Professional Documents
Culture Documents
Bill Van But Zela Ar
Bill Van But Zela Ar
Slide 2
Project
Engineering &
Design Phase
Owner Operator
Sub Projects
Operations
HSE, Competency)
Pipeline
QA Data
Procurement
Materials Mgt
Topsides
Turret /
Mooring
Subsea
Facilities
Well
Constrn
Maintenance &
Inspection
Maintenance Mgt
Project
Domain
Engineering
Engineering
Systems
Corporate
Domain
Project
DMS
Corporate
DMS
1 3 Years
3 40 Years
Engineering Information Management | August 2009 | DRIMS #5090360
Slide 3
Cave Paintings
Stone Tablets
Main Frames
Slide 4
GWA
Angel
Cossack
Enfield
EDM
Facility
Overview
Pluto Offshore
Northern Endeavour
Thylacine
Vincent
KGP
Otway
Pluto Onshore
Slide 5
Core Team
Contract Support
Snr
Intergraph Eng
VNET Portal
Administrator
ALIS/VNET
Snr Designer
2D & Database
Systems
Process Systems
Engineer
Data Team A
ISSoW / P&IDs /
legacy
2D/3D,
PDS,PDMS,
Microstation,
AutoCAD
Snr Des Eng
EDM Services
Electrical
Engineer
2D Eng Data
Coordinator
Corporate
Information
Management
Group
(DRIMS)
Richard Harris
Team Lead
2D Legacy Data
& Software
Developer
Data Team B
Instrument Data
Conversions /
CDRP
Electrical
Engineer
EX data
Slide 6
Slide 7
Slide 8
2.
3.
4.
5.
6.
7.
8.
9.
10.
Slide 9
Greenfield Projects
Promote WEL software systems
Enforce standards
Slide 10
SAP PM
PHD
DMS
Data Publishing
Engineering
Instrumentation
Intelligent
database
database
P&ID
3D
Model
2D
CAD
Document publishing
Slide 11
SAP-PM
VPE
SAP
3D
DRIMS
Bookshelf
D .M. S
AVEVA Products
System Datasheets, Key Lists, 2D & 3D
2D
Virtual
Mechanical
X1
Approved
Measuring points
Data Hub
System Data sheets,
Key Lists, 2D & 3D
Approved
Photogrammetry
Intelligent
3D Model
VP P&ID
PDMS
Excel DS
Eng Design Process Case1 Case 2 Case 3
3D Model
PDS
Intelligent
P&ID
Comms
Instruments
Electrical
System
System
Slide 12
Electrical Isolations
SAP-PM
Engineering Portal
Equipment Hierarchy
& Work Orders
DRIMS
D .M. S
3D Model
Intelligent
PDS/PDMS
P&ID
P&ID
RFID
Slide 13
OIMS
Operations Information Management Standard
Archiving and
Destruction
Standard
Operations Information
Creation and Updating Standard
Numbering
Standard
E-VEM
Standard
VNET
(ALIS)
Standard
2D & 3D
Models
Standard
Electrical,
Instrumentation
& Data Hub
Standard
Tagging
Standard
(Corporate)
Engineering
Library
ANG
MDR
Standard
ALIS Portal
Guideline
2D & 3D Models
Guidelines
Electrical,
Instrumentation
& Data Hub
Guidelines
Corporate
Datasheets
COS
GWA
PBS
Plant
Breakdown
Structure
Datasheet
Web
Validation
Tool
Plant, Area,
Unit &
System
Coding
KGP
Eng SAP-PM
Standard
Eng SAP-MM
Standard
NE
NG
NRA
OTW
Slide 14
2D Drawings
Datasheets
Excel & Access
Microfilms
Key List
Hard Copy
Electronic
Engineering
List
Electronic
Scan to PDF
Scan to PDF
OCR
OCR
Create Tag
Relationships
Create Tag
Relationships
Create Tag
Relationships
Populate
Engineering Master
Repositories
Create Query
Forms
Key Lists
Slide 15
Maintenance
3D
CAD
Line List,
Datasheets
Intelligent
P&IDs
2D/3D
Engineering
Management
Workbench
DAD
SAP PM
DRIMS
Subsea Inspection
SubSea
Database
Procurement
SAP
MM
(not implemented)
SPI
Production
PHD
Planned
Slide 16
Strategic Management
Slide 17
Engineering Standards
Slide 18
Process Mapping
Slide 19
Slide 20
EDM Photogrammetry
Slide 21
Tag: 2KT1420
HP Rotor Overview
HP Rotor - N D E
LP Blade Section
2009 Major Shutdown
LP Stator Blades
LP Rotor Section
LP Rotor in Situ
HP Tilting ad Brg 4U
Scaffolding Arrangement
Scaffolding Arrangemet
Enclosure Scaffolding
Enclosure Scaffolding
HP Stators Topside
Slide 22
Return On Investment
Quantified Benefits:
1.
2.
3.
4.
Unquantified Benefits
Slide 23
Payback period
Woodsides EDM project achieved full
payback in 3.4 years or by mid 2007. The
following graph describes the cumulative
current value costs versus the cumulative
current value benefits.
The point of intersection represents the
projects breakeven point.
From 2009, project costs began to stabilise
as the implementation reached its final
stage.
Benefits increase dramatically from 2007
due to realising the benefits from the Angel
LNG handover and as user adoption
increases.
Slide 24
Keys to success
Slide 25
Slide 26
The electronic information asset was delivered within an integrated VNET Angel Project
Portal ( branded in Woodside as ALIS Asset Lifecycle Information System).
The portal allowed access to all engineering, maintenance and operations information and
allowed for two views, a project view and an operations view.
The project view allowed project personnel to use the portal for project execution while the
operations view allowed for the integration of information assisting the development of
maintenance and operations information well in advance of facility start-up.
ALIS was established on an extranet (new Woodside infrastructure) which was accessible by
third parties involved in the design, fabrication and installation processes.
Slide 27
. 3D models
. Photographs
Many of these engineering applications were new. All information was progressively passed into the
Woodside systems after quality checks were done.
It was a benchmark, with 100% of all project information established within the Woodside systems at the
ready for start-up phase, including all hazardous area inspection and pressure safety valve certification.
The project integrated the asset information, which traditionally has been restricted to topsides plant, with all
the substructure (jacket) and Subsea infrastructure.
The project 3D models were the prime mechanism to navigate this information, using associations with
relevant information and systems. For Subsea, this included integration with the Subsea inspection system
(COABIS) and the GIS. All 3D models were as-built and fully tagged with x-refs, an innovation for the
industry.
Hyperlink : http://www.engineersaustralia.org.au/ieaust/index.cfm?4B274629-D2B5-F3D1-EC4C-DA5201D2A5E5
Slide 28
EDM Statistics
Tag Association References
Otway, 83000
Enfield, 21000
Angel, 171000
304000
Angel, 8000
Cossack, 23000
NRA, 28000
37000
Cossack, 166000
41000
Enfield, 316000
575000
GWA, 320000
Angel
Angel
Cossack
Cossack
Enfield
Enfield
GWA
GWA
Karratha
Karratha
1169000
Northern End
Northern End
NRA
188000
NRA
Otw ay
Otway
Total - 360000
Total - 3104000
Documents in ALIS
NRA, 43000
OTW, 2234
NGA, 3578
NE, 3839
Enfield, 24000
Northern End,
65000
GWA, 43000
Pluto, 820
Angel, 5723
NWS
Angel
NWS, 40344
KGP
Cossack
Angel
Enfield
GWA
NE
Karratha
KGP, 30916
NGA
Northern End
Karratha, 245000
Total - 490000
NRA
OTW
Otway
Pluto
Total - 87454
Slide 29
Slide 30
Success factors
1.
2.
3.
4.
5.
6.
7.
8.
9.
Slide 31
Allows you to
Slice
Dices
Information
Information
Slide 32
Slide 33