Background
Amkor is one of the worlds largest providers of contract semiconductor assembly and
test services. Founded in 1968, Amkor pioneered the outsourcing of IC assembly and
test and is now a strategic manufacturing partner for more than 200 of the worlds
leading semiconductor companies and electronics OEMs.
Date of MOA signing: 4 March 2011. Duration of the Partnership: Three (3) years
II.
III. Summary Reports of Efforts [Narrative discussion, and before and after photos (in
jpeg format, resolution not lower than 100 pixels) on the same site with caption(s)].
A. Reports of Efforts (Donor-Partners): No Updated Report Submitted Yet
A.1. Activities
i. Photo of the Adopted Water Body (Before and After with identified dates):
ii. Water Quality Monitoring Results (if any): None were Reported
iii. Installation of Engineering Interventions, if any, (trash traps, etc.) with volumes of
garbage taken out, etc.: None were Reported
iv. Dredging and Desilting: June 01, 2012
AMKOR in cooperation with Metro Manila Development Authority (MMDA)
conducted a dredging operation at the mouth of Laguna Lake on June 1,
2012)
.
Before
After
Before
After
2.
3.
2.
2.2. Streamers
AMKOR also uses streamers in its IEC campaigns.
2.3. Pamphlets
Pamphlets and newsletters were also used in its IEC campaigns.
A.2. Good Practices, Lessons Learned, and Challenges: None were Reported
16 April 2012
06 June 2012
04 July 2012
16 April 2012
06 June 2012
04 July 2012
16 April 2012
06 June 2012
04 July 2012
Nov-11
8.42
3
26.25
0.802
42.8
0.7
1.270
83
50
5.5
15.2
10
2.94E+0
8
*
Q1 Ave
2012
7.97
1
29.085
0.652
25.39
0.5
Q2 Ave
2012
6.58
0.5
29.21
5.469
70.87
0.7
Q3 Ave
2012
5.70
2.45
26.66
0.383
100.20
0.3
Q4 Ave
2012
7.71
0.7
30.36
0.571
29.60
0.5
1.019
30
30
3.2
11.22
8.26
1.78
44
35
3.3
11.65
9.03
0.595
19
20
7.1
7.50
8.75
0.891
18
20
2.1
8.3
8.6
31304952
*
*
*
*
*
*
*
Standard
Laguna de Bay
Palico Creek
Palico Creek
Laguna de Bay