A PROJECT PROPOSAL
ON BANKING SYSTEM
A PROJECT PROPOSAL
SUBMITTED BY
Dileep Rana
(14050004)
Kishor Dangaura
(14050005)
Padam Bohara
(14050007)
SUBMITTED TO
RESEARCH AND DEVELOPMENT DEPARTMENT
DHANGADHI ENGINEERING COLLEGE
DHANGADHI, KAILAI
EXECUTIVE SUMMARY
Bank is an institution in which primarily deals with in money receiving it on
deposit from customer, honouring customer drawing against such deposit on
demand, collecting cheque for customers and lending or investing surplus
deposit unit require for re-payment.
Banking System keeps the day by day tally record as a complete banking. It
can keep the information of Account type, account opening form, Deposit,
Withdrawal, and Searching the transaction, Transaction report, Closing Account
and Searching account details.
PROBLEM STATEMENT
Our project team study and analyze about banking system and we found that presently
recording of data are done with manually. That is if a customer wants to show his
transaction then there are many difficult.
PROBLEMS WITH EXISTING SYSTEM
Time consuming.
To avoid all these limitations and make the working more accurately the system needs
to be computerized.
OBJECTIVE OF PROPOSED SYSTEM
The objective of proposed system is to develop a system of improved facilities. The
system provides proper security and reduces the manual work.
ADMINISTRATIVE MODULE
This module is the main module which performs all the main operations in the
system. The major operations in the system are:
SYSTEM DESIGN
Design is the first step into the development phase for any engineered product
or system. It may be defined as a process of applying various techniques and
principles for the purpose of defining a device, a process or a system in sufficient
detail to permit its physical realization. System design goes through two phases of
development: Logical and Physical Design.
MAINTENANCE
Once the system phases all the tests, it is developed to the customer and enters the
maintenance. Any modification made to the system after the initial delivers are
usually recognized to this phase.
TIME SCHEDULE
The entire operation for preparing this system will complete during 23rd December 2014 to
22nd January 2014.
Phases
Dec
Dec
Jan
Jan
Jan
Jan
23rd-27th
28th-31st
1st-5th
6th-14th
15th-18th
19th-22nd
Requirement
Analysis
Planning
Approved By :
..
Research and Development Department,
Dhangadhi Engineering College