Download as pdf or txt
Download as pdf or txt
You are on page 1of 14

Alaskan Way Viaduct

Independent Technical Review

Seattle City Council Briefing


April 13, 2015

Our mission, vision, and core values


Mission: deliver a high-quality
transportation system for Seattle

Vision: connected people,


places, and products

Committed to 5 core values to create a city that is:


Safe
Interconnected
Affordable
Vibrant
Innovative
2

Presentation overview

Background
Overview of study area
Historical viaduct settlement
Recent and potential future viaduct
settlement and recommendations for
further analysis

Overview of study area

What is differential settlement?

Historical viaduct settlement

Bents 91-100
(Columbia to Washington)

Bents 91-100
Differential settlement

Bents 91-100
Differential settlement

Bents 73-91 (Seneca to Columbia)


and Columbia/Seneca ramps

10

Bents 73-91 (Seneca to Columbia)


and Columbia/Seneca ramps

11

Bents 100-121 and Railroad Way ramp


(Washington to Railroad Way)

12

Bents 100-121 and Railroad Way ramp


(Washington to Railroad Way)

13

Questions?
jonathan.layzer@seattle.gov | (206) 684-5300

http://www.seattle.gov/transportation

You might also like