Eaton PDF
Eaton PDF
Agenda
1.
2.
3.
4.
5.
Introductions
About Eaton
Learned Facility Facts
Energy Solutions by Eaton
Questions & Open Discussion
Save
Energy
Protect the
Environment
Going Green
Going greenusing natural resources and energy
wisely while reducing the impact of human activity on
the environmentmeans more than just being
environmentally responsible. Its good business, too.
9
15
Lighting Control
10
6
2
13
Uninterruptible
Power Systems
3
11
8
7
3
4
12
14
11
Energy Audits
7
12
13
Variable Frequency
Paralleling Switchgear
Drives and Soft Starters
4
Medium Voltage
Switchgear
Circuit Breakers
14
Automatic Transfer
Switches
Integrated Power
Assemblies
10
15
Integrated Facilities
Systems
Busway
Electricity: $17,000,000.00
Water: $3,000,000.00
Fuel: $550,000.00
Eatons Energy Solutions Business promotes and supports a holistic approach to Energy that starts with senior leadership and cascades down throughout all
levels of an organization grounded by a strategic energy management vision and plan. We will address People/Culture (Behavioral),
Operations/Maintenance, and Technology ideas that when combined as an integrated strategy will not only optimize energy usage and reduce operating
cost but, will create an energy culture that will deliver sustained results and an organizational and operational transformation
that is economically and
7
7
environmentally engaged and accountable.
2.
3.
4.
5.
6.
7.
8.
9.
10
10
Financial Example
ECO Name
Install HVAC Controls
Lighting
Paint Ovens Gas Burners Upgrade
Wash Tunnel Motors VFDs
Compressor Heat Recovery
Compressed air Leak Program
Plug Power - Monitors
Exhaust Fans
Compressor Flow Controller
Cooling Fans
Total
Energy
Savings / Yr
kwh
1,051,316
241,831
KW
388
56
ELEC $
$82,213
$18,911
240,712
$18,824
62,968
26,313
23,920
16,535
15,466
1,679,061
$4,924
$2,058
$1,871
$1,293
$1,209
$131,303
Demand $ NG Therms
NG $
Others $
$4,370
1,938 1877.44367
$7,605
1,052 $
1,020 $
4,280
32,777 $ 31,753
14,955
445
$11,976
50,722
14,487
$49,137
$4,280
Total $
$88,461
$31,816
$31,753
$18,824
$14,487
$4,924
$2,058
$1,871
$1,293
$1,209
$196,695
Project Information
Cost $
ROI % Maint Costs
$131,100
69.24%
$132,687
22.15%
$58,743
55.44%
$89,184
18.50%
$47,150
30.20%
$2,100
236.67%
$1,000
$2,100
100.08%
$1,500
126.89%
$7,500
13.28%
$0
$472,064
42.34%
$1,000
SPP - Yrs
1.48
4.17
1.85
4.74
3.25
0.43
1.02
0.80
5.8
0
2.40
$ Saved / Yr.
$88,461
$31,816
$31,753
$18,824
$14,487
$4,924
$2,058
$1,871
$1,293
$1,209
$196,695
Equivalent to:
conserving
recycling
378
194,760
3,990
227
43,490
14
9
586
11
11
12
12
Remember
Sustainability &
Energy Initiatives
Advisory & Consulting
13
15
Auto
Company
Powertrain
Company
Battery
Company
Charger
Company
Eaton
HEV/EV Powertrain
Vehicle Controls
Motor/Generator
controls
Battery Cells
BMS
Power Electronics and
Harness
Clutch and Drivetrain
Renewable
(Wind/Solar etc)
Grid power mgmt.
Electrical
infrastructure
Commercial power
mgmt.
Smart Metering
?
?
Charging Station
16
16
Thank you!