Professional Documents
Culture Documents
Questionnaire To Town Municipal: Monthly Chief/mayor
Questionnaire To Town Municipal: Monthly Chief/mayor
1.
2.
3.
4.
5.
6.
Length
of
roads
Quality
Roads
made
up of
No of roads No of NH
connecting connecting
to district
to Badami
Total
amount
spent on
repairs
annually
(Rs.)
28.683
'
ii.
Drainage system:
Pattern of
system
(open/und
erground)
iii.
Clean
up of
drainag
e once
in
Safety
measures
taken
while
cleaning
up
Any
technology
used while
clean
up(mention
)
Solid waste:
Pick
up of
solid
waste
/garba
ge
from
house
s
once
in
iv.
Safety
cover
for
manhol
es(yes/
no)
Separat
e
vehicle
is
availabl
e for
solid
waste
collecti
on
(yes/no)
Whethe
r it is
collecte
d
separat
ely as
dry &
wet
waste?
(yes/no)
Separat
e
contain
er
availabl
e?
(yes/no)
Dumpin
g
facility
of this
waste
(commo
n
contain
er/area
outside
town/ot
her)
Whether
the solid
waste/ga
rbage is
recycled?
(yes/no)
Safety
measures
taken
while
recycling
are
Water supply:
Sourc
e of
water
Type of
pipeline
for
water
supply
(Concre
te/plast
ic/ cast
iron
/other)
Wate
r
suppl
y to
hous
es
once
in
If once
a time
then
how
many
hours/
time?
In
summ
er
seaso
n will
the
water
supply
increa
se?
(yes/n
Whethe
r the
purified
water is
being
supplie
d?
(yes/no)
Techni
que of
water
purific
ation
Is any
door
step
water
facility
availabl
e?
(yes/no)
Appx
water
bill of
overa
ll
villag
e
o)
Well,
pipeli
ne
&river
s
v.
Hospital:
No. of
hospita
ls(priva
te+gov
t)
No. of
doctor
s in
Govt.
hospit
al
5
vi.
24*7
treatme
nt in
Govt.
hospital
s(yes/n
o)
yes
Govt.
hospitals
are clean
&
Hygiene?
(yes/no)
No
Free
medicine
facility in
govt
hospital?
(yes/no)
Yes
vii.
Street Light:
% of
taluk
streets
electrifie
d
1149
Street
lights are
operated
manually/
automatica
lly
manually
What
type of
street
lights is
available
to save
the
energy?
Sodium,
mecury
Solar
panel is
used to
generate
sufficient
light?
Yes
solar
panels
used
yes
viii.
Average exp
Lease properties
Rent
Tax
Govt. Funding
Other(specify)
Proposed project
With PPP or By
single Govt.?
Fund amount
Purchasing of Cantenara
at Solid Waste Management
Sit
Contraction of Niramal
Nagar Toilet at
Div.No.21
Construction of CC
Road at Div.No1 in
Tippu Nagar Terdala
House to Ratoda House
Other works
8.0 lakhs
Buildings
3.8 lakhs
Roads
2.08 lakhs
Construction of CC
Drain at Rangntha
Nagar, Anand Nagar
& Old City
Construction of
Lights at Ward No.1
to 23 &
other places
Laying of UGD line at
Anand Nagar, Jaya
Nagar, Rangananth
Bagar & Old City
Constration of CC
Road at Geleya
Balaga to
Kalli Peti Masuti
Storm Water
Drains
20.00 lakhs
Street Lighting
25 lakhs
20 lakhs
Under Ground
Drainag
Roads
7.0 lakhs
15.Schemes:
Name of the
schemes
Implemented from
Used for
No. of beneficiaries