Professional Documents
Culture Documents
SD Questions
SD Questions
The date on which the billing is processed and booked for accounting purposes.
If invoice dates are defined for the customer, the system proposes the billing date
from the invoice date calendar.
If no payment cards are defined, If it is order related billing it will take order creation
date, if delivery related billing it will take delivery creation date. If you are billing
services, the system proposes the date of services rendered. You can change the
date manually in the sales document.
If you are using a billing plan to bill a project, the system can propose billing dates for
the billing plan on the basis of planned or actual dates in the corresponding
milestone.
In a billing plan for a maintenance or rental contract, you can specify rules by which
the system determines billing dates on the basis of other dates in the contract
Issue:
We are facing problem at item level billing date field. This field should be filled with
the GI Date in schedule lines shipping tab. but, it(billing date) is not being filled with
goods issue date but, with the required deliver date at sales order header.
Sol:
In VTFL for header maintain copying requirement as 003
In VTFL for item maintain copying requirement as 004 for item category
PGI date is copied into Billing date field.
(2) Rounding difference condition type: DIFF
Condition type
Reqt
DIFF (Rounding
off)
13
16
Alt base
value
4
A/c key
ERS
S_ALR_87013127
(8) How to quotation numbers to sales order numbers in production order in make to
order process?
(9) RM procurement process in make to order scenario?
F External procurement - system creates a planned order or purchase requisition
based on the choice made in the planning run parameters
E In house production Planned orders are created.
X Both - system would creates a planned order to cover the shortages and gives
the user an option to create a production order or a purchase requisition/purchase
order out of it. If quota arrangement exists then you can have a certain percentage
produced and a certain percentage procured.
User exits:
MV45AFZZ. USEREXIT_MOVE_FIELD_TO_VBAK
MV45AFZZ. USEREXIT_SAVE_DOCUMENT_PREPARE