CURRICULUM VITAE

Mr. TARRA RAMESH BABU Mobile No. +44 7902394097


204, Winterthur Way Residence Ph.No. +441256476682
Victory Hills E-mail: tarraram1@yahoo.com
Basingstoke
Hampshire
Post code- RG21 7UF
United Kingdom (UK)

Profession: Design & Execution


Nationality: Indian
Marital Status: Married
Membership: Indian Road congress
Passport Number & Expiry Date: A-9532385 & 21-03-2011
Drivers Licence: Full licence (Indian)

EDUCATION DETAILS

Andhra University, Visakhapatnam 08/1999 – 06/2001 ME (Structures), % of marks 75.6


CBIT, Osmania University, Hyderabad 09/1995 – 12/1998 BE (Civil), % of marks 69
S.B.T.E & T, Hyderabad 11/1991 – 05/1995 DCE (Civil), % of marks 68.9

TRAININGS

Type of course: Soil Mechanics and Foundation Engineering


Organized by: Advanced Level Telecom Training centre
Bharat Sanchar Nigam LTD,
(A Govt.of India Enterprises), Ghaziabad, India

Type of course: Essentials of Concrete Technology

Organized by: Training Department


Hindustan Construction Co.Ltd, Mumbai, India

WORK EXPERIENCE

SCOTT WILSON LTD 06/2008 – To Present Bridge Engineer (Design)


(Total 6500 employees)

Projects:
A46 Newark to Widmerpool Improvement, UK.
- Strength assessment of bridges.
- Design of vehicle restraint systems, gantries and signposts.
- Used MS office, SAM LEAPS, LUSAS 14.2, LATTIX design software

• Tees Viaduct Substructure refurbishment, phase 3, UK.


- Strength assessment of crossheads, deck slab, pile group, etc.
- Used MS office, SAM LEAPS, LUSAS 14.2

• East London Line rail project, UK. Project includes design of bridges and other civil structures.
- Design checking of structure passing over sewer pipes for RU loading
- Used MS office, SAM LEAPS, LUSAS 14.2

• M1 junction10 to 13 HSD improvements, widening of roads, gantries, signposts and other civil
structures.
- Design of vehicle restraint systems, gantries and signposts.
- Used MS office, SAM LEAPS, LUSAS 14.2, MPILE, LATTIX design software

• A421 Improvement, M1 junction 13 to Bedford, Marsh Leys Roundabout, UK. Project includes design
of bridges, signposts and other civil structures.
- Design checking of integrated prestressed concrete bridges
- Preparation General arrangement and reinforcement detail drawings
- Cat I design check of culverts
- Strength assessment of civil structures
- Design of signposts and gantries using Euro codes
- Used MS office, SAM LEAPS, LUSAS 14.2, MPILE, Lattix design software

• A421 Improvement, M1 junction 13 to Bedford, Lower Shelton road subway extension, UK. Project
includes design of bridges and other civil structures.
- Detailed design and design document preparation
- Preparation of General Arrangement drawings
- Preparation of reinforcement detail drawings
- Used MS office, SAM LEAPS, LUSAS 14.2

• ADDIS ABABA-ADAMA Road Project, Ethiopia. Project includes design of 96 bridges, 23 variants
and other structures.
- Structure selection and span arrangements
- Design data verification for preliminary design
- Used MS office, SAM LEAPS, LUSAS 14.2

Reason for leaving: To explore my knowledge in design and execution

O’CONNOR SUTTON CRONIN AND 07/2007 – 06/2008 Bridge Engineer (Design)


ASSOCIATES LTD
(Specialist in Structures- 250 employees)

Projects:

• Charlesland Pedestrian Bridge – design of cable stayed bridge and execution. Value: 0.7 million euros,
2.5 years.
- Detailed design and document preparation
- Preparation of construction drawings
- Co-ordination with clients
- Used MS office, STRAP, AutoCAD

• Rosslare Euro Port Berth No.02 (Link Span) – Category three design check and execution. Value: 5
million euros, 3 years.
- Checking of all members for HRo and HB loading
- BOQ preparation
- Co-ordination with clients
- Used MS office, STRAP, AutoCAD

RITES LTD 01/2005 – 06/2007 Asst. Manager (Civil)


A Govt. of India Enterprise
(Specialist civil consultant firm - 1900 employees)

Projects:

• East Central railway – Gauge conversion, design of bridges and execution. Value: Rs.700 crores, 3.5
years.
- Construction and Supervision of rail/ road bridges, pile foundation, well foundations, Raft foundations,
road under bridges, Retaining walls, reinforced earth wall etc.
- Design data verification and span fixation
- Detailed design
- Construction drawings
- Full project management for successful completion of project with in schedule
- Co-ordination with clients
- Used MS office, STAAD, AutoCAD

IRCON International Ltd 08/2003- 01/2005 Asst. Manager (Const.)


A Govt. of India Enterprise
(Specialist civil construction and supervision firm - 2800 employees)

Projects:

• J&K rail project – New rail line construction, execution bridges and tunnels, Station buildings,
Alignment fixing etc. Value: Rs.10000 crores, 8 years.
- Construction and Supervision of rail/ road bridges, pile foundation, well foundations, Raft foundations,
road under bridges, reinforced earth wall, retaining walls etc.
- Execution of earth works
- Span fixation as per requirements
- Construction drawings is modified as per site requirements
- Technical meetings with clients
- Bill verification
- Participation in progress review meetings
- Checking of design calculations
- Full project management for successful completion of project with in schedule
- Used MS office, STAAD, AutoCAD

Hindustan Construction Co.Ltd 03/2001- 08/2003 Sr. Engineer (Const.)


(Specialist civil construction and supervision firm - 2000 employees)

Projects:

• National Highway Authority of India – Construction of Highway, Bridges and earthwork. Value:
Rs.400 crores. 3 years
- Construction and Supervision road bridges, foundation, Culverts and reinforced earth wall etc.
- Execution of earth works
- Bill preparation
- Detailed Design of water tanks, Long retaining walls, M.S.Buildings, Road under bridges etc,
- Used MS office, STAAD, AutoCAD

IT SKILLS

Software: Competency on a scale of 1-10:


• LUSAS 14.2 9/10
• SAM LEAP 9/10
• MPILE 7/10
• STAAD Pro 9/10
• STRAP 12.5 9/10
• MATH CAD 6/10
• Microsoft Word 9/10
• Excel 9/10
• PowerPoint 8/10
• AutoCAD 2004 8/10

English Language Skill on scale of (1-10): Spoken Written


8 9
Breakdown of Experience:
Offices: 8 years 10 months Design 45% Planning 5% Site 30% Billing 5%
Project Management 15%
Total: 08 years 10 months