ALUMINIUM FORMWORK

Content
Company Introduction

02

ProMold Introduction
TM

04

Product Characteristics
Key Advantages of ProMold

TM

Installation Process of Aluminum Formworks


Install a Layer of Formwork in 5 days

Comparison between Different Formworks

08

The 4 major Advantages of Aluminum Formworks


Aluminum Formworks VS Timber Formworks VS Steel Formworks
The Cost Comparison between Aluminum and Timber Formworks
Other Types of Formworks

Professional Teams

12

Production Centers and Advanced Machineries

14

Program Group | Aluminium Formwork

Company Introduction
" Y ou d a r e to d r ea m i t
W e ca r e to b ui l d i t "
Program Contractors Ltd was established in
Hong Kong in 1987 with the focus of become
specialists in metalwork fabrication and erection.
With the injection of new resources into the
area of Building Construction, in 1992 Program
has since expanded its capabilities, and has
become a General Contractor, specializing in
many areas including metal works, structural
steelworks, building construction / refurbishment,
building maintenance, addition and alteration
works, associated E&M works etc. Through sucess
in all these areas, Program has elevated it self
to become the first- to- be considered by clients
who demand quality and sophisticated site
management.

Programs construction formwork system


ProMold

TM

With a vast accumulation of experience gained


from works relating to metal fabrication and
construction, Program has successfully invented
its own construction formwork system, the
ProMold . It has the capability of providing clients
TM

with the whole spectrum of services including


formwork design, production and alteration,
installation and recycling. Like always, the aim of
Program is to provide its clients with impeccable
products and services, in the total commitment
to enhance their erection efficiency.
Program is totally committed to listening to
feedback on the formwork provided. By doing so
Program may achieve further improvement, and
may maintain quality and impeccable services
and products on a continuous basis.

ProMold

TM

Introduction
I. Product Characteristics
The ProMold System comprises the following 4 parts:
TM

1
Panel System
Our panels guarantee
the production of solid
structured concrete.

2
Support System
Our support system
caters to all kinds
of roofs, beams,
and cantilevered
structures.

Program Group | Aluminium Formwork

"...With over 25 years experience in design, assembly, product


development and production of metal works, Program guarantees
impeccable quality of ProMold aluminum formworks."
TM

3
Reinforcement system
Our panels guarantee
accuracy in formwork
dimensions, and prevent
breakage from over-loading.

4
Connection system
Our connections ensure
total integrity in interlocking
panels of formwork.

II. Key Advantages of ProMold

TM

Materials
The ProMold aluminum panels by themselves are
TM

already of excellent quality. Nevertheless Program


continues to strive for excellence to attain even
high quality. Research continues focuses in an
attempt to develop a lighter panel with a greater
strength. Such will eusure that during the processes
of construction, possible damage of the panels
may be avoided.
To reduce manufacturing cost, Program focuses
on surface design and patchwork process,
the end result of which is a high degree of
smoothness.

Easy to use
Program tailor made different forming structures for
clients specific needs. The ProMold connecting
TM

system uses cylindrical bolts and wedge-shaped


inserts which is a very simple design without the
need for any specific tools or techniques. Both
installing and dismantling procedures can be
carried out easily.

Safety design
ProMold

TM

support system embodies oblique

support, pipe support and square tube support.


A variety of efficient system to meet different
construction needs is available. Then strengthen
the stability of the panel system and offer
protection to workers.

Program Group | Aluminium Formwork

III. Installation Process of Aluminum Formworks

Pour Concrete

Install and check


the suspended
formwork

10

Dismantling
the formworks

Survey and
Setting Out

Install the wall


and column
reinforcement
bars

Installation
Process

Install the wall


and
column panels

Install the E&M


concealed
conduits

Install the beam


reinforcement
bars

Install the
slab panels

Install the
beam
panels

IV. Install a layer of formwork in 5 days:


DAY 1

Survey and setting out. Followed by the installation of wall and column reinforcement bars
and E&M concealed cable containment.

DAY 2

Install the wall, column panels and the beam panels.

DAY 3

Install the beam side panels and slab panels.

DAY 4

Install the beam reinforcement bars and finish the E&M cable containment. Adjust and
reinforce the wall panels and pillar panels.

DAY 5

Install the slab reinforcing bars and suspended formworks. Pour concrete.

Comparison Between Different Formworks


The 4 Key Advantages of Aluminum Formworks
1. Environmental Friendly

The aluminum formworks can be recycled after smelting.

2. Shorten the Construction Period

Aluminum formworks are light in weight and highly precise in assembly.


The installation process is easier and the installation time can be reduced
by 30% compared with the wooden formworks. A area of 2,000 m 2
aluminum formworks can be completed in about 35 hours.

Reusable Aluminium Formwork

Program Group | Aluminium Formwork

3. Civilized Construction

Installing aluminum formworks does not generate much noise and storage area
can be substantially reduced. The clean and tidy environment measures
up to the stringent standards of modern construction.

4. Reduce costs

The aluminum formwork can be reused for more than 300 times. This can reduce
cost and time of batching procedures. This is evident in constructing the multilayered high-rise buildings as well as highly modular structures.

10

Aluminum Formworks VS Timber Formworks VS Steel Formworks


Aluminum Formworks, Timber Formworks and Steel Formworks are commonly used in construction sites.
The reason why Program develops Aluminum Formworks is that it can widely benefit contractors and
customers.

Formworks
Examples

Characteristics

Aluminum Formworks

Timber Formworks

Unit cost is low

Overall Costs

Quality and
processing

Recycle

Carrying
capacity

Construction
Time and usage

Postprocessing

Unit cost is low

Overall cost is low

High

Real-time investment
is high

Overall cost is low


Real-time investment
is high

Light

Lightest

Heavy

Easy to transport,
store, disassemble
clean

Difficult to clean

Easy to clean

Easy to transport,
store and move

Difficult to transport,
store and disassemble

Can be recycled
over 300 times

Shape elasticity
is low

Shape elasticity

Steel Formworks

Can be recycled in
about 10 times

Shape elasticity
is high

Can combine
with other types of
formworks

Can be recycled
over 40 times

Shape elasticity
is low
Can combine
with other types of
formworks

Strong

Easy to bend

Strongest

Carrying capacity
is high

Carrying capacity
is low

Carrying capacity
is the highest

Easy to use

Construction
time is long

Use heavy machinery


during assemble

Complex assembly
procedures

Construction time
is longer than that
of the Aluminum
Formworks

Simple assembly
procedures
Construction
time is the shortest

None

Need to remove
the saw dusts after
dismantling

None

Program Group | Aluminium Formwork

11

The Comparison between Aluminum and Timber Formworks


Characteristics

Aluminum Formworks

Timber Formworks

Difference

Amortization

3.73

14.40

-10.67

Labour Cost

20

25

-5

16

-16

Cost of Secondary
Patching

No Secondary
Patching

Waste Disposal Fee

No waste

-2

Total

23.73

57.40

-33.67

Remarks:
Aluminum Formworks amortization: Divided by 300 after deducting the recycle value
Timber Formworks amortization: Divided by 10

Unit:RMB/m

Other Types of Formworks

Reusable plastic formwork

Permanent insulated formwork

Stay-in-place structural formwork

Similar to the aluminum formworks,

The permanent insulated

It is usually hollow and serves as

Reusable plastic formwork can

formwork requires no removal

cylindrical and square columns.

form different shapes easily.

after concrete has been poured

As in the case of

Because of its reusable and

in it. It possesses the characteristics

insulated formwork, subsequent

durable characteristics, the unit

of heat proof, noise attenuation,

removal is not required. It is

cost is lower than that of the

waterproof and anti-corrosion.

resistant to erosion, expansion and

Timber Formworks as favar mass

Also it has the added advantage

contraction etc.

construction.

of strengthening architectural
structure, and the construction
time is short. However there
are certain drawbacks, ie, the
construction cost is high, and the
risk of building alterations can
exist.

Permanent

12

Professional Teams

Program Group | Aluminium Formwork

13

To continue to improve the quality of ProMold ,


TM

Program has implemented professional and equipment


optimization plan to meet the customers requirements
as well as providing good services and products.
Program has different professional teams including
design, construction, production and customer service
with excellent technical knowledge. We understand
the unique requirements of each customer. As such,
we strive to provide a tailor-made and all round
solution to help them achieve their construction needs.

14

Production Centers and Advanced Machineries


Program spares no effort in investing heavily in advanced machineries and in improving the working
environment of outstanding products.
Program owns and operates 2 production centers simultaneously. They are equipped with advanced
technology with good working environment. Prospero Metal Products (Shenzhen) Co Ltd. occupies
a factory area of 35, 000m2. In 2002, It was awarded with ISO9001 in Quality Management System. It is
totally committed to providing quality products and impeccable services.
Program Metal Products (Zhuhai) Co. Ltd. is located in China Special Economy Zone in Gaolan Port,
Zhuhai. The rearest sea-freight harbour vastly facilitates logistic arrangements, of this center with the result
that time and costs are saved. This production center occupies an extensive area of 60,000 m2 which is
almost twice the size of Prospero, its sister production center in Shenzhen. It contains 3 single-storeyed
plants, 1 office block, 1 multi-storeyed halls of residence for the staff, a canteen covering 2 floors, and a
recreation floor, an environmental treatment plant together with other ancillary accommodations.

The production workshops include :

1) Punching

Responsible for shearing, punching and bending of all kinds of


products

2) Molding

Responsible for secondary processing and mold making

3) CNC

Responsible for precision cutting

4) Welding

Responsible for various types of structural steel welding

5) Polishing and grinding

Responsible for product polishing and grinding

6) Sheet metal

Responsible for the secondary processing of all kinds of metal


plate

7) Coating

Responsible for the enamel coating, polyester powder coating


and conventional spray paint

8) Assembly

Responsible for pre-assembled of products

Program Group | Aluminium Formwork

15

Zhuhai Factory

16

Production Centers

Program Group | Aluminium Formwork

17

18

Advanced Machineries

Program Group | Aluminium Formwork

19

20

Printed by Totally Chlorine Free Paper