Suo-Motu Determination of Tariff for Generation and Distribution Order dated 11-12-2014

In this context, Commission directs TANGEDCO to provide the monthly energy


demand and availability and its plan of scheduling power in accordance to MoD on
quarterly basis. For power procurement from unapproved sources, TANGEDCO is directed
to take prior approval of the Commission before purchasing energy.
Summary of power purchase costs
4.141 The summary of power purchase costs approved by the Commission for FY 2014-15
from own generation and other sources after considering MoD is tabulated below:
Table 185: Summary of power purchase cost approved by the Commission for FY 2014-15
Capacity
Charges(Rs.
Crore)

Energy
Charges
(Rs./ Unit )

Total Cost
(Rs. Crore)

3.34

276

2,324

3.24

2,792

1,871

3.12

2,200

376

1,204

2.67

1,580

4,059

586

1,107

2.73

1,693

3,725

379

1,016

2.73

1,395

671

3.37

671

3,085
82

7,522
153

2.95
2.16

10,607
235

91

146

2.25

237

51

20.62

51

Valuthur GTPS

1,243

163

267

2.15

429

Total Gas
Erode HEP

2,599
1,365

387
332

565
0.0

2.18
0.00

952
332

Kadamparai HEP

79

79

Source

Units (MU)

Ennore TPS

Tuticorin TPS

7,183

468

Mettur TPS

6,005

329

North Chennai TPS


NCTPS Stage-II** (Unit
1)
NCTPS Stage-II** (Unit
2)
MTPS Stage-III**

4,502

Total Thermal
Tirumakottai GTPS

25,474
706

Kuttalam GTPS

651

Basin Bridge GTPS

Energy
Charges (Rs.
Crore)

Own Generation Stations


276
-

Kundah HEP

2,257

206

0.2

0.00

206

Tirunelveli HEP

964

120

0.3

0.00

120

Total Hydro
Wind mills

4,586
12

736
3

0.53
-

0.00
-

736
3

Total Own Generation

32,671

4,211

8,088

2.48

12,299

NTPC SR (I&II)

3,983

2.10

1,062

NTPC SR III

996

94

264

2.65

357

Central Generation Stations


225
837

NLC TS - I

3,469

274

715

2.06

988

NLC TS - II

3,235

185

690

2.13

875

NLC TS Expansion I

1,469

194

445

3.03

639

NTPC Talcher

3,323

284

524

1.58

808

NTPC Simhadri

1,532

269

363

2.37

632

Tamil Nadu Electricity Regulatory Commission

Page 246
December 2014

Suo-Motu Determination of Tariff for Generation and Distribution Order dated 11-12-2014

Source

Units (MU)

Capacity
Charges(Rs.
Crore)

Energy
Charges (Rs.
Crore)

Energy
Charges
(Rs./ Unit )

Total Cost
(Rs. Crore)

MAPS

1,573

332

2.11

332

KAIGA
NTPC Vallur - Unit 1 &
Unit 2

1,211

375

3.10

375

4,882

745

1,257

2.57

2,002

Kudankulum - Unit 1`

2,188

777

3.55

777

New Plants

4,988

873

1,247

2.50

2,120

NTPC ER

363

34

95

2.61

129

Total CGS

33,212

3,176

7,920

2.38

11,097

Wind

5,228

Renewables
-

1,783

3.41

1,783

Biomass

4.25

Cogeneration

817

293

3.59

293

Captive

3.75

Solar

97

52

5.37

52

Total Renewable

6,148

2,131

3.47

2,131

Samalpatti

IPPs
135

135

Madurai Power Corpn

136

136

Pillaiperumalnallur

122

122

STCMS - Neyveli

1,660

347

384

2.32

731

LANCO Power (Aban co)


PIONEER Power co.
(Penna)

783

120

156

2.00

277

356

55

73

2.04

128

Total IPPs

2,799

915

614

2.19

1,528

Jindal Power

1,752

Case 1 - Bidding (MTOA)


385
476

2.72

861

Adani Power

1,182

296

390

3.30

686

Lanco Power (NETS)

876

215

213

2.43

428

NTPC NVVN

35

16

4.43

16

Total Other sources

3,845

896

1,095

2.85

1,991

PGCIL charges
855

PGCIL - ER & SR
PGCIL - Reactive Energy
Charges
Total transmission
charges

25
880

Total Power Purchases

46,004

4,987

11,760

2.56

17,627

Total Own generation &


Power Purchase

78,675

9,198

19,848

2.52

29,926

Tamil Nadu Electricity Regulatory Commission

Page 247
December 2014