This document provides information on various topics related to telecommunications equipment and infrastructure. It discusses switched mode power supplies, battery types, earthing systems, instruments used for measurement, and components of power plants and UPS systems. It also covers topics like tower structures, shelter specifications, and painting procedures for towers. The document serves as a reference guide covering electrical, electronic and civil aspects of telecom network infrastructure.
This document provides information on various topics related to telecommunications equipment and infrastructure. It discusses switched mode power supplies, battery types, earthing systems, instruments used for measurement, and components of power plants and UPS systems. It also covers topics like tower structures, shelter specifications, and painting procedures for towers. The document serves as a reference guide covering electrical, electronic and civil aspects of telecom network infrastructure.
This document provides information on various topics related to telecommunications equipment and infrastructure. It discusses switched mode power supplies, battery types, earthing systems, instruments used for measurement, and components of power plants and UPS systems. It also covers topics like tower structures, shelter specifications, and painting procedures for towers. The document serves as a reference guide covering electrical, electronic and civil aspects of telecom network infrastructure.
SMPS Stands for ___Switched Mode Power Supply_____
VRLA batteries works in the principle of ____Oxygen Recombination ______ The end plate is _____negative plate_____ The input to UPS is ____both battery and AC supply_____ The standard we use in terms of discharge of battery is _______C10______ For the exchanges where less space is available ____spike____ earthing is recommended. 7. What is the power factor of input commercial AC power supply ______0.8_____. 8. After discharge the positive plate becomes _____PbSO4____ 9. All cells of the battery are connected in ____series_____ 10.Mainly used earthing system in Telecom industry is _____plate_____ 11.The device reduced the size of the power plant is _____SCR_____ 12.The SCR is _____fast switching_______ device 13.Meggar is used to measure _____low resistances____ 14.Unit which cuts the DC in to pulsated DC with a than 20 K Hz speed is ____chopper___ 15.Chopper is the circuit which cuts the DC into ____pulsated DC with of 20 K Hz_______ 16.The purpose of earth plates in earthing is ______to increase the area of contact______ 17.Power plant, batteries and load are connected in ___parallel____ 18.Battery terminals are terminated at ______power plant_____ 19.HRC stands for ___High Rupturing Capacity______ 20.In a cell to meet 4000 Ah, 4 nos of each 1000 Ah are connected in ____parallel____ 21.LVD stands for ____Low Voltage Disconnector____ 22.MCM stands for ____Monitoring and Control Module____ 23.LVD operates at _____44.4 V per battery or 1.75 V per cell____ 24.MCM consists of ___Micro Processor_____ 25.Instrument used to measure earth resistance is _____Meggar____ 26.Plate at which Oxygen gas releases during discharge is ______positive____ 27.Plate at which Hydrogen gas releases during discharge is _____negative____ 28.The batteries which we use in the exchanges are of type ____Secondary _____ 29.The Stage 1 in power plant is also called as ____LPU Lightning Protection Unit_____ 30.All switches and fuses are connected to _____negative path____ 31. The device which converts AC to AC is called as ______cyclo converter______ 32.Huge of size of conventional power plant is due to ____ transformes______ 33.The function of MCM is ____all of the above_____ a)output voltage monitoring b) load sharing c)extension of alarms d) logical operation 34.The device which disconnects the battery at 44.4 V is _____LVD____ 35. The stage 2 in power plant is also called as ______SPU Surge Protector Unit___ 36.The SPU protects the power plant from _____Surge voltages_____ 37.The LPU protects the power plant from ______Lightning voltages_____ 38.Earthing is compulsory in exchanges to divert _____leakage____ and _____faulty ____ currents. 39.Inverter is a device which converts _____DC to AC______ 40.Converter is a device which converts ____AC to DC___ 41.The standard cell voltage is _____2.23 V_____ 42.The electrolyte used in the cell is _____ Sulphuric Acid____ 43.Adding acid/distilled water to the electrolyte is called as____Topping up ____
44.The ____changeover time_____ is the advantage of online UPS over offline
UPS. 45.The heart of an exchange is _____power plant____
1. Air conditioning is designed to _____condition the air_____
a) Cool the air b) heat the air c) supply of air d) condition the air 2. Which class of extinguisher is to be used for electric fire ____Class C____ 3. The kinetic energy is stored in ______flywheel____ 4. TDC stands for _____top dead center_____ 5. BDC stands for _____bottom dead center_____ 6. This constitutes cooling unit in which the liquid refrigerant under a low pressure evaporates and in doing so picks up heat from the air thereby cooling the medium surrounding the cooling coil_____evaporator___ 7. In split AC system the distance between indoor and outdoor units should not be more than 8. AC from 11 KV to 440v is a step down transformer. 9. What are the alternative refrigerants for vapour compression system 10.CPCB stands for ___central pollution control board____ 11.Which is the moving part of E/A set___ 12.For uninterrupted and unmanned supply ______is provided in E/A sets. 13.Sensible heat ratio in precise AC is __________ 14.More number of stars, more energy saving will result from air-conditioners. 15.In air condition cycle, the refrigerant from compressor output is in _________
1. The space occupied by self supporting tower is ____less____ when compared
to the Guyed Tower 2. The mandatory requirement as per the civil aviation law is to keep ______aviation lamp____ on the top of the tower. 3. The floor of prefab shelter is designed to take a load of ____1000KG/Sq M___ 4. The roof of prefab shelter is designed to take a load of ____200KG/Sq M___ 5. The parameters to be taken care of while choosing site for BTS____all of the above___ a) Approach road availability b) no power line crossing c) no low laying area d)all of the above. 6. Verticality tolerance of tower upto 30 meter height ____H/1000 or +/- 20 mm whichever is less 7. Verticality tolerance of tower above 30 meter height ____H/1500 or +/- 25 mm whichever is less. 8. Lightning conductor shall be fixed to the top of the tower with ____teflon sleeve____ 9. Applying of first coat of enamel paint for the tower shall be done after _____48_____hours of applying the primer. 10. Applying of second coat of enamel paint for the tower shall be done after ____48_____hours of applying the first coat of enamel.
(BS en 14511-1 - 2013) - Air Conditioners, Liquid Chilling Packages and Heat Pumps With Electrically Driven Compressors For Space Heating and Cooling. Terms, Definitions and C