DESIGN OF STRAP BEAM

EXT COL

1. 0 LOADS INPUT

Pw1
Mwy1
Pu1
Muy1

EXT COLUMN LOAD


=
190.96 KN
=
42.947 KN-m
=
=

INTERIOR COL
Pw2
Mwy2

242.51 KN
59.542 KN-m

2.0 CONSIDER WEIGHT OF FOOTING

Pu2
Muy2

10

EXTERIOR COLUMN

INTER

Service Column Load

190.96

Service Column Load

Weight of Footing

19.096

Weight of Footing

Total Concentrated Load

210.056

Total Concentrated Loa

3.0 FOOTING AREA

Pw1
Pw2

Total Combined Vertical Load


=
210.056
KN
=
316.602
KN

Required Total A
SBC
Arqd

Pwt

526.66

KN

Length and Area of Exterior Footing


A1
=
2.10
sq.m
L
=
1.45
m
L
A1

=
=

1.60
2.56

m
sq.m

Length and Area of


A2
L
L
A2

COMBINED AREA
A1 + A2

5.8

Remark
sq.m

Aact > Arqd, ok!!

4.0 CENTROID OF FOOTING (WORKING LOAD)

xg

CG OF LOADS
=
P1x1 + P2x2 + Mwy1 + Mwy2

526.658

xg

xg

5.8

CG OF AREA
=
A1x1 + A2x2

xg

2.56

m from reference line

-0.27

difference

2.83

m from reference line

Ref line

Length of footing 1

1.6

Clear "d" bet. Col =

Centroid of column Load X =

P1 =

2.83

210.06

L1 /2 =
0.8

R1

X1
0.8

Pt =

c to c of column =

5.0 SOLVING FOR STRAP BEAM FORCES (ULTIMATE FORCES)


EXTERIOR COLUMN
242.5

KN

0.8

M (KN-m) = 59.5
V

V (Shear)

M
V

=
=

0.8

R1
M1
V1

R1 =

210.91

=
=
=

210.91
34.26
31.60

KN

KN
KN-m
KN

EAM

INT COL

INTERIOR COLUMN LOAD


=
287.82 KN
=
28.683 KN-m
=
=

371.99
40

KN
KN-m

INTERIOR COLUMN

Service Column Load

287.82

Weight of Footing

28.782

Total Concentrated Load

316.602

Required Total Area of footing


=
100
Kpa
=

5.27

sq.m

Length and Area of Interior Footing


=
3.17
sq.m
=
1.78
m
=

1.80
3.24

m
sq.m

Remark

> Arqd, ok!!

erence line

erence line

Clear "d" bet. Col = 1.45

Length of footing 2 =

1.8

P2 = 316.60

L2 /2 =
0.9

526.658
R2

3.15

0.9

4.85

INTERIOR COLUMN

372.0

KN

0.9

M (KN-m) =
40.0

V (Shear)

V (Shear)
0.9

R2
M2
V2

34.26
31.60

KN-m
KN

R2 =

403.59

=
=
=

403.59
11.56
31.60

KN

KN
KN-m
KN