AIC China for Steel Structures

Ltd.
Monthly Report Jan.
QC and Safety Department
Prepared By: Ayman El Malah

1/

Reviewed By:

Monthly Activity:

Checking the Quality of fabricated product and issue the proper NCR.(270 NCR)

Analysis the Monthly NCR.


1. Fabrication:

Quality and Safety sectionPage 1

AIC China for Steel Structures


Ltd.
Monthly Report Jan.
QC and Safety Department
Prepared By: Ayman El Malah

Reviewed By:

2. For Galvanizing:

Make follow up for ensuring that the NCR recommendation is implemented.


(Maintenance department already sent some reports for repairing of many
machines)

Attending the Quality meeting hold by PM and the main points were
1. Arranging the training for fabrication workers and galvanizing workers.
(done)
2. Try to improve our NCR system so, we can prevent any delay.(still on the
checking time)

Quality and Safety sectionPage 2

AIC China for Steel Structures


Ltd.
Monthly Report Jan.
QC and Safety Department
Prepared By: Ayman El Malah

Reviewed By:

3. Try to improve our QC checking system, so it wont affect on the


productivity.
4. The production workers should start to make their own self checking.
(done)

Attending the weekly meeting hold by Mr. Tarek to discuss the weekly activities
and what's the coming weekly issues. (4 meeting per month).

Training for two new inspectors for fabrication department.

Arranging with the QA the randomly check of the packed product.

Arranging the weekly meeting with the inspectors.(3 meeting per month)

Make the proper recovery for galvanizing tanks.

Chemical consumption report (Jan)


Type of chemical
new chemical
inhibitor
Amuniuiom chloride
Zinc chloride
passivation (Cr3)
HCL
zinc aluminum alloy

Quality and Safety sectionPage 3

Area

Weight

Flux tank
HCL
Flux tank
Flux tank
Passivation tank
Pickling Tanks
Zinc Kettle

0.018 ton
0.2 ton
1.3 ton
1.0 ton
0.4 ton
76.7 ton
0.0116 ton

AIC China for Steel Structures


Ltd.
Monthly Report Jan.
QC and Safety Department
Prepared By: Ayman El Malah

Reviewed By:

Checking the status of the workshop daily and take the proper actions to solve
safety issues.
Punishment Record for Behaviors against Rules

Sr.No.

date

Name

Dept.

Reason

Deduct cost

2015/1/17

Liu Yongpeng

GAL

Forklift speeding violating operation

50

2015/1/23

Lin Guosheng

Dispatch

not wearing helmet

20

2015/1/26

Liu Yongpeng

GAL

not wearing helmet

20

2015/1/26

Chi Xingbang

Dispatch

not wearing helmet

20

2015/1/28

Shizhu

GAL

Playing mobile phone

20

2015/1/28

Bai Hua

FAB

not wearing safety shoes

20

Total

150

Arranging special clothes for some workers who were dealing with HCL and Zinc
Kettle.

Increase the new signs inside the workshop to reduce the safety accidents.

Quality and Safety sectionPage 4

AIC China for Steel Structures


Ltd.
Monthly Report Jan.
QC and Safety Department
Prepared By: Ayman El Malah

Reviewed By:

Arranging the deduction of the safety articles when the worker will live the
company.

Sending the injured persons to the hospital and making the follow up for that.

Quality and Safety sectionPage 5

AIC China for Steel Structures


Ltd.
Monthly Report Jan.
QC and Safety Department
Prepared By: Ayman El Malah

Department
SN

PRODUCTION

No of
Accidents

Reasons

Total Cost
(RMB)

A- (2 Accident)
E - (1 Accident)

1206.79

GALVANIZING
2

STORE

Total

DISPATCHING

MAINTENANCE

Quality and Safety sectionPage 6

1,206.79

Reviewed By:

Suggestions

1.pay attention to self


protection and operating
instructions education

AIC China for Steel Structures


Ltd.
Monthly Report Jan.
QC and Safety Department
Prepared By: Ayman El Malah

2/

Reviewed By:

Arranging the reissue of safety articles and deduct the cost.

Issues that have had a positive impact:

3/

Improving the checking done by QC inspector.


Make examination for 2 QC inspector in galvanizing and they passed the exam.

Problems that need to be solved:

The inspection time for QC inspector is very slow.


We are sending any injured person to the hospital because we didn't have any
doctor at the company
The lost route card is taken more time to be fulfilled again.

4/

Action Plan to meet goals:

5/

Coming monthly Activity:

Continue the examination for QC inspectors.


Give training for fabrication and galvanizing workers.
Making the weekly meeting with the inspector.

Quality and Safety sectionPage 7

AIC China for Steel Structures


Ltd.
Monthly Report Jan.
QC and Safety Department
Prepared By: Ayman El Malah

Reviewed By:

Issuing the NCR recommendation for the others departments..


Monthly safety audit.
Arranging safety training for the workshop.
Arranging safety training for our safety officers about the analysis for safety
accidents 2014.

Quality and Safety sectionPage 8