Engineering Wing CS Notes 9-12-14
Engineering Wing CS Notes 9-12-14
Engineering Wing CS Notes 9-12-14
1
2
ADP.NO
74110027
NONADP
637120214
636120212
637120214
1047120647
7
8
1047120647
1047120647
1047120647
10
1048120890
11
1048120890
12
1048120890
Project Name
Approved
cost
Payment
Made to
contractor
Progress in
% Done
Amount of
Technical
Sanction
15.48M
13.8 M
100%
17.028 M
45.4M
30.00 M
70%
45.4 M
10M
10.00 M
95%
10.00 M
50M
50.00M
80%
55.00 M
20M
17.3 M
86%
20.00 M
21.03 M
4.26 M
50%
23.133 M
26.017M
00 M
05%
28.618 M
6.409 M
1.34 M
30%
7.10 M
6.456 M
3.00 M
60%
7.10 M
15.28 M
00 M
00%
16.80 M
50.16 M
23.00 M
40%
55.16 M
4.3 M
95%
9.6 M
8.76M
13
1026110562
14
1025100230
15
640120096
Establishment Of
Water Sports
Recreational Facilities
In Sardaryab
Rehabilitation of
Hayatabad Sports
Complex Peshawar
Youth center at chitral
50M
18.5 M
30%
55.00 M
127.9M
61.48 M
40%
164.9 M
20M
9.00 M
40%
22.00 M
ADP.NO
1051-140036
1028-130054
1053-140037
1034-130059
1032-130068
Project Name
Approved
cost
50 M
10 M
50 M
50 M
20 M
committee to study the issue of sixteen technical sanctions and pin point the
loop holes. Similarly the new tendering process be carried out in consultation
with Communication and works department on board. Lastly the work may be
continued in opinion of the Engineering Wing of this Department as its
stoppage may result in cost over runs.
4.
6.
technical sanctions cost claim whereas the progress on the schemes under
implementation are expected to be completed at the earliest possible.
SECRETARY
SPORTS & TOURISM
CHIEF SECRETARY,
KHYBER PAKHTUNKHWA