Professional Documents
Culture Documents
HVAC Testing & Commissioning Schedule-LABS
HVAC Testing & Commissioning Schedule-LABS
HVAC Testing & Commissioning Schedule-LABS
EQUIPMENT-LAB PROJECT
Activity ID
28-Mar-15 10:36
Activity Name
Original
Duration
COMMISSIONING A
AND TAB PROGRAMME FOR HVAC EQUIPMENT-LAB PROJECT
GENERAL
Activity % Start
Complete
181
25-Mar-15
03-Dec-15
181
25-Mar-15
03-Dec-15
03-Dec-15
181
25-Mar-15
A1070
0% 25-Mar-15
A1080
Permenant Power On
0% 25-Mar-15
A1090
0%
POWER SUPPLY
COMMISSIONING PROCEDURE
WITH TEMPORARY P
POWER SUPPLY
Finish
03-Dec-15
97
25-Mar-15
16-Jul-15
90
25-Mar-15
08-Jul-15
08-Jul-15
90
25-Mar-15
A1001
Close all inlet and outlet gate valves for all Chillers, AHU's,ERU's and FCU
0% 25-Mar-15
30-Mar-15
A1002
Open bypass valves for chilled water system which installed at header and riser
0% 30-Mar-15
31-Mar-15
A1003
0% 30-Mar-15
31-Mar-15
A1004
0% 30-Mar-15
31-Mar-15
A1005
0% 31-Mar-15
05-Apr-15
A1006
Fill and drain system with circulate the water by chilled water pump
45
0% 05-Apr-15
27-May-15
A1007
Check for water colour(visual inspection) and start bleeding till water colour becomes clear
0% 27-May-15
28-May-15
A1008
Open all inlet and outlet gate valves for all Chillers, AHU's,ERU's and FCU
0% 28-May-15
02-Jun-15
A1009
0% 28-May-15
02-Jun-15
A1010
Fill and drain the system with circulate the water by chilled water pump
10
0% 02-Jun-15
14-Jun-15
A1011
0% 14-Jun-15
23-Jun-15
A1012
Check for water colour(visual inspection) and start bleeding till water colour becomes clear
10
0% 23-Jun-15
05-Jul-15
A1013
Send water sample to lab and follow lab instruction to add the recommended quantity of pre-chemical
0% 05-Jul-15
07-Jul-15
A1014
Send water sample to lab and follow lab instruction to add the permanant chemical
0% 07-Jul-15
08-Jul-15
FLUSHING PROCEDURE
PROCED
FOR CHILLED WATER SYSTEM
FLUSHING PROCEDURE
PROCED
FOR CONDENSING WATER SYSTEM
30
25-Mar-15
29-Apr-15
A1015
Close all inlet and outlet gate valves for all Chillers Condenser
0% 25-Mar-15
26-Mar-15
A1016
0% 25-Mar-15
26-Mar-15
A1017
0% 25-Mar-15
26-Mar-15
A1018
0% 26-Mar-15
28-Mar-15
A1019
Fill and drain the system with circulate the water by condenser water pump
15
0% 28-Mar-15
14-Apr-15
A1020
Check for water colour(visual inspection) and start bleeding till water colour becomes clear
0% 14-Apr-15
20-Apr-15
A1021
Open all inlet and outlet gate valves for all Chillers Condenser
0% 14-Apr-15
20-Apr-15
A1022
0% 14-Apr-15
20-Apr-15
Page 1 of 3
Oracle Corporation
28-Mar-15 10:36
Activity Name
Original
Duration
Activity % Start
Complete
Finish
A1023
Fill and drain the system with circulate the water by condenser water pump
0% 20-Apr-15
26-Apr-15
A1024
Check for water colour(visual inspection) and start bleeding till water colour becomes clear
0% 20-Apr-15
26-Apr-15
A1025
Send water sample to lab and follow lab instruction to add the recommended quantity of pre-chemical
0% 26-Apr-15
28-Apr-15
A1026
Send water sample to lab and follow lab instruction to add the permanant chemical
0% 28-Apr-15
29-Apr-15
25-Mar-15
31-Mar-15
COMMISSIONING O
OF CHILLED WATER PUMPS (5NOS)
A1031
0% 25-Mar-15
31-Mar-15
A1032
0% 25-Mar-15
31-Mar-15
A1033
Start up the pump and check for pressure reading and motor amp
0% 25-Mar-15
31-Mar-15
25-Mar-15
31-Mar-15
COMMISSIONING O
OF CONDENSER WATER PUMPS (5NOS)
A1034
0% 25-Mar-15
31-Mar-15
A1035
A1036
5
5
0% 25-Mar-15
0% 25-Mar-15
31-Mar-15
31-Mar-15
97
25-Mar-15
16-Jul-15
30
25-Mar-15
29-Apr-15
WITH PERMANENT P
POWER SUPPLY
COMMISSIONING O
OF AIR HANDLING UNIT (86 NOS)
A1037
30
0% 25-Mar-15
29-Apr-15
A1038
30
0% 25-Mar-15
29-Apr-15
A1039
30
0% 25-Mar-15
29-Apr-15
A1040
30
0% 25-Mar-15
29-Apr-15
14
25-Mar-15
11-Apr-15
COMMISSIONING O
OF FAN COIL UNIT (42 NOS)
A1041
14
0% 25-Mar-15
11-Apr-15
A1042
14
0% 25-Mar-15
11-Apr-15
A1043
14
0% 25-Mar-15
11-Apr-15
29-Apr-15
07-May-15
COMMISSIONING O
OF HEAT RECOVERY UNIT (15 NOS)
A1044
0% 29-Apr-15
07-May-15
A1045
0% 29-Apr-15
07-May-15
A1046
0% 29-Apr-15
07-May-15
A1047
0% 29-Apr-15
07-May-15
COMMISSIONING O
OF WATER COOLED CHILLER (5 NOS)
08-Jul-15
16-Jul-15
A1048
Put on the main power & energize the crank case heater
0% 08-Jul-15
16-Jul-15
A1049
0% 08-Jul-15
16-Jul-15
A1050
Commission the chiller in coordination with the supplier (24 hrs under observation)
0% 08-Jul-15
16-Jul-15
08-Jul-15
16-Jul-15
COMMISSIONING O
OF COOLING TOWER (5 NOS)
Page 2 of 3
Oracle Corporation
Activity Name
28-Mar-15 10:36
Original
Duration
Activity % Start
Complete
Finish
A1051
0% 08-Jul-15
16-Jul-15
A1052
0% 08-Jul-15
16-Jul-15
A1053
0% 08-Jul-15
16-Jul-15
A1054
Commission the cooling tower in coordination with the supplier and record motor amp
0% 08-Jul-15
16-Jul-15
COMMISSIONING O
OF FANS
A1055
A1056
TAB PROCEDURE
30
25-Mar-15
29-Apr-15
30
0% 25-Mar-15
29-Apr-15
30
0% 25-Mar-15
29-Apr-15
203
11-Apr-15
03-Dec-15
30
16-Jul-15
20-Aug-15
A1057
Open all gate and balancing valve fully open & take GPM reading
30
0% 16-Jul-15
20-Aug-15
A1058
Adjust balancing valve at required GPM (start by pump, chiller and riser)
30
0% 16-Jul-15
20-Aug-15
A1059
WATER SIDE
AIR SIDE
AHU'S ALONG ERU
30
0% 16-Jul-15
20-Aug-15
203
11-Apr-15
03-Dec-15
180
07-May-15
03-Dec-15
A1060
180
0% 07-May-15
03-Dec-15
A1061
Adjust the dampers for fresh air and closed the return as required
180
0% 07-May-15
03-Dec-15
A1062
180
0% 07-May-15
03-Dec-15
A1063
180
0% 07-May-15
03-Dec-15
A1064
180
0% 07-May-15
03-Dec-15
15
11-Apr-15
28-Apr-15
A1065
15
0% 11-Apr-15
28-Apr-15
A1066
15
0% 11-Apr-15
28-Apr-15
A1067
15
0% 11-Apr-15
28-Apr-15
Page 3 of 3
Oracle Corporation