Professional Documents
Culture Documents
Electronic Vs Pyrotechnic Detonators (v2 Email)
Electronic Vs Pyrotechnic Detonators (v2 Email)
Pyrotechnic Detonators
Presented by Philipa Lamb
RedBull Powder Company Ltd
Overview
Electronic Delay Detonator
Background
Methodology
Case Studies
Capacitor
Lead
Wire
Earth
Spike
Fuse
Head
Microchip
Primary
Charge
Base
Charge
Pyrotechnic Detonator
Conclusions
Sealer Crimp
Crimp
Shock Tube
Bushing
Isolation
Cup
Delay Train
Primary
Charge
Base
Charge
Background
Historic Review of Scatter
Safety Fuse 1 meter
10000
1000
Electric
Detonators
100
Pyrotechnic
Detonators
10
First
Generation
Electronic
Delay
Detonators
0.1
1860
1910
1925
1950 1950
1965 1965
1990 1990
2003
Relative Effect
Relative Electronic
Timing Probability
60%
66% Confidence
Interval for
Pyrotechnic
40%
20%
25 ms
-40
-20
20
40
Relative
Pyrotechnic Timing
Probabiliy
60
80
100
120
Relative Effect
Relative Electronic
Timing Probability
60%
40%
66% Confidence
Interval for
Pyrotechnic
20%
Relative
Pyrotechnic Timing
Probabiliy
35 ms
-40
-20
20
40
60
80
100
120
Methodology Conclusion
Basalt Quarry
Aim
To control vibration while
blasting next to main highway
and archeological site
Result
Vibration levels controlled
through use of explosive
decking and timing optimisation
Production levels maintained
Conclusion
Significant improvement in
vibration control through the
use of electronic detonators
Basalt Quarry
Aim
Maintain
production levels
while complying
to vibration limits
of 5mm/s (PPV)
Methodology
Delay optimisation
for vibration
control
Sequential
delaying of
explosive decks
within each blast
Basalt Quarry
175ms
0ms
35ms
350ms
70ms
140ms
280ms
105ms
455ms
245ms
420ms
210ms
595ms
385ms
Basalt Quarry
Results
Production blasting
achieved to within 35m
of quarry boundary
Frequency channelling
improved the public
perception of blasting
Conclusion
Extended the reserves
of the quarry through
the use of electronic
detonators
10
Calculated
PPV
8
6
Limit
Actual
PPV
2
0
85
68
52
35
Aim
Increase
predictability of
vibration
Improve
fragmentation
Improve mining
production
Total Mine
Production (BCM)
Pyrotechnics
Electronics
North Wall
April
July
October
Date (2002)
December
Conclusion
Mine converted to
electronic system
Oversize Comparison
Total Mine
Pyrotechnics
Electronics
North Wall
April
July
Date (2002)
October
December
Aim
To improve the
stability of high walls
To improve cast,
fragmentation and
dragline production
Methodology
To use the flexibility
of electronic timing
to reduce the
vibration that affects
the high walls
stability
Results
High walls stable where previously pyrotechnic
presplit had failed
Improved fragmentation
Conclusion
Mine converted to electronic system