INSPECTION AND TEST PLAN1, 2 )

PROJECT

USER

LOCATION

PJIT

AR
A
W
S

NO.

ACTIVITY

: Approval Required
: Actual Inspection
: Witness Inspection
: Operation Surveillance/Provide

REFERENCE DOCUMENT

M
R
T/C
H

: Monitoring
: Review of Document
: Test Certification Required
: Hold Point

VERIFIED DOCUMENT

V
1
2

: Verification
: 100%
: 10%

ACCEPTANCE CRITERIA

INSPECTION LEVEL
TOTAL

PJIT

MIGAS

R1

R1

R1

R1

R1

R1

1. DOCUMENT REVIEW
1

OWNER QA/QC Procedure

Inspection Certificate & Operating Permit


of Facility of Forklift Base Support
Forklift Manufacturer's Data Report &
Forklift Manual
Installation Document of Forklift Support

4
5
6

- Manual Books
- ASME B 56.1

- Design, Fabrication,
Installation & Inspection
Procedure & Document
- NDT Procedure
- Forklift Manufacturer Data
Report & Forklift Manual
- Inspection, Maintenance,
Repair & History Record

- Inspection Procedure
- Manual Book, Specification &
Regulation

Previous Inspection Report & MIGAS


Operating Permit Certificate
Forklift Repair & History Report

PHYSICAL FORKLIFT INSPECTION (PCI)


1 Structural Component

- Inspection Procedure
- Manual Books
- ASME B 56.1

- Inspection Procedure
- Inspection Report

- Inspection Procedure
- Manual Book, Specification &
Regulation

Hydraulic & Electrical Components

Lifting Chain

Fork & Mast

Welding & Bolting Connections

Non Destructive Testing (NDT)

Prime Mover

Cabin and Overhead Guard

Safety Devices

S/AR

10

PCI Overall Comment

Page 1 of 3

INSPECTION AND TEST PLAN1, 2 )


PROJECT

USER

LOCATION

PJIT

AR
A
W
S

NO.
3

ACTIVITY
Recertification Action
1 Repair Procedure

: Approval Required
: Actual Inspection
: Witness Inspection
: Operation Surveillance/Provide

REFERENCE DOCUMENT

- Inspection Procedure
- Manual Books
- Regulation of Minister of Manpower
Departement No. Per.05/MEN/1985
- ASME B 56.1

M
R
T/C
H

: Monitoring
: Review of Document
: Test Certification Required
: Hold Point

VERIFIED DOCUMENT

- Inspection Procedure
- Rectification Procedure
- Inspection Report

V
1
2

: Verification
: 100%
: 10%

ACCEPTANCE CRITERIA

- Inspection Procedure
- Manual Book, Specification &
Regulation

INSPECTION LEVEL
TOTAL

PJIT

MIGAS

S/AR

R1

Repair Activity

Inspection

Non Destructive Testing (NDT)

Resume of Rectification Action

S/AR

R1

FUNCTIONAL TESTING
1 Functional Testing Procedure

- Inspection Procedure
- Manual Books
- ASME B 56.1

- Inspection Procedure
- Functional Testing Procedure
- Inspection Report

- Inspection Procedure
- Manual Book, Specification &
Regulation

Functional Testing Execution

Post Functional Testing Inspection

Functional Testing Release Note

S/AR

AR

AR

S/AR

AR

LOAD TESTING ( If Required )


1 Load Testing Procedure/Sequence
2

Load Testing Execution

Post Inspection of Load Testing

Load Testing Release Note

- Inspection Procedure
- Manual Books
- ASME B 56.1

- Inspection Procedure
- Load Testing Procedure
- Inspection Report

- Inspection Procedure
- Manual Book, Specification &
Regulation

Page 2 of 3

INSPECTION AND TEST PLAN1, 2 )


PROJECT

USER

LOCATION

PJIT

AR
A
W
S

NO.
6

ACTIVITY

: Approval Required
: Actual Inspection
: Witness Inspection
: Operation Surveillance/Provide

REFERENCE DOCUMENT

M
R
T/C
H

: Monitoring
: Review of Document
: Test Certification Required
: Hold Point

VERIFIED DOCUMENT

V
1
2

: Verification
: 100%
: 10%

ACCEPTANCE CRITERIA

INSPECTION LEVEL
TOTAL

PJIT

MIGAS

REPORTING
1

Final Inspection Report


Inspection Certificate

- Inspection Procedure
- Manual Books
- ASME B 56.1

- Inspection Report
- Inspection Certificate
- New Load Chart & Table
- Any Recommendations

- Inspection Procedure
- Manual Book, Specification &
Regulation

Report Handling to MIGAS

MIGAS Operating Permit

S/AR

Note
1 : This ITP is the minimum requirement, and for practical implementation, it shall be added necessarily in accordance with the actual Forklift type, model and or the contract requirement.
2 : Regularly, this ITP will be reviewed and evaluated for a new revision by the team formed by MIGAS.

Page 3 of 3

You might also like