Bukatir

Ashraf : Tripod vice - intermass , welding machine - tig welding only ,


Kumar - Gate pass ,
Diffuser what type of hole ,
Murukan - MS Pipe is there or not -check , then ARC Welding ,

Bhaskaran- madinat Jumerirah site


Tabreed: Antony + Jinesh + Sumeet+ Altaf+ Siraj+ramadoss+Anilkumar+Rashid
Tabreed: rack to be arranged
Bukatir : Hassan + Ashraf : drawing problem,
Joseph - Shutdown system: Sunday - 2 days : Praveen + Arun Anand Joseph - sheraton - not autobackwashing: no service report
Joseph - Commodre abu dhabi + afternoon high building awir
Madinat Jumeirah : softnere control : Joseph -2 technicians :
Bukatir : Hassan
Tankline - Make a letter & then cover the system
Call Al Banna - Send letter, then call jassim, go for meeting
Power factor : norman + jinnu arranfe
EMCO-ASCON - MS Reducer 5 X 4 - 01 nos to be given ,Bolt nuts
Bakresha - pH Probe - 01 Nos
Alba Tower : Jinnu / Sreera
Water sample : Mercury International
Jaice : John , discuss daily where is he going
Bhaskaran : Lndenberg Delivery Date
Ladies Club - Al Ain - testing done, supply of microswitch Asteco- PPM report ,
Airport road -etisalat - mark & spenc mall: commodre contracting
Jaice : Gulf air :
EMCO
EMCO-Jinnu Electrical BOQ
EMCO - Method of statment & ITP
RO_Maintain Contract Nos & all LPO,Quotation in a seperate file,Site reports
Interior International : DO : mail for Draft Items
Pictures of Tankline ,Dubai Airport ,Tabreed
Electron Electromechaical - Verify for pending items to be ordered
Al Bairaq-Delivery Status
EMCO - Arrange for Material Delivery
AIL Industries : get signed invoice receipt
Khalifa al Fahad :
Cheque copy : Khalifa al Fahad
Tankline : Camilo VISIT to Tank cleaning
Murukan 0
Khalifa Al Fahad - Commissioning Arun-9920567-reeta
Tiger construction : Staney - dos pump install
Al Baatein tower - PPM report - inform Lucy
Proforma invoice :
EMCO: Gopinath give jamirullah : payment issue
Shameem - Power factor & Khalifa Al Fahad : Tomorrow
TORO-on chemical cleaning of filter cloth
Ratheesh - QA/QC/HSE documents
Cheque copy required before plantcommisisoning - Khalifa al fahad
Bakresha - Bar screen: confirmation onn payment
Al bairaq -checking :
050-7918491-khalifa al fahad
MGF Commissioning - G + 1 villa in Nad al Sheba 2, dubai

Tankline :
Al baatein tower ;PPM report
shameem / camilo - plan this month AMC ( arabian adv first )
Tankline - review
AMC -all to be tested
Tabreed - blower heating : no pressure gauge
Filter press: adjust air to flow rate in diaphragm pump
Know abt gravity thickening
Mahesh - Disk Drive
Isometric piping plan for WWTP project
Orient House , Al Ain (Jinnu)- Monday,Tuesday :
AIL industries : mudassar - electron electromechanical
precila-jaice-qatar planning - feb 03 mail
Camilo :BILT , saturday :camilo, commsng chemicals
Tasneem RO-Pressure transmitter,SDI kit came, keep one one while going for insta
llation
Interior International-saturday meeting, take dwg,procurement,file status
Target - ADNOC - anyother procedure
AIL indusries - filter cloth
GMG
tank, MOC: GRP, Type: cylindrical, vertical, Suitable
for Underground installation, Capacity : 150 USG, with 3'' Inlet
nozzle (PVC pipe) at the top,
TRUST CONSTRUTION - chemical treeatment :VERY SSERIOUSSS
Trust consttcn
Power Factor / Al Zaim - Mudassar
Jacks: Ticket to be advanced
Camilo: Mercury International: UV Lamp to fixed ,Internal commissioning report ,
Target:
Bakreesha - Bar screen
AIL industries - TDS & filter cloth issue
Alba Tower : check for pump status
gatepass for ven - intermass
al baatein tower - screen
EMCO - COMMISSIONG & TRSTING PROCEDURE
055-1971793-KISHORE HRB CONTRACTING
ALBA TOWER: DISCUSS
ALBA TOWER AL BAIRAQ DELIVERY STATUS
TRUST CONSTRUTION - chemical treeatment :VERY SSERIOUSSS
TRUST CONSTRUCTION: SEND A LETTER , COMPRESSOR DELIVERED, SLUDGE HOLDUNG TANK IN 7-10 DAYS FOR STABILIZATION, AFTER SLUDGE STABLIZED ONLY , FILTER PRESS ,, CA
MILO - TANK CAPACITY : HOW MUCH WE HAD DONE SHOW IT
Jacks -al manzil
Tankline - STP
naveen.kumar@hsbc.com
Arun varghesse & Rashid hussain - 03.02.15 ,
Tags booking - Bareesha-when the noc is not in our hands. bvery well pressurixing ,
irrespective plant nt working for not all fault,
Ticket booking in our scope - baressha,material arrange mixer fan, tags
drydocks - manual dosing: alkali
ansari-intermass / ajith -mercury international
Antony - algeco: ajith
Antony & anish - Welder + 1
Strain in piping - check at drydocsk
Alba tower - Service of pumps
Shameem - tankline
zayed military city
Trust - STP flows out , Sludge +

Drydocks - John sir approval ofr alkali dosing


Tabreed - Signature in snag list
bukatir - tomorrow mampower - plan
bakresha - meeting , mixer fan arrangement
tankine - SS diffuser dwg
bukatir - murukan site visit
Anish Chacko - Tankline daily :
Screw Drain Thickener before filter press
Shameem to be in AIL - pull him out
Manpower for Flushing - Inform Asif
AIL -Mudassar to be electrical only
electron electromechnical drawings
trinity engineering - academic -emirates aviation college MErcury International - Aneish, Antony,Ajith for welding, UV ESCO commssionig
mercury international - stagnant : corrosion to invstigate , minor welding, no w
arranty ,
drydocks - caustic suply
vipin - harish - work sharing
Bukatir - Piping delivery
Intermass - Project Program Update
Mercury International - Bag filter elakiing
national packaging - reducing settling time
Sirajuddin - Tabreed
Air Blower - Dubai airport for service
AMTC
June - AMTC mail ..more testing diff concentrn , 5 ltr in inlet water only
al manzil - total rework,jacks place
Drydocks - Panel change
Brandon - Wetex - Site Photos
Jeevan - Hassan-Foot Valve - Drydocks
Abudhabi-Training schedule
Bakreesha - mixer fan; t o be arranged:>
dante.pascua@mercurymena.com,
Michael.Freeman@mercurymena.com, Sarhosh.Mohammed@mercurymena.com,
Ayham.ElAssadi@hlgroup.com
Shawn /
Shameem Satish G - Trust constrcn; mails to gate pass
PRABHA - PSF QUOTE-CHECK WITH CALVIN
GTM GASCO - BILLING IMMEDIATELY FOR 3 MONTHS
TABREED - MEETING ORGANIZATION WITH SHANKAR RAM & RAVI
Dabur - plant brekage- check with joseph
JAcks - Tuesday to baressha
EDI additional class
commodre -signing
AIL: RobertCalvin: list of projects to be given to project/commissioning team: put CC to ja
ice,antony,jinesh
EMCO - Part Delivery of OWS - Sunday partly,Tuesday balance items ,
Haydon MEP - UV Instaltion Guidance
Four Season Hotel Abu Dhabi - UV system installation clarification
Invoice raising for arabian adventure,Uni;vere,Al ain
04.02.15 - EMCO ASCON OWS arrival date
Invoice
JLW - Dosing Tubing - Valve connectors
october.nov & dec
Lydia - EMCO
agilesh EMCO Material STatus
Airport :Transport Emirates
Jinesh

- Commissioning RO &
Lindenburg : Material Asked - Bhaskaran : vinoj mar
June - Sample required ? for AMTC-Dubal
Tasneem: Ajman RO Commissioning - Technician
gulftalent ,
Ras Al Khaimah : Tasneem - Qassim :
URGENT:::Tasneem - Container 8 th Delivry - Go ahead
Tikka / Hassan / Anish - Dubai Airport
Ahmed - 0564035136: Al Ain Ladies Club - Joseph : Testing , Commissioning
Tankline : Delivery arrangement & Crane Capacity Requirement
Test Kit for Antony ,Jinesh
STERLING Sanitary -Installtioin guidiing
Commodre - Signing of Documents
Tankline - Cheque : Dilip
JLW - connection tubing
WAREHOUSE - SS Piping work
SAND FILTER VESSEL DAMAGE-Gulf Pharmaceutical Industries , Ras Al Khaima
MERCURY INTERNATIONAL - METHOD OF STATEMENT : SOFT COPY ; DANUBE
Thursday - Dry docks @ 10 AM
Ghanada place :DIP , Jebel Ali
ETA - OT Time
Bukatir : PVC + Electrical + SS
Bukatir : Gatepass +
Welder + :lathe operator - job profile
Al Manzil Hotel - Norman Pickup
Training details to be Drydocks
Tankline - delivery of PE Tanks ,
Bakreesha - Satheesh kumar + Jacks
Orient House - Al Ain : Satish G , Jacks, Sreeraj
Tankline - before delivery - cheque copy required
Monitac
TCC- instalation
Natonal packagimg-feb 1st week
Khalif - updated ,
GTM Gasco-Camilo - oct,nov,dec ,
Mudassa
Asif - ETA : Client zafar Iqbal , prakash ,
Test - 10: 30 AM - Norman BK Gulf
Bakreesha - jacks visit
BK Gulf -commisioning report : discuss with calvin ,training date
6mm x 4 mm tube - 50 mtr ( 1 bundle )material reqstn form - for JLW
Joseph - works to be done
Vetex - Presentatuib
Murukan - Drydocks :
Algeco - Photos of sreeraj,norman,shajan - tomorrpw-day after
Bakreesha - Jacks - Next Sunday , Bar Screen Installation
Harisha - Cheque Delivery Rober
Satheesh - Wash water ghantoot project : Ghantoot Project - Technicians , Site E
ngineer :
Tankline - STP send the site visit report
Bimesh - Have a Meeting
Faizal - ETA Container removing - two container out
JBH - Shajan : Night Pickup & Drop
Thursday - Flat - Documents, Amount needs to be ready
Lydia - Outstanding account Status to be Updated
Brandon - Account No.Creation

Commodre - Letter /
Tankline - Piping work ,
Pearl Diving Pool - Electrical person required
DryDocks - Training tomorrow
Ghanfoot wash water recycle - rober speak to him
Reply to Tabreed Mail
BK Gulf - Nasser -issue handled - afternoon - ILT ,tight the manhole
BK Gulf - Jacks , Joseph - Comm. Engineer Akram - Morning Training Drydocks , Commissioning report to signed in
Sreekumar - pickup
tabreed mail - shankar ram /peter tracey-check with john sir
BRANDON - RASHID , EMIRATES ID ,
Rajeev BK Gulf , - 0558758224, Resin issue, water division , Tmrw / Joseph /
June - AMTC - Chemical / Hydrogen Peroxide , 1- 2 days propsaL
Emirate Extrusion - Plant / John Sir
Al Bairaq Mapco - training arrangmeent
presentation - BILT commissioning
drydocks - mail for drain line
robert 0506221246 : wash water recyclen system at ghantoot project
BK Gulf : Al Manzil Hotel - Training : Joseph
Ghanada Place: Antony
Al zaim - Check with lydia on delivery
Tankline - Drain hole
SUmeet- Night Shft- Altaf
Asif - ETA Flushing
Trust Construction - Next
Unilever - Project Engineer Installation Completn Report
Dabur
EMCO-PVC came,panel are ready, cabling reqmnt to be came, OWS is pending at 30th
before 5th , Huge equmnt Height - flight issue
Delivery of Al zaim : Underground Tank , System is Re
300 usd EMCO - 0501067562
Bukatir - Hardcopy
1) Camilo 2) Satheeshkumar 3) Technicians 4) Tikka 5 ) Murukan 6 ) Harish
Saturday : Camilo + mudassar , has to go
Tankline : Passport Copies Requirements - Vipin & Satish G
055-6773040& Ali-Tankline STP ,
Satish G - Review
Tankline - 0528958461
Bukatir - Gate Pass requuirements :
YAHSAT Swaihan Near Shahama Zayed Military City- technican quote
team for tankline -site work & continer work, inform friday also duty for hassan
-matlub alam
dubai drydocks training
Golden sun LLC mail
presentation for BILT
Plan for AMC - shameem -monthly visit
Diploma sheraton - shajan service engineer check
EMCO - check for material status
Reply to adilson on letter arrangement

EMCO - Delivery -Afzal -0501224152 , Payment terms we will do.


Dosing pump error signal in screen, dosing pump not running,
BILT Commissioning - suppl-17-02-2013,
- operator th
Yahsat
BK Gulf -Commissionig report
Al Ain - Jaice commissioning - Shahid ( Fitration ) ,Trans Emirates
Mercury International - Srr=
camilo - take heart of europe, bring
emco - contract signed copy
Target : Schedule to be fixed
Tankline - Mail reply for STP mohtareqah
Al bat tower - chemicals delivery
RO - Only .
Intermass :
1. welding machine -3 phaseline -male & female socket - each 01 nos
2. Blue color 2 phase socket - male socket - each 02 nos
3.Right angle - 02 nos
4. Level (small) -300 mm length - 01 nos
5. L angle
6. C channel
7. Fire Extinguisher - 01 nos
055-6733989 :WT
Filter press commissioning / Pump issue /
Bilal -3'0clock
Mercury international - UV installation- Joseph
Jeevan - Weddinng hall UAQ requirment
Speak to nimesh for ticket confirmation
Mercury International - What to do
enquiry - nalexo-AMC satheesh
EMCO- projects details
Call shankar ram for invoice submisison
STP-Enoc attending
Joseph / Antony :
2. JLW-(
3. BK Gulf commsng
4. Wedding hall - Fujairah completed
6. Dm Leak - Borouge , Abu Dhabi
7. Millenium Hotel - Site Survey- completed
8.Best Laundries completed
9. Al futtaim completed
10.Abu dhabi future school ( mapco) - training
11.Gulf markering group-Suresh K Nair
12.Dabur
STP (mohtareqah project )
International packaging
Electron Electro,echanical - procurement schedule
mail to mashreq bank for pending paymeny
letter to al baatien towers
Joseph - RO-UAQ,Dabur,
Training for dubai airport
Alba tower : waste collection transfer pump - 01 nos not working,
Al banna - approval of transmittal , approved drg from consultant
send a mail to bakreesa on sathhesh visit
Compressor issue at tanjklime
Dubai Airport - Cartidge Replacement

Joseph - Dabur - b/w resin comes out - new iorde: broken top strainer , aqua ion
ic valves-DM
Electron Electromechanical Sherston Hotel - Shajan issue , Diplomat - Al ghurair ,
Mapco : details for training
Mapco - 3 valve system : 050 8251581- albert
Al bairaq status
Complaint at Abdul azia centre, jumeriah village - joseph / antony
Tabreed - Invoice Submission, PPM Schedule submission
Al rehmal -- filtration , inspect the same , leakage
Al rahamall abu dhabi, line investment properties , /filtration systems ,
Anish - 0554010182
026338051 ,adil , basheer not there ,
Strong mail Commodre : Fazil - GWTP, sludge - show , blocking - its not a STP ,
Installation report - Project engineers reqmnt
ramadoss,
Dry docks - comm. report to be sent
dUBAI AI
Oman technical - probe
Dabur - Maintenance
siedco
diplomat pumps
trust - compressor
siraj-mahesh
bakresha mail
harmeeet AMTC Sample
Diplomat meeting
Al futtaim - pumps required , bypass , jofrin - drawings
Heart of europe - Frontal piping
Intermass - Ashraf Ali , Nasser , Sreeraj, Arun varghese
Mr.Sindi - Electron elctromechanical
AIL- snag list
Diploma - chlorination part al ghurair- flushing , UV System technician
diplomat - sheraton hotel , dos. pumps not working - last year - april (
Electron Electromechanical - Procuremnt
Dubai Drydocks : O&M Manual , Training,
Electron Electron- Intro to clieny
DM approval - HRB Contracting
Jinnu - national Packaging- PLC modification- Camilo - Control phikiosphy
Oman technicalcontrcting probe
TASNEEM - 2-3 days beofre speak to qassim on readiness ,sent mail,check accounts
& store,deliver
Shoail - Dubai Airport Antony :
1.jumeira group - PSF quotation
Site Survey - Bhaskaran - Millenium Hotel
GTM gasco - Payment pending
SIEEDCO - COMMSNG METHOD OF STATEMENT, CARREFOUR / AIRPORT - ABUDHABI ADAAC
EMIRATES DRIVING SCHOOL - SCHEDULE TOMORROW 08.01.15 , TIME: 03: 30 ,
Flushing - Panel Modification
staney- borouge , abu dhabi - DM water not working
Trust Constrcn - compressor
Al Banna - Letter / Call - Grey water - recommendations - let me give the -forwa
rd the draft letter - john sir
Intermass Installation work
Goldensun LLC - Emirates Gulf - Commmsng report ,
Commodre - Torch light required
Bills clearence
Tankline - Tank status checking

Heart of europe - frontal piping installtion here


ETA flushing - billing schedule breakup
Dubai airport - level tr
Camilo - International packaginh attend today
Al banna - what next on report
Alvina & Mary - OT
Bukatir - Signature ( Tikka )
Tankline - bahaa , Invoice -shift the tanks to site ,
Fibrex & Darry general contracting LLC - payment pending
*Nasser Gatepass - Diplomat - Gate pass ,
ETA flushing -LC expiry - Jan 31st
Harmeet AMTC -check shameem
Material movement - Bukatir, montica, heart of europe, elite extrusion
Toro Equipment - Trust Constrcn ,
Tabreed - arrange MOB,WD40,cloth cotton waste, haksaw blade
ETA - Jaffza : Part payment possible -chekc with ETA rajesh
BK Gulf -Swiming Pool - Dos. system - commissiong report or Inspection request ,
Rakesh -BK Gulf ,O & M Manual , Filtration System - Automatic System - should wo
rk
050-4213917 , ETA: Rajesh ,
report for srvice calls for al bhiya,emirates
Harisha+ Norman -BK Gulf Commissioning report ??
BK Gulf 1) O&M Manual Prepareation
2) Testing & Commissioning report
3) Inspection request - consultant not approved ,
Swiming pool dosing system - commissioned-operation-inspection- 3rd party inspec
tion , Joseph-raise inspection call
Siraj- take back the materials
Dubal Harmeet : new proposal
Bakreesha control panel modfcn
Al Bairaq - plan for delivery
Jebelali freezone : ID & password : arun@waterbirdwtc.com , PW : Waterbird1#
gate passes for reimbursement
Accomdation - Mr.Jaya - Engineer,
Fibrex - dont do any work
GENCO - 050 -5150618-adhil ,
Fazil - commodre payment
Castlerock :
Ro container panels , unilvere,heart of europe, bukatir-stp is ready, bukatir lift stn not started
tankline-maxhtech panel
al zaim - valright
Al Bairaq monitac - control panel
Interior internationl meeting
Pressure gun's nozzle from Tabreeed
delivery schedule for target new order
Tabreed - dechlor smell - not coming, pH 4.5
whats the problem u facing: procurement status,payment status of all projects in
hand-reviewd daily,
engg. drawng for RO skids , 3D drawing for ETP,RO(check net for taking measureme
nts & details)
Elite extrusion tanks - what to do
star delta starter - download
CODE CONTRACTING - ORDER CAME, ALLOCATE PE,WORKON
Tankline - STP
WATER CHEMISTRY-DESIGN-STRONG
CHECK ALL PROJECT PROPOSAL FROM NOW ONWarDS
BIN SHAFAR - EBRAHIM-

TRUST _ reply abt progress in letter


]Tabreed - pH to be maintained during preservatioin
ASCON- piping BOQ & electrical boq ordering
drydocks : material return
AIL - return of old pH probe & supply of screw pump, balance invoicing
enoc- sonapur - check with
Gasco-EMCO- ordering of toro WS- 6-8 weeks delivery time
Al zaim - Control panel order , - electrical & piping BOQQ
Al bairaq- pending order ,odour control unit ordering,
Al zaim - site engineer visit -collection pump & tank order
Bukatir - Lifting stn panel status , procurment,payment & advance status
EMCO Ascon Gate pass
EMCO Gascon- Drg approved. plan for procurmeent status
Al Zaim- shaft pending to be ordered
Tabreed - speed regulator to installed- status ???
vipin / satish - al zaim
Dubai Airport : Panel GRP Warranty Cert
Monitac - Procurement schedule status
make installation report to bareesa - electrical completion
Check Sathish for what are all the orders he is doing ,check intermass drawing f
or puddle pipes of
Al Bairaq - CDC ,
Chemicals - trolly for Tabreed
Monitac - Letter to save ourside
Emirates Extrusion
STP new order - Jan 25 completion, manpower block,
all bills to be given
al bairaq - technical submtal is pending ,
take expense claim - print out (both size ) & give to engineers,technician
David - Flushing pumps repair
Fibrex - no commissioning act- Aug we raised
concentrate on driving license
Al Bairaq - CDC, Arrange for Engineer - discuss , sundnext to hotel,
3D drawing - complete BOQ for container & in future
Tabreed - DB-01 payment delayed , payment information, even complete snag list ,
OUTSTANDING PAYMENT-UPDATE STATUS
rAFEEQ - HAs to maintain CAPA ( filtration, RO)
GTM Gasco - Sep(agilesh) ,Oct, Nov - Reports ,Dec for Invice
Tankline - any addtnl equipmnts missing - Satheesh / Camilo /
SHAWN - ISO Documents ,
Rafeek,Project handover format,
Oman technical- pH probe
Dubai Airport - ARun Safety PPE,
monthly repot=tabreed time schedule ,
Tankline - advance payment , collect cheque for
proforma payment
elite extrusion Tabreed- PPM Schedule
Bakresha - Chemical ( HCL, NaoCL, NaOH ), MOV ,floclnt mixer
Tabreed - Additonal MCC feeders, Cable laying, quote from vendor,
International packaging - pending payment
Reply to china petroleum mail on pending points
O&M budget - per month ,budget for project in a month
undetaking letter from operators
WPS,PQR,CAPA,project monitoring-(VIPIN - tankine )
tabreed-tools,spares,PPM schedule
create a file for plant log book data which is to be inoffice,
supervision means -give a simple PFD for their installation, Quote plx mention m
edia loading, clarity on manpower visits

Check whether all monthly water reports are filed.


BOX Files :
weekly report from engineers
AMC site visit reports , water analysis reports
Service attending reports ( take & keep with yu)
O& M orders : montyl log book photos copies, plant quality reports
GET THE LIST OF PO for FILTRATION & DOSING SYSTEM
sent the project execution updates to john sir
plan weekly activities for them
SAFETY AUDITS : PROJECT ENGINEERS ,
Speak to mercury on seal status
JOB No for all jobs
MARY- Paper to given
Elite Extrusion : sunday Govindaraj
DUBAI AIRPORT - Parameters measurement by antony amal
bathrromm safety showers,safety PPEs,tea
al habtoor leighton - tikka bal paymnet
Harish
Tankline - after approval only piping, BOQ also later
Unilever Gulf Fze - pid done, now chnged to show lift station details- to be giv
en ok, Fabrcn dwg to be checked, check wit anand
Heart of europe : approval of pid,layout,Reaction tank dwg-status reqd
Joffrin:
Al bairaq- send to client informatio, piping dwg-dilip,Sathish G+ joffrin,
Heart of europe - piping done, BOQ to be done
ASCON-EMCO- nothing pending
Bukatir - piping -VWS over
Bukatir- Lift stn - electrical docs pending, piping completedt
Bukatir - STP : piping done, airline piping dwg pending,
Mercury Internationnal :
1. Pump leakage - sseal replace,
2. Rubber bellow pipes-whose scope
3. Sleeve meaning - UV
4. One
Al Banna
Check the voltage of Brio mixer,Check whether the propeller blades are blocked
What is pH Variation to do with the mixer.check with the supplier
Bukatir : VWS material not recvd.inform tikka
LYDIA
China petroleum- Retention bond when it is to be given..Check
Al habtoor sepcon- material has tobe taken
Calvin :
1.List of orders recvd,supplied( from stores), when to be installed
3.Al Futtaim - UV Lamp issue ( charges to be mentioned )
4.Emirates Aviation college - Panel Clarification--NOBODY ATTENDED
5.Scope of work at james williams-filtraion system,Undertaking docs,safety train
ng-JOSEPH, SUPPLY IN PROCESS
7.Elemec - O & M Manual & training
8.Fairmount hotel ,fujairahr ataor
11.mapco ( future school) - testin is done??, RAFEEQ TO DO, COMMSNG
CIRCULATE MAIL TO CALVIN<NEEL<MUDASAR<TIKKA<ON PENDING SITEWORK <MANPOWER UTLZN

WEEKLY REPORTS - CIRCULATE : URGENTTTTTT


HABTOOR LEIGHTON SPECON
OMAR MUQARAM : 042999412
daman team daman tower, saber, daman projects ,
hamdi, MEP Manager :
Bukatir:
Raise Invoice for billing ,civil foundation are ready for STP, visit survey site
,PM- 055 7847708 (tikka) , GM-056 7004761 ( gatepasses are ready) , project mgr
0507945786
JAICE,SATHISH,CAMILO,ANTONY AMAL RAJ : Weekly report to be given,
Oman technical Servvices - camilo for commissioning
Jinnu :
1. Unilver - control philosphy ( send quote to castel rock ), cabling BOQ --WE C
AN PROCEED
2. Interiors - FIT done, boq also sent to purchase,3.Monitac - FIT completed, Boq to be prepared ( mechanical BOQ tobe prepared )
Inventory for chemicals - TABREED & DUBAI AIRPORT
Commissioning report for Abudhabi islamic bank
jaice -pending jobs-Rafeek works to bemonitored- sit for list of jobs pending
Sathish G'
Pending site complaints - register
submit commsng report for Rain water filt of Mercury
send cv to carrers waterbird ID
Keep Trackof DM OCC expiry for Technicians
indtroduce doc. no for Filtration units,
A broader breakup,
No. of plants ordered, job inhand,
Tabreed: Normalizing data
1)3 ton vehicle for dubai air
Today
1)have to sent weekly report of projects, weekly report of project engineers, te
chnicians status or service calls status
2) ASCON - material delivry status - CMW , tomorrow all orders to be placed-,PR
, List of items to be ordered,
10) Identify the technicians to train ( Check the education backbround )
11) Sending SMS to all technicians for Their weekly schedule along with project
engineers
16) Get engg. status & supply /( under purchase, in warehouse awaitng for other
materls to come) status for all projects
Target activity for Individual Engineers - Projectwise
17) Packinglist & BOQ to be implemented
Prepare following as daily works - checklist ( make a excel,each project in dif
ferent tabs )
GO MICROLEVEL IN PROJECTS
1.Followup with project engineers for daily visits,week visit planned, pending a
ctivity ( sathish G)
2. Have a weekly or periodical plan for technicians ,follow them ,keep visits
3. Followup with Engg for pending drawings,docmnt submisison, Same MDL ( Pending
with vendor, pending with design,pending for approval with client )
4.Followup with purchase for pending orders,delivery of items ( get the lead tim
e of vendors, major vendors)
5.Followup with workshop for daily , equipments under manufacturing.
6. Outstanding payments status/ old projects plan - what to do , action plan
PENDING JOBS LIST - BREAKUP LIKE THIS
7. Make a list of Unattended / Pending Service Calls
8.Site issue,pending, to be solved as a separate Excel sheet - ISSUE , ACTION PL
ANNED /MATERIAL TO BE PROCURED
9. How to check the status of flushing,filtration & RO jobs

10. HAVE WEEKLY - ENGG. REVIEW ,PROCUREMENT REVIEW,PROJECT REVIEW


11. Fabrication tanks checking as per drwns
12.Track record of manpower visits to site including engineers,technicians
Weekly reports on who does what ?...where are the engineers & technicica
Have Targets - Quartely in projects completion
direction for following
1.project completion
2.technicians management
Things to be done :
1.Billing Plan for this month
2.Target for every taks
3.Methodically Checklists at site , Before sending the engineer
4.Master Document List
5.After overall project status, prepare individual project status, then what nee
ds to be done.
6.Log sheets
7. Packing note / checking with BOM or BOQ or drawings, before delivering the ma
terials.
8. GA drawing not mentioning the details, the MOC. These has to be incuded.
9.additional working days to be charged.