Professional Documents
Culture Documents
Ust Monitoring Plan
Ust Monitoring Plan
Facility ID#
Date
Name/address:
Phone:
Monitoring Method
Frequency of
Monitoring
Automatic Tank
Gauging with programmed
leak threshold of 0.2gph.
Manual Tank Gauging
plus annual tank testing.
Tank Tester:
Leak results
recorded:
Daily
Monthly
Leak test performed
Daily
Monthly
Gauging Period
36 hours
60 hours
Statistical Inventory
Reconciliation plus Biennial
tank testing
Enhanced Leak detection
SIR Company:
Other (Specify)
Doublecontained
Tanks
Liquid Sensor in
Annular Space with audible
and visual alarm.
Discriminating sensor in
Annular space with audible
and visual alarm
Liquid float sensor in
annular space with audible
and visual alarm.
Vacuum on Annular
Space.
Other (Specify)
Tank Tester:
Continuous
Continuous
Continuous
Page 1
NoneNO
dispensers in
system
Dispenser Containment
SW UDC
DW UDC
DW UDC monitored by
Vacuum sensor
DW UDC monitored by
Liquid sensor.
10/04
County of Yuba
Certified Unified Program Agency
Facility ID#
Date
At dispenser
due to leak
Pressurized
SW Piping
Suction
SW Piping
Monitoring Method
Specify
Manufacturer of
Equipment
/Company Name
Specify Model
Number /Type
of
Sensors/Equip
ment
Frequency of
Monitoring
Every
pumping
cycle
Monthly
Annual
Daily
Triennial
Gravity
SW Piping
DW
Pressurized
Monitoring
Page 2
Biennial
Dispenser:
Continuous
Tank Sump:
Dispenser:
Continuous
Tank Sump:
Annual
Continuous
Dispenser:
Tank Sump:
Annual
10/04
County of Yuba
Certified Unified Program Agency
Facility ID#
Date
Continuous
Vacuum Sensor
Liquid Sensor
Continuous
Overfill Prevention
Check type
of system.
System alerts
transfer operator when
tank is 90% full by
restricting flow into
tank or triggering an
audible and visual
alarm. Does not allow
for manual override.
System provides
positive shut-off of flow to
tank when tank is filled to
no more than 95% of
capacity. Does not allow
for manual override.
Fill tube valve/flapper
External alarm
OR
Flow Restrictor
System restricts
delivery of flow to tank
at least 30 minutes before
tank overfill. Does not
allow for tank override.
Flow restriction occurs
when tank is 95% of
capacity, and activates
audible alarm five
minutes before tank
overfills.
System
provides positive
shut-off of flow to
tank so that none of
the fittings located
on top of the tank
are exposed to
product due to
overfilling. Does
not allow for
manual override.
Cathodic Protection
Type of
system
None
Impressed
Current
Sacrificial
Anode
Galvanic
System
Location
Servicing Company
Describe Maintenance
Tested triennially
Impressed current
reading every 60 days.
Other
Other Monitoring
Visual Inspection
Daily
Weekly
of
Monthly
Fills
Sumps
Dispenser Pans
Other-Specify
1.
2.
3.
Page 3
Duties
routine
monitoring
equipment
inspections &
record keeping
routine
monitoring
equipment
inspections &
record keeping
routine
monitoring
equipment
inspections &
record keeping
10/04
County of Yuba
Certified Unified Program Agency
Facility ID#
Date
Used for
Where kept
Provided to CUPA
at inspection
at inspection
at inspection
at inspection
at inspection
24 hours initial notification; 5
days for written report.
at inspection
Provide to CUPA
Provide to CUPA
at inspection
annually within 30 days of end of
report period
within 30 days of testing
Electronic
Equipment/ATG
Sensor Probes
Spill Containment
Corrosion Protection
System
Secondary Containment
system
Tank Lining of Upgraded
Tank
Compliance Inspection
Freq. Required/
Anniversary Date
Annual/
Annual/
Service Provider
Name
Address
Phone
Annual/
Annual/
Every three year/
Every 5 Years/
Annualto
coincide with
Monitor
Certifications
Environmental
Health Division:
CUPA
(530) 749-5450
Note: All certification reports must be submitted within 30 days to the CUPA.
Facility Name
Page 4
Facility ID#
Date
10/04
County of Yuba
Certified Unified Program Agency
Review
monitoring / inventory
records.
Conduct tank /
piping test.
Check equipment
used in monitoring and
ensure proper operation.
Have tank system
inspected.
Other
Initial abatement
activities/ removal of
hazardous materials
from secondary
containment.
Remove contents of
tank/ containment.
Determine if release
to environment has
occurred.
Contact service
provider to provide
assistance.
Other
Other: Describe
Training
Date completed.
Certification
I have reviewed this Underground Storage Tank Monitoring and Response Plan and have determined that it
accurately describes monitoring of the designated underground storage tanks at this facility.
Owner/Operator Signature:
Page 5
Date:
10/04