Rate Analysis and Estimate: Brick Work With 1:6 Cement Sand Mortar
Rate Analysis and Estimate: Brick Work With 1:6 Cement Sand Mortar
Sand(Fine) Required
Cost of Sand @ Rs 30.0/Cft
c:
Bricks required
Cost of bricks @ Rs 5.8/ Brick
500 No
0.23 Cum
35.32
0.033 Cum
0.93 Bags
334.23 Rs
0.20 Cum
6.96 Cft
208.89 Rs
500 No
2900 Rs
3,443.12
9 Mason and 18 labourers are required for 400 Cft (11.33 Cum)of Bw per Day
I.e. Manhours required per M3 of Bw
24 MH/Cum
Cost of Mason @ Rs 800/ Mason
Cost of Labour @ Rs 250 Per Labour
7200 Rs
4500 Rs
### Rs
1,032.66 Rs
4,475.78 Rs
Total of C+D
134.27 Rs
4,610.05
5,808.66
5,808.66 Rs
164.46 Rs
a: Cement Required
Cost of Cement @ Rs.360 per bag
b: Sand required
Cost of Sand @ Rs 30/Cft
I.E Material Cost
3 Mason +4 Labour can do 45 Sqm Per Day
Labour Cost for 3 Mason+4Labour (@800&250) for 45
Labour Cost for 100 Sqm
1.2 Cum
1.26 Cum
1.575 Cum
0.315 Cum
8.90 Bags
3,204.23 Rs
1.26 Cum
44.50 Cft
1,335.10 Rs
4,539.33 Rs
1.56 MH/Cum
3400
7,555.56
### Rs
### Rs
### Rs
156.97 Rs
14.59 Rs
16.75 Rs
30 Kg
6 Rs
180 Rs
1 No
100 No
800 Rs
5000 Rs
5180 Rs
5335.4
6722.6
67.226
6.26524
a:
Cement Required
Cost of Cement @ Rs.360 per bag
b:
Sand required
Cost of Sand @ Rs 30/Cft
1.900 Cum
1.995 Cum
2.494 Cum
0.499 Cum
14.09 Bags
5,073.36 Rs
1.995 Cum
70.46 Cft
2,113.90 Rs
7,187.27 Rs
1.75 MH/Cum
### Rs
### Rs
### Rs
203.59 Rs
18.92 Rs
22.00 Cum
621.63 Bags
### Rs
44.00 Cum
1,554.08 Cft
17,094.88 Rs
88.00 Cum
3,108.16 Cft
40,406.08 Rs
154.00 Cum
Material Cost
###
Labor Cost
For Laying 400 Cft Concrete 2 masons and 20 labourers are required
11.33 Cum
176 Mh
15.54 MH/Cum
1600 Rs
5000 Rs
6600 Rs
58,252.43 Rs
Formwork Cost
Material + Labour Cost
###
###
###
###
5,272.22
149.27