Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 8

Project management quality assurance

In this file, you can ref useful information about project management quality assurance such as
project management quality assuranceforms, tools for project management quality assurance,
project management quality assurancestrategies If you need more assistant for project
management quality assurance, please leave your comment at the end of file.
Other useful material for project management quality assurance:
qualitymanagement123.com/23-free-ebooks-for-quality-management
qualitymanagement123.com/185-free-quality-management-forms
qualitymanagement123.com/free-98-ISO-9001-templates-and-forms
qualitymanagement123.com/top-84-quality-management-KPIs
qualitymanagement123.com/top-18-quality-management-job-descriptions
qualitymanagement123.com/86-quality-management-interview-questions-and-answers

I. Contents of project management quality assurance


==================
Kandas Project Managers or QA Managers can help establish a process to improve how overall
development or quality assurance is handled and increase the productivity of the combined
team.

Kandas extensive software development experience allows to offer proven and


efficient Project and QA Management methodologies focusing on:
Communications

Requirements management

Risk assessment and management

Quality Assurance

Knowledge and competence transfer

Reporting setup and management


Kanda software development managers are also able to bring the offshore resources on-site at
key point in a project e.g., at kickoff or deployment. Even if your Kanda project manager or
QA manager is not on-site with you, rest assured that our offsite managers are leveraging their
experience working with line-of-business clients to make sure the job gets done efficiently and
on time.

Software Development Project Management at Kanda is involved at each of


these 3 phases:
Discovery Phase project requirements analysis, current status of the tools and the
software,Road Map creation.
Development Phase design, coding, testing, and roll out.
Maintenance Phase maintenance and product enhancement.
During each of these phases Project Manager makes sure that each member of the team
understands his or her interdependencies, facilitates communications among departments, as well
as manages processes and confirms that deliverables within each stage of the project life cycle
have been met. For specific software development projects Managers duties usually incorporate
those of Business Development and Communications. Project Manager creates the Release Plan
that outlines the procedures needed to get the project out the door.
Kandas seasoned Project Managers are the primary contact for all project related work and
communications and responsible for managing the overall effort and project schedule,
communication with all team members and stakeholders, tracking project issues and risks and
ensuring they are addressed efficiently and in timely manner.
SOFTWARE QUALITY ASSURANCE MANAGEMENT
At Kanda quality assurance is an integral part of software development lifecycle. Throughout
hundreds of software development projects Kandas QA managers applied extensive knowledge
to help determine, set and supervise processes, policies and standards, make effective
recommendations that helped improve clients existing processes.
Kanda Software QA Management Service provides skilled experts in quality assurance to
improve existing process or set up the new one. Quality Assurance managers will not only
analyze the standards and efficacy of the procedures, pinpoint potential weaknesses with regard
to software development objectives, but also propose process restructuring options and suitable
implementation methods.
On the demand of a client experienced QA management team will assess quality assurance
requirements and help setup in-house software testing department and activities.
==================

III. Quality management tools

1. Check sheet

The check sheet is a form (document) used to collect data


in real time at the location where the data is generated.
The data it captures can be quantitative or qualitative.
When the information is quantitative, the check sheet is
sometimes called a tally sheet.
The defining characteristic of a check sheet is that data
are recorded by making marks ("checks") on it. A typical
check sheet is divided into regions, and marks made in
different regions have different significance. Data are
read by observing the location and number of marks on
the sheet.
Check sheets typically employ a heading that answers the
Five Ws:

Who filled out the check sheet


What was collected (what each check represents,
an identifying batch or lot number)
Where the collection took place (facility, room,
apparatus)
When the collection took place (hour, shift, day of
the week)
Why the data were collected

2. Control chart
Control charts, also known as Shewhart charts
(after Walter A. Shewhart) or process-behavior
charts, in statistical process control are tools used
to determine if a manufacturing or business
process is in a state of statistical control.
If analysis of the control chart indicates that the
process is currently under control (i.e., is stable,
with variation only coming from sources common
to the process), then no corrections or changes to

process control parameters are needed or desired.


In addition, data from the process can be used to
predict the future performance of the process. If
the chart indicates that the monitored process is
not in control, analysis of the chart can help
determine the sources of variation, as this will
result in degraded process performance.[1] A
process that is stable but operating outside of
desired (specification) limits (e.g., scrap rates
may be in statistical control but above desired
limits) needs to be improved through a deliberate
effort to understand the causes of current
performance and fundamentally improve the
process.
The control chart is one of the seven basic tools of
quality control.[3] Typically control charts are
used for time-series data, though they can be used
for data that have logical comparability (i.e. you
want to compare samples that were taken all at
the same time, or the performance of different
individuals), however the type of chart used to do
this requires consideration.

3. Pareto chart

A Pareto chart, named after Vilfredo Pareto, is a type


of chart that contains both bars and a line graph, where
individual values are represented in descending order
by bars, and the cumulative total is represented by the
line.
The left vertical axis is the frequency of occurrence,
but it can alternatively represent cost or another
important unit of measure. The right vertical axis is
the cumulative percentage of the total number of
occurrences, total cost, or total of the particular unit of
measure. Because the reasons are in decreasing order,
the cumulative function is a concave function. To take
the example above, in order to lower the amount of
late arrivals by 78%, it is sufficient to solve the first
three issues.
The purpose of the Pareto chart is to highlight the
most important among a (typically large) set of
factors. In quality control, it often represents the most
common sources of defects, the highest occurring type
of defect, or the most frequent reasons for customer
complaints, and so on. Wilkinson (2006) devised an
algorithm for producing statistically based acceptance
limits (similar to confidence intervals) for each bar in
the Pareto chart.

4. Scatter plot Method

A scatter plot, scatterplot, or scattergraph is a type of


mathematical diagram using Cartesian coordinates to
display values for two variables for a set of data.
The data is displayed as a collection of points, each
having the value of one variable determining the position
on the horizontal axis and the value of the other variable
determining the position on the vertical axis.[2] This kind
of plot is also called a scatter chart, scattergram, scatter
diagram,[3] or scatter graph.
A scatter plot is used when a variable exists that is under
the control of the experimenter. If a parameter exists that
is systematically incremented and/or decremented by the
other, it is called the control parameter or independent
variable and is customarily plotted along the horizontal
axis. The measured or dependent variable is customarily
plotted along the vertical axis. If no dependent variable
exists, either type of variable can be plotted on either axis
and a scatter plot will illustrate only the degree of
correlation (not causation) between two variables.
A scatter plot can suggest various kinds of correlations
between variables with a certain confidence interval. For
example, weight and height, weight would be on x axis
and height would be on the y axis. Correlations may be
positive (rising), negative (falling), or null (uncorrelated).
If the pattern of dots slopes from lower left to upper right,
it suggests a positive correlation between the variables
being studied. If the pattern of dots slopes from upper left
to lower right, it suggests a negative correlation. A line of
best fit (alternatively called 'trendline') can be drawn in
order to study the correlation between the variables. An
equation for the correlation between the variables can be
determined by established best-fit procedures. For a linear
correlation, the best-fit procedure is known as linear
regression and is guaranteed to generate a correct solution
in a finite time. No universal best-fit procedure is
guaranteed to generate a correct solution for arbitrary
relationships. A scatter plot is also very useful when we
wish to see how two comparable data sets agree with each

other. In this case, an identity line, i.e., a y=x line, or an


1:1 line, is often drawn as a reference. The more the two
data sets agree, the more the scatters tend to concentrate in
the vicinity of the identity line; if the two data sets are
numerically identical, the scatters fall on the identity line
exactly.

5.Ishikawa diagram
Ishikawa diagrams (also called fishbone diagrams,
herringbone diagrams, cause-and-effect diagrams, or
Fishikawa) are causal diagrams created by Kaoru
Ishikawa (1968) that show the causes of a specific event.
[1][2] Common uses of the Ishikawa diagram are product
design and quality defect prevention, to identify potential
factors causing an overall effect. Each cause or reason for
imperfection is a source of variation. Causes are usually
grouped into major categories to identify these sources of
variation. The categories typically include
People: Anyone involved with the process
Methods: How the process is performed and the
specific requirements for doing it, such as policies,
procedures, rules, regulations and laws
Machines: Any equipment, computers, tools, etc.
required to accomplish the job
Materials: Raw materials, parts, pens, paper, etc.
used to produce the final product
Measurements: Data generated from the process
that are used to evaluate its quality
Environment: The conditions, such as location,
time, temperature, and culture in which the process
operates

6. Histogram method

A histogram is a graphical representation of the


distribution of data. It is an estimate of the probability
distribution of a continuous variable (quantitative
variable) and was first introduced by Karl Pearson.[1] To
construct a histogram, the first step is to "bin" the range of
values -- that is, divide the entire range of values into a
series of small intervals -- and then count how many
values fall into each interval. A rectangle is drawn with
height proportional to the count and width equal to the bin
size, so that rectangles abut each other. A histogram may
also be normalized displaying relative frequencies. It then
shows the proportion of cases that fall into each of several
categories, with the sum of the heights equaling 1. The
bins are usually specified as consecutive, non-overlapping
intervals of a variable. The bins (intervals) must be
adjacent, and usually equal size.[2] The rectangles of a
histogram are drawn so that they touch each other to
indicate that the original variable is continuous.[3]

III. Other topics related to Project management quality


assurance (pdf download)
quality management systems
quality management courses
quality management tools
iso 9001 quality management system
quality management process
quality management system example
quality system management
quality management techniques
quality management standards
quality management policy
quality management strategy
quality management books

You might also like