Professional Documents
Culture Documents
En PDF
En PDF
Content
Company Introduction
02
ProMold Introduction
TM
04
Product Characteristics
Key Advantages of ProMold
TM
08
Professional Teams
12
14
Company Introduction
" Y ou d a r e to d r ea m i t
W e ca r e to b ui l d i t "
Program Contractors Ltd was established in
Hong Kong in 1987 with the focus of become
specialists in metalwork fabrication and erection.
With the injection of new resources into the
area of Building Construction, in 1992 Program
has since expanded its capabilities, and has
become a General Contractor, specializing in
many areas including metal works, structural
steelworks, building construction / refurbishment,
building maintenance, addition and alteration
works, associated E&M works etc. Through sucess
in all these areas, Program has elevated it self
to become the first- to- be considered by clients
who demand quality and sophisticated site
management.
TM
ProMold
TM
Introduction
I. Product Characteristics
The ProMold System comprises the following 4 parts:
TM
1
Panel System
Our panels guarantee
the production of solid
structured concrete.
2
Support System
Our support system
caters to all kinds
of roofs, beams,
and cantilevered
structures.
3
Reinforcement system
Our panels guarantee
accuracy in formwork
dimensions, and prevent
breakage from over-loading.
4
Connection system
Our connections ensure
total integrity in interlocking
panels of formwork.
TM
Materials
The ProMold aluminum panels by themselves are
TM
Easy to use
Program tailor made different forming structures for
clients specific needs. The ProMold connecting
TM
Safety design
ProMold
TM
Pour Concrete
10
Dismantling
the formworks
Survey and
Setting Out
Installation
Process
Install the
slab panels
Install the
beam
panels
Survey and setting out. Followed by the installation of wall and column reinforcement bars
and E&M concealed cable containment.
DAY 2
DAY 3
DAY 4
Install the beam reinforcement bars and finish the E&M cable containment. Adjust and
reinforce the wall panels and pillar panels.
DAY 5
Install the slab reinforcing bars and suspended formworks. Pour concrete.
3. Civilized Construction
Installing aluminum formworks does not generate much noise and storage area
can be substantially reduced. The clean and tidy environment measures
up to the stringent standards of modern construction.
4. Reduce costs
The aluminum formwork can be reused for more than 300 times. This can reduce
cost and time of batching procedures. This is evident in constructing the multilayered high-rise buildings as well as highly modular structures.
10
Formworks
Examples
Characteristics
Aluminum Formworks
Timber Formworks
Overall Costs
Quality and
processing
Recycle
Carrying
capacity
Construction
Time and usage
Postprocessing
High
Real-time investment
is high
Light
Lightest
Heavy
Easy to transport,
store, disassemble
clean
Difficult to clean
Easy to clean
Easy to transport,
store and move
Difficult to transport,
store and disassemble
Can be recycled
over 300 times
Shape elasticity
is low
Shape elasticity
Steel Formworks
Can be recycled in
about 10 times
Shape elasticity
is high
Can combine
with other types of
formworks
Can be recycled
over 40 times
Shape elasticity
is low
Can combine
with other types of
formworks
Strong
Easy to bend
Strongest
Carrying capacity
is high
Carrying capacity
is low
Carrying capacity
is the highest
Easy to use
Construction
time is long
Complex assembly
procedures
Construction time
is longer than that
of the Aluminum
Formworks
Simple assembly
procedures
Construction
time is the shortest
None
Need to remove
the saw dusts after
dismantling
None
11
Aluminum Formworks
Timber Formworks
Difference
Amortization
3.73
14.40
-10.67
Labour Cost
20
25
-5
16
-16
Cost of Secondary
Patching
No Secondary
Patching
No waste
-2
Total
23.73
57.40
-33.67
Remarks:
Aluminum Formworks amortization: Divided by 300 after deducting the recycle value
Timber Formworks amortization: Divided by 10
Unit:RMB/m
As in the case of
contraction etc.
construction.
of strengthening architectural
structure, and the construction
time is short. However there
are certain drawbacks, ie, the
construction cost is high, and the
risk of building alterations can
exist.
Permanent
12
Professional Teams
13
14
1) Punching
2) Molding
3) CNC
4) Welding
6) Sheet metal
7) Coating
8) Assembly
15
Zhuhai Factory
16
Production Centers
17
18
Advanced Machineries
19
20