Professional Documents
Culture Documents
CDP Barela English
CDP Barela English
ftyk&tcyiqj e0iz0
okMZ dzekad 10] esu jksM+ e.Myk] cl LVS.M cjsyk] Qksu ua- 0761&2890426 bZ&esy cmobarela@mpurban.gov.in
dzekad 1253@u-ik-@LFkk-@2013&14@
izfr]
vkj-Ogh- ,lksfl,V~l
bathfu;j ,.M vkfdZVDs V
gSnjkckn vka/kzizns k
fok; %&
lanHkZ %&
uxj ifjkn cjsyk ds izLrko dz- 04 ladYi dz- 132 fnukad 13-09-2013
&&%%0%%&&
egksn;]
fok;kUrxZr lanHkZ esa ys[k gS fd vkidh Vhe ds }kjk uxj {ks= cjsyk dh
uxj fodkl ;kstuk rS;kj dh xbZ gSA bl ;kstuk ds vuqeksnu gsrq ifjkn iVy ij j[kk
x;k] ,oa ik;k x;k fd ;kstuk Hkfo; dks /;ku esa j[kdj rS;kj dh xbZ gSA
mijksDr ;kstuk dks ifjkn dh foksk cSBd fnukad 13-09-2013 ds izLrko
dzekad 04 ds ladYi dzekad 132 ds }kjk Lohd`fr iznku dh tk pqdh gSA
layXu %&
gLrk{kj lgh@&
v/;{k
uxj ifjkn cjsyk
City Profile
Company Name
ULB Name
Whether the Sectoral Analysis report is as per UADD requisites
Town Brief
In one or two
sentences
Historic importance
Population
Latitude
Longitude
MM
Mts
Sq kms
Sq kms
Sq kms
Date
6857
8995
10880
Town level
12620
Arithmetic Increase
13325
16009
19444
Land Use
Aarvee associates
Barela
Yes
23 6'
80 2'
1447.5
NA
9.89
9.89
9.89
Residential
Commercial
Mixed
Public - semi public
Agriculture
Industrial
Roads
Green area
Sensitive
Water bodies
Total
% Standard
Land use (Tentative in Sq
(as per UDPFI)
kms )
48.0
2.0
0.0
8.0
5.0
10.0
12.0
7.0
3.0
5.0
1.51
0.25
0.40
0.25
6.00
0.00
1.00
0.10
0.00
0.38
9.89
Land use
(Tentative in
percentage)
15.27
2.53
4.04
2.53
60.67
0.00
10.11
1.01
0.00
3.84
100.00
Ward 1
Kisani Mohalla
Ward 2
Sardar Patel
Ward 3
Ward 4
Ward 5
Ward 6
Ward 7
Gandhi
524
0.03
Ambedkar
579
0.02
Jawahar
992
0.03
Shastri
819
0.07
Ward 8
Netaji Subash
Ward 9
Ward 10
Sarojini naidu
Ward 11
Ward 12
Ward 13
Ward 14
Ward 15
Vinoba bhave Dada Than Than Pal Vidhya Sagar Dr. Rajendra Prasad Bhagat Singh
712
1.08
648
0.20
Beohari
1060
0.41
952
0.09
Azad
715
0.08
681
0.23
1742
2.53
1258
0.07
588
1.27
579
1.31
771
2.46
660
3305
2593
17710
26133
28351
11297
10883
8877
2960
688
19007
461
441
313
374
338
0
37
459
341
307
5
14
306
553
507
11
95
720
286
238
51
5
369
298
281
203
19
356
538
454
1
3
378
433
386
237
25
491
488
464
297
72
594
377
338
107
161
432
358
323
79
51
212
934
808
134
261
905
657
601
229
66
599
313
275
43
133
401
315
264
112
98
338
400
371
55
180
437
Total
159
128
225
112
136
224
174
214
158
145
388
268
132
140
176
Agriculture
Business
Agriculture
Business
Agriculture
Business
Agriculture
Business
Agriculture
Business
Agriculture
Business
Agriculture
Business
Agriculture
Business
Agriculture
Business
Agriculture
Business
Agriculture
Business
Agriculture
Business
Agriculture
Business
Agriculture
Business
Agriculture
Business
Household works
Household works
Household works
Household works
Household works
Household works
Household works
Household works
Household works
Household works
Household works
Household works
Household works
Household works
Household works
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
1
0
0
1
0
9
1
0
0
1
0
0
1
0
0
1
0
0
1
235
268
197
202
495
372
175
170
43
49
36
37
90
68
32
31
0
0
0
0
0
12620
9.89
1276
6665
5955
1564
1220
6997
893
3
1
2779
Agriculture
Business
Household
works
0
9
8
2114
384
80
64
113
56
68
112
87
107
79
73
194
134
66
70
88
1389.5
24
19
34
17
20
34
26
32
24
22
58
40
20
21
26
417
11
11
11
19
13
139
0
15
87
76
0
0
15
1
178
1
0
75
70
61
0
0
18
1
162
1
0
15
124
108
0
0
20
1
265
1
0
15
62
54
0
0
12
1
131
1
0
75
75
65
0
0
10
1
144.75
1
0
5
123
108
0
0
16
1
248
1
1
75
96
84
0
0
14
1
204.75
1
0
75
118
103
0
0
15
1
238
1
0
75
87
76
0
1
18
1
178.75
1
0
75
80
70
0
0
20
1
170.25
1
0
5
213
186
0
0
14
1
435.5
1
1
15
147
129
0
0
16
1
314.5
1
0
15
73
63
0
0
18
1
147
1
0
75
77
67
0
0
15
1
144.75
1
0
75
97
84
0
0
12
1
192.75
1
12
0
2
Tertiary occupation
No. of SS/LS industrial units
No. of Commercial establishments
No. of Slum pockets
Slum population
No. of Slum Households
No. of Individual water connections in
the ward
904
900
917
832
943
844
891
951
897
902
865
915
879
838
928
78.23033708
80.55555556
73.49056604
83.58778626
81.00172712
79.23387097
76.92307692
64.18067227
71.32867133
83.84728341
74.16762342
68.75993641
74.31972789
77.54749568
74.31906615
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
1
0
1
0
0
0
0
0
0
1
3.37
2.74
1.54
0.61
1.30
2.19
3.09
1.28
2.14
2.22
0.60
3.78
2.78
3.21
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1.0
0
0
0
2.0
0
0
0
0
0
1.44
0.09
0.00
0.00
0.12
0.10
0.30
0.00
0.00
0.51
0.48
0.00
0.00
0.00
0.00
32
3
0
3
1200
800
2000
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
#VALUE!
75
143
Nil
Nil
0
0
0
0
143
0
62
115
Nil
Nil
0
0
0
0
115
0
49
203
Nil
Nil
0
0
0
1
203
0
35
101
Nil
Nil
0
0
0
0
101
0
59
122
Nil
Nil
0
0
0
0
122
15
54
202
Nil
Nil
0
0
0
0
145
17
33
157
Nil
Nil
0
0
0
0
157
35
58
193
Nil
Nil
0
0
0
0
126
0
33
142
Nil
Nil
0
0
0
0
142
0
35
131
Nil
Nil
0
0
0
0
131
18
33
349
Nil
Nil
0
0
0
0
349
16
35
241
Nil
Nil
0
0
0
0
185
25
39
119
Nil
Nil
0
0
0
0
101
0
28
126
Nil
Nil
0
0
0
0
126
0
22
158
Nil
Nil
1
0
0
0
98
18
650
2501
#VALUE!
#VALUE!
1
0
0
1
2244
144
336525
21465
17280
30375
15120
18360
21750
23490
18900
21330
19575
52380
27750
15150
18900
14700
65
60
70
65
65
60
65
70
65
70
70
60
65
65
60
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Remarks
15
3155
1.15
1528
1334
0
1
#VALUE!
0
Sectoral Analysis
Slums & Urban Poor
Ward No
7
8
9
10
11
12
13
14
Total
Shastri
Netaji Subash
Azad
Sarojini naidu
Vinoba bhave
Dada Than Than Pal
Vidhya Sagar
Dr. Rajendra Prasad
Notified/ Unnotified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Ward
population
Slum population
783
892
658
672
1649
1241
583
565
7043
235
268
197
202
495
372
175
170
2114
Individual water
No. of
connections
Community taps
55
62
46
47
115
87
41
40
493
0
0
0
0
0
0
0
0
0
No. of
Handpumps
No. of Individual
toilets
0
0
0
0
0
0
0
0
0
39
45
33
34
82
62
29
28
352
No. of
Community
toilets
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
No. of Pucca
houses
No. of Semi
pucca houses
No. of Kuccha
houses
57
78
32
34
230
148
17
13
609
131.6
153.4
106.6
109.4
304.8
223.2
91.6
88
1209
81.6
103.4
56.6
59.4
254.8
173.2
41.6
38
809
No. of
Permanent
pattas
distributed
No. of
Temporary
pattas
distributed
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Any
interventions
under IHSDP
(Y/N)
N
N
N
N
N
N
N
N
Sectoral Analysis
Source
Water Supply
Tube well
Existing Source
Well
12
1.32
1.32
120
40 (Flat)
65
Sewerage
Drainage
SWM
Physical Infrastructure
Whether any treatment plant exists (Y/N),If yes mention capacity (MLD)
Proposed source (Surface)
Total sewage generation (MLD)
Whether any treatment plant exists (Y/N),If yes mention capacity
Total no. of individual septic tanks
Total no. of community septic tanks
Total no. of Sewage/Mud pumps available with the ULB
Frequency of Cleaning Individual Septic tanks
Frequency of Cleaning Community Septic tanks
Name of natural nallah (Storm water drain)
Length of natural nallah (Storm water drain) Kms
Ultimate disposal point of nallah
Length of road side drain (Kms)
Coverage of road side drainage w.r.t roads (%)
Ultimate disposal point of Road side drains
Any treatment plant/procedure adopted
Per capita Solid waste generation (Considering Standards) (in gms)
Total SW generation (in Tons)
Frequency of SW collection by the ULB (1 time per day/2 times per day)
Collection efficiency of the ULB (%)
Any initiative for DTDC (Yes /No)
Any initiative for scientific disposal of waste
Name of dumping/ landfill site
Is the existing site Dumping site or allotted site for Scientific disposal
Area of allotted landfill site for Scientific disposal
Distance of the Dumping site/landfill site from main settlement area (Kms)
No. of Tractor trolleys/vehicles available with the ULB for carrying Solid waste
to the LF site
If site for Scientific disposal is not allotted then whether formally requested by
the ULB
Street lighting
Roads
Name of National Highway passing from or nearby from the town (NH-XYZ)
Name of State Highway passing from or nearby from the town (SH-XYZ)
NO
NO
CC
WBM
Total (kms)
20
10
30
(kms)
(kms)
Nil
800
Yes
No
Mini-Bus service
1
2
3
No
650
550
265
80
205
Physical Infrastructure
River/Lake
Bargi Left Canal
5
400 KV
220KV
132KV
Jabalpur
Jabalpur
Shahpura & Patan
2000
400
Power
Heritage &
tourism
Environ
ment
16
Nil
Nil
Nil
Nil
Nil
Nil
Health
No. of Hospitals
1
Government
Beds
Private
Beds
1
6
3
10
No
Name of town
Jabalpur
Education
Social security schemes
Social Infrastructure
Distance (Kms)
18
3
6
0
0
150-200
200-300
0
0
NA
Nil
Nil
ULB
NA
Name of Scheme
Beneficiaries
Deendayal
antodaya
Widow pension
650
Nil
Revenue Receipts
Revenue Expenditure
2008-09
2009 10
2010-11
2011-12
2012-13
Property Tax
161881.00
42758.00
204639.00
73090.00
29306.00
102396.00
209317.00
93248.00
302565.00
80497.00
56479.00
136976.00
289057.00
135560.00
424617.00
Current
235529.00
147560.00
166020.00
128359.00
131430.00
138260.00
172603.00
126160.00
416682.00
271080.00
Total
383089.00
294379.00
269690.00
298763.00
687762.00
56734.00
55220.00
54691.00
268000.00
61500.00
67650.00
129150.00
936000
Current
Total
Public Consolidated Tax
Arrears
Water Supply
Arrears
Current
Total
Road Tax
56734.00
733700.00
55220.00
773800.00
268000.00
851000.00
774.00
4577.00
557.00
54691.00
592300.00
1666.00
29134
284.00
1170.00
85837.00
130170.00
23046.00
149065.00
29928.00
159812.00
37921.00
176200.00
27300.00
33000.00
194000.00
30000.00
50000.00
500000.00
Improvement Tax
City development tax
Other Improvement taxes
Market fees
Naye Pulo Patkar
najul ayi
others
Total
1531662.00
1405345.00
1447779.00
1793183.00
3041943.00
Rajhyashasan se udhaar
Kule Bazzar prapth kiye gaye Udhhaar
Water Supply
Collection on without Meter Usage
Rent on Meters and Tankers
269573.00
269634.00
9250.00
299813.00
329180.00
15000.00
265411
341980
13186
81081.00
35250
45765
Pratibhoot
others
interest
Others collections
House rent
11942.00
507.00
700.00
86100.00
86100.00
641987.00
852143.00
11491.00
432621.00
2396.00
7350.00
495818.00
2054.00
621904.00
666342.00
264435.00
416675.00
13750.00
80080.00
12160
31548.00
1306.00
165994.00
840000.00
15125.00
50000.00
15000.00
50000.00
50000.00
3000.00
819954.00
2689119.00
10200.00
299500.00
2635.00
689360.00
13200.00
495000.00
5000.00
500000.00
3000.00
10000.00
6494.00
5000.00
15000.00
10000.00
28408.00
4745.00
381000
7095.00
75482.00
6852.00
8649.00
48213.00
15643.00
536523
1232198
381000
1021189
1043200
4 Revenue Transfers
Octroi
Grand Total
II
3732200.00
5399100.00
6825521.00
5905849
7656588
8939642
2613137
7929000.00
13660062
411450.00
654250.00
1915550.00
499500.00
2997200.00
1049100.00
504300.00
696300.00
1915100.00
581700
1710600
2230300
712000.00
1857000.00
2823000.00
700000.00
2000000.00
2500000.00
500000.00
500000.00
900000.00
Capital Receipts
samany pryojana keliye moolbhoot sadak
state finance commission
Fundamental services
Slum development Programmes
Special Fund for economic help
12 / 13 finance commission
2008-09
2009 10
2010-11
2011-12
2012-13
1 Tax Receipts
Arrears
699000.00
496900
1101000.00
622728.00
17839.00
574679.00
20910.00
27132.00
725998.00
11705.00
31920.00
640567
622721
769623
1193472.00
6384.00
233200.00
32500.00
1527080.00
1968.00
3510.00
215383.00
33426.00
2028948.00
3848.00
18810.00
256800.00
11525.00
1880.00
1465556
1781367
2321811
157577
73778
101932
130577
166232
227581
450380
2610
684345
3341
235850
824630.00
33222.00
26116.00
46467.00
67685.00
998120
1088000.00
50000.00
102600
50000.00
100000.00
1390600
1998859.00
2155000.00
14091.00
313560.00
2000.00
368928.00
2697438
50000.00
350000.00
5000.00
15000.00
1919953.00
4494953
354140
400000
31800
169809
76800
167
425780
170
600919
175000
100000
800000
5000
1480000
10266.00
11600.00
11869.00
110594.00
314573.00
472017.00
22677.00
19600.00
62254.00
1035450
24659.00
17370.00
7136.00
9616.00
376745.00
675691.00
62078.00
13726.00
56101.00
1243122
506649.00
716809.00
19709.00
17210.00
24198.00
1288625
433212.00
937181.00
67762.00
253409.00
1888235
20000.00
5000.00
300000.00
500000.00
50000.00
10000.00
50000.00
658000.00
1050000.00
100000.00
5000.00
300000.00
3048000
352696.00
373920.00
110640.00
371283.00
109019.00
219861.00
477898.00
463193.00
218001.00
466166.00
571600.00
373291.00
933180.00
25000.00
495000.00
837256
0.00
2200.00
702363
96372.00
16912.00
1272376
449694.00
28512.00
1889263
1000000.00
50000.00
2503180
25302.00
4096119.00
546671.00
209581.00
16848.00
1800
4943115.00
314214.00
47093.00
71653.00
14109.00
14065.00
13350.00
2801347.00
224957.00
17462.00
18437.00
2852251.00
103353.00
21005.00
700000.00
250000.00
750000.00
300000.00
1000000.00
50000.00
35148.00
25308.00
22994.00
26500.00
150000.00
50000.00
40000.00
50000.00
18238.00
281675.00
1500.00
2550.00
15385.00
1993.00
86814.00
65329.00
21925.00
5225.00
Other Works
343337.00
53750.00
393738.00
3268.00
609563
199850
517382.00
610210.00
575000.00
700000.00
Grand Total
7924137
4211706
5828913
7620592
8375000
I. Revenue Receipts
Own Income
Grants
2173649
3732200
2257488
5399100
2114121
6825521
2613137
0
5731062
7929000
5905849
7656588
8939642
2613137
13660062
7924137
4211706
5828913
7620592
8375000
13829986
11868294
14768555
10233729
22035062
15.72
36.81
19.02
29.48
14.32
23.65
25.53
100.00
26.01
41.95
II
14380.00
80000.00
53378.00
50000.00
600.00
9939.00
7707.00
2697.00
26682.00
88618.00
55500.00
3819.00
346314.00
70000.00
6013914
47358.00
5075.00
11475.00
3984.00
3000.00
17000.00
10000.00
25000.00
5064.00
200000
440.00
73150.00
84381.00
120000
440.00
73150.00
100000.00
200000
160000.00
57956.00
162659
900.00
2776.00
22415.00
39603.00
25963.00
50000.00
418527.00
6421717
1000.00
5890.00
25651.00
49982.00
14737.00
115408.00
3000.00
40010.00
496900.00
150000.00
465586.00
3732.00
4679130
27768.00
234026.00
952930.00
27132.00
125147.00
1234281.00
4385.00
38885.00
61950.00
17995.00
18326.00
124891.00
84150.00
20068.00
32868.00
250450.00
1521949.00
3600.00
8126.00
72695.00
84525.00
22126.00
1337939
1633995
1996339
68359.00
429162.00
139688.00
3975299
36718.00
236041.00
2252876.00
13512.00
50000.00
20000.00
100000.00
1200000.00
250000.00
100000
500000
200000
6171590
23230.00
2792196
49500.00
500000.00
2500000.00
800000.00
1000.00
150000.00
50000.00
50000.00
25000.00
50000.00
4175500
21992.00
100000.00
97302.00
46327.00
86190.00
2012-13
Full migration of double accounting System
Achieved (Y/N)
2013-14
2014-15
2015-16
Upgrading the EGovernance System
Adopting GIS based
Property Tax System
2 lakhs
3 lakhs
N
N
N
N
5 lakhs
Implementing agency
Executive Summary
I. Overview
The Jawaharlal Nehru National Urban Renewal Mission (JnNURM) is an ambitious programme of the
Government of India to bring about improvements in the existing urban service levels and urban
infrastructure in a financially sustainable manner. The primary objective of the programme is to
create economically productive, efficient, equitable and responsive cities. The projects that qualify
under this scheme include sub-sectors of water supply, sewerage and sanitation, drainage, solid
waste management, traffic and transportation facilities and housing infrastructure. Further, special
projects including urban transit systems, urban expressways, sea-links and other sectors of similar
nature would also be covered under this scheme. In order to access funds through the mission, the
state government and the cities seeking assistance require to sign-up to a set of reforms covering
various areas of urban management and good governance.
of
Gondwana
Kingdom
till
16th
Century.It
is
well
known
at
distance
16kmonNorth-Eastern
of
direction
ofJabalpurCity.Thetownlieson23o6'NorthLatitudeand80o2'EastLongitudeandatanaltitudeof396metersab
ovethesealevel.NH-12A
is
the
major
arterial
road
passingthroughthetownconnectingJabalpurandMandla.
The physical development is extending towards Jabalpur and Mandla towns, which is predominantly
ribbon development in nature along NH-12A. As per Census of India, 2011 the total population of
Barela Nagar Parishad is about 12,620 and the no. of households are 2,779. From the year 1981 to
1991 the growth rate was increased from 23.8 to 31.2. The total extent of the town is 9.89 Sq.km.
Sewerage
Barelalacksadequatesanitaryfacilities.Threeoutoftenhouseshavenolatrinefacilitiesindicatingopendefecati
oninthetown.2001
Censusindicatesthat8.7percentofthehousesresorttopitlatrine,apracticethathasalmostbecomedefunctinth
emodern cities.However,about28.7percentofthehouseholdshavewaterclosets. As per the discussions
with the Nagar Parishad officials, as per 2011, it is estimated about 20% of households with no
latrine facilities (Open defecation).
Solid Waste Management
AspertheNagarParishadofficials,as per 2011, it is estimated about 2.5 tons of waste
iscollectedperdaywhichindicatesacollectionperformanceof 80 percent. Door-to-door collection is not
practiced in the town. Landfill site is proposed near toward number 10, which is 3 km away from the
city core. The total extent of the site is about 1.0 hectare.
Storm Water Drains
The total length of tertiary drains as per available data is 17 km. Out of this, pucca drains length is 12
km and remaining 5 km length is kutcha in nature. The total drain length accounts to 45 per cent of
total road length. There are three major and two minor water bodies existing in the city, comprising
of about 8.25 hectares in its area.
Traffic & Transportation
Barelaiswellaccessedbyroad.Barelatownisconnectedwiththeregionthrough NH12A,whichconnectsthetownto Jabalpur and Mandala. The total road length in Barela is 38.0 km out of
which 35.0 km is maintained by the Nagar Parishad and remaining 3.0 km by the PWD. Around 52 %
of the roads are cement concrete. The share of WBM roads is 26.3 per cent and remaining 13 per
cent are earthen roads.
There are four main junctions in the town namely, Bus stand Junction, Police station Junction, Mazoor
Junction and Society junction. NH-12A passes through all these junctions. The effective width of the
roads leading to the junction is minimal due to lot of informal commercial activities & on-street
parking.
Street Lighting
In Barela there are about 650 street lights with different types of electrical fixtures. The average
spacing of street light poles ranges between 55 m to 60 m, as against the norm of 30 m indicating
gross inadequacy of the system. However, this condition is not uniform. Ward number 2,5,7,10,11
has less number of street lights.
Urban Poor
As per the latest estimate made (Year 2010-11) available by Nagar Parishad, the slum population in
the town stands at 2,113, which accounts to 17 per cent of the total population and total slum
households are 423, which accounts to 20.0 per cent of total households.
A total of 6,993 persons in Barela have been identified as those living Below Poverty Line (BPL). This
would mean that more than 57 per cent of total population in the town is living Below Poverty Line.
Available data reflects that a majority of slum dwellers in Barela are living Below Poverty line.
Social Infrastructure Facilities
The town has one government hospital and three clinics providing health services. There are 3
primary schools in the town. In addition to the primary schools, there are 3 other schools that are
catering to the needs of secondary education and senior secondary education. The town does not
have any land earmarked for Socio-cultural activities except a community hall. Presently community
hall is also not in use because of lack of proper maintenance.
Weekly market (Mela ground) is located in ward-10 with about 100 stalls and on an average about
1000 people visit the Mela ground. Further, on the same ground, daily market also functions for 6
days in a week. About 150 people visit this market on a regular week day. There are 3 burial grounds
in the town, which are primarily serving the needs of Hindu and Muslim religions.
offmeetingatNagaraParishadOffice.ThePresident,ChiefMunicipalOfficer(
CMO),ULBOfficialsandother
Ward
Parishadswerepresentintheworkshop.Consultantsbriefedabouttheproject
objectivesandimportancetothestakeholders.
Phase 2
Phase 3
2012-2015
2015-2025
2025-2035
449.37
215.31
123.12
110.94
82.28
23.95
38.89
19.45
379.37
197.97
125.94
55.47
112.86
86.60
20.84
5.42
Total Amount
(lakhs)
Sanitation
69.50
69.50
0.00
0.00
3387.50
222.00
1565.50
1600.00
316.05
138.96
57.21
119.88
790.00
190.00
225.00
375.00
Environment
30.00
15.00
15.00
0.00
Urban Governance
10.00
10.00
0.00
0.00
155.00
65.00
71.25
18.75
5781.93
1234.29
2242.75
2304.91
Mandatory Reforms
Reforms Status
at ULB
Yet to be
Implemented
Yet to be
Initiated
Yet to be
Initiated
Remarks
System was not implemented
due to lack of awareness,
professional manpower and
software
procurement
/
equipment. Keen to adapt to
the system.
System was not implemented
due to lack of funds, except few
stand-alone desktop machines
being used for accounting
purpose. Keen to adapt to the
system with additional funds
availability.
GIS Mapping for utilities need to
be done for effective collection.
Target
October,
2013
March, 2014
July, 2013
S.N
Reforms Status
at ULB
Remarks
Target
Partially
achieved, except
water and
consolidated
taxes
2016-17
(UGD
system may
not be
considered
due to
proposal of
DEWATS)
2014-2015
2013-2014
Mandatory Reforms
Levy
of
reasonable
User
Charges by ULBs with the
objective that the full cost of
O&M is collected within the next
5 years.
Yet to be
Considered
Partially Initiated
Optional Reforms
Reforms
Status at ULB
Remarks
Revision
of
bye-laws
to
streamline the approval process
for construction of buildings,
development of site etc
Yet to be
Initiated
Conversion of land
from
agriculture to non-agriculture
Yet to be
Initiated
Yet to be
Initiated
Yet to be
Initiated
Yet to be
Initiated
Yet to be
Initiated
Yet to be
Initiated
Target
These
Reforms
are
targeted
for
implement
ation
simultaneo
usly with
the
implement
ation of
Mandatory
reforms
Date: 17-09-2013
Page: Page 1 of 100
TABLE OF CONTENTS
EXECUTIVE SUMMARY..8
CHAPTER 1: PROJECT INTRODUCTION ............................................................................................ 15
1.1
1.2
1.3
Methodology ....................................................................................................................................................17
1.4
Date: 17-09-2013
Page: Page 2 of 100
Date: 17-09-2013
Page: Page 3 of 100
5.4.12
5.4.13
CHAPTER 6
Date: 17-09-2013
Page: Page 4 of 100
CHAPTER 8 CAPITAL INVESTMENT PLAN (CIP) & FINANCIAL OPERATING PLAN (FOP) 66
8.1 City Investment Plan - Introduction .....................................................................................................................66
8.1.1 Water Supply System (WS) ................................................................................................................................. 66
8.1.2 Sewerage ............................................................................................................................................................. 67
8.1.3 Storm Water Drains (SWD) ................................................................................................................................. 68
8.1.4 Solid Waste Management (SWM) ....................................................................................................................... 68
8.1.5 Sanitation ............................................................................................................................................................ 69
8.1.6 Traffic & Transportation (T&T) ............................................................................................................................ 70
8.1.7 Electricity and Street Lighting ............................................................................................................................. 71
8.1.8 Urban Poor .......................................................................................................................................................... 72
8.1.9 Environmentally Sensitive Areas ......................................................................................................................... 72
8.1.10 Urban Governance ............................................................................................................................................ 73
8.1.11 Social Infrastructure .......................................................................................................................................... 73
8.2 FINANCIAL OPERATING PLAN (FOP) - Introduction: .............................................................................................75
8.2.1 Objective and Methodology: .............................................................................................................................. 75
8.2.2 Assumptions and Reforms .................................................................................................................................. 75
8.2.2.2 Municipal Taxes: .............................................................................................................................................. 76
Property Tax ................................................................................................................................................................. 76
Water Tax/Charges ...................................................................................................................................................... 76
Solid waste charge ....................................................................................................................................................... 77
Other Taxes .................................................................................................................................................................. 77
8.2.2.3 Non-Tax Sources............................................................................................................................................... 77
8.2.2.4 New O&M Cost ................................................................................................................................................. 77
Date: 17-09-2013
Page: Page 5 of 100
Date: 17-09-2013
Page: Page 6 of 100
LIST OF TABLES
TABLE 2.1 : DETAILS OF URBAN SETTLEMENTS IN JABALPUR DISTRICT-2001 .................................................................. 21
TABLE 3.1: DECADAL GROWTH RATE OF THE TOWN ....................................................................................................... 23
TABLE 3.2: POPULATION PROJECTION OF THE TOWN ..................................................................................................... 23
TABLE 3.3: AREA, POPULATION & GROWTH RATE ........................................................................................................... 24
TABLE 3.4: CATEGORY WISE WORK FORCE ....................................................................................................................... 24
TABLE 4.1:WARD-WISE DETAILS OF THE TOWN ............................................................................................................... 28
TABLE 4.2: UDPFI STANDARDS FOR LAND USE ................................................................................................................ 29
TABLE 4.3: LAND USE BREAKUP ....................................................................................................................................... 29
TABLE 4.4: DETAILS OF HOUSES, HOUSEHOLDS AND HOUSEHOLDS SIZE OF BARELA ..................................................... 30
TABLE 4.5: HOUSING DEMAND FOR THE YEAR 2035 ........................................................................................................ 30
TABLE 5.1: DETAILS OF WATER SOURCE & SYSTEM ......................................................................................................... 32
TABLE 5.2: DETAILS OF ELSR IN BARELA .......................................................................................................................... 33
TABLE 5.3: DETAILS OF THE DISTRIBUTION SYSTEM ........................................................................................................ 33
TABLE 5.4: DETAILS OF WATER SUPPLY CONNECTION IN BARELA TOWN ....................................................................... 33
TABLE 5.5 : DETAILS OF WATER CONNECTIONS IN BARELA ............................................................................................. 34
TABLE 5.6 : DOMESTIC WATER SUPPLY DETAILS IN BARELA 2011 ................................................................................. 35
TABLE 5.7: DETAILS OF WATER CHARGES IN BARELA 2011 .......................................................................................... 36
TABLE 5.8: WATER DEMAND ASSESSMENT 2035 ......................................................................................................... 36
TABLE 5.9: SERVICE LEVELS IN BARELA ............................................................................................................................ 37
TABLE 5.10 : DETAILS INDICATING THE EXISTING SANITATION FACILITIES ...................................................................... 39
TABLE 5.11 : DETAILS OF PUBLIC CONVENIENCE FACILITY ............................................................................................... 40
TABLE 5.12 : DEMAND ASSESSMENT 2035 .................................................................................................................... 40
TABLE 5.13 : SERVICE LEVELS IN BARELA .......................................................................................................................... 40
TABLE 5.14 : SOLID WASTE DETAILS IN BARELA 2011.................................................................................................... 42
TABLE 5.15 : SOLID WASTE TRANSPORT AND DISPOSAL ARRANGEMENTS...................................................................... 44
TABLE 5.16 : STAFF FOR SOLID WASTE MANAGEMENT IN BARELA.................................................................................. 44
TABLE 5.17 : DETAILS OF CURRENT SERVICE LEVELS ........................................................................................................ 45
TABLE 5.18 : DETAILS INDICATING THE EXISTING DRAINAGE CONNECTIONS .................................................................. 47
TABLE 5.19 : DETAILS OF DRAINAGE IN BARELA ............................................................................................................... 48
TABLE 5.20 : DETAILS OF ENVIRONMENTAL SENSITIVE AREAS ........................................................................................ 48
TABLE 5.21 : DEMAND AND SUPPLY GAPS FOR SWD SYSTEM.......................................................................................... 48
TABLE 5.22 : ROAD SURFACE DETAILS .............................................................................................................................. 50
TABLE 5.23 : DETAILS OF STREET LIGHTING IN BARELA .................................................................................................... 54
TABLE 5.24 : WARD WISE BPL & SLUM DETAILS ............................................................................................................... 56
TABLE 5.25 : SLUM MATRIX WITH REFERENCE TO INFRASTRUCTURE COVERED ............................................................. 57
TABLE 5.26 : DETAILS OF THE EDUCATIONAL INSTITUTIONS IN BARELA .......................................................................... 59
TABLE 5.27 : DETAILS OF MEDICAL FACILITIES IN BARELA ................................................................................................ 60
TABLE 5.28 : DETAILS OF FUTURE DEMAND FOR THE MEDICAL FACILITIES ..................................................................... 60
TABLE 5.29 : DETAILS OF FUTURE DEMAND FOR SOCIO-CULTURAL FACILITIES ............................................................... 60
TABLE 8.1: INVESTMENT REQUIREMENTS FOR WATER SUPPLY SECTOR ........................................................................ 66
TABLE 8.2: INVESTMENT REQUIREMENTS FOR SEWERAGE SECTOR ............................................................................... 67
TABLE 8.3: INVESTMENT REQUIREMENTS FOR STORM WATER DRAINS SECTOR ........................................................... 68
TABLE 8.4: INVESTMENT REQUIREMENTS FOR SOLID WASTE MANAGEMENT SECTOR ................................................. 68
TABLE 8.5 : INVESTMENT REQUIREMENTS FOR SANITATION SECTOR ............................................................................. 69
TABLE 8.6 : INVESTMENT REQUIREMENTS FOR TRAFFIC & TRANSPORTATION ............................................................... 70
TABLE 8.7: INVESTMENT REQUIREMENTS FOR STREET LIGHTING .................................................................................. 72
TABLE 8.8: INVESTMENT REQUIREMENTS FOR URBAN POOR......................................................................................... 72
TABLE 8.9: INVESTMENT REQUIREMENTS FOR ENVIRONMENTALLY SENSITIVE AREAS.................................................. 73
TABLE 8.10 : INVESTMENT REQUIREMENTS FOR SOCIAL INFRASTRUCTURE FACILITIES .................................................. 73
TABLE 8.11 : SUMMARY OF PROPOSED INVESTMENTS .................................................................................................... 74
TABLE 8.12 : SUMMARY/FINDINGS OF THE SECTOR WISE ANALYSIS AND TOWN PROFILE OF BARELA .......................... 87
TABLE 11.1 : SHOWS THE PRIORITIZATION FOR VARIOUS DEVELOPMENTS. ................................................................... 93
Date: 17-09-2013
Page: Page 7 of 100
LIST OF MAPS
MAP 1.1
Base map
MAP 2.1
Density map
MAP 4.1
Landuse map
MAP 4.2
MAP 5.1
MAP 5.2
MAP 5.3
MAP 5.4
MAP 5.5
MAP 5.6
Location of Slums
LIST OF ANNEXURES
ANNEXURE - I
FOP
ANNEXURE - II
ANNEXURE - III
ANNEXURE - IV
ANNEXURE V
ANNEXURE VI
ANNEXURE VII
ANNEXURE VIII
Date: 17-09-2013
Page: Page 8 of 100
Executive Summary
I. Overview
The Jawaharlal Nehru National Urban Renewal Mission (JnNURM) is an ambitious programme of the
Government of India to bring about improvements in the existing urban service levels and urban
infrastructure in a financially sustainable manner. The primary objective of the programme is to create
economically productive, efficient, equitable and responsive cities. The projects that qualify under this
scheme include sub-sectors of water supply, sewerage and sanitation, drainage, solid waste management,
traffic and transportation facilities and housing infrastructure. Further, special projects including urban
transit systems, urban expressways, sea-links and other sectors of similar nature would also be covered
under this scheme. In order to access funds through the mission, the state government and the cities
seeking assistance require to sign-up to a set of reforms covering various areas of urban management and
good governance.
Water Supply
Barela town is dependent on both ground & surface source for water supply. The surface water source for
the city is available from Korsham Ghat (Gour River), which is situated 5 kms away from the city. Presently,
the city is drawing 60% of supplied water every day from the surface source. The present per capita water
supply is 107 LPCD.
Date: 17-09-2013
Page: Page 9 of 100
Sewerage
Barela lacks adequate sanitary facilities. Three out of ten houses have no latrine facilities indicating open
defecation in the town. 2001 Census indicates that 8.7 percent of the houses resort to pit latrine, a practice
that has almost become defunct in the modern cities. However, about 28.7 per cent of the households have
water closets. As per the discussions with the Nagar Parishad officials, as per 2011, it is estimated about
20% of households with no latrine facilities (Open defecation).
As per the Nagar Parishad officials, as per 2011, it is estimated about 2.5 tons of waste is collected per day
which indicates a collection performance of 80 per cent. Door-to-door collection is not practiced in the town.
Landfill site is proposed near toward number 10, which is 3 km away from the city core. The total extent of
the site is about 1.0 hectare.
The total length of tertiary drains as per available data is 17 km. Out of this, pucca drains length is 12 km
and remaining 5 km length is kutcha in nature. The total drain length accounts to 45 per cent of total road
length. There are three major and two minor water bodies existing in the city, comprising of about 8.25
hectares in its area.
Barela is well accessed by road. Barela town is connected with the region through NH-12A, which connects
the town to Jabalpur and Mandala. The total road length in Barela is 38.0 km out of which 35.0 km is
maintained by the Nagar Parishad and remaining 3.0 km by the PWD. Around 52 % of the roads are cement
concrete. The share of WBM roads is 26.3 per cent and remaining 13 per cent are earthen roads.
There are four main junctions in the town namely, Bus stand Junction, Police station Junction, Mazoor
Junction and Society junction. NH-12A passes through all these junctions. The effective width of the roads
leading to the junction is minimal due to lot of informal commercial activities & on-street parking.
Street Lighting
In Barela there are about 650 street lights with different types of electrical fixtures. The average spacing of
street light poles ranges between 55 m to 60 m, as against the norm of 30 m indicating gross inadequacy of
the system. However, this condition is not uniform. Ward number 2,5,7,10,11 has less number of street
lights.
Date: 17-09-2013
Page: Page 10 of 100
Urban Poor
As per the latest estimate made (Year 2010-11) available by Nagar Parishad, the slum population in the
town stands at 2,113, which accounts to 17 per cent of the total population and total slum households are
423, which accounts to 20.0 per cent of total households.
A total of 6,993 persons in Barela have been identified as those living Below Poverty Line (BPL). This would
mean that more than 57 per cent of total population in the town is living Below Poverty Line. Available data
reflects that a majority of slum dwellers in Barela are living Below Poverty line.
The town has one government hospital and three clinics providing health services. There are 3 primary
schools in the town. In addition to the primary schools, there are 3 other schools that are catering to the
needs of secondary education and senior secondary education. The town does not have any land earmarked
for Socio-cultural activities except a community hall. Presently community hall is also not in use because of
lack of proper maintenance.
Weekly market (Mela ground) is located in ward-10 with about 100 stalls and on an average about 1000
people visit the Mela ground. Further, on the same ground, daily market also functions for 6 days in a week.
About 150 people visit this market on a regular week day. There are 3 burial grounds in the town, which are
primarily serving the needs of Hindu and Muslim religions.
Kick-off Workshop
In the initial (Kick-off Meeting) stage, Project Consultants, M/s
aarvee associates architects engineers and consultants pvt ltd., team
comprising of Mr. K. Jagadeesh, Mr. B.NeelaKantam Raju, Mr.
Raghuram, Ms. Sukeerthi and Mr. Ravi Teja visited Jabalpur on 21st
Divisional
Commissioner,
Jabalpur,
Dy.
Director,
Urban
Development Department, Jabalpur Division chaired the start-up meeting and addressed the Presidents and
CMO's of all 7 project towns.
Further, consultants team visited the Barela town on 25/11/2011
and conducted a one day kick-off meeting at Nagara Parishad
Office. The President, Chief Municipal Officer (CMO), ULB Officials and
other Ward Parishads were present in the workshop. Consultants
briefed about the project objectives and importance to the stakeholders.
Date: 17-09-2013
Page: Page 11 of 100
Jabalpur District has reviewed the progress of the CDP work and Chaired the meeting, addressed the CMOs
and representatives of all 7 project towns. Detailed deliberations were made with Shri. Rajeev Nigam, Dy.
Director, urban development. He emphasized on;
1. Provision of Water Supply, Sanitation and Solid
Waste Management,
2. Relocation of slums
3. Imparting training on folk art and folk culture to
the slum dwellers
4. Inculcate Social Awareness
5. Provision of a buffer zone (Urban Forest) along the Bargi canal.
The 2nd stage town level workshop was organized by Aarvee associates Pvt. Ltd with the co-operation of
Chief Municipal Officer (CMO) Barela and active participation of Municipal staff. The information on
conducting the workshop was passed onto Nagar Parishad well in
advance so as to involve as many as identified stakeholders to
participate in the workshop. Workshop on CDP was held at Barela
Nagar Parishad on 16th of April 2012. The purpose of the
workshop was to involve stakeholders and facilitate in the
discussions, record the Comments & obtain suggestions so as to
incorporate them into the plan preparation of CDP.
Summary of workshops
On the whole, there was very good response from all the stakeholders and the major proposals for the
development of Barela Town are expressed below:
Date: 17-09-2013
Page: Page 12 of 100
Date: 17-09-2013
Page: Page 13 of 100
Phase 2
Phase 3
2012-2015
2015-2025
2025-2035
449.37
215.31
123.12
110.94
82.28
23.95
38.89
19.45
379.37
197.97
125.94
55.47
112.86
86.60
20.84
5.42
69.50
69.50
0.00
0.00
3387.50
222.00
1565.50
1600.00
316.05
138.96
57.21
119.88
790.00
190.00
225.00
375.00
Environment
30.00
15.00
15.00
0.00
Urban Governance
10.00
10.00
0.00
0.00
155.00
65.00
71.25
18.75
5781.93
1234.29
2242.75
2304.91
Total Amount
(lakhs)
Sanitation
Traffic & Transportation (TT)
Mandatory Reforms
Reforms Status
at ULB
Yet to be
Implemented
Yet to be
Initiated
Remarks
System was not implemented
due to lack of awareness,
professional manpower and
software
procurement
/
equipment. Keen to adapt to
the system.
System was not implemented
due to lack of funds, except few
stand-alone desktop machines
being used for accounting
purpose. Keen to adapt to the
system with additional funds
availability.
Target
October,
2013
March, 2014
Date: 17-09-2013
Page: Page 14 of 100
S.N
3
Mandatory Reforms
Reform of Property Tax with
GIS applications
Reforms Status
at ULB
Yet to be
Initiated
Remarks
Target
July, 2013
Partially
achieved, except
water and
consolidated
taxes
2016-17
(UGD
system may
not be
considered
due to
proposal of
DEWATS)
2014-2015
Levy
of
reasonable
User
Charges by ULBs with the
objective that the full cost of
O&M is collected within the next
5 years.
Yet to be
Considered
Partially Initiated
2013-2014
Remarks
Target
Optional Reforms
Reforms
Status at ULB
Revision
of
bye-laws
to
streamline the approval process
for construction of buildings,
development of site etc
Yet to be
Initiated
Conversion of land
from
agriculture to non-agriculture
Yet to be
Initiated
Yet to be
Initiated
Yet to be
Initiated
Yet to be
Initiated
Yet to be
Initiated
Yet to be
Initiated
These
Reforms
are
targeted
for
implement
ation
simultaneo
usly with
the
implement
ation of
Mandatory
reforms
Date: 17-09-2013
Page: Page 15 of 100
The Urbanization in Madhya Pradesh is at a faster rate, due to which Urban Local Bodies of the state are
experiencing hard challenges to facilitate the requirements of the growing population with limited technical
and financial resources. GoI as well as GoMP have initiated a number of programmes/schemes to meet the
growing demands of infrastructure and service delivery. The list of GoI schemes include: Urban
Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT) and Integrated Housing and
Slum Development Programme (IHSDP). On the other hand GoMP has initiated DFID funded MPUSP, which
links reforms with investment in infrastructure for the poor. In addition to the above there are several other
programmes that have been initiated by the GoI and GOMP.
Preparation of the CDP will take advantage of the Revised CDP preparation toolkit/Heritage cities toolkit
prepared by GoI under JNNURM and UADD/CMAMP guidelines. These toolkits shall provide guidance to the
formulation of a CDP based on the concept of a consultative strategic planning process.
Focus areas: Government of Madhya Pradesh is planning to improve the water supply system of the towns
by upgrading the prevailing systems. Hence, this CDP shall be focusing on water supply sector as one of the
key area in a comprehensive manner. The revenue generation (revenue from ULBs own sources specially
property tax etc.) and strategies for the enhancement of the same shall also be incorporated in the CDP.
Currently planning is only a discretionary function of ULBs in MP and there is a general lack of planning
culture even in the larger Corporations. The CDP's of four cities of MP (Bhopal, Indore, Jabalpur, Ujjain),
included in JNNURM have been already prepared, along with the CDP's of 96 ULBs in the State. The lessons
learnt from these exercises need to be incorporated into the proposed CDPs. The CDP will be linked to the
overall spatial planning, policy framework of Master Plan and more importantly into the annual municipal
budgeting. Linking the investment plan of the CDP with the municipal budgets will be crucial in ensuring the
O&M and thus sustainability of the infrastructure assets created.
Preparation of the CDP shall include city development strategies, which are outcomes of a structured
consultative process. The process will enable elected representatives, key staff of MC departments,
parastatal agencies and other institutions, policy makers and the citizens to participate and plan for spatial,
social and economic development of the concern cities. A City Development Plan (CDP) will present both a
vision of a desired future perspective for the city and the ULBs strategic framework of sectorial plans
translated into actions that define on how the ULB, together with other stakeholders, intends to work
towards achieving their long-term vision for the next five years.
Date: 17-09-2013
Page: Page 16 of 100
This project of preparing the City Development Plan (CDP) for Barela Panchayat Area, Madhya
Pradesh has been entrusted to Aarvee Associates Architects Engineers & Consultants Pvt. Ltd
(Consultant) ,Hyderabad. The work is assigned through Commissioner, Urban Administration and
Development Department, Government of Madhya Pradesh (Client). The aim of this exercise is to
support various Cities/Urban Local Bodies of Madhya Pradesh with a comprehensive City Development Plan
(CDP) for their long term vision.
1.2
The CDP shall provide a comprehensive long term strategy (Vision 2035) as well as a City Investment Plan
(CIP), based on which the concerned ULB's can approach and be eligible to the funding under GoI /GoMP
schemes along with their own and other sources of finances based on priority actions and projects identified
in the CDP. The document shall also provide Financial Operating Plan (FOP) to direct the ULBs for mobilizing
various financial resources to implement the identified priority projects. The scope of the services include all
necessary steps formulated in JNNURM Toolkit 2, that would help to prepare the CDP, such as Data
Collection & Field Visits, Municipal Staff & all Stakeholders consultative meetings, Sector Analysis, organising
necessary workshops for the successful completion of the CDP. The specific objectives of the project are as
follows;
CDP would scale up existing urban development and poverty alleviation schemes within a
comprehensive and coherent strategic planning framework, in order to ensure optimal benefit from
available resources to the citizens of the ULBs.
CDP would aim to catalyze new thinking and provoke debate through a consultative stakeholder driven
process. The vision and strategic thrusts of the CDP would be built around the lessons and findings of a
comprehensive and rigorous stakeholder consultation and documentation process.
It is expected that the CDP would serve the purpose and meet the requirements of UIDSSMT and IHSDP
programmes as well as JNNURM and other development schemes.
The CDP will generate specific priority actions and projects that can be the basis, for mobilizing funds
from diversified sources.
Date: 17-09-2013
Page: Page 17 of 100
1.3
Methodology
The CDP is prepared through a participatory process, wherein the various stakeholders, citizens and the
concerned authorities play a major role in the formation of the vision for the future development of the city.
The planning process therefore has to be a consultative one, with stakeholders representing a varied
spectrum of qualification taking part in the discussions and dialogue leading to the formulation of a vision,
development of objectives, identification of priority sectors and projects. CDP is prepared as a multistage
exercise, mainly with the following Stages;
Stage 1:
The Consultants with ULB support would organize a one day kick-off workshop to familiarize the
stakeholders with the purpose, process, and expected outcomes of the CDP and build confidence,
understanding and commitment to the CDP. The kick off workshop will help in deriving a consensus along
with the stakeholders firming the process and agreeing upon a structured programme to take the CDP
forward.
Stage 2: Assessment of Existing Situation
In this stage, interaction with various stakeholder groups (meetings, workshops, focus group discussions,
etc.) and review relevant publications, reports, GOs, resolutions, procedures, laws etc. to analyze the current
situation in each of the sector identified. In-depth analysis of the existing situation, covering the
demographic profile, economic profile, urban governance, Physical & Social infrastructure facilities, and
environmental aspects. Gap analysis and future needs will be calculated/identified at every sector level.
Stage 3: Development of City Vision and Sector Goals and Strategies
Based on the cities present scenario and SWOT analysis, the future city vision statement will be formulated.
Discussion will be initiated on strategies, priorities and major actions that may be required in the next five
years to move towards the vision 2035. To achieve the city vision, it is imperative to identify the necessary
goals and strategies for each sector.
Stage 4: Development of Strategies and Priority Actions
The strategies will be evaluated from the perspective of stakeholders contribution in achieving the vision
and sector goals. Criteria will be developed for prioritizing the strategies, programmes and projects in
consultation with the Steering Group. The priority actions will support the strategies to achieve the sector
goals.
Stage 5: Preparation of City Investment Plan (CIP) and Financial Operating Plan (FOP)
City Investment Plan (CIP) and Financial Operating Plan (FOP) are the key components in the entire process
of City Development Plan (CDP). Based on the availability of resources, logical sequencing of actions and
Date: 17-09-2013
Page: Page 18 of 100
potential for immediate implementation, the Consultants will prepare a City Investment Plan (CIP) in
consultation with ULB that lays out the cost and revenue estimates of all priority projects in the next twenty
five years. The preparation of the CIP is a reiterative process requiring adjustments to individual projects as
well as changes in scheduling to make the whole package work financially. The City Investment plan would
be supported with a Financial Operating Plan (FOP).
Stage 6:
The Draft CDP includes City Investment Plan (CIP), Financial Operating Plan (FOP), duly considering the
feedback from all the stakeholders and working groups.
Stage 7:
The final CDP document incorporating the feedback from the workshop and the inputs received at the 2nd
Stage State Level discussion.
In all the above stages, the consultations with all the Stakeholders and working groups will be made
extensively. The following Methodology is adopted for entire process of City Development Plan (CDP) for
Barela Nagara Panchayat.
Date: 17-09-2013
Page: Page 19 of 100
Date: 17-09-2013
Page: Page 20 of 100
1.4
Chapter 1: Introduction: Detailed description of Project background and Methodology adopted for the
entire City Development Plan (CDP) process.
Chapter 2, 3 & 4: City Profile: It includes City Profile, Physical features, Demography details, SocioEconomic details and Housing scenario.
Chapter 5: City Infrastructure: This chapter deals with Physical and Social Infrastructure analysis, demandgap analysis, formation of goals, strategies and action plans for respective sectors, SWOT analysis
Chapter 6: Institutional Framework
Chapter 7: Municipal Finance: deals with Income and Expenditure analysis
Chapter 8: Capital Investment Plan: Detailed and summary of Sector wise Investment Required for
Implemetation of Proposed Projects and Financial Operating Plan
Chapter 9: Urban Reforms: status of Mandatory and optional reforms at both ULB and State level
Chapter 10: Summary of Workshop Proceedings
Chapter 11: City Vision: Provide the city vision along with the consolidated sector strategies
Date: 17-09-2013
Page: Page 21 of 100
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
2001
population
10,880
1,840
11,819
15,283
956,107
66,499
17,062
11,318
9,167
14,539
25,199
13,213
4,483
11,958
37,870
8,145
11,958
2011
Decennial
Density
population growth rate (per sq.km
12,620
15.99
1,276
6,657
261.79
2,809
14,349
21.41
5,605
9,285
-39.25
1,326
1,069,292
11.84
7,924
72,261
8.66
2,536
19,040
11.59
1,539
13,210
16.72
2,100
12,599
37.44
6,666
9,839
-32.33
494
27,932
10.85
2,722
14,324
8.41
1,099
5,084
13.41
1,281
13,601
13.74
2,042
44,048
16.31
1,861
14,787
81.55
5,666
8,087
-32.37
2,151
Date: 17-09-2013
Page: Page 22 of 100
2.1.3
Barela town is in Jabalpur Tehsil of Jabalpur District in Madhya Pradesh. It is situated at a distance of 16 km
on North-Eastern direction of Jabalpur City. The town lies on 23o 6' North Latitude and 80o 2' East Longitude
and at an altitude of 396 meters above the Mean Sea Level (MSL). NH-12A is the major arterial road passing
through the town and connecting Jabalpur and Mandla.
2.1.4
The climate of the town is pleasant and healthy. It is generally dry except in monsoon. The temperature of
Barela varies from 43o C to 8o C. the average rain fall is approximately 1447.5 m.
Date: 17-09-2013
Page: Page 23 of 100
Date: 17-09-2013
Page: Page 24 of 100
population observed during the last three decades is attributed to the slow-down in the local economy,
especially between 1991, 2001 and 2011. The following table indicates the population and growth rate
details;
Table 3.1 Decadal Growth Rate of the Town
S.No
Year
Population
1971
5,538
1981
6,857
23.8
1991
8,995
31.2
2001
10,880
21.0
2011
12,620
12.8
35.0
30.0
23.8
25.0
20.0
15.0
10.0
5.0
0.0
1981
31.2
21.0
12.8
1991
2001
2011
Sl.
No.
1
2
3
Methods
Arithmetic Increase method
Geometric increase method
Incremental increase method
Population
for 2011
12620
12620
12620
Year 2015
13325
13741
14346
Year 2025
16009
17708
17066
Year 2035
19444
23083
20562
Date: 17-09-2013
Page: Page 25 of 100
Factors such as growing importance of the town in the region, cultural growth pattern, In-migration (plotted
development) were studied for finalizing the future population. Hence, the projections are made considering
different categories like
1.
2.
The above projected population figures indicate that the population by all methods except Arithmetical
method is above the Average growth rate of Barela and looks on higher side. So, from the past Population
growth trend it is appropriate to consider Arithmetical Projection as appropriate, figuring to population of
19,444.
S.No
Year
Population
1971
5,538
989
1981
6,857
989
1991
8,995
989
2001
10,880
989
11
2011
12,620
989
12
3.1.6 Issues
Other than agriculture activities and household industries, there is no other alternative source for
employment in the town. Due to this, out-migration of population is observed in search of employment to
nearby cities i.e., Jabalpur, Itarsi, Raipur, Nagpur and Bhopal.
City Development Plan for Barela Town
Date: 17-09-2013
Page: Page 26 of 100
3.2.2
Literacy Rate
of
literate
population
to
the
total
S.No
Category
Total Population
Male
Female
3506
2787
719
32
48
14
2922
2440
482
4 % to Total Workers
83
88
67
5 Marginal Workers
584
347
237
6 % to Total Workers
17
12
33
1 Total Workers
2 WPR (%)
3 Main Worker
Date: 17-09-2013
Page: Page 27 of 100
14
48
Migration
Strategy
Providing Employment
Opportunities
Development of Educational and
Health facilities
Action Plan
Encouraging small scale industries
related to Agro-based industries
Development of ITI & Polytechnic
institutions
Development of women & child care
health facilities
Date: 17-09-2013
Page: Page 28 of 100
Ward No
Ward Name
2001
HH
2011
Population
HH
Population
HH
Population
Ward No.1
Kisani Mohalla
132
702
145
727
10.2
3.6
Ward No.2
Sardar Patel
125
622
131
655
4.8
5.3
Ward No.3
Beohari
195
1023
208
1042
6.9
1.9
Ward No.4
Gandhi
96
462
112
558
16.3
20.8
Ward No.5
Ambedkar
110
545
104
519
-5.6
-4.8
Ward No.6
Jawahar
197
977
189
947
-3.9
-3.1
Ward No.7
Shastri
143
801
157
783
9.5
-2.2
Ward No.8
Netaji Subash
163
868
178
892
9.4
2.8
Ward No.9
Azad
91
505
132
658
44.6
30.3
Ward No.10
Sarojini naidu
150
662
134
672
-10.4
1.5
Ward No.11
Vinoba bhave
255
1188
330
1649
29.3
38.8
Ward No.12
134
695
248
1241
85.2
78.6
Ward No.13
Vidhya Sagar
117
567
117
583
-0.3
2.8
Ward No.14
107
468
113
565
5.6
20.7
Ward No.15
Bhagat Singh
175
795
157
785
-10.3
-1.3
2190
10880
2455
Total
12620
Source: Census of India, 2001&2011
Date: 17-09-2013
Page: Page 29 of 100
Land use
% of Developed Area
Small Towns
Medium Towns
Large Cities
Metro Cities
Residential
45 50
40-45
35-40
35-40
Commercial
23
3-4
4 -5
4-5
Industrial
8 10
8-10
10-12
12-14
68
10-12
12-14
14-16
Recreational
12 14
18-20
18-20
20-25
10 12
12-14
12-14
15-18
Balance
balance
balance
balance
The land use percentages were calculated using the updated base map and the available data. As most of
the Municipal area is associated with agriculture, the area has unique significance for land use analysis. The
residential land comprises of 15% of total land & the agriculture area comprises of almost 61%. Map 4.1
shows the Existing Land Use Map of Barela Nagar Parishad. The following table provides the land use
percentages.
Table 4.3: Land use Breakup
Sl. No
Residential use
Commercial use
% to total area
151.06
44.86
15.33
25.2
7.48
2.56
Mixed use
35.21
10.46
3.57
25.25
7.50
2.56
100
336.72
29.70
100.00
10.15
Agriculture Area
7
8
600.2
60.91
Water bodies
38.5
3.91
Vacant Areas
10
1.01
985
100
Total area
Date: 17-09-2013
Page: Page 30 of 100
4.5 Housing
Housing is the constituent of the social infrastructure of the economy. Like the other constituents, such as
the system of education and health, housing divergence also can either reduce or enhance the disparities in
the society.
Years
Total
No. of
Average Household
Population
Houses
Households
Size
1981
6857
1495
1520
4.5
1991
8995
1982
2000
4.5
2001
10880
2168
2190
4.96
2011
12620
2338
2779
4.5
Category
Projected years
Existing
(2011)
2015
2025
2035
Population
12620
13325
16009
19444
Households
2779
2665
3202
3889
4.5
5.0
5.0
5.0
Household size
By the year 2035 the additional Houses required are 1434 taking into the consideration one home per one
household. The land requirements for these housing needs are taken into consideration on the proposed
Land Use map.
Map 4.2: Anticipated Future Growth Map
City specific Strategies and Action Plans
Issue
Strategy
Action Plan
Haphazard Development
Planned Development
Date: 17-09-2013
Page: Page 31 of 100
Social Infrastructure
Water Supply
Health
Education
Recreational Facilities
Social security
Housing
Street Lighting
Date: 17-09-2013
Page: Page 32 of 100
Sl.
No.
1.
2.
3.
4.
5.
6.
Details
12 (10 are in working condition)
7
2
1.32
107
10
Date: 17-09-2013
Page: Page 33 of 100
that the current shortage of storage capacity is about 0.08 ML. The demand of water supply by the end of
the horizon period of CDP is about 2.62 MLD for which storage capacity of 1.30 ML is required by 2035.
Table 5.2 indicates the details of the ELSR and the wards covered. Map 5.1 indicates the water supply
system of the town.
Table 5.2: Details of ELSR in Barela
Sl.
No.
1.
2.
Location of ELSRs
ELSR-1, Ward 12
ELSR-2, Ward 7
Total Storage Capacity (ML)
Capacity
(in ML)
0.32
0.13
0.45
Wards Covered
11,12,10,1,2,3,4 & 5
6,7,8,9,14 & 15 wards
Main Types
Distribution Main
Details or Dimension
Range
Percentage of
Coverage Network
Pipe Material
a.
CI
2.0 mm to 2.5 mm
b.
1.5 mm to 2.0 mm
65
GI
Year
2009-10
2010-11
2011-12
Connections
1166
1216
1296
% Growth of Connections
4.2
6.5
Date: 17-09-2013
Page: Page 34 of 100
The domestic connections account to 88.7 per cent of the total connections and 51 per cent of the total
households where as commercial connections are mere 0.7 per cent of total connections. There are 150
public stand posts, which serves 6.1 per cent of total households. Table 5.5 indicates the details of the
service connections in the town.
Table 5.5 : Details of Water Connections in Barela
Sl.
No.
1
2
Particulars
Total Population 2011
Number of Households 2011
Connections
3
4
5
6
7
Units
Domestic
Non-domestic (other than industrial)
Industrial
Public Stand Posts
Total Number of Connections
12,620
2,779
Number
1296
10
0.0
150
1456
% to total
Connections
88.7
0.7
0.0
10.6
100.0
% to total
Households
50.90
0.4
0.0
6.1
> 65.0
Date: 17-09-2013
Page: Page 35 of 100
Sl. No.
Particulars
Per Capita Supply
1
Population 2011
2
Water Supply (in MLD)
3
Current Per Capita water supply per day (in LPCD)
4
Per Capita supply as per CPHEEO Norm (in LPCD)
Coverage
5
% population covered with piped Water Supply
6
Areas
Surplus Supply
Nil
with
Moderate Supply
All wards (except wards with
less supply and no supply)
Avg. Supply
Ward No. 1, 3, 4
Less Supply
Ward No. 11, 12 & 13
Storage Capacity
7
Total Storage Capacity available (in ML)
Total Storage Capacity required (in ML)
Deficit (in ML)
Distribution Network (%)
8
Good
Fair
Bad
Staff Details
9
Permanent Staff
10
Temporary Staff
Units
12,620
1.32
107.0
135.0
0.0 %
75.0 %
15.0 %
10.0 %
0.46
0.76
0.30
60
20
20
16
Date: 17-09-2013
Page: Page 36 of 100
temporary employees of Nagar Parishad. With the growing population, the demand for adequate
provision of service is increasing and the role of the local body as a service provider calls for better
performance.
5.1.7 Operation & Maintenance (O&M)
The sustainability of water supply system is assured only if local resources are generated for O&M by
the Urban Local Body (ULB). The systematic planning, expansion and maintenance requires dedicated
planning approach.
Cost Recovery
Nagar Parishad collects a flat rate of Rs.60.00 per month per household for domestic connection and
Rs.120.00 for non-domestic connection. In small towns like Barela, no user charges are collected on
pro-rata basis; the reason being absence of metered devices. None of the connections in Barela are
metered. The charge for a new connection is Rs.1001; it includes road cutting charges as well. Table
5.7 gives the details pertaining to flat rate per month and the installation of new connection charges.
Table 5.7: Details of Water Charges in Barela 2011
Description
Flat Rate per Month
1.
Domestic
Commercial
New Connection Charges
60.00
120.00
2.
Domestic
Commercial
1001.00
1001.00
The present per capita water supply is 107 LPCD. The future population growth calls for:
Additional storage capacity to meet the requirement of the growing population, densities and
increase of developed areas.
Particulars
1. Projected Population
2. Projected Households
3. Quantum of water required @ 135 lpcd
4. Required capacity of treatment plant
5. Additional Storage capacity (in ML)
Source: Analysis
Phase 1
Phase 2
Phase 3
2011-2015
2015-2025
2025-2035
13325
2665
1.80
0.48
0.13
16009
3202
2.16
0.84
0.25
19444
3889
2.62
1.30
0.41
Date: 17-09-2013
Page: Page 37 of 100
The cumulative water demand projected for the coming 25 years is indicated in the Table 5.8.
Considering a per capita supply of 135 LPCD, the total domestic water demand will be 2.62 MLD by
2035. Adequate facilities for water storage, treatment and supply should be planned.
5.1.9 Water Supply Project
As of now, the town is not covered under any planned schemes/projects for water supply system in the
town.
5.1.10 Comparative Analysis (Service Levels)
The water system in the town can be improved by efficient extension of the water supply network,
increase in the number of HSCs, rehabilitation works and efficient cost recovery plans. The existing
system is not adequate to meet the growing demand of the population. The current service levels are
indicated in the following Table.
Table 5.9: Service Levels in Barela
Indicator
Per Capita Supply
Storage capacity
Length of distribution network as per cent to total
road length
Treatment Plant capacity
Number of HHs with HSC connections
Loss due to leakages
Norm
Existing Levels
135 lpcd
33.0 per cent
107 lpcd
35.0 per cent
65 per cent
60 per cent
51.0 per cent
10 per cent
Source: Analysis
5.1.11 SWOT Analysis
Strengths
Weaknesses
Opportunities
Threats
The existing flat rates are required to be revised as the amount collected is very meager.
The distribution system is not adequate as various parts of the town is not connected or
integrated to the system.
Date: 17-09-2013
Page: Page 38 of 100
The major pipelines in the existing system are around 45 years old and require repairs and
rehabilitation measures on priority basis.
Lack of manpower has affected the operation and maintenance of water supply system including
the revenue collection.
No initiatives for rain water harvesting, reuse of waste water and lack of community participation
and awareness in improving water management system, system efficiency, O&M and decision
making.
There is no water quality monitoring done on a regular basis both at the transmission end and
consumer end.
5.1.13 City specific Strategies and Action Plans
Issue
Goal
Strategies
Water Source
To provide
surface
water
source
Inadequate
storage
capacity
100 %
storage
capacity
Inadequate
Coverage
and Supply
Network
100 %
coverage
with
"potable
water
supply"
Inadequate
manpower
for
Operation &
Maintenance
100 %
O&M
Recovery
Action plans/Proposals
Surface source from Korsham
Ghat-Gour River (5 km away from
the town)
1 km length of intake pipeline & 5
km length of raising main has to be
improved.
1.30 MLD capacity of WTP has to
be constructed.
75 hp capacity of centrifugal pumps
are required
Priority Actions
Provision of water supply system with Gour River (5 km away from the town) as the source.
Provision of 1.30 MLD Capacity of Water Treatment Plant (WTP) near to the surface source.
Date: 17-09-2013
Page: Page 39 of 100
5.2
Sewerage System
Household Latrines
Barela lacks adequate sanitary facilities. Three out of ten houses have no latrine facilities indicating
open defecation in the town. 2001 Census indicates that 8.7 percent of the houses resort to pit
latrine, a practice that has almost become defunct in the modern cities. However, about 28.7 per
cent of the households have water closets. As per the discussions with the Nagar Parishad officials,
as per 2011, there are 20% of households with no latrine facilities (Open defecation).
Table 5.10 : Details indicating the Existing Sanitation Facilities
Particulars
Pit Latrine
Water Closet
Other Latrine
No Latrine
Date: 17-09-2013
Page: Page 40 of 100
5.3.1
Public Toilets
There is only one public convenience structure is in existence with 15 seats serving for the town
needs. The average users per day are estimated to be 100. The details of public conveniences are
shown in the following table.
Table 5.11 : Details of Public Convenience facility
a.
b.
c.
Total Seats
No of Users/ Day
1
15
100
The cumulative sewerage demand projected for the next 25 years is indicated in the following
table. Considering a per capita supply of 135 LPCD, the total domestic sewerage demand will be
2.1 MLD by 2035 (assuming 80 per cent of total water demand).
Table 5.12 : Demand Assessment 2035
Particulars
1.
Projected Population
2.
Quantum of water required (in MLD)
3.
Total quantity of Sewage (in MLD)
4.
Length of Trunk Lines (600 mm dia)
5.
Length of lateral Lines (100 mm dia)
6.
Capacity of treatment plant (in MLD)
Source: Analysis
Phase 1
Phase 2
Phase 3
2011-2015
2015-2025
2025-2035
13325
1.80
1.44
16009
2.16
1.73
12
47
1.73
19444
2.62
2.10
32
2.10
Indicator
Sewerage Estimated
Norm
Levels
80 % of water supply
2.1 MLD
Source: Analysis
5.3.5 SWOT Analysis
Strengths
60 % of households have
access to improved
sanitation.
City Development Plan for Barela Town
Weaknesses
Date: 17-09-2013
Page: Page 41 of 100
Opportunities
Availability of Undeveloped
Land For Locating
Amenities such as
Sewerage Treatment Plant
(Tentatively Next To LokSagar Talab)
Absence of an UGS system, presence of open defecation and stagnation of sewage leading
to environmental and health problems.
Low coverage of individual disposal system and about 40 per cent of the households resort
to open defecation.
Sewage and waste water entering into water bodies resulting, pollution hazards.
Issue
Under Ground
Sewerage
(UGS) system
Goal
Provision of
UGS with 100
% coverage
Open
defecation
Remove the
practice of
open
defecation
Absence of
sewerage
treatment plant
Provision of
mini sewerage
treatment plant
Lack of
Operation &
Maintenance
Adopt the
utility mapping
system
Strategies
Conducting a detailed
physical survey
Coverage of core areas on
priority basis
Extension of network to new
developed areas
Improving the existing public
toilets by providing adequate
facilities.
25 per cent of the
households shall be provided
with LCS focusing on urban
poor.
Construct the new public
toilets in un-served areas.
Capacity of STP should meet
the current gap and future
requirements in a phased
manner.
Sewerage quality analysis
needs to be upgraded.
Training & capacity building
programs for ULB staff.
Regular monitoring system.
Action plans/Proposals
Preparation of a
Comprehensive Sewerage
network plan.
Improvement of existing
public toilets: 1 Nos.
Constructing public toilets
in unserved areas: 4 Nos.
Construction of Low Cost
Sanitation units for 25 per
cent of the total
Households: 972 Nos.
2.10 MLD capacity of
SDGS system has to
construct.
2 ac of land has to acquire
for STP
Private Sector participation
in O&M to increase
efficiency of service
delivery.
Date: 17-09-2013
Page: Page 42 of 100
Priority Actions
Provision of Public Conveniences near Bus stand, Police station, society junction, Jain mandir &
Mela ground
Laying 79 km length sewer lines by 2035
Construction of toilets through low cost sanitation programs
Construction of public toilets in slums & poor settlements
Campaign at town level on stopping open defecation
Provision of SDGS system/Root zone treatment system1
The quantity of solid waste generated in Barela has increased in the past few years due to the
growth of commercial and service activities. At present the solid waste generated at household
level and on the streets is collected from the dustbins and open dumping points. The regular
collection is confined to the main streets of the town. The details of the existing SWM system are
detailed in the following Table.
Table 5.14 : Solid Waste Details in Barela 2011
Sl. No.
1.
2.
3.
4.
5.
6.
7.
Note:
Particular
Total Population (2011)
Domestic Waste (in tons)
Commercial Waste (in tons)
Quantum of Hospital Waste Generated (in tons)
Total Waste Generated Per Day (in tons)
Total Waste Collected Per Day (in tons)
Collection Performance (%)
Details
12,620
2.15
0.77
0.16
3.08
2.5
80.0
The average solid waste generated in Barela town is about 3.08 tons per day. The major source of
waste generation is the domestic waste. The total quantity of hospital waste generated is about
0.02 tons per day.
1
Date: 17-09-2013
Page: Page 43 of 100
5.4.2
The various sources of solid waste generated are out of domestic and commercial usage. Out of
the total waste generated in Barela, around 70.0 per cent is domestic waste, 25 per cent is of
commercial waste and the rest is through hospital waste.
The non-
biodegradable waste comprises of plastic, rubber, packaging materials, metal, batteries, and
construction waste.
5.4.3
At present open dumping is in practice. Door-to-door collection is not practised in the town. The
solid waste is dumped along the main roads & vacant lands. This type of open dumping will lead to
unhygienic conditions.
5.4.4
At present there are no standard practices followed for segregation and storage.
location
elsewhere
and
subsequently
carried to dumping site through trucks. There is no doorto-door collection system in the town.
As per the Nagar Parishad officials, approximately 2.5 tons
of waste is collected per day which indicates a collection
performance of 80 per cent. The main roads are swept every day and the waste is deposited in the
containers and is then taken to dumping site. The shortfall in the collection process is due to the
following reasons:
1.
Solid Waste deposits in the storm water drains which are left unattended.
2.
Improper dumping points and unscientific disposal methods like open dumping of waste on
roadsides, vacant sites, etc.
3.
4.
5.
5.4.6
It is informed by the officials of Nagar Parishad that a new landfill site is proposed near to ward
number 10, which is 3 km away from the city core. The total extent of the site is about 1.0
hectare. The following Table indicates the existing transport & disposal arrangements.
Date: 17-09-2013
Page: Page 44 of 100
1.
2.
3.
4.
5.
6.
7.
8.
9.
Particulars
Number of Dustbins
Total Number of Vehicles (Tractor)
Capacity of each vehicle (in quintals)
Total Number of Tippers/Handcarts
Age of Vehicle (in Years)
Persons per vehicle
Total Capacity of Vehicles (in tons)
Number of trips per day per vehicle
Type of Disposal
Units
17
1
4
2/10
15
1 driver + 5 persons
2
3
Open Dumping
The Nagar Parishad owns 1 tractor for disposal of solid waste. Capacity of each tractor is 4.0
quintals. Number of trips per day per vehicle is three. The distance traversed by each tractor per
day is around 3 km. However lack of adequate infrastructure and manpower has led to improper
removal, transportation and operational efficiency.
5.4.8
Institutional Set-up
Solid Waste Management is enlisted in the state list and is the obligatory responsibility of the ULB,
handled by the Health wing of each Nagar Parishad. The MSW rule 2000 put-forth detailed
guidelines for the entire process for handling Solid Waste Management. The field staffs include
drivers, cleaners & loaders. The number of staff in the ULBs varies depending on the size of the
ULB.
The staffing pattern as provided by the Nagar Parishad, Barela indicates that currently 3
employees of Nagar Parishad are discharging the duties of Solid Waste & Sanitation and additional
25 persons are employed for attending various other duties. The details of the staff are indicated in
the following table.
Table 5.16: Staff for Solid Waste Management in Barela
Number
1
2
3
22
25
Estimated waste generation in the town by the year 2035 is about 4.5 tons. Approximately 3.6 tons
of waste collection may be possible based on existing collection performance with some
improvement in management practices.
City Development Plan for Barela Town
Date: 17-09-2013
Page: Page 45 of 100
Indicator
Waste collection performance
Spacing of Dustbins
Road length per conservancy staff
Conservancy staff per 100 population
Norms
90 100 %
100 m
400 600 m
3
Number of Units
80
Irregular
1500 m
0.14
Source: Analysis
5.4.11 SWOT Analysis
Strengths
Type of solid waste generated is
predominantly domestic,
commercial and biomedical absence of industrial hazardous
waste
Weaknesses
Multiple disposal points.
Opportunities
Adaptation of Vermi Composting
methods
Threats
Possibility of public health hazards as the
dumping yards are located in the town
The location of dustbins should be reviewed and fixed with proper intervals and at proper
places so that efficiency can be increased.
Although the quantity of biomedical waste generated in Barela is very less, the improper
handling of the waste from the private clinics is leading to infectious conditions.
Date: 17-09-2013
Page: Page 46 of 100
5.4.13
Issue
Open
dumping
Absence of
Door-toDoor (D2D)
collection
Goal
Suitable space
(landfill site) for
disposal of
waste
Implementation
of D2D collection
system
Absence of
Encourage
segregation of Scientific
waste at the methods for
source
segregation
Priority Actions
Strategies
Initiating segregation of
waste at source.
Placing of collection bins
wherever is necessary
(suitable locations).
Identification of primary
collection points.
Provision of adequate
equipments & vehicles.
Provision of infrastructure & man power required for efficient solid waste management
Provision of slaughter house
Development of solid waste land fill site
Construction of Vermi-composting yard
Campaign for segregation of solid waste at source.
Date: 17-09-2013
Page: Page 47 of 100
5.5
Drainage System
1.
2.
3.
Particulars
Total Number of Households
Particulars
Per cent of Households having bathroom
facility within the house
Type of Connectivity for Waste Water Outlet
Closed Drainage
Open Drainage
No Drainage
Nos.
2183
% of Total No. of Households
32.39
6.92
49.89
43.20
Goti Talab
There is lack of primary drains in the town and Bargi canal is acting as a secondary drain for the city
Barela.
Date: 17-09-2013
Page: Page 48 of 100
type of storm water drains in the town. The road-drain ratio works out to 1:0.44. In other words, for
every 1000 m road length, 440 m drain length is available.
Map 5.3 Shows the Drainage network of the Town
Table 5.19: Details of Drainage in Barela
1.
2.
Drain Type
Open Drains Pucca
Open Drains Kutcha
3.
Closed Drains
4.
5.
Length (km)
12.0
5.0
Total
17.0
45 per cent
1: 0.44
to
generation
of
biodegradable
and
non-
due
to
human
interventions.
Environmentally
Particulars
Area (ha)
Status
Condition
Remarks
Goti Talab
3.5
Un-regulated
Bad
lacks maintenance
4.0
Un-regulated
Bad
lacks maintenance
Kuliyana Talab
0.25
Un-regulated
Bad
lacks maintenance
Devi Talaiya
0.5
Regulated
Avg.
lacks maintenance
Sl. No
1
2
3
Components
Existing Municipal road length
Additional road length required
Contemplated road length
Length
in km/ Nos.
38
40
79
Date: 17-09-2013
Page: Page 49 of 100
Sl. No
4
5
6
7
8
Length
in km/ Nos.
17
8.5
21
40
3
Components
Existing pucca drain length
Rehabilitation of existing pucca drain length
Provision of pucca drains in un-served areas (current gap)
Provision of pucca drains in future expansion areas
Number of lakes requiring development
Source: Analysis
5.5.7 SWOT Analysis
Strengths
Weaknesses
Opportunities
Threats
Issue
Lack of road
side pucca
drains
Goal
Provision
of
road
side
drains
Strategies
Lack of
Maintenance
of Talabs
Provision of
drains along
lanes in city
core areas
Protection and
conservation
of
water
bodies.
To create
sufficient
space for
laying of the
drainage
system
Rehabilitation
of
existing drains system
and extension to unserved areas.
Provision of road side
drains
in
future
extension areas.
Priority Actions
Date: 17-09-2013
Page: Page 50 of 100
The
NH 12 A
the physical development towards the eastern & western direction, which is predominantly ribbon
development. The details of roads are given in the following table.
Table 5.22 : Road Surface Details
Length
(km)
Surface Type
A.
Municipal Roads
1. Concrete
2. Water Bound Macadam
3.
Earthen
Total
B.
National Highways
Total
% to Total
Length
Condition of Road
(in km)
Good
Fair
Bad
20.0
52.6
15.0
5.0
10.0
26.3
13.15
6.0
4.0
5.0
7.89
100.00
2.0
17.0
1.0
12.0
9.0
5.0
35.0
3.0
38.0
Date: 17-09-2013
Page: Page 51 of 100
Truck Terminus
Currently, there is no truck terminal located in the town. Since, a lot of inter-state traffic moves along the
National highway, which pass through the town, it is essential to develop these facilities in order to
reduce the interactions of the heavy regional traffic with the local traffic of the town.
5.6.3 Junctions
There are four main junctions in the town namely, Bus stand Junction, Police station Junction, Mazoor
Junction and Society junction. NH-12A passes through all these junctions. The effective width of the
roads leading to the junction is minimal due to lot of informal commercial activities & on-street parking.
These junctions need to be upgraded and provided with traffic signals, signages, kerbs & foot paths. The
Map 5.5 indicates the road network in Barela.
5.6.4 Intermediate Public Transport System
The predominant modes of transport in the town are two-wheelers and Intermediate Public Transport
(IPT). The IPT mode consists of autos, jeeps & cycle rickshaws, which plays a vital role in catering to
common mans needs. Lack of adequate parking areas has resulted in vehicles being parked along either
side of the NH-12A in the town. The unregulated movement and irregular parking of these vehicles
creating hindrance to smooth sailing of vehicular and pedestrian movement. The intra-city commuting is
predominantly pedestrian. Under JnNURM Schemes
5.6.5 Parking Assessment
There are no organized or designated parking areas in the town for any type of mode. The rickshaws,
jeeps and the two-wheelers are haphazardly parked in all parts of the commercial and institutional areas.
On-street parking is not regulated. There are no bus bays, bus shelters and truck terminal in the town.
The absence of organized parking is leading to congestion at all junctions and market areas.
Date: 17-09-2013
Page: Page 52 of 100
Weaknesses
Opportunities
Threats
The road widths are narrow in old areas, thereby passing serious threat to smooth and effective
operations of ambulance and fire service in emergency services delivery.
Most of the roads in the older parts are equipped with CC surface. Remaining roads are kutcha in
nature, causing problems especially during rainy season. The road side drains being very small in
narrow roads in older areas, and as a result, during rainy season, the entire road gets chocked and
drained.
Footpaths are completely absent in all parts of the town. The pedestrian movement is displaced
hindering the traffic movement.
The main roads carrying heavy traffic are interconnected by narrow streets; this sometimes leads
to choking of traffic flow. These streets are also used as shortcuts causing noise and air pollution
in residential areas.
The junctions like Bus stand, Police station, mazdoor & Society lack safety measures and hence,
needs proper planning.
5.6.8
Issue
A
Lack of Bus
Stand
Goal
Provision of bus
stand with
proper
Strategies
Improve the
existing bus stand
with adequate
Date: 17-09-2013
Page: Page 53 of 100
Provision of bus
shelters along
the highway
Regional
traffic is
passing
through the
town
To minimize the
interface of
regional traffic
with local traffic
Provision of Bye
Pass to divert the
regional traffic
from the town
Provision of Truck
Terminals along
the NH-12
3 km length of Bye-pass
road from WTP to Mela
ground
Provision of truck terminal
along Jabalpur road by end
of plan period
Non-uniform
and narrow
widths of
roads
Removal of current
encroachments
and avoiding
future
encroachments
Widening of roads
CC Roads: 10 km
WBM Roads: 8 km
Widening of Roads:
NH-12A: 3 km
sub-arterial roads: 4 km
Provision of
parking spaces for
Rickshaws & Autos
Provision of
parking spaces in
commercial, public
& semi-public
places
Widening of
junctions
Provision of traffic
signaling systems
Provision of
medians
Provision of foot
paths along the
main roads &
commercial areas
To make
uniform and
regular width of
the roads
Lack of public
parking
spaces
facilities
Provide mini-bus
stands wherever is
necessary
Lack of Bus
Shelters
Improper
Road
Junctions
Lack of
Footpaths
Provision of
On-street and
Off-street
parking space
in appropriate
locations
Improving
junctions for
safe and
smooth flow of
traffic
Improvement
of footpaths
Priority Actions
Date: 17-09-2013
Page: Page 54 of 100
5.7
5.7.1
Street lighting is an important component of Traffic safety and management. In Barela there are about
650 street lights with different types of electrical fixtures. The average spacing of street light poles
ranges between 55 m to 60 m, as against the norm of 30 m indicating gross inadequacy of the system.
However, this condition is not uniform. Ward number 2,5,7,10,11 has less number of street lights.
Table 5.23 : Details of Street Lighting in Barela
Description
High Mast Lamps
Energy Saver Lamps
Sodium Vapour Lamps
Tube Lights
Empty Poles
1.
2.
3.
4.
5.
Total
Street Lights
5
80
205
265
100
650
Percentage to Total
0.77
12.31
31.54
40.07
15.38
100.00
Weaknesses
headquarter
Opportunities
Threats
services.
5.7.5
Issue
Goal
Strategies
Inadequate
Street
Lights
100 %
coverage of
streets
lighting in
the town
Provision of street
lights in un-served
areas.
Current gap:
Assessment of street
lights in future
Date: 17-09-2013
Page: Page 55 of 100
Issue
Goal
Strategies
development areas.
5.8
5.8.1 Introduction
As per 2001 population census, 285.35 million people reside in urban areas. It constitutes 27.8 per cent
of the total population of the country. In post-independence era while population of India has grown
three times, the urban population has grown five times. The rising urban population has also given rise to
increase in the number of urban poor. The urban poor and slums are by-products of economic
development and urbanisation process. It is indispensable to analyse status of poverty in any city
development exercise. Besides it becomes more important in the state like Madhya Pradesh where level
of poverty is relatively higher.
This section deals with the access of urban poor in Barela to basic services, drawing from secondary
information as well as site visits to slums in the town and interaction with local residents. The aim is to
identify key issues in service delivery to the poor in Barela and suggest strategies that would enable the
Nagar Parishad, Barela to address issues and fulfil its mandate of providing basic services to the poor in
the town.
5.8.2 Poverty in the Town
Various estimates of poverty in Barela have converged to between 50 to 60 per cent of total population.
As per the latest estimate made available by Nagar Parishad-Barela, the slum population in the town
stands at 2,113, which accounts to 17 per cent of the total population and total slum households are 423,
which accounts to 20.0 per cent of total households.
It is, now, widely understood that poverty is experienced through a variety of dimension out of which low
income is one among. Further, within the poor, there are variances in depth of poverty, the ability of
poor households to graduate from poverty and the relative vulnerability of different groups to withstand
risks to livelihood such as unemployment, sickness and eviction. Effective poverty reduction programmes
need to be able to differentiate these groups and design appropriate measures and shall be target group
responsive.
A total of 6,993 persons in Barela have been identified as those living Below Poverty Line (BPL). This
would mean that more than 57 per cent of total population in the town is living Below Poverty Line.
Available data reflects that a majority of slum dwellers in Barela are living Below Poverty line. A sizeable
poor population lives around the water body areas where they have ancestral shelters to live in but are
mostly unemployed.
Date: 17-09-2013
Page: Page 56 of 100
Ward No
Ward Name
Ward No.1
Kisani Mohalla
Ward No.2
Sardar Patel
Ward No.3
2011-BPL
HH
2011-slums
Population
HH
Population
102
459
68
306
Beohari
160
720
Ward No.4
Gandhi
82
369
Ward No.5
Ambedkar
79
356
Ward No.6
Jawahar
84
378
Ward No.7
Shastri
109
491
47
235
Ward No.8
Netaji Subash
132
594
54
268
Ward No.9
Azad
96
432
39
197
Ward No.10
Sarojini naidu
47
212
40
202
Ward No.11
Vinoba bhave
201
905
99
495
Ward No.12
133
599
74
372
Ward No.13
Vidhya Sagar
89
401
35
175
Ward No.14
75
338
34
170
Ward No.15
Bhagat Singh
97
437
1554
6997
422
2114
Total
Date: 17-09-2013
Page: Page 57 of 100
Slum Name
Shastri
Netaji Subash
Azad
Sarojini naidu
Vinoba bhave
Dada Than Than
Pal
Vidhya Sagar
Dr. Rajendra
Prasad
Services Covered
Partially Covered
5.8.5
Ward
No.
Land
Tenu
re
7
8
9
10
11
Pvt
Pvt
Pvt
Pvt
Pvt
12
Pvt
13
Pvt
14
Pvt
Water
Suppl
y
(Pipe
d)
Sanita
tion
(Sewer
Line)
S
W
M
Storm
Water
Drains
Stre
et
Ligh
ts
Roa
ds
Educ
ation
Hea
lth
Socia
l
Secur
ity
50-60%
0-50%
SWOT Analysis
Strength
Opportunities
Weakness
Date: 17-09-2013
Page: Page 58 of 100
5.8.6
Issues
Following are the issues based on the analysis done through secondary sources as well as observations
and discussions with ULB engineers, community based organizations and slum dwellers. Major issues in
brief are given below:
Inadequate infrastructural facilities like water supply, sewerage and roads, etc.
Absence of proper strategy and policies to create affordable housing stock for the urban poor in
the city.
Goal
Strategies
Provision of basic
services with
Inclusive
Planning.
schools, there are 3 other schools that are catering to the needs of secondary education and senior
secondary education. Students from surrounding villages are dependent on Barela town for education
purpose. The details of the existing educational institutions are provided in the following table.
Date: 17-09-2013
Page: Page 59 of 100
Type
Population
Year
Primary
Secondary/
High School
Senior
Secondary
School
College
Poly Technic
Norm (UDPFI)
Existing
No.
Area
No.
Area
No.
Area
1/ 2500 population
0.4 ha
1/ 7500 population
1.6 ha
1/ 7500 population
1.6 ha
No.
1/ 125000
population
4.0 ha
1/ 1000,000
2.4 ha
Area
No.
Area
Cumulative Demand
13325
16009
19444
2011
3
3
3
-
2016
5
2.0
3
4.8
3
4.8
2026
6
2.4
3
4.8
3
4.8
2035
7
2.8
4
6.4
4
6.4
0
-
0
-
0
-
4.0
1
2.4
Medical Facilities
1. Hospitals
2. Health Centers
3. Others/Clinics
Nos.
1
3
3
Source: Barela
Number of Doctors
2
6 (2 per Health Center)
3
No. of Beds
6
30 (10 per Health Center)
Date: 17-09-2013
Page: Page 60 of 100
The available data is compared with UDPFI guidelines to assess the adequacy of medical facilities. The
details of future demand for the medical facilities are provided in the following table.
Table 5.28 : Details of Future Demand for the Medical Facilities
Type
Projected Population
Hospital
No.
Maternity
Centers/Clinics
Community
Health Centers
Area
No.
Area
No.
Area
Norm (UDPFI)
Existing
1 for 100000
persons
3.7 ha
1/ 45000 population
0.2 ha
1/ 45000 population
0.2 ha
Cumulative Demand
13325
16009
2011
1
2016
1
2026
1
19444
2035
1
3
1
-
3.7
3
0.6
1
0.2
3.7
3
0.6
1
0.2
3.7
4
0.8
2
0.4
Type
Norm (UDPFI)
Community Hall
Local Park
Cremation
No.
No.
No.
Ground
1/ 15000 population
1/ 10000 population
2 sites for 5 lakhs
Existing
13325
16009
19444
2011
3
0
3
2015
1
-
2025
2035
2
-
5
3
5
(pop)
Police Station
No.
Markets
The major activity is observed at daily market, which is located along the NH in the town. This market
primarily caters to the daily needs of the population of the town. The market functions for 6 days in a
week. About 150 people visit the market on a regular week day. Weekly market (Mela ground) is located
in ward-10, wherein the total number of shops is about 100 and 1000 people visit on that day. Lack of
Date: 17-09-2013
Page: Page 61 of 100
parking space at Mela ground is leading to congestion in the area, thereby obstructing the pedestrian and
traffic movement.
5.9.6 Crematoria & Burial Grounds
There are 3 burial grounds in the town, which are primarily
serving the needs of Hindu and Muslim religions. The burial
grounds and crematoria are maintained properly. Though there
are sufficient to cater to the present needs, there is a need for
reservation of additional space for future requirement.
Graveyard in the Barela Town
5.9.7 City specific Strategies and Action Plans
Social Infrastructure
Issue
Inadequate
social
infrastructure
Goal
Development of
social
infrastructure to
improve the
Quality of Life
Strategies
Development of higher
education facilities,
vocational training centers
and job oriented training
facilities
Improvement of specialized
health services
Provision of cultural &
recreational facilities
Provision of additional burial
grounds
Provision of firefighting
facilities
Provision of hotel facilities
for visitors (outsiders)
Priority Actions
Provision of Parks
Primary schools: 7
Secondary high schools: 4
Senior secondary schools: 4
Polytechnic college: 1
Provision of Heath facilities:
Maternity hospitals: 1
Community halls: 6
Park: 3
Provision of land for additional
burial grounds: 2
Provision fire station: 1
Provision of hotels: 2
Date: 17-09-2013
Page: Page 62 of 100
CHAPTER 6
INSTITUTIONAL FRAMEWORK
Public sphere
in Bhopal
President/Chairperson
Ward Councilors
President in Council
Appeal Committee
Advisory Committee
Ward Committee
Figure 6.1: Organization Structure of the deliberative wing in Barela Nagar Parishad
As shown in the above figure, President and Vice-President are the elected bodies, whereas the Nagar
Parishad is headed by Chief Municipal Officer.
Date: 17-09-2013
Page: Page 63 of 100
Departmental Heads
Zonal Officers
-
Technical Staff
Non
Technical Staff
Ward Officers
Figure 6.2: Organization Structure of the Executive wing in Barela Nagar Parishad
Date: 17-09-2013
Page: Page 64 of 100
Date: 17-09-2013
Page: Page 65 of 100
Date: 17-09-2013
Page: Page 66 of 100
Total
Amount
(lakhs)
Phase
1
20122015
Phase
2
20152025
Phase
3
20252035
Gap/
Demand
Unit
Unit
Cost
(lakhs)
10
km
5.5
55.00
55.00
13
km
5.5
71.50
126.50
71.50
126.5
0.00
0.00
40
0.41
2.62
km
ML
MLD
5.5
60
11
221.87
24.37
28.87
12.19
28.87
110.94
12.19
-
110.94
-
A. System
Refurbishment
Existing improvement of
pipeline network
laying of network system in
un-served Areas
Sub Total (A)
B. System Augmentation
Pipeline system for
future/additional road
length
Additional storage capacity
Additional Treatment Plant
Date: 17-09-2013
Page: Page 67 of 100
Total
Amount
(lakhs)
Phase
1
20122015
Phase
2
20152025
Phase
3
20252035
Gap/
Demand
Unit
Unit
Cost
(lakhs)
75
hp
0.17
12.75
12.75
2.307015
0.301314
9
km
20
46.14
46.14
km
5.5
1.66
335.67
1.66
101.61
123.12
110.94
LS
5.00
5.00
LS
30.00
35.00
30.00
35.00
0.00
0.00
497.17
263.11
123.12
110.94
Capacity
Centrifugal pumps capacity
required
8.1.2 Sewerage
Proposed projects in sewerage sector were identified based on the future demand. In this sector
proposals are to prepare Root-Zone treatment system instead of Underground drainage system. Total
proposed investment is Rs. 82.28 lakh, which also includes conducting capacity building programmes at
town level.
A summary of projects and corresponding capital investment requirement for augmentation and
refurbishment of the sewerage system is presented in Table 8.2
Table 8.2: Investment Requirements for Sewerage Sector
Sewerage
A. System Refurbishment
Sewerage network plan- Root
zone system
Sub Total (A)
B. System Augmentation
Provision of DEWATS (Baffled
treatment system)
Sub Total (B)
C. Others
Capacity Building Programmes
for ULB Staff
Sub Total (c)
Grand Total (A+B+C)
City Development Plan for Barela Town
Gap/
Unit
Demand
Unit
Cost
(lakhs)
LS
3889
No's
LS
0.02
Total
Amount
(lakhs)
Phase 1
20122015
Phase 2
20152025
Phase 3
20252035
2.00
2.00
2.00
2.00
0.00
0.00
77.78
19.45
77.78
19.45
38.89
38.89
19.45
19.45
2.50
2.50
2.50
82.28
2.50
23.95
0.00
38.89
0.00
19.45
Date: 17-09-2013
Page: Page 68 of 100
Phase
2
20152025
Phase
3
20252035
Unit
Total
Amount
(lakhs)
8.5
Km
17.00
17.00
21
Km
5.5
115.50
115.50
132.50
132.50
0.00
0.00
Phase
1
20122015
Unit
Cost
(lakhs)
Gap/
Demand
40.34
Km
5.5
221.87
55.47
110.94
55.47
No's
15.00
15.00
10.00
10.00
246.87
65.47
125.94
55.47
379.37
197.97
125.94
55.47
Improvement of Lakes
Provision of Rainwater
harvesting system
LS
Unit
Unit
Cost
(lakhs)
Total
Amount
(lakhs)
Phase
1
20122015
Phase
2
20152025
Phase
3
20252035
HH
2.4
10.37
2.59
5.19
2.59
13
HH
0.08
1.04
0.26
0.52
0.26
Gap/
Demand
Date: 17-09-2013
Page: Page 69 of 100
Total
Amount
(lakhs)
Phase
1
20122015
Phase
2
20152025
Phase
3
20252035
0.65
0.65
12.06
3.50
5.70
2.85
0.05
0.05
0.05
0.05
0.00
0.00
10.27
2.57
5.14
2.57
10.27
2.57
5.14
2.57
0.25
0.49
0.49
10
20.00
10.00
10.00
20.49
10.49
10.00
0.00
50.00
50.00
10.00
10.00
5.00
5.00
65.00
65.00
0.00
0.00
5.00
5.00
5.00
5.00
0.00
0.00
112.86
86.60
20.84
5.42
Gap/
Demand
Unit
Unit
Cost
(lakhs)
65
HH
0.01
0.01
158
km
0.065
HH
LS
1
Ha
10
LS
LS
8.1.5 Sanitation
Proposed projects in Sanitation sector were identified based on the future demand. In sanitation sector it
is proposed to construct 4 nos of public toilets across various locations in the city. Total proposed
investment is Rs. 69.50 lakh, which also includes conducting capacity building programmes at town level
and construction of Low Cost Sanitation Units.
A summary of projects and corresponding capital investment requirement for augmentation and
refurbishment of the Sanitation system is presented in Table 8.5
Table 8.5 : Investment Requirements for Sanitation Sector
Sanitation
A. System Refurbishment
Improvement of Existing
Public Toilets
Gap/
Demand
Unit
No's
Unit
Cost
(lakhs)
Total
Amount
(lakhs)
3.00
Phase 1
20122015
3.00
Phase 2
20152025
Phase 3
20252035
Date: 17-09-2013
Page: Page 70 of 100
Sanitation
Sub Total (A)
B. System Augmentation
Construction of New Toilets
Construction of low cost
sanitation units
Sub Total (B)
C. Others
Capacity Building
Programmes for ULB Staff
Sub Total (c)
Grand Total (A+B+C)
Gap/
Demand
Unit
No's
950
No's
Unit
Cost
(lakhs)
Total
Amount
(lakhs)
3.00
Phase 1
20122015
3.00
Phase 2
20152025
0.00
Phase 3
20252035
0.00
6.5
26.00
26.00
0.04
38.00
38.00
64.00
64.00
0.00
0.00
2.50
2.50
2.50
69.50
2.50
69.50
0.00
0.00
0.00
0.00
LS
Phase
1
20122015
Phase
2
20152025
Phase
3
20252035
Unit
Unit
Cost
(lakhs)
Total
Amount
(lakhs)
km
2.5
15.00
km
20
100.00
100
115
100
15
Gap/
Demand
CC roads
WBM roads
A. Existing Improvement
15
2.5
km
10
25.00
25
km
22
110.00
110
135
110
25
km
25
75.00
75
0.00
0.00
Sub-Arterial roads
km
25
100.00
100
175
75
100
Sub Total (C )
Date: 17-09-2013
Page: Page 71 of 100
Gap/
Demand
Unit
Unit
Cost
(lakhs)
40
km
75
Phase
1
20122015
Phase
2
20152025
Phase
3
20252035
Total
Amount
(lakhs)
3000.00
1500
1500
3000
1500
1500
E. Parking Facilities
Near Bus station
LS
0.5
0.5
LS
0.5
0.5
LS
0.5
0.5
LS
3.5
1.5
No's
2.5
2.50
2.5
No's
2.5
2.50
2.5
2.5
2.5
No's
8.00
police station
No's
8.00
society
No's
8.00
24
16
0
0.00
Km
7.5
22.50
22.5
0.00
Km
5.00
27.5
22.5
Km
400
800.00
800
800
800
4285
319.5
1565.5
2400
897.5
97.5
800
3387.5
222
1565.5
1600
Date: 17-09-2013
Page: Page 72 of 100
Unit
Unit
Cost
(lakhs)
Total
Amount
(lakhs)
505
No's
0.15
75.75
Gap/
Demand
Phase
1
20122015
Phase
2
20152025
Phase 3
20252035
75.75
345
No's
0.1
34.50
17.25
17.25
1332
No's
0.15
199.80
39.96
39.96
119.88
No's
6.00
316.05
138.96
57.21
119.88
Grand Total
Gap/
Demand
500
Phase
1
20122015
Phase
2
20152025
Phase
3
20252035
Unit
Unit
Cost
(lakhs)
Total
Amount
(lakhs)
No's
1.5
750.00
150
225
375
15
15
765
165
225
375
15
15
15
15
10
10
10
10
790
190
225
375
A. Slum Upgradation
Construction of houses
Health & Education
Programmes
LS
LS
LS
Date: 17-09-2013
Page: Page 73 of 100
Description
Unit Cost
(Lakhs)
Unit Cost
(lakhs)
10
Amount
(Lakhs)
30
Total
30
Social Infrastructure
(SI)
Gap/
Demand
Unit
Unit
Cost
(lakhs)
Total
Amount
(lakhs)
Phase 1
20122015
Phase
2
20152025
Phase
3
20252035
LS
75
56.25
18.75
LS
25
25
Community Halls
LS
15
15
Crematorium Facilities
Market/Slaughter
house/Mela Ground
LS
10
10
LS
15
15
Social Security
LS
15
15
155
65
71.25
18.75
Grand Total
Summary of Sector wise Investments
The summary of proposed investment is presented in Table 8.11. Total investment proposed is Rs.
5781.93 lakh out of which Rs. 4991.93 lakh is proposed for urban infrastructure and governance and Rs.
790.00 lakh is proposed for basic services to the urban poor and housing for urban poor.
Date: 17-09-2013
Page: Page 74 of 100
Total
Amount
(lakhs)
497.17
Phase 1
Phase 2
Phase 3
2012-2015
2015-2025
2025-2035
263.11
123.12
110.94
82.28
23.95
38.89
19.45
379.37
197.97
125.94
55.47
112.86
86.60
20.84
5.42
69.50
69.50
0.00
0.00
3387.50
222.00
1565.50
1600.00
316.05
138.96
57.21
119.88
790.00
190.00
225.00
375.00
30.00
15.00
15.00
0.00
Sanitation
Traffic & Transportation (TT)
Environment
Urban Governance
Social Infrastructure (SI)
Grand Total
10.00
10.00
0.00
0.00
155.00
65.00
71.25
18.75
5781.93
1234.29
2242.75
2304.91
Date: 17-09-2013
Page: Page 75 of 100
The investment sustenance of the Barela Municipal Corporation is assessed using a Financial Operating
Plan (FOP) model. The FOP is a multi-year forecast of finances for a term till 2035-36. This analysis is
first done without introducing the identified capital investments in order to arrive at the borrowing and
investment capacities. The second step is to introduce certain reforms and consider necessary
measures, which is expected to improve the financial capability of the Nagar Parishad. The third step is
the sustainability will be checked with the reforms and without reforms. In simple, FOP is worked out
under three scenarios, viz.
a) Base Case; i.e. Do Nothing Scenario
b) Introduce reforms with no capital Investments; and
c) Investment Sustenance.
Date: 17-09-2013
Page: Page 76 of 100
Number of Assessments
In case of property tax, the total number of property tax assessments in 2011-12 as per BNP (Barela
Nagar Parishad) records adopted as the base. The number of properties in BNP has increased from 2388
to 3046 at a CAGR of 3.42 per cent during 2013-14 to 2017-18. A nominal growth rate of 2.00 per cent
(equivalent to forecast population growth rate of 2.32 per cent during 2013-14 to 2035-36) is adopted for
forecasting the number of property tax assessments.
The annual property tax demand per assessment in 2011-12 is Rs 250/- for pucca houses and is assumed
to be revised by 20 per cent beginning from 2013-14, at a conservative growth rate of 15 percent for
each three years. The presumed rate for analysis for domestic houses is Rs.300 and commercial is Rs.350
Per annum.
Collection Efficiency
The average property tax collection efficiency during 2009-10 to 2011-12 was 35 percent & 48 per cent
of arrears and current tax demands respectively. It is assumed that BNP would consider 35% and 45% in
2013-14 and gradually increase its tax collection performance to 90 per cent against arrears and current
tax demand respectively.
Water Tax/Charges
Number of Assessments
Presently, there are 1296 water connections, out of which, 1270 are domestic and 26 are commercial,
which is 54.27 % of the property tax assessments. Based on the population, the water connections are
assessed by dividing 5 people per house-hold. In this regard, based on the growth of the population, the
connections are increased to 2650 for the year 2035-36.
The average monthly water tax demand per assessment in 2011-12 is Rs. 60 for domestic and Rs.120 for
commercial and is assumed to be revised to Rs. 80 and Rs.130 beginning from 2013-14, at a
conservative simple growth rate of 15 per cent per 3 years.
Collection Efficiency
It is assumed that BNP would gradually increase its tax collection performance from 45 percent to 90
percent against arrears and current tax demand respectively.
Date: 17-09-2013
Page: Page 77 of 100
Number of Assessments
The ultimate number of assessments for solid waste charge is purely based on the property tax
assessments. It is assumed no.of property tax assessments is the base for the collection of revenue.
It is assumed that the average monthly solid waste charge demand is Rs. 20 per house hold for domestic
Rs.35 for commercial and it is also assumed that the rate will be revised for every three years at a
conservative growth rate of 15 per cent per every three years.
Collection Efficiency
It is assumed that BNP would gradually increase its tax collection performance from 45 percent to 90
percent against arrears and current tax demand respectively.
Other Taxes
Other relatively insignificant taxes like Road tax, Improvement tax, Market fees etc., are forecast to grow
at a nominal rate of 10-15% per cent per annum. It is assumed on the basis of CAGR and Average
annual growth (trend) rate, whichever is lower.
Date: 17-09-2013
Page: Page 78 of 100
New Investments:
Before moving to the various scenarios, it is necessary to discuss the details of the Capital Investment
Plan (CIP) and its application on the FOP. The next paragraphs detail on the same. For the purpose of
incorporating new investments, Let us discuss the below:
Amount
Sectors
Phase 1
Phase 2
Phase 3
2013-2016
2016-2026
2026-2036
Rs.(lakhs)
449.37
215.31
123.12
110.94
82.28
23.95
38.89
19.45
379.37
197.97
125.94
55.47
112.86
86.6
20.84
5.42
69.5
69.5
3387.5
222
1565.5
1600
316.05
138.96
57.21
119.88
790
190
225
375
Environment
30
15
15
Urban Governance
10
10
155
65
71.25
18.75
5781.93
1234.29
2242.75
2304.91
Sewerage
Sanitation
Phasing of new investments: The identified investments are phased into three; the first one, being
the short term is made for 5 years beginning 2011. The second phase is the midterm and begins from
2016-2026, and the third one being the long term ends with 2035-36.This is based on the demand and
priorities. The following table gives the details of phasing of investments.
The Grant from the central and state government is considered as 80:10 and the Nagar Parishad will get
its contribution as Loan from outside institutions
O&M Costs:
The details of O&M costs for each sector have been worked out and the same has been
incorporated in the analysis. The annual growth rate of O&M cost is 8% per annum. The details of O&M
calculation:
Particulars
Assumed %
2.00%
4.31
Sewerage
3.00%
0.72
2.00%
3.96
5.00%
4.33
Sanitation
2.00%
1.39
Date: 17-09-2013
Page: Page 79 of 100
Particulars
Assumed %
2.00%
4.44
2.00%
2.78
0.00
Environment
0.00
Urban Governance
0.00
2.00%
1.30
Grand Total
23.22
The financial operating plan, under the first scenario which is a Do Nothing situation (without
introduction of new investments). The details of same can be seen here It is to be noted that
Projections
Particulars
2013-14
2014-15
2015-16
2016-17
2017-18
Total Revenue
2,51,00,888 2,73,75,773 2,99,40,105 3,28,37,203 3,61,17,613
Total Expenses
2,48,54,864 2,65,28,652 2,84,11,138 3,05,32,306 3,29,26,837
Total Surplus
2,46,024
8,47,121
15,28,967
23,04,897
31,90,775
Closing balance
36,47,947
44,95,068
60,24,035
83,28,932 1,15,19,707
TE/TR
0.9902
0.9691
0.9489
0.9298
0.9117
FOP is done without introducing any new investments. Even though it has a good TE/TR ratio.
the above
2018-19
3,98,40,396
3,56,34,898
42,05,499
1,57,25,206
0.8944
The TE/TR (Total Expenditure/Total Revenue) ratio during the year 2035-36 is 0.6986 and having a
closing balance of Rs.60.02 crores at the end of the plan i.e 2035-36. The annexure of assumptions has
given in the last the FOP of the Base case scenario is given at annexure.
b)
It is basically introducing reforms that are likely, rather necessary for the ULB to execute, in order to
improve their financial position. Certain assumptions have been made on this account, which are the
prevailing trends in various other places. However, the assumptions are already discussed above.
Particulars
Total Revenue
Total Expenses
Total Surplus
Closing balance
TE/TR
Projections
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2,58,97,165 2,92,54,949 3,22,58,665 3,56,70,057 3,95,42,511 4,33,72,112
2,48,54,864 2,65,28,652 2,84,11,138 3,05,32,306 3,29,26,837 3,56,34,898
10,42,300
27,26,297
38,47,526
51,37,751
66,15,673
77,37,215
44,44,223
71,70,520 1,10,18,047 1,61,55,798 2,27,71,471 3,05,08,686
0.9598
0.9068
0.8807
0.8560
0.8327
0.8216
Date: 17-09-2013
Page: Page 80 of 100
It is to be noted that the above FOP is done without introducing any new investments. But by introducing
some reforms with based assumptions. Even then, it has a good TE/TR ratio.
The TE/TR ratio during the year 2035-36 is 0.6759 and having a closing balance of Rs.73.08 crores at the
end of the plan i.e 2035-36. The annexure of assumptions has given in the last the FOP of the Base case
scenario is given at annexure. The above has been without introducing new investments, and therefore
shows huge surpluses.
c)
This scenario is done to test the strength of ULB after incorporating the new investments on to scenario
2. While the same set of assumptions on management measures is made as in Scenario 2 is assumed
and considered here. The table is
Particulars
Total Revenue
Total Expenses
Total Surplus
Closing balance
TE/TR
2013-14
5,67,54,415
5,81,11,844
(13,57,430)
20,44,493
1.024
2014-15
7,24,55,099
7,23,20,510
1,34,589
21,79,082
0.998
2015-16
8,16,30,265
8,05,81,783
10,48,481
32,27,563
0.987
Projections
2016-17
4,68,83,807
4,85,86,628
(17,02,821)
15,24,743
1.036
2017-18
5,29,99,011
5,34,65,746
(4,66,736)
10,58,007
1.009
2018-19
6,57,99,612
6,54,05,991
3,93,621
14,51,628
0.994
It is to be noted that the above FOP is done by introducing new investments. But there is no good TE/TR
ratio in the initial years, but later it has slowly picked up to the sustainability. Even then, the ULB is not
strengthening on its own funding of sources. It has to approach outside institutions for its share. The
TE/TR ratio during the year 2035-36 is 0.7447 and having a closing balance of Rs.50.40 crores at the end
of the plan i.e 2035-36. The annexure of assumptions has given in the last the FOP of the Base case
scenario is given at annexure.
Recommendations:
The recommendation suggested therefore, is that the Nagar Parishad shall first introduce certain
management reforms and also certain management measures (not included in FOP) to start with, try
outsourcing activities, which will enhance revenues. It is advised after implementing measures, then the
Nagar Parishad is better to move to the Capital Investment plan. i.e implementing the measures gives
rather cash flows than capital investment
Suggested Measures:
The following measures are suggested to be implemented by the management of Nagar Parishad, which
is helpful for the improvements in managing the municipal activities. A few are given below:
Improvement to Property tax collections- Have tie-ups with nationalized banks and open E-SEVA
centers (like in Andhra Pradesh at Vijayawada Municipal Corporation) for collection of property tax, so
that payments become easier and will improve collection efficiency.
Address Government to expedite in resolving court cases, if any, the books of the municipality.
Date: 17-09-2013
Page: Page 81 of 100
As a final step and a more technologically advanced step, it is suggested that the ULB goes in for
GIS mapping of the entire properties, which will help in bringing all properties into tax net. This needs to
be updated periodically. A separate cell in the Municipal Administration is to be maintained in this regard.
Automatic revision of property tax rates and other taxes once in 3 years shall be made
mandatory.
On the expenditure side minimal reforms are helpful to reduce manpower and operational expenditure
can be attempted such as:
Introduce machinery for water supply like for pumping etc., and there by the Human resource
Outsource of solid waste management activities involving primary and secondary collection; there
are possibilities where, even the vehicles purchases can be invested by the operator.
Similarly, maintenance of street lights can be outsourced to ESCO (Energy Saving Companies
Periodical maintenance of pumps, etc. can prevent huge O&M expenditure and this also can be
outsourced.
Date: 17-09-2013
Page: Page 82 of 100
Provide for an integrated governance framework with transparency and clear lines of
authority and accountability to achieve the objectives of good urban governance;
Facilitate and promote inclusiveness, civic engagement and effective participation of the civil
society in city management;
Contribute towards financial sustainability of cities - strengthen the financial base of the cities
and make them bankable;
Enable the cities to work towards planned and integrated provision and operation and
maintenance of infrastructure;
Develop partnerships with public, private and other sectors for better provision and delivery
of services;
Extend the canvas of IT and eGovernance to all aspects of city management for efficient,
effective and timely service delivery; and
Promote pro-poor urban governance and work towards slum free cities with universal,
adequate and affordable housing and basic services;
Ensure renewal and revival of inner cities;
Contribute to municipal capacity enhancement.
Implementation of Reforms
Implementation of governance reforms is central to JnNURM. These reforms address issues of urban
governance and urban poverty in a sustainable manner. In what follows, an overview of mandatory and
optional reforms is presented.
S.No
Mandatory Reforms
Reforms Status
at ULB
Remarks
Yet to be
Implemented
October, 2013
March, 2014
July, 2013
Yet to be Initiated
Yet to be Initiated
Target
Date: 17-09-2013
Page: Page 83 of 100
Partially achieved,
except water and
consolidated taxes
2016-17
(UGS system may
not be
considered due
to proposal of
DEWATS)
Yet to be
Considered
2014-2015
Partially Initiated
2013-2014
Levy
of
reasonable
User
Charges by ULBs with the
objective that the full cost of
O&M is collected within the next
5 years.
S.No
Reforms Status
at ULB
Optional Reforms
Remarks
Revision
of
bye-laws
to
streamline the approval process
for construction of buildings,
development of site etc
Yet to be Initiated
Conversion
of
land
from
agriculture to non-agriculture
Yet to be Initiated
Introduction of property
certification system in ULB
Yet to be Initiated
Yet to be Initiated
Yet to be Initiated
Yet to be Initiated
Yet to be Initiated
title
Target
These Reforms
are targeted for
implementation
simultaneously
with the
implementation of
Mandatory
reforms
Date: 17-09-2013
Page: Page 84 of 100
Municipal Chairperson
Ward Councilors
Line Departments of the State Government such as Pollution Control Broad, Health Department,
Tourism Department, PHED, PWD, Traffic and transportation etc.,
Inspector of Police
Representatives of media
All the stakeholders and the citizens of the Town become the planning partners of the City Development
Plan.
Date: 17-09-2013
Page: Page 85 of 100
All the stakeholders identified play an important role in the City Development Planning Process and their
suggestions on various issues regarding the improvement of the quality of life in the Town are very much
a part of the City Development Plan.
Date: 17-09-2013
Page: Page 86 of 100
On behalf of the consultant team, Mr. K. Jagadeesh, Manager and Mr. Raghuram, Urban Planner
presented the methodology of the study, Visions and Strategies foreseen for the preparation of City
Development Plan. The consultants addressed the importance of data inputs from various line
departments in the plan preparation. Handouts have been circulated to all the representatives of 7 towns
and details are showed in Annexure 1.
All the suggestions were recorded during the meeting, and shall be incorporated in the Priorities and
Projects stage.
Relocation of slums
Giving training on folk art and folk culture to the slum dwellers
Date: 17-09-2013
Page: Page 87 of 100
Sectors
Demography
Land use
Income and
expenditure
Economic base
Housing
Analysis
sanitation
Sewerage/
Income
Property taxes, Grants, other revenues are the major Income sources
Property taxes and grants are gradually increasing year by year, which explains the
increase in growth and development activities
Expenditure
New construction, Health facilities, salaries and other expenditure are the major
expenditure sectors.
The priority has been clearly on improving health facilities and new construction of
various infrastructure provisions
Water supply
The Population of the Municipal area according to the 2011 census is 12,620.
Decadal Growth rate was 12.8 % during 2001 2011 years
Population Density (Persons per Hectare) was 12 (2011 year)
The estimated population for the year 2035 is 19,444
Nagar Parishad plays role in water supply, having 10 Tube wells, 7 hand pump facility.
Water Supply deficiency wards are 11, 12 & 13.
Population covered by water supply is (75%) and 107 LPCD
Total demand of water will be 2.62 MLD
Additional Storage capacity for the year 2035 is 1.30 ML
Sanitation system is completely through open drains along the roadways and houses
Some of the wards drains are maintained properly, but there are issues with the
chocking of water due to presence of waste materials in the drain.
There are no regularly planned drains in slum residing wards.
The storm water also runs through the same drains causing over flow problems in
rainy season.
Date: 17-09-2013
Page: Page 88 of 100
Sectors
Analysis
Nagar Parishad is responsible to collect and transfer the solid waste generating from all
the households in the Nagar Parishad area.
Tractors are available for solid waste collection and transfer
The collection frequency is once a week, leading to staking of waste along roadside and
near dust bins
Some of the slum wards have very poor management of solid waste; the situation
demands for better frequency of waste collection by the Nagar Parishad
No segregation of waste at source of collection
Estimated waste generated for the year 2035 is 4.5 tonnes
Solid Waste
management
Roads and
Transportation
Barela Nagar Parishad is well connected by roads to surrounding areas of Jabalpur and
other nearby places.
Nearest Railway station is Jabalpur
The total road length in Barela is 38 km.
There is no Public Transport facility available in Barela Nagar Parishad to nearby places.
The town is well developed with almost 90% of households having electricity
connections.
The remaining 10% of the households, not having connections are in squatter
settlements.
10 hours of power cut a day.
There are provisions for high mast lamps in the main roadways of Nagar Parishad.
The Barela town has 1 Hospital, 3 Health centers and 3 other clinics which does not
have satisfactory health facilities when compared to standards.
Electricity
Educational
Health
Recreational
facilities
Slums
Environmental
Sensitive Areas
Barela town has two private ponds; conservation of these two ponds should be given
priority.
Date: 17-09-2013
Page: Page 89 of 100
Date: 17-09-2013
Page: Page 90 of 100
requirement w.r.t Capital investment Plan(CIP), Introduction of Urban reform and finally
explaining about
funding pattern and Financial Operating Plan has been presented to facilitate the
discussion among the participants (refer Appendix: 3 for the copy of presentation).
10.7.3 Workshop Summary
The Meeting was attended by The President, Chief Municipal Officer, (Shri. G.P Chowbay), Municipal
Engineer, and all the Municipal Councilors and general public and gave their valuable suggestions for
development of the town.
The workshop summary has been explained in following stages.
1. In the welcome statement, the Chief Municipal Officer (Shri. G.P Chowbay) briefed the Purpose of the
meeting.
2. The Engineer of Barela Municipal Council has also elaborated on the role and need for the CDP.
3. Mr. Jagadeesh and Mr. Vishwanath, Urban Planners representing Aarvee Associates Pvt Ltd Hyderabad
for this project made a Presentation on the Sector analysis and Town Profile on the following topics.
The Town profile and sector analysis included the following topics
Demography Study
Physical infrastructure
Date: 17-09-2013
Page: Page 91 of 100
Water Supply
Storm water/Sanitation
Electricity
Social Infrastructure
Educational Facilities
Health Facilities
Other Facilities
Urban Reforms
Funding Pattern
Percentage increase in taxes to raise the fund by Nagar Parishad to meet the proposed
projects.
Date: 17-09-2013
Page: Page 92 of 100
Date: 17-09-2013
Page: Page 93 of 100
As shown in the above figure The blue color stretch represents good, red color represents
satisfactory and Green color represents the not satisfactory opinions of the people. Even though some
of the facilities represent major portion as satisfactory at present, the service levels would become largely
deficient in the coming years. The CDP aims at evaluating and providing satisfactory service levels for the
year 2035.
Priority
1
3
4
5
6
7
8
9
10
11
12
13
14
From the above table it is observed that the first and foremost priority in town which needs immediate
attention is provision of better and sustainable source for water supply system. The provision of housing
schemes for economically weaker sections, Encouraging setting up of small scale industries, re-design of
open drains, job training Programmes, public transportation facility, better garbage disposal, and
provision of children parks and theatres would be the priorities to form a lively and healthy living city. The
developmental aspects like water supply, drainage, garbage etc., leads to healthy environmental
Condition in the town and also helps in improving quality of the life in the town.
Essential elements of the vision
Because a vision statement will eventually be incorporated into the city development plan, it is essential
that the community identity or unique resources are identified, so that they are preserved through the
development process. Such categories may include, but are not limited to environmental resources such
as streams, mature woodlands, and agricultural resources historic cultural and scenic resources such as
Date: 17-09-2013
Page: Page 94 of 100
parks and recreation areas and non-renewable resources of economic value such as sand, gravel, land,
mineral deposits. The vision statement in the city development plan must be specific to be effective. The
community should be proactive with its vision statement.
VISION STATEMENT: Planned Development for Nagar Parishad Barela (2035)
Date: 17-09-2013
Page: Page 95 of 100
The local governments should effectively involve in efficiently collecting and disposing of solid waste,
encourage people to practice segregation of solid waste at source.
Vision
Vision is to achieve environmentally sustainable waste management practices .
100 % literacy
Universal access to primary health care and no one should die of preventable diseases
Date: 17-09-2013
Page: Page 96 of 100
Community empowerment
Provision of basic infrastructure both physical (water, roads, sanitation and sewerage) and
social infrastructure (clinics, schools, training facilities, etc).
11.5 Conclusion: Brief strategies, actions and projects for the city.
Urban Planning & Growth Management
The key issues emerging out of planning and growth management is that in-spite of not having master
plan for Barela town, its lacks in implementation and managing the development in an organized fashion,
which is leading to unplanned haphazard development. Absence of strategic project implementation
mechanism and inadequate financial resources to implement the schemes, lack of private sector
community participation in development process were identified as the existing challenges before the city
Managers.
The CDP process has undergone extensive dialogue with the technical people and public opinion in
prioritizing the key sectors for investments and reform initiatives. The following are the top prioritized
proposals which may guide, facilitate the Town to have a sustainable infrastructure and satisfactory living
conditions with enhanced quality of life.
New water treatment plant and supply system upgrading the existing system.
Date: 17-09-2013
Page: Page 97 of 100
Annexure-I
Details
Assumption
Tax receipts
Property Tax
10%
12%
Water Supply
15%
Road Tax
5%
Improvement Tax
1%
13%
0%
Market fees
8%
3%
Najul Ayi
1%
Others
1%
1%
1%
Water Supply
0%
6%
20%
10%
Pratibhoot
1%
Others
10%
Interest
2%
Others collections
8%
House rent
10%
1%
1%
2%
Nikshep
3%
8%
1%
1%
other fee
Bhavano ka nirmaan anugna shulk
10%
1%
Date: 17-09-2013
Page: Page 98 of 100
Details
Assumption
1%
General
1%
Education / others
1%
Capital Receipts
samany pryojana keliye moolbhoot sadak
10%
20%
Fundamental services
5%
1%
2%
12 / 13 finance commission
1%
10%
Other Works
15%
Revenue Expenditure
12%
b. Allowance / Emergency
20%
1%
d. Travel allowance
1%
1%
Office Expenditure
Establishment of revenue department and officials payment
13%
Allowance
10%
1%
Remuneration
9%
10%
Extra charges
1%
1%
Administrative expenses
8%
Education
Primary schools and mid day meal
15%
1%
Cook / chef
1%
1%
8%
library, auditorium,museums
10%
Date: 17-09-2013
Page: Page 99 of 100
Details
Assumption
Water Works
Government water
1%
Bonfire
1%
construction of embankment
1%
15%
20%
1%
10%
- Establishment
15%
- Provisional establishment
12%
25%
road irrigation
10%
Communicable type
15%
21%
Akasmikata
10%
20%
1%
1%
Improvements
Lok Nirman (Public Works)
Establishment
Construction workers
- Construction
New roads, lanes and drains construction
1%
1%
15%
1%
10%
Maintenance
8%
other works
10%
15%
1%
1%
Interest
1%
5%
Tractor maintenance
1%
1%
1%
legal chargers
1%
1%
1%
Date: 17-09-2013
Page: Page 100 of 100
Details
ABF
Assumption
1%
10%
Expenditure fee
15%
Extra
Expenditure on stamp ticket and postages
check book, bank kale, chagr
expenditure on national festivals
1%
10%
1%
15%
Expenditure on elections
3%
1%
1%
1%
Samvadhi nisheph
20%
15%
Others
15%
5%
10%
Others
Establishment
8%
5%
5%
New works
1%
1%
Purchase of stationary
5%
expenditure in advertisement
3%
Computer / xerox
5%
vehicle rent
1%
Furniture
1%
NH
12
A
Lok
Sagar
Talab
WARD NO. 2
WARD NO. 3
Kotwali
Mohalla
WARD NO. 4
WARD NO. 6
Mandir
va
da
Pa
rds
wa
To
Grave
Yard
Goti
Talab
WARD NO. 11
Higher
Secondary
School
Mela
Ground
Nagar
ParishadWARD NO. 10
WARD NO. 9
WARD Jain
NO. 8
Police
WARD NO. 7
Station
WARD NO. 12
Weekly
Market
School
Devi
Talaiya
Kulyana
Talab
WARD NO. 5
WARD NO. 14
WARD NO. 13
12
A
To
M wa
a
nd rds
la
NH
TITLE
LEGEND
MAP NO 1.1
WARD NO. 11
aarvee associates
CONSULTANT
Client:
Project:
City Development Plan
Scale - 1:15000
Ward No
Ward Boundary
Municipal Boundry
NH
Roads
Water bodies
Streams
Buildings
BASE MAP
Toward
s Jabalp
ur
NH
12
A
Rajol Nagar
Plots
WARD NO. 1
WARD NO. 15
Khalsa
Enginee
ring
Collage
Road
s
rd
wa r
To ghaa
Sil
WARD NO. 2
WARD NO. 6
WARD NO. 3
WARD NO. 4
WARD NO. 5
WARD NO. 8
WARD NO. 7
WARD NO. 12
WARD NO. 9
WARD NO. 11
WARD NO. 10
LEGEND
Municipal Boundary
Ward Boundary
50-150
0 - 50
Range (PPH)
4,5,6,12
7,8,9
1,2,3,10,11,
13,14,15
Wards
Ward Numbers
>150
Hatch
Client:
Project:
City Development Plan
Scale - 1:15000
WARD NO. 10
TITLE
WARD NO. 1
WARD NO. 15
WARD NO. 14
WARD NO. 13
CONSULTANT
aarvee associates
MAP NO 2.1
WARD NO. 1
NH
12
A
Lok
Sagar
Talab
WARD NO. 2
Kotwali
Mohalla
WARD NO. 3
WARD NO. 4
WARD NO. 6
rds
wa
To
Grave
Yard
WARD NO. 11
Higher
Secondary
School
Mela
Ground
NO. 10
Goti
Talab
Nagar
ParishadWARD
WARD NO. 9
Jain Mandir
NO. 7
WARD NO. 8
Police
WARD
Station
WARD NO. 12
Weekly
Market
School
Devi
Talaiya
Kulyana
Talab
WARD NO. 5
WARD NO. 14
WARD NO. 13
va
da
Pa
12
A
To
M wa
a
nd rds
la
NH
TITLE
LEGEND
Residential
Mixed
Commercial
Agricultural
Streams
Water bodies
Roads
National Highway
Municipal Boundary
Ward Boundary
Ward No
MAP NO 4.1
aarvee associates
CONSULTANT
Client:
Project:
City Development Plan
Scale - 1:15000
WARD NO. 11
EXISTING
LANDUSE MAP
Toward
s
Jabalpu
r
NH
12
A
WARD NO. 15
Khalsa
Enginee
ring
Collage
Road
s
rd
wa r
To ghaa
Sil
NH
WARD NO. 3
rds
wa
To
Grave
Yard
WARD NO. 11
va
da
Pa
Higher
Secondary
School
Mela
Ground
NO. 10
Goti
Talab
Nagar
Parishad WARD
WARD NO. 9
Jain Mandir
NO. 7
WARD NO. 8
Police
WARD
Station
WARD NO. 12
Weekly
Market
School
Devi
Talaiya
Kulyana
Talab
WARD NO. 5
WARD NO. 4
WARD NO. 6
Kotwali
Mohalla
Lok
Sagar
Talab
WARD NO. 2
12
A
WARD NO. 14
WARD NO. 13
12
A
To
M wa
a
nd rds
la
NH
TITLE
LEGEND
Building Blocks
Streams
Water Bodies
Roads
Ward Boundary
Ward Number
Municipal Boundary
Scale - 1:15000
MAP NO 4.2
WARD NO. 11
aarvee associates
CONSULTANT
Client:
Project:
City Development Plan
FUTURE GROWTH
DIRECTION
Toward
s
Jabalpu
r
NH
12
A
Rajol Nagar
Plots
WARD NO. 1
WARD NO. 15
Khalsa
Enginee
ring
Collage
Road
s
rd
wa r
To ghaa
Sil
NH
12
A
WARD NO. 3
s
ard
ow
T
Grave
Yard
WARD NO. 11
va
da
Pa
Higher
Secondary
School
Mela
Ground
NO. 10
Goti
Talab
Nagar
ParishadWARD
WARD NO. 9
Jain Mandir
NO. 7
WARD NO. 8
Police
WARD
Station
WARD NO. 12
Weekly
Market
School
Devi
Talaiya
Kulyana
Talab
WARD NO. 5
WARD NO. 4
WARD NO. 6
Kotwali
Mohalla
Lok
Sagar
Talab
WARD NO. 2
Water Treatment
Plant
WARD NO. 14
WARD NO. 13
12
A
To
M wa
a
nd rds
la
NH
TITLE
LEGEND
Building Blocks
Hand Pump
Culvert
Streams
Water bodies
Roads
Municipal Boundary
Ward Boundary
Ward No
MAP NO 5.1
aarvee associates
CONSULTANT
Client:
Project:
City Development Plan
Scale - 1:15000
WARD NO. 11
EXSISTING WATER
SUPPLY NETWORK
Toward
s
Jabalpu
r
Rajol Nagar
Plots
WARD NO. 1
WARD NO. 15
Khalsa
Enginee
ring
Collage
Road
s
rd
wa r
To ghaa
Sil
12
A
NH
12
A
Lok
Sagar
Talab
WARD NO. 2
Kotwali
Mohalla
WARD NO. 3
WARD NO. 4
WARD NO. 6
s
ard
ow
T
Grave
Yard
WARD NO. 11
va
da
Pa
Higher
Secondary
School
Mela
Ground
NO. 10
Goti
Talab
Nagar
ParishadWARD
WARD NO. 9
Jain Mandir
NO. 7
WARD NO. 8
Police
WARD
Station
WARD NO. 12
Weekly
Market
School
Devi
Talaiya
Kulyana
Talab
WARD NO. 5
WARD NO. 14
WARD NO. 13
Dumpying
Yard
12
A
To
M wa
a
nd rds
la
NH
LEGEND
Building Blocks
Dumping bins
Dumping Yard
Water bodies
Streams
Roads
Municipal Boundary
Ward Boundary
Ward No
MAP NO 5.2
aarvee associates
CONSULTANT
Client:
Project:
City Development Plan
Scale - 1:15000
WARD NO. 11
SOLID WASTE
MANAGEMENT
TITLE
Toward
s
Jabalpu
r
NH
Rajol Nagar
Plots
WARD NO. 1
WARD NO. 15
Khalsa
Enginee
ring
Collage
Road
s
rd
wa r
To ghaa
Sil
2
41
41
2
413
414
4
41
417
43
2
43
4
437
0
43
416
5
41
411
410
0
41
408
408
2
41
7
40
407
42
6
438
12
A
TITLE
LEGEND
WARD NO. 11
DRAINAGE
NETWORK
Building Blocks
Contours
Pacca Drains
Katcha Drains
Water bodies
Streams
Roads
Municipal Boundary
Ward Boundary
Ward No
413
6
41
7
41
407
412
8
40
416
41
6
425
MAP NO 5.3
aarvee associates
CONSULTANT
Client:
Project:
City Development Plan
Scale - 1:15000
427
NH
To
M wa
a
nd rds
la
8
42
419
9
41
va
da
Pa
Dumpying
Yard
Grave Yard
rds
wa
To
6
42
426
8
42
427
3
41
Goti
Talab
NO. 10
Mela
Ground
WARD NO. 11
Higher
Secondary
School
427
411
41
1
WARD NO. 3
431
409
405
408
408
41
1
40
7
412
406
406
41
4
409
417
40
4
406
40
8
6
40
42
5
42
7
407
Lok
Sagar
Talab
9
41
422
Nagar
Parishad WARD
43
0
WARD NO. 9
Jain Mandir
NO. 7
WARD NO. 8
41
6
1
42
423
7
40
2
41
405
4
41
415
WARD NO. 2
Kotwali
Mohalla
WARD NO. 4
WARD NO. 6
Police
WARD
Station
417
WARD NO. 13
416
420
422
41
3
WARD NO. 5
414
420
431
413
WARD NO. 1
40
9
406
Toward
s
Jabalpu
r
7
40
NH
12
A
413
419
Kulyana
Talab
418
1
43
411
WARD NO. 15
41
0
4
41
40
9
7
41
40
9
407
408
410
407
6
40
7
40
7
40
8
40
40
8
Khalsa
Enginee
ring
Collage
Road
437
440
7
43 438 439
6
43
5
43
8
40
409
410
411
6
41
41
5
WARD NO. 14
418
428
412
413
417
416
423
3
43
431
0
43
9
42
414
40
9
417
42
5
424
41
5
41
8
419
420
8
41
408
411
405
5
40
9
40
406
40
6
408
6
40
41
0
41
3
418
s
rd
wa r
To ghaa
Sil
0
42
Hi
gh
A
WARD NO. 1
12
Rajol Nagar
Plots
Lok
Sagar
Talab
WARD NO. 2
WARD NO. 3
Kotwali
Mohalla
WARD NO. 4
WARD NO. 6
Mandir
rds
wa
To
Grave
Yard
Goti
Talab
NO. 10
Mela
Ground
va
da
Pa
Higher
Secondary
School
WARD NO. 11
Nagar
ParishadWARD
WARD NO. 9
NO. 7
WARD Jain
NO. 8
Police
WARD
Station
WARD NO. 12
Weekly
Market
School
Devi
Talaiya
Kulyana
Talab
WARD NO. 5
WARD NO. 14
WARD NO. 13
Na
tio
na
12
To
M wa
a
nd rds
la
lH
i
gh
wa
y
LEGEND
Dense Areas
Slums along
the Water body
Streams
Commercial
Water bodies
Roads
Municipal Boundry
Ward Boundary
Ward No
MAP NO 5.4
aarvee associates
CONSULTANT
Client:
Project:
City Development Plan
Scale - 1:15000
WARD NO. 11
ENVIROMENT
SENSITIVE AREAS
TITLE
Toward
s Jabalp
ur
N
a
tio
na
l
wa
y
WARD NO. 15
Khalsa
Enginee
ring
Collage
Road
s
rd
wa r
To ghaa
Sil
WARD NO. 1
Rajol Nagar
Plots
NH
12
A
Lok
Sagar
Talab
WARD NO. 2
Kotwali
Mohalla
WARD NO. 3
WARD NO. 4
WARD NO. 6
Grave
Yard
rds
wa
To
WARD NO. 11
Higher
Secondary
School
Mela
Ground
NO. 10
Goti
Talab
Nagar
ParishadWARD
WARD NO. 9
Jain Mandir
NO. 7
WARD NO. 8
Police
WARD
Station
WARD NO. 12
Weekly
Market
School
Devi
Talaiya
Kulyana
Talab
WARD NO. 5
WARD NO. 14
WARD NO. 13
va
da
Pa
NH
To
M wa
a
nd rds
la
12
A
LEGEND
National Highway
Arterial
Sub arterial
Roads
Culvert
Water bodies
Municipal Boundary
Ward Boundary
Ward No
MAP NO 5.5
aarvee associates
CONSULTANT
Client:
Project:
City Development Plan
Scale - 1:15000
WARD NO. 11
EXSISTING ROAD
NETWORK
TITLE
Toward
s
Jabalpu
r
NH
12
A
WARD NO. 15
Khalsa
Enginee
ring
Collage
Road
s
rd
wa r
To ghaa
Sil
Toward
s
Jabalpu
r
WARD NO. 1
NH
12
A
Lok
Sagar
Talab
WARD NO. 2
Kotwali
Mohalla
WARD NO. 3
WARD NO. 4
WARD NO. 6
s
ard
ow
T
Grave
Yard
WARD NO. 11
va
da
Pa
Higher
Secondary
School
Mela
Ground
NO. 10
Goti
Talab
Nagar
ParishadWARD
WARD NO. 9
Jain Mandir
NO. 7
WARD NO. 8
Police
WARD
Station
WARD NO. 12
Weekly
Market
School
Devi
Talaiya
Kulyana
Talab
WARD NO. 5
WARD NO. 14
WARD NO. 13
12
A
To
M wa
a
nd rds
la
NH
SLUMS
LOCATION
MAP NO 5.6
WARD NO. 11
aarvee associates
CONSULTANT
Client:
Project:
City Development Plan
Scale - 1:15000
Ward No
Ward Boundary
Municipal Boundary
Culvert
Roads
Streams
Water bodies
Slums
LEGEND
TITLE
WARD NO. 15
Khalsa
Enginee
ring
Collage
Road
s
rd
wa r
To ghaa
Sil
50
'
NH
12
A
Water
Treatment
Plant
50
'
Proposed
Bus Stand
Kotwali
Mohalla
Lok
Sagar
Talab
40'
Bar
ghi
Irrig
atio
nC
ana
l
Police
Station
Jain
Mandir
Weekly
Market
Devi
Talaiya
Kulyana
Talab
40
'
Nagar
Parishad
School
rds
wa
To
Grave
Yard
Goti
Talab
va
da
Pa
Higher
Secondary
School
Mela
Ground
Burial
Ground
'
50
60
'
NH
To
M wa
a
nd rds
la
12
A
LEGEND
Existing Residentail
Use
Proposed Commercial
Use
EnvironmentalBuffer Zone
Existing Roads
Proposed Roads
Burial Ground
Water Bodies
Agriculture
Municipal Boundary
100m
300m
Scale - 1:14000
50m
ANNEXURE: II
aarvee associates
CONSULTANT
Client:
Project:
City Development Plan
PROPOSED
LAND USE MAP
TITLE
T
o
w
a
r
d
s Jabalp
ur
NH
12
A
60
'
50
'
Khalsa
Enginee
ring
Collage
Road
s
rd
wa r
To ghaa
Sil
50'
NH
12
A
Water
Treatment
Plant
50'
Proposed
Bus Stand
Kotwali
Mohalla
Lok
Sagar
Talab
40'
Bar
ghi
Irrig
atio
nC
ana
l
Police
Station
Jain
Mandir
Weekly
Market
Devi
Talaiya
Kulyana
Talab
40'
Nagar
Parishad
School
Grave
Yard
rds
wa
To
Goti
Talab
va
da
Pa
Higher
Secondary
School
Mela
Ground
Burial
Ground
50'
60
'
NH
To
M wa
a
nd rds
la
12
A
LEGEND
Existing Roads
Proposed Roads
Proposed Commercial
Use
EnvironmentalBuffer Zone
Burial Ground
Water Bodies
Agriculture
Municipal Boundary
100m
300m
Scale - 1:14000
50m
ANNEXURE: VI
aarvee associates
CONSULTANT
Client:
Project:
City Development Plan
PROPOSED
ROAD NETWORK MAP
TITLE
T
o
w
a
r
d
s Jabalp
ur
NH
12
A
60
'
50'
Khalsa
Enginee
ring
Collage
Road
s
rd
wa r
To ghaa
Sil
NH
12
A
60
'
50'
NH
12
A
Water
Treatment
Plant
50'
Proposed
Bus Stand
Kotwali
Mohalla
Lok
Sagar
Talab
40'
Bar
ghi
Irrig
atio
nC
ana
l
Police
Station
Jain
Mandir
Weekly
Market
Devi
Talaiya
Kulyana
Talab
40'
Nagar
Parishad
School
Grave
Yard
rds
wa
To
Goti
Talab
va
da
Pa
Higher
Secondary
School
Mela
Ground
Burial
Ground
50'
60
'
NH
To
M wa
a
nd rds
la
12
A
LEGEND
Proposed
Sewerage Treatment Plant
Proposed
Sewerage Network
Proposed Commercial
Use
EnvironmentalBuffer Zone
Existing Roads
Proposed Roads
Burial Ground
Water Bodies
Agriculture
Municipal Boundary
100m
300m
Scale - 1:14000
50m
ANNEXURE: IV
aarvee associates
CONSULTANT
Client:
Project:
City Development Plan
PROPOSED
SEWERAGE MAP
TITLE
T
o
w
a
r
d
s Jabalp
ur
Proposed
STP
50'
Khalsa
Enginee
ring
Collage
Road
s
rd
wa r
To ghaa
Sil
Dust Bin
Dust Bin
50'
Dust Bin
NH
12
A
50'
Dust Bin
Dust Bin
Kotwali
Mohalla
Lok
Sagar
Talab
40'
Bar
ghi
Irrig
atio
nC
ana
l
Proposed
Bus Stand
Water
Treatment
Plant
Dust Bin
Police
Station
Dust Bin
Jain
Mandir
Weekly
Market
Devi
Talaiya
Kulyana
Talab
Dust Bin
40'
Dust Bin
Nagar
Parishad
School
Dust Bin
Grave
Yard
rds
wa
To
Goti
Talab
va
da
Pa
Dust Bin
50'
Higher
Secondary
School
Mela
Ground
Burial
Ground
Dust Bin
Dust Bin
60
'
NH
To
M wa
a
nd rds
la
12
A
LEGEND
Proposed
Solid Waste Disposal Places
Proposed Commercial
Use
EnvironmentalBuffer Zone
Existing Roads
Proposed Roads
Burial Ground
Water Bodies
Agriculture
Municipal Boundary
100m
300m
Scale - 1:14000
50m
ANNEXURE: V
Dust Bin
aarvee associates
CONSULTANT
Client:
Project:
City Development Plan
PROPOSED
SOLID WASTE MAP
TITLE
T
o
w
a
r
d
s Jabalp
ur
NH
12
A
60
'
Dust Bin
Dust Bin
50'
Dust Bin
Khalsa
Enginee
ring
Collage
Road
s
rd
wa r
To ghaa
Sil
60'
Water Treatment
Plant
50'
NH
12
A
Water
Treatment
Plant
50'
Proposed
Bus Stand
Proposed
OHT
Kotwali
Mohalla
Lok
Sagar
Talab
40'
Bar
ghi
Irrig
atio
nC
ana
l
Police
Station
Jain
Mandir
Weekly
Market
Devi
Talaiya
Kulyana
Talab
40'
Nagar
Parishad
School
rds
wa
To
Grave
Yard
Goti
Talab
va
da
Pa
Proposed
OHT
Higher
Secondary
School
Mela
Ground
Burial
Ground
50'
12
A
To
M wa
a
nd rds
la
60' N
H
LEGEND
Proposed OHT
Proposed
Water Treatment Plant
Proposed Commercial
Use
EnvironmentalBuffer Zone
Existing Roads
Proposed Roads
Burial Ground
Water Bodies
Agriculture
Municipal Boundary
100m
300m
Scale - 1:14000
50m
ANNEXURE: III
aarvee associates
CONSULTANT
Client:
Project:
City Development Plan
PROPOSED
WATER SUPPLY MAP
TITLE
T
o
w
a
r
d
s Jabalp
ur
NH
12
A
50'
Khalsa
Enginee
ring
Collage
Road
s
rd
wa r
To ghaa
Sil
I. Introduction
Infrastructure is the basic requirement of urban life and its adequacy and accessibility are two
important ingredients key contributors in the up-gradation and enrichment of quality of urban life
which is the primary objective of any planned development effort. The extent and the nature of
problems faced by different towns vary by size, geographical conditions & local natural resources,
state/regional differentials in the resource availability & the policies, resource base of local
authorities and several such factors directly or indirectly affecting the population of cities/towns.
Sl.
No
1.
2.
3.
4.
5.
6.
7.
Source Particulars
Number of Tube wells
Number of Hand pumps
Number of ELSRs
Capacity of Treatment Plant (MLD)
Quantum of water Supplied (MLD)
Per capita consumption (LPCD)
Estimated Transmission and Distribution losses
(% of total supply)
Details
12 (10 are in working condition)
7
2
1.32
1.32
107
10
III.
The present per capita water supply is 107 LPCD. The future population growth calls for:
Additional storage capacity to meet the requirement of the growing population, densities and
increase of developed areas.
Particulars
1. Projected Population
2. Projected Households
3. Quantum of water required @ 135 lpcd
4. Required capacity of treatment plant
5. Additional Storage capacity (in ML)
Source: Analysis
Phase 1
Phase 2
Phase 3
2012-2015
2015-2025
2025-2035
13325
2665
1.80
0.48
0.13
16009
3202
2.16
0.84
0.25
19444
3889
2.62
1.30
0.41
The cumulative water demand projected for the coming 25 years is indicated in the Table 20.
Considering a per capita supply of 135 LPCD, the total domestic water demand will be 2.62 MLD by
2035. Adequate facilities for water storage, treatment and supply should be planned.
Weaknesses
Opportunities
Implementation
of
Threats
rain
water
harvesting
Goal
To provide
surface
water
source
Inadequate
storage
capacity
100 %
storage
capacity
Inadequate
Coverage
and Supply
Network
Inadequate
manpower
for
Operation &
Maintenance
100 %
coverage
with
"potable
water
supply"
100 %
O&M
Recovery
Strategies
Identify proper "Network
Plan" for Intake Pipe line
& Raising Main from
surface water source to
the town.
Improve the existing
Water Treatment Plant
Increase the capacity of
"Centrifugal Pumps".
Identify the location and
number of ELSRs
required.
Storage capacity should
meet future demand
Replacement and
extension of existing
network system.
Phase-wise replacement
of pipe lines.
Supply network plan for
future developments
Capacity building
initiatives for ULB staff to
improve skills.
Provide metered
household service
connections in a phased
manner.
Regular monitoring
system.
Action plans/Proposals
Surface source from Korsham
Ghat-Gour River (5 km away from
the town)
1 km length of intake pipeline & 5
km length of raising main has to be
improved.
1.30 MLD capacity of WTP has to
be constructed.
75 hp capacity of centrifugal pumps
are required
2 ELSRs are required.
0.41 ML of additional storage
capacity is required by the end of
the plan period 2035
10 km length of existing network
system has to be replaced.
13 km length of network has to be
laid in un-served areas.
40 km length of pipeline network
has to be laid in future
development areas.
Training & capacity building
programs for ULB staff.
New connections for 1000
households in a phased manner.
Water tariff should be revised
periodically.
Priority Actions
Provision of water supply system with Gour River (5 km away from the town) as the source.
VII.
Gap/
Demand
Unit
Unit
Cost
(lakhs)
Total
Amount
(lakhs)
Phase 1
20122015
10
km
5.5
55.00
55.00
13
km
5.5
71.50
126.50
71.50
126.5
0.00
0.00
40
km
5.5
221.87
110.94
110.94
0.41
ML
60
24.37
12.19
12.19
2.62
MLD
11
28.87
28.87
75
hp
0.17
12.75
12.75
2.307015
0.301314
9
km
20
46.14
46.14
km
5.5
1.66
335.67
1.66
101.61
123.12
110.94
LS
5.00
5.00
LS
30.00
35.00
30.00
35.00
0.00
0.00
497.17
263.11
123.12
110.94
Phase 2
20152025
Phase 3
20252035