SBPDCL BRGF Project phase-I Report

S. No. NIT

Name of Agency

R & M work ( in %)
overall
R&M
Supply Erection work (%)

New 33 KV line( in %)
overall
new 33
kv line
Supply Erection work (%)

New 11 KV line( in %)

Supply

Erection

overall 11
kv line
work (%) Overall %

196

M/s GKC-APL Joint Venture,

94.55%

73.92%

84.24%

69.92%

2.00%

35.96%

57.07%

5.00%

31.04%

50.30%

203

M/s Supreme & Co. Pvt.


Ltd,

48.00%

29.00%

38.50%

58.00%

7.00%

32.50%

36.00%

3.00%

19.50%

30.17%

204

M/s. Vijai Electricals


Limited

100.00% 87.45%

93.73%

90.46%

10.16%

50.31%

82.99%

41.32%

62.16%

68.73%

205

M/s Bajaj Electricals


Limited,

97.73%

78.33%

88.03%

92.18%

11.19%

51.69%

100.00%

41.55%

70.78%

70.16%

206

M/s East India Udyog


Limited,

78.65%

64.13%

71.39

88.80%

24.30%

56.55

61.26%

16.59%

38.92

54.923

207

M/s Bajaj Electricals


Limited,

100.00% 61.62%

80.81%

72.62%

2.00%

37.31%

82.13%

27.78%

54.96%

57.69%

208

M/s Technofab-Gammon
Joint Venture,

100.00% 49.05%

74.53%

100.00%

7.17%

53.59%

100.00%

13.10%

56.55%

61.55%

Work Achivement of last month During 23.02.2015 to 03.03.2015 of Special Plan(BRGF) Phase-I
NIT NO: 196/PR/SBPDCL/2013

Sl NO Details of Work

Name of Agency: M/s GKC -APL joint venture,Hydrabad

Unit

District: Gaya,Nawada & Jahanabad

Supply Portion

Erection Portion

Mar-15

Mar-15

Achievement
up to
23.02.2015

Achievement
up to
03.03.2015

New PSS

Soil testing & Contour Survey

Nos

Construction of Boundry Walls

Nos

Construction of Control Rooms

Nos

10 MVA Power Transformer

Nos

33 KV VCB with Control Panel

Nos

2
20
-

2
20
-

Achievement
During Last
Month

Achievement
up to
23.02.2015

Achievement
up to
03.03.2015

Achievement During Last


Month

3
1.75
0
0
0
0
0
0
0
0

3
3
0
0
0
0
0
0
0
0

0
1
0
0
0
0
0
0
0
0

5
47
125
5
24
24

5
51
127
28
54
24
0
47
0
0
0
47
0
65
279
0
0
0
0
344

0
4
2
23
30
0

Nos

11 KV VCB with Control Panel

Nos

33 KV & 11 KV Current Transformer

Nos

33 KV & 11 KV Potential Transformer

Nos

33 KV AB switch

Nos

11 KV AB switch

Nos

R&M of existing Power Sub Stations

Nos

5 MVA to 10 MVA

Nos

33 KV VCB

Nos

11 KV VCB

Nos

33 KV AB switch

Nos

11 KV AB switch

Nos

Civil Works for Control rooms and Boundary W Nos

New 33 KV Line

CKms

13 Meter Rail Pole

Nos

ACSR Wolf Conductor

Kms

33 KV V Cross arm with matching materials

Nos

33 KV Pin Insulators

Nos

33 KV Disc/Post Insulators

Nos

Stone Base Plate

Nos

New 11 KV Line

CKms

13 Meter Rail Pole

CKms

400 Kg PSC pole

Nos

ACSR Dog Conductor

Kms

11 KV V Cross arm with matching materials

Nos

11 KV Disc & Post Insulators

Nos

11 KV Pin Insulators

Nos

Stone Base Plate

Nos

373
113.0
244
1,915
642
807

373
114.0
244
1,915
642
807

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0

1480
419
415
760
103
9,000
1,899

1480
432
415
760
103
9,000
1,912

0
13
0
0
0
0
13

5
85
133
47
115
-

5
85
133
47
115
-

31
0
0
0
0
31
65
259
0
0
0
0
324

16
0
0
0
0
16
0
20
0
0
0
0
20

South Bihar Power Distribution Company Ltd


Progress of Work of Special Plan(BRGF) Phase-I
NIT NO: 196/PR/SBPDCL/2013
LOA No & Date:1545 & 1546 Date :-09.12.13
Date of Completion for R&M :-06.08.14
Date of Completion for New PSS :-06.11.14

Date:-03/03/201
Name of Agency: M/s GKC -APL joint venture,Hydrabad
Date of Agreement/Effective date:07.01.14

Package Cost: 85.20 Crores


Status of Mobilization Advance: Payment done (INR 6,71,00,000/- for Supply and INR
1,81,00,000/- for Erection portion) (Total INR 8.52 Crores)

Status of
Land:

District: Gaya,Nawada & Jahanabad


Date of Completion: 7 Months for R&M

1) Mayabigha - Land Made Available


2) Majhwe Land Made Available
3) Dakhshini Jehanabad - Land Acquired by 11.09.2014
Supply Portion

Sl NO

Details of Work

Unit

Frozen.
Quantity

New PSS

Nos

Soil testing & Contour Survey

Nos

3
3

Nos

Nos

3
6
12
24
36+72
9+9
30
51
39
5
85
133
50
146

Nos

29

Construction of Boundry Walls

c
d
e
f
g
h
i
j

Construction of Control Rooms


10 MVA Power Transformer
33 KV VCB with Control Panel
11 KV VCB with Control Panel
33 KV & 11 KV Current Transformer
33 KV & 11 KV Potential Transformer
33 KV AB switch
11 KV AB switch

Nos
Nos

R&M of existing Power Sub Stations

Nos

a
b
c
d
e

5 MVA to 10 MVA
33 KV VCB
11 KV VCB
33 KV AB switch
11 KV AB switch
Civil Works for Control rooms and
Boundary Walls

Nos
Nos
Nos

Nos
Nos
Nos
Nos
Nos
Nos

Nos

Erection Portion

Mar-15

Mar-15

Cumulative
Target

Achieved

6
12
24
36+72
9+9
30
51

6
12
24
36+72
9+9
20
51

0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
66.67%
100.00%

3
3
6
12
24
36+72
9+9
30
51

5
85
133
50
146

5
85
133
47
115

100.00%
100.00%
100.00%
94.00%
78.77%

5
72
131
50
146

5
52
127
24
58

0.00%

29

24

Page 3 of 26

29

% of work
completed

0.00%

Cumulative
Target

Achieved

3
3
1
0
0
0
0
0
0
0

Supply Portion
Sl NO

a
b
c
d
e
f
4

a
b
c
d
e
f
g

Details of Work

Unit

Frozen.
Quantity

48.0
912
Nos
13 Meter Rail Pole
148.32
Kms
ACSR Wolf Conductor
846
33 KV V Cross arm with matching materia Nos
2859
Nos
33 KV Pin Insulators
642
Nos
33 KV Disc/Post Insulators
999
Nos
Stone Base Plate
New 11 KV Line
CKms 176.38
1615
CKms
13 Meter Rail Pole
1386
Nos
400 Kg PSC pole
545.014
Nos
ACSR Dog Conductor
3096
11 KV V Cross arm with matching materia Kms
2856
Nos
11 KV Disc & Post Insulators
10578
Nos
11 KV Pin Insulators
Nos
3001
Stone Base Plate
New 33 KV Line

Erection Portion

Mar-15
Cumulative
Target

Mar-15

Achieved

% of work
completed

Cumulative
Target

912
170.07
846
2859
642
999

692
114.0
244
1,915
642
807

75.88%
67.03%
28.84%
66.98%
100.00%
80.78%

999
170.07
846
2859
642
999

1615
1386
621.8
3096
2856
10578
3850

1480
1084
415
760
103
9,000
1,912

91.64%
78.21%
66.74%
24.55%
3.61%
85.08%
49.66%

2304
1546
621.8
3096
2856
10578
3850

CKms

Page 4 of 26

Achieved

0
51
0
0
0
51
0
84
319
0
0
0
0
403

e:-03/03/2015

y 11.09.2014

n Portion

r-15
% of work
completed

100%
100%
33%
0%
0%
0%
0%
0%
0%
0%
100%
72%
97%
48%
40%
83%
Page 5 of 26

n Portion

r-15
% of work
completed

0%
5%
0%
0%
0%
0%
5%
0%
4%
21%
0%
0%
0%
0%
10%

Page 6 of 26

Achievement Vs Target for (Supply &Erection) (New & R&M Works) up to Decem
Plan(BRGF) Phase-I

NIT NO: 196/PR/SBPDCL/2013

Name of Agency: M/s GKC -APL joint venture,Hydrabad


Districts:

Gaya

LOA No & Date: 1545 & 1546 Date :-09.12.13


Date of Agreement/Effective date: 07.01.14
Date of Completion:-06.11.14
Package Cost: 14.95 Crores
Status of Mobilization Advance: ( 1.495 Crores = Supply + Erection )

Mar-15
Sl NO

Details of Work

Unit

Frozen.
Quantity

Supply
Cumulative
Cumulative
Target
Achivement

R&M of PSS

Nos

16

5 MVA to 10 MVA

Nos

3.15MVA to 5MVA

Nos

33 KV VCB

Nos

29

29

29

11 KV VCB

Nos

65

65

29

33 KV AB switch

Nos

43

43

37

11 KV AB switch

Nos

62

62

62

New Line (11 KV)

CKms

20.3

13 Meter Rail Pole

Nos

179

179

170

400 Kg PSC pole

Nos

161.5

161.5

132

ACSR Dog Conductor

Kms

62.7

62.7

31

11 KV V Cross arm with


matching materials

Nos

345.0

345.0

253

11 KV Disc & Post Insulators

Nos

4140.0

4140.0

11 KV Pin Insulators

Nos

1156.0

1156.0

1026

Stone Base Plate

Nos

340.0

340.0

340.0

As per Approved Bar Chart/Pert Network

& R&M Works) up to December 14 under Special


hase-I

Date:13/03/2015

on )
Mar-15
Erection
Cumulative
Cumulative
Target
Achivement
10

29

25

65

59

43

18

62

13

19.7

179

161.5

61

62.7

345.0
4140.0
1156.0
340.0

61

Remarks

South Bihar Power Distribution Company Limited:Patn


Achievement Vs Target for (Supply &Erection) (New & R&M Works) up to
Special Plan(BRGF) Phase-I
NIT NO: 196/PR/SBPDCL/2013

Da

Name of Agency: M/s GKC -APL joint venture,Hydrabad


Districts:

Nawada

LOA No & Date: 1545 & 1546 Date :-09.12.13


Date of Agreement/Effective date: 07.01.14
Date of Completion:-06.11.14
Package Cost: 42.58 Crores
Status of Mobilization Advance: ( 4.258 Crores = Supply + Erection )

Mar-1
Sl NO

Details of Work

Unit

Frozen.
Quantity

New PSS

Nos

Soil testing & Contour Survey

Nos

Construction of Boundry Walls

Supply
Cumulative
Target

Cumulative
Achivement

Nos

Construction of Control Rooms

Nos

10 MVA Power Transformer

Nos

33 KV VCB

Nos

11 KV VCB

Nos

16

16

33 KV AB switch

Nos

20

20

20

11 KV AB switch

Nos

34

34

R&M of PSS

Nos

13

13

5 MVA to 10 MVA

Nos

3.15MVA to 5MVA

Nos

33 KV VCB

Nos

18

18

17

11 KV VCB

Nos

44

44

32

33 KV AB switch

Nos

10

10

10

11 KV AB switch

Nos

35

35

34

Mar-1
Sl NO

Details of Work

Unit

Frozen.
Quantity

CKms

40.5

Supply
Cumulative
Target

Cumulative
Achivement

New 33 KV Line

13 Meter Rail Pole

Nos

770

770

492

ACSR Wolf Conductor

Kms

125.145

125.145

90.0

33 KV V Cross arm with


matching materials

Nos

729

729

33 KV Pin Insulators

Nos

2307

2307

33 KV Disc/Post Insulators

Nos

729

729

Stone Base Plate

Nos

770

770

New 11 KV Line

CKms

100.4

13 Meter Rail Pole

Nos

966.96

1153

308

400 Kg PSC pole

Nos

739

805

150

ACSR Dog Conductor

Kms

254

254

233

11 KV V Cross arm with


matching materials

Nos

1706

1958

11 KV Disc & Post Insulators

Nos

602

494

11 KV Pin Insulators

Nos

5118

5874

Stone Base Plate

Nos

1706

1958

As per Approved Bar Chart/Pert Network

Company Limited:Patna
ew & R&M Works) up to December 14 under
F) Phase-I
Date:13/03/2015

on )
Mar-15
Erection
Cumulative
Target

Cumulative
Achivement

16

20

34

13

18

10

44

31

10

35

27

Remarks

Mar-15
Erection
Cumulative
Target

Cumulative
Achivement

47.5

770

125.145

729
2307
729
770
82.3

1153

805

196

254

1958
494
5874
1958

202

Remarks

Achievement Vs Target for (Supply &Erection) (New & R&M Works) up to


Special Plan(BRGF) Phase-I

NIT NO: 196/PR/SBPDCL/2013

Name of Agency: M/s GKC -APL joint venture,Hydrabad


Districts:

Jahanabad

LOA No & Date: 1545 & 1546 Date :-09.12.13


Date of Agreement/Effective date: 07.01.14
Date of Completion:-06.11.14
Package Cost: 27.7 Crores
Status of Mobilization Advance: ( 2.77 Crores = Supply + Erection )
Mar-15
Sl NO

Details of Work

Unit

Frozen.
Quantity

New PSS

Nos

Supply
Cumulative
Cumulative
Target
Achivement
1

Soil testing & Contour Survey

Nos

Construction of Boundry Walls

Nos

Construction of Control Rooms

Nos

10 MVA Power Transformer

Nos

33 KV VCB

Nos

11 KV VCB

Nos

33 KV AB switch

Nos

10

10

11 KV AB switch

Nos

17

17

R&M of PSS

Nos

10

10

5 MVA to 10 MVA

Nos

3.15MVA to 5MVA

Nos

33 KV VCB

Nos

25

25

25

11 KV VCB

Nos

58

58

36

33 KV AB switch

Nos

11 KV AB switch

Nos

49

49

49

Sl NO

Details of Work

Unit

Frozen.
Quantity

CKms

7.5

Mar-15
Supply
Cumulative
Cumulative
Target
Achivement

New 33 KV Line

13 Meter Rail Pole

Nos

143

143

143

ACSR Wolf Conductor

Kms

23

23

23

33 KV V Cross arm with matching


materials

Nos

135

135

135

33 KV Pin Insulators

Nos

427

427

427

33 KV Disc/Post Insulators

Nos

135

135

135

Stone Base Plate

Nos

143

143

143

New Line (11 KV)

CKms

56.0

13 Meter Rail Pole

Nos

469

469

469

400 Kg PSC pole

Nos

486

486

486

ACSR Dog Conductor

Kms

173

173

120

11 KV V Cross arm with matching


materials

Nos

952

952

253

11 KV Disc & Post Insulators

Nos

672

672

100

11 KV Pin Insulators

Nos

3024

3024

3024

Stone Base Plate

Nos

955

955

637

As per Approved Bar Chart/Pert Network

w & R&M Works) up to December 14 under


) Phase-I
Date:30/03/2015

Mar-15
Erection
Cumulative
Cumulative
Target
Achivement
1

1
2

10

17

10

25

16

58

37

49

Remarks

Mar-15
Erection
Cumulative
Cumulative
Target
Achivement

143

51

23

135
427
135
143

51

74

469

78

486

96

173

952
672
3024
955

174

Remarks

South Bihar Power Distribution Company Limited:Patna

Special Plan(BRGF) Phase-

1.Name
M/s GKC-APL
Venture,
DETAILS of
OFAgency:
Feeders(33KV
& 11KVJoint
Line)BRGF
WORK IN Gaya District
Survey No. 9(P), CII Green Building Lane,
Hitech City Kondapur, Hyderabad-500084

Name of Feeder
Sl.No.

Particular
From

To

paibigha

Kathar

Imamgunj
PSS

Imamgunj
Town

New 11 KV Imamgunj
Line
PSS

Ranigunj

Belaganj
Paibigha

Length of Length
Line On
of Line
Rail
PSC
rail
on PSC Pole(LOA Pole(LOA
Pole(LOA Pole(LOA Quantity) Quantity
Quantity) Quantity
CKm
)CKm
CKm
)CKm

30.9

30.9

170

170

Kabirpur
Men

Sub-Total

30.9

30.9

170

170

Length of Line (In


CKm.)

Rail Pole PSC Pole

3.15

3.38

4.5

10.53

9.5

atna

Special Plan(BRGF) Phase-I


Date:13/03/2015

Proposed Qty (In Pole dumped


Nos)
at site

Pole
Erection(In
Nos.)

Stringing(In
Ckm)

Rail Pole

PSC
Pole

Rail
Pole

PSC
Pole

Rail
Pole

PSC
Pole

Rail
Pole

PSC
Pole

68

70

54

60

57

60

WIP

77

88

27

85

112

34

179.01

161.5

190

200

61

Remarks

South Bihar Power Distribution Company Limited:Patna

Special Plan(BRGF) Phase-I

DETAILS OF Feeders(33KV & 11KV Line)BRGF WORK IN Nawada District


A. Special Plan(BRGF) Phase-I
1.Name of Agency: M/s GKC-APL Joint Venture,

Name of Feeder
Sl.No.

From

Proposed Qty (In


Nos)

Rail Pole

Rail Pole

12.5

238

15

285

13

247

40.5

770

Orhanpur New PSS


Mayabigha New
PSS

New 33 KV Line Nawada Grid


Wagirganj Grid

60

1140

Majhwe

Sub-Total

From

To

60

1140

Length of
Length of Line
Line on PSC
On rail
Rail Pole(LOA PSC Pole(LOA
Pole(LOA
Pole(LOA
Quantity)CKM Quantity)CKM
Quantity)CK
Quantity)CKM
M

Rail Pole

PSC Pole

12.68

216

2)Majhwe New PSS to Baidnathpur

6.17

105

3)Majhwe New PSS to Latawan

119

16.3

277

16.41

279

2.47

42

8.88

151

1.2

20

5.47

93

1)Majhwe to

Chetriya

4)Majhwe New PSS to Gaundane Bigha


5)Majhwe New PSS to Nagma
2

Length of Line (In Km.)


Rail Pole(LOA Quantity)CKM

To

Nawada
1

Length of Line On rail


Pole(LOA Quantity)CKM

Particular

Rail Pole PSC Pole

New 11 KV Line
6)Majhwe New PSS to Tungi
7) Govindpur PSS to

Lakhpath bigha

9) Mayabigha New
PSS to

Kadirganj Town

10) Mayabigha New


PSS to

Pachiya

64

64

1088

1088

11)Mayabigha New
PSS to

Thika

6.7

114

12) Mayabigha New


PSS to

Hemja

102

13) Mayabigha New


PSS to

Daulatia Village

7.78

132

14) Mayabigha New


PSS to

Aathi

3.29

56

56.88

43.47

966.96

739

Sub-Total

64

64

1088

1088

on Company Limited:Patna

Special Plan(BRGF) Phase-I


Date:03/03/2015

Pole dumped at
site

Pole Erection(In
Nos.)

Stringing(In
Ckm)

Rail Pole

Rail Pole

Rail Pole

240

17

235

492

Rail Pole PSC Pole

Rail
Pole

PSC
Pole

Rail
Pole

PSC
Pole

150

15

80

100

11

113

50

150

136

20

120

45

125

110

140

56

369

845

11

196

South Bihar Power Distribution Company Limited:Patna

Special Plan(BRGF)

DETAILS OF Feeders(33KV & 11KV Line)BRGF WORK IN Jehanabad District


A. Special Plan(BRGF) Phase-I
1.Name of Agency: M/s GKC-APL Joint Venture,

Name of Feeder
Sl.No.Particular

33KV Line

Rail Pole(LOA
Quantity)CKM

Length of Line
(In Km.)

Proposed Qty
(In Nos)

Rail Pole

Rail Pole

From

To

1) Erki Grid to

Dakshin Jahanabad

15

285

7.5

143

Sub-Total

15

285

7.5

143

Length of
Length of Line
PSC
Line On rail
on PSC
Rail Pole(LOA
Pole(LOA
Pole(LOA
Pole(LOA
Quantity)CKM Quantity)CK
Quantity)CKM Quantity)CKM
M

Rail
Pole

PSC
Pole

Rail
Pole

Dakshin Jehanabad
Bharthua
New PSS

1.50

26

Dakshin Jehanabad
Hajipur
New PSS

4.19

71

Dakshin Jehanabad
Narayanpur
New PSS

2.00

34

8.51

145

11.10

189

0.20

4.50

From

Length of Line On rail


Pole(LOA Quantity)CKM

To

11 kV Line Dakshin Jehanabad Nonhi


New PSS
Dakshin Jehanabad
Pijora
New PSS

50

50

850

850

Dakshin Jehanabad
Ranipur
New PSS
Ghosi PSS

Ghosi Town

Hulasganj PSS

Hulasganj town

4.50

Jehnabad old PSS

Jehanabad Town FS

5.00

Kako Pss

Kako town

3.50

Makhdampur PSS
Sakurabad Pss

Makhdampur town
Sakurbad Town
Sub- Total

0
0
27.50

5.00
6.00
28.50

0
0
469.00

50

50

850

850

Plan(BRGF) Phase-I
Date:26.03.2015

Pole dumped at
site

Pole
Erection(In
Nos.)

Stringing(In
Ckm)

Rail Pole

Rail Pole

Rail Pole

Rail Pole

143

200

51

143

200

51

posed Qty
(In Nos)

PSC
Pole

Rail
Pole

PSC
Pole

Rail
Pole

PSC
Pole

Rail
Pole

PSC
Pole

35

80

30

175

200

71

77

90

73

77

97

23

85

60

50

85
102
486.00

0
0
525.00

50
100
387.00

0
0
78.00

0
0
96.00

0
0
0.00

0
0
0.00

Remar
ks

0.00

RENOVATION & MODERNIZATION OF 33/11 KV PSS


NO: 196/PR/SBPDCL/2013
S. No

Name Of PSS

Name of Agency: M/s GKC -APL joint venture,Hyd

Augmentation of Power
Transformer
3.15 To 5 MVA 5 To 10 MVA

VCB Installation

33 KV

11 KV

CR Panel
Installation
33 KV

11 KV

Lightning
Arresters
33 KV

11 KV

Isolator/AB switch

33 KV

PSS
Earthing

11 KV

Laying Of
Cantrol
Cable

Gravel
Filling

NAWADA
1
2
3
4
5
6
7
8
9
10
11
12
13

HISSUA
PAKRIBARAWA
SIRDALLA
BADUKRA
AKBARPUR
ROHA
WARISALIGANJ
KAWAKOL
RAJAULI
Cherkiyar
Nardiganj
Orhanpur
Govindpur
Completed
Total Completed

No scope

No scope

1
1
1
3
1
-

6
5
4
4
4
4
4
0
0

2
1
3
0
2
1
2
-

7
0
4
5
5
2
5
-

3
1
2
-

7
5
4
7
4
-

complete
complete
complete
complete
complete
complete
complete

10
52

31
127

0
30

0
71

11
30

28
72

6
24

27
58

0
1

complete
complete
complete
complete

26

complete
complete
complete
complete

0
4

0
0

WIP
WIP

KV PSS

nture,Hydrabad

District: Gaya,Nawada & Jahanabad


BRGF:Painting
completed

Structure
Painting

Yard
Lighting

complete
complete
complete
complete
complete
complete
complete
complete

WIP
WIP
complete
complete
complete
WIP
complete
WIP
WIP

complete
complete
complete
0
0

0
0

Patch Work
Boundry
Wall

Cantrol
Room

Painting
Cable
Trench

Boundry
Wall

Cantrol
Room

complete
complete
complete
complete
complete
complete
complete
complete
complete BRGF:Damage
complete condition
complete BRGF:DAMAGE
complete
CONDITION
complete
complete
complete
complete
complete
complete
complete
complete
complete
complete
complete
complete

complete
complete
complete
complete
complete
complete

complete

complete

complete

complete

complete

complete
complete
complete
complete
7
14

complete
complete
complete
complete
7
13

complete
complete
complete
complete
6
12

complete
complete
complete
complete
6
12

complete
complete
complete
complete
7
13

BRGF-:Damage
condition.Approval
from SBPDCL Process

BRGF:Damage
contion.Approval
from SBPDCL PROPESS

South Bihar Power Distribution Company Limited:Patna

Special Plan(B

DETAILS OF Feeders(33KV & 11KV Line)BRGF Phase-I


NIT NO: 196/PR/SBPDCL/2013

District: Gaya,Nawada & Jahanabad

Name of Agency: M/s GKC -APL joint venture,Hydrabad


Name of Feeder
Sl.No.

Particular
From

33KV Line

11KV Line

To

75
Length
of Line
On rail
Pole(LO
A
Quantit
y)CKM

Sub-Total 144.9

Proposed Qty
(In Nos)

Rail Pole

Rail Pole

48

912

Rail Pole(LOA
Quantity)CKM

To

Sub-Total

From

Length of Line
On rail
Pole(LOA
Quantity)CKM

Length of Line
in CKM

1425

Length
of Line
Rail
PSC
on PSC Pole(LO Pole(LO
Pole(L
A
A
OA
Quantit Quantit
Quanti y)CKM y)CKM
ty)CKM
144.9

2108

2108

Rail
Pole

PSC
Pole

Rail
Pole

94.91

81.47

1615

atna

Special Plan(BRGF) Phase-I


Date:-11/03/2015

hanabad

Proposed Qty
(In Nos)

Pole
dumped at
site

Pole
Erection(In
Nos.)

Stringing(In
Ckm)

Rail Pole

Rail Pole

Rail Pole

Rail Pole

912

692

51

PSC
Pole

Rail
Pole

PSC
Pole

Rail
Pole

PSC
Pole

Rail
Pole

PSC
Pole

1386

1084

1432

89

353

You might also like