Excavation Pits For Contract E 101: City Tunnel Malmö, Central Station, May 2005 To Dec 2007
Excavation Pits For Contract E 101: City Tunnel Malmö, Central Station, May 2005 To Dec 2007
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Agenda
Normales Erstarrungsverhalten
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Diaphragm-Walls
ca. 1km
walls
Etapp 1: sheet piles / shotcrete
Etapp 2: D-Wall
Etapp 3: D-Wall / sheet piles
Etapp 4: D-Wall
Etapp 5: sheet piles
temporary anchors
2 rows, strand-anchors
3 rows, strand-anchors
2 rows, strand-anchors
2 rows, strand-anchors
2 rows, strand-anchors
uplift anchors
GEWI
GEWI
GEWI
GEWI
GEWI
Etapp 3
Etapp 4
Etapp 1
old habour
Etapp 2
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Overburden ground
-10
Diaphragm-Wall
Copenhagen ridge
-20
Limhamn ridge
-30
Layer
Average thickness
Overburden ground
8m
Copenhagen rigde
3m
Limhamn ridge
70 m
5
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
H1 [%]
H2 [%]
H3 [%]
H4 [%]
H5 [%]
Geological
formation
a
Copenhagen
layer
20
030
20
1030
0-10
25
2030
30
2535
Limhamns
layer A, B, D,
E
010
17
1525
18
1525
55
5060
0-10
Limhamns
layer C
05
35
3040
45
4050
15
1020
0-5
Normales Erstarrungsverhalten
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Hardness
class
Unconfined
compressive strength
[MPa]
Tensile
strength
(Brazilian
Test) [MPa]
MOE
[GPa]
Shear strength
Cohesion
[MPa]
Friction angle
[o]
H1
0.3
0.05-0.5
0.04
0.02
27
H2
3-10
0.6
0.3-2
0.53
0.5
0.5
-1
50
45-55
H3
12
5-25
0.4-4
1-10
1-3
50
45-55
H4
35
10-75
0.6-9
12
5-25
3-9
55
50-55
H5
250
100-400
25
10-40
35
2050
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Excecution of D-Walls
The Diaphragm-Walls were constructed to depths between 14 and 24 m,
up to 14 m of which in limestone formations.
The overburden ground was excavated by grab.
Due to high rock strength, a hydro mill was necessary for
excavation in limestone.
D-Wall surface
over all surface:
overburden ground:
limestone:
11.700 m2
6.700 m2
5.000 m2
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Excecution of D-Walls
Production sequence:
- Constuction of guide walls,
- Excavation by grab until rockhead of limestone (1st rig),
- further excavation by hydro mill (2nd rig),
- Change of process bentonite suspension to clean suspension,
- Installation of stop ends (3rd rig),
- Installation of reinforcement cages (3rd rig),
- Concreting (3rd rig).
Normales Erstarrungsverhalten
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Excecution of D-Walls
3rd rig
1st
rig
2nd rig
10
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
200 mm
1200mm
820 mm
700 mm
11
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Normales Erstarrungsverhalten
12
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Excecution of D-Walls
excavation by hydro mill
Hydro mill BC 30:
-Long frame (approx. 30 t)
-Powerpack (total. 650 KW)
-Total weight: approx. 115 t
-Cutting wheels with round
shank chisels
18 m
Normales Erstarrungsverhalten
13
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
max. 450 m
desander,
500 cbm/h
panel
hydro mill
BC 30
6 pipes
2 x 10 pipes
mud pump
4 pipe
bentonite
mixing stn., 40 cbm/h
storage basin,
500 cbm
(process susp.)
clean susp
fine screen
and cyclons
coarse screen
fine screen
and cyclons
remote control
for mud pumps
14
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Normales
Erstarrungsverhalten
10 cm
15
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Normales Erstarrungsverhalten
16
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
primary panel
waterstops
gravel
fill
to avoid
concrete
flow
Normales Erstarrungsverhalten
secondary panel
17
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Normales Erstarrungsverhalten
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Normales Erstarrungsverhalten
19
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Stop-end
Steel
TBM
GRP
Steel
Normales Erstarrungsverhalten
20
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Normales Erstarrungsverhalten
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
to desander
Betonage
pump
stop end
gravel material
guide wall
21
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
22
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Agenda
Normales Erstarrungsverhalten
23
8,0 m
11,0 m
GW
Overburden ground
max. 22,0m
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
2,3 m
Copenhagen
ridge
D =133 mm
D =114 mm
Limhamn
ridge
Total:
max. 30 m
max. 17 m
max. 12 m
24
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
25
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
new
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
new
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Agenda
Normales Erstarrungsverhalten
28
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
GW
Overburden Ground
Copenhagen
ridge
3 m x 3 m (typical)
D =133 mm
D =114 mm
Limhamn
ridge
D = 152 mm
total: approx. 2500 uplift anchors GEWI 63,5 mm with double corrosion
protection, 1050 kN, max. L = 19 m
29
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
30
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
1 erection
of GEWI
3 tendon installation
31
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH
Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH