Table of Contents
1
Introduction......................................................................................................... 5
1.1
Overview .............................................................................................................. 6
2.1
2.2
Applications ....................................................................................................... 27
6.1
6.2
6.2.1
6.2.2
6.2.3
6.2.4
6.2.5
6.2.6
6.3
6.3.1
6.3.2
6.3.3
6.3.4
6.3.5
6.3.6
Projects............................................................................................................... 14
5.1
5.2
5.3
BPCS Features......................................................................................................... 6
BPCS Architecture .................................................................................................. 7
Document Structure................................................................................................. 5
7.2
7.2.1
7.2.2
Dubai Municipality
7.3
7.4
7.5
7.6
7.7
Acquiring Permit for Site Preparation & Excavation Works .................... 294
8.1
8.1.1
8.1.2
8.2
8.2.1
8.2.2
8.2.3
8.2.4
8.2.5
8.3
8.3.1
8.3.2
8.3.3
8.3.4
8.3.5
BPCS
10.1.1
10.1.2
10.2
Dubai Municipality
BPCS
Dubai Municipality
BPCS
Introduction
This document is the user guide for the business users of Building Permit & Control
System (BPCS). Business users refer to Consultants, Contractors and land/building
owners.
Modifying Applications
Acquiring permits for Site
Preparation & Excavation Works
Miscellaneous Service Applications
Appendix
Dubai Municipality
Description
Introduces the structure of the guide, and the audience of
the guide.
Describes the minimum hardware and software
requirements to be able to access BPCS.
Describes the business user prerequisites, and the steps
involved to register and log on to BPCS.
Describes projects and the steps involved to create, view
and delete projects.
Describes applications, application types and the steps
involved in creating permit application for different
building types.
Describes the steps involved to submitting modification
permit applications for different building types
Describes the steps involved in creating permits
application for fencing, preliminary digging and final
digging works.
Describes the steps involved in creating permit application
for building number request, to whom it may concern
letter, renewing permit, extending approval validity,
changing consultant, unblocking a parcel, and other
miscellaneous applications.
Describes the steps involved in creating permit application
for submitting planting permission requests, and gate level
permission.
Describes the steps involved in creating permit application
for normal dcor requests and dcor permit before issue of
completion certificate.
Describes the steps involved in creating application
requesting for exceptions.
Describes the steps involved in creating applications
requesting statistical info, to whom it may concern letters
and unblocking services
Describes the steps involved in creating applications for
creating charges, complete design change, changing
building to hotel or hotel apartments, creating versions of a
returned application, responding to engineer notes,
resubmitting a CFR application, printing screens and steps
to view modifications for all the adjustment addition and
dcor applications. These processes are common to all
application types and hence are included in this section.
BPCS
2 Overview
Building Permit & Control Systems (BPCS) is a system that has revolutionized and
automated the building departments permit issue and control section application
process in Dubai Municipality.
BPCS allows business users (which are: consultants, contractors, and owners) to
apply for, and follow up on the application for permits through an e- service. This
ensures the minimal manual transactions in Dubai Municipality for building permits
related work.
BPCS includes all the processes that covers the building permit needs of consultant/
contractor and owner and provide them options to track the processing and check the
results also system is integrated with other DM systems (like the e-payment system,
Geographical Information System (GIS), financial systems, pre qualification
procedures and more) to provide a convenient and enterprise environment for BPCS
users..
Create new building permit and control applications for the required
mandatory processes
Make payments
Dubai Municipality
BPCS
Dubai Municipality
BPCS
A general description of the BPCS architecture and the process is described below.
Each user logs into the DM portal and creates an application which belongs to a
specific project. Once the application is complete and submitted to DM, it goes
through an approval process based on the type of permit and the type of building.
The counter clerk is the first interface between the user and engineers in DM. The
counter clerk reviews the application and either approves or rejects the same. If the
application is rejected, its returned to the user. If the application is accepted, its
forwarded to the relevant building engineers committee for approval.
Each of engineers reviews the application and the attachment and if approved,
forward it to the senior architect or engineer for final approval. If the engineers dont
approve the application, its returned to the user with comments. The user creates a
new version of the application and resubmits the same for acceptance and approval.
The senior architects or engineers review the application and approve the same. The
approved application is returned to the user with further instructions. If the senior
engineers or architects reject the application, the application is still returned to the
user with comments, who resubmits the same for acceptance and approval.
The instructions to create the different applications, based on the application types are
discussed in detail in the manual.
Dubai Municipality
BPCS
3 System Requirements
This section lists the minimum hardware and software requirements by the
consultants and contractors to access and utilize the BPCS.
Version
Operating System
Internet Explorer
Internet Speed
RAM
Dubai Municipality
BPCS
4 Getting Started
This section describes the prerequisites to be either a Consultant. It also describes the
Registration process for the Dubai municipality portal and the log in process for
BPCS.
After registering with e-government, the user name and password is issued to the
Consultants Company. The company has to create user ids and assign them proper
services and roles so that they can have access to the BPCS system. The applicant
uses this user name and password to log on to the BPCS system as Consultants and
create projects and applications.
Dubai Municipality
10
BPCS
Action
1. Double click the Internet Explorer on your desktop and enter the following
URL: www.dm.gov.ae. The following page is displayed.
2. Enter the User Name and Password. After the credentials are verified, the
DM Services page is displayed.
3. Click the Building & Control Services link. The BPCS homepage is
displayed.
Dubai Municipality
11
BPCS
4. The home page is divided into two panes: Tasks and Messages and General
Messages Pane.
5. The Tasks and Messages pane lists the notifications received from the Dubai
Municipality with regards to the submitted applications. It displays details such as
Message Date, Sender, Message, Application Type, Application Status, Parcel
number and Application number.
6. It also allows you to search for information based on Parcel ID, Project
Number, Application Number, Application Status, and Message Date.
7. The General messages pane displays any communication/ messages sent by
the Dubai Municipality.
8. It displays details such as Message Date, Sender, and the Message. You can
also send messages to the Dubai Municipality for any communication relating to the
application follow up.
Dubai Municipality
12
BPCS
9. To send a general message, click the Send General Messages link. The Send
Messages screen is displayed.
10. Enter the message in the message box. To send the message, and click the
Send Message button.
11. To cancel the message, click the Reset button.
12.
Dubai Municipality
13
BPCS
5 Projects
A project refers to a new file opened by the consultants and contractors to apply for
any permit related work on the parcel. A project can have more than one application
(but only one draft application per applicant is allowed in same project). A Contractor
can have more than one projects for different building assignments, and more than
one application for each project. Each project has a unique project number which is
generated by BPCS when the first application in the project is submitted. If there are
no submitted applications in the project, then it will be assigned a draft number.
Parcel refers to a defined plot of land in an area. A parcel could be an empty plot of
land, or a land with building existing on it. Each parcel has a unique parcel id which
is provided by the Geographical Information System (GIS). It is mandatory for the
consultant to provide the parcel id when applying for the any building permit. A
parcel id is a seven digit number, where first 3 digits represent the Community
number.
.
Action
1. Click the Working Area link on the homepage. The following screen is
displayed.
Dubai Municipality
14
BPCS
Dubai Municipality
15
BPCS
It is mandatory to fill out the fields with an asterisk (*) against the field name.
8. To select a contractor by his grade, click the Contr. Grade drop down box
and select a contractor. All the contractors belonging to the selected grades are
displayed.
Dubai Municipality
16
BPCS
9. Select the radio button against the contractor name and click the Apply
Selection button. The selected contractor is displayed in the Contractor Name
field.
10. To view the contractor information, click the Cont Info link. The following
screen is displayed.
Dubai Municipality
17
BPCS
13. To view the geographic location of the parcel, click the Show Map link. The
following screen displaying the location of the parcel is displayed.
14. To check if the parcel exists, click the Show Info button. If the parcel exists,
the details such as the community name, parcel status and zone code are
displayed.
15. Enter the percentage of the parcel occupied in the %of parcel occupied field.
16. Select the check box against the I agree that I hold an approval letter from
the parcel owner to be his consultant for the specified parcel.
17. Click the Save button to save the project information. The following screen is
displayed.
Dubai Municipality
18
BPCS
Dubai Municipality
19
BPCS
Action
1. Click the Working Area on the home page. The working area screen is
displayed. Scroll down and locate the project details pane.
2. The project details pane lists all the open projects with details such as Project
Status, Project No, Project Description, No of applications, Parcel
Number, Project Date, Display Building, and Old System.
3. To view details of a particular project, click the details listed under the
Project Number column. The following project information screen is
displayed.
Dubai Municipality
20
BPCS
4. To view the parcel details of the project, click the details listed under the
Parcel Number column. The parcel details screen is displayed.
Dubai Municipality
21
BPCS
5. The parcel details screen displays details of the Affection Plan which
includes the parcel id, the community name and code ; the Area of Land
which includes affected area, balance area and total area; the Zoning Details
such as the set back, the land usage, height, parking and remarks if any; and
Miscellaneous, Parcel Gate Level and Exception details if any.
6. If the parcel has existing building, and you wish to view the building details,
click the View link listed in the Display Building Details column. The
following screen is displayed.
Dubai Municipality
22
BPCS
7. To view the application in the project, click View App. The application
details associated with the project are displayed.
8. To view the version details of the application listed in the project, click the
number listed in Version Number column. The following screen is
displayed.
Dubai Municipality
23
BPCS
9. To view the application details, click the View link listed under the App.
Details column. The following screen is displayed.
Dubai Municipality
24
BPCS
10. To return to the home page, click the App. Follow Up link.
Dubai Municipality
25
BPCS
Action
1. Click the Working Area tab on the homepage. The working area screen is
displayed.
2. Scroll down to the Project details pane and select the check box against the
project you wish to delete.
Projects which have one or more submitted applications cannot be deleted. You will notice
that the check box under the Delete column is grayed out for such projects.
3. Click the Delete Project button. The following screen, asking you to confirm
the deletion is displayed.
Dubai Municipality
26
BPCS
6 Applications
Application refers to the permit request forms that are submitted by consultants and
contractors to get DMs permission before initiating buildings or parcel related work.
All applications are linked to a project. Each application has a unique number made
up of three parts: Project Number, Application Number and Application Version
Number.
For instance, in the application id: 118183 - 10 1:
118183 is the project number,
10-is the application number, and
1-is the version number of the application.
An application has to be associated with a project. An application cannot be independent
of a project.
Processes Group
o Application Types
Applications
Application types are categorized into process groups for easy identification and
allocation of application types. For instance, the new building permit application
group has two application types: Preliminary and Final new building.
Dubai Municipality
27
BPCS
The application types associated with each the above six process groups are given
below:
Prelim arrangement & digging application for all the 6 building types
Final arrangement & digging application for all the 6 building types
Dubai Municipality
28
BPCS
Action
1. Click the Working Area tab on the homepage. The working area screen is
displayed. Click on the Project Number for which you will create an
application.
2. Alternatively, you can create a new project and add an application. For details
refer to the Creating a new project section in the About Projects chapter.
The following screen is displayed.
Dubai Municipality
29
BPCS
4. Select a group from the Process Group drop down box. You can choose
from any of the six groups.
5. Select an application type from the Application Type drop down box.
Depending on the process group you select, the application type is displayed.
6. Enter a description for the application.
7. Click the Save Application button. The new application is created for the
selected project and you are prompted to fill in further details.
The above is a generic procedure for creating an application. As stated earlier, for
each of the six process groups selected during application creation different
application types are displayed. The application creation procedure for each of the
group and its application type is given below.
Dubai Municipality
30
BPCS
Step
Action
1. Create a new application. For details, refer to the Creating a new application
(Generic) process .Follow steps 1-3. The Permit Application screen is
displayed.
2. Select the New Building Permit Application option from the Process group
drop down box.
3. Click the Application Type drop down box. You will notice two application
types: Preliminary- New Building and Final- New building.
4. Select the Preliminary New Building option.
Dubai Municipality
31
BPCS
A preliminary project indicates a draft version of the project. To avoid rejections or returns
when the final application is submitted, consultants create preliminary applications and
submit them for approvals.
Dubai Municipality
32
BPCS
8. Since the application is to get a permit for a new building, you have to create
the building. Select the Create New Building Operation from the drop down
box and click the Go button. The following screen is displayed.
Dubai Municipality
33
BPCS
9. For every new building you create, you have to select a building type. You
can choose from the following six building types: Private Villa, Investment
Villa, Industrial Building, Public Building, Multi Storey and Floor Area
Ratio.
10. The building main components vary depending on the building type you
choose and the procedure for each of the building types is described below.
Dubai Municipality
34
BPCS
Step
Action
1. Create an application for a new building preliminary. For details refer to the
Creating new building Preliminary process. At the end of the procedure,
the building main component screen is displayed.
2. Select the Private Villa option from the building type drop down box. The
page is refreshed and the building components page for the private villa is
displayed.
3. By default, the Charges Free option is No. Unless it is a special case, the
Charge Free option is always No.
Dubai Municipality
35
BPCS
4. If you wish to get a permit for more than one identical villa, enter the number
of villas in the No of identical villas field. Else, enter the value 1.
5. Specify the floor details such as Underground, Ground, Mezzanine, Pent
House, and Roof Services in the respective fields. Each consultant is assigned
a floor limit and the consultant can not exceed the floor limit.
6. Enter details such as the Building name, Address details, Number of lifts
required in the building, and approximate Cost of the building.
7. Select the Foundation and Building System/Style details and enter details
such as Air conditioned area, Soil barring capacity, Power consumption,
and Thermal load.
8. To save the building component details, click the Save Info button. The
following message is displayed.
9. To make any changes to the building information, click Cancel and make the
required changes. To go to the main usages screen click Ok. The following
screen is displayed.
Dubai Municipality
36
BPCS
10. Select the usage of your choice. Here we have selected villa as an example.
So, select the Villa checkbox in the Usages screen and click the Confirm
Selection button. The following screen is displayed.
11. Depending on the floors details specified in the building component page, the
floor details are displayed here. Enter the Total Floor Area in sq feet and
click the Save Info button.
12. A message confirming the save is displayed. The message prompts you to
enter the area for the usages.
13. Click the Villa link, adjacent to the Floor info. The following screen is
displayed.
Dubai Municipality
37
BPCS
14. Enter details such as Number of Bedrooms on each floor and the total sq
feet area of all the bedroom and click the Save Info button.
Make sure the sq feet area for each of the bedrooms doesnt exceed the total sq feet area
specified in the floor info-Private Villa screen. If it does, you will not be able to submit the
application. Any remaining space is automatically used up for Facilities & Circulation.
To reconfirm that the area of the rooms in the villa is not more than floor area specified,
return to the floors Info-Private Villa screen. If you dont see any negative values, continue
the process. If you see any negative values, return to the Villas- Private Villa screen, and
make the required changes.
15. If you have specified more than one identical building in the building
component details, click the Copy Identical Buildings button. You can copy
a building only after you have entered all the floor and usages details. The
same information is copied to all the buildings and the following screen
displayed.
16. If you wish to make any changes to the usage details, click cancel and make
the required changes. Else, click the Ok button. The information is copied to
all the buildings and the following message displayed.
Dubai Municipality
38
BPCS
17. Click the Close button. You are directed to the Building Main Components
screen. Scroll down and click the Building Card link. The following screen is
displayed.
18. The Building on Parcel screen displays building details for all the buildings
on the parcel. A red check mark against the building name indicated that the
building was created in the current application.
19. Return to the permit application screen and click the Submit Application
button on the Permit Application page. The following message is displayed.
Dubai Municipality
39
BPCS
20. Click Ok. Click the Consultant Engineers link displayed against the Contr.
Name field. The following screen is displayed.
21. Click the Engineer Specialty drop down box and select the architect option.
22. Click the Engineer Name drop down box and select an architect from the list
of architect names displayed.
23. Enter the square feet area designed by the architect in the Designed area field
and click the Save button.
24. The selected architect details are displayed below. Click the Close button to
return to the permit application screen.
25. Click the Submit Application button. The following screen is displayed
Dubai Municipality
40
BPCS
26. This screen gives a summary of the application and displays details such as
the project number, application type, application status, building type and the
number of floors and the height of the building. It also displays the total area
details such as the built up area, external area, concrete slabs if any, pergolas
area and the length of the fence. Click the Submit Now button. The following
message is displayed.
27. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
28. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
Dubai Municipality
41
BPCS
29. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
30. Also, the final status of the application is changed from New to Submitted.
31. You can also view the application submission message in the application
follow up screen.
Dubai Municipality
42
BPCS
32. This step marks the end of creating a preliminary application for a private
villa.
Dubai Municipality
43
BPCS
Step
Action
1. Create an application for a new building preliminary. For details refer to the
Creating new building Preliminary process. At the end of the procedure,
the building main component screen is displayed.
2. Select the Investment Villa from the building type drop down box. The page
is refreshed and the building components page for the investment villa is
displayed.
Dubai Municipality
44
BPCS
3. By default, the Charges Free option is No. Unless it is a special case, the
Charge Free option is always No.
4. If you wish to get a permit for more than one identical villa, enter the number
of villas in the No of identical villas field. Else, enter the value 1.
5. Specify the floor details such as Underground, Ground, Mezzanine, Pent
House, and Roof Services. Each consultant is assigned a floor limit and the
consultant can not exceed the floor limit.
6. Enter details such as the Building name, Address details, Number of lifts
required in the building, and approximate Cost of the building.
7. Select the Foundation and Building System/Style details and enter details
such as Air conditioned area, Soil barring capacity, Power consumption,
and Thermal load.
8. To save the building component details, click the Save Info button. The
following message is displayed.
9. To make any changes to the building information, click Cancel and make the
required changes. To go to the main usages screen click Ok. The following
screen is displayed.
Dubai Municipality
45
BPCS
10. Select the usage of your choice. Here we have selected villa as an example.
So, select the Villa checkbox in the Usages screen and click the Confirm
Selection button. The following screen is displayed.
11. Depending on the floors details specified in the building component page, the
floor details are displayed here. Enter the total floor area in sq feet and click
the Save Info button.
12. A message confirming the save is displayed. The message prompts you to
enter the area for the usages.
Dubai Municipality
46
BPCS
13. Click the Villa link, adjacent to the Floor info. The following screen is
displayed.
14. Enter details such as Number of Bedrooms on each floor and the total sq
feet area of all the bedrooms and click the Save Info button.
Make sure the sq feet area for each of the bedrooms doesnt exceed the total sq feet area
specified in the floor info-Investment Villa screen. If it does, you will not be able to submit the
application. Any remaining space is automatically used up for Facilities & Circulation.
To reconfirm that the area of the rooms in the villa is not more than floor area specified,
return to the floors Info-Investment Villa screen. If you dont see any negative values, continue
the process. If you see any negative values, return to the Villas- Investment Villa screen, and
make the required changes.
15. If you have specified more than one identical building in the building
component details, click the Copy Identical Buildings button. You can copy
a building only after you have entered all the floor and usages details. The
same information is copied to all the buildings and the following screen
displayed.
Dubai Municipality
47
BPCS
16. If you wish to make any changes to the usage details, click cancel and make
the required changes. Else, click the Ok button. The information is copied to
all the buildings and the following message displayed.
17. Click the Close button. You are directed to the building Main component
page. Scroll down and click the Building Card button. The following screen
is displayed.
18. The Building on Parcel screen displays building details for all the buildings
on the parcel. A red check mark against the building name indicated that the
building was created in the current application.
19. Return to the permit application screen and click the Submit Application
button. The following message is displayed.
20. Click Ok. Click the Consultant Engineers link displayed against the Contr.
Name field. The following screen is displayed.
Dubai Municipality
48
BPCS
21. Click the Engineer Specialty drop down box and select the architect option.
22. Click the Engineer Name drop down box and select an architect from the list
of architect names displayed.
23. Enter the square feet area designed by the architect in the Designed area field
and click the save button.
24. The selected architect details are displayed below. Click the Close button to
return to the permit application screen.
25. Click the Submit Application button. The following screen is displayed.
Dubai Municipality
49
BPCS
26. This screen gives a summary of the application and displays details such as
the project number, application type, application status, building type and the
number of floors and the height of the building. It also displays the total area
details such as the built up area, external area, concrete slabs if any, pergolas
area and the length of the fence. Click the Submit Now button. The following
message is displayed.
27. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
28. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
Dubai Municipality
50
BPCS
33. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
34. Also, the final status of the application is changed from New to Submitted.
35. You can also view the application submission message in the application
follow up screen.
Dubai Municipality
51
BPCS
36. This step marks the end of creating a preliminary application for an
investment villa.
Dubai Municipality
52
BPCS
Step
Action
1.
2.
Select the Industrial Building option from the building type drop down
box. The page is refreshed and the building components page for the
industrial building is displayed.
Dubai Municipality
53
BPCS
3.
By default, the Charges Free option is No. Unless it is a special case, the
Charge Free option is always No
4.
If you wish to get a permit for more than one identical villa, enter the
number of buildings in the No of identical buildings field. Else, enter the
value 1.
5.
6.
7.
8.
To save the building component details, click the Save Info button. The
following message is displayed.
9.
To make any changes to the building information, click Cancel and make
the required changes To go to the main usages screen click Ok. The
following screen is displayed.
Dubai Municipality
54
10.
BPCS
11.
Specify the use of the industrial building, which is Workshop and Stores
in this case and click the Go Create Building Form button. The
following screen is displayed.
12.
13.
Dubai Municipality
55
BPCS
14.
15.
16.
If you have specified more than one identical building in the building
component details, click the Copy Identical Buildings button. You can
copy a building only after you have entered all the floor and usages
details. The same information is copied to all the buildings and the
following screen displayed.
Dubai Municipality
56
BPCS
17.
To make any changes to the usage details, click Cancel and make the
required changes. Else, click the Ok. The information is copied to all the
buildings and the following message displayed.
18.
Click the Close button. You are directed to the building Main component
page. Scroll down and click the Building Card link. The following
screen is displayed.
19.
The Building on parcel screen displays building details for all the
buildings on the parcel. A red check mark against the building name
indicated that the building was created in the current application.
20.
Return to the permit application screen and click the Submit Application
button. The following message is displayed.
Dubai Municipality
57
BPCS
21.
Click Ok. Click the Consultant Engineers link displayed against the
Contr. Name field. The following screen is displayed.
22.
Click the Engineer Specialty drop down box and select the architect
option.
23.
Click the Engineer Name drop down box and select an architect from the
list of architect names displayed.
24.
Enter the square feet area designed by the architect in the Designed area
field and click the save button.
25.
The selected architect details are displayed below. Click the Close button
to return to the permit application screen.
26.
Dubai Municipality
58
BPCS
27.
This screen gives a summary of the application and displays details such
as the project number, application type, application status, building type
and the number of floors and the height of the building. It also displays the
total area details such as the built up area, external area, concrete slabs if
any, pergolas area and the length of the fence. Click the Submit Now
button. The following message is displayed.
28.
If you want to make some changes to the permit application, click cancel.
Else, click Ok.
29.
Dubai Municipality
59
BPCS
30.
You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
31.
32.
You can also view the application submission message in the application
follow up screen.
Dubai Municipality
60
BPCS
Figure 6-52
33.
Dubai Municipality
61
BPCS
Step
Action
1.
2.
Select the Public Building option from the building type drop down box.
The page is refreshed and the building components page for the public
building is displayed.
Dubai Municipality
62
BPCS
3.
By default, the Charges Free option is No. Unless it is a special case, the
Charge Free option is always No.
4.
If you wish to get a permit for more than one identical villa, enter the
number of villas in the No of identical buildings field. Else, enter the
value 1.
5.
6.
7.
8.
To save the building component details, click the Save Info button. The
following message is displayed.
9.
To make any changes to the building information, click Cancel and make
the required changes. To go to the main usages screen click Ok. The
following screen is displayed.
Dubai Municipality
63
BPCS
10.
11.
Specific the use of the public building. In this case, the building will house
Shopping Centers, Shops and Service Blocks. Click the Go Create
Building Form button. The following screen is displayed.
Dubai Municipality
64
BPCS
12.
13.
14.
Click the Commercial link, adjacent to the Floor info. The following
screen is displayed.
Dubai Municipality
65
BPCS
15.
16.
Dubai Municipality
66
BPCS
17.
Enter details such as Showrooms and the square feet area of the
showrooms on each floor of the public building and click the Save button.
18.
A message confirming the save is displayed. Click the Service Block link
adjacent to Shopping Center. The following screen is displayed.
Dubai Municipality
67
BPCS
19.
Enter details such as the number of service blocks per floor and the square
feet area on each floor and click the Save Info button. A message
confirming the save is displayed.
Make sure the sq feet area for each of the service blocks doesnt exceed the total sq feet area
specified in the floor info-Public Building screen. If it does, you will not be able to submit the
application. Any remaining space is automatically used up for Facilities & Circulation.
To reconfirm that the area of the rooms in the villa is not more than floor area specified,
return to the floors Info- Public Building screen. If you dont see any negative values, continue
the process. If you see any negative values, return to the floor Info- Public Building screen,
and make the required changes.
20.
If you have specified more than one identical building in the building
component details, click the Copy Identical Buildings button. You can
copy a building only after you have entered all the floor and usages
details. The same information is copied to all the buildings and the
following screen displayed.
Dubai Municipality
68
21.
BPCS
To make any changes to the usage details, click Cancel and make the
required changes. Else, click the Ok. The information is copied to all the
buildings and the following message displayed.
22.
Click the Close button. You are directed to the building Main component
page. Scroll down and click the Building Card button. The following
screen is displayed.
23.
The Building on Parcel screen displays building details for all the
buildings on the parcel. A red check mark against the building name
indicated that the building was created in the current application.
24.
Return to the permit application screen and click the Submit Application
button. The following message is displayed.
25.
Click Ok. Click the Consultant Engineers link displayed against the
Contr. Name field. The following screen is displayed.
Dubai Municipality
69
BPCS
26.
Click the Engineer Specialty drop down box and select the architect
option.
27.
Click the Engineer Name drop down box and select an architect from the
list of architect names displayed.
28.
Enter the square feet area designed by the architect in the Designed area
field and click the Save button.
29.
The selected architect details are displayed below. Click the Close button
to return to the permit application screen.
30.
Dubai Municipality
70
BPCS
31.
This screen gives a summary of the application and displays details such
as the project number, application type, application status, building type
and the number of floors and the height of the building. It also displays the
total area details such as the built up area, external area, concrete slabs if
any, pergolas area and the length of the fence. Click the Submit Now
button. The following message is displayed.
32.
If you want to make some changes to the permit application, click cancel.
Else, click Ok.
33.
Dubai Municipality
71
BPCS
34.
You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
35.
You can also view the application submission message in the application
follow up screen.
Dubai Municipality
72
BPCS
36.
This step marks the end of creating a preliminary application for a public
building.
Dubai Municipality
73
BPCS
Step
Action
1.
2.
Select the Multi Storey option from the building type drop down box. The
page is refreshed and the building components page for the multi storey is
displayed.
Dubai Municipality
74
BPCS
3.
By default, the Charges Free option is No. Unless it is a special case, the
Charge Free option is always No.
4.
If you wish to get a permit for more than one identical villa, enter the
number of villas in the No of identical buildings field. Else, enter the
value 1.
5.
6.
7.
8.
To save the building component details, click the Save Info button. The
following message is displayed.
9.
To make any changes to the building information, click Cancel and make
the required changes. To go to the main usages screen click Ok. The
following screen is displayed.
Dubai Municipality
75
BPCS
10.
Select the usage of your choice. Here we have selected commercial and
residential usage as an example. So, select the Commercial and
Residential/Apartments checkbox in the Usages screen and click the
Confirm Selection button. The following screen is displayed.
11.
Specific the use of the multi storey building. In this case, the building will
house Studios, One bedroom and Two bedroom apartments. Click the
Go Create Building Form button. The following screen is displayed.
Dubai Municipality
76
BPCS
12.
Specify the total floor areas for underground, ground and mezzanine floor.
Enter the floor numbers for the repeated groups and total floor area of the
group and click the Save Info button. The following screen is displayed.
Dubai Municipality
77
BPCS
13.
Depending on the floors details limit of the consultant, the floor details are
displayed here. Enter the total floor area in sq feet and click the Save
Info button.
14.
15.
Click the Residential link, adjacent to the Floor info. The following
screen is displayed.
Dubai Municipality
78
BPCS
16.
17.
Dubai Municipality
79
BPCS
18.
Enter details such as number of shops on each floor and the sq feet area
of each shop and click the Save Info button.
Make sure the sq feet area for each of the shops doesnt exceed the total sq feet area specified
in the floor info-Multi Storey screen. If it does, you will not be able to submit the application.
Any remaining space is automatically used up for Facilities & Circulation.
To reconfirm that the area of the rooms in the villa is not more than floor area specified,
return to the floors Info- Multi Storey screen. If you dont see any negative values, continue
the process. If you see any negative values, return to the Usages - Multi Storey screen, and
make the required changes.
19.
If you have specified more than one identical building in the building
component details, click the Copy Identical Buildings button. You can
copy a building only after you have entered all the floor and usages
details. The same information is copied to all the buildings and the
following screen displayed.
Dubai Municipality
80
BPCS
20.
To make any changes to the usage details, click Cancel and make the
changes. Else, click the Ok. The information is copied to all the buildings
and the following message displayed.
21.
Click the close button. You are directed to the building Main component
page. Scroll down and click the Building Card button. The following
screen is displayed.
22.
The Building on parcel screen displays building details for all the
buildings on the parcel. A red check mark against the building name
indicated that the building was created in the current application.
23.
Return to the permit application screen and click the Submit Application
button on the Permit Application page. The following message is
displayed.
Dubai Municipality
81
BPCS
24.
Click Ok. Click the Consultant Engineers link displayed against the
Contr. Name field. The following screen is displayed.
25.
Click the Engineer Specialty drop down box and select the architect
option.
26.
Click the Engineer Name drop down box and select an architect from the
list of architect names displayed.
27.
Enter the square feet area designed by the architect in the Designed area
field and click the Save button.
28.
The selected architect details are displayed below. Click the Close button
to return to the permit application screen.
29.
Dubai Municipality
82
BPCS
30.
This screen gives a summary of the application and displays details such
as the project number, application type, application status, building type
and the number of floors and the height of the building. It also displays the
total area details such as the built up area, external area, concrete slabs if
any, pergolas area and the length of the fence. Click the Submit Now
button. The following message is displayed.
31.
If you want to make some changes to the permit application, click cancel.
Else, click Ok.
32.
Dubai Municipality
83
BPCS
33.
You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
34.
35.
You can also view the application submission message in the application
follow up screen.
Dubai Municipality
84
BPCS
36.
This step marks the end of creating a preliminary application for a multi
storey.
Dubai Municipality
85
BPCS
Step
Action
1.
2.
Select the Floor Area Ratio option from the building type drop down
box. The page is refreshed and the building components page for the floor
area ratio building is displayed.
Dubai Municipality
86
BPCS
3.
By default, the Charges Free option is No. Unless it is a special case, the
Charge Free option is always No.
4.
If you wish to get a permit for more than one identical villa, enter the
number of villas in the No of identical buildings field. Else, enter the
value 1.
5.
6.
7.
8.
Enter the allowed ration and the provided ration in the Allowed Ratio and
Provided Ratio fields respectively.
9.
To save the building component details, click the Save Info button. The
following message is displayed.
10.
To make any changes to the building information, click Cancel and make
the changes. To go to the main usages screen click Ok. The following
screen is displayed.
Dubai Municipality
87
BPCS
11.
Select the usage of your choice. Here we have selected institute and hotel
apartments usage as an example. So, select the Institute and Hotel
Apartments checkbox in the Usages screen and click the Confirm
Selection button. The following screen is displayed.
12.
Specify the usage of the floor area ratio building. In this case, the building
will house an educational institute and hotel apartments wit h Studios,
and One bedroom. Click the Go Create Building Form button. The
following screen is displayed.
Dubai Municipality
88
BPCS
13.
Specify the total floor areas for underground, ground and mezzanine floor.
Enter the floor numbers for the repeated groups and total floor area of the
group and click the Save Info button. The following screen is displayed.
Dubai Municipality
89
BPCS
14.
Depending on the floors details limit of the consultant, the floor details are
displayed here. Enter the total floor area in sq feet and click the Save
Info button.
15.
16.
17.
18.
Dubai Municipality
90
BPCS
19.
20.
If you have specified more than one identical building in the building
component details, click the Copy Identical Buildings button. You can
copy a building only after you have entered all the floor and usages
details. The same information is copied to all the buildings and the
following screen displayed.
Dubai Municipality
91
21.
BPCS
To make any changes to the usage details, click Cancel and make the
required changes. Else, click the Ok button. The information is copied to
all the buildings and the following message displayed.
22.
Click the Close button. You are directed to the building Main component
page. Scroll down and click the Building Card button. The following
screen is displayed.
23.
The Building on Parcel screen displays building details for all the
buildings on the parcel. A red check mark against the building name
indicated that the building was created in the current application.
24.
Return to the permit application screen and click the Submit Application
button on the Permit Application page. The following message is
displayed.
25.
Click Ok. Click the Consultant Engineers link displayed against the
Contr. Name field. The following screen is displayed.
Dubai Municipality
92
BPCS
26.
Click the Engineer Specialty drop down box and select the architect
option.
27.
Click the Engineer Name drop down box and select an architect from the
list of architect names displayed.
28.
Enter the square feet area designed by the architect in the Designed area
field and click the Save button.
29.
The selected architect details are displayed below. Click the Close button
to return to the permit application screen.
30.
Dubai Municipality
93
BPCS
31.
This screen gives a summary of the application and displays details such
as the project number, application type, application status, building type
and the number of floors and the height of the building. It also displays the
total area details such as the built up area, external area, concrete slabs if
any, pergolas area and the length of the fence. Click the Submit Now
button. The following message is displayed.
32.
If you want to make some changes to the permit application, click cancel.
Else, click Ok.
33.
Dubai Municipality
94
BPCS
34.
You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
35.
36.
You can also view the application submission message in the application
follow up screen.
Dubai Municipality
95
BPCS
37.
This step marks the end of creating a preliminary application for a floor
area ratio type of building.
Dubai Municipality
96
BPCS
Step
Action
2. Select the New Building Permit Application option from the Process group
drop down box.
3. Click the Application Type drop down box. You will notice two application
types: Preliminary- New Building and Final- New building.
4. Select the Final New Building option.
5. Enter a Description for the application.
6. Click the Save Application button to save the application. The following
screen is displayed.
Dubai Municipality
97
BPCS
Figure 6-108:
For every new building application, you have to enter mandatory details for the following
operations: Building Card, Attachments, and Parking & Garbage.
Dubai Municipality
98
BPCS
8. Since the application is to get a permit for a new building, you have to create
the building. Select the Create new Building Operation from the drop down
box and click the Go button. The following screen is displayed.
Dubai Municipality
99
BPCS
9. For every new building you create, you have to select a building type. You
can choose from the following six building types: Private Villa, Investment
Villa, Industrial Building, Public Building, Multi Storey and Floor Area
Ratio.
10. The building components vary depending on the building type you choose and
the procedure for each of the building types is described below.
Dubai Municipality
100
BPCS
Step
Action
1. Create an application for a new building preliminary. For details refer to the
Creating new building Final process. At the end of the procedure, the
building main component screen is displayed.
2. Select the Private Villa option from the building type drop down box. The
page is refreshed and the building components page for the private villa is
displayed.
Dubai Municipality
101
BPCS
3. By default, the Charges Free option is No. Unless it is a special case, the
Charge Free option is always No.
4. If you wish to get a permit for more than one identical villa, enter the number
of villas in the No of identical villas field. Else, enter the value 1.
5. Specify the floor details such as Underground, Ground, Mezzanine, Pent
House, and Roof Services. Each consultant is assigned a floor limit and the
consultant can not exceed the floor limit.
6. Enter details such as the Building name, Address details, Number of lifts
required in the building, and approximate Cost of the building.
7. Select the Foundation and Building System/Style details and enter details
such as Air conditioned area, Soil barring capacity, Power consumption,
and Thermal load.
8. To save the building component details, click the Save Info button. The
following message is displayed.
9. To make any changes to the building information, click Cancel and make the
required changes. To go to the main usages screen click Ok. The following
screen is displayed.
Dubai Municipality
102
BPCS
10. Select the usage of your choice. Here we have selected villa as an example.
So, select the Villa checkbox in the Usages screen and click the Confirm
Selection button. The following screen is displayed.
11. Depending on the floors details specified in the building component page, the
floor details are displayed here. Enter the total floor area in sq feet and click
the Save Info button.
12. A message confirming the save is displayed. The message prompts you to
enter the area for the usages.
13. Click the Villa link, adjacent to the Floor info. The following screen is
displayed.
Dubai Municipality
103
BPCS
14. Enter details such as Number of Bedrooms on each floor and the total sq
feet area of all bedrooms and click the Save Info button.
Note: Make sure the sq feet area for each of the bedrooms doesnt exceed the total sq feet area
specified in the floor info-Private Villa screen. If it does, you will not be able to submit the
application. Any remaining space is automatically used up for Facilities & Circulation.
Note: To reconfirm that the area of the rooms in the villa is not more than floor area specified,
return to the floors Info-Private Villa screen. If you dont see any negative values, continue
the process. If you see any negative values, return to the Villas- Private Villa screen, and
make the required changes.
15. If you have specified more than one identical building in the building
component details, click the Copy Identical Buildings button. You can copy
a building only after you have entered all the floor and usages details. The
same information is copied to all the buildings and the following screen
displayed.
Dubai Municipality
104
BPCS
16. If you wish to make any changes to the usage details, click cancel and make
the required changes. Else, click the Ok button. The information is copied to
all the buildings and the following message is displayed.
17. Click the Close button. You are directed to the Building Main Components
screen. Scroll down and click the Building Card link. The following screen is
displayed.
18. The Building on Parcel screen displays building details for all the buildings
on the parcel. A red check mark against the building name indicated that the
building was created in the current application.
19. Return to the permit application screen and click the Submit Application
button on the Permit Application page. The following message is displayed.
Dubai Municipality
105
BPCS
20. Click Ok. Click the Consultant Engineers link displayed against the Contr.
Name field. The following screen is displayed.
21. Click the Engineer Specialty drop down box and select the Architect option.
22. Click the Engineer Name drop down box and select an architect from the list
of architect names displayed.
23. Enter the square feet area designed by the architect in the Designed area field
and click the save button.
24. The selected architect details are displayed below.
25. Click the Engineer Specialty drop down box and select the Structural option.
26. Click the Engineer Name drop down box and select a structural engineer
from the list of names displayed.
27. Enter the square feet area designed by the engineer in the Designed area field
and click the Save button.
Dubai Municipality
106
BPCS
31. This screen gives a summary of the application and displays details such as
the project number, application type, application status, building type and the
number of floors and the height of the building. It also displays the total area
details such as the built up area, external area, concrete slabs if any, pergolas
area and the length of the fence. Click the Submit Now button. The following
message is displayed.
32. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
Dubai Municipality
107
BPCS
33. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
34. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
35. Also, the final status of the application is changed from New to Submitted.
Dubai Municipality
108
BPCS
36. You can also view the application submission message in the application
follow up screen.
37. This step marks the end of creating a final application for a private villa.
Dubai Municipality
109
BPCS
Step
Action
1. Create an application for a new building preliminary. For details refer to the
Creating new building Final process. At the end of the procedure, the
building main component screen is displayed.
2. Select the Investment Villa option from the building type drop down box.
The page is refreshed and the building components page for the private villa is
displayed.
Dubai Municipality
110
BPCS
3. By default, the Charges Free option is No. Unless it is a special case, the
Charge Free option is always No.
4. If you wish to get a permit for more than one identical villa, enter the number
of villas in the No of identical villas field. Else, enter the value 1.
5. Specify the floor details such as Underground, Ground, Mezzanine, Pent
House, and Roof Services. Each consultant is assigned a floor limit and the
consultant can not exceed the floor limit.
6. Enter details such as the Building name, Address details, Number of lifts
required in the building, and approximate Cost of the building.
7. Select the Foundation and Building System/Style details and enter details
such as Air conditioned area, Soil barring capacity, Power consumption,
and Thermal load.
8. To save the building component details, click the Save Info button. The
following message is displayed.
9. To make any changes to the building information, click Cancel and make the
required changes. To go to the main usages screen click Ok. The following
screen is displayed
Dubai Municipality
111
BPCS
10. Select the usage of your choice. Here we have selected villa as an example.
So, select the Villa checkbox in the Usages screen and click the Confirm
Selection button. The following screen is displayed.
11. Depending on the floors details specified in the building component page, the
floor details are displayed here. Enter the Total floor area in sq feet and click
the Save Info button.
12. A message confirming the save is displayed. The message prompts you to
enter the area for the usages.
13. Click the Villa link, adjacent to the Floor info. The following screen is
displayed.
Dubai Municipality
112
BPCS
14. Enter details such as number of bedrooms on each floor and the total sq feet
area of all bedrooms and click the Save Info button.
Make sure the sq feet area for each of the bedrooms doesnt exceed the total sq feet area
specified in the floor info-Investment Villa screen. If it does, you will not be able to submit the
application. Any remaining space is automatically used up for Facilities & Circulation.
To reconfirm that the area of the rooms in the villa is not more than floor area specified,
return to the floors Info-Investment Villa screen. If you dont see any negative values, continue
the process. If you see any negative values, return to the Villas- Investment Villa screen, and
make the required changes.
15. If you have specified more than one identical building in the building
component details, click the Copy Identical Buildings button. You can copy
a building only after you have entered all the floor and usages details. The
same information is copied to all the buildings and the following screen
displayed.
16. To make any changes to the usage details, click Cancel and make the required
changes. Else, click the Ok. The information is copied to all the buildings and
the following message displayed.
Dubai Municipality
113
BPCS
17. Click the close button. You are directed to the building Main component page.
Scroll down and click the Building Card button. The following screen is
displayed.
18. The Building on Parcel screen displays building details for all the buildings
on the parcel. A red check mark against the building name indicated that the
building was created in the current application.
19. Return to the permit application screen and click the Submit Application
button on the Permit Application page. The following message is displayed.
Dubai Municipality
114
BPCS
20. Click Ok. Click the Consultant Engineers link displayed against the Contr.
Name field. The following screen is displayed.
21. Click the Engineer Specialty drop down box and select the Architect option.
22. Click the Engineer Name drop down box and select an architect from the list
of architect names displayed.
23. Enter the square feet area designed by the architect in the Designed area field
and click the save button.
24. The selected architect details are displayed below.
25. Click the Engineer Specialty drop down box and select the Structural
option.
26. Click the Engineer Name drop down box and select a structural engineer
from the list of names displayed.
27. Enter the square feet area designed by the engineer in the Designed area field
and click the save button.
28. The selected structural engineers details are displayed below.
29. Click the Close button to return to the permit application screen.
30. Click the Submit Application button. The following screen is displayed.
Dubai Municipality
115
BPCS
31. This screen gives a summary of the application and displays details such as
the project number, application type, application status, building type and the
number of floors and the height of the building. It also displays the total area
details such as the built up area, external area, concrete slabs if any, pergolas
area and the length of the fence. Click the Submit Now button. The following
message is displayed.
32. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
33. The application is submitted and a message prompting you to pay the charges
is displayed For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
116
BPCS
34. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
35. Also, the final status of the application is changed from New to Submitted.
36. You can also view the application submission message in the application
follow up screen.
Dubai Municipality
117
BPCS
37. This step marks the end of creating a final application for an investment villa.
Dubai Municipality
118
BPCS
Step
Action
1. Create an application for a new building preliminary. For details refer to the
Creating new building Final process. At the end of the procedure, the
building main component screen is displayed.
2. Select the Industrial Building option from the building type drop down box.
The page is refreshed and the building components page for the private villa is
displayed.
3. By default, the Charges Free option is No. Unless it is a special case, the
Charge Free option is always No.
Dubai Municipality
119
BPCS
4. If you wish to get a permit for more than one identical villa, enter the number
of villas in the No of identical buildings field. Else, enter the value 1.
5. Specify the floor details such as Underground, Ground, Mezzanine, Pent
House, and Roof Services. Each consultant is assigned a floor limit and the
consultant can not exceed the floor limit.
6. Enter details such as the Building name, Address details, Number of lifts
required in the building, and approximate Cost of the building.
7. Select the Foundation and Building System/Style details and enter details
such as Air conditioned area, Soil barring capacity, Power consumption,
and Thermal load.
8. To save the building component details, click the Save Info button. The
following message is displayed.
9. To make any changes to the building information, click Cancel and make the
required changes. To go to the main usages screen click Ok. The following
screen is displayed.
10. Select the usage of your choice. Here we have selected warehouses and
workshop usage as an example. So, select the Warehouse and Workshops
Dubai Municipality
120
BPCS
checkbox in the Usages screen and click the Confirm Selection button. The
following screen is displayed.
11. Specify the use of the industrial building, which is Laboratories and Stores
in this case and click the Go Create Building Form button. The following
screen is displayed.
12. Depending on the floors details specified in the building component page, the
floor details are displayed here. Enter the total floor area in sq feet and click
the Save Info button.
13. A message confirming the save is displayed. The message prompts you to
enter the area for the usages.
Dubai Municipality
121
BPCS
15. Enter details such as number of Stores and Laboratories on each floor and
the total sq feet area of all bedrooms and click the Save Info button.
Make sure the sq feet area for each of the bedrooms doesnt exceed the total sq feet area
specified in the floor info-Industrial Buildings screen. If it does, you will not be able to submit
the application. Any remaining space is automatically used up for Facilities & Circulation.
To reconfirm that the area of the rooms in the villa is not more than floor area specified,
return to the floors Info- Industrial Buildings screen. If you dont see any negative values,
continue the process. If you see any negative values, return to the Stores & Laboratories Industrial Buildings screen, and make the required changes.
16. If you have specified more than one identical building in the building
component details, click the Copy Identical Buildings button. You can copy
a building only after you have entered all the floor and usages details. The
same information is copied to all the buildings and the following screen
displayed.
Dubai Municipality
122
BPCS
17. If you wish to make any changes to the usage details, click cancel and do the
needful. Else, click the Ok button. The information is copied to all the
buildings and the following message displayed.
18. Click the close button. You are directed to the building Main component page.
Scroll down and click the Building Card button. The following screen is
displayed.
19. The Building on Parcel screen displays building details for all the buildings
on the parcel. A red check mark against the building name indicated that the
building was created in the current application.
20. Return to the permit application screen and click the Submit Application
button on the Permit Application page. The following message is displayed.
Dubai Municipality
123
BPCS
21. Click Ok. Click the Consultant Engineers link displayed against the Contr.
Name field. The following screen is displayed.
22. Click the Engineer Specialty drop down box and select the Architect option.
23. Click the Engineer Name drop down box and select an architect from the list
of architect names displayed.
24. Enter the square feet area designed by the architect in the Designed area field
and click the save button.
25. The selected architect details are displayed below.
26. Click the Engineer Specialty drop down box and select the Structural
option.
27. Click the Engineer Name drop down box and select a structural engineer
from the list of names displayed.
28. Enter the square feet area designed by the engineer in the Designed area field
and click the save button.
Dubai Municipality
124
BPCS
32. This screen gives a summary of the application and displays details such as
the project number, application type, application status, building type and the
number of floors and the height of the building. It also displays the total area
details such as the built up area, external area, concrete slabs if any, pergolas
area and the length of the fence. Click the Submit Now button. The following
message is displayed.
33. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
Dubai Municipality
125
BPCS
34. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
35. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
36. You can also view the application submission message in the application
follow up screen.
37. Also, the final status of the application is changed from New to Submitted.
Dubai Municipality
126
BPCS
38. This step marks the end of creating a final application for an industrial
building.
Dubai Municipality
127
BPCS
Step
Action
1. Create an application for a new building preliminary. For details refer to the
Creating new building Final process. At the end of the procedure, the
building main component screen is displayed.
2. Select the Public Building option from the building type drop down box. The
page is refreshed and the building components page for the private villa is
displayed.
Dubai Municipality
128
BPCS
3. By default, the Charges Free option is No. Unless it is a special case, the
Charge Free option is always No.
4. If you wish to get a permit for more than one identical villa, enter the number
of villas in the No of identical buildings field. Else, enter the value 1.
5. Specify the floor details such as Underground, Ground, Mezzanine, Pent
House, and Roof Services. Each consultant is assigned a floor limit and the
consultant can not exceed the floor limit.
6. Enter details such as the Building name, Address details, Number of lifts
required in the building, and approximate Cost of the building.
7. Select the Foundation and Building System/Style details and enter details
such as Air conditioned area, Soil barring capacity, Power consumption,
and Thermal load.
8. To save the building component details, click the Save Info button. The
following message is displayed.
9. To make any changes to the building information, click Cancel and make the
required changes. To go to the main usages screen click Ok. The following
screen is displayed.
Dubai Municipality
129
BPCS
10. Select the usage of your choice. Here we have selected hotels, cinemas and
theater usage as an example. So, select the Hotels, Cinema, and Theater
checkbox in the Usages screen and click the Confirm Selection button. The
following screen is displayed.
11. Specify the use of the public building. In this case, the building will house
Hotels, cinema, and theatre. Click the Go Create Building Form button. The
following screen is displayed.
Dubai Municipality
130
BPCS
12. Depending on the floors details specified in the building component page, the
floor details are displayed here. Enter the total floor area in sq feet and click
the Save Info button.
13. Enter details such as number of seats on each floor, number of cinemas on
each floor and the total sq feet area of each floor and click the Save Info
button.
14. Click the Theater link adjacent o the Cinema. The following screen is
displayed.
Dubai Municipality
131
BPCS
17. Click the Hotels link adjacent to Theater. The following screen is displayed.
18. Enter details such as No of Halls, No of Restaurants, Rooms and the total sq
feet area for each usage per floor and click the save info button. A message
confirming the save is displayed.
Make sure the sq feet area for each of the bedrooms doesnt exceed the total sq feet area
specified in the floor info-Public Building screen. If it does, you will not be able to submit the
application. Any remaining space is automatically used up for Facilities & Circulation.
To reconfirm that the area of the rooms in the villa is not more than floor area specified,
return to the floors Info- Public Building screen. If you dont see any negative values, continue
the process. If you see any negative values, return to the Usages- Public Building screen, and
make the required changes.
19. If you have specified more than one identical building in the building
component details, click the Copy Identical Buildings button. You can copy
Dubai Municipality
132
BPCS
a building only after you have entered the entire floor and usages details. The
same information is copied to all the buildings and the following screen is
displayed.
20. To make any changes to the usage details, click Cancel and make the required
changes. Else, click the Ok. The information is copied to all the buildings and
the following message displayed.
21. Click the Close button. You are directed to the building Main component
page. Scroll down and click the Building Card button. The following screen
is displayed.
Dubai Municipality
133
BPCS
22. The Building on Parcel screen displays building details for all the buildings
on the parcel. A red check mark against the building name indicated that the
building was created in the current application.
23. Return to the permit application screen and click the Submit Application
button on the Permit Application page. The following message is displayed.
24. Click Ok. Click the Consultant Engineers link displayed against the Contr.
Name field. The following screen is displayed.
Dubai Municipality
134
BPCS
25. Click the Engineer Specialty drop down box and select the Architect option.
26. Click the Engineer Name drop down box and select an architect from the list
of architect names displayed.
27. Enter the square feet area designed by the architect in the Designed area field
and click the save button.
28. The selected architect details are displayed below.
29. Click the Engineer Specialty drop down box and select the Structural
option.
30. Click the Engineer Name drop down box and select a structural engineer
from the list of names displayed.
31. Enter the square feet area designed by the engineer in the Designed area field
and click the save button.
32. The selected structural engineers details are displayed below.
33. Click the close button to return to the permit application screen.
34. Click the Submit Application button. The following screen is displayed.
Dubai Municipality
135
BPCS
35. This screen gives a summary of the application and displays details such as
the project number, application type, application status, building type and the
number of floors and the height of the building. It also displays the total area
details such as the built up area, external area, concrete slabs if any, pergolas
area and the length of the fence. Click the Submit Now button. The following
message is displayed.
36. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
37. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
136
BPCS
38. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
39. You can also view the application submission message in the application
follow up screen.
40. Also, the final status of the application is changed from New to Submitted.
Dubai Municipality
137
BPCS
41. This step marks the end of creating a final application for a public building.
Dubai Municipality
138
BPCS
Step
Action
1. Create an application for a new building preliminary. For details refer to the
Creating new building Final process. At the end of the procedure, the
building main component screen is displayed.
2. Select the Multi Storey option from the building type drop down box. The
page is refreshed and the building components page for the private villa is
displayed.
Dubai Municipality
139
BPCS
3. By default, the Charges Free option is No. Unless it is a special case, the
Charge Free option is always No.
4. If you wish to get a permit for more than one identical villa, enter the number
of villas in the No of identical buildings field. Else, enter the value 1.
5. Specify the floor details such as Underground, Ground, Mezzanine,
Repeated Group Floors, Pent House, and Roof Services. Each consultant is
assigned a floor limit and the consultant can not exceed the floor limit.
Repeated Group refers to the similar or typical structures on different floors in the building.
You could have one or more than one repeated group. Repeated groups are the typical floors
which follow the same pattern in the building.
6. Enter details such as the Building name, Address details, Number of lifts
required in the building, and approximate Cost of the building.
7. Select the Foundation and Building System/Style details and enter details
such as Air conditioned area, Soil barring capacity, Power consumption,
and Thermal load.
8. To save the building component details, click the Save Info button. The
following message is displayed.
9. To make any changes to the building information, click Cancel and make the
required changes. To go to the main usages screen click Ok. The following
screen is displayed.
Dubai Municipality
140
BPCS
10. Select the usage of your choice. Here we have selected residential apartments
and others as an example. So, select the Residential/Apartments and Others
checkbox in the Usages screen and click the Confirm Selection button. The
following screen is displayed.
11. Specify the use of the multi storey building. In this case, the building will
house Studios, One bedroom and two bedroom apartments and Shops.
Click the Go Create Building Form button. The following screen is
displayed.
Dubai Municipality
141
BPCS
12. Specify the total floor areas for underground, ground floor. Enter the floor
numbers for the repeated groups and total floor area of the group and click the
Save Info button. The following screen is displayed.
Dubai Municipality
142
BPCS
13. Depending on the floors details specified in the building component page, the
floor details are displayed here. Enter the total floor area in sq feet and click
the Save Info button.
14. A message confirming the save is displayed. The message prompts you to
enter the area for the usages.
15. Click the Residential link, adjacent to the Floor info. The following screen is
displayed.
Dubai Municipality
143
BPCS
16. Click the Others link adjacent to Residential. The following screen is
displayed.
Dubai Municipality
144
BPCS
Make sure the sq feet area for each of the bedrooms doesnt exceed the total sq feet area
specified in the floor info-multi storey screen. If it does, you will not be able to submit the
application. Any remaining space is automatically used up for Facilities & Circulation.
To reconfirm that the area of the rooms in the villa is not more than floor area specified,
return to the floors Info- multi storey screen. If you dont see any negative values, continue the
process. If you see any negative values, return to the Villas- multi storey screen, and make the
required changes.
17. .If you have specified more than one identical building in the building
component details, click the Copy Identical Buildings button. You can copy
a building only after you have entered all the floor and usages details. The
same information is copied to all the buildings and the following screen
displayed.
18. To make any changes to the usage details, click Cancel and make the required
changes. Else, click the Ok. The information is copied to all the buildings and
the following message displayed.
19. Click the Close button. You are directed to the building Main component
page. Scroll down and click the Building Card button. The following screen
is displayed.
Dubai Municipality
145
BPCS
20. The Building on Parcel screen displays building details for all the buildings
on the parcel. A red check mark against the building name indicated that the
building was created in the current application.
21. Return to the permit application screen and click the Submit Application
button on the Permit Application page. The following message is displayed.
22. Click Ok. Click the Consultant Engineers link displayed against the Contr.
Name field. The following screen is displayed.
Dubai Municipality
146
BPCS
23. Click the Engineer Specialty drop down box and select the Architect option.
24. Click the Engineer Name drop down box and select an architect from the list
of architect names displayed.
25. Enter the square feet area designed by the architect in the Designed area field
and click the save button.
26. The selected architect details are displayed below.
27. Click the Engineer Specialty drop down box and select the Structural
option.
28. Click the Engineer Name drop down box and select a structural engineer
from the list of names displayed.
29. Enter the square feet area designed by the engineer in the Designed area field
and click the Save button.
30. The selected structural engineers details are displayed below.
31. Click the close button to return to the permit application screen.
32. Click the Submit Application button. The following screen is displayed.
Dubai Municipality
147
BPCS
33. This screen gives a summary of the application and displays details such as
the project number, application type, application status, building type and the
number of floors and the height of the building. It also displays the total area
details such as the built up area, external area, concrete slabs if any, pergolas
area and the length of the fence. Click the Submit Now button. The following
message is displayed.
34. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
35. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
148
BPCS
36. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
37. Also, the final status of the application is changed from New to Submitted.
38. You can also view the application submission message in the application
follow up screen.
Dubai Municipality
149
BPCS
39. This step marks the end of creating a final application for a multi storey
building.
Dubai Municipality
150
BPCS
Step
Action
1. Create an application for a new building preliminary. For details refer to the
Creating new building Final process. At the end of the procedure, the
building main component screen is displayed.
2. . Select the Floor Area Ratio option from the building type drop down box.
The page is refreshed and the building components page for the private villa is
displayed.
Dubai Municipality
151
BPCS
3. By default, the Charges Free option is No. Unless it is a special case, the
Charge Free option is always No.
4. If you wish to get a permit for more than one identical villa, enter the number
of villas in the No of identical buildings field. Else, enter the value 1.
5. Specify the floor details such as Underground, Ground, Mezzanine,
Repeated Group Floors, Pent House, and Roof Services. Each consultant is
assigned a floor limit and the consultant can not exceed the floor limit.
Repeated Group refers to the similar or typical structures on different floors in the building.
You could have one or more than one repeated group. Repeated groups are the typical floors
which follow the same pattern in the building.
6. Enter details such as the Building name, Address details, Number of lifts
required in the building, and approximate Cost of the building.
7. Select the Foundation and Building System/Style details and enter details
such as Air conditioned area, Soil barring capacity, Power consumption,
and Thermal load.
8. Enter the allowed ration and the provided ration in the Allowed Ratio and
Provided Ratio fields respectively.
9. To save the building component details, click the Save Info button. The
following message is displayed.
10. To make any changes to the building information, click Cancel and make the
required changes. To go to the main usages screen click Ok. The following
screen is displayed.
Dubai Municipality
152
BPCS
11. Select the usage of your choice. Here we have selected schools and factory
usages as an example. So, select the Schools and Factory checkbox in the
Usages screen and click the Confirm Selection button. The following screen
is displayed.
12. Specify the use of the multi storey building. In this case, the building will
house Open sheds and an educational institute. Click the Go Create
Building Form button. The following screen is displayed.
Dubai Municipality
153
BPCS
13. Specify the total floor areas for underground, ground floor. Enter the floor
numbers for the repeated groups and total floor area of the group and click the
Save Info button. The following screen is displayed.
14. Depending on the floors details specified in the building component page, the
floor details are displayed here. Enter the total floor area in sq feet and click
the Save Info button.
Dubai Municipality
154
BPCS
15. A message confirming the save is displayed. The message prompts you to
enter the area for the usages.
16. Click the Education link, adjacent to the Floor info. The following screen is
displayed.
Dubai Municipality
155
BPCS
19. Enter details such as the number of Open sheds per floor and the total sq feet
area of each shed and click the save info button.
Make sure the sq feet area for each of the bedrooms doesnt exceed the total sq feet area
specified in the floor info-floor area ratio screen. If it does, you will not be able to submit the
application. Any remaining space is automatically used up for Facilities & Circulation.
To reconfirm that the area of the rooms in the villa is not more than floor area specified,
return to the floors Info- floor area ratio screen. If you dont see any negative values, continue
the process. If you see any negative values, return to the Villas- floor area ratio screen, and
make the required changes.
20. If you have specified more than one identical building in the building
component details, click the Copy Identical Buildings button. You can copy
a building only after you have entered all the floor and usages details. The
same information is copied to all the buildings and the following screen
displayed.
21. To make any changes to the usage details, click Cancel and make the required
changes. Else, click the Ok. The information is copied to all the buildings and
the following message displayed.
Dubai Municipality
156
BPCS
22. Click the close button. You are directed to the building Main component page.
Scroll down and click the Building Card button. The following screen is
displayed.
23. The Building on parcel screen displays building details for all the buildings
on the parcel. A red check mark against the building name indicated that the
building was created in the current application.
24. Return to the permit application screen and click the Submit Application
button on the Permit Application page. The following message is displayed.
25. Click Ok. Click the Consultant Engineers link displayed against the Contr.
Name field. The following screen is displayed.
Dubai Municipality
157
BPCS
26. Click the Engineer Specialty drop down box and select the Architect option.
27. Click the Engineer Name drop down box and select an architect from the list
of architect names displayed.
28. Enter the square feet area designed by the architect in the Designed area field
and click the save button.
29. The selected architect details are displayed below.
30. Click the Engineer Specialty drop down box and select the Structural
option.
31. Click the Engineer Name drop down box and select a structural engineer
from the list of names displayed.
32. Enter the square feet area designed by the engineer in the Designed area field
and click the save button.
33. The selected structural engineers details are displayed below.
34. Click the Close button to return to the permit application screen.
35. Click the Submit Application button. The following screen is displayed.
Dubai Municipality
158
BPCS
36. This screen gives a summary of the application and displays details such as
the project number, application type, application status, building type and the
number of floors and the height of the building. It also displays the total area
details such as the built up area, external area, concrete slabs if any, pergolas
area and the length of the fence. Click the Submit Now button. The following
message is displayed.
37. If you want to make some changes to the permit application, click Cancel.
Else, click Ok.
38. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
159
BPCS
39. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
40. Also, the final status of the application is changed from New to Submitted.
41. You can also view the application submission message in the application
follow up screen.
Dubai Municipality
160
BPCS
42. This step marks the end of creating a final application for a floor area ratio
building.
Dubai Municipality
161
BPCS
Painting permit
Dubai Municipality
162
BPCS
Action
1. Create a new application. For details, refer to the Creating a new application
(Generic) process .Follow steps 1-3. The Permit Application screen is
displayed.
Dubai Municipality
163
BPCS
Dubai Municipality
164
BPCS
Step
Action
Dubai Municipality
165
BPCS
2. Select the Major option from the modification type drop down box.
3. Select the Major Works option from the Contr.Work Type drop down box
and click the Save Application button. The Permit Application screen is
displayed.
4. Scroll down ad click the Building Card link. The following screen is
displayed.
5. Click the radio button against the private villa you want to make changes to
and select Modify Building option from select option drop down box. Click
the Go button. The following screen is displayed.
Dubai Municipality
166
BPCS
6. Select the usages you want to add or modify in the villa. In this case, we are
adding a play area to the private villa. Select the Play Area options under
Commercial usage and click the Add Usages/Sub Usages button. The
following screen is displayed.
Dubai Municipality
167
BPCS
7. Select the floor you want to make changes to and click the Modify button.
The following screen is displayed.
8. Enter the total square feet area you are adding to the floor in the Variations
field and click the Save Modifications button. A message confirming the save
is displayed. If you are removing an area, enter the negative value in
variations field. Since we are adding a play area in the Commercial usage
section of the villa, click the Commercial link adjacent to Floor Info. The
following screen is displayed.
9. Add the total area to be used as the play area in the variations field and click
the Save Modifications button. A message confirming the save is displayed.
Since we have completed entering details for the play area, click the close
button.
Dubai Municipality
168
BPCS
10. The Building on parcel screen is displayed. Click the Permit Application
link. The permit application screen is displayed.
11. Scroll down and click the Submit Application button. The following message
is displayed.
12. To modify or recheck the building modifications, click Ok. To submit the
application, click Cancel. The following screen is displayed.
Dubai Municipality
169
BPCS
13. This screen displays the project details, building details and area details of the
application. The area details block displays the current values and added
values columns. The current value here represents the existing value of the
built up and the added values displays the values added during modifications.
Click the Submit Now button. The following screen is displayed.
14. To make changes, click Cancel. To submit the application, click Ok.
15. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
170
BPCS
16. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
17. Also, the final status of the application is changed from New to Submitted.
18. You can also view the application submission message in the application
follow up screen.
19. This step marks the end of creating a preliminary adjustment/addition
application for a private villa.
Dubai Municipality
171
BPCS
Step
Action
Dubai Municipality
172
BPCS
2. In this example select the Medium option from the modification type drop
down box.
3. Select the Medium Works option from the Contr. Work Type drop down
box and click the Save Application button. The Permit Application screen is
displayed.
4. Scroll down ad click the Building Card link. The following screen is
displayed.
5. Click the radio button against the investment villa you want to make changes
to and select Modify Building option from select option drop down box.
Click the Go button. The following screen is displayed.
Dubai Municipality
173
BPCS
6. .Select the usages you want to add or modify in the villa. In this case, we are
adding a service block and a watchman room to the investment villa. Select
the Service Block option and Outdoor Swimming Pool and Watchman Room
Dubai Municipality
174
BPCS
option under Outdoor Services usage and click the Add Usages/Sub Usages
button. The following screen is displayed.
7. Select the floor you want to make changes to and click the Modify button.
The following screen is displayed.
8. Enter the total square feet area you are adding to the floor in the Variations
field and click the Save Modifications button. A message confirming the save
is displayed. If you are removing an area, enter the negative value in
variations field. Since we are adding an outdoor swimming pool and
watchman room in the outdoor services usage section, villa, click the Outdoor
Services link adjacent to Floor Info. The following screen is displayed.
Dubai Municipality
175
BPCS
9. Enter the total floor area for the swimming pool and the total area for the
watchman room and click the Save Modifications button. A message
confirming the save is displayed. Click the Services Block link adjacent to
Villa. The following screen is displayed.
10. Enter the number of external service buildings and the total area for the same
in the Variations field and click the Save Modifications button. A message
confirming the save is displayed. Since we have completed modifying the
usage details, click the Close button.
11. The Building on parcel screen is displayed. Click the Permit Application
link. The permit application screen is displayed.
12. Scroll down and click the Submit Application button. The following message
is displayed.
Dubai Municipality
176
BPCS
13. To modify or recheck the building modifications, click Ok. To submit the
application, click Cancel. The following screen is displayed.
14. This screen displays the project details, building details and area details of the
application. The area details block displays the current values and added
values columns. The current value here represents the existing value of the
built up and the added values displays the values added during modifications.
Click the Submit Now button. The following screen is displayed.
Dubai Municipality
177
BPCS
15. To make changes, click Cancel. To submit the application, click Ok.
16. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
178
BPCS
17. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
18. Also, the final status of the application is changed from New to Submitted.
19. You can also view the application submission message in the application
follow up screen.
20. This step marks the end of creating a preliminary adjustment/addition
application for an investment villa.
Dubai Municipality
179
BPCS
Step
Action
2. In this example select the Medium option from the modification type drop
down box.
Dubai Municipality
180
BPCS
3. Select the Medium Works option from the Contr. Work Type drop down
box and click the Save Application button. The Permit Application screen is
displayed.
4. Scroll down ad click the Building Card link. The following screen is
displayed.
5. Click the radio button against the industrial building you want to make
changes to and select Modify Building option from select option drop down
box. Click the Go button. The following screen is displayed.
Dubai Municipality
181
BPCS
6. Select the usages you want to add or modify in the industrial building. In this
case, we are adding open sheds to the industrial building. Select the Open
Sheds option under Warehouse/Factory/Workshop usage and click the Add
Usages/Sub Usages button. The following screen is displayed.
Dubai Municipality
182
BPCS
7. Select the floor you want to make changes to and click the Modify button.
The following screen is displayed.
8. Enter the total square feet area you are adding to the floor in the Variations
field and click the Save Modifications button. A message confirming the save
is displayed. If you are removing an area, enter the negative value in
variations field. Since we are adding an open sheds in the
Warehouse/Factory/Usages section, click the Warehouse/Factory/Usages link
adjacent Offices. The following screen is displayed.
Dubai Municipality
183
BPCS
9. Enter the number of open sheds on each floor and the total floor area for the
same and click the Save Modifications button. A message confirming the
save is displayed. Since we have completed entering the usage, click the Close
button.
10. The Building on parcel screen is displayed. Click the Permit Application
link. The permit application screen is displayed.
11. Scroll down and click the Submit Application button. The following
message is displayed.
12. To make or recheck the modifications, click Ok. To submit the application,
click Cancel. The following screen is displayed.
Dubai Municipality
184
BPCS
13. This screen displays the project details, building details and area details of the
application. The area details block displays the current values and added
values columns. The current value here represents the existing value of the
built up and the added values displays the values added during modifications.
Click the Submit Now button. The following screen is displayed.
14. To make changes, click Cancel. To submit the application, click Ok.
15. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
185
BPCS
16. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
17. You can also view the application submission message in the application
follow up screen.
18. This step marks the end of creating a preliminary adjustment/addition
application for an industrial building.
Dubai Municipality
186
BPCS
Step
Action
2. In this example select the Medium option from the modification type drop
down box.
3. Select the Medium Works option from the Contr. Work Type drop down
box and click the Save Application button. The Permit Application screen is
displayed.
Dubai Municipality
187
BPCS
4. Scroll down ad click the Building Card link. The following screen is
displayed.
5. Click the radio button against the public building you want to make changes
to and select Modify Building option from select option drop down box.
Click the Go button. The following screen is displayed.
Dubai Municipality
188
BPCS
6. Select the usages you want to add or modify in the public building. In this
case, we are adding shops to hotels in the public building. Select the Shops
option under Hotels usage and click the Add Usages/Sub Usages button. The
following screen is displayed.
Dubai Municipality
189
BPCS
7. Select the floors you want to modify and click the Modify button. The
following screen is displayed.
8. Enter the total square feet area you are adding to the floor in the Variations
field and click the Save Modifications button. A message confirming the save
is displayed. If you are removing an area, enter the negative value in
variations field. Since we are adding shops in the Hotels usage section of the
villa, click the Hotels link adjacent to Theater. The following screen is
displayed.
Dubai Municipality
190
BPCS
9. Enter the number of shops and administrative offices with the square feet area
for the same on the selected floors and click the Save Modifications button. A
message confirming the save is displayed. Since we have completed
modifying the usage details, click the Close button.
10. The Building on parcel screen is displayed. Click the Permit Application
link. The permit application screen is displayed.
11. Scroll down and click the Submit Application button. The following message
is displayed.
12. To modify or recheck the building modifications, click Ok. To submit the
application, click Cancel. The following screen is displayed.
Dubai Municipality
191
BPCS
13. This screen displays the project details, building details and area details of the
application. The area details block displays the current values and added
values columns. The current value here represents the existing value of the
built up and the added values displays the values added during modifications.
Click the Submit Now button. The following screen is displayed.
14. To make changes, click Cancel. To submit the application, click Ok.
15. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
192
BPCS
16. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
17. Also, the final status of the application is changed from New to Submitted.
18. You can also view the application submission message in the application
follow up screen.
19. This step marks the end of creating a preliminary adjustment/addition
application for a public building.
Dubai Municipality
193
BPCS
Step
Action
2. Select the Major option from the modification type drop down box.
3. Select the Major Works option from the Contr. Work Type drop down box
and click the Save Application button. The Permit Application screen is
displayed.
Dubai Municipality
194
BPCS
4. Scroll down and click the Building Card link. The following screen is
displayed.
5. Click the radio button against the multi storey you want to make changes to
and select Modify Building option from select option drop down box. Click
the Go button. The following screen is displayed.
Dubai Municipality
195
BPCS
6. Select the usages you want to add or modify in the multi storey. In this case,
we are adding new floors to create studios and a watchman room in the multi
storey building. Select the Studios option under Residential usage and
Watchman room under outdoor service usage and click the Add Usages/Sub
Dubai Municipality
196
BPCS
7. Enter the number of new floors to be added in the Added floors field and click
the Add floors button. Click the Add Floor Variations link. The following
screen is displayed.
8. Select the floors you have added and enter the total floor area for each floor.
Click the Modify button. The following screen is displayed.
Dubai Municipality
197
BPCS
Figure 7-49
9. Enter the total floor area for the newly added floors and click the Save
Modifications button. A message confirming the save is displayed. If you are
removing an area, enter the negative value in variations field. Since we are
adding studios and apartments in the residential usage and watchman room in
the outdoor services usage section click the Residential link adjacent to office.
The following screen is displayed.
10. Enter the number of Studio and one bed apartments on each of the new floors
and click the Save Modifications button. A message confirming the save is
displayed. Click the Outdoor Services link. The following screen is
displayed.
Dubai Municipality
198
BPCS
11. Enter details such as the number of watchman rooms on each floor and the
area of each room. Click the Save Modifications button. A message
confirming the save is displayed. Since we have completed entering details for
the new floors, click the close button.
12. The Building on parcel screen is displayed. Click the Permit Application
link. The permit application screen is displayed.
13. Scroll down and click the Submit Application button. The following message
is displayed.
14. To modify or recheck the building modifications, click Ok. To submit the
application, click Cancel. The following screen is displayed.
Dubai Municipality
199
BPCS
15. This screen displays the project details, building details and area details of the
application. The area details block displays the current values and added
values columns. The current value here represents the existing value of the
built up and the added values displays the values added during modifications.
Click the Submit Now button. The following screen is displayed.
16. To make changes, click Cancel. To submit the application, click Ok.
17. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
200
BPCS
18. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
19. Also, the final status of the application is changed from New to Submitted.
20. You can also view the application submission message in the application
follow up screen.
21. This step marks the end of creating a preliminary adjustment/addition
application for a multi storey.
Dubai Municipality
201
BPCS
Step
Action
2. Select the Medium option from the modification type drop down box.
3. Select the Medium Works option from the Contr. Work Type drop down box
and click the Save Application button. The Permit Application screen is
displayed.
Dubai Municipality
202
BPCS
4. Scroll down and click the Building Card link. The following screen is
displayed.
5. Click the radio button against the Floor Area Ratio building you want to make
changes to and select Modify Building option from select option drop down
box. Click the Go button. The following screen is displayed.
Dubai Municipality
203
BPCS
6. Select the usages you want to add or modify in the floor area ratio. In this
case, we are adding a restaurant, cinema and other usages to the building.
Select the Restaurant option under Commercial usage and others option and
click the Add Usages/Sub Usages button. The following screen is displayed.
Dubai Municipality
204
BPCS
7. Select the floors you want to modify and click the Modify button. The
following screen is displayed.
8. Enter the total floor area for the newly added floors and click the Save
Modifications button. A message confirming the save is displayed. If you are
removing an area, enter the negative value in variations field. Since we are
Dubai Municipality
205
BPCS
adding restaurants in the commercial usage and other usage section click the
Commercial link adjacent to office. The following screen is displayed.
9. Enter the number of restaurants to be added and the total floor area of the
same in on each floor and click the Save Modifications button. A message
confirming the save is displayed. Click the Cinema link adjacent to
Commercial. The following screen is displayed.
10. Enter details such as the number of cinemas, seats and the total area for the
floors you are modifying and click the Modify button. A message confirming
the save is displayed. Click the Others link adjacent to Cinemas. The
following screen is displayed.
Dubai Municipality
206
BPCS
11. Enter the usage name for and area for the usage on each floor and click the
Save Modification button. A message confirming the save is displayed. Click
the Cinema link. The following screen is displayed. Since we have completed
entering details for the new floors, click the Close button.
12. The Building on parcel screen is displayed. Click the Permit Application
link. The permit application screen is displayed.
13. Scroll down and click the Submit Application button. The following message
is displayed.
14. To modify or recheck the building modifications, click Ok. To submit the
application, click Cancel. The following screen is displayed.
Dubai Municipality
207
BPCS
15. This screen displays the project details, building details and area details of the
application. The area details block displays the current values and added
values columns. The current value here represents the existing value of the
built up and the added values displays the values added during modifications.
Click the Submit Now button. The following screen is displayed.
16. To make changes, click Cancel. To submit the application, click Ok.
17. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
208
BPCS
18. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
19. You can also view the application submission message in the application
follow up screen.
20. This step marks the end of creating a preliminary adjustment/addition
application for floor area ratio building.
Dubai Municipality
209
BPCS
Step
1.
Action
2.
3.
Click the Application Type drop down box. You will notice seven
application types: Preliminary- Adjustment/Addition, FinalAdjustment/Addition, Adjustment and Addition Permit (Simple),
Permit for Road Signboards, Painting Permit, Permit for Roof
Signboards, and Maintenance Permit by Consultant.
4.
5.
Dubai Municipality
210
BPCS
6.
Select the type of modification from the Modification Type drop down
box. You can choose from the following options: Minor, Medium,
Major, Complete Design Change, and Change Bldg to HTL/HTL Apt.
7.
Select the type of works from the contract types drop down box. You can
choose from the following options: Minor Works, Medium Works,
Major Works and Special Case.
8.
9.
Scroll down and click the Building Card link. The following screen is
displayed.
10.
Dubai Municipality
211
BPCS
Step
Action
2. Select the Medium option from the modification type drop down box.
3. Select the Medium Works option from the Contr. Work Type drop down box
and click the Save Application button. The Permit Application screen is
displayed.
Dubai Municipality
212
BPCS
4. Scroll down ad click the Building Card link. The following screen is
displayed.
5. Click the radio button against the floor area ratio building you want to make
changes to and select Modify Building option from select option drop down
box. Click the Go button. The following screen is displayed
6. To modify building without Area or Usage changes, click Yes. Else, click No.
In this case, we will modify the building by changing area or usage and hence
Dubai Municipality
213
BPCS
have selected the No option. Click the Save button. The following screen is
displayed.
Dubai Municipality
214
BPCS
7. Select the usages you want to add or modify in the private villa. In this case,
we are adding an outdoor swimming pool and a fence to the villa. Select the
Outdoor Swimming Pool and Fence option under Outdoor Services usage and
click the Add Usages/Sub Usages button. The following screen is displayed.
8. Select the floors you want to modify and click the Modify button. The
following screen is displayed.
9.
Enter the total floor area for the usages and click the Save Modifications
button. A message confirming the save is displayed. If you are removing an
area, enter the negative value in variations field. Since we are adding outdoor
service usages for the villa, click the Outdoor Services link adjacent to Floor
Info. The following screen is displayed.
Dubai Municipality
215
BPCS
10. Enter details such as the total area for the outdoor swimming pool and the
length for the fence. Click the Save Modifications button. A message
confirming the save is displayed. Since we have completed entering details for
the new floors, click the Close button.
11. The Building on parcel screen is displayed. Click the Permit Application
link. The permit application screen is displayed.
12. Scroll down and click the Submit Application button. The following screen
is displayed.
13. Click ok. Click the Consultant Engineers link displayed against the Contr.
Name field. The following screen is displayed.
Dubai Municipality
216
BPCS
14. Click the Engineer Specialty drop down box and select the Architect option.
15. Click the Engineer Name drop down box and select an architect from the list
of architect names displayed.
16. Enter the square feet area designed by the architect in the Designed area field
and click the Save button.
17. The selected architect details are displayed below.
18. Click the Engineer Specialty drop down box and select the Structural
option.
19. Click the Engineer Name drop down box and select a structural engineer
from the list of names displayed.
20. Enter the square feet area designed by the engineer in the Designed area field
and click the Save button.
21. The selected structural engineers details are displayed below.
22. Click the Close button to return to the permit application screen.
23. Click the Submit Application button. The following screen is displayed
Dubai Municipality
217
BPCS
24. To modify or recheck the villa modifications, click Ok. To submit the
application, click Cancel. The following screen is displayed.
25. This screen displays the project details, building details and area details of the
application. The area details block displays the current values and added
values columns. The current value here represents the existing value of the
built up and the added values displays the values added during modifications.
Click the Submit Now button. The following screen is displayed.
Dubai Municipality
218
BPCS
26. To make changes, click Cancel. To submit the application, click Ok.
27. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
219
BPCS
28. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
29. Also, the final status of the application is changed from New to Submitted.
30. You can also view the application submission message in the application
follow up screen.
31. This step marks the end of creating a final adjustment/addition application for
a private villa.
Dubai Municipality
220
BPCS
Step
Action
2. Select the Major option from the modification type drop down box.
3. Select the Major Works option from the Contr. Work Type drop down box
and click the Save Application button. The Permit Application screen is
displayed.
4. Scroll down ad click the Building Card link. The following screen is
displayed.
Dubai Municipality
221
BPCS
5. Click the radio button against the investment villa you want to make changes
to and select Modify Building option from select option drop down box.
Click the Go button. The following screen is displayed.
6. To modify building without Area or Usage changes, click Yes. Else, click No.
In this case, we will modify the building by changing area or usage and hence
have selected the No option. Click the Save button. The following screen is
displayed.
Dubai Municipality
222
BPCS
7. Select the usages you want to add or modify in the investment villa. In this
case, we are adding External Ground Concrete Slabs and Other External
Structure. Select the External Ground Concrete Slabs and Other External
Dubai Municipality
223
BPCS
Structure option under Outdoor Services usage and click the Add Usages/Sub
Usages button. The following screen is displayed.
8. Select the floors you want to modify and click the Modify button. The
following screen is displayed.
9. Enter the total floor area for the usages and click the Save Modifications
button. A message confirming the save is displayed. If you are removing an
area, enter the negative value in variations field. Since we are adding outdoor
service usages for the villa, click the Outdoor Services link adjacent to Floor
Info. The following screen is displayed.
Dubai Municipality
224
BPCS
10. Enter details such as the total floor area for the external ground concrete slabs
and other structures and click the Save Modifications button. A message
confirming the save is displayed. Since we have completed adding the usages,
click the close button.
11. The Building on parcel screen is displayed. Click the Permit Application
link. The permit application screen is displayed.
12. Click ok. Click the Consultant Engineers link displayed against the Contr.
Name field. The following screen is displayed.
Dubai Municipality
225
BPCS
13. Click the Engineer Specialty drop down box and select the Architect option.
14. Click the Engineer Name drop down box and select an architect from the list
of architect names displayed.
15. Enter the square feet area designed by the architect in the Designed area field
and click the Save button.
16. The selected architect details are displayed below.
17. Click the Engineer Specialty drop down box and select the Structural
option.
18. Click the Engineer Name drop down box and select a structural engineer
from the list of names displayed.
19. Enter the square feet area designed by the engineer in the Designed area field
and click the Save button.
20. The selected structural engineers details are displayed below.
21. Click the Close button to return to the permit application screen.
Dubai Municipality
226
BPCS
22. Scroll down and click the Submit Application button. The following message
is displayed.
23. To make or recheck the modifications, click Ok. To submit the application,
click Cancel. The following screen is displayed.
24. This screen displays the project details, building details and area details of the
application. The area details block displays the current values and added
values columns. The current value here represents the existing value of the
built up and the added values displays the values added during modifications.
Click the Submit Application button. The following screen is displayed.
Dubai Municipality
227
BPCS
25. To make changes, click Cancel. To submit the application, click Ok.
26. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
228
BPCS
27. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
28. Also, the final status of the application is changed from New to Submitted.
29. You can also view the application submission message in the application
follow up screen.
30. This step marks the end of creating a final adjustment/addition application for
an investment villa.
Dubai Municipality
229
BPCS
Step
Action
2. Select the Medium option from the modification type drop down box.
3. Select the Medium Works option from the Contr. Work Type drop down
box and click the Save Application button. The Permit Application screen is
displayed.
4. Scroll down ad click the Building Card link. The following screen is
displayed.
Dubai Municipality
230
BPCS
5. Click the radio button against the industrial building you want to make
changes to and select Modify Building option from select option drop down
box. Click the Go button. The following screen is displayed.
6. To modify the industrial building without Area or Usage changes, click Yes.
Else, click No. In this case, we are modifying the building without changing
Dubai Municipality
231
BPCS
area or usage and hence have selected the Yes option. Click the Save button.
The following screen is displayed.
7. You will notice that the Modified Status against the selected building is
changed to Yes.
8. Scroll down and click the Submit Application button. The following message
is displayed.
Dubai Municipality
232
BPCS
10. This screen displays the project details, building details and area details of the
application. The area details block displays the current values and added
values columns. The current value here represents the existing value of the
built up and the added values displays the values added during modifications.
Click the Submit Now button. The following screen is displayed.
11. To make changes, click Cancel. To submit the application, click Ok.
12. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
233
BPCS
13. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
14. Also, the final status of the application is changed from New to Submitted.
15. You can also view the application submission message in the application
follow up screen.
16. This step marks the end of creating a final adjustment/addition application for
an industrial building.
Dubai Municipality
234
BPCS
Step
Action
2. Select the Medium option from the modification type drop down box.
3. Select the Medium Works option from the Contr. Work Type drop down box
and click the Save Application button. The Permit Application screen is
displayed.
Dubai Municipality
235
BPCS
4. Scroll down ad click the Building Card link. The following screen is
displayed.
5. Click the radio button against the public building you want to make changes
to and select Modify Building option from select option drop down box.
Click the Go button. The following screen is displayed.
6. To modify building without Area or Usage changes, click Yes. Else, click No.
In this case, we will modify the building by changing area or usage and hence
have selected the No option. Click the Save button. The following screen is
displayed.
Dubai Municipality
236
BPCS
7. Select the usages you want to add or modify in the public building. In this
case, we are adding External Ground Concrete Slabs and Other External
Dubai Municipality
237
BPCS
Structure. Select the External Ground Concrete Slabs and Other External
Structure option under Outdoor Services usage and click the Add Usages/Sub
Usages button. The following screen is displayed.
8. Select the floors you want to modify and click the Modify button. The
following screen is displayed.
9. Enter the total floor area for the usages and click the Save Modifications
button. A message confirming the save is displayed. Since we are adding
outdoor service usages for the villa, click the Outdoor Services link adjacent
to Floor Info. The following screen is displayed.
Dubai Municipality
238
BPCS
10. Enter details such as the total floor area for the external ground concrete slabs
and other structures and click the Save Modifications button. A message
confirming the save is displayed. Since we have completed adding the usages,
click the close button.
11. The Building on parcel screen is displayed. Click the Permit Application
link. The permit application screen is displayed.
12. Scroll down and click the Submit Application button. The following message
is displayed
13. To make or recheck the modifications, click Ok. To submit the application,
click Cancel. The following screen is displayed.
Dubai Municipality
239
BPCS
14. Click the Engineer Specialty drop down box and select the Architect option.
15. Click the Engineer Name drop down box and select an architect from the list
of architect names displayed.
16. Enter the square feet area designed by the architect in the Designed area field
and click the Save button.
17. The selected architect details are displayed below.
18. Click the Engineer Specialty drop down box and select the Structural
option.
19. Click the Engineer Name drop down box and select a structural engineer
from the list of names displayed.
20. Enter the square feet area designed by the engineer in the Designed area field
and click the Save button.
21. The selected structural engineers details are displayed below.
22. Click the close button to return to the permit application screen.
23. Scroll down and click the Submit Application button. The following message
is displayed.
Dubai Municipality
240
BPCS
Figure 7-114
24. To modify or recheck the building modifications, click Ok. To submit the
application, click Cancel. The following screen is displayed.
25. This screen displays the project details, building details and area details of the
application. The area details block displays the current values and added
values columns. The current value here represents the existing value of the
built up and the added values displays the values added during modifications.
Click the Submit Now button. The following screen is displayed.
Dubai Municipality
241
BPCS
26. To make changes, click Cancel. To submit the application, click Ok.
27. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
242
BPCS
28. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
29. You can also view the application submission message in the application
follow up screen.
30. This step marks the end of creating a final adjustment/addition application for
a public building.
Dubai Municipality
243
BPCS
Step
Action
2. Select the Medium option from the modification type drop down box.
Dubai Municipality
244
BPCS
3. Select the Medium Works option from the Contr. Work Type drop down box
and click the Save Application button. The Permit Application screen is
displayed.
4. Scroll down ad click the Building Card link. The following screen is
displayed.
5. Click the radio button against the multi storey you want to make changes to
and select Modify Building option from select option drop down box. Click
the Go button. The following screen is displayed.
Dubai Municipality
245
BPCS
6. To modify building without Area or Usage changes, click Yes. Else, click No.
In this case, we are modifying the building changing area or usage and hence
have selected the No option. Click the Save button. The following screen is
displayed.
Dubai Municipality
246
BPCS
7. Select the usages you want to add or modify in the multi storey. In this case,
we are adding extra floors for office usage. Select the Offices usage option
and click the Add Usages/Sub Usages button. The Building forms creation
screen is displayed. Click the Add Floors link. The following screen is
displayed.
8. Enter the number of floors to be added in the Added floors field and click the
Add Floors button. Click the Add Floor Variations link. The following
screen is displayed.
Dubai Municipality
247
BPCS
9. Enter the total floor area for each of the t newly added floors and click the
Save Modifications button. If you are removing an area, enter the negative
value in variations field. A message confirming the save is displayed. Since
we are creating office space in the new floors, click the Offices link adjacent
to Floor Info. The following screen is displayed.
Dubai Municipality
248
BPCS
10. Enter details such as the number of offices on each floor and the total area for
each office. Click the Save Modifications button. A message confirming the
save is displayed. Since we have completed entering usage details for the new
floors, click the close button.
11. The Building on parcel screen is displayed. Click the Permit Application
link. The permit application screen is displayed.
Dubai Municipality
249
BPCS
12. Scroll down and click the Submit Application button. The following message
is displayed.
13. Click ok. Click the Consultant Engineers link displayed against the Contr.
Name field. The following screen is displayed.
14. Click the Engineer Specialty drop down box and select the Architect option.
15. Click the Engineer Name drop down box and select an architect from the list
of architect names displayed.
16. Enter the square feet area designed by the architect in the Designed area field
and click the Save button.
Dubai Municipality
250
BPCS
24. To modify or recheck the building modifications, click Ok. To submit the
application, click Cancel. The following screen is displayed.
Dubai Municipality
251
BPCS
25. This screen displays the project details, building details and area details of the
application. The area details block displays the current values and added
values columns. The current value here represents the existing value of the
built up and the added values displays the values added during modifications.
Click the Submit Now button. The following screen is displayed.
26. To make changes, click Cancel. To submit the application, click Ok.
27. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
252
BPCS
28. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
29. Also, the final status of the application is changed from New to Submitted.
30. You can also view the application submission message in the application
follow up screen.
31. This step marks the end of creating a final adjustment/addition application for
a multi storey.
Dubai Municipality
253
BPCS
Step
Action
2. Select the Major option from the modification type drop down box.
3. Select the Major Works option from the Contr. Work Type drop down box
and click the Save Application button. The Permit Application screen is
displayed.
Dubai Municipality
254
BPCS
4. Scroll down and click the Building Card link. The following screen is
displayed.
5. Click the radio button against the floor area ratio building you want to make
changes to and select Modify Building option from select option drop down
box. Click the Go button. The following screen is displayed.
6. To modify building without Area or Usage changes, click Yes. Else, click No.
In this case, we will modify the building without changing area or usage and
hence have selected the Yes option. Click the Save button. The following
screen is displayed.
Dubai Municipality
255
BPCS
7. You will notice that the Modified Status against the selected building is
changed to Yes.
8. Scroll down and click the Submit Application button. The following message
is displayed.
Dubai Municipality
256
BPCS
10. This screen displays the project details, building details and area details of the
application. The area details block displays the current values and added
values columns. The current value here represents the existing value of the
built up and the added values displays the values added during modifications.
Click the Submit Now button. The following screen is displayed.
11. To make changes, click Cancel. To submit the application, click Ok.
12. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
257
BPCS
13. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
14. Also, the final status of the application is changed from New to Submitted.
15. You can also view the application submission message in the application
follow up screen.
16. This step marks the end of creating a final adjustment/addition application for
a floor area ratio building.
Dubai Municipality
258
BPCS
Step
Action
1. Create a new application. For details, refer to the Creating a new application
(Generic) process .Follow steps 1-3. The Permit Application screen is
displayed.
2. Select the Adjustment/Addition Permit option from the process group drop
down box.
3. Select the Adjustment and Addition permit (Simple) option from the
application type drop down box.
Dubai Municipality
259
BPCS
4. Enter a Description for the application and click the Save Application button.
The permit application screen is displayed.
5. Scroll down and click the Building Card link. The following screen is
displayed.
6. Select the Modify Building option from the Select Operation drop down box
and select the radio button against the building you want to modify and click
the Go button. The following screen building usages screen is displayed.
Dubai Municipality
260
BPCS
7. You can modify the building by either by adding floor variations, adding
usages/sub usages or modifying the building details. To modify building
details, click the Modify Building Details button in the building form usages
as shown in figure 7-141. The following screen is displayed.
Dubai Municipality
261
BPCS
8. Make the required changes and click the Save Modifications button. The
Building card Details screen is displayed.
9. To Add New Usages, select the usages of your choice from the building form
usage screen as shown in figure 7-141 and follow instructions in the Final
Adjustment Addition permit section.
10. To modify floor details of the selected usages, click the Add Usages, Sub
usages button. The following screen is displayed.
11. To add floor variations, select the floors you want to add or remove area from
by selecting the checkbox against the floor and click the Modify button. The
following screen is displayed.
Dubai Municipality
262
BPCS
12. Enter the area you wish to add and click the Save Modifications button. The
details are saved and click Close.
13. The Building Card Details screen is displayed. Select the check box on the left
against the building you made modifications to and click the Save Selected
building button. The following screen is displayed.
Dubai Municipality
263
BPCS
14. You will notice that the status for the selected building in the modified
column is changed to Yes. Click the permit application button. The permit
application screen is displayed.
15. Scroll down and click the Submit Application button. The following screen
is displayed.
16. Click Submit Now button. The following dialog box is displayed.
17. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
18. The application is submitted and a message prompting you to pay the charges
is displayed.
19. For details refer to the section 14.1 Creating Charges in the appendix. After
paying charges return to the permit application page by clicking the Permit
Application link. The following screen is displayed.
Dubai Municipality
264
BPCS
20. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
21. Also, the final status of the application is changed from New to Submitted.
22. You can also view the application submission message in the application
follow up screen.
23. This step marks the end of submitting an application for a simple owner
adjustment/addition permit.
Dubai Municipality
265
BPCS
Step
Action
Dubai Municipality
266
BPCS
3. Select the Permit for Road Signboards option from the application type
drop down box.
4. Enter a Description for the application.
5. Enter details such as applicant mobile number, applicant telephone
number and email in the respective fields and click the Save Application
button. The following screen is displayed.
6. Click the Click here to signboards link against the Details field. The
following screen is displayed.
Dubai Municipality
267
BPCS
7. Select the Sreet number from the building street number drop down box.
Alternatively, you can enter the street number in the adjacent text box.
8. Select Commercial option from the types of signboards drop down box.
You can choose between Advertisement and Commercial.
9. Enter details such as the Length, Depth, Height of the signboard against
the dimensions field.
10. If the signboard will be placed with the parcel or plot, select Yes. Else,
select No.
11. Enter details such as the Height, Electricity load and Description for the
signboard and click Add. The following screen is displayed.
12. To edit an entry, select the radio button against the details you want to
edit, and click the edit link. Make the required changes and click the Done
button.
13. To remove a request, select the radio button against the details you want to
remove, select the check box under Delete and click the Delete link.
14. You will notice that the entered signboard details are displayed below.
Click the Done button. The permit application screen is displayed.
15. To make changes to the sign board details, select the select to edit radio
button against the details. The details are displayed. Make the required
changes and click and click
16. Scroll down and click the Submit Application button. The following
screen is displayed.
Dubai Municipality
268
BPCS
17. Click Submit Now button. The following dialog box is displayed.
18. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
19. The application is submitted and a message prompting you to pay the
charges is displayed.
20. For details refer to the section 14.1 Creating Charges in the appendix.
After paying charges return to the permit application page by clicking the
Permit Application link. The following screen is displayed.
Dubai Municipality
269
BPCS
21. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
22. Also, the final status of the application is changed from New to
Submitted.
23. You can also view the application submission message in the application
follow up screen.
24. This step marks the end of submitting an application for road sign boards.
Dubai Municipality
270
BPCS
Step
Action
Dubai Municipality
271
BPCS
2. Select the Adjustment/ Addition Permit option from the process group
drop down box.
3. Select the Maintenance Permit by Consultant option from the
application type drop down box.
4. Select the work type from the Contr. Work type drop down box. You can
choose from Minor, Medium, and Major and Special Case options.
5. Enter a description for the application in the Description field.
6. Enter the number of floors that require maintenance in the Total Floors
that require maintenance field.
7. Click the Save Application button. The permit application screen is
displayed.
8. Click the Save Application button. The permit application screen is
displayed.
9. Scroll down and click the Building Card link. The following screen is
displayed.
Dubai Municipality
272
BPCS
10. Besides making modifications, you can View building details, Floor
details, and Details of maintenance, Fill building summary, Fix floor
and usage info, and Fix building details.
11. To view the building details, select the View Building Details option from
the Select Operation drop down box and click the Go button. The
following screen is displayed.
12. To return to the building card details screen, click the Close button.
13. To view the floor details, select the view building details option from the
Select Operation drop down box and click the Go button. The following
screen is displayed.
Dubai Municipality
273
BPCS
14. To return to the building card details screen, click the Close button.
15. To view the details of maintenance, select the Maintenance Details
option from the Select Operation drop down box and click the Go button.
The following screen is displayed.
Dubai Municipality
274
BPCS
16. Select the checkbox against the floors you want to view maintenance
details for and click the View button. The following screen is displayed.
17. The screen displays the maintenance details. To return to the building card
details screen, close the screen.
18. To fill the building summary details, select the Fix Building Summary
details option from the Select Operation drop down box and click the Go
button. The following screen is displayed.
Dubai Municipality
275
BPCS
19. To add or remove floors, click the + /- button against the floor type and
click the Save button. To return to the building card details screen, click
the close button.
20. To fix floor and usages info, select the Fix Floor and Usages info option
from the Select Operations drop down box and click the Go button. The
following screen is displayed.
21. To make changes to the floor and usage details, enter the required
information and click the Save button. To return to the building card
details screen, click the close button.
22. To fix building details, select the Fix Building Details option from the
Select Operation drop down box and click the Go button. The following
screen is displayed.
Dubai Municipality
276
BPCS
23. To make changes to the building details, enter the required information
and click the Save button. To return to the building card details screen,
click the close button.
24. Select the building(s) you want to undertake maintenance work for by
clicking the check box on the left and click the Save Selected building
button. The following screen is displayed.
Dubai Municipality
277
BPCS
25. You will notice that the status for the selected building in the modified
column is changed to Yes. Click the permit application button. The permit
application screen is displayed.
26. Scroll down and click the Submit Application button. The following
screen is displayed.
27. Click Submit Now button. The following dialog box is displayed.
28. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
29. The application is submitted and a message prompting you to pay the
charges is displayed.
30. For details refer to the section 14.1 Creating Charges in the appendix.
After paying charges return to the permit application page by clicking the
Permit Application link. The following screen is displayed.
Dubai Municipality
278
BPCS
31. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
32. Also, the final status of the application is changed from New to
Submitted.
33. You can also view the application submission message in the application
follow up screen.
34. This step marks the end of submitting an application for maintenance
permit.
Dubai Municipality
279
BPCS
Step
Action
Dubai Municipality
280
BPCS
7. Scroll down and click the Building Card link. The following screen is
displayed.
8. Besides requesting a painting permit, you can View Floor details, and
Details of painting, Fill building summary, Fix floor and usage info,
and Fix building details.
9. To view the floor details, select the View Building details option from the
Select Operation drop down box and click the Go button. The following
screen is displayed.
Dubai Municipality
281
BPCS
10. To return to the building card details screen, click the Close button.
11. To view the details of maintenance, select the Maintenance Details
option from the Select Operation drop down box and click the Go button.
The following screen is displayed.
Dubai Municipality
282
BPCS
12. Select the checkbox against the floors you want to view painting details
for and click the View button. The following screen is displayed.
13. The screen displays the painting details. To return to the building card
details screen, close the screen.
14. To fill the building summary details, select the Fix Building Summary
details option from the Select Operation drop down box and click the Go
button. The following screen is displayed.
Dubai Municipality
283
BPCS
15. To add or remove floors, click the + /- button against the floor type and
click the Save button. To return to the building card details screen, click
the close button.
16. To fix floor and usages info, select the Fix Floor and Usages info option
from the Select Operations drop down box and click the Go button. The
following screen is displayed.
17. To make changes to the floor and usage details, enter the required
information and click the Save button. To return to the building card
details screen, click the close button.
18. To fix building details, select the Fix Building Details option from the
Select Operation drop down box and click the Go button. The following
screen is displayed.
Dubai Municipality
284
BPCS
19. To make changes to the building details, enter the required information
and click the Save button. To return to the building card details screen,
click the close button.
20. Select the building(s) you want to make paint changes to and click the
Save Selected building button. The following screen is displayed.
Dubai Municipality
285
BPCS
21. You will notice that the status for the selected building in the modified
column is changed to Yes. Click the permit application button. The permit
application screen is displayed.
22. Scroll down and click the Submit Application button. The following
screen is displayed.
Dubai Municipality
286
BPCS
23. Click Submit Now button. The following dialog box is displayed.
24. If you want to make some changes to the permit application, click cancel.
Else, click Ok. The application is submitted and a message prompting you
to pay the charges is displayed.
25. For details refer to the section 14.1 Creating Charges in the appendix.
After paying charges return to the permit application page by clicking the
Permit Application link. The following screen is displayed.
Dubai Municipality
287
BPCS
26. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
27. Also, the final status of the application is changed from New to
Submitted.
28. You can also view the application submission message in the application
follow up screen.
29. This step marks the end of submitting an application for painting permit.
Dubai Municipality
288
BPCS
Step
Action
Dubai Municipality
289
BPCS
3. Select the Permit for Roof Signboards option from the application type
drop down box.
4. Enter a Description for the application.
5. Enter details such as Applicant Mobile number, Telephone number and
Email in the respective fields and click the Save Application button. The
following screen is displayed.
6. Click the Click here to Add signboards link against the Details field.
The following screen is displayed.
Dubai Municipality
290
BPCS
7. Select the Street number from the building street number drop down box.
Alternatively, you can enter the street number in the adjacent text box.
8. Select Commercial option from the types of signboards drop down box.
You can choose between Advertisement and Commercial.
9. Enter details such as the Length, Depth, Height of the signboard against
the dimensions field.
10. If the signboard will be placed with the parcel or plot, select Yes. Else,
select No.
11. Enter details such as the Height, Electricity load and Description for the
signboard and click Add. The following screen is displayed.
12. To edit an entry, select the radio button against the details you want to
edit, and click the edit link. Make the required changes and click the Done
button.
Dubai Municipality
291
BPCS
13. To remove a request, select the radio button against the details you want to
remove, select the check box under Delete and click the Delete link.
14. You will notice that the entered signboard details are displayed below.
Click the Done button. The permit application screen is displayed.
15. Scroll down and click the Submit Application button. The following
screen is displayed.
16. Click Submit Now button. The following dialog box is displayed.
17. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
18. The application is submitted and a message prompting you to pay the
charges is displayed.
19. For details refer to the section 14.1 Creating Charges in the appendix.
After paying charges return to the permit application page by clicking the
Permit Application link. The following screen is displayed.
Dubai Municipality
292
BPCS
20. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
21. Also, the final status of the application is changed from New to
Submitted.
22. You can also view the application submission message in the application
follow up screen.
23. This step marks the end of submitting an application for roof sign boards.
Dubai Municipality
293
BPCS
Dubai Municipality
294
BPCS
Step
1.
Action
Dubai Municipality
295
BPCS
2.
Select the Site Preparation and Excavation Works option from the
Process group drop down box.
3.
Click the Application Type drop down box. You will notice three
application types: Fencing Permit Application, Preliminary
Arrangement and Digging, and Final arrangement and digging.
4.
5.
6.
Select the type of fencing permit you want to obtain. You can choose
between a permanent fence and temporary fence.
7.
Select the application number of the building where you wish to start the
fencing work.
8.
The above is the general process to obtain a fencing permit. The permit can be a
temporary fence or a permanent fence. The procedures to obtain the temporary
and permanent fencing permits are given below.
Dubai Municipality
296
BPCS
Step
1.
Action
2.
Select the Site Preparation and Excavation Works option from the
Process group drop down box.
3.
Select the Fencing Permit Application option from the application type
drop down box.
Dubai Municipality
297
BPCS
4.
5.
Select the Temporary Fencing option from the fence type drop down
box. .
6.
Select the related application from the Related Application drop down
box. Related application refers to all the new building applications that are
on the specific project
7.
Select the Application number of the building where you wish to start the
fencing work.
8.
9.
10.
11.
If you want to make some changes to the permit application, click cancel.
Else, click Ok.
12.
Dubai Municipality
298
BPCS
in the appendix. After paying charges return to the permit application page
by clicking the Permit Application link. The following screen is displayed.
13.
You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
14.
15.
You can also view the application submission message in the application
follow up screen.
16.
This step marks the end of creating a permit application for a temporary
fence.
Dubai Municipality
299
BPCS
Step
1.
Action
2.
Select the Site Preparation and Excavation Works option from the
Process group drop down box.
3.
Select the Fencing Permit Application option from the application type
drop down box.
Dubai Municipality
300
BPCS
4.
5.
Select the Permanent Fence option from the fence type drop down box.
6.
Select the application number of the building where you wish to start the
fencing work.
7.
8.
Select the building you are requesting the fence for and select Create
Permanent Fence option from the Select Operations dropdown box and
click the Go button. The following screen is displayed.
Dubai Municipality
301
BPCS
9.
Enter the total length of the fence for the outdoor services usage and click
the Save Info button. A message confirming the save is displayed. Click
the Close button and return to the building on parcel screen. The building
on parcel screen is displayed.
10.
You will notice that a new element stating a new permanent fence is added
to the list of building names on the parcel. Click the permit application
link. The permit application screen is displayed.
11.
12.
Dubai Municipality
302
BPCS
13.
If you want to make some changes to the permit application, click cancel.
Else, click Ok.
14.
Dubai Municipality
303
BPCS
15.
You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
16.
17.
You can also view the application submission message in the application
follow up screen.
18.
This step marks the end of creating a permit application for a permanent
fence.
Dubai Municipality
304
BPCS
Step
1.
Action
Dubai Municipality
305
BPCS
2.
Select the Site Preparation and Excavation Works option from the
Process group drop down box.
3.
Click the Application Type drop down box. You will notice three
application types: Fencing Permit Application, Preliminary
Arrangement and Digging, and Final arrangement and digging.
4.
5.
6.
Select the type of arrangement and digging. You can choose from Piling
works, Piling and Shoring, Site Preparation and Excavation,
Excavation, Shoring and Dewatering, and Foundations.
7.
Select the application number of the building where you wish to start the
digging work.
8.
The above is the general process to obtain preliminary digging permit. The
detailed steps to obtain permit for the different arrangements and digging type are
given below.
Dubai Municipality
306
BPCS
Step
Action
Dubai Municipality
307
BPCS
4. Select the Application Number of the building where you wish to start
the digging work.
5. Click the Save Application button. The Permit Application screen is
displayed.
6. Click the Submit Application button. The following screen is displayed.
7. Click the Submit Now button. The following dialog box is displayed.
8. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
9. The application is submitted and a message prompting you to pay the
charges is displayed. For details refer to the section 14.1 Creating Charges
in the appendix. After paying charges return to the permit application page
by clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
308
BPCS
10. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
11. Also, the final status of the application is changed from New to
Submitted.
12. You can also view the application submission message in the application
follow up screen.
13. This step marks the end of creating a preliminary permit application for
piling and shoring works.
Dubai Municipality
309
BPCS
Step
Action
Dubai Municipality
310
BPCS
4. Select the Application Number of the building where you wish to start
the digging work.
5. Click the Save Application button. The Permit Application screen is
displayed.
6. Click the Submit Application button. The following screen is displayed.
7.
Click the Submit Now button. The following dialog box is displayed.
8. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
9. The application is submitted and a message prompting you to pay the
charges is displayed. For details refer to the section 14.1 Creating Charges
in the appendix. After paying charges return to the permit application page
by clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
311
BPCS
10. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
11. Also, the final status of the application is changed from New to
Submitted.
12. You can also view the application submission message in the application
follow up screen.
13. This step marks the end of creating a preliminary permit application for
site preparation and excavation works.
Dubai Municipality
312
BPCS
Step
Action
1. Create a new application. For details, refer to the Creating a new application
(Generic) process .Follow steps 1-3. The Permit Application screen is
displayed
Dubai Municipality
313
BPCS
3. Select the Excavation, Shoring and Dewatering option from the type of
arrangement and digging drop down box.
4. Select the Application Number of the building where you wish to start the
digging work.
5. Click the Save Application button. The Permit Application screen is
displayed.
6. Click the Submit Application button. The following screen is displayed.
7. Click the Submit Now button. The following dialog box is displayed.
8. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
9. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
314
BPCS
10. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
11. Also, the final status of the application is changed from New to Submitted.
12. You can also view the application submission message in the application
follow up screen.
13. This step marks the end of creating a preliminary permit application for
excavation, shoring and dewatering works.
Dubai Municipality
315
BPCS
Step
Action
1. Create a new application. For details, refer to the Creating a new application
(Generic) process .Follow steps 1-3. The Permit Application screen is
displayed
Dubai Municipality
316
BPCS
3. Select the Foundations option from the type of arrangement and digging drop
down box.
4. Select the Application Number of the building where you wish to start the
digging work.
5. Click the Save Application button. The Permit Application screen is
displayed.
6. Click the Submit Application button. The following screen is displayed.
7. Click the Submit Now button. The following dialog box is displayed.
8. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
9. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
317
BPCS
10. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
11. Also, the final status of the application is changed from New to Submitted.
12. You can also view the application submission message in the application
follow up screen.
13. This step marks the end of creating a preliminary permit application for
foundation works.
Dubai Municipality
318
BPCS
Step
Action
1. Create a new application. For details, refer to the Creating a new application
(Generic) process .Follow steps 1-3. The Permit Application screen is
displayed
Dubai Municipality
319
BPCS
4. Select the Application Number of the building where you wish to start the
digging work.
5. Click the Save Application button. The Permit Application screen is
displayed.
6. Click the Submit Application button. The following screen is displayed.
7. Click the Submit Now button. The following dialog box is displayed.
8. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
9. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
320
BPCS
10. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
11. Also, the final status of the application is changed from New to Submitted.
12. You can also view the application submission message in the application
follow up screen.
13. This step marks the end of creating a preliminary permit application for piling
works.
Dubai Municipality
321
BPCS
Step
1.
Action
Dubai Municipality
322
BPCS
2.
Select the Site Preparation and Excavation Works option from the
Process group drop down box.
3.
Click the Application Type drop down box. You will notice three
application types: Fencing Permit Application, Preliminary
Arrangement and Digging, and Final Arrangement and Digging.
4.
5.
6.
Select the type of arrangement and digging. You can choose from
Piling works, Piling and Shoring, Site Preparation and
Excavation, Excavation, Shoring and Dewatering, and
Foundations.
7.
8.
The above is the general process to obtain preliminary digging permit. The
detailed steps to obtain permit for the different arrangements and digging type are
given below.
Dubai Municipality
323
BPCS
Step
Action
1. Create a new application. For details, refer to the Obtaining Final Digging
Permit process .Follow steps 1-4. The Permit Application screen is
displayed.
Dubai Municipality
324
BPCS
4. Select the application number of the building where you wish to start the
digging work.
5. Click the Save Application button. The Permit Application screen is
displayed. Scroll down and click the Submit Application button. The
following screen is displayed.
6. Click the Submit Now button. The following dialog box is displayed.
7. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
8. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
325
BPCS
9. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
10. Also, the final status of the application is changed from New to Submitted.
11. You can also view the application submission message in the application
follow up screen.
12. This step marks the end of creating a final application for piling and shoring
works.
Dubai Municipality
326
BPCS
Step
Action
1. Create a new application. For details, refer to the Obtaining Final Digging
Permit process .Follow steps 1-4. The Permit Application screen is
displayed.
Dubai Municipality
327
BPCS
4. Select the application number of the building where you wish to start the
digging work.
5. Click the Save Application button. The Permit Application screen is
displayed. Scroll down and click the Submit Application button. The
following screen is displayed.
6. Click the Submit Now button. The following dialog box is displayed.
7. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
8. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
328
BPCS
9. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
10. Also, the final status of the application is changed from New to Submitted.
11. You can also view the application submission message in the application
follow up screen.
12. This step marks the end of creating a final application for site preparation and
excavation.
Dubai Municipality
329
BPCS
Step
Action
1. Create a new application. For details, refer to the Obtaining Final Digging
Permit process .Follow steps 1-4. The Permit Application screen is
displayed.
Dubai Municipality
330
BPCS
4. Select the Application number of the building where you wish to start the
digging work.
5. Click the Save Application button. The Permit Application screen is
displayed. Scroll down and click Submit Application button. The following
screen is displayed.
6. Click the Submit Now button. The following dialog box is displayed.
7. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
8. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
331
BPCS
9. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
10. Also, the final status of the application is changed from New to Submitted.
11. You can also view the application submission message in the application
follow up screen.
12. This step marks the end of creating a final application for excavation, shoring
and dewatering works.
Dubai Municipality
332
BPCS
Step
Action
1. Create a new application. For details, refer to the Obtaining Final Digging
Permit process .Follow steps 1-4. The Permit Application screen is
displayed.
Dubai Municipality
333
BPCS
6. Click the Submit Now button. The following dialog box is displayed.
7. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
8. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
334
BPCS
9. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
10. Also, the final status of the application is changed from New to Submitted.
11. You can also view the application submission message in the application
follow up screen.
12. This step marks the end of creating a final application for foundations.
Dubai Municipality
335
BPCS
Step
Action
1. Create a new application. For details, refer to the Obtaining Final Digging
Permit process .Follow steps 1-4. The Permit Application screen is
displayed.
Dubai Municipality
336
BPCS
4. Select the Application Number of the building where you wish to start the
digging work.
5. Click the Save Application button. The Permit Application screen is
displayed. Scroll down and click the Submit Application button. The
following screen is displayed.
6. Click the Submit Now button. The following dialog box is displayed.
7. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
8. The application is submitted and a message prompting you to pay the charges
is displayed. For details refer to the section 14.1 Creating Charges in the
appendix. After paying charges return to the permit application page by
clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
337
BPCS
9. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
10. Also, the final status of the application is changed from New to Submitted.
11. You can also view the application submission message in the application
follow up screen.
12. This step marks the end of creating a final application for piling works.
Dubai Municipality
338
BPCS
Unblocking a parcel
This section describes the application process for each of the miscellaneous
services.
Dubai Municipality
339
BPCS
Step
1.
Action
Dubai Municipality
340
BPCS
2.
3.
Select the Request Building Number option form the application type
drop down box.
4.
5.
Dubai Municipality
341
6.
BPCS
7.
Select direction of the street and enter details such as the number of
gates the building has.
8.
Click the Select link adjacent to the select building field. The
following screen is displayed.
9.
Select the check box against the building(s) you are requesting the
number for.
10.
Click the Close button. The request for building number screen is
displayed.
Dubai Municipality
342
BPCS
11.
The screen displays the details of the building you are requesting a
number for. Click Add. The following screen is displayed.
12.
To edit an entry, select the radio button against the details you want to
edit, and click the edit link. Make the required changes and click the
Done button.
13.
To remove a request, select the radio button against the details you
want to remove, select the check box under Delete and click the Delete
link.
14.
You will notice that the added street and building details are displayed
in the screen below. Click the Done button. The permit application
screen is displayed.
15.
Scroll down and click the Submit Application button. The following
screen is displayed.
Dubai Municipality
343
BPCS
16.
Click the Submit Now button. The following dialog box is displayed.
17.
18.
Dubai Municipality
344
BPCS
19.
You will notice that a task has been generated for the DM official and
a message about your application submission is displayed.
20.
21.
22.
Dubai Municipality
345
BPCS
Step
Action
Dubai Municipality
346
BPCS
Dubai Municipality
347
BPCS
9. Select the checkbox against the permit number and choose the building
type of for the blueprints submitted for stamping. If you choose a multi
storey or a public building, you will be prompted to enter the number of
floors. Enter the floor numbers in and click the Save button. The building
permit screen is displayed.
You can select a maximum of 3 permits on a parcel.
If the permit you want to stamp is not listed, enter the permit number and select the building
below and save the details.
10. Scroll down and click the Submit Application link. The following screen
is displayed.
Dubai Municipality
348
BPCS
11. Click Submit Now button. The following dialog box is displayed.
12. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
13. The application is submitted and a message prompting you to pay the
charges is displayed. For details refer to the section 14.1 Creating Charges
in the appendix. After paying charges return to the permit application page
by clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
349
BPCS
14. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
15. Also, the final status of the application is changed from New to
Submitted.
16. You can also view the application submission message in the application
follow up screen.
17. This step marks the end of submitting an application to stamp and
photocopy blue prints.
Dubai Municipality
350
BPCS
Step
Action
Dubai Municipality
351
BPCS
8. Click the Submit Now button. The following dialog box is displayed.
Dubai Municipality
352
BPCS
9. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
10. The application is submitted and a message prompting you to pay the
charges is displayed. For details refer to the section 14.1 Creating Charges
in the appendix. After paying charges return to the permit application page
by clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
353
BPCS
11. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
12. Also, the final status of the application is changed from New to
Submitted.
13. You can also view the application submission message in the application
follow up screen.
14. This step marks the end of submitting an application to renew permit for
six months.
Dubai Municipality
354
BPCS
Step
1.
Action
Dubai Municipality
355
BPCS
2.
3.
4.
5.
Select the application you want to extend the approval from the
Application for renewal drop down box.
Only approved application, about to expire in a months time are displayed in the application
for renewal drop down box.
6.
7.
Scroll down and click the Submit Application screen. The following
screen is displayed.
Dubai Municipality
356
8.
BPCS
Click the Submit Now button. The following dialog box is displayed.
9.
10.
Dubai Municipality
357
BPCS
11.
You will notice that a task has been generated for the DM official and
a message about your application submission is displayed.
12.
13.
14.
This step marks the end of submitting a request to extend the approval
validity.
Dubai Municipality
358
BPCS
Step
Action
Dubai Municipality
359
BPCS
Dubai Municipality
360
BPCS
8. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
9. The application is submitted and a message prompting you to pay the
charges is displayed. For details refer to the section 14.1 Creating Charges
in the appendix. After paying charges return to the permit application page
by clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
361
BPCS
10. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
11. Also, the final status of the application is changed from New to
Submitted.
12. You can also view the application submission message in the application
follow up screen.
13. This step marks the end of submitting an application to cancel permit
before start of work.
Dubai Municipality
362
BPCS
Step
Action
Dubai Municipality
363
BPCS
Dubai Municipality
364
BPCS
9. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
10. The application is submitted and a message prompting you to pay the
charges is displayed. For details refer to the section 14.1 Creating Charges
in the appendix. After paying charges return to the permit application page
by clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
365
BPCS
11. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
12. Also, the final status of the application is changed from New to
Submitted.
13. You can also view the application submission message in the application
follow up screen.
14. This step marks the end of submitting an application to cancel the building
permit application.
Dubai Municipality
366
BPCS
Step
Action
367
BPCS
3. Select the Consultant Change before Permit Issue option form the
application type drop down box.
4. Enter a Description for the application and a Valid Explanation for
extending the approval.
5. Click the Select link and choose the replacement Consultant from the list.
The list displays all the active consultants whose grade matches the
project.
6. Click the Save Application button. The permit application screen is
displayed.
7. Scroll down and click the Submit Application screen. The following
screen is displayed
Dubai Municipality
368
BPCS
9. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
10. The application is submitted and a message prompting you to pay the
charges is displayed. For details refer to the section 14.1 Creating Charges
in the appendix. After paying charges return to the permit application page
by clicking the Permit Application link. The following screen is displayed.
Figure 9-35: Submitted Application for Consultant Change before Permit Issue
Dubai Municipality
369
BPCS
11. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
12. Also, the final status of the application is changed from New to
Submitted.
13. You can also view the application submission message in the application
follow up screen.
14. This step marks the end of submitting an application to change consultant
before permit application.
Dubai Municipality
370
BPCS
10.1.1
Step
Action
Dubai Municipality
371
BPCS
Dubai Municipality
372
BPCS
7. Click the Add Outdoor planting requests link. The following screen is
displayed.
8. Enter details such as the Street number, and Planting Width in the
respective fields.
9. Select the direction the street is facing form the street direction drop down
box and click Add. The following screen is displayed.
10. To edit an entry, select the radio button against the details you want to
edit, and click the edit link. Make the required changes and click the Done
button.
11. To remove a request, select the radio button against the details you want to
remove, select the check box under Delete and click the Delete link.
12. You will notice that the entered street details are displayed below. Click
the Close button. The permit application screen is displayed.
13. Click the Submit Application button. The following screen is displayed.
Dubai Municipality
373
BPCS
14. Click the Submit Now button. The following dialog box is displayed.
15. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
16. The application is submitted and a message prompting you to pay the
charges is displayed. For details refer to the section 14.1 Creating Charges
in the appendix. After paying charges return to the permit application page
by clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
374
BPCS
17. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
18. Also, the final status of the application is changed from New to
Submitted.
19. You can also view the application submission message in the application
follow up screen.
20. This step marks the end of submitting an application for full planting
permit.
Dubai Municipality
375
10.1.2
BPCS
Step
Action
2. Select the Permissions for road services and temporary works option
from process group drop down box.
Dubai Municipality
376
BPCS
3. Select the Outside Planting Permit option from the application type drop
down box.
4. Enter a Description for the application.
5. Select the Partial Planting option from the planting type drop down box.
6. Enter details such as the Applicants mobile number, Telephone number
and Email id in the respective fields and click the Save Application
button. The following screen is displayed.
Dubai Municipality
377
BPCS
7. Click the Add Outdoor planting requests link. The following screen is
displayed.
8. Enter details such as the Street Number, and Planting Width in the
respective fields.
9. Select the direction the street is facing form the Street Direction drop
down box and click Add. The following screen is displayed.
10. To edit an entry, select the radio button against the details you want to
edit, and click the edit link. Make the required changes and click the Done
button.
11. To remove a request, select the radio button against the details you want to
remove, select the check box under Delete and click the Delete link.
12. You will notice that the entered street details are displayed below. Click
the Close button. The permit application screen is displayed.
13. Click the Submit Application button. The following screen is displayed.
Dubai Municipality
378
BPCS
14. Click the Submit Now button. The following dialog box is displayed.
15. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
16. The application is submitted and a message prompting you to pay the
charges is displayed. For details refer to the section 14.1 Creating Charges
in the appendix. After paying charges return to the permit application page
by clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
379
BPCS
17. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
18. Also, the final status of the application is changed from New to
Submitted.
19. You can also view the application submission message in the application
follow up screen.
20. This step marks the end of creating a permit application for a permanent
fence.
Dubai Municipality
380
BPCS
Step
Action
2. Select the Permission for Road Services and Temporary Works option
from the process group drop down box.
Dubai Municipality
381
BPCS
3. Select the Gate Level option from the application type drop down box.
4. Enter a Description for the application.
5. You will notice that the email id and contractor name are automatically
displayed in the applicant email and contractor name fields respectively.
6. Click the Save Application button. The following screen is displayed.
7. Click the Parcel Gate Levels link adjacent to the Gate Level field. The
following screen is displayed.
Dubai Municipality
382
BPCS
8.
9. Select the direction the building is facing from the Direction drop down
box.
10. Select the status of the street from the Street Status drop down box. You
can choose from Existing (Asphalted) and Not existing option.
11. Select the width of the street from the street width drop down box and
click the Add. The street details are saved and the following screen is
displayed.
12. To edit an entry, select the radio button against the details you want to
edit, and click the edit link. Make the required changes and click the Done
button.
13. To remove a request, select the radio button against the details you want to
remove, select the check box under Delete and click the Delete link.
Dubai Municipality
383
BPCS
14. You will notice that the entered street details are displayed below. Click
the Close button. The permit application screen is displayed.
15. Click the Submit Application button. The following screen is displayed.
16. Click the Submit Now button. The following dialog box is displayed.
17. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
18. The application is submitted and a message prompting you to pay the
charges is displayed. For details refer to the section 14.1 Creating Charges
in the appendix. After paying charges return to the permit application page
by clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
384
BPCS
19. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
20. Also, the final status of the application is changed from New to
Submitted.
21. You can also view the application submission message in the application
follow up screen.
22. This step marks the end of submitting an application for a gate level
permit.
Dubai Municipality
385
BPCS
Dubai Municipality
386
BPCS
Step
Action
Dubai Municipality
387
BPCS
2. Select the Application for owner and decor companies option from the
process group drop down box.
3. Select the Normal decor permit before issuing completion certificate
option from the application type drop down box.
4. Enter a Description for the application and select the type of work from
the cont work type drop down box.
5. Enter details such as Commercial Name, Unit permit owner name, Unit
permit number, and Unit owner telephone number in the respective
fields and click the Save Application button. The permit application
screen is displayed.
6. Scroll down and click the Building Card link. The following screen is
displayed.
7. Select the building you want to apply a decor permit for and select the
Modify building option from the Select Operation drop down box and
click the Go button. The building form usage selection screen is displayed.
Scroll down and click the Add usages/Sub usages button. The following
screen is displayed.
Dubai Municipality
388
BPCS
8. Select the floor(s) you want to make decor changes to and click the
Modify button. A message confirming the save is displayed. Click the
Offices link adjacent to floor info. The following screen is displayed.
9. Enter the Area you want to add decor to and click the Details link
adjacent to the Variation field. The following screen is displayed.
10. Click the Select Operations on Unit drop down box. You can perform the
following operations on the building: select units for dcor, add units for
decor, split units, remove units and merge units.
11. To select units for decor, select the Select Units for Dcor option from
the Select operations on unit drop down box as shown in figure 11-6 and
select the number of units you want to add decor to. Click the Save button.
You will notice that the selected units are displayed in the lower pane of
figure 11-6.
Dubai Municipality
389
BPCS
12. . Enter details such as the Name, Number and Contact number for the
unit, and the Electric and Water meter details and click the Save button.
Continue from step 20 for submitting the application.
13. To add a new unit to dcor, select the Add Unit option from the select
operations drop down box as show in figure 11-6. The following screen is
displayed.
Dubai Municipality
390
BPCS
14. Enter details such as the Name, Number and Contact number for the
unit, and the Electric and Water meter details and click the Save button.
Continue from step 20 for submitting the application.
15. To split one to two or more units, select the Split Units option from the
Select Operations on unit drop down box. The following screen is
displayed.
16. Select the unit you want to split by select the radio button against the
building and click the Select button. The following screen is displayed.
Dubai Municipality
391
BPCS
17. Enter the number of units you want to split the unit into in the Enter No of
Units to be Split into field as shown in figure 11-9 and click the Split
button. The following screen is displayed.
18. Enter details such as the Name, Number and Contact number for the
unit, and the Electric and Water meter details and click the Save button.
Continue from step 20 for submitting the application.
19. To remove a unit, select the Remove Unit option from the select
operations on unit drop down box. The following screen is displayed.
Dubai Municipality
392
BPCS
20. Select the unit you want to remove by selecting the checkbox against the
unit and click the Select button. The following screen is displayed.
21. You will notice that the selected unit is removed and displayed in the
removed unit details pane. Continue from step 22 to submit the
application.
To merge one or more units, select the merge units operation from the select operations on
unit. Select one or more units and click the select button. The selected units are merged.
22. Close the screen. The office usages screen is displayed. Click the Close
button. The building on parcel screen is displayed. Refresh the building on
parcel screen. The following screen is displayed.
Dubai Municipality
393
BPCS
23. You will notice that the status for the selected building in the modified
column is changed to Yes. Click the permit application button. The permit
application screen is displayed.
24. Scroll down and click the Submit application button. The following
screen is displayed.
25. To modify or recheck the villa modifications, click Ok. To submit the
application, click Cancel. The following screen is displayed.
Dubai Municipality
394
BPCS
26. Click Submit Now button. The following dialog box is displayed.
27. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
28. The application is submitted and a message prompting you to pay the
charges is displayed.
29. For details refer to the section 14.1 Creating Charges in the appendix.
After paying charges return to the permit application page by clicking the
Permit Application link. The following screen is displayed.
Dubai Municipality
395
BPCS
30. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
31. Also, the final status of the application is changed from New to
Submitted.
32. You can also view the application submission message in the application
follow up screen.
33. This step marks the end of submitting an application for a normal decor
permit.
Dubai Municipality
396
BPCS
Step
Action
Dubai Municipality
397
BPCS
2. Select the Application for owner and decor companies option from the
process group drop down box.
3. Select the Decor permit before issuing completion certificate option
from the application type drop down box.
4. Enter a Description for the application and select the Type of work from
the cont work type drop down box.
5. Enter details such as Commercial Name, Unit Permit Owner Name,
Unit Permit Number, and Unit Owner Telephone Number in the
respective fields and click the Save Application button. The permit
application screen is displayed.
6. Scroll down and click the Building Card link. The following screen is
displayed.
7. Besides making dcor changes, you can view building details, view floor
details, details of modifications, delete draft building or shared services,
details of decor, Fill building summary, Fix floor and usage info, and Fix
building details from this screen.
8. To view building details, select the view building details option from the
Select Operation drop down box and click the Go button. The following
screen building usages screen is displayed.
Dubai Municipality
398
BPCS
9. To return to the building card details screen, click the Close button.
10. To view floor details, select the view floor details option from the Select
Operation drop down box and click the Go button. The following screen
building usages screen is displayed.
Dubai Municipality
399
BPCS
11. To return to the building card details screen, click the Close button.
12. To view modification details, select the view modification details option
from the Select Operation drop down box and click the Go button. The
following screen building usages screen is displayed.
13. Click the View Modifications link. The following screen is displayed.
14. To return to the building card details screen, click the close button.
15. To fill building summary details, select the fill building summary details
option from the Select Operation drop down box and click the Go button.
The following screen building usages screen is displayed.
Dubai Municipality
400
BPCS
16. To return to the building card details screen, click the close button.
17. to fix floor and usage info, select the fix floor and info details option from
the Select Operation drop down box and click the Go button. The
following screen building usages screen is displayed.
Dubai Municipality
401
BPCS
18. To return to the building card details screen, click the close button.
19. To fix building details, select the fix floor and info details option from the
Select Operation drop down box and click the Go button. The following
screen building usages screen is displayed.
20. To return to the building card details screen, click the close button.
21. To make decor changes, select the building(s) you want to begin the decor
works on by clicking the check box against the building name and click
the Save Selected Buildings button. The following screen is displayed.
Dubai Municipality
402
BPCS
22. You will notice that the status for the selected building in the modified
column is changed to Yes. Click the permit application button. The permit
application screen is displayed.
23. Scroll down and click the Submit Application button. The following
screen is displayed.
24. Click Submit Now button. The following dialog box is displayed.
Dubai Municipality
403
BPCS
25. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
26. The application is submitted and a message prompting you to pay the
charges is displayed.
27. For details refer to the section 14.1 Creating Charges in the appendix.
After paying charges return to the permit application page by clicking the
Permit Application link. The following screen is displayed.
Dubai Municipality
404
BPCS
Figure 11-30: Submitted Application for dcor permit before issue of completion certificate
28. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
29. Also, the final status of the application is changed from New to
Submitted.
30. You can also view the application submission message in the application
follow up screen.
31. This step marks the end of submitting an application for a dcor permit
before issue of completion certificate.
Dubai Municipality
405
BPCS
Step
Action
Dubai Municipality
406
BPCS
2. Select Special Services and Exceptions from the process group drop
down box.
3. Select request for exceptions option from the Application Type drop
down box.
4. Enter a Description for the application
5. Select the building type you want an exception for, from the building type
drop down box.
6. Enter details such as the Applicants mobile number, Owners mobile
number, Owners fax number in the respective fields and click the Save
Application button. The following screen is displayed.
Dubai Municipality
407
BPCS
8. Select the Type of exception from the exception type drop down box.
9. To view the fee calculation details for the selected exception type, click
the Click Here button. The following screen is displayed.
Dubai Municipality
408
BPCS
10. The screen displays the explanation for the selected exception and the
projections of the fee for the exception. To return to the Parcel Exception
screen, exit the excel sheet.
11. Select the Sub type of the exception from the exception sub type drop
down box.
12. Enter details such as the Exception you want, and Exception Description
in the respective fields.
Dubai Municipality
409
BPCS
13. Select the building you want to apply the exception to from the buildings
listed in related buildings. To select more than one building, press Ctrl
key on the key board and select the buildings.
14. Enter a Valid reason for the exception.
15. The expected cost per square feet cannot be edited as it is provided by the
land department.
16. Enter details such as the area added as a result of exception, parcel area
and the total allowed build up area on the parcel.
17. These details are used to calculate the fee DM charges to approve an
exception. Click Add. The following screen is displayed.
18. To edit an entry, select the radio button against the exception you want to
edit, and click the edit link. Make the required changes and click the Done
button.
19. To remove a request, select the radio button against the exception you
want to remove, select the check box under Delete and click the Delete
link. The exception detail is removed from the list of exceptions.
Dubai Municipality
410
BPCS
20. You will notice that the entered street details are displayed below. Click
the Close button. The permit application screen is displayed.
21. Click the Submit Application button. The following screen is displayed.
22. The total fee to pay for the exception is displayed. These charges are
generated by DM for exceptions fees and the land department fees for
parcel pricing. If you dont want to accept the fees click Cancel. Else click
Ok. The following screen is displayed.
23. Click the Submit Now button. The following dialog box is displayed.
Dubai Municipality
411
BPCS
24. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
25. The application is submitted and a message prompting you to pay the
charges is displayed. For details refer to the section 14.1 Creating Charges
in the appendix. After paying charges return to the permit application page
by clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
412
BPCS
26. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
27. Also, the final status of the application is changed from New to
Submitted.
28. You can also view the application submission message in the application
follow up screen.
29. This step marks the end of submitting an application for exception permit.
Dubai Municipality
413
BPCS
13 Other Applications
Besides the applications grouped under the various application process types, we have
three applications which are common to all and are grouped as others. The three
application types are: Request Statistical Info, to whom it may concern letter and
Unblocking Services.
Action
1. Click the Other Application tab on the homepage. The following screen
is displayed.
2. The screen is divided into two blocks. The upper block lists the links to
create different application types. The lower block lists all the existing
applications with details such as Permit Number, Application Type,
Status, Permit Date and application description.
3. The steps to apply for other applications are described in the following
sections.
Dubai Municipality
414
BPCS
Action
1. Click the Request for Statistical Info link on the Other Applications page
as shown in figure 13-1. The following screen is displayed.
2. Enter a description for the type of information you are requesting in the
Application Description field.
3. Enter a valid reason for the request in the Reason field.
4. Enter the applicants mobile number and telephone number in the
Applicant Mobile No and Applicant Telephone No field.
5. Enter the applicants email id in the Applicant Email field.
6. Enter the applicants name in English and Arabic in the Applicant NameEnglish and Applicant Name-Arabic field.
Dubai Municipality
415
BPCS
7. Enter the applicants company name in the Company Name field and
click the Save Application button.
8. The permit application screen is displayed. Scroll down and click the
Submit Application button. The following screen is displayed.
9. Click the Submit Now button. The following dialog box is displayed.
10. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
11. The application is submitted and a message prompting you to pay the
charges is displayed. For details refer to the section 14.1 Creating Charges
in the appendix. After paying charges return to the permit application page
by clicking the Permit Application link. The following screen is displayed
Dubai Municipality
416
BPCS
Figure 13-5
12. You will notice that a message about your application submission is
displayed.
13. Also, the final status of the application is changed from New to
Submitted.
14. You can also view the application submission message in the application
follow up screen.
15. This step marks the end of submitting an application for to request
statistical info.
Dubai Municipality
417
BPCS
Step
Action
1. Click the Request for To Whom It May Concern letter link on the Other
Applications page as shown in figure 13-1. The following screen is
displayed.
Dubai Municipality
418
BPCS
6. Click the Submit Now button. The following dialog box is displayed.
7. If you want to make some changes to the permit application, click cancel.
Else, click Ok.
8. The application is submitted and a message prompting you to pay the
charges is displayed. For details refer to the section 14.1 Creating Charges
in the appendix. After paying charges return to the permit application page
by clicking the Permit Application link. The following screen is displayed.
Dubai Municipality
419
BPCS
9. You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
10. Also, the final status of the application is changed from New to
Submitted.
11. You can also view the application submission message in the application
follow up screen.
12. This step marks the end of submitting an application for a to whom it may
concern letter.
Dubai Municipality
420
BPCS
Step
1.
Action
Click the Request for Unblocking link on the Other Applications page as
shown in figure 13-1. The following screen is displayed.
2.
3.
Enter details such as mobile and telephone number of the applicant in the
Applicant mobile number and Telephone number field.
4.
Enter the email id of the applicant in the Email Id field and click the Save
Application button. The permit application screen is displayed.
Dubai Municipality
421
5.
BPCS
Scroll down and click the Submit Application button. The following
screen is displayed.
6.
Click the Submit Now button. The following dialog box is displayed.
7.
If you want to make some changes to the permit application, click cancel.
Else, click Ok.
8.
Dubai Municipality
422
BPCS
9.
You will notice that a task has been generated for the DM official and a
message about your application submission is displayed.
10.
11.
You can also view the application submission message in the application
follow up screen.
12.
Dubai Municipality
423
BPCS
14 Appendix
Some actions are common to all application types. For instance, to create charges
after submitting an application. This section describes the following common
actions:
Dubai Municipality
424
BPCS
Action
2. The screen displays the details of the charges DM has generated for the
submitted application type.
3. It gives details such as the type of charge, the total payment, the payee
name, the application version, the application and building type.
4. To view the invoice details, click the link listed under the Voucher
Number column. The following screen is displayed.
Dubai Municipality
425
BPCS
5. The screen displays the actual break of the charges with the applicants
details. KDF here refers to Knowledge Dirham Fee, which is charged by
DM for all application that is submitted. However, the charges vary
depending on the type of application thats submitted.
6. Click the Close button. The application charges screen is displayed. Click
the click here to view and pay online link on the application charges
screen as shown in figure 14-1. The following screen is displayed.
Dubai Municipality
426
BPCS
7. To proceed with the payment, click the Pay Online button. And follow the
instructions that appear on the screen.
8. Sometime, you might receive an error instead of viewing the application
charges. The error is displayed below.
9. When you see this error, make sure you make the payments by coming in
person to DM.
Dubai Municipality
427
BPCS
Action
2. Select the Adjustment Addition Permit option from the Process Group
drop down box.
3. Select the Final/Preliminary Adjustment option from the application type
drop down box. Here, we have selected the Final-Adjustment Addition
application type.
4. Enter a description for the design change in the application description
field.
Dubai Municipality
428
BPCS
5. Select the Complete Design Change option from the Modification Type
drop down box.
6. Select the Medium Works option from the Cont. Work type drop down
box and click the Save button. The permit application screen is displayed.
7. Scroll down and click the Building Card link. The following screen is
displayed.
9. You can either copy the details of the existing building or create a new
building card and enter new details for the design change.
10. If you decide to copy the existing building details, click the Ok button.
The following screen is displayed.
Dubai Municipality
429
BPCS
11. All the information from the existing building is replicated. You can now
go ahead and add usages and sub usages. To add the main usages, click the
Add Main Usages button and follow instructions from step 14.
12. If you decide to create a new building card for the design change, click the
Cancel button as shown in figure 14-7. The following screen is displayed.
Dubai Municipality
430
BPCS
13. Enter the building information details and click the Save Info button. You
can then go ahead and add the Main and Sub usages. To add the main
usages, click the Add Main Usages button. The following screen is
displayed.
Dubai Municipality
431
BPCS
14. Select the main usages by selecting the check box and click the Confirm
Selection button. The following screen is displayed.
15. Select the sub usage and click the Go Create Building Form button. The
following dialog box is displayed.
Dubai Municipality
432
BPCS
17. The floor information details are displayed based on the entry in the
building card details screen.
18. Enter the total floor area for each floor type and click the Save Info
button. Click the Offices link adjacent to Floors Info. The following
screen is displayed.
19. Enter the total floor area of for the office usage in each of the floor types
and click the Save info button. The building card details screen is
displayed.
Dubai Municipality
433
BPCS
20. Return to the Permit application screen and click the Submit Application
button. The following screen is displayed.
21. Click the Submit Now button. The following screen is displayed.
22. To submit the application, click Ok. The charges are created as shown in
section 14-1 of the guide.
23. To return to the permit application page, click the Permit Application link
on the charges screen.
24. You will note that a task has been generated for the DM employee and the
status of the application is changed from New to Submitted.
25. This step marks the end of submitting an application for complete design
change.
Dubai Municipality
434
BPCS
1.
Action
2.
Select the Adjustment addition permit option from the Process Group
drop down box.
3.
4.
Dubai Municipality
435
BPCS
5.
6.
Select the Minor Works option from the Cont. Work type drop down box.
7.
Enter the number of rooms and the area you are modifying in the Modified
Room No and Other Areas modified fields and click the Save button. The
permit application screen is displayed.
8.
Scroll down and click the Building Card link. The following screen is
displayed.
9.
10.
You can either copy the details of the existing building or create a new
building card and enter new details for the design change.
11.
If you decide to copy the existing building details, click the Ok button.
The following screen is displayed.
Dubai Municipality
436
BPCS
12.
All the information from the existing building is replicated. You can now
go ahead and add usages and sub usages. To add the main usages, click the
Add Main Usages button and follow instructions from step 15.
13.
If you decide to create a new building card for the design change, click the
Cancel button as shown in figure 14-7. The following screen is displayed.
Dubai Municipality
437
BPCS
14.
Enter the building information details and click the Save Info button. You
can then go ahead and add the Main and Sub usages.
15.
To add the main usages, click the Add Main Usages button. The
following screen is displayed.
Dubai Municipality
438
BPCS
16.
Select the main usages by selecting the check box and click the Confirm
Selection button. The following screen is displayed.
17.
Select the sub usage and click the Go Create Building Form button. The
following dialog box is displayed
18.
Dubai Municipality
439
BPCS
19.
The floor information details are displayed based on the entry in the
building card details screen.
20.
Enter the total floor area for each floor type and click the Save Info
button. Click the Offices link adjacent to Floors Info. The following
screen is displayed.
Dubai Municipality
440
BPCS
21.
Enter the total floor area of for the office usage in each of the floor types
and click the Save info button. The building card details screen is
displayed.
22.
Return to the Permit application screen and click the Submit Application
button. The following screen is displayed.
Dubai Municipality
441
BPCS
23.
24.
To submit the application, click Ok. The charges are created as shown in
section 14-1 of the guide.
25.
26.
You will note that a task has been generated for the DM employee and the
status of the application is changed from New to Submitted.
27.
This step marks the end of submitting an application for complete design
change.
Dubai Municipality
442
BPCS
Action
1. Select the modified application, click the Building Card link. The
following building card details screen is displayed.
Dubai Municipality
443
BPCS
4. This screen displays the floor variations and other modifications on the
selected building. To modify details, make the changes and click the Save
Modification button.
5.
6. To view building details, select the building by clicking the radio button
against the same and select the View Building Details option from the
select operation drop down box. Click the Go button. The following
screen is displayed.
Dubai Municipality
444
BPCS
7. To view floor details, select the building by clicking the radio button
against the same and select the View Floor Details option from the select
operation drop down box. Click the Go button. The following screen is
displayed.
Dubai Municipality
445
BPCS
8. Click the Close button to return to the building card details screen.
9. To fix building details, select the building by clicking the radio button
against the same and select the Fix Building Details option from the
select operation drop down box. Click the Go button. The following
screen is displayed.
10. To modify details, make the changes and click the Save Modification
button.
11. Click the Close button to return to the building card details screen.
12. To fix floor and usage details, select the building by clicking the radio
button against the same and select the Fix Floor & Usage Details option
from the select operation drop down box. Click the Go button. The
following screen is displayed.
Dubai Municipality
446
BPCS
13. To modify details, make the changes and click the Save Modification
button.
14. Click the Close button to return to the building card details screen.
15. To fix building summary details, select the building by clicking the radio
button against the same and select the Fix Building Summary option
from the select operation drop down box. Click the Go button. The
following screen is displayed.
Dubai Municipality
447
BPCS
16. To modify details, make the changes and click the Save Modification
button. To add floors, click the + button and to remove floors, click the
button.
17. Click the Close button to return to the building card details screen.
Dubai Municipality
448
BPCS
Action
1. Locate the project which has the returned application and click the view
application link. For details refer to section 5.2 View Project Details. The
following screen is displayed.
Figure 14-36
2. This screen lists all the application in the selected project. Locate the
project with the status Returned and click the version number. The
following screen is displayed.
Dubai Municipality
449
BPCS
4. To create a new version of the application click Ok. Else click Cancel.
The following screen with the confirmation message is displayed.
Dubai Municipality
450
BPCS
Dubai Municipality
451
BPCS
8. Make sure you adhere to the notes and take care of the comments.
9. To respond to the engineers message, enter the response in the reply
message text box and click Save.
10. Return to the permit application screen, complete the application and
submit the application.
11. A message stating the submission of the application is displayed.
12. This step marks the end of creating a new version of a returned
application.
Dubai Municipality
452
BPCS
Action
1. Locate the project which has the returned application and click the view
application link. For details refer to section 5.2 View Project Details. The
following screen is displayed.
2.
Click the View link against the CFR application. The following screen is
displayed.
Dubai Municipality
453
BPCS
3. Make the changes suggested by the engineers and save the application.
4. You can also leave a note for the engineer to indicate that the changes
have been made.
5. To create a comment, click the Create Comment link. The following
screen is displayed.
Dubai Municipality
454
BPCS
6. Enter the comments and click the Save button. The permit application
screen is displayed.
Dubai Municipality
455
BPCS
9. You will notice that the status of the application has been changed from
CFR to CFR Completed.
10. This step marks the end of re submitting a CFR application.
Dubai Municipality
456
BPCS
Action
Dubai Municipality
457
BPCS
2. Click the View All Notes link in the Follow up DM Engineers pane as
show in figure 13-25. The following screen is displayed.
3. The screen displays the notes given by the engineer or the DM employee
who is processing the application.
4. To respond to the engineers notes, select the subject from the drop down
box in the Notes Reply column.
5. Enter the message or comment in the text box in the Reply Message
column.
6. Click the Save button.
7. The note is saved and is visible to employee who is processing your
application.
8. This step marks the end of responding to engineer notes process.
Dubai Municipality
458
BPCS
Action
2. Click the Print button displayed on the left menu. The following screen is
displayed.
Dubai Municipality
459
BPCS
3. Select the printer you want to print on and click the Print button.
4. This step marks the end of printing screens from BPCS.