Cost summary of various categories (Foundation, Super Structure, Plaster, Flooring etc) Saving as shown below.
S. No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
Foundation work
Super Structure work
Plaster work
Flooring Work
Doors,Windows,Modular Kitchen & Other Wood Work
Stairs Flooring / Kitchen Slabs,Balcony Railing, Water Tank, Pump etc
Painting Work
Electrical Work
CP Fitting & Sanitary Ware
Total (without Basement)
Market Cost
97,292
12,94,859
91,534
74,759
4,11,211
3,89,362
92,552
46,928
30,888
25,63,729
Allcost.in Cost
90,244
11,93,859
76,521
63,946
3,51,914
3,44,386
86,733
42,240
27,408
22,77,251
1.Foundation work
High Quality
Description
Item Details
Unit of
Measurement
Total
Area
Total
Qty
Rate per
Unit
Total
Amount
Material Cost
Manpower Cost
Cement-43 Grade
Bag
2280
41.04
310.00
12722.00
Coarse Sand
Cubic Meter
2280
11.40
1400.00
15960.00
Aggregate 10 & 20
mm
Cubic Meter
2280
77.52
750.00
58140.00
Men
Nos
2280
20.52
350.00
7182.00
90,244
Item Details
Unit of
Measurement
Total
Area
Total
Qty
Rate
per
Unit
Total
Amount
1/6
9/10/2014
Column Work: 9" x 4", M25, Straightening, Cutting & laying Steel Reinforcement. Straightening, Cutting , bending ,laying and
fixing in position the Steel Reinforcement in all reinforced concrete work at all floors, depths, levels and heights as per drawing, design
and as directed by the Engineer In Charge. The rate to include supply and use of 18 gauge black annealed binding wire double fold to tie
the bars in position and providing Chairs, spacers, separators.
Material Cost
Manpower Cost
Kg
2280
570.00
43.00
24510.00
Cement-43 Grade
Bags
2280
34.20
300.00
10260.00
Coarse Sand
Cubic Meter
2280
6.84
1200.00
8208.00
Aggregate 10 & 20
mm
Cubic Meter
2280
9.12
700.00
6384.00
Shuttering Material
Square Feet
2280
1026.00
10.00
10260.00
Men
Nos
2280
20.52
300.00
6156.00
Slab Work: M25, Straightening, Cutting & laying Steel Reinforcement more...
Material Cost
Manpower Cost
Kg
2280
5700.00
43.00
245100.00
Cement-43 Grade
Bags
2280
193.80
300.00
58140.00
Coarse Sand
Cubic Meter
2280
11.86
1200.00
14232.00
Aggregate 10 & 20
mm
Cubic Meter
2280
72.96
700.00
51072.00
Shuttering Material
Square Feet
2280
2052.00
10.00
20520.00
Men
Nos
2280
0.00
300.00
0.00
Cement-43 Grade
Bags
2280
184.68
300.00
55404.00
Coarse Sand
Cubic Meter
2280
53.12
1200.00
63744.00
Bricks
Nos
2280
74373.60
3.25
241714.00
Men
Nos
2280
20.52
300.00
6156.00
Cement-43 Grade
Bags
2280
50.16
300.00
15048.00
Coarse Sand
Cubic Meter
2280
6.84
1200.00
8208.00
Bricks
Nos
2280
25992.00
3.25
84474.00
Men
Nos
2280
34.20
300.00
10260.00
Material Cost
Manpower Cost
Material Cost
Manpower Cost
2. Total Cost of Super Structure
9,02,256
3. Plaster
Average Quality
Description
Item Details
Unit of
Measurement
Total
Area
Total
Qty
Rate per
Unit
Total
Amount
12 - 15 mm thick Plaster on Walls and Ceiling. Cement/ Sand Mortar 1:6, Fine & Coarse sand in equal proportion
http://www.allcost.in/calculator/advanced/MjI4MA==/MA==/MjI=
2/6
9/10/2014
Material Cost
Manpower Cost
Cement-43 Grade
Bags
2280
140.45
300.00
42135.00
Fine Sand
Cubic Meter
2280
12.04
564.00
6791.00
Coarse sand
Cubic Meter
2280
12.04
1200.00
14448.00
Men
Nos
2280
34.20
300.00
10260.00
70,688
4. Flooring Work
Average Quality
Description
Item Details
Unit of
Measurement
Total
Area
Total
Qty
Rate per
Unit
Total
Amount
Manpower Cost
Cement-43 Grade
Bags
2280
79.80
300.00
23940.00
Fine Sand
Cubic Meter
2280
34.20
564.00
19289.00
Brick Blast
Cubic Meter
2280
18.24
587.25
10711.00
Coarse Sand,DW
Cubic Meter
2280
4.56
1200.00
5472.00
Men
Nos
2280
9.12
300.00
2736.00
13,03,051
Item Details
Unit of
Measurement
Total
Area
Total
Qty
Rate per
Unit
Total
Amount
(5- a) Door Frame Select an Option: Teak/ Hard Wood Door Frames
Providing of Teak/ Hard Wooden Door
Frames more...
Material
Running Feet
2280
969.00
80.00
77520.00
Installation Charges
labour
Running Feet
2280
969.00
15.00
14535.00
(5- b) Doors Select an Option: Wooden Flush door / Panel Door / Glazed door/ Flush Doors with out teak veeners
Providing of Wooden Flush door / Panel Door
/ Glazed door/ Flush Doors with out teak
veeners more...
Manpower Cost
Material
Square Feet
2280
22.80
1800.00
41040.00
labour
Square Feet
2280
22.80
300.00
6840.00
Material
Square Feet
2280
45.60
850.00
38760.00
labour
Square Feet
2280
45.60
243.00
11081.00
Material
Square Feet
2280
2.28
20000.00
45600.00
http://www.allcost.in/calculator/advanced/MjI4MA==/MA==/MjI=
3/6
9/10/2014
Manpower Cost
labour
Square Feet
2280
2.28
5000.00
5. Total Cost of Doors, Window, Modular Kitchen including Frame & Supporting
11400.00
5,28,036
Average Quality
Description
Item Details
Unit of
Measurement
Total
Area
Total
Qty
Rate per
Unit
Total
Amount
(6- a)Providing of 20 mm thick Kota stone in Treads & Risers in Flooring more...
Cement-43 Grade
Bags
2280
66.12
240.00
15869.00
Fine Sand
Cubic Meter
2280
34.20
564.00
19289.00
Brick Blast
Cubic Meter
2280
25.08
587.25
14728.00
Coarse Sand, DW
Cubic Meter
2280
2.28
1200.00
2736.00
Kota Stone
Square Feet
2280
2280.00
28.00
63840.00
Polishing Material
Square Feet
2280
6840.00
2.00
13680.00
Men
Nos
2280
1322.40
24.00
31738.00
Total Area
2280
1140.00
30.00
34200.00
Cement-43 Grade
Bags
2280
23.26
240.00
5582.00
Fine Sand
Cubic Meter
2280
16.19
564.00
9131.00
Coarse Sand, DW
Cubic Meter
2280
1.85
1200.00
2220.00
Tile
Square Feet
2280
1140.00
14.00
15960.00
White Cement
Bags
2280
2.28
850.00
1938.00
Men
Nos
2280
22.80
300.00
6840.00
Material+Labour
2280
NaN
2.50
2500.00
Material+Labour
2280
0.00
2.80
2800.00
Material+Labour
2280
0.00
5.70
5700.00
Material
2280
0.00
3.50
3000.00
Material+Labour
2280
0.00
10.00
13000.00
Material+Labour
2280
0.00
70.00
70000.00
Material Cost
Manpower Cost
Material Cost
Manpower Cost
(6- d)Cement Pavers and Blocks for outer Areas
Providing and laying Cement-Concrete Precast Pavement blocks more...
(6- e)Cement Tiles for Ramp Area
Providing and laying Pre cast heavy duty
Chequered Cement tiles more...
(6- f)Kitchen Granite Stone Counters
http://www.allcost.in/calculator/advanced/MjI4MA==/MA==/MjI=
4/6
9/10/2014
Material+Labour
2280
0.00
2.00
2000.00
Material
Kg
2280
300.00
45.00
13500.00
labour
Kg
2280
300.00
10.00
3000.00
6. Total Cost of Stairs Flooring, Kitchen Slabs, Balcony Railing, Water Tank, Pump & Misc Work
3,39,120
7. Painting Work
Average Quality
Description
Item Details
Unit of
Measurement
Material+labour
Square Feet
2280
Material+labour
Square Feet
Total
Amount
6498.00
6.00
38988.00
2280
3192.00
5.00
15960.00
Rate per
Unit
(7-b)External Paint
Providing and applying Snowcem with
necessary repair only no Putty
application more...
Total
Qty
Total
Area
Material+labour
Square Feet
2280
150.00
22.00
3300.00
1,47,180
8 . Electrical Work
Average Quality
Description
Item Details
Unit of
Measurement
Total
Area
Total
Qty
Rate per
Unit
Total
Amount
Running Meter
2280
1000.00
15.00
15000.00
Set
2280
1000.00
3.80
3800.00
Set
2280
1000.00
1.75
1750.00
Misc
Set
2280
1000.00
2.00
2000.00
Nos
2280
13.50
13500.00
34,608
Average Quality
Description
http://www.allcost.in/calculator/advanced/MjI4MA==/MA==/MjI=
Item Details
Unit of
Total
Total
Rate per
Total
5/6
9/10/2014
Measurement
Area
Qty
Unit
Amount
2280
0.00
22.00
22000.00
2280
0.00
31.50
9. Plumbing & Sanitary Ware (Water Supply Pipes and Various) Fittings
3 Toilets + 2 Kitchen + Sanitary Pipes
(Sewerage)
Manpower Cost
Material
Misc
labour
3150.00
24,144
http://www.allcost.in/calculator/advanced/MjI4MA==/MA==/MjI=
6/6