Built Up Rate
MATERIAL COST
WASTAGE
LABOUR
PROFIT
TOTAL (E+F)
ROUND UP
G15
232.00
5%
243.60
24.00
10%
PROFIT
TOTAL (G+H)
ROUND UP
26.76
294.36
294.40
G15
50MM THICK
75MM THICK
100MM THICK
125MM THICK
150MM THICK
175MM THICK
200MM THICK
225MM THICK
275MM THICK
300MM THICK
3. BRC COST/M2
ITEM
DESCRIPTION
A
MATERIAL COST
B
DISCOUNT
C
COST/M2
D
WASTAGE + LAPS
E
SUB TOTAL (C+D)
F
LABOUR (3.02KG/M2)
G
SUB TOTAL (E+F)
24.00
267.60
11.60
14.72
22.08
29.44
36.80
44.16
51.52
58.88
66.24
80.96
88.32
A6
65.70
6.57
1.31
7.88
1.15
9.03
20%
1.15
10%
0.90
9.93
10.00
Y10
2.55
B
C
D
E
F
G
H
WASTAGE
SUB TOTAL (A+ B)
LABOUR
SUB TOTAL (C+D)
PROFIT
TOTAL (E+F)
ROUND UP
5%
0.38
10%
0.13
2.68
0.23
2.91
0.29
3.20
3.20
G20
G25
G30
245.00
257.00
267.00
12.25
12.85
13.35
257.25
269.85
280.35
24.00
24.00
24.00
281.25
293.85
304.35
28.13
29.39
30.44
309.38
323.24
334.79
309.40
323.20
334.80
G20
G25
15.47
23.205
30.94
38.675
46.41
54.145
61.88
69.615
85.085
92.82
A7
83.00
G30
16.16
24.24
32.32
40.4
48.48
56.56
64.64
72.72
88.88
96.96
A8
144.10
16.74
25.11
33.48
41.85
50.22
58.59
66.96
75.33
92.07
100.44
A10
177.20
8.3
1.66
9.96
1.15
11.11
14.41
2.88
17.292
1.15
18.44
17.72
3.54
21.264
1.15
22.41
1.11
1.84
2.24
12.22
20.28
24.65
12.20
Y12
20.30
Y16
2.55
24.70
Y20
2.40
Y25
2.36
Y32
2.40
2.40
0.13
2.6775
0.34
3.01
0.30
3.32
3.30
0.12
2.52
0.60
3.12
0.31
3.43
3.40
0.12
2.478
0.94
3.42
0.34
3.76
3.80
0.12
2.52
1.46
3.98
0.40
4.38
4.40
0.12
2.52
2.40
4.92
0.49
5.42
5.40
R6
R8
2.50
1.80
0.13
2.625
0.08
2.71
0.27
2.98
3.00
0.09
1.89
0.15
2.0401
0.20
2.24
2.20
3.59