
4.00
Rate
Total Cost
Signature of Contractor
Sl.No.
Description Of Work
Unit
Quantity
Nos.
2.00
Nos.
4.00
Nos.
15.00
Nos.
4.00
Nos.
1.00
Nos.
1.00
Nos.
1.00
Nos.
150.00
Nos.
Mtrs.
50.00
50.00
Mtrs.
50.00
Nos.
1.00
Nos.
1.00
Rate
Total Cost
Signature of Contractor
Description Of Work
Unit
Quantity
Nos.
1.00
Rmt.
1200.00
sq.m.
100.00
cu.m.
10.00
Rate
Total Cost
SERVICE TAX
45
Signature of Contractor
Cs5-5 nos @ 1 m
Cs6-5 nos @ 1 m
Cs4-5 nos @ 1 m
Cs7-5 nos @ 1 m
Cs8-5 nos @ 1 m
G3
Ss7-40 nos @ .3 m
Hs40-20 nos @ 1 m
Hs43-30 nos @ 1 m
Hs41-20 nos @ 1 m
Hs42-40 nos @ 1 m
G3
Cs9-5 nos @ 1 m
H36 -30 nos @ 1 m
T7
Cs3-5 nos @ 1 m
G1
P1-30 nos @ 1 m
Cs10-5 nos @ 1 m
P4-30 nos @ 1 m
P3-26 nos @ 1 m
G2
Cs2-5 nos @ 1 m
Hs16-350 nos @ .3 m
Hs21-200 nos @ .3 m
Hs51-250 nos @ .3 m
Hs51-250 nos @ .3 m
Hs23-500 nos @ .3 m
T 10
T8
T9
Hs22-500 nos @ .3 m
T6
ROAD
GRASS PAVER TILES
CONCRETE PAVE TILES
LAWN
SHRUB/ GROUND COVER
REED BED
WATER BODY
T5
STONES OR GRAVELS
TREES
Hs13-30 nos @ 1 m
Code
Num
Hs2-500 nos @ .3 m
Name
NO.S
Plntg
Dist
1m
Cassia grandis
5m
Hs 1
Stendat cassia
Plumeria alba
5m
Hs 2
Vinca Hybrid
500
.3 m
T3
Lagestromia
5m
Hs 3
Bougainvilla
1m
T4
T5
Cassia fistula
6
6
5m
Hs 4
Hs 5
Nerium variety
3
2
1m
5m
T6
T7
Bombax cieba
5m
5m
Hs 6
Hs 7
Yucca
Bottle brush
4
4
Dahelia
1
26
1m
1m
T8
Cassia javanica
5m
Hs 8
Lowsonia inermis
1m
T9
Gulmohar
5m
Hs 9
Canna hybrid
5m
Taebebia rosea
NO.S
plntg
Dist
Nicodevia
1m
1m
Hs 10 Gladioles
1m
Hs 11 Calliandra
1m
Hs 12 Coleus
Hs 13 Cassia biflora
1
30
1m
1m
1m
1m
S1
Pentas
1m
S2
Mussaenda
1m
Hs 14 Caramada
Hs 15 Duranta variety
2
4
S3
Acalypha
1m
Hs 16 Russelia
500
.3 m
S4
S5
Brunsfelia
2
3
1m
1m
Hs 17 Acalypha variety
1m
1m
S6
S7
Eranthemum
26
Pseudoerathemum 30
1m
1m
Hs 19 Zerbera
1m
Hs 20 Opiopogum
30
1m
S8
Crossandra
1m
Hs 21 Verbina
500
.3 m
S9
Daedlacanthus
1m
Hs 22 Office flowers
500
.3 m
S 10
Cestrum
1m
S 11
Crotons
1m
Hs 23 Potato creepers
Hs 24 Tecoma variety
500
500
.3 m
.3 m
Aphelandra
NO.S plntg
Dist
Code Name
Num
Hs 25 Nyctanthus
2
Hs 26 Taebernamontana 50
1m
1m
Hs 27 Hamelia patens
1m
Ss 1
Alocasia macrorhiza
40
1m
Hs 28 Chrysanthemum
1m
Ss 2
1m
Hs 29 Rose
1m
Ss 3
Dieffenbachia
30
1m
Hs 30 Rose hybrid
1m
Ss 4
Ss 5
Monstera
30
30
1m
1m
Hs 31 Thumbergia variety
Hs 32 Alternenthera
1m
Ss 6
Ss 7
Syngonium
.3 m
.3 m
Hs 33 Asparagus
1m
Spathyphyllum
30
40
Hs 34 Crotons variety
1m
Ss 8
Shefflera
26
.3 m
Hs 35 Draceana
Hs 36 Areca palm
5
30
1m
1m
Phelodendron
Code Name
Num
T3
NO.S
T2
Code Name
Num
Code Name
Num
T1
T 10 Jacaranda
T4
plntg
Dist
NO.S plntg
Dist
1m
1m
1m
Hs 39 Jatropha
100
1m
Hs 40 Ficus Blakaie
20
1m
Hs 41 Ficus panda
20
1m
Cs 1
jasmine
1m
Cs 2
Bignonia
1m
Cs 3
Madhumalati
1m
Cs 4
Cs 5
Alamanda
5
5
1m
1m
1m
Hs 43 Ficus panda(other) 30
1m
1m
1m
Hs 44 Euphorbia
caracasana
1m
Ipomea
Tecoma
Cs 6
Cs 7
Passiflora
5
5
Cs 8
Rose wood
1m
Hs 45 Ixora variety
Cs 9
Ixora
1m
1m
Hs 46 Gazenia
500
Hs 47 Magnolia Champa 1
.3 m
1m
Hs 48 M.champa red
Hs 49 Golden bamboo
1
20
1m
1m
Hs 50 Wedelia variety
500
.3 m
Hs 51 Lily variety
500
.3 m
Cs 10 Curtain Creeper
Code Name
Num
NO.S Plntg
Dist
P1
Rhaphis exelsa
30
1m
P2
1m
4
5
26
1m
Code Name
Num
30
Carypha umbraculifera 2
1m
1m
G1
Carpet grass(mexican)
G2
G3
Doob Grass(selection1)
Shade Grass
P3
Licula grandis
P4
P5
Licula spinosa
1m
T2
H7 -26 nos @ 1 m
S7
T 1-30 nos @ 1 m
Hs50 -500 nos @ .3 m
S6 -26 nos @ 1 m
NOTE
The drawing is the property of ................. and unauthorised
use or reproduction of the drawing is not permitted without
the Architect's permission.
The drawing is not to be scaled
All dimensions are in millimetres and all levels are in metres
unless otherwise indicated.
Any discrepancy in the drawing is to be brought to the
immediate notice of the Architect.
The drawing is to be read in conjunction with all other
relevant Architectural, Structural and Services drawings and
specifications
Rev No.
Drawn : Vagish
Drawing Title
Details
Chkd : Iype
Date
Rev No.
Scale : 1:500
Planting Plan
Details
Date
Date
: 03 January 2014
: Tender
Drawing No.
Project
NC-LD-001
Project No. 13-01
Rev No.
R0