Elias European Market Design Work

Group & Belpex Users Group

Info Session NWE Day-Ahead


Operational & contractual changes for
Belgian wholesale market organization

Agenda
Introduction
Pascale Fonck

General overview of NWE Price Coupling


Martine Verelst

Operational principles & possible scenarios


Amlie Gemers

Detailed operational procedures


Ghizlan Achkari

New Smart Order types & Automatic Order Submission Tool


Rob Loos

Changes to Market Rules (Belpex / Elia)


Rob Loos

Member Testing & Planning to go-live


Rob Loos

Conclusion
James Matthys-Donnadieu

General overview

NWE DAY-AHEAD PRICE


COUPLING

AS IS > TO BE
Two separate Market Couplings (CWE &
Nordic) linked by a volume coupling (ITVC
organised by EMCC)
Sequential calculation approach
No common algorithm applied
Full coupling with GB
One single price coupling based on a
single calculation
One single common algorithm to allow for a
sound and robust price formation

NWE

PCR : Price Coupling of


Regions

NWE Behind the scenes


Parties involved

13 Transmission System Operators

4 Power Exchanges

Systems & interfaces

Approx. 50 systems involved


Approx. 150 interfaces
40 serviced interconnectors
30 bidding zones
6

NWE Driving European


Market Integration
NWE is more than the sum of its parts

It promotes liquidity and

robustness of DA markets
It allows for

It establishes the
necessary

NWE DA

optimal usage

framework to

of cross-border

enable extensions

capacities
It encourages

the harmonization of market rules


7

Potential integration of losses


on DC cables

Activation of losses on a specific interconnector is subject to approval


of relevant national NRAs
Cable

Loss factor
foreseen

Comments

IFA (UK-FR)

yes

Application to Ofgem and CRE.


Foreseen for go-live

Britned (UK-NL)

yes

Application to Ofgem and ACM.


Foreseen for go-live

NorNed (NO-NL)

yes

Application to NVE and ACM. Pending


regulatory approval
88

NWE - Interconnectors

FerroSkan

EstLink
Skagerak
Kontiscan
NorNed DK1-DE Baltic

SwePol

BritNed
Kontek
IFA

General principles

OPERATIONAL PRINCIPLES
& POSSIBLE SCENARIOS

Price Coupling Process

General term for ATC and/or FB parameters used = CZCs : Cross Zonal Capacities
11

NWE Business Process

10:30
CZCs and allocation
constraints submitted
to PCR

12:00
Orderbooks closure

Global Preliminary PX
Confirmation

CZCs and allocation


constraints
submission and
integration

Final
Confirmation
of the results

12:55
Global Final Confirmation
Publication

Market Coupling
Results and
Scheduled Exchanges
transfer

12:55 14:00
Nominations

Trading
confirmation
and scheduled
exchanges
notification

PCR process:
CZCs and allocation constraints
process
Orderbook processing
PMB calculation
Preliminary confirmation process

Final
confirmation
process

12

PCR Process Timings for NWE


Normal process 55 minutes
12:00

OBK GCT

12:00 12:10

Check of OBK and sending to PMB

12:10 12:27

Calculation

12:28 12:41

Preliminary PX validation

12:42

Publication of preliminary results (incl. market clearing price) to


the market and in parallel sending of these preliminary results
for final confirmation/approval to the TSOs

12:42 12:54

Final TSO validation

12:55

Publication of Final Results (incl. market clearing price)


Start of Notification Process

13

Process is delayed
Target
Time

Partial
Coupling/Full
Decoupling
Deadline

Latest Time to
Start an IC

TIME

Normal Procedure

Normal procedures can still apply after


target time

Backup procedure
can apply before the
target time

Backup procedures

Fallback procedures can apply before fallback


time

Fallback procedures
Decoupling
preparation

decoupling
14

Process delayed assumptions


Pre-coupling
Deadline to solve incidents with Network Data (CZCs)
publication is 11:45 CET

Coupling
Time allowance for technical problem solving up to 55 min
Time allowance for special market procedures such as
handling of curtailment situations or price threshold reached
via a second auction used by CWE PXs or the NPS-applied
regulated routines that include peak load capacity
(production/load) reserves activation.
Deadline for final Market Results is 13:50 CET

Max. Time
/Flexibility to solve
technical problems

55min

2nd Auction
CWE/ GB

48 min

Post-coupling
Final notification deadline of 15:30 in CWE, CWE-GB and
CWE-Nordic interconnectors
15

Second Auction

2nd Auction
CWE/ GB

48 min

A Second Auction is triggered in case at least one of the CWE/GB


prices reach or exceed the predefined price thresholds

The routine consists in


Reopening the PXs order books for 10 minutes to give the Market Participants
the opportunity to modify their bids in order to improve the market situation
Execution of a second calculation with the new Order Data

The thresholds to trigger a 2nd auction in CWE remain the same:


+ 500 EUR/MWh and -150 EUR/MWh

In GB thresholds will be introduced:


+ 500 GBP/MWh and -150 GBP/MWh

In case the prices still reach the thresholds after the Second
Auction calculation, no additional Second Auction will be
triggered
16

PCR PROCESS TIMINGS for NWE

* This is the maximum time which could be used to solve a technical problem in order to avoid a decoupling. If the technical
problem is resolved in less than 55 min than the next processes will start earlier.
** the Second Auction in CWE / GB is a single process taking 48 minutes.
*** the Special Procedure for the Nordics is an iterative process which will run the number of times necessary taking into the
13.50 full decoupling deadline when NWE is coupled.

17

Fallback procedures
Target
Time

Partial
Coupling/Full
Decoupling
Deadline

Latest Time to
Start an IC

TIME

Normal Procedure

Normal procedures can still apply after


target time

Backup procedure
can apply before the
target time

Backup procedures

Fallback procedures can apply before fallback


time

Fallback procedures
Decoupling
preparation

decoupling
18

Fallback procedures
Target
Time

Partial
Coupling/Full
Decoupling
Deadline

Latest Time to
Start an IC

TIME

Normal Procedure

Normal procedures can still apply after


target time

Backup procedure
can apply before the
target time

Backup procedures

Fallback procedures can apply before fallback


time

Fallback procedures
Decoupling
preparation

decoupling
19

Full Decoupling of NWE


Internally in CWE and for the CWE Nordic interconnectors (except
Baltic Cable):
Shadow auctions organized by CASC will be held and results published
The 3 PXs within CWE will reopen the order books (20 min) and perform local DA spot
market calculations without using cross border capacities
The notification deadline of 15:30 is applicable for the notification by market parties of
utilization of Explicit Capacity bought in Shadow Auctions
Fallback for Baltic cable : capacity goes back to the cable owner

In GB
Shadow auctions organized by RTE/NGIC are applicable for FR/GB border only (IFA
interconnector), this consists of daily explicit auctions
Capacity of virtual interconnector set to zero
The 2 PXs will reopen the order books (APX UK 15 min) and perform local DA spot market
calculations without using cross border capacities
Fallback for BritNed : capacity goes to intraday

For the Nordic Baltic area including the link with Poland
Shadow auctions on 3 CWE-Nordic links
Re-opening of NPS order books
Price coupling will be performed by NPS utilizing the cross border capacities within this
region
20

Shadow Auctions
Bids submitted through the Shadow Auctions interface at CASC.EU
are default bids :
They are valid for every day of the year, for a specific border, direction
and an hourly period (Volume in MW and a Price in /MWh)
Participants can update their default bids at any time before the
freezing of the database when Shadow Auctions are run

Description in Harmonised Auction Rules for CWE, CSE and CH


Possibility to register only for Shadow Auctions, with a lighter
status: Participant to Shadow Auctions Only"
Market Participants need to submit a nomination towards the
respective TSOs by the notification deadline of 15:30
21

Full Decoupling scenario


CWE : 4 local PX auctions

Nordic-Baltic Market Splitting


Virtual Capacity is set to Zero
2 local PX auctions
Shadow Auctions

Local matching process

In case of full decoupling the processes are local


Communication in case of fallback is organized locally (different info,
different timings)
22

22

CWE TSO investigate flexibility


of notification deadline
The CWE TSOs and 50 Hertz have agreed upon a joint target
solution for the deadlines for submitting the different schedules
towards the TSOs available as of Go-Live of the Price Coupling in
the NWE region
Taken into account that it is important for the TSOs to receive data
of good quality, the TSOs agreed to extend the deadline for
submitting generation schedules in the very rare cases of specific
fallback situations to a later time than 15:30
In these extraordinary situations, all CWE TSOs and 50 Hertz will
extend the deadline for submitting generation schedules until at
least 15:45. Some TSOs can extend this deadline even beyond
15:45 depending on local market rules
This means that market participants have at least 60 minutes for
the submission of generation schedules
23

CWE TSO investigation on


flexibility of notification deadline
impact on procedures
Exceptional cases

Notification
Process
45 min
15:30

15:30

Crossborder
Notification
Process
45 min
15:30

15:45

Generation
Notification
Process
At least
60 min
24

PCR PROCESS TIMINGS for NWE

25

Full Decoupling before OBK


GCT (12:00)
Case X10
Full decoupling
before 12.00

Case X11
X10 +
delay

OBK GCT = 12:00

Full decoupling
42 min

Notification

Process
60 min

Case X12
X10 +
2nd Auction
CWE

Full decoupling
42 min

Full decoupling
42 min

Max. Time
/Flexibility to
solve technical
problems

2nd Auction
CWE/ GB

55min*

Notification

Process
60 min

28 min**
Notification
Process

60 min

Final Notification deadline =15:30 which applies to:


Internal CWE, CWE-GB and CWE-Nordic interconnectors

* This is the maximum time which could be used to solve a technical problem in order to avoid a decoupling. If the technical
problem is resolved in less than 55 min than the next processes will start earlier.
** the Second Auction in CWE / GB is a single process taking 48 minutes.
*** the Special Procedure for the Nordics is an iterative process which will run the number of times necessary taking into the
13.50 full decoupling deadline when NWE is coupled.

26

Partial (De)coupling within NWE


Any scenario where one or more bidding areas and/or
interconnectors are temporary not participating in NWE Market
Coupling while the remaining bidding areas/interconnectors still
participate in NWE Market Coupling
The CZCs for the decoupled borders / interconnectors will be
allocated via the fallback solution for these temporary not
participating borders / interconnectors
NWE parties will try to couple as many borders / interconnectors as
possible
Partial Decoupling is triggered
during the pre-coupling process, at the latest at 11:45
during the coupling process, at the latest at 12:40

27

Partial Decoupling Scenario


Example : CWE+GB <> Nordic
PCR coupling

Nordic-Baltic: Market Splitting


Shadow Auctions
Local matching process
PCR matching process

28

Partial Decoupling Scenario


Example : NorNed
PCR coupling

Shadow Auctions
PCR matching process

29

Partial Decoupling Scenario


Example : EPEX OBK missing
PCR coupling
Shadow Auctions
PCR matching process
Local matching process

30

Partial Decoupling Scenario


Example: APX NL/Belpex OBK
missing
PCR coupling
Shadow Auctions
Local matching process
PCR matching process

31

Partial Decoupling Scenario


Example : no CWE CZCs in PMB
PCR coupling

Shadow Auctions
PCR matching process

Local matching process

32

Decoupling scenarios
Wheres the problem

What decouples?

Resulting configuration

APX/Belpex

CWE internal borders (FR-DE,


FR-BE, BE-NL, NL-DE) and
NorNed and BritNed and GB-GB

NL, BE and APX UK


markets isolated

EPEX

CWE internal borders and IFA,


DK-DE, DE-SE

DE, FR, and BE


markets isolated

NPS (Nordic)

Nordic area, NorNed, DE-DK,


DE-SE

Nordic markets
isolated (but internally
coupled)

N2EX

GB-GB, IFA

N2EX market isolated

CWE TSOs

CWE internal borders

BE market isolated

BritNed

BritNed

No market isolated

NorNed

NorNed

No market isolated

Any other individual


interconnector

That interconnector

No market isolated

PMB, or problem after


12:20

Entire region

All markets isolated


(but Nordic markets
internally coupled)

33

33

Partial Decoupling before OBK


GCT (12:00)

* This is the maximum time which could be used to solve a technical problem in order to avoid a decoupling. If the technical
problem is resolved in less than 55 min than the next processes will start earlier.
** the Second Auction in CWE / GB is a single process taking 48 minutes.
*** the Special Procedure for the Nordics is an iterative process which will run the number of times necessary taking into the
13.50 full decoupling deadline when NWE is coupled.

34

Partial Decoupling before OBK


GCT (12:00)
Partial coupling followed by Full
Decoupling
+ Special Routine Nordics

* In case X6b, the NPS special procedure, being an iterative process, may take the same timeframe as when all
markets are still coupled, but this is not relevant in a full decoupling since Nordic and Baltic TSOs do not impose a
nomination deadline, but instead NPS can take as long time as needed to finish the Price Calculation and
subsequent notifications can be submitted (updated) by NPS and market parties to relevant TSOs until about 1
hour before delivery hour.

35

Partial Decoupling after OBK


GCT (12:00)
Case X7

Case X8

Case X9a

Case X9b

Publication of
preliminary results
=12:42

36

36

Nomination Deadlines @ Elia


Cases
Number

Case Description

Normal
X1
X10

partial decoupling before OBK GCT


full decoupling before OBK GCT

1
X2
X11
X12

small delay
partial decoupling before OBK GCT + small delay
full decoupling before OBK GCT + small delay
full decoupling before GCT + 2nd auction

1
2a *
3a *
X2
X3a *
X4a *
X7
X11

Longer/maximum delay
2nd auction
delay + 2nd auction
partial decoupling before OBK GCT + longer/maximum delay
partial decoupling before OBK GCT + 2nd auction
partial decoupling before OBK GCT + delay + 2nd auction
partial decoupling after OBK GCT
full decoupling before OBK GCT + longer/maximum delay

4
X5
X8

full decoupling
partial decoupling before OBK GCT + full decoupling
partial decoupling after OBK GCT + full decoupling

5a
X6a
X9a

full decoupling + 2nd auction


partial decoupling before OBK GCT + full decoupling + 2nd auction
partial decoupling after OBK GCT + full decoupling + 2nd auction

* In case Market Results are published before 13:20, nomination deadlines from case 1 apply

NO market
results
before

HUB 1

Cross Border
HUB2
Off-Take
Injection

Generation

14:00

14:30

15:00

13:00

14:15

14:30

15:00

13:20

14:45

15:00

15:30

13:50

15:15

15:30

15:30

13:50

15:15

15:30

16:00

37

38

39

Timings and messages

DETAILED OPERATIONAL
PROCEDURES

NORMAL NWE/PCR PROCESS

Normal NWE/PCR process


Normal
timing

Final
results

PX GCT
10:30

12:00

12:42

12:55

15:00

CZC publication
MPs introduce orders

Preliminary result
publication

Coupling process

Notifications to Elia
* All timings are C.E.T

42

Normal process timeline


CZC published at 10:30 on CASC website
PX gate closure time at 12:00
Publication of preliminary market results 12:42
Publication of final market results 12:55
Notification
deadline

Belgium

France

Germany

The Netherlands

Cross-Border

14:30

14:30

14:30

14:00 (E-program)

Local/hub

Hub 1: 14:00
Hub 2: 14:30

Ex post

14:30

14:00 (E-program)

Consumption

14:30

n/a

14:30

14:45 (T-program)

Generation

15:00

16:30

14:30

14:45 (T-program)

43

CASE 1 PROCESS DELAYED


WITH MAX TIMING

Case 1 Process delayed with


max timing
Normal
timing

Final
results

PX GCT
10:30

12:00

12:42

12:55

13:00

13:20

Exceptional
timing

13:38

13:50

15:30

CZC publication
MPs introduce orders
Preliminary result
publication

Coupling process / Backup procedures

Notifications to Elia
Message to MP
Technical problem

* All timings are C.E.T

45

Case 1 Process delayed with


max timing

CZC published at 10:30 on CASC website


PX gate closure time at 12:00
Delay in Market Coupling results

Timing

Message

Additional actions
for MPs

12:42

[ExC_02]: Delay in Market


Coupling Results
publication

CASC: invitation to
update bids in the
Shadow Auction
system before 13:40

13:00

TSO: Delay in Market


Coupling Results/ local
Market Results publication
and extension of Hub
Notification deadline

CASC: invitation to
update bids in the
Shadow Auction
system before 13:40

13:20

TSO: Delay in Market


Coupling Results/ local
Market Results publication
and extension of Hub
Notification deadline

Market
results
Publication
deadline

Local hub
Notification
Deadline
HUB1/HUB2

Cross
Border
Notification
Deadline

Generation
notification
deadline

13:50

14:15/14:30

14:30

15:00

13:50

14:45/15:00

15:00

15:30

13:50

46

Messages
PX : [ExC_02]

TSO

47

CASE 2A SECOND AUCTION

Case 2a second auction


Normal
timing

Final
results

PX GCT
10:30

12:00

12:30

Exceptional
timing

14:00
>12:42

>12:55

13:00

13:20 <13:50

15:30

CZC publication
MPs introduce orders

Preliminary result
publication

Coupling process

Notifications to Elia
Message to MP
* All timings are C.E.T

49

Case 2a second auction

CZC published at 10:30 on CASC website


PX gate closure time at 12:00
Threshold reached -150/MWh or 500/MWh (-150/MWh or + 500/MWh)
Second Auction triggered (re-opening of Order Books)

Timing

Message

Additional
actions for MPs

12:30

[ExC_01]: Thresholds
reached - Reopening of the
order books

PX: OBK open for


10 minutes after
message

13:00

TSO: Delay in Market


Coupling Results/ local
Market Results publication
and extension of Hub
Notification deadline

CASC: invitation
to update bids in
the Shad ow
Auction system
before 13:40

13:20

TSO: Delay in Market


Coupling Results/ local
Market Results publication
and extension of Hub
Notification deadline

Market
results
Publication
deadline

Local hub
Notification
Deadline
HUB1/HUB2

Cross Border
Notification
Deadline

Generation
notification
deadline

13:50

14:15/14:30

14:30

15:00

13:50

14:45/15:00

15:00

15:30

13:50

50

Messages
PX : [ExC_01]

CASC will add: Therefore, if relevant, we


advise you to update your shadow bids at
CASC EXAU platform before 13:40.

51

CASE 4 FULL DECOUPLING

Case 4 Full Decoupling


Normal
timing

Shadow
Auction
results

PX GCT
10:30

12:00

Final
results

12:55

Exceptional
timing

12:42

13:00

13:20

13:50

>14:30 15:30

CZC publication
MPs introduce bids
Process run

Full
decoupling
preparation*

Full
decoupling
MPs update orders**

Exceptional procedures

Notifications to Elia

Message to MP

Note:
*Shadow auction will be triggered at CASC
** Reopening of order book for 20 min

53

Case 4 Full Decoupling

Timing

CZC published at 10:30 on CASC website


PX gate closure time at 12:00

Message

12:42

[ExC_02]: Delay in Market


Coupling Results
publication

13:00

TSO: Delay in Market


Coupling Results/ local
Market Results publication
and extension of Hub
Notification deadline

Additional actions
for MPs

Market
results
Publication
deadline

Local hub
Notification
Deadline
HUB1/HUB2

Cross Border
Notification
Deadline

Generation
notification
deadline

13:50

14:15/14:30

14:30

15:00

CASC: invitation to
update bids in the
Shadow Auction
system before 13:40

CASC: invitation to
update bids in the
Shadow Auction
system before 13:40

54

Case 4 Full Decoupling

Timing

Full decoupling announcement


Shadow auctions
Follow the local auction rules
Message

[ExC_03b]: Risk of Full


Decoupling

13:20

TSO: Extension of
Notification Deadlines due
to full decoupling
declared/delay in local
Market Results publication

Market
results
Publication
deadline

Local hub
Notification
Deadline
HUB1/HUB2

Cross Border
Notification
Deadline

Generation
notification
deadline

13:50

14:45/15:00

15:00

15:30

15:15/15:30

15:30

15:30

CASC: invitation to
update bids in the
Shadow Auction
system before 13:40

TSO: Delay in Market


Coupling Results/ local
Market Results publication
and extension of Hub
Notification deadline
[ExC_04b]: Full
Decoupling Reopening of
the order books

13:50

Additional actions
for MPs

PX: OBK open for 20


minutes after
message

55

Messages
PX : [ExC_02]

56

Messages
PX : [ExC_03b]

TSO

CASC will add: Therefore, if relevant, we


advise you to update your shadow bids at
CASC EXAU platform before 13:40

57

Messages
PX : [ExC_04b]

TSO

58

CASE 5A FULL DECOUPLING


+ 2ND AUCTION

Case 5a Full Decoupling + 2nd


Auction
Normal
timing

Shadow
Auction
results

PX GCT
10:30

Exceptional
timing

12:00

Final****
results

12:55
12:42

13:00

13:20

13:50

14:00

14:25

14:45

16:00

CZC publication
MPs introduce bids

Coupling process

Full
decoupling
preparation*

Full
decoupling
MPs update orders**

Exceptional procedures

MPs update orders***

Notifications to Elia

Message to MP

Note:
*Shadow auction will be triggered at CASC
** Reopening of order book for 20 min
*** Reopening of order book second auction 10 min
**** PX publish at best effort base at 14:45

60

Case 5a Full Decoupling + 2nd Auction

Timing

CZC published at 10:30 on CASC website


PX gate closure time at 12:00
Message

Additional actions
for MPs

12:42

[ExC_02]: Delay in Market


Coupling Results
publication

CASC: invitation to
update bids in the
Shadow Auction
system before 13:40

13:00

TSO: Delay in Market


Coupling Results/ local
Market Results publication
and extension of Hub
Notification deadline

CASC: invitation to
update bids in the
Shadow Auction
system before 13:40

[ExC_03b]: Risk of Full


Decoupling

CASC: invitation to
update bids in the
Shadow Auction
system before 13:40

Market
results
Publication
deadline

Local hub
Notification
Deadline
HUB1/HUB2

Cross Border
Notification
Deadline

Generation
notification
deadline

13:50

14:15/14:30

14:30

15:00

13:50

14:45/15:00

15:00

15:30

13:20
TSO: Delay in Market
Coupling Results/ local
Market Results publication
and extension of Hub
Notification deadline

61

Case 5a Full Decoupling + 2nd Auction

Timing

Full decoupling announcement


Shadow auctions
Follow the local auction rules

Message

[ExC_04b]: Full
Decoupling Reopening of
the order books
13:50

Additional actions
for MPs

Local hub
Notification
Deadline
HUB1/HUB2

Cross Border
Notification
Deadline

Generation
notification
deadline

15:15/15:30

15:30

15:30

15:15/15:30

15:30

16:00

PX: OBK open for 20


minutes after
message

TSO: Extension of
Notification Deadlines due
to full decoupling
declared/delay in local
Market Results publication

[CWE_UMM_05]:
Thresholds reached during
local auction

Market
results
Publication
deadline

PX: OBK open for 10


minutes after
message

14:25
TSO: Extension of
Generation Notification
Deadlines due to Second
Auction Triggered after Full
Decoupling

62

Messages
PX : [ExC_02]

63

Messages
PX : [ExC_03b]

TSO

CASC will add: Therefore, if relevant, we


advise you to update your shadow bids at
CASC EXAU platform before 13:40

64

Messages
PX : [ExC_04b]

TSO

65

Messages
PX : [UMM_05]

TSO

66

CASE X3A PARTIAL


COUPLING BEFORE OBK GCT
+ SECOND AUCTION

Case X3a partial coupling before


OBK GCT + Second Auction
Shadow
Auction
results

Normal
timing

PX GCT

10:30

Exceptional
timing

11:15

Final
results

12:00
12:30

14:00
>12:42

11:45

>12:55

13:00

13:20 <13:50

15:30

CZC publication
MPs introduce orders

Preliminary result
publication

Partial coupling
before OBK GCT

Coupling process

Notifications to Elia

Message to MP

* All timings are C.E.T

68

Case X3a partial coupling before


OBK GCT + Second Auction

Timing

CZC published at 10:30 on CASC website


PX gate closure time at 12:00
Threshold reached -150/MWh or 500/MWh (-150/MWh or + 500/MWh)
Second Auction triggered (re-opening of Order Books)
Publication of final market results before 13:50
Message

Additional actions for


MPs

Market
results
Publication
deadline

Local hub
Notification
Deadline
HUB1/HUB2

Cross Border
Notification
Deadline

Generation
notification
deadline

CASC: invitation to
update bids in the
Shadow Auction
system before 11:35

11:15

[UMM_02]: Risk of partial


decoupling for one or more
interconnectors

11:45

[UMM_03]: One or more


interconnectors decoupled

12:30

[ExC_01]: Thresholds
reached - Reopening of the
order books

PX: OBK open for 10


minutes after message

13:50

13:00

TSO: Delay in Market


Coupling Results/ local
Market Results publication
and extension of Hub
Notification deadline

CASC: invitation to
update bids in the
Shadow Auction
system before 13:40

13:50

14:15/14:30

14:30

15:00

13:20

TSO: Delay in Market


Coupling Results/ local
Market Results publication
and extension of Hub
Notification deadline

13:50

14:45/15:00

15:00

15:30

69

Message
PX : [UMM_02]

CASC will add: Therefore, if relevant, we


advise you to update your shadow bids at
CASC EXAU platform before 13:40

70

Messages
PX : [ExC_01]

71

CASE X7 PARTIAL COUPLING


AFTER GCT

Case X7 partial coupling after GCT


Normal
timing

Shadow
Auction
results

PX GCT
10:30

Final
results

12:00

Exceptional
timing

12:20

12:30

12:40

13:00

13:20 13:38

13:50

15:30

CZC publication
MPs introduce orders
Preliminary result
publication

Partial
coupling
preparation*

Partial
coupling
MPs update orders**

Coupling process / backup procedures


Notifications to Elia
Note:

Message to MP

*Shadow auction will be triggered at CASC


** Reopening of order book for 10 min

73

Case X7 partial coupling after GCT

CZC published at 10:30 on CASC website


PX gate closure time at 12:00
Publication of preliminary market results at the latest 13:38
Publication of final market results at the latest 13:50

Timing

Message

Additional
actions for MPs

Market
results
Publication
deadline

Local hub
Notification
Deadline
HUB1/HUB2

Cross Border
Notification
Deadline

Generation
notification
deadline

12:20

[ExC_03a]: Risk of Partial


Decoupling

CASC: invitation
to update bids in
the Shadow
Auction system
before 12:30

12:40

[ExC_04a]: Partial
Decoupling Reopening of
the PX order books

PX: OBK open for


10 minutes after
message

13:50

13:00

TSO: Delay in Market


Coupling Results/ local
Market Results publication
and extension of Hub
Notification deadline

CASC: invitation
to update bids in
the Shadow
Auction system
before 13:40

13:50

14:15/14:30

14:30

15:00

13:50

14:45/15:00

15:00

15:30

13:20

TSO: Delay in Market


Coupling Results/ local
Market Results publication
and extension of Hub
Notification deadline

74

74

Messages
PX : [ExC_03a]

CASC will add: Therefore, if relevant, we


advise you to update your shadow bids at
CASC EXAU platform before 12:30.

75

Messages
PX : [ExC_04a]

TSO

76

NWE process overview


Normal
timing

PX GCT
10:30

Exceptional
timing

12:00
11:45

12:55
12:20

12:40

13:05

13:50

15:30

CZC publication
MPs introduce bids
Process run
Partial coupling due
to CZC reason

Partial coupling
preparation

Partial
coupling
Full
decoupling
preparation

Exceptional procedures

Full
decoupling

Notifications to Elia

77

Decoupling scenarios
Wheres the problem

What decouples?

Resulting configuration

APX/Belpex

CWE internal borders (FRDE, FR-BE, BE-NL, NL-DE)


and NorNed and BritNed
and GB-GB

NL, BE and APX UK


markets isolated

EPEX

CWE internal borders and


IFA, DK-DE, DE-SE

DE, FR, and BE


markets isolated

NPS (Nordic)

Nordic area, NorNed, DEDK, DE-SE

Nordic markets
isolated (but internally
coupled)

N2EX

GB-GB, IFA

N2EX market isolated

CWE TSOs

CWE internal borders

BE market isolated

BritNed

BritNed

No market isolated

NorNed

NorNed

No market isolated

Any other individual


interconnector

That interconnector

No market isolated

PMB, or problem after 12:20

Entire region

All markets isolated


(but Nordic markets
internally coupled)

78

78

Communication to the market summarized


Time/
Deadline

Communication

Message
number

Other messages

10:00

Risk of Partial/full Decoupling known in


advance

[ExC_03a/b]

10:30

Partial/full Decoupling known in advance

[ExC_05a/b]

11:15

Risk of partial decoupling for one or more


interconnectors

[UMM_02]

11:45

One or more interconnectors decoupled

[UMM_03]

12:20

Risk of Partial Decoupling in certain regions

[ExC_03a]

~ 12:30

Second Auction

[ExC_01]

12:40

Partial Decoupling Reopening of order books

[ExC_04a]

Regular publication time


(12:42)

Delay in Market Coupling Results publication

[ExC_02]

CASC

TSO

Local PX

NB 1. The fallback solutions and processes as well as their associated contents and timings are organized on local / regional level and not on NWE level. Timings are
therefore indicative and additional messages can be sent (e.g. IFA CMS will also sent messages in case of a fall back situation)
NB 2. The shift of notification deadlines only applies for CWE internally and CWE borders.

79

Communication to the market summarized


Time/
Deadline

Communication

Message
number

13:00

Delay in Market Coupling Results publication ->


Extension of notification deadlines

13:20

Risk of Full Decoupling


Delay in Market Coupling Results publication ->
Extension of notification deadlines

[EXC_03b]

13:50

Decision of Full decoupling


Extension of notification deadlines

[EXC_04b]

14:25

Thresholds reached during local auction

[UMM_05]

Other messages
CASC

TSO

Local PX

80

81

Smarter Day-ahead

Smart bids project

New Block Order Types

LINKED & EXCLUSIVE BLOCK


ORDERS

Linked Block Orders


Definition:
The execution of (a set of) profile block(s) is subject to the
execution of another block
Other standard execution rule apply in full

Use:
Allows to explicitly consider technical and economical
constraints
For example, a first block may include the start-up costs of a
production facility, and additional blocks comprising fuel costs
may be linked to this block
Possibility to design complex linked structures (i.e. families)

Q
1
Hour

Block Order

11

13

15

Block Order 2

17

19

21

Block Order83
3

23

1
Hour

Block Order

11

13

15

Block Order 2

17

19

21

Block Order 3

23

83

Example
Technical plant data
Pmin
Pmax

Output
(MW)

Cost
(/MWh)

50

65

200

62

300

60

Production cost 50 MW = 65 /MWh


Production cost 300 MW = 60
/MWh
Marginal cost to increase production
from 50 MW to 300 MW = 59 /MWh
Marginal cost to increase from 50
MW to 200 MW = 61 /MWh
Marginal cost to increase from 200
MW to 300 MW = 56 /MWh

Bidding strategies
Possible bidding strategy 1:
Block 1: Sell 50 MW @ 65
Block 2: Sell 250 MW @ 59
linked to Block 1

Unit is fully accepted if P>60;


or 50 MW accepted if P>65
Possible bidding strategy 2:
Block 1: Sell 50 MW @ 65
Block 2: Sell 150 MW @ 61
linked to Block 1

Block 3: Sell 100 MW @ 56


linked to Block 2

Unit is fully accepted if P>60;


or 200 MW accepted if P>62;
or 50 MW accepted if P>65
84

Example
Technical plant data
Pmin

Output
(MW)

Cost
(/MWh)

50

65

Possible bidding strategy 1:


Block 1: Sell 50 MW @ 65
Block 2: Sell 250 MW @ 59
linked to Block 1

Unit is fully accepted if P>60;


orwellfare
50 MW accepted
if P>65
300Linked Block
Orders: global
considered
60
200

Pmax

Bidding strategies

62

Possible bidding strategy 2:


Production cost 50 MW = 65 /MWh
The
unitMW
will=also
60 @
P65
Block 1:price
Sell 50isMW
Production
cost 300
60 clear if baseload
/MWh
Block 2: Sell 150 MW @ 61
65!
Marginal cost to increase production
linked to Block 1
from 50 MW to 300 MW = 59 /MWh
Block 3: Sell 100 MW @ 56
The
algorithm
is 50
not sequential,
buttoconsiders
the
Marginalcost
to increase
from
linked
Block 2
MW to 200 global
MW = 61
/MWh of both blocks.
wellfare
Unit is fully accepted if P>60;
Marginal cost to increase from 200
or 200 MW accepted if P>62;
MW to 300 MW = 56 /MWh
or 50 MW accepted if P>65
85

Linked Block Orders use


cases
Optimise thermal power plants
Offer plant using multiple orders, allowing it to run at different
outputs, each reflected by their own cost level
Run one/several hour(s) earlier or later if power prices remain
interesting outside of the peak period

Optimise consumption processes


Only execute part B of consumption process if part A of
process was started earlier
Or only start A+B when combination does not exceed certain
costs

Optimise storage capacity


Sell only during peak period if off-peak purchase order has
been accepted and buy/sell combination is in the money
86

Exclusive Block Orders


Definition:
Within a set of profile blocks, at most one block can be
accepted
Other standard execution rule apply in full

Use:
Allows to propose for trading different production patterns
For example, a specific production plant can be offered

at a low price for baseload production,


at a medim price for peak load production
>at a high price for super peak load production
but can only be executed once
Low price order

11

13 15

Medium price order

17 19

21 23

11

13 15

High price order

17 19

21 23

11

13 15

17 19

21 23

Exclusive Block Orders


Optimise thermal power plants
Similar to using Linked Block Orders

Optimise combined heat & power installations


Heat demand with flexible timing, or some heat buffer
Flexibility might allow to produce heat & power when power
prices are highest, using several exclusive production profiles

Optimise demand side management


Case: End user can stop consumption, but only if DAM prices
> 500 /MWh and for max 2 hours/day
Program load shedding on the DAM on the most expensive
hours (and only of threshold is reached), using a combination
of exclusive blocks of 2 hours
Block 1: hours 1 & 2, Block 2: hours 2 & 3,
88

Benefits of Smart Orders


Smarter orders give more flexibility when
introducing orders for the auction
Better reflecting technical constraints of generation units
E.g. no partial clearing at non-cost reflective price levels, lower PRB
frequency (plant offered in smaller blocks),
Easier bidding, less operational work

Result: better asset optimization (generation +


consumption)
Better price formation
More robust against uncertainties faced when
making day-ahead price forecasts

89

Static Demo
Linked Family

90

Linked Family - Entry


Two options are available to submit a Linked family

Option 1

Option 2

91

Linked Family - Entry


A visual representation helps the trader to identify
mistakes: Red screen for Buy side (Green for Sell side)
Show the number of
Family group submitted

Indicate the parent of the


block

Give a representation of
the family

92

Linked Family - Entry


Linked family can combine Buy and Sell: the background
turns blue and the columns turn red or green to represent
Buy or Sell orders
Graph shows both sides

Indicates the side of the


block

Pressing this button shows


the family in a tree

93

Linked Family - Entry


A Tree View shows the hierarchical relationship between
orders
Block 4 can only be traded if
Bloc 2 and block 1 are trade

Pressing this button lead the


trader back to the entry screen

Color represents the side of


the order (Buy or Sell).
Colored squares make the
link with the graphs above.

94

Static Demo
Exclusive Group

95

Exclusive Group - Entry


Two options are available to submit an Exclusive Group

Option 1

Option 2

96

Exclusive Group - Entry


A visual representation helps the trader to identify
mistakes: Green screen for Sell side (Red for Buy side)
Number of exclusive group will be
limited limit to be defined

Out of all the order entered,


maximum one will be traded

97

Exclusive Group - Entry


Linked family can combine Buy and Sell: the background
turns blue and the columns turn red or green to represent
Buy or Sell orders
Graph shows both sides

Indicates the side of the


block

98

Smarter Day-ahead

Smart bids project

Submit Orders using XML files

AUTOMATIC ORDER
SUBMISSION TOOL
99

Automatic Order Submission


Intro
New tool to facilitate submitting orders in
automated way using XML files
Easier workflow
Eliminates operational risks involved with Paste
from Excel functionality
Planned to be available before launch of Smart
Orders

100

Automatic Order Submission


Details
Software to be installed alongside EuroLight client
Tool will monitor specific folder and
Process all xml files contained in folder
Give feedback via acknowledgement xml file

Orders introduced via tool will be visible in


EuroLight Order Book
Editing via EuroLight possible

101

Automatic Order Submission


XML Specifications & Testing
Draft manual & specifications of xml files available
on APX / Belpex websites

Scheduled to be available on the Member Testing


environment as of 23 October

102

Belpex Market Rules Elia ARP contract

CHANGE TO RULES

103

Belpex Market Rules


Market Rules
Execution conditions for Linked & Exclusive Block
Orders
Clarifications of procedures (with no impact on
members)

104

Belpex Market Procedures


Market Segment Specifications
Changes with respect to countries involved in
Market Coupling
Day-Ahead Market

Minimum price will become -500 /MWh


Via Communication
Maximum price will remain +3000/MWh
Availability Linked & Exclusive Block Orders confirmed
Changes to operational timings

Changes regarding rollback

User Procedure
Changes regarding Linked & Exclusive Block
Orders
105

Changes to Elia ARP contract


ARP Contract
No changes
Contains nomination deadlines for normal
procedures

106

Capacities Flows Prices

PUBLICATIONS

107

Publications
www.belpex.be
Market prices & auction volumes

www.elia.be
NTC values, ATC values, flows

www.casc.eu
ATC values, Shadow Auction results (if any)
Yearly, monthly capacity auction results

www.europeanpricecoupling.eu
Daily prices, ATC values & flows

108

Belpex Market Rules Elia ARP contract

PLANNING TO GO-LIVE &


MEMBER TESTING
109

NWE Target Go-live Date


The Target Go-live date has been set at 26
November 2013
for Delivery Date 27 November 2013

Go-live date is subject to

Successful completion of the Simulation Test phase;


Successful completion of the Member Test phase;
Signing of all contracts and agreements;
Regulatory approval

Final Go/No Go decision to launch will be taken


early November
Launch activities have been started

110

NWE Simulation Testing


Simulation Testing phase by NWE project parties
until 31/10/2013
Normal Day scenarios
Backup scenarios
Fallback scenarios (full decoupling and partial coupling)

Complexity due to
testing with 50+ systems and 150+ interfaces involved
New partial coupling procedures and system functionality

NWE Parties are working hard to meet the


acceptance criteria for simulation testing
111

Joint NWE Member Tests


NWE Member Test planned for 14/10 25/10
Timing delayed to afternoon, but same process time
On request of members, testing of nomination process has been added
to all test days

Smart Orders are available in NWE Member Testing


Date

Simulation

Settlement
i
Process
Yes
Yes
Yes

Monday, October 14
Normal Day
Tuesday, October 15
2nd auction triggering in CWE / GB
Wednesday, October 16 Full decoupling of NWE
Partial Coupling 1 (Nordic-Baltic area
Thursday, October 17
will be decoupled from the CWE. CWE
and GB remain coupled.)
No
Friday, October 18
No testing
N/A
Saturday, October 19
Sunday, October 20
Partial Coupling 2 (missing order books
Monday, October 21
EPEX)
Yes
Tuesday, October 22
Full decoupling of NWE
Yes
No test foreseen, but can still be used
Wednesday, October 23
as backup testing day
No
No test foreseen, but can still be used
Thursday, October 24
as backup testing day
No
Friday, October 25
No testing
N/A

Nomination Process
Yes
Yes
Yes

Yes
N/A

Yes
Yes
No
No
N/A

112

Local Member Tests


Smart Orders
Smart Orders are available on Member Test
environment already
Will remain available until (and after) NWE Go-live

From 28 October until 15 November, test auction


will be organized by APX / Belpex
Smart orders will be available to see how matching results are
presented
Details on these local tests will be communicated later

113

Local Member Tests


Automatic Order Submission Tool
Scheduled to be available on Member Testing
environment as of 23 October
Exact details will be communicated later

Will be available on Production environment prior to


the NWE go-live
Please note that the Smart Orders functionality will only be available
after NWE Go-live

114

Disclaimer: All messages and timings are subject to changes after final testing.
115

CONCLUSION

116

Annex

SUMMARY

117

PCR PROCESS TIMINGS for


NWE

* This is the maximum time which could be used to solve a technical problem in order to avoid a decoupling. If the technical
problem is resolved in less than 55 min than the next processes will start earlier.
** the Second Auction in CWE / GB is a single process taking 48 minutes.
*** the Special Procedure for the Nordics is an iterative process which will run the number of times necessary taking into the
13.50 full decoupling deadline when NWE is coupled.

118

PCR PROCESS TIMINGS for NWE

119

Full decoupling before OBK GCT


(12:00) Case X10
Case X12
Case X11

Full decoupling
before 12.00

Idem +
delay

OBK GCT = 12:00

Publication of preliminary results =12:42

Idem +
2nd Auction
CWE

Full decoupling
42 min

Full decoupling
42 min

Full decoupling
42 min

Notification

Max. Time
/Flexibility to
solve technical
problems

2nd Auction
CWE/ GB

Process
60 min

55min*

Notification

Process
60 min

28 min**
Notification
Process

60 min

Final Notification deadline =15:30 which applies to:


Internal CWE, CWE-GB and CWE-Nordic interconnectors

* This is the maximum time which could be used to solve a technical problem in order to avoid a decoupling. If the technical
problem is resolved in less than 55 min than the next processes will start earlier.
** the Second Auction in CWE / GB is a single process taking 48 minutes.
*** the Special Procedure for the Nordics is an iterative process which will run the number of times necessary taking into the
13.50 full decoupling deadline when NWE is coupled.

120

Partial Coupling before OBK GCT


(12:00)
Case X1

Case X2

Case X3a

Case X3b

Case X4a

Case X4b

Publication of preliminary results =12:42

121

Partial Coupling before OBK GCT


(12:00)

* In case X6b, the NPS special procedure, being an iterative process, may take the same timeframe as when all markets are still
coupled, but this is not relevant in a full decoupling since Nordic and Baltic TSOs do not impose a nomination deadline, but
instead NPS can take as long time as needed to finish the Price Calculation and subsequent notifications can be submitted
(updated) by NPS and market parties to relevant TSOs until about 1 hour before delivery hour.

122

Partial coupling after OBK GCT (12:00)


Case X7

Case X8

Case X9a

* In case X9b, the NPS special procedure, being an iterative process, may take the same timeframe as when all markets are
still coupled, but this is not relevant in a full decoupling since Nordic and Baltic TSOs do not impose a nomination deadline, but instead NPS
can take as long time as needed to finish the Price Calculation and subsequent notifications can be submitted (updated) by NPS and market
parties to relevant TSOs until about 1 hour before delivery hour.

Case X9b

123

Communication to the market summarized


Time/
Deadline

Communication

Message
number

Other messages

10:00

Risk of Partial/full Decoupling known in


advance

[ExC_03a/b]

10:30

Partial/full Decoupling known in advance

[ExC_05a/b]

11:15

Risk of partial decoupling for one or more


interconnectors

[UMM_02]

11:45

One or more interconnectors decoupled

[UMM_03]

12:20

Risk of Partial Decoupling in certain region

[ExC_03a]

~ 12:30

Second Auction

[ExC_01]

12:40

Partial Decoupling Reopening of order books

[ExC_04a]

Regular publication time


(12:42)

Delay in Market Coupling Results publication

[ExC_02]

CASC

TSO

Local PX

NB 1. The fallback solutions and processes as well as their associated contents and timings are organized on local / regional level and not on NWE level. Timings are
therefore indicative and additional messages can be sent (e.g. IFA CMS will also sent messages in case of a fall back situation)
NB 2. The shift of notification deadlines only applies for CWE internally and CWE borders.

124

Communication to the market summarized


Time/
Deadline

Communication

Message
number

13:00

Delay in Market Coupling Results publication ->


Extension of notification deadlines

13:20

Risk of Full Decoupling


Delay in Market Coupling Results publication ->
Extension of notification deadlines

[EXC_03b]

13:50

Decision of Full decoupling


Extension of notification deadlines

[EXC_04b]

14:25

Thresholds reached during local auction

[UMM_05]

Other messages
CASC

TSO

Local PX

125

Nomination Deadlines @ Elia


Cases
Number

Case Description

Normal
X1
X10

partial decoupling before OBK GCT


full decoupling before OBK GCT

1
X2
X11
X12

small delay
partial decoupling before OBK GCT + small delay
full decoupling before OBK GCT + small delay
full decoupling before GCT + 2nd auction

1
2a *
3a *
X2
X3a *
X4a *
X7
X11

Longer/maximum delay
2nd auction
delay + 2nd auction
partial decoupling before OBK GCT + longer/maximum delay
partial decoupling before OBK GCT + 2nd auction
partial decoupling before OBK GCT + delay + 2nd auction
partial decoupling after OBK GCT
full decoupling before OBK GCT + longer/maximum delay

4
X5
X8

full decoupling
partial decoupling before OBK GCT + full decoupling
partial decoupling after OBK GCT + full decoupling

5a
X6a
X9a

full decoupling + 2nd auction


partial decoupling before OBK GCT + full decoupling + 2nd auction
partial decoupling after OBK GCT + full decoupling + 2nd auction

* In case Market Results are published before 13:20, nomination deadlines from case 1 apply

NO market
results
before

HUB 1

Cross Border
HUB2
Off-Take
Injection

Generation

14:00

14:30

15:00

13:00

14:15

14:30

15:00

13:20

14:45

15:00

15:30

13:50

15:15

15:30

15:30

13:50

15:15

15:30

16:00

126