Excavation Pits for Contract E 101:

City Tunnel Malm, Central Station,


May 2005 to Dec 2007

Brckner Grundbau GmbH


Dipl.-Ing. Hans W. Neuenhaus

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Agenda

Excavation Pits for Contract E 101


General
Geological conditions
Excecution of Diaphragm-Walls
Excecution of temporary anchors
Excecution of uplift anchors

Normales Erstarrungsverhalten

Excavation pits for Contract E 101


General: Selected construction methods for retaining walls

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Areas without sensitive


adjacent properties:
Overburden ground to head
of limestone: anchored sheet
pile walls
In limestone: shotcrete walls,
tied back with rock bolts
Penetration grouting of
fractures and joints in limestone
Areas with sensitive properties:
In overburden ground and rock:
stiff D-Walls (width = 0.8m,
anchored)
D-Walls for temporary use
only
Water tightness of D-Wall
and joints required

Excavation pits for Contract E 101

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

General: lay out of pits


Diaphragm-Walls

Diaphragm-Walls

ca. 1km
walls
Etapp 1: sheet piles / shotcrete
Etapp 2: D-Wall
Etapp 3: D-Wall / sheet piles
Etapp 4: D-Wall
Etapp 5: sheet piles

temporary anchors
2 rows, strand-anchors
3 rows, strand-anchors
2 rows, strand-anchors
2 rows, strand-anchors
2 rows, strand-anchors

uplift anchors
GEWI
GEWI
GEWI
GEWI
GEWI

Excavation pits for Contract E 101


Geological conditions general elevation
Etapp 5

Etapp 3

Etapp 4

Etapp 1

old habour

Etapp 2

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Overburden ground
-10

Diaphragm-Wall

Copenhagen ridge

-20

Limhamn ridge
-30

Layer
Average thickness
Overburden ground
8m
Copenhagen rigde
3m
Limhamn ridge
70 m
5

Excavation pits for Contract E 101


Geological conditions hardness of rock

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

H1 [%]

H2 [%]

H3 [%]

H4 [%]

H5 [%]

Geological
formation
a

Copenhagen
layer

20

030

20

1030

0-10

25

2030

30

2535

Limhamns
layer A, B, D,
E

010

17

1525

18

1525

55

5060

0-10

Limhamns
layer C

05

35

3040

45

4050

15

1020

0-5

Normales Erstarrungsverhalten

source: contract documents


6

Excavation pits for Contract E 101


Geological conditions strength of rock

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Hardness
class

Unconfined
compressive strength
[MPa]

Tensile
strength
(Brazilian
Test) [MPa]

MOE
[GPa]

Shear strength

Cohesion
[MPa]

Friction angle
[o]

H1

0.3

0.05-0.5

0.04

0.02

27

H2

3-10

0.6

0.3-2

0.53

0.5

0.5
-1

50

45-55

H3

12

5-25

0.4-4

1-10

1-3

50

45-55

H4

35

10-75

0.6-9

12

5-25

3-9

55

50-55

H5

250

100-400

25

10-40

35

2050

source: contract documents


7

Excavation pits for Contract E 101

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Excecution of D-Walls
The Diaphragm-Walls were constructed to depths between 14 and 24 m,
up to 14 m of which in limestone formations.
The overburden ground was excavated by grab.
Due to high rock strength, a hydro mill was necessary for
excavation in limestone.

D-Wall surface
over all surface:
overburden ground:
limestone:

11.700 m2
6.700 m2
5.000 m2

limestone cubature: 4.000 m3

Contractual construction time: 148 days

Excavation pits for Contract E 101

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Excecution of D-Walls
Production sequence:
- Constuction of guide walls,
- Excavation by grab until rockhead of limestone (1st rig),
- further excavation by hydro mill (2nd rig),
- Change of process bentonite suspension to clean suspension,
- Installation of stop ends (3rd rig),
- Installation of reinforcement cages (3rd rig),
- Concreting (3rd rig).

Normales Erstarrungsverhalten

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Excavation pits for Contract E 101

Excecution of D-Walls

3rd rig

1st
rig
2nd rig

10

Excavation pits for Contract E 101


Excecution of D-Walls construction of guide walls

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

200 mm

1200mm

820 mm

700 mm

11

Excavation pits for Contract E 101

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Excecution of D-Walls excavation by grab

Normales Erstarrungsverhalten

12

Excavation pits for Contract E 101

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Excecution of D-Walls
excavation by hydro mill
Hydro mill BC 30:
-Long frame (approx. 30 t)
-Powerpack (total. 650 KW)
-Total weight: approx. 115 t
-Cutting wheels with round
shank chisels
18 m

Normales Erstarrungsverhalten

13

Excavation pits for Contract E 101


Excecution of D-Walls excavation by hydro mill

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

max. 450 m

desander,
500 cbm/h

panel
hydro mill
BC 30

6 pipes

2 x 10 pipes

mud pump
4 pipe

bentonite
mixing stn., 40 cbm/h

storage basin,
500 cbm
(process susp.)
clean susp

fine screen
and cyclons

coarse screen

fine screen
and cyclons

remote control
for mud pumps

centrifugal mud pump

14

Excavation pits for Contract E 101


Excecution of D-Walls flint and limestone

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

crushed flint and limestone separated in the coarse screen

Normales
Erstarrungsverhalten
10 cm

15

Excavation pits for Contract E 101

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Excecution of D-Walls flint and silicified limestone boulders

silicified limestone boulder

Normales Erstarrungsverhalten

16

Excavation pits for Contract E 101

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Excecution of D-Walls construction of joints


prefabricated
concrete
element

primary panel

waterstops

gravel
fill
to avoid
concrete
flow

Normales Erstarrungsverhalten

secondary panel

17

Excavation pits for Contract E 101

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Excecution of D-Walls construction of joints

Normales Erstarrungsverhalten

Core through stop-end element


and cast in situ concrete panel
18

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Excavation pits for Contract E 101


Excecution of D-Walls
installation of a reinforcement cage with box outs for
temporary anchors

Normales Erstarrungsverhalten

19

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Excavation pits for Contract E 101


Excecution of D-Walls
installation of combined
steel and glasfibre reinforced
plastic (GRP) cage in TBMpenetration walls

Stop-end
Steel

TBM

GRP

Steel

Normales Erstarrungsverhalten

20

Excavation pits for Contract E 101

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Excecution of D-Walls lifting of combined steel and GRP- cage

Normales Erstarrungsverhalten

Excavation pits for Contract E 101


Excecution of D-Walls concreting

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

to desander
Betonage

30 cbm/h concreting with 2 tremie pipes

pump

stop end
gravel material

guide wall

21

Excavation pits for Contract E 101

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Excecution of D-Walls quality control of the bentonite suspension

22

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Agenda

Excavation Pits for Contract E 101


General
Geological conditions
Excecution of Diaphragm-Walls
Excecution of temporary anchors
Excecution of uplift anchors

Normales Erstarrungsverhalten

23

Excavation pits for Contract E 101

8,0 m

11,0 m

GW

Overburden ground

max. 22,0m

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

2,3 m

Excecution of temporary anchors general elevation

Copenhagen
ridge

D =133 mm

D =114 mm

Limhamn
ridge

Total:

545 anchors in 1st row,


760 anchors in 2nd row,
80 anchors in 3rd row,

max. 870 kN,


max. 1080 kN,
max. 1080 kN,

max. 30 m
max. 17 m
max. 12 m

24

Excavation pits for Contract E 101

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Excecution of temporary anchors


- 1st row, just above groundwater level,
- 2nd and 3rd anchor rows required drilling and installation against water head,
- Duplexmethod, outer casing and inner rod are simultanously driven by a
strong hydraulic drifter (Klemm-Serial KD 2728).

Works for 3rd anchor row


of D-Wall

25

Excavation pits for Contract E 101


Excecution of temporary anchors drilling tools

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Standard drill bits:

new

after drilling 15 m in limestone


26

Excavation pits for Contract E 101


Excecution of temporary anchors drilling tools

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Standard drill bits:

new

Specialy improved drill bits:

drilling of 180-200 m in limestone made possible


27

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Agenda

Excavation Pits for Contract E 101


General
Geological conditions
Excecution of Diaphragm-Walls
Excecution of temporary anchors
Excecution of uplift anchors

Normales Erstarrungsverhalten

28

Excavation pits for Contract E 101


Excecution of uplift anchors general elevation

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

GW

Overburden Ground

Copenhagen
ridge
3 m x 3 m (typical)
D =133 mm

D =114 mm

Limhamn
ridge
D = 152 mm

total: approx. 2500 uplift anchors GEWI 63,5 mm with double corrosion
protection, 1050 kN, max. L = 19 m
29

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Excavation pits for Contract E 101

Excecution of uplift anchors drilling operation

30

Excavation pits for Contract E 101


Excecution of uplift anchors

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

2 filling of cement grout

1 erection
of GEWI

3 tendon installation

31

Excavation pits for Contract E 101


Special features

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

- 2nd Diaphragm-Wall project in Scandinavia, therefore required:


-thorough planning, detailing and coordination work with Main Contractor
and Client,
- high requirements on quality management and documentation,
- environmental politics:
-all materials used on site must have an environmental approval
(declaration of all ingredients, environmental risk assessments etc.), any
material used was documented in weekly running reports,
-only bio-degradable oils were permited for any hydraulic drives,
hydraulic fluids and grease had to be based on vegetable originated
products,
-Diesel-engined machinery with installed power > 75 kW was to fulfil
emission values for NOx of max 4,0 g/kWh. Machinery not meeting this
limit were to be equipped with NOx-filters to keep emission limits,
-Units were to be equipped with hose protective valves providing the
immediate shut up in case of sudden loss of pressure.

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

H. W. Neuenhaus, Brckner Grundbau, Germany

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

H. W. Neuenhaus, Brckner Grundbau, Germany

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

Excavation Pits for Contract E 101: City Tunnel Malm, Central Station
Brckner Grundbau GmbH

to many thanks for your attention !

H. W. Neuenhaus, Brckner Grundbau, Germany

You might also like