CONCRETE GRADE:
M5 = 1:4:8
M10= 1:3:6
M15= 1:2:4
M20= 1:1.5:3
M25= 1:1:2
CLEAR COVER TO MAIN REINFORCEMENT:
1.FOOTINGS : 50 mm
2.RAFT FOUNDATION.TOP : 50 mm
3.RAFT FOUNDATION.BOTTOM/SIDES : 75 mm
4.STRAP BEAM : 50 mm
5.GRADE SLAB : 20 mm
6.COLUMN : 40 mm
7.SHEAR WALL : 25 mm
8.BEAMS : 25 mm
9.SLABS : 15 mm
10.FLAT SLAB : 20 mm
11.STAIRCASE : 15 mm
12.RET. WALL : 20/ 25 mm on earth
13.WATER RETAINING STRUCTURES : 20/30 mm
WEIGHT OF ROD PER METER LENGTH:
DIA WEIGHT PER METER
6mm = 0.222Kg
8mm = 0.395 Kg
10mm = 0.616 Kg
12mm = 0.888 Kg
16mm = 1.578 Kg
20mm = 2.466 Kg
25mm = 3.853 Kg
32mm = 6.313 Kg
40mm = 9.865 Kg
1bag cement-50kg
1feet-0.3048m
1m-3.28ft
1sq.m-10.76sq.f t
1cu.m-35.28cu.f t
1acre-43560sq.f t
1cent-435.6sq.f t
1hectare-2.47ac re
1acre-100cent-4 046.724sq.m
1ground-2400sq. ft
1unit-100cu.ft- 2.83cu.m 1square-100sq.f t
1 M LENGTH STEEL ROD I ITS VOLUME
V=(Pi/4)*Dia x DiaX L=(3.14/4)x D x D X 1 (for
1m length) Density of Steel=7850 kg/ cub meter
Weight = Volume x Density=(3.14/4)x D x D X
1x7850 (if D is in mm ) So = ((3.14/4)x D x D X
1x7850)/(1000x1000) = Dodd/162.27
DESIGN MIX:
M10 ( 1 : 3.92 : 5.62)
Cement : 210 Kg/ M 3
20 mm Jelly : 708 Kg/ M 3
12.5 mm Jelly : 472 Kg/ M 3
River sand : 823 Kg/ M 3
Total water : 185 Kg/ M 3
Fresh concrete density: 2398 Kg/M 3
M20 ( 1 : 2.48 : 3.55)
Cement : 320 Kg/ M 3
20 mm Jelly : 683 Kg/ M 3
10.35Kg 0.21
17. Grano Flooring CC 1:1.5:3 1440/1.5*0.45*0.05
21.60Kg 0.43
18. Plastering CM 1:3, 12mm tk 1440/3*0.014
6.72Kg 0.13
19. Wall Plastering CM 1:4,
12mm tk 1440/4*0.014 5.00Kg 0.10
20. Laying Pressed Tiles Over
a CM 1:4, 20mm tk 1440/4*0.022 7.92Kg 0.16
21. Ceramic Tiles, Marble,
Granite, Caddapah Slab
CM 1:4, 20mm tk 1440/4*0.022 7.92Kg 0.16
22. Hollow Block Masonry
CM 1:6, 200mm tk/m2 10.00Kg 0.20
SAND CALCULATION (CFT):
01. Any Concrete Work
(PCC, RCC) 0.45*35.315= 20.00
02. Damp Proof Course
CM `1:3, 20mm tk 1.00
03. 2"tk Precast slab M15 1.00
04. 3"tk Precast slab M15 1.50
05. SS Masonry in CM 1:7 15.00
06. Brick Work in CM 1:6 15.00
07. Brick Work in CM 1:4,115mm tk 2.00
08. Grano Flooring in CC 1:1.5:3 1.00
09. Plastering in CM 1:3, 12mm tk 1.00
10. Wall Plastering CM 1:4, 12mm tk 1.00
11. Laying Pressed Tiles over a CM 1:4, 20mm tk
1.00
12. Ceramic Tiles, Marble, Granite, Cuddapah slab