Professional Documents
Culture Documents
Report On Energy
Report On Energy
Report On Energy
Contents
Executive Summary 01
Introduction and Key Issues 05
Objectives and Scope of Policy
09
27
01
Executive summary
02
1. Executive summary
Quality power supply to various competing sectors is a sinequa-non to meet the ambitious development objectives of
newly formed state of Telangana. Driven by considerable
growth in demand from agriculture, domestic, industrial
sectors and metro city of Hyderabad, the per-capita
consumption in the state stands at 9851 units against a
national average of 9172 units for FY 2012-13.
Energy deficit in Telangana for last three years was in the
range of 5%-12%. Energy requirement in Telangana was
47,428 MU in FY 13-14, of which only 44,946 MU could be
met resulting in an energy deficit of nearly 5%. Going forward,
energy requirement is expected to see an increase of around
11% for the period FY 2014-15 to FY 2018-19.
*- Details of Base, Optimistic and Pessimistic cases are available in Section 4.1, 4.2, 4.3
1 TSDISCOMS
03
04
05
06
3 TSDISCOMS
4 CEA Executive Summary, Power Sector, August-14
Source: TSSLDC
FY
12-13
FY
13-14
FY*
14-15
TSGENCO-Thermal
85%
85%
75%
81%
TSGENCO- Hydel
30%
10%
23%
11%
APGENCO- Thermal
85%
86%
81%
84%
APGENCO- Hydel
30%
10%
23%
11%
CGS
85%
86%
94%
86%
Gas IPPs
85%
39%
20%
7%
Source
07
TSGENCO- Thermal
8,622
TSGENCO- Hydel
2,408
APGENCO- Thermal
10,612
CGS
13,230
IPPs
2,041
NCEs
500
APGENCO- Hydel
813
Others (Case-I)
1,570
Short Term
6,000
Total
45,795
FY 16-17
FY 17-18
FY 18-19
703
1,051
1,402
1,402
Source: TSSLDC
Source: TSSLDC
FY
14-15
FY
15-16
FY
16-17
FY
17-18
FY
18-19
Energy Requirement
54,998
63,047
67,902
77,164
84,496
Energy Availability
(Existing sources)
45,795
45,037
44,030
43,896
43,754
Energy Deficit
-9,203
-18,009
-23,872
-33,268
-40,742
-16.7%
-28.6%
-35.2%
-43.1%
-48.2%
Source: TSSLDC
FY 15-16
FY 15-16
3,728
FY 16-17
FY 17-18
FY 18-19
3,728
7,392
7,392
FY 16-17
FY 17-18
FY 18-19
876
1,752
2,628
2,632
Source: TSSLDC
08
09
10
TSGENCO
TSGENCO has planned significant capacity additions in the
next 5 years of which some projects are under construction
while the others have been conceptualized. Table 7 provides
the status of upcoming TSGENCO power plants.
Table 7: Key milestones of upcoming TSGENCO power plants
Synchronization
Sch.
CoD
Oct-15
Apr-18
NA
4000
NA
Ramagundam TPS
1080
NA
Lower Jurala
HEP##
Pulichintala
HEP###
240
Mar-15
120
Dec-15
Cap
(MW)
Feas.
Study
Kakatiya TPP
Stage-II#
Kothagudem TPS
Stage-VII
Kakatiya TPP
Stage-III*
600
800
800
Manuguru TPS
Power plant
Land
Fin.
Acqstn. Closure
*- KTPP Stage-III CoD not expected by FY 18-19 as public hearing is not completed, Telangana share# : 323 MW, ## : 129 MW, ### : 64.5 MW
Source: TSSLDC, Analysis
11
TSGENCO
A total of 1000 MW of power from upcoming CGS would
be available to Telangana in the next 5 years from Kudigi,
Tuticorin, Neyveli, Kalpakkam and Srikali plants. The capacity
availability to Telangana from upcoming CGS is detailed in
Table 8.
CoD
FY
14-15
FY
15-16
FY
16-17
FY
17-18
FY
18-19
Energy
per annum
(MU)
CoD
FY
14-15
FY
15-16
FY
16-17
Energy per
annum (MU)
Dec-14
431
2,937
431
2,937
323
2,203
NTPC Kudigi
TPS Stage-1
Aug-15
Mar-17
218
171
2,812
NTPL Tuticorin
Apr-15
133
906
Krishnatpatnam
Unit-I
New Neyveli
TPP
Aug-17
59
405
Krishnatpatnam
Unit-II
Jun-15
NPCIL
Kalpakkam
RTPP Stage-IV
Mar-17
Jun-15
69
419
269
1,836
261
104
2,381
Thermal Power
Tech (Case-I LT)
Apr-15
431
700
323
9,913
Total
420
171
320
104
6,922
Total
12
Length
Sch.
completion
date
Source
Potential (MW)
Wind*
1500
0.0%
Solar
5000
79
1.6%
Biomass
100
72
72.0%
Bagasse
150
126
84.0%
Mini Hydel
200
38
18.8%
Waste based
100
38
38.1%
Total
7050
353
5.0%
Expected
Capacity
Benefit
Remarks
Dec ' 15
600 - 700
MW
Under Construction
275 +
300 km
Aug ' 16
1000 - 1500
MW
Under Construction
270 +
270 km
Mar ' 17
3000 MW
6000 MW
Approval by
standing committee
pending
1500 km
Aug ' 19
Source: PGCIL
MW
3850
3314
4000
1050
1795
1155
Source: PGCIL
13
14
Table 13: Capacity and Energy loss to Telangana post PPA expiry with TSGENCO & APGENCO
Current
Source
Gain(+) /Loss(-)
MW
MW
MU
MW
MU
MW
MU
TSGENCO Thermal
1,283
691
4,844
1,283
8,988
591
4,144
TSGENCO Hydel
1,776
957
1,621
1,776
3,009
819
1,387
TSGENCO Total
3,058
1,648
6,465
3,058
11,997
1,410
5,532
APGENCO Thermal
1,680
905
6,345
- 905
- 6,345
APGENCO Hydel
1,580
851
1,404
- 851
- 1,404
APGENCO Total
3,260
1,757
7,748
- 1,757
- 7,748
Total
6,318
3,405
14,213
3,058
11,997
- 347
- 2,217
PP cost
Energy
Rs./Unit
MU
TSGENCO Thermal
2.84
4011
APGENCO Thermal
3.36
5632
Power Plant
MW
MW
Total Thermal
3.15
9643
GVK Phase-I
216
116
19-Jun-15
Lanco Kondapalli
362
195
17-Oct-15
Spectrum
208
112
18-Apr-16
Reliance
220
119
23-Oct-17
1,006
542
Source: TSDISCOMS
Table 15: Capacity and Energy loss to Telangana post PPA expiry with gas IPPs
Installed
Capacity
Total
Source: TSDISCOMS
Telangana Share
15
NTPC Ramagundam-II
Post expiry of PPA with NTPC Ramagundam-I on 30th April
2010, DISCOMS reached an arrangement for supply of
power to them on same terms and conditions of expired PPA
till generation is possible. TSDISCOMS can follow similar
approach for PPA with NTPC Ramagundam-II, which is due
to expire by 31st March 2016. This would ensure continued
availability of 2,000 MU annually to Telangana state.
Production(
LT)
Open Cast
Production
Cost (Rs/Ton)
Production
(LT)
Production
Cost (Rs/Ton)
2007-08
126
1,719
280
711
2008-09
121
2,018
325
817
2009-10
110
2,169
385
1,012
2010-11
116
2538
397
1,142
2011-12
105
3,316
417
1,229
16
FY 12-13
FY 13-14
Ramagundam (NTPC)*
1.80
1.80
6.60
6.60
8.40
8.40
11.95
13.26
3.55
4.84
Source: SCCL
Hydel
Total
2282
2082
4365
Source: TSGENCO
TS
TN
CG
OR
PLF
75.0%*
77.9%
80.8%
86.5%
Auxiliary Consumption
7.4%
7.6%
5.2%
4.7%
Forced Outages
4.2%
12.8%
7.9%
5.1%
Generation cost
Rs./kWh
4.25
4.73
2.85
NA
Parameter
17
Current
(FY 13-14)
Target
(FY 18-19)
PLF
75.0%
90%
Forced Outages
4.2%
0%
Days
30
100%
kCal/kg
3,400
Parameter
Source: Annual Report on The Working of State Power Utilities & Electricity Departments, (Power &
Energy Division), Planning Commission, Government of India, February 2014 and SLDC
18
Line
Approximate
capacity/Ckt
(MW)
Singareni TPP
825
Singareni TPP
825
825
Ramagundam (TPS) to
Karimnagar SS
825
825
BPLY to Oglapur
825
BPLY to Jangoan
825
RTS
Ramagundam - KarimnagarGajwel
825
Sattupally-Khammam-Suryapet
825
825
KTS
Khammam to proposed
Suryapet SS
825
Source: TSTRANCO
3. 765kV-Wardha-Nizamabad-Maheshwaram:
Downstream strengthening by establishing 400 kV SS
and associated line at Maheshwaram by TSTRANSCO.
4. 765kV-Warora-Warangal-Hyd-Kurnool: Downstream
strengthening of network proposed at Warangal and
Hyderabad.
It may be noted that energy from new capacities would be
available through these new transmission systems.
Hence, timely completion of all the above planned schemes
is critical. There is need to set up a dedicated project
management group to ensure expeditious resolution of any
issues.
The key focus areas of TSTRANSCO going forward should be
in Network Strengthening, Renovation and Modernization of
the network, Operation and Maintenance. Initiatives taken in
the above areas would enable TSTRANSCO to cater to the
increased peak demand, ensuring highest levels of availability
and in reducing the transmission losses. Table 22 gives a
snapshot of performance and key network infrastructure in FY
2013-14 and projected figures for FY 2018-19.
Table 22: TSTRANSCO KPIs and Key Infrastructure Current vs Target
Unit
Current
(FY 13-14)
Target
(FY 18-19)
Transmission availability
99.94%
99.96%
Transmission losses
3.59%
3.0 %
MW
7,093*
10,396
Parameter
No of Power Transformers
400 KV
Nos
14
220 KV
Nos
48
71
132 KV
Nos
169
195
*- 53.89% of current peak demand for consolidated AP is considered as peak demand for Telangana
Source: TSTRANSCO
19
No. of consumers
Consumer
Contribution (%)
Domestic
81.5 Lakh
73%
Agriculture
19.1 Lakh
17%
1.0 Lakh
1%
8.9 Lakh
8%
Others
1.1 Lakh
1%
Source: TSDISCOMS
Unit
TS
TN
Maha
Guj
T&D losses
16.9%
20%
18.8 %
17.9 %
Cost of Supply
Rs./kWh
5.27
6.45
5.84
4.95
No./MU
0.54
1.27
0.64
0.80
Source: Annual Report on The Working of State Power Utilities & Electricity Departments, (Power
& Energy Division), Planning Commission, Government of India, February 2014
13. Age profiling of DTRs: Age profile of all DTRs and meters
should be recorded. Inventory planning, Repairs and
Maintenance (R&M) should evolve into a function of age /
repair profiles of major materials to enable better cash flow
management.
14. Installation of pre-paid meters: In coordination with urban
development authorities, avenues should be explored for
gradually introducing pre-paid metering in urban centres. A
target of 10% of total supply on a pre-paid arrangement by
2018 may be pursued.
15. Setting up Consumer care centers: Consumer care centers
should be set up in each district with mapping of all
consumers in the district along with telephone numbers.
This step shall enable a greater reach into consumer base.
If Telangana DISCOMS were to reduce Transmission &
Distribution losses at the rate of 0.75%/year vis--vis a
business-as-usual of 0.25%/year, it translates into a cumulative
savings of nearly Rs 2,716 Crores for the period FY 2015-16 to
FY 2018-19. The detailed computation of savings in each year
if losses are reduced by 0.75% every year is given in Table 27.
Item
Balance (No.)
DTRs
13,268
11,125
2,143
11 kV
422
333
89
Source: TSDISCOMS
Unit
FY
14-15
FY
15-16
FY
16-17
FY
17-18
FY
18-19
77,164
84,496
Energy Req.
MU
54,998
63,047
67,902
Business As
Usual loss
trajectory
16.6%
16.4%
16.1%
15.9%
15.6%
Target Loss
trajectory
16.1%
15.4%
14.6%
13.9%
13.1%
Energy Saved
MU
328
745
1,193
1,792
2,432
Energy Savings#
Rs. Crs.
125
298
501
791
1,126
Balance (No.)
DTRs
13,268
13,254
14
11 kV
422
354
68
Source: TSDISCOMS
20
21
Unit
Current
(FY 13-14)
Target
(FY 18-19)
T&D losses
16.9%
13.2%
15%
5%
33 kV interruptions
No./ckm
1.19
0.92
11 kV interruptions
No./ckm
1.92
1.49
Infrastructure Additions
33/11 SS
No
2,156
3,238
DTRs
No
464,684
748,947
33 kV feeders
No
1,037
1,529
11 kV feeders
No
8,877
10,512
Source: TSDISCOMs
FY
12-13
FY
13-14
Rs. Crs.
12,991
16,162
Tariff Subsidy
Rs. Crs.
3,709
3,899
Additional Subsidy
Rs. Crs.
FSA
Rs. Crs.
1,376
Total Revenue
Rs. Crs.
18,076
20,061
Rs. Crs.
438
433
Rs. Crs.
18,514
20,494
Rs. Crs.
16,972
17,045
Rs. Crs.
905
799
Distribution Costs
Rs. Crs.
5,765
3,328
Total Expenses
Rs. Crs.
23,642
21,173
MU
34,502
35,937
Rs./Unit
3.89
4.62
Rs./Unit
5.37
5.70
ACS (B)
Rs./Unit
6.85
5.89
Gap ( A- B)
Rs./Unit
-1.49
-0.19
Item
Sales (MU)
Item
FY 11-12
FY 12-13
FY 13-14
FY 14-15*
TSNPDCL
96%
104%
101%
96%
TSSPDCL
98%
101%
95%
100%
22
Department
TSSPDCL
TSNPDCL
Arrears as on
30.08.2014
Panchayat Raj
501
385
885
Municipalities
116
37
153
Corporations
10
10
GHMC
11
11
HMWS & SB
143
145
Irrigation
39
18
57
123
12
134
10
18
Unit
CoS
Approved
Sales
Total
Subsidy
Tariff
Order
Subsidy
Cross
Subsidy
Rs. /Unit
MU
Rs. Crs.
Rs. Crs.
Rs. Crs.
FY 11-12
3.58
5,346
1,914
515
1,399
FY 12-13
4.37
5,881
2,570
837
1,733
FY 13-14
5.20
5,881
3,058
935
2,123
Source: TSSPDCL
Approved
Sales
Total
Subsidy
Tariff
Order
Subsidy
Cross
Subsidy
Rs. /Unit
MU
Rs. Crs.
Rs. Crs.
Rs. Crs.
FY 11-12
3.82
3,596
1,374
944
429
FY 12-13
4.71
3,956
1,863
1,579
284
FY 13-14
5.51
3,956
2,180
1,751
428
Animal Husbandry
Tourism
961
492
1,453
14
12
Unit
School Education
Higher Education
Social Welfare
B.C. Welfare
Tribal Welfare
Total
Source: TSPCC
Source: TSNPDCL
Table 34: Historic Agricultural Sales and Subsidy Trend- Telangana Discom
Approved
Sales
Total Subsidy
Tariff Order
Subsidy
Cross
Subsidy
Unit
MU
Rs. Crs.
Rs. Crs.
Rs. Crs.
FY 11-12
8,943
3,288
1,459
1,828
FY 12-13
9,837
4,433
2,416
2,017
FY 13-14
9,837
5,238
2,687
2,551
23
FY
14-15
FY
15-16
FY
16-17
FY
17-18
FY
18-19
Avg. CoS
Rs. /Unit
5.72
6.09
6.43
6.69
6.99
Agl. Sales
MU
11,939
12,536
13,163
13,821
14,512
Agl. Subsidy
Required
Rs. Cr.
6,832
7,640
8,467
9,248
10,141
Projected Agl.
Subsidy by Govt.
Rs. Cr.
3,331
3,522
3,904
4,264
4,676
Cross subsidy
through tariffs
Rs Cr.
3,501
4,117
4,563
4,984
5,465
Item
Source: Analysis
undertaken.
Long term: Metering of agricultural consumers to be
undertaken
The above would help in segregating agriculture sales
from losses and this would portray the actual loss levels of
DISCOMS.
2. Re-survey of all the agricultural services is needed for
greater subsidy targeting. As per Government Policy, small
and marginal farmers need to be provided with subsidy.
Resurvey of agricultural services will aid in identification of
the small and marginal farmers.
3. Implementation of HVDS on a larger scale, covering
segregation of all agricultural feeders needs to be taken
up. Presently around 41,813 pump sets are envisaged
to be covered under JICA scheme in FY 14-15 and 5,358
agricultural pump sets have been covered till July 2014.
Total pump sets to be covered under JICA scheme is 1.96
Lakhs. Steps need to be taken for implementing HVDS for
the balance agricultural pump sets in an expedited manner.
This will ensure better quality of supply and reduced
distribution losses.
increased efficiency
Installation of solar pump sets in areas with high water
24
Table 36: Projected ARR and ACS gap for Telangana DISCOMS
FY
14-15
Revenue from Sales (Rs Cr)
Agl. Tariff Subsidy (Rs Cr)
FY
15-16
FY
16-17
FY
17-18
FY
18-19
20,845
25,540
29,366
35,667
41,694
3,331
3,522
3,904
4,264
4,676
1,394
1,618
1,861
2,110
2,402
4,725
5,140
5,765
6,374
7,078
25,570
30,681
35,131
42,042
48,772
455
478
502
527
553
26,025
31,159
35,632
42,568
49,325
22,815
27,561
31,243
37,413
43,118
944
1,224
1,543
1,685
1,745
2,188
3,040
3,491
3,966
4,518
268
295
324
357
392
26,216
32,121
36,601
43,421
49,774
Sales (MU)
45,813
52,707
56,902
64,895
71,230
4.65
4.94
5.25
5.58
5.93
5.68
5.91
6.26
6.56
6.92
ACS (Rs/KWh)(B)
5.72
6.09
6.43
6.69
6.99
-0.04
-0.18
-0.17
-0.13
-0.06
Gap (A-B)
Tariff subsidy for FY 14-15 also includes a subsidy amount of Rs. 496 Crs for LT Domestic consumers with monthly consumption between 50 and 200 units. This amount has been considered for future year
projections also
Source: Wheeling Tariff Order for TSDISCOMS ( FY 14-15 to FY 18-19), Analysis
25
households in Telangana was around 7,800 MU in FY 201314. Of this, lighting accounted for 30% of consumption
which is around 2,330 MU. A target for a minimum 10% of
replacement of existing bulbs with LED bulbs every year is
worked out in Table 37.
Table 37: Energy efficiency measures for domestic consumers
Unit
FY
14-15
FY
15-16
FY
16-17
FY
17-18
FY
18-19
House holds
Lakhs
81
83
86
89
91
LEDs installed
Lakhs
16
33
34
35
55
Energy savings
MU
123
372
376
256
391
Unit
MU
Unit
FY
14-15
FY
15-16
FY
16-17
FY
17-18
FY
18-19
Agl pumps to be
replaced
Lakhs.
0.95
2.00
2.09
2.20
2.31
Energy savings
MU
165
347
364
382
401
Particulars
Particulars
FY
14-15
FY
15-16
FY
16-17
FY
17-18
FY
18-19
154
154
154
154
154
26
27
28
Item
FY
14-15
FY
15-16
FY
16-17
FY
17-18
FY
18-19
Energy Requirement
54,998
63,047
67,902
77,164
84,496
45,795
45,037
44,030
43,896
43,754
C = A-B
-9,203
-18,009
-23,872
-33,268
-40,742
D (Sec 3.1)
D.1
13
1,618
5,565
6,531
12,523
D.2
2,305
3,005
5,658
6,922
D.3
7,289
7,965
9,981
9,981
D.4
Procure power from power plants located in Southern and outside Southern region
4,069
8,176
8,176
D.5
420
1,260
2,101
3,012
D =SUM(D1:D5)
1,512
11,632
21,865
32,448
40,614
E (Sec 3.2)
431
431
431
862
F=C-D-E
-7,691
-5,947
-1,577
-389
735
-13.98%
-9.43%
-2.32%
-0.50%
0.87%
442
873
894
792
946
1,499
G (Sec 3.3)
H-F-G
-7,249
-5,074
-683
403
1,681
-13.18%
-8.05%
-1.01%
0.52%
1.99%
Source: Analysis
29
Item
FY
14-15
FY
15-16
FY
16-17
FY
17-18
FY
18-19
Energy Requirement
54,998
63,047
67,902
77,164
84,496
45,795
45,037
44,030
43,896
43,754
C = A-B
-9,203
-18,009
-23,872
-33,268
-40,742
D (Sec 2.1)
D.1
13
2,007
5,565
6,531
12,523
D.2
2,305
3,005
5,658
6,922
D.3
1,499
7,289
7,965
9,981
9,981
D.4
Procure power from power plants located in Southern and outside Southern region
4,069
8,176
8,176
D.5
60
1,472
3,081
4,833
7,029
D =SUM(D1:D5)
1,571
13,072
23,686
35,179
44,632
E (Sec 2.2)
431
862
862
862
862
F=C-D-E
-7,201
-4,076
675
2,773
4,752
-13.09%
-6.46%
0.99%
3.59%
5.62%
442
873
894
792
946
G (Sec 2.3)
H-F-G
-6,759
-3,203
1,569
3,565
5,698
-12.29%
-5.08%
2.31%
4.62%
6.74%
Source: Analysis
30
6 months.
e. SCCL Unit-1 to be commissioned by October 2016 and
Item
FY
14-15
FY
15-16
FY
16-17
FY
17-18
FY
18-19
Energy Requirement
54,998
63,047
67,902
77,164
84,496
45,795
45,037
44,030
43,896
43,754
C = A-B
-18,009
-23,872
-33,268
-40,742
D (Sec 3.1)
D.1
13
486
3,637
6,531
10,521
D.2
851
2,900
4,506
6,543
D.3
1,499
5,820
7,778
9,981
9,981
D.4
Procure power from power plants located in Southern and outside Southern region
3,849
6,813
6,813
D.5
175
525
910
1,401
D =SUM(D1:D5)
1,512
7,332
18,690
28,742
35,259
E (Sec 3.2)
431
431
431
F=C-D-E
-7,691
-10,678
-4,752
-4,095
-5,052
-13.98%
-16.94%
-7.00%
-5.31%
-5.98%
Source: Analysis
-9,203
31
32
country.
to availability of gas.
Ensure renewal of PPA with NTPC Ramagundam-II on
quality of coal.
4. Improve efficiency of Generation sector
Ensure sufficient coal linkage and materialization:
through
Tariff based competitive bidding
Viability Gap Funding (VGF) based on grant by GoI.
Identify lines with high losses and undertake system
augmentation works.
33
Particulars
LT- I Domestic
0-50 KWh
898
50-200 KWh
496
LT V Agriculture
3,331
Subsidy
4,725
26
P
hase wise HVDS implementation to cover 19.1 lakh
agricultural consumers
455
M
onitor agriculture supply as per Government policy, by
effective metering and data collection.
453
Financing
935
5,660
Budget release order to be issued,#The arrears on tariff subsidy for the FY 2014-15 receivable till
31st Oct 14 is Rs. 1,318 crores
Source: TSPCC
objectives as well as co-ordinate with all the stakeholders for achieving efficiency in energy consumption
in target segments.
34
Responsible Entity
TSGENCO
TSGENCO
TSTRANSCO
PGCIL
TSTRANSCO
Energy Department
Energy Department
TSREDA
TSTRANSCO/
TSDISCOMS
Implementation of 11 KV SCADA
TSTRANSCO/
TSDISCOMS
Timeline
35
Annexure
Annexure I
Table 45: Station-wise capacities , Telangana share and PPA expiry
Sl No
I.
1 Kothagudem - A
240
129
31/03/2019
2 Kothagudem - B
240
129
31/03/2019
3 Kothagudem - C
240
129
31/03/2019
4 Kothagudem - D
500
269
31/03/2019
500
269
22/10/2036
6 Ramagundam - B
63
34
31/03/2019
7 Dr NTTPS
1260
679
31/03/2019
8 Dr NTTPS Stage IV
500
269
27/01/2035
9 R.T.P.P.Stg.1
420
226
31/03/2019
420
226
28/03/2033
210
113
9/02/2036
500
269
13/09/2035
Total Thermal
5093
2744
84
45
58
31
3 Nizam Sagar
10
4 Upper Sileru
240
129
5 Donkarayi
25
13
6 Lower Sileru
460
248
770
415
31/03/2019
900
485
31/03/2019
90
49
31/03/2019
10 Nagarjunasagar Main PH
816
440
31/03/2019
60
32
12 Pochampadu
36
19
13 Penna Ahobilam
20
11
14 Singur
15
15 Jurala
234
126
3817
2057
16 Mini Hydel
12
11
17 Wind
8925
4814
THERMAL
HYDEL
1 Machkund,Interstate
project,Orissa
T.B.Station,Interstate
project,
2
Karnataka
Total Hydel
31/03/2019
9/01/2037
36
37
194
105
30/4/2010
486
262
31/03/2016
3 N.T.P.C Ramagundam -7
170
92
24/03/2030
412
222
31/07/2030
1000
539
28/02/2028
455
245
29/09/2037
7 Neyveli (Tamilnadu)stage-I
116
62
22/04/2013
8 Neyveli (Tamilnadu)stage-II
205
110
8/4/2019
9 M.A.P.P (Tamilnadu)
143
77
20/3/2011
44
24
15/03/2025
136
73
19/01/2036
12 Vallur Stage -1
144
78
31/07/2039
3503*
1888
1 Vijjeswaram Stage-I
100
2 Vijjeswaram Stage-II
172
23
Total Jt Sector
272
32
217
117
19/06/2015
220
119
13/04/2024
208
112
18/4/2016
351
189
17/10/2015
220
119
23/10/2017
6 M/s Vemagiri
370
199
15/09/2029
444
239
29/06/2025
8 M/s.Gautami
464
250
4/06/2024
Total IPPs
2495
1344
IV.
Joint sector
IPPs
VI.
274
74
205
58
29
4 Mini Hydel
106
14
5 Wind
664
41
54
19
1419
179
17
31/3/2018
37
7/10/2017
25
13
79
13
27
15
16719
8284
Total MPPs
VII.
Others
1 Isolated gas wells
Total Capacity ( I to VII)
38
39
Annexure II
Key generation plants and load centers - Telangana state
40
Glossary of Terms
ACS
MDAS
AMR
MDO
APDISCOMS
MNG
Manuguru
APGENCO
MNRE
APTRANSCO
MTOA
ARR
NCE
Non-Conventional Energy
AT&C
NEW
North-East-West
BEE
NLC
BHPL
Bhoopalpally
NPCIL
BIS
NTPC
CAGR
OCP
CGS
PGCIL
CHP
PLF
CoD
PMG
CoS
Cost of Service
PPA
DDG
R-APDRP
DTR
Distribution Transformer
ECBC
RTPP
ER
Eastern Region
SBD
FSA
SCADA
GCV
SCCL
GIS
SECM
GoI
Government of India
SERC
GPRS
SR
Southern Region
GSDP
SRPC
HMR
T&D
HVAC
TANGEDCO
HVDS
ToD
Time of Day
IPP
TSDISCOMS
ITIR
TSGENCO
JICA
TSNPDCL
KPI
TSPCC
KTPP
TSPFC
KTPS
TSREDA
LED
TSSLDC
LEED
TSSPDCL
LIS
TSTRANSCO
LTA
VSAT
LTOA
WCL
MBC
WR
Western Region
MCL