Rate Analysis and Estimate

Brick Work With 1:6 Cement Sand Mortar


1 For 1.0 Cum of Bw No of Bricks Required=500
2 For 1.0 Cum of Bw Dry Mortar Required =

3 For1.0 Cum of Brick Work


a:
Cement Required
Cost of Cement @ Rs 360 per bags
b:

Sand(Fine) Required
Cost of Sand @ Rs 30.0/Cft

c:

Bricks required
Cost of bricks @ Rs 5.8/ Brick

Cost of Material for 1.0 Cum BW

500 No
0.23 Cum

35.32

0.033 Cum
0.93 Bags
334.23 Rs
0.20 Cum
6.96 Cft
208.89 Rs
500 No
2900 Rs

3,443.12

9 Mason and 18 labourers are required for 400 Cft (11.33 Cum)of Bw per Day
I.e. Manhours required per M3 of Bw
24 MH/Cum
Cost of Mason @ Rs 800/ Mason
Cost of Labour @ Rs 250 Per Labour

7200 Rs
4500 Rs

Labour Cost for 11.33 Cum of BW


Labour Cost for 1.0 Cum of BW

### Rs
1,032.66 Rs

Material Cost + Labour Cost per 1.0 .Cum

4,475.78 Rs

Tools, Plants and Water Charges (3%)

Total of C+D

134.27 Rs
4,610.05

Adding 26% for Tax, Over Head, Profit

5,808.66

I.e. Cost of 1.0 Cum of Bw


I.e. Cost of 1.0 Cft of Bw

5,808.66 Rs
164.46 Rs

Rate Analysis and Estimate


1:4 Cement Sand Plaster 12 mm thick
1 For 100 Sqm Plaster 12mm Thick material Qty
Adding 5% wastage
Dry Material for 100 Sqm Plaster 12 mm Thick (25% ad

a: Cement Required
Cost of Cement @ Rs.360 per bag
b: Sand required
Cost of Sand @ Rs 30/Cft
I.E Material Cost
3 Mason +4 Labour can do 45 Sqm Per Day
Labour Cost for 3 Mason+4Labour (@800&250) for 45
Labour Cost for 100 Sqm

I.e Material+labour Cost

1.2 Cum
1.26 Cum
1.575 Cum

0.315 Cum
8.90 Bags
3,204.23 Rs
1.26 Cum
44.50 Cft
1,335.10 Rs
4,539.33 Rs
1.56 MH/Cum
3400
7,555.56

### Rs

Adding 3% for Tools & Plant and water charges

### Rs

Adding 26% for Tax, Ohand Profit

### Rs

Cost per Sqm

156.97 Rs

Cost Per Sft

14.59 Rs

Average for 12mm and 19 mm thick plaster

16.75 Rs

Rate Analysis and Estimate


White Wash
Qty of Lime Required for 100 Sqm (Three Coa

30 Kg

Rate of Lime Per KG

6 Rs

Material Cost for 100 Sqm

180 Rs

Man Hours Per Sqm (Three) Coats


For 100 Sqm MH Required

1 No
100 No

1 Carpainter and 1 helper cando 16 sqm per Day


Labour Cost of 16 Sqm
Labour Cost of 100 Sqm

800 Rs
5000 Rs

Labour Cost + Material Cost

5180 Rs

Adding 3% for tools & Plants and Water Charg

5335.4

Adding 26% for Profit+Tax+Oh

6722.6

Cost Per Sqm

67.226

Cost Per Sft

6.26524

Rate Analysis and Estimate


1:4 Cement Sand Plaster 19 mm thick
1 For 100 Sqm Plaster 19mm Thick material Qty
Adding 5% wastage
Dry Material for 100 Sqm Plaster 12 mm Thick (25% ad

a:

Cement Required
Cost of Cement @ Rs.360 per bag

b:

Sand required
Cost of Sand @ Rs 30/Cft

I.E Material Cost


3 Mason +4 Labour can do 40Sqm Per Day

1.900 Cum
1.995 Cum
2.494 Cum

0.499 Cum
14.09 Bags
5,073.36 Rs
1.995 Cum
70.46 Cft
2,113.90 Rs
7,187.27 Rs
1.75 MH/Cum

Labour Cost for 3 Mason+4Labour (@800&250) for 45S


3400
Labour Cost for 100 Sqm
8,500.00

I.e Material+labour Cost

### Rs

Adding 3% for Tools & Plant and water charges

### Rs

Adding 26% for Tax, Ohand Profit

### Rs

Cost per Sqm


Cost Per Sft

203.59 Rs
18.92 Rs

Rate Analysis and Estimate


P.C.C 1:2:4
For 100 Cum of PCC 1:2:4 Dry Material Required
1 Cement Required

22.00 Cum
621.63 Bags
### Rs

Cost of Cement @ Rs 300 Per bag


2 Sand Required

44.00 Cum
1,554.08 Cft
17,094.88 Rs

Cost of Sand @ Rs 11 per Cft


3 Crush Required

88.00 Cum
3,108.16 Cft
40,406.08 Rs

Cost of Crush @ Rs 13 Per Cft


I.e

154.00 Cum

Material Cost

###

Labor Cost
For Laying 400 Cft Concrete 2 masons and 20 labourers are required
11.33 Cum

176 Mh

Mason Cost @ Rs800 Per Mason


Labour Cost @ Rs 250 Per Labour

Labour Cost for 11.33 Cum


Labour Cost for 100 Cum

15.54 MH/Cum
1600 Rs
5000 Rs

6600 Rs
58,252.43 Rs

Formwork Cost
Material + Labour Cost

###
###

Adding 3% for Tools & Plant and Water Charges

###

Adding 26% for Profit , Tax and OH

###

Cost per Cum


Cost Per Cft

5,272.22
149.27

17.6 for 100 Cft

for 100 Cft