This calculator is specially designed to give you cost estimation based on your customized requirements. You can choose quality (Average,
Medium or High) for each category separately and get exact, accurate estimates for your all construction needs, moreover our experts can
provide you accurate and detailed cost based on your House Map, Design or based on shortlisted Brands, to know more details, please fill
up enquiry form Click Here or Contact Us.
Basement Required ?
Yes
No

Dehradun

Cost summary of various categories (Foundation, Super Structure, Plaster, Flooring etc) Saving as shown below.

S. No.

Description (Without Basement)

1.
2.
3.
4.
5.
6.
7.
8.
9.

Foundation work
Super Structure work
Plaster work
Flooring Work
Doors,Windows,Modular Kitchen & Other Wood Work
Stairs Flooring / Kitchen Slabs,Balcony Railing, Water Tank, Pump etc
Painting Work
Electrical Work
CP Fitting & Sanitary Ware
Total (without Basement)

Market Cost
97,292
12,94,859
91,534
74,759
4,11,211
3,89,362
92,552
46,928
30,888
25,63,729

Allcost.in Cost
90,244
11,93,859
76,521
63,946
3,51,914
3,44,386
86,733
42,240
27,408
22,77,251

Grand Total (without basement) : 25,63,729


See Basement Cost Breakup

1.Foundation work

High Quality
Description

Item Details

Unit of
Measurement

Total
Area

Total
Qty

Rate per
Unit

Total
Amount

(1- a) Foundation- Plain Cement Concrete


Plain Cement Concrete of Mix 1 : 2 : 4 more...

Material Cost

Manpower Cost

Cement-43 Grade

Bag

2280

41.04

310.00

12722.00

Coarse Sand

Cubic Meter

2280

11.40

1400.00

15960.00

Aggregate 10 & 20
mm

Cubic Meter

2280

77.52

750.00

58140.00

Men

Nos

2280

20.52

350.00

7182.00

1. Total Cost of Foundation work

90,244

2. Super Structure work


Average Quality
Description

Item Details

Unit of
Measurement

Total
Area

Total
Qty

Rate
per
Unit

Total
Amount

2. Super Structure work


(2- a) Ground Floor Slab - Column & Slab Work
http://www.allcost.in/calculator/advanced/MjI4MA==/MA==/MjI=

1/6

9/10/2014

Detailed Construction Calculator for Residence

Column Work: 9" x 4", M25, Straightening, Cutting & laying Steel Reinforcement. Straightening, Cutting , bending ,laying and
fixing in position the Steel Reinforcement in all reinforced concrete work at all floors, depths, levels and heights as per drawing, design
and as directed by the Engineer In Charge. The rate to include supply and use of 18 gauge black annealed binding wire double fold to tie
the bars in position and providing Chairs, spacers, separators.

Material Cost

Manpower Cost

TMT 8,10, 12, 16


mm Dia

Kg

2280

570.00

43.00

24510.00

Cement-43 Grade

Bags

2280

34.20

300.00

10260.00

Coarse Sand

Cubic Meter

2280

6.84

1200.00

8208.00

Aggregate 10 & 20
mm

Cubic Meter

2280

9.12

700.00

6384.00

Shuttering Material

Square Feet

2280

1026.00

10.00

10260.00

Men

Nos

2280

20.52

300.00

6156.00

Slab Work: M25, Straightening, Cutting & laying Steel Reinforcement more...

Material Cost

Manpower Cost

TMT 8,10, 12, 16


mm Dia

Kg

2280

5700.00

43.00

245100.00

Cement-43 Grade

Bags

2280

193.80

300.00

58140.00

Coarse Sand

Cubic Meter

2280

11.86

1200.00

14232.00

Aggregate 10 & 20
mm

Cubic Meter

2280

72.96

700.00

51072.00

Shuttering Material

Square Feet

2280

2052.00

10.00

20520.00

Men

Nos

2280

0.00

300.00

0.00

Cement-43 Grade

Bags

2280

184.68

300.00

55404.00

Coarse Sand

Cubic Meter

2280

53.12

1200.00

63744.00

Bricks

Nos

2280

74373.60

3.25

241714.00

Men

Nos

2280

20.52

300.00

6156.00

Cement-43 Grade

Bags

2280

50.16

300.00

15048.00

Coarse Sand

Cubic Meter

2280

6.84

1200.00

8208.00

Bricks

Nos

2280

25992.00

3.25

84474.00

Men

Nos

2280

34.20

300.00

10260.00

(2- b) Brick Work ( MASONARY WORKS)


Providing and Constructing Half Brick (4") walls more...

Material Cost

Manpower Cost

Providing and Constructing Half Brick (4") walls more...

Material Cost

Manpower Cost
2. Total Cost of Super Structure

9,02,256

3. Plaster

Average Quality
Description

Item Details

Unit of
Measurement

Total
Area

Total
Qty

Rate per
Unit

Total
Amount

12 - 15 mm thick Plaster on Walls and Ceiling. Cement/ Sand Mortar 1:6, Fine & Coarse sand in equal proportion
http://www.allcost.in/calculator/advanced/MjI4MA==/MA==/MjI=

2/6

9/10/2014

Detailed Construction Calculator for Residence

Material Cost

Manpower Cost

Cement-43 Grade

Bags

2280

140.45

300.00

42135.00

Fine Sand

Cubic Meter

2280

12.04

564.00

6791.00

Coarse sand

Cubic Meter

2280

12.04

1200.00

14448.00

Men

Nos

2280

34.20

300.00

10260.00

3. Total Cost of Plaster work

70,688

4. Flooring Work

Average Quality
Description

Item Details

Unit of
Measurement

Total
Area

Total
Qty

Rate per
Unit

Total
Amount

Flooring Type Select an Option: Cement Concrete Flooring

Providing and laying Cement Concrete


flooring more...

Manpower Cost

Cement-43 Grade

Bags

2280

79.80

300.00

23940.00

Fine Sand

Cubic Meter

2280

34.20

564.00

19289.00

Brick Blast

Cubic Meter

2280

18.24

587.25

10711.00

Coarse Sand,DW

Cubic Meter

2280

4.56

1200.00

5472.00

Men

Nos

2280

9.12

300.00

2736.00

4. Total Cost of selected Flooring type

13,03,051

5.Doors,Windows,Modular Kitchen & Other Wood Work


Average Quality
Description

Item Details

Unit of
Measurement

Total
Area

Total
Qty

Rate per
Unit

Total
Amount

(5- a) Door Frame Select an Option: Teak/ Hard Wood Door Frames
Providing of Teak/ Hard Wooden Door
Frames more...

Material

Running Feet

2280

969.00

80.00

77520.00

Installation Charges

labour

Running Feet

2280

969.00

15.00

14535.00

(5- b) Doors Select an Option: Wooden Flush door / Panel Door / Glazed door/ Flush Doors with out teak veeners
Providing of Wooden Flush door / Panel Door
/ Glazed door/ Flush Doors with out teak
veeners more...
Manpower Cost

Material

Square Feet

2280

22.80

1800.00

41040.00

labour

Square Feet

2280

22.80

300.00

6840.00

Material

Square Feet

2280

45.60

850.00

38760.00

labour

Square Feet

2280

45.60

243.00

11081.00

Material

Square Feet

2280

2.28

20000.00

45600.00

(5- c) Window Select an Option: Wooden/ Panel/ Teak Window


Providing and fixing single or double
Wooden/ Panel/ Teak Window more...
Manpower Cost
(5- d) Modular Kitchen
Providing and fixing of Modular Kitcen of
selected design with MDF particle
Board more...

http://www.allcost.in/calculator/advanced/MjI4MA==/MA==/MjI=

3/6

9/10/2014

Detailed Construction Calculator for Residence

Manpower Cost

labour

Square Feet

2280

2.28

5000.00

5. Total Cost of Doors, Window, Modular Kitchen including Frame & Supporting

11400.00
5,28,036

6. Stairs Flooring / Kitchen Slabs & Misc Important Work

Average Quality
Description

Item Details

Unit of
Measurement

Total
Area

Total
Qty

Rate per
Unit

Total
Amount

(6- a)Providing of 20 mm thick Kota stone in Treads & Risers in Flooring more...
Cement-43 Grade

Bags

2280

66.12

240.00

15869.00

Fine Sand

Cubic Meter

2280

34.20

564.00

19289.00

Brick Blast

Cubic Meter

2280

25.08

587.25

14728.00

Coarse Sand, DW

Cubic Meter

2280

2.28

1200.00

2736.00

Kota Stone

Square Feet

2280

2280.00

28.00

63840.00

Polishing Material

Square Feet

2280

6840.00

2.00

13680.00

Men

Nos

2280

1322.40

24.00

31738.00

Total Area

2280

1140.00

30.00

34200.00

Cement-43 Grade

Bags

2280

23.26

240.00

5582.00

Fine Sand

Cubic Meter

2280

16.19

564.00

9131.00

Coarse Sand, DW

Cubic Meter

2280

1.85

1200.00

2220.00

Tile

Square Feet

2280

1140.00

14.00

15960.00

White Cement

Bags

2280

2.28

850.00

1938.00

Men

Nos

2280

22.80

300.00

6840.00

Material+Labour

2280

NaN

2.50

2500.00

Material+Labour

2280

0.00

2.80

2800.00

Providing & Laying machine cut 17 - 18 mm


thick Pre-polished Granite stone slab more...

Material+Labour

2280

0.00

5.70

5700.00

(6- g)Over Head Water Tank 1500 Ltrs

Material

2280

0.00

3.50

3000.00

(6- h)Under Ground Water Tank 1000 Ltrs

Material+Labour

2280

0.00

10.00

13000.00

(6- i)Motors for Submersible and Boring

Material+Labour

2280

0.00

70.00

70000.00

Material Cost

Manpower Cost

(6- b)FlOORING MATERIAL WATER PROOFING TREATMENT


Providing and treating "Vacuum De-watering
Treatment" more...
(6- c)TILES IN DADO, BATHROOM AND OTHER AREAS

Material Cost

Manpower Cost
(6- d)Cement Pavers and Blocks for outer Areas
Providing and laying Cement-Concrete Precast Pavement blocks more...
(6- e)Cement Tiles for Ramp Area
Providing and laying Pre cast heavy duty
Chequered Cement tiles more...
(6- f)Kitchen Granite Stone Counters

http://www.allcost.in/calculator/advanced/MjI4MA==/MA==/MjI=

4/6

9/10/2014

Detailed Construction Calculator for Residence

(6- j)Motors incase No Submersible is there

Material+Labour

2280

0.00

2.00

2000.00

(6- k)Iron Grill for Railing and Windows


Providing and fixing of Modular MS Iron
grill of selected design and
specification more...
Manpower Cost

Material

Kg

2280

300.00

45.00

13500.00

labour

Kg

2280

300.00

10.00

3000.00

6. Total Cost of Stairs Flooring, Kitchen Slabs, Balcony Railing, Water Tank, Pump & Misc Work

3,39,120

7. Painting Work
Average Quality
Description

Item Details

Unit of
Measurement

Material+labour

Square Feet

2280

Material+labour

Square Feet

Total
Amount

6498.00

6.00

38988.00

2280

3192.00

5.00

15960.00

Select an Option: Enamel Paint

(7-C)Paint on Wooden Doors/ Window/ MS Frames


Providing and applying Enamle Paint with
necessary repair or Putty application or both
as required more...

Rate per
Unit

Select an Option: Snowcem

(7-b)External Paint
Providing and applying Snowcem with
necessary repair only no Putty
application more...

Total
Qty

Select an Option: Oil Bound Distemper

(7-a) Internal Paint


Providing and applying Oil Bound Distemper
with necessary repair with Putty and
application of 2 or more coats more...

Total
Area

Material+labour

Square Feet

2280

150.00

22.00

7.Total Cost of Painting work

3300.00
1,47,180

8 . Electrical Work

Average Quality
Description

Item Details

Unit of
Measurement

Total
Area

Total
Qty

Rate per
Unit

Total
Amount

Electric Fitting Including Wiring and Switchgear


Flexible Wires (FRLS Grade)

Running Meter

2280

1000.00

15.00

15000.00

Modular Switches & Sockets, including


Modular base plates

Set

2280

1000.00

3.80

3800.00

Electrical Switch Gear

Set

2280

1000.00

1.75

1750.00

Misc

Set

2280

1000.00

2.00

2000.00

Labour Charges for Installation & Fixing

Nos

2280

13.50

13500.00

8.Total Cost of Electrical Work

34,608

9.CP Fitting & Sanitary Ware

Average Quality
Description
http://www.allcost.in/calculator/advanced/MjI4MA==/MA==/MjI=

Item Details

Unit of

Total

Total

Rate per

Total
5/6

9/10/2014

Detailed Construction Calculator for Residence

Measurement

Area

Qty

Unit

Amount

2280

0.00

22.00

22000.00

2280

0.00

31.50

9. Plumbing & Sanitary Ware (Water Supply Pipes and Various) Fittings
3 Toilets + 2 Kitchen + Sanitary Pipes
(Sewerage)
Manpower Cost

Material

Misc

labour

9.Total Cost of Plumbing & Sanitary Ware work

3150.00

24,144

Grand Total (without basement) Rs. 22,77,251


This Construction Cost Estimate was calculated with AllCost.in Advanced Calculator

Benefits Of Allcost Membership


By becoming member and talking our services you will be able to save up to 15% of the project cost, you can freely speak to our
consultants on following services
Architectural and Interiors
Structural design and MEP service design
Quantity calculation,detailed planning and measurements based on drawings and designs
Accurate budget and cost calculations based on customized requirements
Consultancy on correct products shortlisting, procurement and buying
Educate your self through building material section of site
Scale mapping of Architects /MEP-Civil Contractors/Interior Designers
Free guidance on how to beware of contractors befooling techniques
24*7 Customer care support
Close

http://www.allcost.in/calculator/advanced/MjI4MA==/MA==/MjI=

6/6

You might also like