Products Traceability and Identification Procedure
Products Traceability and Identification Procedure
Products Traceability and Identification Procedure
Issue date
Issue
.No
:
:
1/8/2012
1
Page
1/9
Doc Code
PN-DP-02
:Issue authorities
:
Planning manager
:Review authorities
:
Management representative
:Approve authorities
:
1/8/2012
.Quality manager
Page
2/9
Doc Code
PN-DP-02
.General Manager
Distribution list
Serial
1
2
3
4
5
6
7
8
9
Job
Planning manager
.Finance manager
Production manager.
.Quality manager
Factory manager
H.R manager
Store manager
Sales manager
General manager
Index of continents
S/N Subject.
Page
Modification record
Purpose
Scope
Responsibilities
1
2
6
7
:
:
1/8/2012
1
Page
3/9
Doc Code
PN-DP-02
5-7
Process steps
Flow chart
1- Modification records
.No
.Issue No
Issue date
Modification description
:
:
1/8/2012
1
Page
4/9
Doc Code
PN-DP-02
:Purpose-2
To be sure of applying a well developed procedure for product traceability
:Scope-3
- Raw material, production requirements and finish products
4- Responsibility
- Production engineer responsible for marking all product cable drums in different
operations
:
:
1/8/2012
1
INPUTS
1- Customer Complainant.
2- Sale returns
3- Non-conforming products
during in-process
4- Incoming materials
4- Final products
5- In-process products
PROCES
S
Process For
product
traceability and
identification
Page
5/9
Doc Code
PN-DP-02
OUTPUTS
1- Material identification
card
2- Identified in-process
products
3- Identified final products
during storage
4- Rejected cause analysis
after traceability from
company records
6- Process Steps:
6.1To tracing the products in different operations as follow
process
Tracing cards
Tracing documents
Material
Item card
Raw Materials Inspection -1
inspection ,
Documents
storage
Raw material testing -2
documents
Drawing
Production
Production card
Drawing card
Reference
.Identification card
..
Input drum No -1
Job order No -2
:
:
1/8/2012
1
Page
6/9
Doc Code
PN-DP-02
Production -3
operator
Machine -4
.Production date -5
Stranding
Production
stranding card
Production card
Insulation
Production
insulation
card
Production card -1
Coiling
Production
coiling card
Production card
Production -1
operator
Shift production -2
date
.Job order No -3
.Job order No -1
Production -2
operator
product size, -3
color and
description
.Job order No -1
Production -2
operator
Shift production -3
date
Coiling machine -4
process
Assembly
Bedding
Tracing cards
Production
assembly card
Tracing documents
Production card
Production
bedding card
Production card
Reference
Input drums -1
.Order No -2
production -3
operator
Shift production -4
date
Input drum -1
.Order No -2
:
:
1/8/2012
1
Page
7/9
Doc Code
PN-DP-02
production -3
operator
Shift production -4
date
Armoring
Production
armoring card
Production card
Input drum -1
.Order No -2
Sheathing
Production
sheathing
card
Production card
production -3
operator
Shift production -4
date
Input drum -1
.Order No -2
production -3
operator
Shift production -4
date
process
Electrical test
Finish product
warehouse
Tracing cards
Metallic card
Finish -1
product card
Coiling -2
Tracing documents
Finish products addition card
Reference
Input drums -1
.Order No -2
Quality -3
technician
Shift production -4
date
.Drum No -1
Manufacturing -2
date
:
:
1/8/2012
1
sticker
Page
8/9
Doc Code
PN-DP-02
Customer name -3
Manufacture -4
country
Dispatch
Finish -1
product card
Delivering authorization
.Drum No -1
Manufacturing -2
date
Customer name -3
Coiling -2
sticker
Manufacture -4
country
:Notes
The tracing may be finished at any previous process according to the problem type and the
reasons for problem
7- Flow chart:
Customer complaint
or sale returns
1/8/2012
Page
9/9
Doc Code
PN-DP-02
Review
product
identification
sticker
Review
machine
productivity to
know
operation
condition
Drum
Check drawing and stranding steps and machine productivity to know operation condition
Supplier to take
necessary action