Amal HRSG -1 Project


Section C5 Schedule D - Page 1 of 10

Petroleum Development Oman L.L.C.


Schedule D - Unit Rates for Alterations & Day Works C-5

C311333
Amal HRSG -1 Project
Section C5 Schedule D - Page 2 of 10

Unit Rates for Alterations & Dayworks


CIVIL WORKS
Ref.
No.

1.

DESCRIPTION

UNIT

Excavation

a)

Hand excavation in all types of soil except rock to reduce


levels, for pits, trenches, foundations, etc. including support
to sides of excavation all as per PDO-ERD-17-01.

b)

Ditto but rock excavation or breaking up existing reinforced


concrete.

c)

Mechanical excavation in all types of soil except rock.

d)

Mechanical rock excavation.

1.

Filling

a)

Backfilled into excavations and compacted in 200 mm layers


including removing surplus materials from the Site all as per
PDO-ERD-17-01.

a)

Selected excavated material

b)

Imported granular material

c)

Sand bedding for cable trench

d)

35 mm Gravel filling ( switchyard area )

e)

Cable warning tape

f)

Cable tile

No

2.

Plain Cement Concrete

a)

Supply and place plain concrete including any required


formwork.

b)
c)
d)

15 N/mm
25 N/mm
35 N/mm

2
2
2-

3.

Reinforced Cement Concrete

a)

Supply and fix reinforced concrete including any required


formwork.

a)
b)
c)

25 N/nm
35 N/nm

2
2

Extra over all concrete rates for sulphate resisting or


supersulphated cement

m
m
m

m
m
m
m

m
m
m

m
m
m

3
3
3

3
3
3
3

3
3
3

3
3
3

UNIT RATE
RO

C311333
Amal HRSG -1 Project
Section C5 Schedule D - Page 3 of 10

CIVIL WORKS
Ref.
No.

DESCRIPTION

UNIT

4.

Reinforcement

a)

Supply and install high yield steel rod reinforcement of all


diameter bars to BS 4449.

kg.

b)

Supply and install A 142 fabric reinforcement to BS 4483.

c)

Supply and install A 193 fabric reinforcement to BS 4483.

d)

Supply and install A 252 fabric reinforcement to BS 4483.

5.

Foundation protection

a)

Supply and place 1000


concrete foundations.

b)

Foundation Protection including Protection of Concrete


surfaces in contact with soil (including top of blinding
concrete) up to 150mm above Grade Level by painting (DFT =
600 microns minimum) with NITOCOAT PE-135 or MASTER
SEAL-550 or equivalent product.

c)

Underside of Foundations to be protected with 1000 gauge


Polythene Sheet.

6.

Grouting

a)

Cement and sand (1:2) with non-shrinkable grout to


machinery bed plates, steel structure base plates and the like.

7.

Anchor Bolts

a)

Supply, install and cast anchor bolts as per standard drawing


STD-2-3950-01-A3-A, including cutting pocket and grouting.

8.

Block work

a)

200mm compound wall of load bearing hollow concrete block


work (10.5 N/mm2 at 28 days) in cement mortar (1:4).

b)

200mm hollow block internal wall in filled with Grade 15


concrete and T10Rebar

c)

350mm external cavity wall consisting of 100mm solid block


external skin, 200mm hollow block internal skin and 50mm
cavity filled with mineral wool like Polystyrene or rock fiber
insulation. In filled with Grade 15 concrete and T10Rebar

9.

Plastering

a)

Plastering / rendering of block wall and concrete surface using


CM 1:4 including providing galvanized corner heads, angle
beads and expanded metal lathes required etc complete.

b)

15mm thick external plaster

c)

15mm thick internal plaster

gauge

polythene

sheet below

m
m
m

m
m

2
2
2

2
2

item

m
m

3
3
3

2
2

UNIT RATE
RO

C311333
Amal HRSG -1 Project
Section C5 Schedule D - Page 4 of 10

CIVIL WORKS
Ref.
No.

DESCRIPTION

UNIT

d)

13mm thick ceiling plaster

10.

Painting

a)

Prepare and apply one coat of primer and two coats of paint
of approved shade on concrete and plastered surfaces

b)

External and internal walls - washable and steam resistant


emulsion paint with matt finish (Refer ' W3'. Appendix D of
PDO-ERD-17-04)

c)

Ceiling - emulsion paint (Refer ' C2'. Appendix G of PDO-ERD17-04)

11.

Fencing

a)

Supply and erect chain link fencing all in accordance with


Specification and drawing No. STD 2 1601 01.

b)

Single gate (type 20) as described on drawing No. STD 2 1625


20.

No.

c)

Double gate (type 7) as described on drawing No. STD 2 1625


007.

No.

12.

Roads

a)

Shape and trim excavation onto falls.

b)

Naturally occurring rock and gravel compacted sub-base.

c)

300 mm road base of fine graded stone.

d)

50 mm thick bitumen, aggregate premix as bearing course.

e)

250 x 125 mm flush precast concrete kerb and including


concrete bed and launch.

13.

Steelworks

m
m

m
m
m
m

2
2

2
3
2
2

Supply, fabricate, galvanise and erect steelwork and


metalwork including all cutting, notching, drilling, bolting,
welding and fixing.
Applicable for Gantry, Cross arms and Cross bracing of OHL
structure, Stay blocks for OHL structure, Switchyard
Equipment support structure.
a)

Heavy steelwork weighing more than 22 kg/m

kg

b)

Light steelwork weighing up to 22kg/m.

kg

c)

Hand railing and balustrading.

kg

d)

Ladders and caged ladders.

kg.

14.

Preliminary excavation and backfilling for HRSG

UNIT RATE
RO

C311333
Amal HRSG -1 Project
Section C5 Schedule D - Page 5 of 10

CIVIL WORKS
Ref.
No.

a)

DESCRIPTION

Unit adjustment rate for Civil Works associated with


preliminary excavation and backfilling for HRSG (See
Schedule B3)

UNIT

UNIT RATE
RO

C311333
Amal HRSG -1 Project
Section C5 Schedule D - Page 6 of 10

PLANT
Ref.
No.

1.

DESCRIPTION

Unit

6.6kV Cabling

a)

6.6kV 400 Amps three phase cable, supply, direct buried, test
and commission.

b)

6.6kV 300 Amps three phase cable, supply, install direct


buried, test and commission.

c)

6.6kV termination, supply, install, test and commission

each

d)

6.6kV straight joint, supply, install, test and commission

each

2.

33kV Cabling

a)

33kV 400 Amp three phase cable, supply, install direct buried,
test and commission.

b)

33kV termination, supply, install, test and commission

each

c)

33kV straight joint supply, install, test and commission

each

d)

33kV Outdoor single phase sealing end, supply install, test


and commission.

each

3.

Concrete cable trench

a)

Concrete cable trench, with covers, 2000mm wide 1000mm


deep.

b)

Concrete cable trench, with covers, 2000mm wide 1000mm


deep suitable for vehicle road crossing.

UNIT RATE
RO

C311333
Amal HRSG -1 Project
Section C5 Schedule D - Page 7 of 10

ENGINEERING & DESIGN


Ref.
No.

DESCRIPTION

Unit

Design Engineer

Hr.

Lead Discipline Engineer

Hr.

Protection Engineer

Hr.

Electrical Engineer substation

Hr.

Electrical Engineer OHL transmission

Hr.

Civil Engineer substation

Hr.

Civil Engineer OHL transmission

Hr.

Commissioning Engineer

Hr.

QA/QC Engineer

Hr.

10

Designer

Hr.

11

Draughtsman

Hr.

12

Technical Assistant

Hr.

14

Telecom Site Supervisor / Engineer

Hr

UNIT
RATE RO

OVERTIME
UNIT
RATE RO

UNIT
RATE RO

OVERTIME
UNIT
RATE RO

23
SITE LABOUR
Ref.
No.

DESCRIPTION

Unit

Mechanical
1

Foreman

Hr.

Welder

Hr.

Pipe Fitter / Fabricator

Hr.

Millwright

Hr.

Rigger

Hr.

Plant Fitter

Hr.

A/C Mechanic

Hr.

Instrument Pipe Fitter

Hr.

Electrical and Instrumentation


9

Foreman

Hr.

10

Electrician

Hr.

11

Cable Jointer

Hr.

12

Telecom Technician

Hr.

C311333
Amal HRSG -1 Project
Section C5 Schedule D - Page 8 of 10

SITE LABOUR
Ref.
No.

DESCRIPTION

Unit

UNIT
RATE RO

OVERTIME
UNIT
RATE RO

Civil and Miscellaneous


13

Foreman

Hr.

14

Mason

Hr.

15

Concrete Labourer

Hr.

16

Unskilled

Hr.

17

Painter

Hr.

18

Steel Fixers

Hr.

19

Steel Erectors

Hr.

20

Plasterers

Hr.

21

Plant Operator

Hr.

22

Light Duty Driver

Hr.

Plant
Ref.
No.

DESCRIPTION

Unit

Portable compressor, 4.6 m3/min (complete with


air dryer with -20 oC water dewpoint capability)

Hr.

including tools and hoses.


2

Compressor, hoses and breaker to 10 m3/m

Hr.

Dumper, 0.53 m3 capacity

Hr.

Dumper, 1.00 m3 capacity

Hr.

Excavator, 0.50 m3 capacity

Hr.

Tipper truck, 7/10 ton

Hr.

Mobile crane, 15 ton

Hr.

Concrete mixer, reversing drum with hopper


(0.20/0.15)

Hr.

Concrete mixer, reversing drum with hopper,


weigher and feed shovel (0.40/0.28)

Hr.

10

Vibrator poker type

Hr.

11

Water Bowser 5000 litres

Hr.

12

Front end loader

Hr.

13

Tipper truck of 20T/24T

Hr.

14

Gas cutting gear

Hr.

UNIT
RATE RO

OVERTIME
UNIT
RATE RO

C311333
Amal HRSG -1 Project
Section C5 Schedule D - Page 9 of 10

15

Backhoe 1.0 cubic meters capacity

Hr.

16

JCB 3c or equivalent

Hr.

17

Pick-up truck

Hr.

18

Truck 5T

Hr.

19

50T Crane

Hr.

20

15T Crane

Hr.

21

5T Crane

Hr.

22

Water bowser 5 m3 capacity

Hr.

23

Generator 10 - 25 KW

Hr.

24

Generator 100 - 15 KW

Hr.

25

Generator 150 - 240 KW

Hr.

26

Temporary Generator 5 MVA 11kV

26

Diesel welding set (400 A)

Hr.

27

Electrical welding set (400A)

Hr.

28

Air compressor 250 CFM (including air dryer with


-20oC water dewpoint capability)

Hr.

29

Ditto 600 CFM

Hr.

30

Fill pump 1000 GPM including hoses etc.

Hr.

31

High pressure test pump including hoses etc.

Hr.

32

Blast unit,
personnel

Hr.

33

Bucket Truck

fully

operational

Per Day

with

operating

Hr

PERCENTAGE ADJUSTMENT FOR OVERHEADS


MATERIALS PROCUREMENT

FOR

ADDITIONAL SERVICES

AND

(Refer Section C5, Schedule A Preambles paragraph 4)


Ref.
a

Applicable Schedule

% Adjustment

ADDITIONAL SERVICES Adjustment to the net cost of additional services for


costs of handling, administration, financing, overheads,
profit and all other costs related to the procurement of
such additional services.

+/- 3%

ON COSTS ON IMPORTED MATERIALS

+/- 3%

Adjustment to the net cost of Materials procured locally


or GCC countries, for costs of handling, administration,
financing, overheads, profit and all other costs related
to such procurement.

C311333
Amal HRSG -1 Project
Section C5 Schedule D - Page 10 of 10

IMPORTED MATERIALS
Adjustment to the net cost of Materials procured from
outside of the GCC countries for costs of handling,
administration, financing, overheads, profit, all other
costs related to such procurement.

+/- 3%