Augmentation of water supply to
Shillong Urban Centres
July 2008
CONTENTS
Sl.
No.
Descriptions
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
2.1
2.2
2.2.6
2.2.8
2.2.8.1
Land.
Physical infrastructure components.
Design consideration
Detailed design engineering
Design on economic size of rising transmission main for intake pumping
station.
2.2.8.2 Design of RCC Sump for intermediate pumping station.
2.2.8.3 Design on economic size of transmission main for intermediate pumping
station.
2.2.8.4 Design calculation of pumping plant for intake pumping station.
2.2.8.5 Design calculation for pumping plant of intermediate pumping station.
2.2.8.6 Design of 8 Mld. water treatment plant
2.2.8.7 Process design of the treatment plant units.
2.2.8.8 Design of RCC sump for clear water pumping station
2.2.8.9 Design of clear water rising main
2.2.8.10 Design calculation for a pumping plant of clear water rising main for 6th
Mile to Laitkor
2.2.8.11 Design of clear water gravity transmission main
2.2.8.12 Design and computation for capacity of service reservoir
2.2.8.13 Design of storage reservoir
Map showing town under SUA and area covered by GSWSP (Phase I & II)
Map showing zoning of project area
2.2.8.14 Design of distribution system
Map, length and route of pipe lines
GoM : Phed
Page
No.
1
1
6
8
10
11
15
15
17
17
18
24
39
39
43
43
47
49
51
51
62
63
67
69
71
72
73
74
75
76
77
82
Sl.
No.
Descriptions
Map showing distribution network Zone-II
Length of pipe line Zone-II
Proposed pipeline route Zone-II
Map showing distribution network Zone-III
Length of pipe line Zone-III
Proposed pipeline route Zone-III
Map showing distribution network Zone-IV
Length of pipe line Zone-IV
Proposed pipeline route Zone-IV
Map showing distribution network Zone-V
Length of pipe line Zone-V
Proposed pipeline route Zone-V
Map showing distribution network Zone-VI
Length of pipe line Zone-VI
Proposed pipeline route Zone-VI
Map showing distribution network Zone-VII
Length of pipe line Zone-VII
Proposed pipeline route Zone-VII
Map showing distribution network Zone-VIII
Length of pipe line Zone-VIII
Proposed pipeline route Zone-VIII
Map showing distribution network Zone-IX
Length of pipe line Zone-IX
Proposed pipeline route Zone-IX
Map showing distribution network Zone-X
Length of pipe line Zone-X
Proposed pipeline route Zone-X
Map showing distribution network Zone-XI
Length of pipe line Zone-XI
Proposed pipeline route Zone-XI
Map showing distribution network Zone-XII
Length of pipe line Zone-XII
Proposed pipeline route Zone-XII
Page
No.
92
93
100
113
114
122
137
138
143
152
152
165
186
187
192
202
203
207
215
216
236
267
268
283
309
310
324
349
350
354
362
363
372
Drawings
GoM : Phed
389
390
391
392
393
394
ii
Sl.
No.
Descriptions
2.3
2.4
2.5
2.6
3
3.12
3.12.2
3.12.4
4
4.1
4.2
4.3
4.4
4.5
5.
5.1
5.2
6
6.1
6.2
6.3
6.4
6.5
7
7.1
7.2
8.
8.1
9.
9.1
9.2
GoM : Phed
Page
No.
395
396
397
398
399
400
401
403
404
404
Project cost
405
Cost estimation
Physical infrastructure detail estimate
Any other detail estimate
406
406
441
444
444
Project phasing
Schedule for tendering/selection for procurement of services
Schedule for bring instate level and ULB level contribution to the project
Schedule for obtaining all clearances
Schedule for shifting utilities
Project infrastructure component-wise implementation
Project O & M
Institution framework (organisation and operation) strategy
Tariff and user cost recovery.
445
445
445
446
447
447
447
448
448
448
449
449
449
451
451
453
453
453
454
454
454
iii
Sl.
No.
Descriptions
Page
No.
Annexures
2.
3.
4 (a)
4 (c)
4 (d)
455
456
457
458
459
4 (e)
460
Appendixes
1
2
3
4
5
6
7
8
9
10
GoM : Phed
461
462
467
469
471
474
475
476
478
495
iv
1.
1.1
1.1.1
Shillong, the capital of Meghalaya occupies the northern slopes and foothills of Shillong
peak at an average altitude of 1496 metres above mean sea level. The city derived its name
from a deity named Shillong, whose dwelling place is known as Shillong Peak. He is
believed to have established the art of democratic governance and rule of justice in the
formation of the princely State of Shillong (Hima Shillong), which was subsequently
bifurcated into Mylliem State and Khyrim State in 1830. During the British Rule, Shillong
consisted of only a few scattered clusters of hamlets. The British Administration shifted the
headquarters of United Khasi and Jaintia Hills District from Cherrapunjee to Shillong. In
1874 the State of Assam was created out of Bengal and the city became its provincial
capital. In 1972, when the State of Meghalaya became a separate State, the city became its
capital.
1.1.2
The city is situated in the East Khasi Hills District and is also the district headquarter. It is
well connected by a network of roads within the State and with all important cities in the
neighboring States. It is connected with the rest of the country through Guwahati by road,
rail and by air. Helicopter service is also available between Shillong-Guwahati-Shillong and
Shillong-Tura. There is a minor airport at Umroi, 35 kms from Shillong. All the State
Government offices and important Central Government offices are located in Shillong.
Some of the other important institutions which are located in Shillong are the headquarter of
the North Eastern Council, North- Eastern Hill University, Headquarter of Eastern Air
Command; 101 Communication Zone of the Army and other Para military organizations.
The schools, colleges and other educational institutions attract students from all over the
North Eastern Region. The Shillong State Central Library and Museum offers scope for
study and research of the ethnic cultures in the region. It is one of the few hill stations with
motorable roads all round the city. Shillong has its own charm, different from other hill
stations, and presents a natural scenic beauty with waterfalls, brooks, pine grooves and
gardens. The place, the people, the flora and fauna and the climate all combine make
Shillong an ideal resort throughout the year.
1.1.3.
The mission statement as per Shillong City Development Plan envisages planned
development of Greater Shillong Planning Area (GSPA) covering an area of 174 sq.km
including an area of 10.73sq.km falling under Shillong Municipal jurisdiction. The Greater
Shillong Planning Area comprises of 7 urban centres and 32 villages surrounding the Urban
Centres. The present structure of GSPA, its problems and magnitude of the problems to be
faced by it in future have been indicated in the Shillong CDP. The city of Shillong despite
its physical threshold and constrains is likely to expand and grow. Population of the
Shillong Urban Centres (SUA) has increased from 1.56 lakhs in 1971 to 2.68 lakhs in 2001
and expected to increase to 3.16 lakhs by 2011. The existing problems which required
immediate attention and large magnitude of investment would assume challenging
propositions in case not addressed and taken care of.
GoM:Phed
1.1.4
The existing main supply sources to the project area (SUA) is the Greater Shillong Water
Supply Project (GSWSP) designed to cover the areas under Shillong Urban Agglomeration
(SUA) in existence during the period (1978) viz. Shillong Municipal Board (SMB),
Shillong Cantonment Board (SCB), Mawlai and Nongthymmai. Phase I of the project
whose implementation commenced in the year 1978-79 was completed and commissioned
in the year 1986. The source of supply is the river Umiew at Mawphlang about 30km away
from Shillong. The project (phase-I) envisages lifting of water from the run-off the river in
2 stages against a total head of 312m and convey via 2.42km parallel M.S. rising main of
600mm dia. to the water treatment plant at Mawphlang. The treatment plant constructed
under Phase I of the project has a capacity of 34.05Mld. Treatment comprises of chemical
coagulation, flocculation, settlement, filtration and post chlorination. A total length of about
30km of pipes varying in size from 750mm dia. to 150mm dia. were laid to convey the
treated water by gravitational flow from Mawphlang towards different parts of Greater
Shillong Area and zonal reservoirs of total storage capacity of about 6.81Ml were
constructed under Phase I of the project.
Intake structure and pumping system constructed under GSWSP (Phase I) in 1985-86 consist of
2 Nos. R.C.C. Well of 8.20m clear diameter of about 36 m in height, a Pump House on top of the well and
an approach bridge of span about 40m.
Under Phase I, 6 Nos. Vertical Turbine, Kirloskar Make BHR 35-30 4 Stage Self Water Lubricated
Pumps coupled to 6 Nos. KEC Make 300Kw squirrel cage induction motor were installed. Each Pump has a
suspended column assembly length of 38m. The pumps capable of lifting 51.30 Mld of water against a
Head of 122m and conveying it to the RCC Sump at the Intermediate pumping station via a 0.32 Km.
parallel main of 0.600m diameter were commissioned in the year 1986. The pumps were designed to
develop the required discharge pressure at a speed of 1482 Rpm.
GoM:Phed
The Intermediate structure & pumping system constructed under Phase I consist of RCC Raw Water
Sump 2 Nos.x14.00 dia. x 4.30m and a Pump House, 6 Nos. Kirloskar make MN 54-30o 2 Stage Horizontal
Pumps coupled 6 Nos. Kirloskar Electric make motors 530 Kw. The pumps designed to lift 51.30 Mld of
water against a Head of 190m and conveying it to the Treatment Plant at Mawphlang via a 2.10 Km.
parallel main of 0.600m diameter were installed and commissioned in the year 1986. The pumps which
were designed to develop the required discharge pressure at a speed of 1482 Rpm, failed, on account of
the fluctuation in the frequency of power system leading to installation of Booster Pumps Station after
stage II pumping system.
The Treatment Plant constructed under Phase I of the Project and commissioned in the year 1986 has a
capacity of 34.05 Mld.
GoM:Phed
1.1.5
Phase II of the project comprises construction of mass gravity concrete dam of about 130m
wide and 50m high across the river Umiew at Mawphlang downstream of the existing
intake structure; construction of additional water treatment plant of capacity 17.25Mld
(3.8Mgd), gravity feeder main of a total length of about 25km varying in size from
400mm dia. to 150mm dia. and construction of zonal reservoirs of total storage capacity of
11.40Ml.
Gravity concrete dam of about 130m wide and 50m high across river Umiew downstream of Intake structure was
constructed under Phase II of the GSWSP. The dam which was taken up for construction in 1997 and completed
in 2003, provides storage of 9.145MCM. The dam is meant solely for drinking water supply and is owned and
maintained by State PHED.
GoM:Phed
1.1.6
Works for distribution of water supply were taken up from 1980 onwards on a piecemeal
basis depending on availability of fund. The pattern of existing water distribution in the
project area is from the zonal tank to the supply tank (GI Tank) and from the supply tank to
consumers trough a lengthy service lines mostly of GI pipes. A bunch of as many as 50
service lines take off from a single supply tank. The service lines are 15mm G.I and are
laid over ground and usually inside the drain.
1.1.7
The pumping machineries for Stage I and Stage II pumping system which were
commissioned in the year 1986 have been replaced through the scheme sanctioned and
funded under State Plan. The pumping machineries have since been commissioned and the
Greater Shillong Water Supply Project (Phase I & II) are now meeting the designed
capacity of 51.30Mld. Though following the commissioning of the new pumping
machineries for both Stage I and Stage II pumping system of Greater Shillong Water
Supply Project, the generation and supply has improved considerably; however, considering
the high percentage of UFW in clear water main and distribution networks including supply
to enroute to villages, the total available supply in the project area from all sources of
supply including Greater Shillong Water Supply Project is about 23.60Mld. The water
availability in the project area is indicated in table 1.1.1.
Table 1.1.1.
Sl.
No.
1.
Quantity available
Mld
51.30 Mld
2.
3.
19.15
1.95
2.50
23.60
Total :
GoM:Phed
1.2
1.2.1.
The Shillong Urban Agglomeration comprises of 7 urban centres. The total population of
SUA as per 2001 census is 2.68 lakhs. The Project under consideration takes into account
initial period of the Project as 2011, intermediate period as 2026 and ultimate period as
2041. Population forecasting was arrived at using the programme developed by CPHEEO.
The print out of the population forecasting is appended as Appendices.
1.2.2
The Population of Shillong Urban Agglomeration as worked out on the basis of 6 decades
of population (1961-2001) is indicated in table 1.2.1.
Table 1.2.1
1.2.3
Year
Population
2001
2,67,662
2008
3,01,000
2011
3,16,000
2021
3,74,000
2026
4,05,000
2031
4,39,000
2041
5,12,000
Remarks
Initial stage
Intermediate stage
Ultimate stage
The population of Shillong Urban Agglomeration for 2007, 2011, 2021, 2026, 2031 and
2041 and the corresponding water requirement @135 Lpcd including UFW @15% as
worked out is indicated in the table 1.2.2.
Table 1.2.2
Year
Population
@135Lpcd
Mld
GoM:Phed
2008
3,01,000
40.63
46.72
2011
3,16,000
42.66
49.06
2021
3,74,000
50.49
58.06
2026
4,05,000
54.68
62.88
2031
4,39,000
59.27
68.15
2041
5,12,000
69.12
79.49
1.2.4
The Greater Shillong Water Supply Project (Phase I & II) which was originally formulated
in the year 1978 was designed to cater supply to areas covered under SUA which at the time
comprises of 4 towns viz. SMB comprising areas under Shillong Municipality, SCB
comprising areas of cantonment and 2 census town viz. Mawlai and Nongthymmai. While
both SMB and SCB have civic status of municipality and cantonment board respectively;
Nongthymmai and Mawlai are the non municipality town since 1971 census. At the time
(1978), Madanriting, Pynthorumkhrah and Nongmynsong were still regarded as rural areas
and are therefore, outside the coverage of Greater Shillong Water Supply Project
(Phase I & II). Madanriting and Pynthorumkhrah came into existence as census town in
1981 census and Nongmynsong came into existence as census town only in 1991 census.
1.2.5
GoM:Phed
The Shillong Urban Agglomeration (SUA) comprises of 7 Urban Centres. Water supply
poses a serious problem as major areas of SUA are yet to be covered with organized water
supply system. The areas which are covered by Greater Shillong Water Supply Project have
access to organized water supply system and other areas outside coverage of Greater
Shillong Water Supply project depends on other small water supply schemes like deep bore
wells and other local sources for water supply. High leakage losses occurred in the
consumers lengthy service lines as well as in the supply tank. The losses in the transmission
main and distribution system account to about 55%. Though the existing project generate its
full desired capacity, available supply at consumers end is about 78 Lpcd.
1.3
1.3.1
UFW in GSWSP accounted for the loss in treatment process @ 3%, losses in clear water
main between treatment plant and different zonal reservoirs @ 20% and loses in distribution
networks as a result of lengthy service lines @ 35% totalling to 58%. Taking into
consideration implementation of various measures for UFW reduction through replacement
of 750mm C.I. water main and improvement in the existing distribution system like
replacement of the existing bunched connection system prevailing in the SMB areas to the
sub main system including reducing the losses in feeder main etc., the UFW can be brought
down from the present level of about 58% to about 15%. The water availability against
daily water requirement of the project area keeping in view the present UFW @ 58% and
future improvement in UFW @15% is indicated in table 1.3.1
Table 1.3.1
Year
Water availability
2008
Mld
46.72
2011
49.06
55.75
- 6.69
2021
58.06
55.75
2.31
2026
62.88
55.75
7.13
Say 8.00
2031
68.15
55.75
12.40
2041
79.49
55.75
23.74
Say 24.00
Shortfall
Mld
23.12
1.3.2
For the project under consideration, the shortfall on water availability for 2026 and 2041 is
8Mld and 24Mld respectively. Taking this into consideration, infrastructure for generation
and distribution of additional quantity of water to meet the shortfall is required to be created
without any loss of time.
1.3.3
River Umiew the source of GSWSP is a dependable river. The Dam constructed across the
river Umiew at Mawphlang provide storage of 9.145 MCM of water for pumping by the
system. The catchments of river Umiew is about 115sqkm and large area of the catchment
is in close proximately to Cherrapunjee. As a result, the catchment receives a fairly good
amount of rain in comparison to other areas. During the dry weather months of
2007 & 2008, Umiam reservoir (Barapani) water level dropped alarmingly low warranted
State Electricity Board to resort to load shedding to conserve water. The situation was
comparatively different with Umiew river. Records available indicate daily spilling of water
almost 24 hrs. a day despite lifting about 51.30 Mld, indicating that the river has the
potential to cater to the additional and future increase in population of the Shillong Urban
Centres.
GoM:Phed
1.3.4
Due to very high pressure, the 750mm C.I. clear water main is reported to be frequently
prone to bursting disrupting the supply to the city for days together. Further, the clear water
main of C.I Pipes with lead joints accounts for very high percentage of UFW. The clear
water main has also outlived its useful life. Frequent disruption of water supply as a result
of frequent bursting of clear water main including control of losses in the main would only
be possible through replacement of the main. The proposed project viz. GSWSP (Phase III),
therefore, include provision for replacement of the existing CI 750mm water main with a
new D.I. water main of 1000/900 mm , capable to convey both the existing supply of
GSWS (Phase I & II) and additional supply of GSWSP (Phase III).
1.3.5
The project also takes into consideration improvement of the existing distribution networks
of GSWSP (Phase I & II) and laying of distribution networks to all uncovered areas of
Shillong Urban Centres. Key improvement to the existing distribution system shall be the
replacement of existing bunched connection system to the sub main system so that UFW
can be considerably reduced, contamination of water due to leakages in lengthy service
lines can be checked as roadside drain continue to be the carrier of storm water. This
conversion shall be critical towards.
1.3.6
Though considering the high difference in level between pump floor level of the existing
intake structure with the water level of dam, there may be a scope for increasing the height
of the existing Dam to increase live storage, taking up feasibility study for increasing the
height of the dam is not necessary at this stage as sufficient water is available to meet the
additional demand.
1.3.7
All above proposals considered under the project is in line with the various provision of
water supply sector under the City Development Plan (CDP).
GoM:Phed
The pumping machineries for Stage I & Stage II pumping station were commissioned in
1986 and have since outlived the designed life of 15 years. Prioritizing the urgent needs of
phasing out the existing machineries for the pumping system, new machineries were
installed for Stage I & Stage II pumping station of the GSWS project (phase I & II) under
the scheme sanctioned by State Government with fund made available under State Plan.
While installation of new pumping machineries for Stage I was completed in March 2006,
installation of new pumping machineries for Stage II pumping station was completed in
October 2007. The new pumps installed, discharged water directly into Water Treatment
Plant by-passing the existing Booster Pumps Station. The system GSWS (Phase I & II) is
now lifting about 51.30Mld of water from the dam.
1.4.2
The scheme which comprise replacement of pumping machineries and treatment units of
34.05 Mld. Water Treatment Plant also includes installation of VVVF drives for pumping
system, Automation Control and visualization system for pumping system and water
treatment plant. Excepting replacement of pumping machineries for Stage I and Stage II,
which were completed and successfully commissioned, other components of the scheme are
ongoing.
A battery of 6 units Voltas Ltd. make VH 350-4S/036 self water lubricated vertical turbine pumps coupled to
Crompton Greaves 6.6Kv 310Kw squirrel cage induction motor for the Stage I Pumping System installed and
commissioned in 2006. The pumps were designed to lift 51.30Mld of water against a head of 112m. Pumps were
designed to develop the required discharge pressure at a speed of 1400 Rpm.
GoM:Phed
10
A battery of 6 units KBL make MN 54-30 2 stage horizontal pumps coupled to SIMO Xian make 6.6Kv 630Kw
squirrel cage induction motor for Stage II pumping system installed and commissioned in 2007. The pumps were
designed to lift 51.30Mld of water against a head of 190m. Pumps were designed to develop the required
discharge pressure at a speed of 1400 Rpm.
1.4.3
The GSWSP (Phase I & II) which was originally designed to cater supply to
Greater Shillong Area was also designed to cater supply to enroute to villages for a total
population of 40,000. Following the necessity to delink the supply to villages from that of
Greater Shillong Area, state government has sanctioned a scheme for supply of water
to
the enroute villages separately and from a separate source to delink the GSWSP from
enroute villages. The scheme is ongoing.
1.5
Existing tariff and cost recovery methods and extent of cost recovery.
1.5.1
The Shillong Urban Agglomeration comprises of 7 towns viz. SMB, SCB, Mawlai,
Nongthymmai, Madanriting, Pynthorumkhrah and Nongmynsong. While both SMB and
SCB have civic status of municipality and cantonment board respectively, Mawlai,
Nongthymmai, Madanriting, Pynthorumkhrah and Nongmynsong are non municipality
town. As per present arrangement, areas under the control of SMB, supply is made by State
Phed in bulk and individual services to households and other institutions is being extended
by SMB. Similarly, water is only supplied in bulk to SCB for distribution to consumers by
the Cantonment Board. In areas outside of SMB and SCB, individual services to household
and other institutions is being extended by State Phed.
GoM:Phed
11
1.5.2
The old water tariff formulated by the state Phed is a simple tariff and provides realization
of cost of unmetered supply made to consumers on the basis of fixed charges base on
ferrule size. The tariff also provides for realization of cost of supply to bulk consumers as
per bulk supply rates. The tariff which has been in existence for the last many years is
indicated in table 1.5.1.
Table 1.5.1
Sl.
No.
Category of supply
1.
Domestic
2.
1.5.3
Ferrule size
15mm
20mm
25mm
Commercial
1.50 per Kl
Though cost recovery is being implemented from consumers provided with individual
service connection to households and other institutions through unmetered supply as well as
metered bulk supply, the extent of cost recovery is not satisfactory as realization of charges
from all bulk consumers could not be effected. Supply is presently made to SMB in bulk
free of cost and without any charges. The cost of supply from other bulk consumers
viz.SCB and other private organizations though regularly recovered, the amount of recovery
is negligible in comparison with the cost of O&M. The number of individual services to
household in other census towns viz. Pynthorumkhrah, Madanriting and Nongmynsong is
also negligibly less as these areas are still outside of the coverage of GSWSP (Phase I & II).
The extent of cost recovery during the last 5 years is indicated in table 1.5.2.
Table 1.5.2
Year
GoM:Phed
Total yearly
revenue from
both
unmetered
supply and
bulk supply
No. of
connection
of 15mm
ferrule size
Applicable
rate per
connection/
month
Yearly revenue
Applicable
rate
Per kl
SMB
SCB &
MES
Other private
agencies
Yearly
revenue
2002
2920
Rs. 70.00
Rs.23,23,800
Rs.1.50
Nil
Rs.4,54,500
Rs.1,29,000
Rs.5,83,500
Rs.29,07,300
2003
2953
Rs. 70.00
Rs.24,80,520
Rs.1.50
Nil
Rs.4,54,500
Rs.1,29,000
Rs.5,83,500
Rs.30,64,020
2004
3168
Rs. 70.00
Rs.26,61,120
Rs.1.50
Nil
Rs.4,54,500
Rs.1,29,000
Rs.5,83,500
Rs.32,44,620
2005
3213
Rs. 70.00
Rs.26,98,920
Rs.1.50
Nil
Rs.4,54,500
Rs.1,29,000
Rs.5,83,500
Rs.32,82,420
2006
3378
Rs. 70.00
Rs.28,53,480
Rs.1.50
Nil
Rs.4,54,500
Rs.1,29,000
Rs.5,83,500
Rs.34,36,980
12
1.5.4
In Meghalaya, available water in rivers, streams and dams including ground water is
required to be lifted and transported against considerable head and distance to a place of
treatment to make it safe for drinking and thereafter required to be transported again over
long distance to consumers in urban areas. Tremendous amount of Electrical Energy is
required for lifting and transportation of water. In Meghalaya especially, the electricity
tariff applicable to water works is not only the highest in the country but the highest among
all category of supply much higher than rates applicable to commercial and industries. In
addition to the high cost of electricity, cost of salary and wages and other inputs,
considerable amount of chemicals are also required in the treatment process to make the
water safe for drinking. The high cost of electricity charges on public water works has had a
direct bearing on cost of production of water.
1.5.5
The steep increase in O&M of water works vis--vis inapplicability of the existing rates of
water charges to commensurate with the expenditure necessitated state Phed to reframe the
water tariff, revising and refixing the standard rates and charges for different category of
supply. The revised water tariff as finalized is indicated in table 1.5.3.
Table 1.5.3
Category of supply
Category 1:
Domestic
connection
unmetered
Applicability
Rates per
connection/month
Category 2 :
Domestic
connection
metered
Category 3:
Non Domestic/commercial
metered connection
latrines,
cattle
troughs,
GoM:Phed
13
Category of supply
Applicability
Rates per
connection/month
any
unit/concern
offering
recreational/sports
club/golf
for
ornamental
use
of
water,
Bulk Supply
GoM:Phed
Municipalities/local bodies.
14
1.5.6
The basis, assumptions and method of calculations in arriving at the standard rates and
charges as per revised water tariff is indicated herein below :
37.62 Mld
Yearly generation
1,34,43,200 Kl
:
:
Rs. 9.35
Rs. 9.50
1.5.7
Analysis of monthly water tax on individual service to household for unmetered connection
base on ferrule size is worked out accordingly based on the generation cost, average flow in
the pipe according to ferrule size and average hours of supply.
1.6
1.6.1
Private sector/community participation in any areas of the sector is presently nil. The state
Phed has all along shouldered the responsibility of project design, project execution, project
management and/or O&M services of all water supply system in the state including Greater
Shillong Water Supply Project. State Phed which is a well structured organization with
proper hierarchy has at its disposal, technically competent engineers in the cadre for
maintaining urban and rural water supplies.
1.7
1.7.1
The list of key issues that are of importance to this sector and the project are :
GoM:Phed
Protection of water sources : Though major watersheds of the Umiew river, the source of GSWSP
needs to be protected and flow of silt into the Umiew river needs to be controlled, the same is excluded
from the scope of the project.
Enhancement of source : As water impounded by the dam would be sufficient to meet the additional
demand, feasibility study for enhancement of the capacity of source would not be necessary and
excluded from the scope of the project.
15
Inadequate distribution networks and inefficiency in distribution system : High leakage losses
occurred in the consumers lengthy service lines as well as in the supply tank. The losses in the
transmission main and distribution system account to about 55%. Though the existing project generate
its full desired capacity, available supply at consumers end is far below the designated norm.
Needs for modification of distribution : Bunched connection system for distribution of water needs to
be changed. Modification and laying of distribution network for changing over to sub:main system in
already covered areas is required to be undertaken.
Distribution system for non-covered areas : All uncovered areas to be extended with new distribution
system.
Establishment of a full fledge dedicated and well equipped laboratory: The existing laboratory at
Mawphlang is not fully equipped. A full fledged laboratory equipped with all necessary equipments is
required to be set up at the water treatment plant at Mawphlang.
Cost recovery measures : Realization of cost of supply on the basis of realistic water tariff for ensuring
system self sustainability.
Production and transmission losses upto the zonal reservoirs accounts for about 20.35% which may
be due to losses in the treatment process, leakages in the supply main, old sluice valves and air
valves.
Distribution losses accounts for about 15% which is mainly due to long length of individual service
lines, leakages from service tanks, air valves and sluice valves, overflowing from storage tanks,
continuous running of water from stand posts and inefficient use of domestic connections.
The need to conduct study for UFW assessment and possible reduction of UFW from the existing
level of 30.35% to about 18% and then to 15%.
Installation of bulk water meters at generation end, reservoirs and pipelines for assessment of water
losses.
1.7.2
The project under consideration is intended to materialize the vision envisages under the
CDP in respect of water supply sector viz. to provide to consumers with an equitable,
adequate and sustainable water supply.
1.7.3
The project is designed to address all key issues/problems of the water supply sector under
the CDP and it is expected that upon implementation, the project would provide solution to
all key issues/problems under this sector.
GoM:Phed
16
2.
2.1
Land.
2.1.1
The GSWSP (Phase I & II) was implemented after an agreement was entered into by the
government in Phed with the Hima of Mawphlang. The agreement provides for the Hima of
Mawphlang to donate raid land or community land free of cost to State Phed for
implementation of different components of the project, and in return, State government
would provide employment in the project for eligible youths of the Hima. Following the
agreement, sizeable area of land was donated by the Hima of Mawphlang at the Intake site
and at the WTP site where Intake & Intermediate structure and WTP were constructed
respectively. The land which was acquired and under the control of state Phed has enough
area for creating additional infrastructure for generation and treatment of water.
2.1.2
For the project under consideration viz. GSWSP (Phase III), further acquisition of land for
construction of intake structure (Stage I) and intermediate structure (Stage II) including
construction of WTP would not be necessary as these components are proposed to be
constructed in the area of land already acquired and under the control of state Phed.
Additional land is required to be acquired for only a few portion of the rising main and for
laying of clear water gravity main that passes through land of private parties. Since the land
to be acquired is located in rural areas, acquisition of land would not therefore pose any
problem.
2.1.3
Clear water gravity feeder mains of smaller diameter from 6th Mile, Upper Shillong towards
different zonal reservoirs are proposed to be laid along the state road and by the side berm
of the road. Acquisition of land in this context may not be necessary since compensation for
restoration of damaged portion of the road as a result of pipe trenching is to be paid to
PWD.
2.1.4
Distribution networks is also proposed to be laid along the state road by the side berm as far
as possible avoiding laying of pipes along land of private parties. Though compensation is
required to be made for restoration of damaged road as a result of trenching along the
piping routes, acquisition of land is not necessary except incase where pipes passes private
land.
2.1.5
Sl.
No.
1.
GoM:Phed
Particulars
Source development (Intake structure, Intermediate structure,
building for offices, housing and roads).
2.
3.
4.
5.
6.
Service Reservoir.
Distribution system
17
2.2
2.2.1
The population of Shillong Urban Agglomeration for 2008, 2011, 2021, 2026, 2031 and
2041 and the corresponding water requirement @135 Lpcd including UFW @15% as
worked out is indicated in the table 2.2.1.
Table 2.2.1
Year
Population
@135Lpcd
Mld
2.2.2
2008
3,01,000
40.63
46.72
2011
3,16,000
42.66
49.06
2021
3,74,000
50.49
58.06
2026
4,05,000
54.68
62.88
2031
4,39,000
59.27
68.15
2041
5,12,000
69.12
79.49
The daily water requirement, the water availability keeping in view the present UFW @
58% and future improvement in UFW @15% is indicated in table 2.2.2.
Table 2.2.2
Year
Water availability
Shortfall
Mld
2008
46.72
23.60
23.12
2011
49.06
55.75
- 6.69
2021
58.06
55.75
2.31
2026
62.88
55.75
7.13
Say 8.00
2031
68.15
55.75
12.40
2041
79.49
55.75
23.74
Say 24.00
GoM:Phed
18
2.2.3
For the project under consideration, the shortfall on water availability for 2026 and 2041 is
8 Mld and 24Mld respectively. Taking this into consideration, infrastructure for generation
and distribution of additional quantity of water to meet the shortfall is required to be created
without any loss of time. Considering the potentiality of the river Umiew to cater to
additional water requirement, the project proposed to create an infrastructure at Mawphlang
for lifting and treatment of additional 24Mld of water.
2.2.4
The infrastructure to be created with the source from Umiew river at Mawphlang shall be
designed to cater to the stages of design as indicated in table 2.2.3.
Table 2.2.3
Stages of design
2.2.5
Year
Initial stage
2011
Intermediate stage
2026
8.00
Ultimate stage
2041
24.00
The proposed project viz. GSWSP (Phase III) which is described herein below (excepting
pumping machineries) is designed to provide 24Mld of water service to all the category of
consumers, improve the period of service and extend the distribution service to the urban
poor.
1.
Source development.
(i)
Type of source : The source of the project is the river Umiew. A mass gravity concrete dam across the river
has already been constructed under Phase II of the GSWSP. The project (GSWSP Phase III) does not bear
any provision for further enhancement/augmentation of the source.
(ii)
Diversion structure : This component has not been included under the project.
(iii) Raw Water Intake structure and pump house (Stage I) : 1 no. RCC well of 10m clear diameter of about
36m in height is proposed to be constructed. An RCC pump house shall be constructed on top of the intake
structure alongwith an approach bridge of span about 40m. 3 nos. vertical turbine 4 Stage Self Water
Lubricated Pumps coupled to 200Kw electric motor are proposed to be installed. The Pumps considered is
designed to lift 8Mld of water against a total head of 112m. VVVF drives including automation control and
visualization system is proposed to be installed and as such the pumping machineries and other associated
equipments shall be compatible with VVVF drives including automation control and visualization system.
(iv) Raw Water Intermediate structure and pump house (Stage II): Located at about 0.70Km from Intake
Pumping Station. This consist of RCC Raw Water Sump 9.00 x 4.30m and a pump house. 3 Nos. 2 Stage
Horizontal Pumps coupled to 315Kw electric motor. The pumps considered is designed to lift 8Mld of water
against a head of 190m. VVVF drives including automation control and visualization system is proposed to
be installed and as such the pumping machineries and other associated equipments shall be compatible with
VVVF drives including automation control and visualization system.
(v) Other structure : Approach road to Stage I & Stage II pumping system, water treatment plants, colony
areas of total length of about 1km including construction of minimum number of staff quarters to provide
accommodation for housing facilities for O&M staff.
GoM:Phed
19
2.
Raw water transmission main : About 0.70km of 500mm MS rising main is proposed to
be laid to convey 24 Mld of raw water to be lifted by the Stage I pumping system to the
RCC sump at Stage II pumping system and about 2.5kms of 500mm MS rising main is
proposed to be laid to convey 24 Mld of raw water lifted by the stage II pumping system to
the Water Treatment Plant.
3.
Water treatment plant : For providing effective treatment to raw water lifted by the
pumps, Water Treatment Plant with conventional treatment having a capacity of 8 Mld of
civil structure and to be installed with machineries/treatment units of capacity 8 Mld is
proposed to be constructed at the site of the existing water treatment plant of GSWSP
(Phase I & II) to produce and maintain water that is hygienically safe, aesthetically
attractive and palatable in economical manner. Treatment shall comprise of chemical
coagulation, flocculation, settlement, filtration and post chlorination. The water treatment
plant shall comprise of the following units.
(i)
Inlet works: The inlet works shall comprise of stilling chamber and measuring channel.
(ii)
Chemical house and dosing systems: Chemical house of adequate size for storage of chemicals and for
preparation of chemical solution required for treatment is proposed for construction. Alum with a solution
strength of 5 to 10% is proposed to be used as coagulant. For preparation of alum solution, 2 alum mills are
proposed to be installed each alum solution tank shall have a capacity to hold 8 hrs. requirement at the
maximum demand of chemical at the designed flow. The solution shall gravitate to a constant head dosing
tank placed over the raw water channel and the solution shall flow directly from the dosing tank into raw
water channel through a taper needle valve at a preset dosage which shall adjust itself automatically to any
change in flow rate of raw water. For PH adjustment, lime solution is proposed to be used. For preparation of
lime solution, 2 lime mills are proposed to be installed. Lime dosage shall gravitate to the raw water inlet
stilling chamber, an area of maximum turbulence, for proper mixing of the solution.
(iii) Rapid mixing : For rapid mixing of raw water with the coagulant, flash mixer is proposed to be installed.
After measuring channel, raw water alongwith coagulant shall enter a flash mixing well where the coagulant
added shall be rapidly and intimately mixed with raw water by the agitator assembly.
(iv)
Clari-flocculator : Primary treatment : From the flash mixer, dosed water shall flow through a hume pipe of
600mm bore to the central shaft of the clarifier and enter the flocculating zone at the top of the shaft through
4 openings in the shaft wall, each opening 600mm high and 150mm wide. In the flocculating zone, which
shall be 8.4m dia. with an effective flocculating depth of 3.5 m, the water while flowing downwards shall be
stirred by 4 sets of flocculator paddles. It shall then passes below the flocculator wall to the settling zone of
the clarifier flowing radially outwards and upwards to the outlet launder. The clarifier has a diameter of 20m
and side water depth of 3 m. The detention time of flocculator shall be 30 minutes and that of clarifier
2.8Hrs.
(v)
Filters House and associated plant and equipments: Settled water from the clarifier shall pass through a
battery of 2 nos. rapid gravity sand filters. Filter cleansing shall be effected by first agitating the beds with
compressed air. After agitating the beds with compressed air, water at the suitable rate per m of bed surface
area shall be allowed to flow in the reverse process. The associated plant and equipments to be installed shall
be compatible with automation control and visualization system provided with centrally control and
monitoring.
(vi)
Clear water reservoir : Filtered water from each of the 2 filters shall flow into the common channel
chlorinated enroute into the reservoir having the capacity of 8 Ml. Water from the reservoir shall be
simultaneously transferred to the supply main maintaining maximum pressure in the reservoir at all time.
GoM:Phed
20
(vii) Disinfection : For sterilization of the filtrate, chlorination with chlorine solution shall be used. The flow of
chlorine from the chlorine cylinder into the absorption tower shall be adjusted and control by the chlorinator
control panel.
(viii) Control room & laboratory : The various process of the plant shall be centrally monitored and control
from the control room of the existing WTP through automation control and visualization system. A full
fledged dedicated and well equipped laboratory is also proposed to be set up.
4.
Clear water transmission system : The areas demarcated for covering under the project
(GSWSP Phase III) is divided into 13 zones including 9 zones which were earlier
demarcated for coverage under GSWSP (Phase I & II). These zones are Zone I to Zone X
excluding Zone VII comprising areas of Pynthorumkhrah. Although substantial works were
carried out under the scheme which includes substantive improvement in reservoir and
primary pipe line, considerable amount of works are yet to be done in distribution of water.
Clear water from the water treatment plant at Mawphlang shall be transmitted to reservoirs
constructed/proposed to be constructed for each zones. Under the project, a total length of
about 58.063km of pipes varying in sizes from 1000mm to 100mm are proposed to be laid.
Booster arrangement is proposed to be installed at 6th Mile, Upper Shillong for lifting water
via. a 300mm dia. DI rising main to the main reservoir at Laitkor for distribution to
Madanriting. The zonewise breakup of population is appended as appendices and the
summary of the zonewise breakup of population is indicated in table 2.2.4. The zonewise
break up of daily water requirement of all the zone under the project area as worked out is
appended as appendices. The summary of the zonewise daily water requirement is indicated
in table 2.2.5
GoM:Phed
21
Table 2.2.4
Zonewise
Classifica
tion
Areas of Coverage
Projected population
11127
11290
14145
14749
16857
20305
II
Lachumiere, Secretariat
11686
12189
15535
17643
18815
23495
III
Laitumkhrah
16695
18175
22405
24090
27610
34477
IV
11623
13215
15368
16377
18322
22768
Nongthymmai, Pohkseh
37142
38085
42431
45530
47052
50146
VI
4674
4741
5777
6031
6594
7920
VII
Pynthorumkhrah, Pynthorbah
26723
28627
36424
39257
41653
43876
VIII
Mawlai
41858
42748
46090
48012
49128
50756
IX
41923
45055
57562
63849
71578
91748
44848
51072
58804
64266
71682
91070
XI
Nongmynsong
15613
16057
18077
18943
21380
22941
XII
19426
21118
25747
28076
29028
32083
XIII
12662
13628
15635
18177
19301
20415
296000
316000
374000
405000
439000
512000
2007
Total :
2011
2021
2026
2031
2041
Table 2.2.5
Daily water requirement worked out @ 135 Lpcd for of the population
Zone
2021
2026
2031
2041
1727467
1752773
2196011
2289782
2617049
3152351
II
1814252
1892342
2411809
2739076
2921029
3646046
III
2591899
2821669
3478376
3739973
4286453
5352554
IV
1804471
2051629
2385882
2542529
2844491
3534732
5766296
5912696
6587413
7068533
7304823
7785167
VI
725639
736040
896879
936313
1023719
1229580
VII
4148746
4444342
5654826
6094649
6466628
6811749
VIII
6498455
6636627
7155473
7453863
7627122
7879869
IX
6508546
6994789
8936501
9912557
11112485
14243877
6962652
7928928
9129321
9977297
11128631
14138618
XI
2423918
2492849
2806454
2940901
3319245
3561590
XII
3015887
3278570
3997222
4358799
4506597
4980886
XIII
1965776
2115747
2427334
2821979
2996480
3169429
45954004
49059001
58063501
62876251
68154752
79486448
Total:
GoM:Phed
2011
22
5.
Service reservoir : The capacity of storage reservoir is computed on the basis of 20 hours.
pumping and the capacity required, the capacity of reservoir in existence under GSWSP
(Phase I & II) and additional capacity required to be constructed is indicated in table 2.2.6.
Table 2.2.6
Capacity of
storage reservoir
required
Existing
reservoir
capacity
(Ml)
3
(Ml)
4
Proposed
capacity of
storage
reservoir
(Ml)
5
6 Mile
3.30
4 Mile
2.90
1.09
1.16
1.26
1.12
0.14
III
Laitumkhrah
1.85
0.23
1.12
IV
1.22
3.75
2.69
3.38
0.43
0.34
0.09
2.36
1.00
Mawlai
2.73
1.39
0.84
4.93
1.25
1.03
4.89
0.34
1.17
1.23
1.23
1.72
1.72
1.10
27.50
15.86
11.64
Zones
I
II
VI
VII
VIII
IX
X
XI
XII
XIII
Total :
6.
GoM:Phed
Distribution System : Control of the very high UFW under the existing distribution system
is extremely difficult. The project, therefore, proposed to lay a well planned distribution
network for the entire project area. The proposed distribution system is a Loop System and
designed to ensure residual pressure differential at various node to remain in a manageable
band of 7 meters to 17 meters. DI pipes has been considered for use in the distribution
system. Considering the topographical condition of the project area, installation of pressure
reducing valves are proposed to be used at some strategic location in the distribution
networks to ensure equitable distribution of water.
23
All components of the scheme are designed/considered as per the norms and standard laid
down in the Manual on Water Supply and Treatment published by CPHEEO, Ministry of
Urban Development, Government of India as far as practicable.
2.2.6.2
The scheme is designed to meet the requirement over a period of 30 years after completion.
The time lag of 3 years between design and completion of the project have been taken into
account thereby making 2011 as the initial period, 2026 and 2041 as the intermediate and
ultimate period of the scheme respectively. The 30 years period of the project is however
modified in regard to certain components of the project depending on their useful life and/or
the facility for carrying out the extensions when required so that expenditure far ahead of
utility is avoided
2.2.6.3
In forecasting the population of the town, the programme developed by MoU, CPHEEO is
adopted to arrive at the initial, intermediate and ultimate period of the scheme.
2.2.6.4
As implementation of sewerage project is contemplated in the project area, the per capita
rate of supply is considered as 135Lpcd.
2.2.6.5
The source of the existing water supply project i.e. GSWSP (Phase I & II) is the river
Umiew. A mass gravity dam across the river has already been constructed under Phase I of
GSWSP. The dam constructed provide storage of 9.145Mcm of water for pumping by the
system. The catchment of the river Umiew is about 115 sq.km and a large area of the
catchment is in close proximity to Cherrapunjee. As a result, the catchment receive a fairly
good amount of rain in comparison to other areas. During the dry weather months of
2006-07, Umiam reservoir (Barapani) water level dropped alarmingly low warranted the
State Electricity Board to resort to load shedding for a pretty long period of time. The
situation was comparatively different with Umiew river. During the same period, water
from the dam of GSWSP is spilled daily for almost 24 hr. a day despite lifting about
34.00Mld of water indicating that the river has the potential to cater to the additional
requirement. The project under consideration, has, therefore, no provision for
enhancement/augmentation of the source.
2.2.6.6
Considering the weather condition of the area, the necessity for construction of all weather
road to different work sites viz. pumping stations, sub:stations, WTP & staff quarters for
transportation of construction materials during construction and pre-commissioning period
and to facilitate O&M of the project on post commissioning period including construction
of minimum numbers of staff quarters for O&M personnel is absolutely necessary and
therefore considered.
2.2.6.7
The site for construction of the intake structure under the project is located a few distance
away from the intake structure of the existing source (Phase I & II). The source being the
same i.e. water impounded by the dam, construction of intake structure is to be considered
with respect to HFL and LWL of the dam and the level position of intake structure of the
existing project (Phase I & II) is also to be considered to ensure same level is adopted for
pump floor level and delivery floor level. Considering the topographical and soil condition
of the site, considerable excavation may have to be carried out for proper foundation of the
Intake well.
GoM:Phed
24
The size of the intake structure is arrived at taking into consideration the space requirement
and the out planning of pumping system for the ultimate stage. The factors considered are
as under:
2.2.6.8
2.2.6.9
GoM:Phed
The minimum water level/crest level of dam is at RL 1562.00m above mean sea level and the high flood level is
at RL 1577.00m above mean sea level. In order to keep the operating floor free from obstruction and pipe work,
delivery is taken below the pump floor level i.e. at RL 1583.20m, 2.40m below the pump floor level which is at
RL 1585.60m and 8.6m above the high flood level in keeping the same level with the existing intake structure
The depth of the Intake well has been considered taking into consideration the minimum water depth required
upto minimum WL to satisfy NPSHR for VT Pump to avoid air entry during drawdown.
Provision for obtaining uniform distribution of the in-flow to all the operating pumps and to prevent starvation of
any pump.
Though civil structure has been designed to cater to the demand of the ultimate stage, the pumping units has
been considered to cater to the demand of the intermediate stage.
The size of the pump houses is arrived at taking into consideration the space requirement
and the out planning of pumping system for the ultimate stage. The factors considered are
as under :
The availability of sufficient space in the pump house to locate the pump, motor, valves, pipings, control panels
and cable trays in a rational manner with easy access and with sufficient space around each equipment for the
maintenance and repairs.
The provision of sufficient space for the control panels as per the Indian Electricity (I.E.) Rules.
The provision of service bay in the station with different space to accommodate overhauling and repairs of the
largest equipment.
Provision of a ramp or a loading and unloading bay so that all pipings and valves can be laid on the lower floor
permitting free movement in the upper floor.
Provision of a head room and material handling tackle with adequate clearance to lift the motor clear off the face
of the coupling and also carry the motor to the service bay without interference with any other apparatus
including adequate clearance to dismantle and lift the largest column assembly.
Though civil structure has been designed to cater to the demand of the ultimate stage, the pumping units has
been considered to cater to the demand of the intermediate stage.
The size of RCC sump at the Intermediate pump house is arrived at taking into
consideration, the storage requirement and the out planning of the pumping system for the
ultimate stage. The factors considered are :
Avoidance on starvation of pumps in the event of sudden tripping of pumps of the Intake Pumping
station for a duration of about 30 minutes or so.
Avoidance of mutual interference between two adjoining pumps by maintaining sufficiency clearance.
Avoidance of dead spots by keeping rear clearance from the center line of the pump.
Avoidance of sudden change in the direction of flow by provision of a stilling chamber to reduce the
velocity gradually to about 0.3 m/s near the suction bellmouth.
Avoidance of dead spots at the suction bell mouth by maintaining the bottom clearance.
Provision for adequate submergence of the inlet of pump under the LWL, so as to prevent entry of air
during draw-down and to satisfy NPSHr.
25
2.2.6.10
In a water supply projects, pipelines are a major investment and constitute a major part of
the assets. Pipes represent a large proportion of the capital invested in water supply projects
and therefore are of particular importance. Pipe materials for the project have therefore been
judiciously selected not only from the point of view of durability, life and overall cost
which includes, besides the pipe cost, the installation and maintenance costs necessary to
ensure the required function and performance of the pipeline through out its designed
lifetime.
2.2.6.11
The final choice of pipe materials for the project was arrived at taking into consideration the
technical factors such as internal pressure, co-efficient of roughness i.e. C value, hydraulic
and operating conditions, maximum permissible diameter, internal and external corrosion
problems, laying and jointing, type of soil, special condition etc.. For the raw water rising
main, the alignment passes through very difficult terrain. In view of the site conditions, the
choice of pipe materials are governed by the following factors :
The safety, economy and availability of manufactured size of pipes and specials.
2.2.6.12
Considering the factors, the choice of pipe materials for raw water rising main and is
limited to MS pipes. Pipes proposed to be laid underground shall be protected against
external corrosion by providing necessary treatment like hot applied coal-tar asphaltic
enamel reinforced with fibre glass fabric yarn and those proposed to be laid on/above
ground shall be properly painted. The economical diameter for rising main was arrived at,
using computer software viz. Ecodia.
2.2.6.13
Since the pumps to be installed for Stage I pumping system are vertical turbine pumps, the
frequency of breakdown of pumps is comparatively higher than that of a horizontal pumps.
Since pumps with parameter to suit the scheme would have to be tailor made and
considering the remoteness of the location of the site, 3 units of vertical turbine pumps are
proposed to be installed. The vertical turbine pumps shall be of 1400Rpm, 4 stage self
water lubricated. Out of the 3 units, 2 would be in operation at a time on roaster basis to
cater to the demand of intermediate stage of 8 Mld.
2.2.6.14
To facilitate correlation of discharge of the pumps of the Intake and Intermediate pumping
stations; 3 units. of horizontal pumps are also proposed to be installed at the Intermediate
pumping station. Out of the 3 units, 2 units will be in operation at a time to cater to the
demand of intermediate stage of 8 Mld.
2.2.6.15
Frequency in the power system is a vital parameter which determines the quality of AC
supply. The rated frequency in the country is 50 Hz.. and all electrical equipments as well
as the whole power system are designed for obtaining the optimum efficiency when
connected to a power supply of this rated frequency. The performance of the electrical
equipments and the power system changes when the frequency deviates from 50 Hz. and
though it is necessary to maintain the system frequency as close to 50 Hz. as possible, so as
to have the best efficiency of operation, frequency fluctuate whenever load connected in
the system does not match with that of generation.
GoM:Phed
26
2.2.6.16
2.2.6.17
N and
Likewise, the laws of interrelation between speed N of electric motor and frequency f of
power system is as under :
Ns =
120f
P
Where,
Ns = Synchronous speed of field in Rpm
F
As P is constant, Ns f
2.2.6.18
Frequency of power system in the state is highly fluctuating. The frequency dips as low as
47.50 Hz. and shoots as high as 51.50 Hz.. The highly fluctuating frequency of power
system in the state has had an adverse impact on the original pumping system of GSWS
(Phase I & II) where the 2 stage pumping system commissioned in 1986 had to be
converted to a 3 stage pumping system through the installation of Booster Pumps station in
1996 following continuous problem encountered in lifting of water by the system on
account of continued fluctuation in frequency of power system.
2.2.6.19
Though following the replacement of the original pumping units with new ones in 2007
Booster Pumps station was eliminated and stage II pumping system could discharge
directly into the WTP, special consideration in designing of pumps units were taken into
account to overcome fluctuation in the frequency of power system, the new pumps
installed and commissioned were designed to develop required discharge pressure at a
speed of 1400Rpm corresponding of motor speed when connected to power system with
frequency of 47.50 Hz.. The motor capacity was considered taking into consideration the
power to be drawn by the pump when speed suddenly shoots up as a result of sudden
fluctuation in the frequency of power system to the upper limit.
2.2.6.20
The pumping units under the project i.e. GSWS (Phase III) has been considered taking into
consideration the highly fluctuating frequency of power system in the region.
2.2.6.21
The electric motor for the project shall preferably have the following characteristics :
(a)
Type of enclosure
Class of duty
GoM:Phed
Class of insulation
System voltage
27
(b)
Type of enclosure
Class of duty
Class of insulation
System voltage
2.2.6.22
In a pumping system generated flow of water increases or decreases with the increase in
motor speed corresponding to the upward or downward fluctuation in the power system
frequency. Though the generated flow could be controlled by mechanical means through
throttling process, these mechanical means of achieving flow control have a major
disadvantage, in terms of friction, resulting in energy loss and overall poor efficiency.
2.2.6.23
2.2.6.24
The GSWS project being a high head pumping scheme envisages multi stages pumping
system, the consumption of energy for lifting of water from the river/dam is exceptionally
high. Considering the high cost in procurement of energy, and the practical difficulties
encountering in operation of the machineries on account of wide range of fluctuation in the
system frequency that adversely affects the efficiency of the pumping system, there is a
necessity for installation of suitable equipment\devices which could maintain a stable
output voltage and frequency thereby enable controlling the generated flow of water during
the process of pumping without effecting conventional mean of flow fluid control viz.
throttling. In such circumstances energy is saved as frictional losses accounted for through
the process of throttling is eliminated.
2.2.6.25
2.2.6.26
In the case of Stage I pumping system, the total pump head is 112m. Considering the total
pump head, the valves inside the pump house including the delivery manifold should have a
working pressure of not less than 1.5 times the working pressure i.e. not less than
20Kg/cm. Good quality, quick closing non-return valve is proposed to be provided in the
GoM:Phed
28
transmission main downstream of the delivery manifold. In the case of Stage II pumping
system, the picture is comparatively bad as the total pump head is 190m. In such a situation,
water hammering would be quite severe in the event of power failure. Considering the total
pump head, the valves inside the pump house including the delivery manifold should have a
working pressure of not less than 30Kg/cm. Non return valves on the individual pump
delivery lines are proposed to be provided with dash pot arrangement to dampen the rate of
closure towards the end of closure. Air valves are also proposed to be provided in the rising
main.
2.2.6.27
Though good quality, quick closing non-return valves are proposed to be provided, the
situation may not be sufficient to withstand against severe water hammering in the event of
power failure. Providing protection devices against surge pressure is therefore absolutely
necessary for the safety of plant and machineries. Provision, is, therefore included in the
project estimated cost.
2.2.6.28
Raw water is proposed to be lifted from the river against the total head of 112m in the case
of Stage I pumping system and 190m in the case of Stage II pumping system. Sudden
tripping of pumps in the event of power failure or breakdown of machinery, severe water
hammering may be set up in either the pump discharge and/or suction piping which may
have sufficient magnitude to rupture the pipe or damage the connected equipment.
Normally in a pumping system, the strength of the pipes and valves in the pump house will
be as good or better than the strength of pipes and valves in the transmission main. The test
pressure for the pipes and valves are normally fixed in relation to the pump head. This
makes the pipes and valves in the pump house, upto and including the delivery manifold
relatively vulnerable to surge pressure/water hammering. Hence, the surge protection
system, if any, should provide protection essentially for this small vulnerable reach.
2.2.6.29
Though the wall thickness (9.50mm) of the pipes for rising main may be sufficient to
withstand very severe surge pressure, the valves in the pump house including the delivery
manifold is required to be properly selected so as to prevent the damage of the machineries
in the event of sudden tripping of pumps as a result of power failure.
2.2.6.30
The Water Treatment Plant under consideration is designed to produce and maintain water
i.e. hygienically safe, aesthetically attractive and palatable, in an economical manner.
Evaluation of water quality shall not be confined to the end of the treatment facilities but
shall be extended to the points of consumers use. Considering the nature of raw water
quality constituents and the desired standards of water quality including the comparative
economics of alternative treatment steps applicable, the sequence of treatment and units of
operation proposed to be employed in the WTP, shall comprise of chemical coagulation,
flocculation (rapid and slow mixing) and clarification, filtration and post chlorination.
Though, the civil structure for the WTP has been designed to cater to the demand of the
ultimate stage, the treatment units/machineries including electrical-mechanical equipments
considered under the project would cater to the demand of the intermediate stage.
(i)
GoM:Phed
Inlet works : For meeting the demand of ultimate stage, 2 nos. of inlet works are proposed under the project.
Each inlet works shall include raw water stilling chamber at right angle to the flow, a raw water channel with
parshall flume for measurement of flow rate. The raw water channel shall be 2m wide and the parshall flume
shall have a threat width of 1.22m.. Measuring equipment for measurement of flow shall be installed.
29
Calibration of the measurement device shall initially be carried out and periodically be checked to ensure
accuracy. Since only 1 No. inlet works would be able to cater to the demand of intermediate stage, the other
inlet works considered under the project is only for civil structure and without any electro-mechanical units.
(ii)
Dosing system : Alum solution of 5-10% strength is proposed to be used as a coagulant and lime suspension
is proposed to be applied for PH correction. Alum solution shall be prepared in 2 alum mills and each alum
solution tank shall have the capacity to hold 8 hrs. requirement at the maximum demand of chemical at the
designed flow. The alum solution tank shall be provided with a free board of 0.3m. The solution tank shall
be constructed with reinforced cement concrete with suitable lining of rubber to resist corrosion. The alum
solution tank shall be located inside the chemical house where chemicals shall be stored and shall be located
at a suitable elevation to facilitate gravity feed of the chemical solution. A lifting tackle for lifting the
chemicals to die elevated tanks shall be provided. The solution tank shall be also be provided with a platform
of at least 0.75m wide to allow the workers sufficient space for handling the chemicals and preparing the
solution. The platform shall be provided with a railing upto a minimum height of 0.75m. The platform shall
be located at an elevation to have clear head room of 2m from the ceiling. The top of the solution tank shall
not be higher than 1m from the floor of the platform.
Dissolving box with the pipe manifold having holes either at bottom or at sides for dissolving chemicals
shall be constructed. Each solution tank shall be provided with mechanical agitator for maintaining
homogeneity of the prepared chemical solution. Alum solution from the solution tank shall gravitate via.
chemical feed lines to a constant head dosing tank placed over the raw water channel and solution shall flow
directly from the dosing tank into raw water through a taper needle valve at a preset dosage which adjust
itself automatically to any change in flow rate of raw water.
Lime suspension shall be prepared in 2 lime mills, each having capacity to hold 8 hrs. of requirement at the
maximum demand of chemicals at the designed flow. Dosage shall be adjusted by regulating a variable V
notch. The dose shall gravitate via. the chemical feed lines to the raw water stilling chamber, an area of
maximum turbulence in the raw water channel.
(iii) Chemical house, administrative building & laboratory : An RCC building to provide for storage of
chemicals, rooms for control and administration including laboratory is proposed to be constructed. The
building to be constructed, takes into consideration the space necessary for storage of chemicals viz. alum,
lime & chlorine gas cylinder for a minimum of 3 months requirement, space required for installation of
2 alum mills, 2 lime mills and chlorination room in one floor, administration & control, electrical &
laboratory in the other floor. The building shall have sufficient space with access for handling bulk storage
allowing for negotiating of vehicles and cranes likely to be used for unloading of chemicals including
loading of empty chlorine gas cylinder. Though, the civil structure for the chemical house, administrative
building & laboratory has been designed to cater to the demand of the ultimate stage, the treatment
units/machineries including electrical-mechanical equipments considered under the project would cater to
the demand of the intermediate stage. The electro-mechanical equipments considered under the project is
2 units of alum mill and 2 units of lime mill.
(iv)
GoM:Phed
Rapid mixing : For meeting the demand of the ultimate stage, 2 Nos. of rapid mixing units would be
required. For each flash mixing unit, mechanical flash mixer unit is proposed to be installed for rapid mixing
of the coagulant. The flash mixer shall be capable of creating velocity gradient of 300s-1. The flash mixing
well shall be deep and circular. The ratio of impeller dia. to tank dia. is 0.2 to 0.4 and the shaft speed of
propeller shall be greater than 100 rpm, imparting a tangent shell velocity greater than 3 m/s at the tip of the
blade. The ratio of tank height to dia. has been considered for proper dispersal. The vertical strips or baffles,
projecting 1/10th to 1/12th tank dia. at a minimum of 4 places along the walls of the tank shall be provided to
reduce vortex formation or rotational movement of water above the impeller shaft. The mixing chamber is
placed below the chemical feed flow ensuring short chemical feed lines. The mechanical agitator drive is an
electric motor with continuous duty operating through a reduction gear. Though civil structure for 2 mixing
unit to cater to the demand of ultimate stage has been considered under the project, the electro-mechanical
equipments for only 1 unit has been considered under the project to cater to the intermediate stage.
30
(v)
Primary treatment (Clari-flocculation) : Considering the nature of raw water quality constituents where
content of iron is less than 1Mg/l, the process of aeration is not desirable and has not been considered. For
each clari-flocculator, the coagulation and sedimentation processes is incorporated in a single unit in the
clari-flocculator. The unit consist of 4 flocculating paddles placed equi-distantly. The paddles rotate on the
vertical axis. The flocculating paddles shall be of rotor stator type rotating in opposite direction around this
vertical axis. Dosed water from the flash mixer gravitate through a hume pipe of 600mm bore to the central
shaft of the clarifier and enter the flocculating zone at the top of the shaft through 4 openings in the shaft
wall, each opening 600mm high around 50mm wide. In the flocculating zone, which is 8.60m dia. with an
effective flocculating depth of 3.5m, the water while flowing downwards is stirred by 4 sets of flocculator
paddles, it then passes below the flocculator wall to the settling zone of the clarifier flowing radially
outwards and upwards to the outlet launder. The clarifier has a dia. of 20m and side water depth of 3.5m the
detention time of flocculator is 30 mins. and that of clarifier 2.8 hrs..
Diameter of the clarifier is governed by the structural requirement of the trusses that carry the scraping
mechanism, as well as wind effects on the trusses. Keeping this into consideration including site condition,
the diameter of the clariflocculator is arrived at. The clariflocculator is designed to provide pre-treatment
8Mld. in 20 hrs duration per day. The surface loading of the clari-flocculator has been considered as
24.882m/m/day. Weir loading has been considered at 209.43m/m. Sludge is proposed to be removed under
hydrostatic pressure through pipes of 300mm diameter. Mechanical scrappers are provided for scraping the
sludge and the floor slopes considered is greater than 1 in 12 to ensure continuous and proper connection of
sludge. The scraping mechanism shall rotate slowly to complete 1 revolution in about 30 to 40 minutes.
Sludge and wash water shall be properly disposed off. Reclamation of water from the sludge removed from
the settling basin has not however, been considered. Settling tank shall be capable of giving settled/clarified
water having turbidity less than 10 NTU. Though, the civil structure for 2 nos. clariflocculator has been
considered under the project the electro-mechanical equipments of only 1 unit has been considered under the
project to meet the demand of intermediate stage.
(vi)
Rapid sand filter : For meeting the demand of the intermediate stage, 2 Nos. of rapid sand filter would be
required. For each rapid sand filter clarified water from the clari-flocculator shall pass through a battery of
rapid sand filters and then to the filtered water reservoir being chlorinated enroute. 2 filters are provided,
each filter will be made up of 2 sections, each section will be 5.8m wide and 4.3m long having an area of
25m. Filter cleansing will be effected by first agitating the beds with compressed air and backwashing at a
wash rate of 600 Lpm of bed surface area. The under drain system will comprise of AC pressure pipe,
strainers of 80mm bore perforated at intervals for admission of filtrate and egress of agitating air and
backwash water. Strainers will fit into RCC Tee pieces opening into a header channel below the floor of the
bed, connected to the filter outlet pipe. The filters has been designed at a normal rate of filtration of
5.5m/hr/m but with the inlet and outlet control arrangement designed to permit a 100% overload for
emergent occasion. The capacity of the rapid sand filters has been arrived at taking into consideration the
number of units that can take care of the total quantity of water to be filtered and is optimum to keep the
filters working without undue overloading at any time. The number of units was arrived at, keeping in view
the rate of backwashing and the hydraulic problems for securing uniform distribution of wash water for large
unit area. Though, the civil structure for the 6 units rapid sand filter has been considered under the project,
the electro-mechanical equipments for only 3 units has been considered under the project to cater to the
intermediate stage.
The unit consist essentially of :
1.
2.
3.
4.
5.
6.
7.
8.
GoM:Phed
31
(vii)
Filter Sand : The shape, size and quality of filter sand shall satisfy the following norms :
a)
b)
c)
d)
e)
f)
g)
h)
(viii)
Sand shall be of hard and resistant quartz or quartzite and free of clay, fine particles, soft grains and dirt
of every description.
Effective size shall be 0.45 to 0.70mm
Uniformity coefficient shall not be more than 1.7 nor less than 1.3
Ignition loss should not exceed 0.7 percent by weight.
Soluble fraction in hydraulic acid shall not exceed 5.0% by weight.
Silica content should not be less than 90%
Specific gravity shall be in the range between 2.55 to 2.65.
Wearing loss shall not exceed 3%
Sterilization and Chlorination: For sterilization of the filtrate, chlorination with chlorine solution is
proposed to be used. Providing an effective chlorination system is one of the major objectives under the
project. The distance between the point of treatment and the point at the consumers end is about 30km.
Considering the distance, chlorinators are proposed to be installed at suitable location in the distribution
system to supplement the treatment provided at the treatment plant so as to ensure availability of adequate
free residual chlorine at consumers end for improved water quality.
Chlorination room of size 4m x 4m x 4m shall be constructed in each location for installation of chlorinators.
Each chlorinator shall be provided with a pump capable of developing head higher than the line pressure at
that point. The discharge of the pump will be small as it has to pump a small quantity through the venturi to
develop enough vacuum to draw the liquid chlorine from the toner. Chlorine toner shall also be provided at
each location. Each location shall have adequate number of toners as a standby.
The location where chlorinators are proposed to be installed, rate of flow of water in the location, capacity of
chlorinators and the number of toners required to be kept are indicated in table 2.2.7:
Table 2.2.7
Sl
No
Location
Flow rate
Mld
2.2.6.31
GoM:Phed
1.
2.
3.
4.
Ml/hr
Capacity of
chlorinators
Kg/hr.
No. of
toners
51.30
2.57
1+1
8.00
0.40
1+1
59.30
2.97
39.80
1.99
1+1
Excepting one zone, all zones considering under the project area are located at an elevation
lower than the water treatment plant at Mawphlang rendering flow of water by gravity from
water treatment plant towards Shillong, possible. The entire stretch of 750 mm C.I. clear
water main of the existing scheme linking the GSWS water works at Mawphlang with the
main reservoir at 4 Mile, Upper Shillong are prone to bursting. When bursting occurs,
supply to the state capital is disrupted for days together. Further, leakages in the 750 mm
CI clear water main of the scheme accounted for high percentage of UFW. As the existing
750 mm CI clear water main of the scheme is no longer reliable, it is proposed to replace
DPR of GSWSP (Phase III)
32
the existing CI 750mm water main with a new D.I. water main of 1000mm , capable to
convey both the existing supply of GSWS (Phase I & II) and additional supply of GSWS
(Phase III). The 1000mm gravity feeder main is proposed to be bifurcated at 6th Mile to
different branches for conveying treated water to zonal reservoirs. For conveying of treated
water from 6th Mile towards reservoir at Laitkor which at higher elevation than Mawphlang,
Booster pumps is proposed to be installed. The diameter of pipe for all gravity feeder main
are worked out separately. For conveying treated water from 6th Mile to Laitkor, a clear
water rising main is proposed to be laid. As DI pipes exhibits higher C value of 140 and
considering other technical factor, DI pipes are proposed to be use for all clear water gravity
main and clear water rising main.
2.2.6.32
In the design of the reservoirs, the following data were taken into considerations :
2.2.6.33
The provision for zonal reservoirs with adequate staging height is considered for use
principally as a distributing reservoirs. The reservoirs are considered for construction at
different locations of the locality with a view to provide a suitable reserve of treated water
with minimum interruptions of supply due to failure of mains, pumps etc. including meeting
the widely fluctuating demands as a result of intermittent pumping. The capacity of zonal
and service reservoirs were arrived at on the basis of 20 hrs. pumping keeping in mind the
capacity of the existing service reservoirs. The design calculation for arriving at the
capacity of the service reservoir is based on the Manual on Water Supply and Treatment.
2.2.6.34
The altitude of the project area varies between 1400m to 1900m above mean sea level.
Considering the maximum differences in the altitude of the project area, zoning of the
project area is absolutely necessary to ensure equalization of supply through the area.
Accordingly, the project area is divided into 13 zones. Each zone shall be served by
separate system. The project provides for inter connection of the neighbouring zones to
provide emergency supplies. The isolated valves between the zones shall however be kept
under closed condition and to be opened only in case of emergency.
2.2.6.35
The distribution system is designed to cover the ultimate population. The peak factor
adopted in the design of distribution network is 2.5. The proposed distribution of water
under the project takes into consideration coverage of all streets, lanes, paths and stairways
under the project area. Extensive survey was carried out for the purpose. The distribution
main/sub:main are also designed to replace all bunch and lengthy service lines from the
service tanks.
GoM:Phed
33
2.2.6.36
Distribution system has been designed to convey wholesome water at adequate residual
pressure in sufficient quantity and at convenient points to consumers 24 hrs. a day. The
system of designed adopted for distribution of water is a grid pattern or loop system where
the different mains are interconnected, keeping dead ends to the minimum. The system
facilitate any one point being fed from atleast two different directions. The system would
prove efficient and equitable in distribution of water.
2.2.6.37
Network analysis was carried out using Epanet and after the initial designs, proper judgement
had been made on the links, reducing the diameters of some select links to bring
optimization into the system so that residual pressure differential at various nodes remains
in a manageable band of 7 meters to 17 meters as per the manual. DI pipes has been
considered for use in the distribution system and the minimum size of pipe is 100mm .
2.2.6.38
Considering the topographical condition of the project area, installation of special valves
viz. Plunger valves/automatic pressure reducing valves are proposed to be used at some
strategic location in the distribution networks to ensure equitable distribution of water.
2.2.6.39
auditing in Production System : Flow meters are proposed to be installed at the entry
of the existing plants of both 34.05Mld and 17.25Mld WTP. The quantity of flow at the entry
and exit points shall be recorded and the corresponding losses shall be assessed. Effort shall then
be made to reduce the losses to a specified minimum level over a period of time.
Water
GoM:Phed
34
For
carrying out water auditing in production system, water meters have been installed at the
entry and exit points of both the WTP of the existing water supply project viz. GSWSP
(Phase I & II). The meters installed are PC based inline full bore electromagnetic inductive flow
meter. The details are indicated in table 2.2.8:
Table 2.2.8
Sl
Location of installation
Size
No
1.
DN 600
2.
DN 400
3.
DN 750
4.
DN 150
5.
DN 400
6.
DN 150
7.
DN 300
8.
DN 300
9.
DN 300
10.
DN 450
Though
some mechanical meters as well as inline full bore electromagnetic induction flow
meter have been installed in some primary and secondary lines of the existing project, additional
number of meters are proposed to be installed to facilitate assessment of UFW of the complete
project. Table 2.2.9 indicates the status of installation of meters on primary and secondary lines.
Table 2.2.9
Sl.
No.
Location of installation
GoM:Phed
Sizes
Type
Status
1.
DN 1000
Electromagnetic
Proposed
2.
DN 300
Electromagnetic
Proposed
3.
DN 400
Electromagnetic
Completed
4.
DN 350
Electromagnetic
Proposed
5.
DN 300
Electromagnetic
Proposed
6.
DN 300
Electromagnetic
Proposed
7.
DN 400
Electromagnetic
Proposed
th
35
8.
DN 300
Electromagnetic
Proposed
9.
DN 300
Electromagnetic
Proposed
10.
DN 300
Electromagnetic
Proposed
11.
DN 200
Electromagnetic
Proposed
12.
DN 250
Electromagnetic
Proposed
13.
DN 200
Mechanical
Completed
14.
Lachumiere reservoir
DN 150
Mechanical
Completed
15.
Lachumiere
DN 200
Mechanical
Completed
16.
DN 250
Mechanical
Completed
17.
DN 250
Mechanical
Completed
18.
DN 250
Mechanical
Completed
19.
DN 150
Mechanical
Completed
20.
DN 200
Mechanical
Completed
21.
DN 250
Mechanical
Completed
22.
DN 300
Mechanical
Proposed
23.
Barapathar reservoir
DN 150
Mechanical
Completed
24.
Mawprem reservoir
DN 150
Mechanical
Completed
20.
DN 250
Mechanical
Completed
21.
DN 350
Mechanical
Completed
In
line full bore electromagnetic induction flow meter has the advantage over mechanical type
water meter as the meter has a system capable of providing easy access of the flow in the system
through the PC at any point of time. The electromagnetic flow meters are being proposed for
installation on account of the following advantages.
No mechanical movements and hence no wear and tear, negligible maintenance cost.
No obstruction-negligible pressure drops.
Suspended solids/scaling have no effect on the performance of the meter.
Factor calibrated instruments with guaranteed with accuracy over an extensive turn down.
Stable performance over extended periods of time.
GoM:Phed
36
2.2.6.40
Consumer water meter : Consumer water meters are proposed to be installed covering the
entire supply network. All existing individual services to household and other institutions
shall be provided with water meters. It is estimated that the number of individual services to
households and other institutions would rise to about 44,000 by 2011. The project under
consideration include installation of 44,000 consumer water meters. Though consumer
meters of various types are available, meters proposed to be installed shall be of class B
magnetic meters with ISO certification. The consumer meters to be installed shall broadly
conform to the following specification.
Inferential, multijet, superdry, straight reading type, hermetically sealed with magnetic drive, brass body
and coupling.
Stainless steel cap.
Sealed against tempering
leak proof and totally dry.
The totalizer should be oriented 360
2.2.6.41
The raw water pumping stations are located about 6.5Km. away from the nearest habitation
viz. Mawphlang and about 24Km. away from the Shillong. Since the staff are to be
accommodated at the site providing residential accommodation to various categories of
Operation & Maintenance personnel viz. Technicians, Lineman, Electricians, Operators,
Watchman etc. is therefore absolutely necessary. The number of buildings for staff quarters
proposed for construction is based on appendix 13.7 of the Manual on Water Supply
and Treatment wherein a typical staff pattern for (50 to 7.5Mld system) with
conventional treatment is recommended. Since the recommendations is for a single
stage raw water pumping, the Table 2.2.10 would indicate the typical staff pattern for a
2 stage raw water pumping system in the light of the recommendations. The necessity of
having separate staff pattern for Stage II pump house located 1km away from Stage I
including clear water booster station located about 12km away from WTP is highly
necessary.
Table 2.2.10
Sl
No.
1.
2.
3.
4.
5.
6.
7.
Note :
GoM:Phed
Category of staff
Superintending
Manager (A.E.E)
Supervisor/Asst.
Manager (A.E.)
Assistant
Supervisor/Junior
Manager
Operators
Helpers/Fitters
Electrician/
Mechanic
Watchman
Stage I
Pump
house
Stage II
pump
house
Raw
water
rising
main
-
7
6
-
7
6
-
1
-
Service
reservoir
Distribution
system
7
6+2(lab)
3
4
-
3
-
1.
The above staffing pattern does not include personnel for billing, collection an accounting for water charges.
2.
Above staffing pattern includes the operating staff required for one off-day in a week for staff. Suitable
adjustments may have to be made between personnel in Pump House and Treatment works.
37
2.2.7.42
The plinth area of the Buildings proposed for construction is based on the recommendation
of the Buildings sub-committee Report 1982. The type of buildings, official entitlement and
the recommended plinth area as per the Building Sub-Committee Report 1982 is indicated
in Table 2.2.11.
Table : 2.2.11
Sl.
Type of Quarters
No.
2.2.7.43
Officials Entitlement
1.
III
90M
2.
IV
60M
3.
50M
4.
VI
33M
Though as per table 2.2.11 the number of quarters required for system component as per
flow line of the project is 62 units, a minimum of 10 units only is proposed to be
constructed. Table 2.2.12 provides total unit and plinth area of building required to be
constructed.
Table : 2.2.12
Sl
No
Category of staff
1.
J.E.
2.
Technician/Operator/Electrician/Mechanic
Total :
2.2.7.44
GoM:Phed
No. of units
proposed for
construction
Type of
Quarter
Recommended
plinth area
Total plinth
area
IV
60m
60m
50m
450m
10
510m
For raw water pumping station, a 33Kv power is available at the site near the Stage I
pumping system of GSWSP (Phase I & II), a 33/6.6Kv sub:station is proposed to be
constructed and 33/6.6Kv transformer is proposed to be installed for stepping down the
power to 6.6Kv and 33/0.415Kv for raw water pumping machineries and for low tension
supply respectively. For water treatment plant, a 33Kv power is available at the site near the
existing WTP of GSWS (Phase I & II). A 33/0.415Kv transformer is proposed to be
installed for energizing plant & machineries of the proposed WTP. For clear water pumping
station, power is proposed to be drawn from the nearest available point of SEB and the
33Kv power shall be stepped down to 6.6Kv and 0.415Kv respectively for energizing the
clear water pumping machineries and for low tension supply.
38
Design on Economic size of Rising Transmission Main for Intake Pumping Station.
1.
Water requirements
Year
Discharge
Initial
2011
0.10 mld
Intermediate
2026
8.00 mld
Ultimate
2041
24.00 mld
2.
700 m
3.
112 m
4.
Design period
30 years
5.
70%
6.
Rs.15,000 per Kw
7.
Interest rate
10%
8.
15 years
9.
Energy charges
545 paise/unit
10.
Pumping hrs.
20 hrs.
11.
Residual head
1m
Input Data
Pipe Data
At Site rate
Diameter
Type
Class
HWC
Rs./m
350
MS
GR 410
100
6917.96
400
MS
GR 410
100
8167.96
450
MS
GR 410
100
9417.96
500
MS
GR 410
100
10667.96
550
MS
GR 410
100
11920.22
600
MS
GR 410
100
13250.00
Solution
2nd 15 years
1.
Discharge at installation
0.10 Mld
8.00 Mld
2.
8.00 Mld
24.00 Mld
3.
Average discharge
4.05 Mld
16.00 Mld
4.
10.13 hrs.
13.33 hrs.
5.
1.56 *H1
4.67 *H2
20154.40 *Kw1
26540.77 *Kw2
6.
GoM:Phed
1st 15 years
39
TABLE I : Table showing velocity and loss of Head for different pipe size
Sl.
No.
Pipe
Size
in
mm
Frictional Head
Loss per 1000M
2nd
1st
stage
stage
flow
flow
Velocity in m/s
1st
stage
flow
2nd
stage
flow
Total Head in m for 700m pipe lengths including 112m of static head
Frictional
loss
Avg.
Line
pressure
Kg/cm
Frictional
loss
Avg.
Line
pressure
Kg/cm
M
7
H1
9
10
m
11
12
H2
13
14
1.
350
6.00
45.91
1.16
3.47
4.20
0.42
117.62
11.76
32.14
3.21
148.35
14.83
2.
400
3.13
23.96
0.88
2.65
2.19
0.22
115.41
11.54
16.77
1.68
131.45
13.14
3.
450
1.76
13.50
0.70
2.10
1.24
0.12
114.36
11.44
9.45
0.94
123.39
12.34
4.
500
1.06
8.08
0.57
1.70
0.74
0.07
113.81
11.38
5.66
0.57
119.22
11.92
5.
550
0.66
5.08
0.47
1.40
0.46
0.05
113.51
11.35
3.56
0.36
116.91
11.69
6.
600
0.43
3.32
0.39
1.18
0.30
0.03
113.33
11.33
2.33
0.23
115.56
11.56
150
148
146
144
142
140
138
136
134
132
400
450
500
550
600
GoM:Phed
40
TABLE II : Table showing Kilowatts required and cost of pump sets for different pipe size
Sl.
No.
Pipe
size
in
mm
Class
of
pipe
Cost of pipe
per unit
length
(Rs.)
Cost of
700 m
pipeline
(Rs. In
thousand)
10
11
1.
350
MS
118
275
4118
148
1039
15583
6918
4843
2.
400
MS
115
269
4041
131
920
13807
8168
5718
3.
450
MS
114
267
4004
123
864
12961
9418
6593
4.
500
MS
114
266
3985
119
835
12523
10668
7468
5.
550
MS
114
265
3974
117
819
12281
11920
8344
6.
600
MS
113
265
3968
116
809
12139
13250
9275
16
15
14
13
12
11
10
Cost of Pump
(Rs. in Million)
9
8
7
6
5
4
3
2
350
400
450
500
550
600
GoM:Phed
41
TABLE III: Table showing Comparative Statement of Overall Cost structure of pumping main L for Different pipe size
1st Stage Flow of 8.00 Mld
Capitalized
CapitaAnnual
total cost
lized
Energy
(Rs. in
Energy
Cost
thousands)
cost
(Rs. in
(Rs. in
thousthousands
ands)
)
Sl.
No.
Pipe
size
in
mm
Class
of
pipe
1.
350
MS
4118.39
3689.05
28059.2
32177.58
15582.85
18381.4
139810.2
37199.87
74220.02
2.
400
MS
4041.02
3619.75
27532.08
31573.09
13807.39
16287.1
123880.6
32961.41
70252.08
3.
450
MS
4004.16
3586.73
27280.94
31285.09
12961.49
15289.2
116291.2
30942.07
68819.74
4.
500
MS
3985.06
3569.62
27150.83
31135.89
12523.25
14772.3
112359.3
29895.89
68499.34
5.
550
MS
3974.48
3560.15
27078.77
31053.25
12280.55
14486
110181.8
29316.51
68713.92
6.
600
MS
3968.30
3554.61
27036.64
31004.94
12138.64
14318.6
108908.5
28977.73
69257.67
Cost of
pump Set
(Rs. in
thousands)
Cost of
pump Set
(Rs. in
thousands)
Grand total
of
capitalized
cost for 30
yrs. (Rs. in
thousands)
12
80
78
76
Capitalised Cost
(Rs. in Million)
74
72
70
68
66
350
400
450
500
550
600
REMARKS : As seen from the Graph, the most economical sizes of rising main is 500mm.
GoM:Phed
42
Ultimate demand
Hour of pumping
Combined discharge of pump in parallel
4.
5.
6.
Detention time
Capacity of CWR
Considering circular sump assuming
Area
H
d
4
d
d
Say
24.00 mld
20 hrs./day
24.00 x 24/20
28.80 mld
400 Lps
24,000 Lpm
30 min
7,20,000 Ltrs.
3.00m
240.00m
4 x 240.00/
17.48m
18.00m
0.30
x 18.00 x 18.00 x 3.30
4
839.75m
8,39,750.00 Ltrs.
Water requirements
Year
Discharge
Initial
2011
0.10 Mld
Intermediate
2026
8.00 Mld
Ultimate
2041
24.00 Mld
2.
2500 m
3.
190 m
4.
Design period
30years
5.
70%
6.
Rs.15,000per Kw
7.
Interest rate
10%
8.
15 years
9.
Energy charges
10.
Pumping hrs.
20 hrs.
11.
Residual head
1m
Input Data
Pipe Data
Diameter
350
400
450
500
550
600
GoM:Phed
At Site rate
Type
MS
MS
MS
MS
MS
MS
Class
GR 410
GR 410
GR 410
GR 410
GR 410
GR 410
HWC
Rs./m
100
100
100
100
100
100
6917.96
8167.96
9417.96
10667.96
11920.22
13250.00
43
Solution
1st 15 years
2nd 15 years
1.
Discharge at installation
0.10 Mld
8.00 Mld
2.
8.00 Mld
24.00 Mld
3.
Average discharge
4.50 Mld
16.00 Mld
4.
10.13 hrs.
13.33 hrs.
5.
1.56 *H1
4.67 *H2
20154.40 *Kw1
26540.77 *Kw2
6.
TABLE I : Table showing velocity and loss of Head for different pipe size
Sl.
No.
Pipe
Size
in
mm
Frictional Head
Loss per 1000M
1st stage 2nd stage
flow
flow
Velocity in m/s
1st stage
flow
2nd stage
flow
Total Head in m for 2500m pipe lengths including 190m of static head
1st Stage Flow
Other
Total
losses
Losses
Frictional
loss
m
11
12
H2
13
Avg.
Line
pressure
Kg/cm
14
H1
9
Avg.
Line
pressure
Kg/cm
10
15.00
1.50
207.50
20.75
114.77
11.48
317.25
31.72
2.65
7.83
0.78
199.61
19.96
59.89
5.99
256.88
25.69
0.70
2.10
4.41
0.44
195.85
19.59
33.74
3.37
228.12
22.81
8.08
0.57
1.70
2.64
0.26
193.90
19.39
20.20
2.02
213.22
21.32
0.66
5.08
0.47
1.40
1.66
0.17
192.83
19.28
12.70
1.27
204.97
20.50
0.43
3.32
0.39
1.18
1.09
0.11
192.20
19.22
8.31
0.83
200.14
20.01
Frictional
loss
M
7
1.
350
6.00
45.91
1.16
3.47
2.
400
3.13
23.96
0.88
3.
450
1.76
13.50
4.
500
1.06
5.
550
6.
600
320
310
300
290
280
270
260
400
450
500
550
600
GoM:Phed
44
TABLE II : Table showing Kilowatts required and cost of pump sets for different pipe size
1st Stage Flow of 8.00 Mld
Cost of
H1
Kw required
pump
(rounded to
(Total
nearest ten
head loss
@ Rs.15000
per Kw
including
in mm)
(Rs.in
50% standby)
thousands)
4
5
6
Cost of pipe
per unit
length
(Rs.)
Cost of
2500 m
pipeline
(Rs. In
thousand)
10
11
33324
6918
17295
1799
26983
8168
20420
228
1597
23962
9418
23545
6789
213
1493
22397
10668
26670
450
6752
205
1435
21530
11920
29801
449
6730
200
1402
21023
13250
33125
Sl.
No.
Pipe
size
in
mm
Class
of
pipe
1.
350
MS
208
484
7266
317
2222
2.
400
MS
200
466
6989
257
3.
450
MS
196
457
6858
4.
500
MS
194
453
5.
550
MS
193
6.
600
MS
192
36
32
28
24
Cost of Pump 20
(Rs. in Million) 16
12
8
4
0
350
400
450
500
550
600
GoM:Phed
45
TABLE III : Table showing Comparative Statement of Overall Cost structure of pumping main L for Different pipe size
1st Stage Flow of 8.00 Mld
Capitalize
CapitaAnnual
d total cost
lized
Energy
(Rs. in
Energy
Cost
thousands)
cost
(Rs. in
(Rs. in
thous-ands)
thousands
)
Sl.
No.
Pipe
size
in
mm
Class
of
pipe
1.
350
MS
7265.54
6508.119
49501.27
56766.82
33324.12
39308.80
298985.80
79552.35
153614.07
2.
400
MS
6989.23
6260.609
47618.69
54607.92
26983.16
31829.10
242094.40
64415.02
139442.84
3.
450
MS
6857.58
6142.687
46721.77
53579.35
23962.11
28265.50
214989.40
57203.08
134327.34
4.
500
MS
6789.38
6081.594
46257.09
53046.47
22396.96
26419.20
200946.80
53466.71
133183.08
5.
550
MS
6751.61
6047.76
45999.75
52751.35
21530.18
25396.80
193169.90
51397.50
133949.40
6.
600
MS
6729.52
6027.977
45849.27
52578.79
21023.35
24798.90
188622.60
50187.57
135891.37
Cost of
pump
Set
(Rs. in
thousands)
Cost of
pump Set
(Rs. in
thousands)
Grand total
of
capitalized
cost for 30
yrs. (Rs. in
thousands)
12
155
150
145
Capitalised Cost
(Rs. in Million)
140
135
130
350
400
450
500
550
600
REMARKS : As seen from the Graph, the most economical sizes of rising main is 500mm.
GoM:Phed
46
2.2
2.3
2.4
Column pipes
Design velocity
a.
b.
c.
d.
e.
f.
g.
h.
1.5m/s
1.00m
2.5m/s
0.300m
0.80m/s
1.00m
3.9
3.10
700Rm
500mm
100
1664.00m
3
2
1
1585.60m
1577.00m
1587.00m
30C
3.2
3.3
3.4
3.5
3.8
1577.00
1575.00m
1562.00m
Hydraulic calculations
Combined discharge of 2 pumps in parallel
3.7
8.00 Mld
20 hrs per day
2.5 to 3m/s
Say,2.75 m/s
0.300m
3.0
3.1
3.6
GoM:Phed
8.00 x 24
20
9.60 mld
0.133 m/s
0.07 m/s
102.00m
0.74m
0.074 m
0.074 m
0.034m
102.92 m 103.00 m
System resistant curves are prepared by calculating total head of flows and based on following level conditions in sump at
minimum, mean and maximum WLs. The head losses worked out are as tabulated :
Combined Q m/s.
0.06
0.07
0.08
0.09
0.10
0.11
Max. Static head
102.00 m
Mean static head
89.00 m
Min. static head
87.00 m
Friction in rising main
0.10
0.13
0.14
0.18
0.24
0.34
Friction in valves and fittings@ 10% of
0.01
0.013
0.014
0.018
0.024
0.034
(e)
Velocity head loss
0.16
0.18
0.25
0.28
0.30
0.32
Total friction (e)+(f)+(g)
0.270
0.320
0.40
0.48
0.56
0.690
47
i.
Total head
Min WL
27.54
32.64
Mean WL
24.03
28.48
Max WL
23.49
27.84
Note : Station losses in individual delivery pipe taper and
curve but should not be deducted from pumps H-Q curve.
40.80
35.60
34.80
valves are
48.96
57.12
42.72
49.84
41.76
48.72
not added for system
70.38
61.41
60.03
resistance
80
70
60
(Hstat) 50
40
30
20
0.06
0.07
0.08
0.09
0.10
0.11
Discharge Q m/sec
Min WL
Max WL
80
70
(Hstat) LWL
of Suction Sump
60
(Hstat) HWL
of Suction Sump
50
40
30
20
0.06
0.07
0.08
0.09
0.10
0.11
Discharge Q m/sec
(i)
(ii)
(ii)
4.0
Option
a.
b.
c.
d.
e.
f.
Type
Vertical turbine or Hor. End-suction
Hor. Double Suction
Vertical turbine
Vertical turbine
Vertical turbine
Vertical turbine
Stages
1
1
2
3
4
6
Suctions
1
2
1
1
1
1
Speed
1400,980
1400,980
1400,980
1400,980
1400,980
1400,980
Out of the above available options, 4 stage single suction 1400Rpm Vertical turbine pump under option (e) appears to be
the most suitable choice to provide a maximum and stable efficiency. The calculations are as under.
4 stage single suction, 1400Rpm
H, Head per stage = 112./4 =28m
Nq = 3.65 NxQ0.5/H0.75 = 3.65x1400x(0.07)0.5/(28)0.75 = 111
Attainable efficiency as per the curve = 75%
GoM:Phed
48
2.2.8.5
GoM:Phed
8.00 Mld
20 hrs per day
3.30m
1664.00m
1661.50m
1661.00m
2500m
500mm
100
1847.00m
3
2
1
1661.00m
30C
1.5m/s
1.00m
Say 1000mm
49
2.2
2.3
3.
3.1
3.2
3.3
3.4
3.5
2.5m/s
0.300m
Say 300mm
0.8m/s
1.00m
Say 1000mm
Hydraulic calculations
Combined discharge of 2 pumps in parallel 8.00x24/20
9.60 mld
Rate of total flow with 20 hrs running of pumps per day
0.133 m/s
Discharge of each pump
0.07 m/s
Static Delivery Head (1847.00 1664.00)m
183 m
Frictional loss in straight pipe of rising main for combined
discharge.
2.64m
Frictional losses in bends, valves & in rising main @ 10%
of(3.5)
0.264m
Frictional loss in taper, delivery valve, NRV & individual
delivery pipe of Nb 450mm
0.264m
Velocity head lost at atmosphere at the exit, as v/2g, where v
= 0.875 m/s
0.030m
Static Suction Head (1664.00 1661.00)m
3.00m
Head Loss at entrance to bellmouth
Hi = 0.05 V/2g
0.30m
Head Loss in discharge bend/tee
0.40m
Margin between duty head and shut off head
6.00m
Total head = (3.4) + (3.5) + (3.6) + (3.7) + (3.8) - (3.9) +
(3.10) + (3.11) + (3.12)
189.90m
Thus, design duties and Head variation shall be as under :
Discharge Q = 0.07m/s i.e. 70 l/s
Duty
H = 190.10m 190.00m
head
Head range : Pump should be suitable for operation in all variations from solo operation to 2 pumps in parallel and
level variation in sump from min. WL to max. WL
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
(i)
(ii)
(iii)
4.
Option
a.
b.
c.
d.
Type
Hor. End-suction
Hor. End-suction
Hor. End-suction
Hor. End-suction
Stages
1
2
3
4
Suctions
1
1
1
1
Speed
2900, 1400, 980
2900, 1400, 980
2900, 1400, 980
2900, 1400, 980
Out of the above available options, 2 stage single suction 1480Rpm Horizontal End Suction pump under option (b)
appears to be the most suitable choice to provide a maximum and stable efficiency. The calculations are as under.
2 stage single suction, 1400.00 Rpm
H, Head per stage = 190.00/2= 95 m
Nq = 3.65 NxQ0.5/H0.75 = 3.65x1400x(0.07)0.5/(95.00)0.75 = 45 Rpm
Attainable efficiency as per the curve = 65 %
5.
(a)
(b)
6.
(a)
GoM:Phed
50
Input power
190x70x60 = 217.32Kw 220 Kw
6120x0.60
Power loss in bearings
15 Kw
Input to pump
235 Kw
As the pump is designed to develop the required discharge pressure at a speed of 1400Rpm
correspond to a motor speed when connected to a power system with a frequency of 47.50Hz., the
motor capacity should have ample margin of power to take care in the event of sudden increase in
the input power to pumps, when speed suddenly shoots up as a result of sudden fluctuation in the
frequency of power system to the upper limit of 51.50Hz.. Taking this into consideration, 30%
margin of power is provided in the motor and considering the commercial rating, the power rating
of motor shall be
315 Kw
As motor are to be installed in doors, SPDP motors with IP 23 protection and voltage rating of 6.6Kv is adopted to
facilitate O&M
2.2.8.6
2.2.8.7
20 hrs.
30 sec.
0.3 m
0.5 hrs.
2.25 hrs
2.0%
5.5m/m/hr
36m/m/hr
Duration of backwash
10 minutes/day
Distribution loss
10%
1 nos.
30 sec.
0.3m
(Range = 30 to 60 sec)
(Range = 2 to 2.5)
(Range = 4.5 to 6)
GoM:Phed
51
Sl.
No.
Rate of flow
(m/hr)
Depth required
(m)
Design depth
(m)
1.
400.00
0.600
2.30
2.240
2.50
:
:
:
1
0.9m/sec
400.00m/hr.
Sl.
No.
Rate of flow
(m/hr)
1.
400.00
0.111
0.588
600
Sl.
No
Rate of
flow
Flow
through
each
clarifier
Volume of
flocculator
Area
required
for
flocculator
(m/hr.)
(m/hr.)
(m)
400.00
400.00
200.00
:
:
:
:
:
:
:
:
:
1
0.5 hrs.
3.8m
3.5m
0.9m
1.32m
24.882m/m/day
0.125m
0. 5m
Required
dia. of
flocculator
Design
dia. of
flocculator
Outer dia.
of
flocculator
Area
required
for
clarifier
Total area
required for
clariflocculator
Required dia.
of
clariflocculator
(m)
Area of
flocculator
including
central
shaft
(m)
(m)
(m)
(m)
(m)
(m)
(m)
52.63
53.95
8.28
8.30
8.55
257.14
311.09
20.00
Inner diameter of
weir (m)
Perimeter of weir
(m)
Weir loading
(m/m)
Volume of clarifier
(m)
19.00
60.00
209.43
1028.56
2.50
GoM:Phed
:
:
300 (m/m)
2.25 hr.
:
:
:
:
1
2%
5.5m/m/hr
50m
OK
OK
52
Sl.
No.
Rate of flow
(m/hr)
Loss in clarifier
(m/hr)
Input to filter
(m/hr)
No. of bed
required
No. of beds
provided
400.00
8.00
392.00
71.27
1.42
2 Nos.
2 Nos. of filters are proposed to be provided. Each filter will be made up of 2 sections. Each section will be
5.80mx4.30m, having and area of 24.94m
:
:
:
5.5x24.94x2
274.34m/hr.
0.076m/sec
In designing inlet pipe the discharge is taken as twice the actual to provide 100% overload
Diameter of inlet pipe
2(0.076m/sec)x4
2
0.097
300mm
:
:
:
5.5x24.94
137.17m/hr.
0.038m/sec
2(0.038m/sec)x4
2
0.22
250mm
: 3x8.00(106x160x7x30+106x100x5x30)
12 10
106
106
:
92.20 Mt
53
:
:
:
:
:
:
:
:
:
:
:
:
20.83m
4.56m x 4.56m each
8.00x10x80x10-3x7x30+8.00x10
x50x10-3x5x30
194400 Kg
194.40 t
1.4t/m
2.00m
194.40
2.00x1.4
69.43m
20%
83.31m
9.12m x 9.12m
:
:
5.5mx5.5m
2mx3.5m
:
:
:
8.00x10x160x10-3
1280 Kg/day
1.28 t/day
:
:
:
:
:
:
:
:
5%
25.60 m
25.60/4
6.40 m
1.5m
4.26m
2.06m x 2.06m x 1.50m
2.06m x 2.06m x 1.50m
(with 300mm freeboard)
:
:
:
:
8.00 x 10 x 80 x 10-3
640.00 Kg/day
0.64 t/day
1.50%
i.e
Solution Tank:
a) Alum
Requirement of alum
i.e.
Considering strength of solution
Volume of solution required
Volume of each tank
Assuming height of tank
Area of tank required
Size of tank required
Provided 4 tanks of size
b) Lime
Volume of lime solution required
200
2x1.4
71.36m
54
4.27m
:
:
:
:
:
:
4.27/2
2.13m
1.50m
1.42m
1.20m x 1.20m x 1.50m
1.20m x 1.20m x 1.50m
:
:
5x50
250Kg/day
d) Polyelectrolyte Tank
Considering polyelectrolyte requirement @ 1ppm
Strength
Flow
Alum required
Consider holding capacity
Volume of tank required
Considering height
Area required
Diameter required
:
:
:
:
:
:
:
:
10%
400.00m/hr.
400.00Kg/hr.
12 hrs.
2.5Kg/hr/hr
1.5m
1.67m
1.29m
:
:
8.00 Mld
2.50hr.
Capacity of
reservoir (m)
No. of reservoir
Diameter
(m)
Depth
(m)
833
20.60
3.0
3.30
:
:
:
:
400.00m/hr
2m/sec
0.60m
400.00/0.60/3600
55
Area of flow
Wetted perimeter
Hydraulic radius
Length of channel
Mannings coefficient
0.20m
:
:
:
:
:
:
:
:
0.20x0.60
0.120m
2.x0.12+0.60
0.84m
0.120m/0.84
0.143m
20m
0.015 (for sand and cement plaster
finish, refer table 6.2 of CPHEEO
manual)
0.01406m/m
1 in 71
0.281m
1847.00m
1846.50m
0.5m
Hence OK
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
30m
600mm
400.00m/hr.
400.00/(3600x0.785x0.6^2)
0.40 m/sec
1.60m/Km (from modified Hazen
Williams chart, appendix 6.3 or
from the formula given in article
6.2.4 CPHEEO manual)
1.60x30/1000
0.048m
3 nos.
:
:
:
:
:
:
:
:
:
:
0.8
:
KV^2/2/g
0.8x1.028^2/2/g
0.043m
0.043x3
0.129m
0.177m
1844.00m
1846.50m
1843.00m
1846.20m
0.3m
Hence OK
:
:
:
:
:
:
400.00m/hr
1m/sec
400.00/1/0.45/3600/2
0.40m
0.45x0.40
0.18m
GoM:Phed
56
Wetted perimeter
Hydraulic radius
Length of channel (half perimeter of clariflocculator)
Mannings coefficient
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
2.x0.40+0.45
1.25m
0.18/1.25
0.144m
30.00m
0.015 (for sand and cement plaster
finish, refer table 6.2 of CPHEEO
manual)
0.00339m/m
1 in 295
0.207m
0.20m
1846.20m
0.10m
1845.90m
0.30m
1845.50m
1845.20m
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
400.00m/hr.
2m/sec
0.40m
400.00/1/0.4/3600
0.40m
0.40x0.40
0.160m
2x0.40+0.4
1.20m
(0.160/1.20)
0.133
15m
0.015 (for sand and cement plaster
finish, refer table 6.2 of CPHEEO
manual)
0.01406m/m
1 in 71
0.210m
1842.40m
1845.90m
1841.90m
1843.90m
1.79m
Hence OK
:
:
:
:
15m
500mm
400.00m^3/hr.
400.00/(3600x0.785x0.5^2)
57
:
:
:
:
:
1.00m/s
4.00m/Km(from modified Hazen
Williams chart, appendix 6.3 or
from the formula given in article
6.2.4 CPHEEO manual)
4.00x1.5/1000
0.06m
3 nos.
:
:
:
:
:
:
0.8
KV^2/2/g
0.8x3.63^2/2/g
0.53m
0.53x3
1.6m
:
:
:
:
:
:
:
1.66m
1841.90m
1843.90m
1840.80m
1834.00m
1837.40m
1.74m
Hence OK
GoM:Phed
1.
i)
ii)
iii)
2.
i)
Intermediate
1 no.
1 set
1 set
2 sets
ii)
50mm MS rubber lined wall pipe for solution and sludge outlet.
2 nos.
iii)
50mm C.I. rubber lined diaphragm valve for solution and sludge.
2 nos.
iv)
2 range
58
v)
2 range
vi)
Stainless steel 50mm inlet float valve with PVC float and
adjustable stem for maintaining a constant level in the dosing tank
at any preset head
2 nos.
vii)
viii)
Lining of wetted surface of alum tank and alum dosing tank with
chlorinated rubber paint or bitumen.
ix)
2 nos.
2 item
2 sets
2 sets
xi)
MS sheet, lime receiving tray with excess flow back lime and dose
regulating adjustable V-Notch and dose diluting hopper
2 sets
xii)
2 ranges
xiii)
G.I. service water piping from wash water tank to units in chemical
house.
2 ranges
xiv)
1 no.
xv)
1 no.
x)
Flash mixer
i)
ii)
4.
Clarifier-cum-flocculator
i)
ii)
iii)
iv)
GoM:Phed
1 no.
1 set
1 no.
1 set.
1x1 set.
1x4 sets.
59
v)
1x4 sets
vi)
1x1 no.
vii)
Current transfer slip ring unit at central pivot and one carriage on
clarifier wall.
1 no.
viii)
ix)
1x1 range
1x1 range
x)
Filters.
i)
6 nos.
ii)
6 nos.
iii)
3 nos.
iv)
Wash waste wall pipe C.I. 400mm flanged and plain end.
3 nos.
v)
Filter outlet wall pipe C.I. 250mm flanged and plain end.
6 nos.
vi)
6 nos.
vii)
6 nos.
6 nos.
Outlet control valve 350mm outlet and twin 250mm inlet with
control fittings.
3 nos.
x)
6 nos.
xi)
100mm butterfly valve for filter rinse with motorize actuator and
position indicator
3 nos.
3 nos.
3 nos.
viii)
ix)
xii)
xiii)
GoM:Phed
1x1 range.
60
xiv)
xv)
Underdrain comprising:
3 sets.
R.C.C. Tees
A.C. strainer
xvi)
xvii)
C.I. wash main 400mm from wash water tank to wash inlet valve of
10 filters.
xviii)
1 set.
6 lines
xix)
xx)
Air blower of 500 cfm capacity at 5 psi complete with motor and
accessories and pneumatically operated bypass valve.
xxi)
xxii)
80mm C.I. air valve with motorize actuator and position indicator.
xxiii)
xxiv)
xxv)
1 no.
1 range.
6 nos.
1 no.
3 nos.
(a)
6 nos.
(b)
6 sets.
Sterilization.
i)
1 set.
1 no.
i)
Scour outlet short pipe with C.I. sluice valve with hand wheel,
150mm size
ii)
1 no.
1 lot
iii)
GoM:Phed
1 range
ii)
1 lot
2 nos.
61
i)
2 nos.
ii)
2 nos.
iii)
1 no.
iv)
4 nos.
v)
1 no.
1 No.
1.
2.
3.
Ultimate demand
Hour of pumping
Combined discharge of pump in parallel
4.
5.
6.
Detention time
Capacity of CWR
Considering circular sump assuming
Area
H
d
4
d
d
Say
GoM:Phed
4.98 mld
20 hrs./day
4.98 x 24/20
5.98 mld
83.00 Lps
4980 Lpm
30 min
1,49,400 Ltrs.
3.00m
49.80m
4 x 49.80/
7.96m
8.00m
0.30
x 8.00 x 8.00 x 3.30
4
165.88m
1,65,880.00 Ltrs.
62
Water requirements
Year
Discharge
Initial
2011
3.28
Intermediate
2026
4.36
Ultimate
2041
4.98
2.
6570 m
3.
163 m
4.
Design period
30years
5.
70%
6.
Rs.12,000 per Kw
7.
Interest rate
10%
8.
15 years
9.
Energy charges
10.
Pumping hrs.
20 hrs.
11.
Residual head
1m
Input Data
Pipe Data
Diameter
Type
Class
HWC
Rs./m
200
DI
K9
140
2402.06
250
DI
K9
140
3156.97
300
DI
K9
140
3921.89
350
DI
K9
140
4992.31
400
DI
K9
140
5989.16
450
DI
K9
140
7131.78
Solution
1st 15 years
1.
Discharge at installation
3.28 Mld
4.36 Mld
2.
4.36 Mld
4.98 Mld
3.
Average discharge
3.82 Mld
4.67 Mld
4.
17.52 hrs.
5.
0.85 *H1
0.97 *H2
34880.42 *Kw1
37332.96 *Kw2
6.
GoM:Phed
At Site rate
2nd 15 years
18.76 hrs.
combined
63
TABLE I : Table showing velocity and loss of Head for different pipe size.
Sl.
No.
Pipe
Size
in
mm
Frictional Head
Loss per 1000M
Velocity in m/s
1st stage
flow
2nd stage
flow
1st stage
flow
2nd stage
flow
Total Head in m for 6570m pipe lengths including 163m of static head
Frictional
loss
m
11
12
H2
13
Avg.
Line
pressure
Kg/cm
14
H1
9
Avg.
Line
pressure
Kg/cm
10
104.90
10.49
279.39
27.94
134.19
13.42
311.61
31.16
1.41
35.38
3.54
202.92
20.29
45.26
4.53
213.78
21.38
0.86
0.98
14.56
1.46
180.01
18.00
18.62
1.86
184.48
18.45
1.34
0.63
0.72
6.87
0.69
171.56
17.16
8.79
0.88
173.67
17.37
0.55
0.70
0.48
0.55
3.59
0.36
167.94
16.79
4.59
0.46
169.05
16.90
0.31
0.39
0.38
0.44
2.02
0.20
166.22
16.62
2.58
0.26
166.84
16.68
Frictional
loss
M
7
1.
200
15.97
20.42
1.93
2.20
2.
250
5.39
6.89
1.23
3.
300
2.22
2.83
4.
350
1.05
5.
400
6.
450
320
300
280
260
200
180
160
200
250
300
350
400
450
GoM:Phed
64
TABLE II : Table showing Kilowatts required and cost of pump sets for different pipe size.
1st Stage Flow of 4.36 Mld
Cost of
H1
Kw required
pump
(rounded to
(Total
nearest ten
head loss
@ Rs.12000
per Kw
including
in mm)
(Rs.in
50% standby)
thousands)
4
5
6
Cost of pipe
per unit
length
(Rs.)
Cost of
6570 m
pipeline
(Rs. In
thousand)
10
11
5434
2402
15782
311
3728
3157
20741
184
268
3217
3922
25767
2619
174
252
3028
4992
32799
214
2564
169
246
2948
5989
39349
211
2538
167
242
2909
7132
46856
Sl.
No.
Pipe
size
in
mm
Class
of
pipe
1.
200
DI
279
355
4265
312
453
2.
250
DI
203
258
3098
214
3.
300
DI
180
229
2748
4.
350
DI
172
218
5.
400
DI
168
6.
450
DI
166
2
200
250
300
350
400
450
GoM:Phed
65
TABLE III : Table showing Comparative Statement of Overall Cost structure of pumping main L for Different pipe size.
1st Stage Flow of 4.36 Mld
Capitalized
CapitaAnnual
total cost
lized
Energy
(Rs. in
Energy
Cost
thousands)
cost
(Rs. in
(Rs. in
thousthousands
ands)
)
nd
Sl.
No.
Pipe
size
in
mm
Class
of
pipe
1.
200
DI
4265.21
8265.12
62865.16
67130.37
5433.50
11269.4
85715.73
21820.40
104732.31
2.
250
DI
3097.76
6002.84
45658.1
48755.86
3727.74
7731.52
58806.57
14970.22
84467.37
3.
300
DI
2748.10
5325.27
40504.4
43252.49
3216.84
6671.9
50746.98
12918.51
81937.82
4.
350
DI
2619.02
5075.14
38601.89
41220.91
3028.24
6280.73
47771.77
12161.12
86181.50
5.
400
DI
2563.85
4968.23
37788.75
40352.60
2947.63
6113.55
46500.15
11837.41
91538.79
6.
450
DI
2537.57
4917.3
37401.35
39938.91
2909.23
6033.9
45894.3
11683.18
98477.88
Cost of
pump Set
(Rs. in
thousands)
Cost of
pump Set
(Rs. in
thousands)
Grand total
of
capitalized
cost for 30
yrs. (Rs. in
thousands)
12
110
105
100
Capitalised Cost
(Rs. in Million)
95
90
85
80
200
250
300
350
400
450
REMARKS : As seen from the graph, the most economical sizes of rising main is 300mm.
GoM:Phed
66
2.2.8.10 Design calculations for a pumping plant of Clear water rising main for 6th Mile
to Laitkor.
1.
1.1
1.2
1.3
1.3.1
1.3.2
1.3.3
1.4
1.4.1
1.4.2
1.4.3
1.5
1.6
1.6.1
1.6.2
1.7
1.8
1.9
1.10
2.
2.1
2.2
2.3
3.
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
(i)
(ii)
(iii)
GoM:Phed
4.36 Mld
20 hrs per day
4.50 m
1775.00 m
1771.50 m
1772.00 m
6570 m
0.30m
140m
1935.00m
3
2
1
1772.00m
30C
1.5m/s
0.60m
Say 600mm
2.5m/s
1.50m
Say 150mm
0.8m/s
0.60m
Say 600mm
Hydraulic calculations
Discharge of pumps 4.36 x 24/20
5.22 mld
Rate of total flow with 20 hrs running of pumps per day
0.07 m/s
Discharge of each pump
0.04 m/s
Static Delivery Head (1935.00 1772.00)m
163 m
Frictional loss in straight pipe of rising main for combined 14.56 m
discharge.
Frictional losses in bends, valves & in rising main
1.456 m
@ 10% of(3.5)
Frictional loss in taper, delivery valve, NRV & individual 1.456 m
delivery pipe
Velocity head lost at atmosphere at the exit, as v/2g,
0.03m
where v = 0.875 m/s
Static Suction Head (1775.00 1772.00)m
3.00m
Head Loss at entrance to bell mouth
Hi = 0.05 V/2g
0.006m
Head Loss in discharge bend/tee
0.57m
Margin between duty head and shut off head
6.00m
Total head = (3.4) + (3.5) + (3.6) + (3.7) + (3.8) - (3.9) + (3.10)
+ (3.11) + (3.12)
184.08 m
Thus, design duties and Head variation shall be as under :
Discharge Q = 0.04m/s i.e. 40 l/s
Duty
H = 184.08m 184.00m
head
Head range : Pump should be suitable for operation in all variations from solo operation to 2 pumps in parallel and level
variation in sump from min. WL to max. WL
67
4.
Option
a.
b.
c.
d.
Type
Hor. End-suction
Hor. End-suction
Hor. End-suction
Hor. End-suction
Stages
1
2
3
4
Suctions
1
1
1
1
Speed
2900, 1400, 980
2900, 1400, 980
2900, 1400, 980
2900, 1400, 980
Out of the above available options, 2 stage single suction 1400Rpm Horizontal End Suction pump under option (d)
appears to be the most suitable choice to provide a maximum and stable efficiency. The calculations are as under.
2 stage single suction, 1400.00 Rpm
H, Head per stage = 184.00/2 = 92.00 m
Nq = 3.65 NxQ0.5/H0.75 = 3.65x1400x(0.04)0.5/(92.00)0.75 = 35 Rpm
Attainable efficiency as per figure 11.1 = 64 %
5.
(a)
(b)
6.
(a)
GoM:Phed
15 Kw
140 Kw
170 Kw
6.6Kv is adopted to
68
2.
From
Mawphlang WTP
Reservoir at 6th mile
Jc bifur at Lumshyiap
Jc bifur at Lumshyiap
Reservoir at 6th mile
Reservoir at 6th mile
Rilbong
Rilbong
Reservoir at 4 mile
Junction to Jhalupara
Junction to Iewrynghep
Junction to Iewrynghep
Reservoir at Laitkor
To
Dia.
(mm)
1000
300
200
250
250
200
100
150
150
150
150
100
200
Reservoir at 4 Mile
Jc bifur at Lumshyiap
Reservoir at Lumshyiap
Reservoir at Nongmynsong
Reservoir Nongthymmai
Rilbong
Jhalupara
Rhino area
Junction to Jhalupara
Junction to Iewrynghep
Nongkwar
Iewrynghep
Reservoir at Madanrting
Length
(m)
13500.00
9530.00
337.00
4170.00
8000.00
4750.00
400.00
5600.00
2730.00
4180.00
760.00
146.00
3960.00
:
:
32.97Mld
1834.00m
Ref: Long section of Clear water Feeder Main and Table 2.2.13
Table : 2.2.13
Sl.No.
800mm
Hydraulic Level
m
900mm
1000mm
1821.40
1827.04
1829.96
1827.00
1821.02
1826.83
1829.84
2429.00
1826.00
1820.73
1826.67
1829.74
4.
2932.00
1831.00
1817.98
1825.16
1828.85
5.
2976.00
1835.00
1817.74
1825.03
1828.77
6.
3047.00
1834.00
1817.35
1824.82
1828.65
Chainage
m
R.L. of ground
m
1.
2305.00
1825.00
2.
2375.00
3.
Options :
DI pipe 800mm dia, 900mm dia and 1000mm dia were opted to compute the feasibility of the main for possible
transmission of the required quantity of clear water from the clear water storage reservoir at Mawphlang to 4 Mile
Upper Shillong.
Summary :
GoM : Phed
In between the sending end at Mawphlang and the receiving end at 4 Mile Upper Shillong the alignment for the main
passes through 6 humps at chainage 2305.00m, 2375.00m, 2429.00m, 2932.00m, 2976.00m, 3047.00m before the exit
point.
As seen from the table above, utilization of 800mm & 900mm dia pipes would not be feasible in view of high cost
involved in excavations of pipe trench to the required level to facilitate the flow of water.
69
3.
Length
Population
(2041)
Population
to be
benefited
by the line
Water
demand
Quantity of
water
already
available
Balance
quantity to be
supplied
(Discharge)
Size of pipe
Frictional head
loss/1000m
(m)
2
mile to Jc bifur at
9530
66,817
66,817
337
43,876
4170
22,941
Spot level
Level of hydraulic
gradient line
Terminal pressure
(Kld)
5
(Kld)
6
(Kld)
7 (5-6)
(mm)
8
(m)
9
(m)
10
11
12
13
10,373.34
1640.00
8733.34
300
12.00
115.28
A: 1775
B : 1471
1659.72
188.72
43,876
6,811.75
1400.00
5411.75
200
34.00
11.55
Reservoir at Lumshyiap
C : 1495
1648.17
153.17
22,941
3,561.59
240.00
3321.59
250
4.50
18.92
Reservoir at Nongmynsong
1640.80
30.80
Zone - VII, XI
Reservoir at 6th
Lumshyiap
D: 1610
Zone - V
Reservoir at 6th mile to reservoir at
Nongthymmai site (V)
8000
50,146
50,146
7,785.17
1800.00
5985.17
250
13.00
104.83
A: 1775
F : 1656
1670.17
14.17
4750
20,415
20,415
3,169.43
3169.43
200
12.90
61.77
A : 1775
H : 1472
1713.23
241.23
Rilbong to Jhalupara
400
8415
8415
1,306.43
1306.43
100
65.00
26.21
Jhalupara
I : 1494
1687.02
193.02
5600
12,000
12,000
1,863.00
1863.00
150
19.50
110.07
Rhino
J : 1533
1603.16
70.16
2730
14,719
14,719
2,285.13
2285.13
150
28.00
77.05
Reservoir at 4 mile
Jn Jhalupara
K : 1714
U : 1494
1636.95
142.95
Zone XIX
mile to JN to
JN to Jhalupara to JN to Iewrynghep
4180
14,719
14,719
2,285.13
2285.13
150
28.00
117.98
Jn Iewrynghep
N : 1408
1518.97
110.97
JN to Iewrynghep to reservoir at
Nongkwar site.
760
11,719
11,719
1,819.38
1819.38
150
19.50
14.94
Reservoir Nongkwar
M : 1442
1504.03
62.03
JN to Iewrynghep to reservoir at
Iewrynghep site.
146
3000
3000
465.75
465.75
100
11.50
1.69
Reservoir at Iewrynghep
O : 1434
1502.34
68.34
3960
32,083
32,083
4,980.89
200.00
4780.89
200
27.00
107.78
Reservoir at Laitkor
Reservoir at Madanrting
Q :1908
R :1734
1800.22
66.22
Zone : XII
Reservoir at Laitkor to reservoir at
Madanrting (XII)
GoM : Phed
70
2.2.8.12
Period in hours
Hourly Demand
Cumulative
demand
Cumulative
pumping
Cumulative deficit or
surplus
04-05
0.40a
0.40a
1.20a
(+) 0.80a
05-07
0.80a
2.00a
3.60a
(+) 1.60a
07-10
2.25a
8.75a
7.20a
(-) 1.55a
10-12
10.75a
9.60a
(-) 1.15a
12-13
0.60a
11.35a
10.80a
(-) 0.55a
13-16
0.70a
13.45a
14.40a
(+) 0.95a
16-19
2.25a
20.20a
14.40a
(-) 5.80a
19-20
0.90a
21.10a
14.40a
(-) 6.70a
20-22
0.70a
22.50a
16.80a
(-) 5.70a
22-23
0.40a
22.90a
18.00a
(-) 4.90a
23-03
0.20a
23.70a
22.80a
(-) 0.90a
03-04
0.30a
24.00a
24.00a
0.00a
20
Maximum
cumulative
surplus
Maximum cumulative
deficit
Capacity of storage
reservoir
1.60a
6.70a
8.30a
Water requirement
Storage reservoir required
GoM:Phed
Capacity of storage
reservoir in litres
Substituting values of
a = 3.3118ML.
= 7,94,86,448 lpcd
= 2,75,00,000 litres
71
Type of
reservoir
Location
Ref.
Point
2.
2
Main
Main
3
6 Mile
4 Mile
4
-
5
-
3.
Zonal
Zone I
Zone II
1.
4.
Designed
population
(2041)
Total demand
Including
15% UFW
@ 135 Lpcd
Existing
reservoir
capacity
8
-
(Ml)
9
-
Capacity of
storage
reservoir
required
8.30(a)
(Ml)
10
-
(Ml)
11
2.90
12
3.30
-
13
RCC
-
Peak factor
24
Proposed capacity
of storage
reservoir
Type of
construction
Height
of reservoir
(m)
14
6.00
(m)
15
4.00
-
16
4.30
-
4.00
4.00
4.30
4.30
(Ml)
6
-
7
-
20,305
31,52,351
2.25
0.1313
1.09
1.16
Lachumiere Secretariat
23,495
36,46,046
2.25
0.1519
1.26
1.12
0.14
Height
of
reservoir with free
board
(m)
Staging
Height
5.
Zone III
Laitumkhrah
34,477
53,52,554
2.25
0.223
1.85
0.23
1.12
RCC
RCC
6.00
6.
Zone IV
22,768
35,34,732
2.25
0.1473
1.22
3.75
RCC
4.00
4.30
4.00
4.30
3.00
50,146
77,85,167
2.25
0.3244
2.69
3.38
RCC
7,920
12,29,580
2.25
0.0512
0.43
0.34
0.09
RCC
6.00
4.00
4.30
43,876
68,11,749
2.25
0.2838
2.36
1.00
RCC
6.00
4.00
4.30
Mawlai
50,756
78,79,869
2.25
0.3283
2.73
1.39
0.84
RCC
3.00
4.00
4.30
91,748
1,42,43,877
2.25
0.5935
4.93
1.25
1.03
RCC
3.00
4.00
4.30
4.00
4.00
4.30
7.
Zone V
Nongthymmai, Pohkseh
8.
Zone VI
9.
Zone VII
10.
Zone VIII
11.
Zone IX
12.
Zone X
91,070
1,41,38,618
2.25
0.5891
4.89
0.34
1.17
RCC
13.
Zone XI
Nongmynsong
22,941
35,61,590
2.25
0.1484
1.23
1.23
RCC
3.00
4.00
4.30
14.
Zone XII
32,083
49,80,886
2.25
0.2075
1.72
1.72
RCC
2.00
4.00
4.30
15.
Zone XIII
20,415
31,69,429
2.25
0.1321
1.10
RCC
4.00
4.30
5,12,000
7,94,86,448
3.3118
27.50
15.86
11.64
Total :
GoM : Phed
72
g,
,
i
C:=J
C:=J
_
C:=J
C:=J
C:=J
C:=J
Town under SUA and area covered by GSWSP (Phase I & II)
o
<;l
O.2km
O.3km
GoM:PHED
Legends
c::::J
c::::J
g,
,
i
Zone - I
Zone - II
Zone-ill
Zone-IV
c::::J
Zone - V
Zone-VI
c::::J
Zone - VII
Zone-Vill
Zone-IX
c::::J
c::::J
c::::J
Zone - X
Zone - XI
Zone - XII
:;;!
O.2km
O.3km
GoM:PHED
2.2.8.14
GoM : Phed
2. Zone II
Lachumiere Secretariat
3. Zone III
Laitumkhrah
4. Zone IV
5. Zone V
Nongthymmai, Pohkseh
6. Zone VI
7. Zone VII
8. Zone VIII
Mawlai
9. Zone IX
10. Zone X
11. Zone XI
Nongmynsong
75
g,
,
i
Legends
Pipeline
Road
Zone Boundary
Reservoir
Distribution Network - Zone - I: Police Bazar, Jail Road, Oakland & Assembly Areas
o
.Ol2km
.Ol8km
GoM:PHED
GoM : Phed
Pipe No.
Node No.
500
450
400
200
150
100
20.00
37.00
104
4.
10.00
5.
89.00
6.
10
83.00
7.
10
11
10
100.00
8.
11
12
11
95.00
9.
12
13
12
72.00
10.
13
13
75.00
11.
12
14
14
28.00
12.
14
15
15
22.00
13.
15
17
17
100.00
14.
17
18
118.00
15.
12
18
19
118.00
16.
18
19
20
82.00
17.
19
20
21
113.00
18.
20
21
22
69.00
19.
21
22
23
47.00
20.
22
23
24
79.00
21.
23
24
25
76.00
22.
24
25
26
103.00
23.
25
10
27
40.00
24.
25
26
28
77.00
From
To
1.
2.
3.
77
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
29
72.00
28
30
44.00
28
23
31
78.00
28.
21
29
32
91.00
29.
29
30
33
77.00
30.
30
31
34
121.00
31.
31
32
35
95.00
32.
32
33
36
37.00
33.
32
34
37
44.00
34.
34
35
38
79.00
35.
35
36
39
50.00
36.
36
37
40
50.00
37.
37
38
41
46.00
38.
38
19
42
3.00
39.
38
39
43
69.00
40.
39
40
44
48.00
41.
40
33
45
47.00
42.
39
41
46
51.00
43.
41
37
47
57.00
44.
35
42
48
185.00
45.
42
43
49
83.00
46.
43
15
50
89.00
47.
43
44
51
54.00
48.
44
14
52
58.00
49.
44
45
53
65.00
50.
45
37
54
67.00
51.
46
55
62.00
From
To
25.
26
27
26.
27
27.
78
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
56
84.00
48
57
48.00
48
49
58
98.00
55.
49
50
59
130.00
56.
50
51
60
59.00
57.
51
52
61
49.00
58.
52
47
62
73.00
59.
50
53
63
59.00
60.
53
54
64
24.00
61.
54
51
65
83.00
62.
54
55
66
28.00
63.
55
56
67
82.00
64.
56
57
68
48.00
65.
57
58
69
50.00
66.
58
59
70
42.00
67.
59
60
71
52.00
68.
60
55
72
39.00
69.
59
61
73
30.00
70.
61
62
74
64.00
71.
62
63
75
106.00
72.
63
64
76
64.00
73.
64
27
77
136.00
74.
63
65
78
34.00
75.
65
66
79
66.00
76.
66
67
80
89.00
77.
67
27
81
72.00
78.
65
68
82
68.00
From
To
52.
46
47
53.
47
54.
79
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
83
64.00
70
84
40.00
70
71
85
19.00
82.
71
72
86
54.00
83.
72
75
89
35.00
84.
75
76
90
53.00
85.
76
77
91
55.00
86.
77
78
92
56.00
87.
78
66
93
70.00
88.
78
79
94
15.00
89.
79
75
95
134.00
90.
79
70
96
61.00
91.
69
80
97
103.00
92.
80
81
98
70.00
93.
81
82
99
120.00
94.
82
83
100
58.00
95.
83
62
101
10.00
96.
83
84
102
65.00
97.
84
85
103
75.00
98.
85
86
104
53.00
99.
86
87
105
65.00
100.
87
88
106
73.00
101.
88
89
107
108.00
102.
89
80
108
29.00
103.
85
90
109
37.00
104.
90
57
110
84.00
105.
90
91
111
56.00
From
To
79.
68
69
80.
69
81.
80
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
112
107.00
94
114
101.00
94
95
115
137.00
109.
95
96
116
81.00
110.
96
97
117
88.00
111.
97
87
118
112.00
112.
95
98
119
69.00
113.
98
99
120
99.00
114.
99
100
121
120.00
115.
100
101
122
134.00
116.
101
102
123
100.00
117.
102
103
124
75.00
118.
103
104
125
81.00
119.
104
105
126
68.00
120.
105
106
127
139.00
121.
106
107
128
103.00
122.
107
108
129
151.00
123.
108
109
130
98.00
124.
109
112
133
133.00
125.
112
98
16
1000.00
20.00
99.00
1208.00
8687.00
From
To
106.
91
92
107.
92
108.
Total :
81
ZONE-I
C;~)
1. Police Bazar
2. Jail Road
3. Oakland & Assembly Areas
.
9
21
"
'20
31
40
109
, 08
-.....~.------..I
"
106
10'
103
GoM:Phed
82
N
Elevation
25.00
50.00
89
71
72
75.00
76
100.00
1477
77
1476
78
67
29
1476 69
30
22
20
40
1488
39
38
1491
1490
41
1489
1490
36
1488
1480
1478
1480
1477
84
83
1483
61
59
35
1489
1488
1489
25
1491
11
1493
43
1493
60
51
52
1498
1495
13
1500
15
17
1496
1501
1496
1491
48
1494
90
98
1476
1478
109
108
1477
1477
1478
99
1479
92
1476
94
1476
1477
100
107
1477
1477
101
106
1478
1476
102
105
1476
50
103
1492
1475
104
1475
1475
1505
1497
1502
1517
1495
14
46
53
1494
47
1490
1490
1491
1479
112
95
1488
55
54
57
1489
56
1489
1496
44
1491
26
12
1491
42
24
1497
1492
45
1488
10
18
1481
1476
1480 91
58
1482
96
85
1480
1479
1481
1487
1476
1476
86
64
27
97
82
147962
1493
1490
37
1492
34
19
1488
33
1488
1480
87
68
1488
31
32
65
63
1487
1489
1493
1492
23
21
1490
1477
1479
1476
1479
1482
1485
88
81
79
1479
66
28
1477
70
1478
1478
80
1478
1476
75
49
3
1493
1502
4
1503
GoM : Phed
83
Page 1
7/24/2008 5:12:16 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone I Jail Road.NET
Zone - I (Jail Road, Police Bazar, Oakland etc.)
Link - Node Table:
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------1
1
2
20
250
2
2
3
37
200
3
3
4
104
150
7
3
8
10
150
8
8
9
89
100
9
9
10
83
100
10
10
11
100
100
11
11
12
95
100
12
12
13
72
100
13
13
8
75
100
14
12
14
28
100
15
14
15
22
100
17
15
17
129
100
18
17
4
118
100
19
12
18
118
100
20
18
19
82
100
21
19
20
113
100
22
20
21
69
100
23
21
22
47
100
24
22
23
79
100
25
23
24
76
100
26
24
25
103
100
27
25
10
40
100
28
25
26
77
100
29
26
27
72
100
30
27
28
44
100
31
28
23
78
100
32
21
29
91
100
33
29
30
77
100
34
30
31
121
100
35
31
32
95
100
36
32
33
37
100
37
32
34
44
100
38
34
35
79
100
39
35
36
50
100
40
36
37
50
100
41
37
38
46
100
GoM : Phed
84
Page 2
Zone - I (Jail Road, Police Bazar, Oakland etc.)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------42
38
19
3
100
43
38
39
69
100
44
39
40
48
100
45
40
33
47
100
46
39
41
51
100
47
41
37
57
100
48
35
42
185
100
49
42
43
83
100
50
43
15
89
100
51
43
44
54
100
52
44
14
58
100
53
44
45
65
100
54
45
37
67
100
55
2
46
62
200
56
46
47
84
150
57
47
48
48
150
58
48
49
98
150
59
49
50
130
150
60
50
51
59
150
61
51
52
49
150
62
52
47
73
150
63
50
53
59
150
64
53
54
24
150
65
54
51
83
150
66
54
55
28
150
67
55
56
82
150
68
56
57
48
150
69
57
58
50
100
70
58
59
42
100
71
59
60
52
150
72
60
55
39
150
73
59
61
30
100
74
61
62
64
100
75
62
63
106
100
76
63
64
64
100
77
64
27
136
100
78
63
65
34
100
79
65
66
66
100
80
66
67
89
100
81
67
27
72
100
82
65
68
68
100
83
68
69
64
100
84
69
70
40
100
85
70
71
19
100
86
71
72
54
100
89
72
75
35
100
90
75
76
53
100
GoM : Phed
85
Page 3
Zone - I (Jail Road, Police Bazar, Oakland etc.)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------91
76
77
55
100
92
77
78
56
100
93
78
66
70
100
94
78
79
15
100
95
79
75
134
100
96
79
70
61
100
97
69
80
103
100
98
80
81
70
100
99
81
82
120
100
100
82
83
58
100
101
83
62
10
100
102
83
84
65
100
103
84
85
75
100
104
85
86
53
100
105
86
87
65
100
106
87
88
73
100
107
88
89
108
100
108
89
80
29
100
109
85
90
37
100
110
90
57
84
100
111
90
91
56
100
112
91
92
107
100
114
92
94
101
100
115
94
95
137
100
116
95
96
81
100
117
96
97
88
100
118
97
87
112
100
119
95
98
69
100
120
98
99
99
100
121
99
100
120
100
122
100
101
134
100
123
101
102
100
100
124
102
103
75
100
125
103
104
81
100
126
104
105
68
100
127
105
106
139
100
128
106
107
103
100
129
107
108
151
100
130
108
109
98
100
133
109
112
133
100
16
112
98
1000
100
GoM : Phed
86
Page 4
Zone - I (Jail Road, Police Bazar, Oakland etc.)
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------2
0.00
1516.68
11.68
3
0.00
1516.29
14.29
4
0.63
1515.90
12.90
8
0.00
1516.05
16.05
9
3.18
1511.48
13.48
10
0.00
1508.49
11.49
11
1.05
1509.07
13.07
12
0.00
1509.83
14.83
13
1.05
1512.69
15.69
14
0.00
1509.81
14.81
15
0.00
1509.94
13.94
17
0.33
1512.97
11.97
18
0.63
1508.61
16.61
19
0.00
1507.89
17.89
20
1.56
1506.77
18.77
21
0.00
1506.32
17.32
22
1.68
1505.62
17.62
23
0.00
1504.79
17.79
24
1.56
1505.13
16.13
25
0.00
1505.89
12.89
26
3.18
1503.38
12.38
27
0.00
1501.90
14.90
28
1.68
1502.78
17.78
29
0.36
1506.53
16.53
30
0.36
1506.75
13.75
31
0.36
1507.15
15.15
32
0.00
1507.51
19.51
33
1.95
1507.51
15.51
34
0.60
1507.63
19.63
35
0.00
1507.92
19.92
36
2.46
1507.91
18.91
37
0.00
1507.95
17.95
38
0.00
1507.89
17.89
39
0.00
1507.77
19.77
40
1.95
1507.58
16.58
41
0.45
1507.84
18.84
42
0.60
1508.80
17.80
43
0.00
1509.29
16.29
44
0.00
1509.28
16.28
45
0.63
1508.57
17.57
46
1.50
1515.67
13.67
47
0.00
1510.40
14.40
48
0.60
1509.87
15.87
49
0.60
1508.83
15.83
50
0.00
1507.52
15.52
51
0.00
1507.56
16.56
52
3.18
1508.59
14.59
GoM : Phed
87
Page 5
Zone - I (Jail Road, Police Bazar, Oakland etc.)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------53
0.60
1506.64
15.64
54
0.00
1506.29
16.29
55
0.00
1504.80
14.80
56
1.68
1503.74
15.74
57
0.00
1503.20
14.20
58
8.94
1503.13
22.13
59
0.00
1503.43
15.43
60
3.18
1504.14
15.14
61
3.18
1501.67
19.67
62
0.00
1498.95
15.95
63
0.00
1498.99
18.99
64
3.18
1499.55
18.55
65
0.00
1498.80
19.80
66
0.00
1498.90
18.90
67
2.58
1500.23
18.23
68
3.06
1497.99
19.99
69
0.00
1497.66
21.66
70
0.00
1497.73
21.73
71
0.90
1497.73
19.73
72
0.90
1497.75
21.75
75
0.00
1497.78
19.78
76
0.90
1497.78
20.78
77
0.90
1497.81
21.81
78
0.00
1497.88
18.88
79
0.00
1497.83
18.83
80
0.00
1496.42
19.42
81
5.64
1496.45
17.45
82
3.24
1497.46
17.46
83
0.00
1498.45
19.45
84
3.30
1497.76
17.76
85
0.00
1497.47
18.47
86
3.60
1495.68
18.68
87
0.00
1494.68
18.68
88
2.43
1494.99
17.99
89
2.43
1495.97
17.97
90
0.00
1497.71
17.71
91
3.24
1495.72
16.72
92
3.24
1493.31
15.31
94
3.24
1492.05
15.05
95
0.00
1490.73
14.73
96
3.24
1491.13
15.13
97
3.24
1492.20
16.20
98
0.00
1489.48
12.48
99
0.90
1488.65
12.65
100
0.90
1487.88
10.88
101
0.90
1487.24
9.24
102
0.90
1486.91
10.91
GoM : Phed
88
Page 6
Zone - I (Jail Road, Police Bazar, Oakland etc.)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------103
0.90
1486.75
11.75
104
0.90
1486.66
11.66
105
0.90
1486.62
11.62
106
0.90
1486.61
10.61
107
0.90
1486.61
9.62
108
0.90
1486.67
8.67
109
0.60
1486.76
9.76
112
0.90
1486.95
10.95
1
-109.47
1517.00
0.00
Reservoir
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
109.47
2.23
16.12
Open
2
48.46
1.54
10.57
Open
3
13.03
0.74
3.77
Open
7
35.44
2.01
24.02
Open
8
18.37
2.34
51.29
Open
9
15.19
1.94
36.07
Open
10
-5.67
0.72
5.81
Open
11
-6.72
0.86
7.96
Open
12
-16.02
2.04
39.79
Open
13
-17.07
2.17
44.76
Open
14
1.58
0.20
0.55
Open
15
-5.65
0.72
5.78
Open
17
-12.07
1.54
23.55
Open
18
-12.40
1.58
24.75
Open
19
7.72
0.98
10.30
Open
20
7.09
0.90
8.80
Open
21
7.56
0.96
9.92
Open
22
6.00
0.77
6.47
Open
23
9.46
1.20
14.99
Open
24
7.78
0.99
10.44
Open
25
-4.91
0.63
4.45
Open
26
-6.47
0.82
7.42
Open
27
-20.86
2.66
64.87
Open
28
14.39
1.83
32.62
Open
29
11.21
1.43
20.54
Open
30
-11.00
1.40
19.86
Open
31
-12.68
1.62
25.83
Open
32
-3.45
0.44
2.32
Open
33
-3.81
0.49
2.79
Open
34
-4.17
0.53
3.30
Open
35
-4.53
0.58
3.84
Open
36
-0.73
0.09
0.13
Open
GoM : Phed
89
Page 7
Zone - I (Jail Road, Police Bazar, Oakland etc.)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------37
-3.80
0.48
2.77
Open
38
-4.40
0.56
3.64
Open
39
0.69
0.09
0.12
Open
40
-1.77
0.23
0.67
Open
41
2.52
0.32
1.29
Open
42
0.47
0.06
0.05
Open
43
2.05
0.26
1.64
Open
44
4.63
0.59
3.99
Open
45
2.68
0.34
1.45
Open
46
-2.58
0.33
1.35
Open
47
-3.03
0.39
1.82
Open
48
-5.09
0.65
4.76
Open
49
-5.69
0.73
5.86
Open
50
-6.41
0.82
7.30
Open
51
0.72
0.09
0.13
Open
52
-7.23
0.92
9.13
Open
53
7.95
1.01
10.88
Open
54
7.32
0.93
9.34
Open
55
61.01
1.94
16.18
Open
56
59.51
3.37
62.76
Open
57
23.39
1.32
11.13
Open
58
22.79
1.29
10.61
Open
59
22.19
1.26
10.10
Open
60
-5.22
0.30
0.69
Open
61
-32.94
1.87
20.99
Open
62
-36.12
2.05
24.89
Open
63
27.41
1.55
14.93
Open
64
26.81
1.52
14.32
Open
65
-27.72
1.57
15.25
Open
66
54.53
3.09
53.38
Open
67
25.26
1.43
12.83
Open
68
23.58
1.34
11.30
Open
69
2.62
0.33
1.40
Open
70
-6.32
0.80
7.10
Open
71
-26.09
1.48
13.63
Open
72
-29.27
1.66
16.86
Open
73
19.77
2.52
58.79
Open
74
16.59
2.11
42.49
Open
75
-1.42
0.18
0.45
Open
76
-7.04
0.90
8.67
Open
77
-10.22
1.30
17.30
Open
78
5.62
0.72
5.71
Open
79
-2.76
0.35
1.53
Open
80
-9.42
1.20
14.88
Open
81
-12.00
1.53
23.29
Open
82
8.38
1.07
11.97
Open
83
5.32
0.68
5.16
Open
GoM : Phed
90
Page 8
Zone - I (Jail Road, Police Bazar, Oakland etc.)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------84
-3.06
0.39
1.85
Open
85
-0.20
0.03
0.02
Open
86
-1.10
0.14
0.28
Open
89
-2.00
0.26
0.85
Open
90
-0.66
0.08
0.11
Open
91
-1.56
0.20
0.53
Open
92
-2.46
0.31
1.24
Open
93
-6.66
0.85
14.60
Open
94
4.20
0.53
3.33
Open
95
1.35
0.17
0.41
Open
96
2.85
0.36
1.63
Open
97
8.37
1.07
11.97
Open
98
-1.28
0.16
0.37
Open
99
-6.92
0.88
8.41
Open
100
-10.16
1.29
17.14
Open
101
-18.01
2.29
49.46
Open
102
7.85
1.00
10.63
Open
103
4.55
0.58
3.87
Open
104
10.47
1.33
33.77
Open
105
6.87
0.88
15.48
Open
106
-4.80
0.61
4.27
Open
107
-7.23
0.92
9.11
Open
108
-9.66
1.23
15.59
Open
109
-5.92
0.75
6.30
Open
110
-20.95
2.67
65.44
Open
111
15.03
1.92
35.38
Open
112
11.79
1.50
22.57
Open
114
8.55
1.09
12.45
Open
115
5.31
0.68
9.61
Open
116
-5.19
0.66
4.93
Open
117
-8.43
1.07
12.11
Open
118
-11.67
1.49
22.12
Open
119
10.50
1.34
18.20
Open
120
6.89
0.88
8.34
Open
121
5.99
0.76
6.43
Open
122
5.09
0.65
4.76
Open
123
4.19
0.53
3.32
Open
124
3.29
0.42
2.12
Open
125
2.39
0.30
1.17
Open
126
1.49
0.19
0.49
Open
127
0.59
0.07
0.09
Open
128
-0.31
0.04
0.03
Open
129
-1.21
0.15
0.33
Open
130
-2.11
0.27
0.93
Open
133
-2.71
0.35
1.48
Open
16
-3.61
0.46
2.52
Open
GoM : Phed
91
g,
,
i
Legends
Pipeline
Road
Zone Boundary
Reservoir
.03im
.045bn
GoM:PHED
GoM : Phed
Pipe No.
Node No.
From
To
500
450
400
200
150
100
46.00
60.00
59.00
59.00
44.00
161.00
98.00
71.00
10
58.00
10
10
11
186.00
11
10
11
12
138.00
12
11
12
13
43.00
13
12
10
14
109.00
14
12
13
15
84.00
15
13
14
16
145.00
16
14
15
17
104.00
17
15
16
18
96.00
18
16
17
19
45.00
19
17
20
298.00
20
13
16
21
167.00
21
17
18
22
120.00
22
18
19
23
102.00
23
19
21
25
103.00
93
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
27
90.00
23
28
91.00
23
25
30
42.00
27
25
26
31
62.00
28
26
32
104.00
29
26
27
33
135.00
30
27
28
34
182.00
31
28
29
35
122.00
32
29
10
37
192.00
33
26
37
44
71.00
34
37
39
46
149.00
35
39
40
47
240.00
36
40
41
48
190.00
37
41
42
49
254.00
38
42
43
50
175.00
39
43
44
51
333.00
40
44
46
53
112.00
41
46
47
54
109.00
42
47
49
56
76.00
43
49
51
58
101.00
44
51
59
102.00
45
51
52
60
100.00
46
52
61
117.00
47
46
53
62
184.00
48
53
54
63
153.00
49
54
55
64
95.00
From
To
24
21
25
26
94
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
66
102.00
18
68
174.00
54
59
69
122.00
53
59
60
70
59.00
54
60
61
71
119.00
55
61
62
72
66.00
56
62
63
73
40.00
57
63
64
74
85.00
58
64
65
75
52.00
59
65
60
76
85.00
60
65
66
77
87.00
61
66
67
78
126.00
62
67
68
79
90.00
63
68
59
80
111.00
64
67
70
82
232.00
65
70
18
83
171.00
66
67
71
84
218.00
67
71
72
85
238.00
68
72
75
86
79.00
69
75
76
87
212.00
70
76
15
88
144.00
71
67
77
91
43.00
72
77
78
92
199.00
73
78
74
93
94.00
74
79
80
94
132.00
75
80
64
95
81.00
From
To
50
55
57
51
57
52
95
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
96
192.00
82
97
125.00
82
83
98
148.00
79
83
84
99
118.00
80
84
85
100
177.00
81
85
81
101
188.00
82
84
86
102
220.00
83
86
87
103
142.00
84
87
88
104
100.00
85
88
83
105
267.00
86
88
89
106
54.00
87
89
90
107
105.00
88
90
91
108
230.00
89
91
87
109
376.00
90
91
92
110
66.00
91
92
94
112
221.00
92
94
95
113
136.00
93
95
96
114
169.00
94
96
97
115
70.00
95
97
98
116
76.00
96
98
99
117
135.00
97
99
95
118
265.00
98
99
100
119
142.00
99
100
101
120
87.00
100
101
102
121
116.00
101
102
99
122
178.00
From
To
76
79
81
77
81
78
96
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
123
84.00
104
124
42.00
104
105
125
57.00
105
105
106
126
60.00
106
106
108
128
103.00
107
108
109
129
75.00
108
109
104
130
76.00
109
108
113
134
201.00
110
113
114
135
48.00
111
114
101
136
264.00
112
114
78
137
122.00
113
114
115
138
183.00
114
115
116
139
269.00
115
116
117
140
123.00
116
117
72
141
125.00
117
63
118
142
163.00
118
118
119
143
136.00
119
119
121
145
198.00
120
121
122
146
114.00
121
122
123
147
195.00
122
123
124
148
57.00
123
124
118
149
93.00
124
124
125
150
131.00
125
125
126
151
96.00
126
126
122
152
66.00
127
122
89
153
332.00
From
To
102
102
103
103
103
104
97
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
154
33.00
122
155
124.00
127
128
156
134.00
131
128
129
157
238.00
132
129
61
158
155.00
133
128
46
159
86.00
134
127
130
160
104.00
135
130
131
161
227.00
136
131
132
162
84.00
137
132
41
163
261.00
138
132
133
164
271.00
139
133
134
165
230.00
140
134
135
166
254.00
141
135
40
167
362.00
142
134
136
168
154.00
143
136
137
169
234.00
144
137
138
170
252.00
145
138
139
171
177.00
146
139
140
172
179.00
147
130
143
175
173.00
148
143
144
176
281.00
149
144
145
177
237.00
150
145
146
178
150.00
151
146
147
179
172.00
152
147
148
180
244.00
153
148
149
181
197.00
From
To
128
126
127
129
127
130
98
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
182
146.00
151
183
143.00
151
152
184
167.00
157
152
150
185
198.00
158
152
140
186
353.00
159
146
156
190
282.00
160
156
157
191
202.00
161
157
158
192
132.00
162
158
159
193
122.00
163
159
160
194
162.00
164
160
161
195
284.00
165
161
162
196
158.00
166
162
163
197
158.00
167
163
159
198
133.00
168
163
164
199
130.00
169
164
157
200
287.00
170
157
165
201
269.00
171
165
166
202
239.00
172
166
167
203
135.00
173
167
170
206
234.00
174
170
171
207
74.00
175
171
122
208
261.00
176
171
145
211
157.00
46.00
60.00
118.00
91.00
324.00
2975.00
22579.00
From
To
154
149
150
155
150
156
Total :
99
160
ZONE - II
((j
161'
162
1. Lachumiere
163
2. Secretariat
------------- 140
~ \ .""
16~
...t49
139
151
'148
138
167
37
147
17
136
'40
11
37
27
11
GoM:Phed
100
N
Elevation
25.00
160
50.00
159
158
1510
1510 157
161 1508
75.00
100.00
1508
162
163
1509
1510
152
1518
1512
164
1511
165
m
167
166
1515
170
92
94
1513
96
97
1513
95
91
1513
87
90
86 1513 88
122
121
1514
151
1517
1516
146
1518
147
145
1520
1516
149
1514
148
1511
139
1522
171
1519
138
1523
144
137
1518
1517
1520
143
127
1514
126
1514
1513
119 1516
130
1521
1514
123
84
83
98
1520
1518
1517
1522
125
124 1516
1515
1515 118
134
1514 99
128
131
85
1515
1516 1291517
106
102
1526
105
1518
1522
104 103
1526
63
82
133
1516
100
1514
1516
62
1514 1514
1521
81
46
132
1514
1520641519
1527
44
109
61
1516
135
1520
53
108
1521 80
1520
1525
1528
101
60
1527
1514
1520 54
79
1529
65
47
1528
1515
1522
113
1517
1522
1522
59
1529
1522
1537
78
49
66
1516
114
55
68
41
1527
43
42
1523 77
1538
51
1523
40
1518
1531
1526
52
1530
1528
1529
152467
1539
1531
1539
2
39
57
3
115
1524
21
23
15401541
1532
70
1533
1518
4
1
37
1539 0
153625
19
5
1532
1543 1537
1535
1533
26
71
27
1551
9
1538
1539
6
8
18
116
1534 1533
1522
1538
1542
1538
17
10
28
29
1534
12
1516
117
1535
1537 1531 1532
13 1536
16
72
11
1518
75
76
1535
1534
15
1520
1536
1524
1531
1532
14
1513
150
1510
1516
1513
89
1513
1513
156
140
136
1525
1525
1534
GoM : Phed
101
Page 1
6/21/2008 5:44:28 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone II (Lachumiere).net
Zone II( Lachumiere & Secretariat
Link - Node Table:
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------1
0
1
46
450
2
1
2
60
350
3
2
3
59
300
4
3
4
59
300
5
4
5
44
150
6
5
6
161
150
7
6
1
98
150
9
5
8
71
100
10
8
9
58
150
11
9
10
186
150
12
10
11
138
150
13
11
12
43
150
14
12
10
109
150
15
12
13
84
150
16
13
14
145
100
17
14
15
104
100
18
15
16
96
100
19
16
17
45
150
20
17
8
298
150
21
13
16
167
100
22
17
18
120
150
23
18
19
102
150
25
19
21
103
150
27
21
2
90
150
28
4
23
91
250
30
23
25
42
200
31
25
26
62
200
32
26
9
104
150
33
26
27
135
100
34
27
28
182
100
35
28
29
122
100
37
29
10
192
100
44
26
37
71
200
46
37
39
149
200
47
39
40
240
150
48
40
41
190
150
49
41
42
254
100
GoM : Phed
102
Page 2
Zone II( Lachumiere & Secretariat
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------50
42
43
175
100
51
43
44
333
100
53
44
46
112
100
54
46
47
109
100
56
47
49
76
100
58
49
51
101
100
59
51
3
102
100
60
51
52
100
100
61
52
2
117
150
62
46
53
184
100
63
53
54
153
100
64
54
55
95
100
66
55
57
102
100
68
57
18
174
100
69
54
59
122
100
70
59
60
59
100
71
60
61
119
100
72
61
62
66
100
73
62
63
40
100
74
63
64
85
100
75
64
65
52
100
76
65
60
85
100
77
65
66
87
100
78
66
67
126
100
79
67
68
90
100
80
68
59
111
100
82
67
70
232
150
83
70
18
171
150
84
67
71
218
100
85
71
72
238
100
86
72
75
79
100
87
75
76
212
100
88
76
15
144
100
91
67
77
43
150
92
77
78
199
150
93
78
79
94
100
94
79
80
132
100
95
80
64
81
100
96
79
81
192
100
97
81
82
125
100
98
82
83
148
100
99
83
84
118
100
100
84
85
177
100
101
85
81
188
100
102
84
86
220
100
103
86
87
142
100
104
87
88
100
100
GoM : Phed
103
GoM : Phed
104
GoM : Phed
105
GoM : Phed
106
GoM : Phed
107
Page 7
Zone II( Lachumiere & Secretariat
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------121
3.72
1529.95
13.95
122
0.00
1529.97
11.97
123
2.08
1530.03
14.03
124
0.00
1530.15
14.15
125
4.06
1530.11
13.11
126
0.00
1530.27
12.27
127
0.00
1530.62
10.62
128
0.00
1533.30
11.30
129
3.74
1532.52
11.52
130
0.00
1530.73
8.73
131
0.92
1533.71
7.71
132
0.00
1535.04
7.04
133
2.50
1534.77
7.77
134
0.00
1534.78
8.78
135
2.50
1537.61
8.61
136
0.36
1533.66
8.66
137
0.27
1532.14
7.14
138
0.55
1530.63
7.63
139
0.37
1529.76
7.76
140
0.00
1528.98
8.98
143
1.24
1529.39
8.39
144
1.24
1527.92
7.92
145
0.00
1527.15
8.15
146
0.00
1526.62
8.62
147
0.09
1526.77
16.77
148
0.09
1526.99
15.99
149
0.09
1527.18
13.18
150
0.00
1527.33
11.33
151
1.08
1527.35
11.35
152
1.50
1527.45
9.45
156
2.34
1524.59
7.59
157
0.00
1523.99
11.99
158
1.88
1523.79
13.79
159
0.00
1523.76
13.76
160
0.30
1523.76
15.76
161
0.30
1523.75
15.75
162
0.30
1523.75
14.75
163
0.00
1523.76
13.76
164
1.88
1523.76
12.76
165
2.34
1524.02
11.02
166
2.34
1524.45
10.45
167
0.00
1525.16
10.16
170
2.34
1526.39
10.39
171
0.00
1527.15
10.15
0
-127.75
1551.00
0.00
Reservoir
GoM : Phed
108
Page 8
Zone II( Lachumiere & Secretariat
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
127.75
0.80
1.23
Open
2
117.87
1.23
3.59
Open
3
72.94
1.03
3.13
Open
4
64.16
0.91
2.46
Open
5
5.90
0.33
0.87
Open
6
-9.87
0.56
2.25
Open
7
-9.87
0.56
2.25
Open
9
15.77
2.01
38.67
Open
10
-4.50
0.25
0.53
Open
11
14.25
0.81
4.45
Open
12
6.89
0.39
1.16
Open
13
5.97
0.34
0.89
Open
14
-8.79
0.50
1.82
Open
15
13.20
0.75
7.20
Open
16
7.57
0.96
9.93
Open
17
6.65
0.85
7.81
Open
18
-8.92
1.14
13.47
Open
19
-3.29
0.19
0.29
Open
20
-20.27
1.15
8.54
Open
21
5.63
0.72
5.75
Open
22
16.98
0.96
6.16
Open
23
-33.53
1.90
21.69
Open
25
-33.53
1.90
21.69
Open
27
-33.53
1.90
21.69
Open
28
58.26
1.19
5.01
Open
30
58.26
1.86
14.86
Open
31
57.66
1.84
14.58
Open
32
18.75
1.06
7.40
Open
33
4.65
0.59
4.03
Open
34
4.65
0.59
4.03
Open
35
3.09
0.39
1.89
Open
37
1.43
0.18
0.46
Open
44
34.25
1.09
5.56
Open
46
34.25
1.09
5.56
Open
47
30.59
1.73
18.30
Open
48
21.36
1.21
9.41
Open
49
9.47
1.21
15.04
Open
50
4.89
0.62
4.42
Open
51
0.31
0.04
0.03
Open
53
0.31
0.04
0.03
Open
54
-17.07
2.17
44.77
Open
56
-17.07
2.17
44.77
Open
58
-17.07
2.17
44.77
Open
59
-8.78
1.12
13.08
Open
60
-8.29
1.06
11.74
Open
61
-11.41
0.65
2.94
Open
62
2.18
0.28
0.99
Open
GoM : Phed
109
Page 9
Zone II( Lachumiere & Secretariat
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------63
-1.56
0.20
0.54
Open
64
-11.52
1.47
21.63
Open
66
-11.52
1.47
21.63
Open
68
-11.52
1.47
21.63
Open
69
9.96
1.27
16.51
Open
70
10.35
1.32
17.72
Open
71
5.87
0.75
6.19
Open
72
6.29
0.80
7.04
Open
73
3.17
0.40
1.98
Open
74
-4.05
0.52
3.12
Open
75
-8.89
1.13
13.38
Open
76
-4.48
0.57
3.76
Open
77
-4.41
0.56
3.65
Open
78
-6.91
0.88
8.38
Open
79
0.39
0.05
0.04
Open
80
0.39
0.05
0.04
Open
82
-33.87
1.92
22.10
Open
83
-38.99
2.21
28.68
Open
84
6.55
0.83
7.60
Open
85
0.63
0.08
0.10
Open
86
-8.09
1.03
11.24
Open
87
-11.83
1.51
22.71
Open
88
-15.57
1.98
37.77
Open
91
20.02
1.13
8.35
Open
92
16.59
0.94
5.89
Open
93
7.40
0.94
9.53
Open
94
-0.44
0.06
0.05
Open
95
-4.84
0.62
4.34
Open
96
7.84
1.00
10.60
Open
97
4.37
0.56
3.59
Open
98
-0.31
0.04
0.03
Open
99
0.56
0.07
0.08
Open
100
-0.51
0.07
0.07
Open
101
-3.47
0.44
2.35
Open
102
1.07
0.14
0.27
Open
103
-1.73
0.22
0.64
Open
104
-1.02
0.13
0.24
Open
105
0.87
0.11
0.18
Open
106
-1.89
0.24
0.76
Open
107
0.80
0.10
0.16
Open
108
0.18
0.02
0.01
Open
109
0.71
0.09
0.12
Open
110
-0.52
0.07
0.07
Open
112
-0.52
0.07
0.07
Open
113
-1.92
0.25
0.79
Open
114
-0.01
0.00
0.00
Open
115
-0.79
0.10
0.15
Open
GoM : Phed
110
GoM : Phed
111
Page 11
Zone II( Lachumiere & Secretariat
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------168
6.39
0.81
7.25
Open
169
6.03
0.77
6.51
Open
170
5.75
0.73
5.97
Open
171
5.21
0.66
4.96
Open
172
4.84
0.62
4.33
Open
175
6.60
0.84
7.71
Open
176
5.36
0.68
5.25
Open
177
4.12
0.53
3.23
Open
178
4.33
0.55
3.52
Open
179
-1.98
0.25
0.83
Open
180
-2.07
0.26
0.90
Open
181
-2.17
0.28
0.98
Open
182
-2.26
0.29
1.06
Open
183
-0.61
0.08
0.09
Open
184
-1.69
0.22
0.62
Open
185
1.65
0.21
0.59
Open
186
-4.84
0.62
4.33
Open
190
6.31
0.80
7.20
Open
191
3.97
0.51
3.00
Open
192
2.74
0.35
1.51
Open
193
0.86
0.11
0.18
Open
194
0.49
0.06
0.06
Open
195
0.19
0.02
0.01
Open
196
-0.11
0.01
0.00
Open
197
-0.41
0.05
0.04
Open
198
-0.37
0.05
0.03
Open
199
-0.04
0.01
0.00
Open
200
-1.92
0.24
0.78
Open
201
-0.69
0.09
0.12
Open
202
-3.03
0.39
1.82
Open
203
-5.37
0.68
5.26
Open
206
-5.37
0.68
5.26
Open
207
-7.71
0.98
10.28
Open
208
-7.91
1.01
10.78
Open
211
0.20
0.03
0.01
Open
GoM : Phed
112
g,
,
i
Legends
Pipeline
Road
Zone Boundary
Reservoir
.03im
.045bn
GoM:PHED
GoM : Phed
Node No.
Pipe No.
From
To
500
450
400
200
150
100
1.
15.00
2.
157.00
3.
16.00
4.
103.00
5.
102.00
6.
28.00
7.
25.00
8.
10
87.00
9.
10
11
10
52.00
10.
11
12
11
23.00
11.
12
13
12
29.00
12.
13
14
14
84.00
13.
14
15
15
39.00
14.
15
16
17
17.00
15.
16
17
18
93.00
16.
17
18
19
50.00
17.
18
22
23
39.00
18.
22
23
24
32.00
19.
23
24
25
70.00
20.
24
25
26
66.00
21.
25
12
27
107.00
22.
24
26
28
63.00
23.
26
27
29
69.00
24.
27
30
45.00
114
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
31
141.00
29
32
95.00
29
30
33
68.00
28.
30
31
34
77.00
29.
31
32
35
101.00
30.
32
24
36
75.00
31.
32
33
37
62.00
32.
33
34
38
48.00
33.
34
24
39
81.00
34.
34
35
40
71.00
35.
35
39
44
91.00
36.
39
40
45
99.00
37.
40
41
46
50.00
38.
41
42
47
36.00
39.
42
43
48
48.00
40.
43
44
49
92.00
41.
44
45
50
46.00
42.
45
46
51
47.00
43.
46
39
52
86.00
44.
45
35
53
102.00
45.
44
47
54
68.00
46.
47
32
55
32.00
47.
47
48
56
47.00
48.
48
49
57
143.00
49.
49
50
58
From
To
25.
16
28
26.
28
27.
66.00
115
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
59
49.00
52
60
63.00
52
53
61
62.00
53.
53
48
62
103.00
54.
53
54
63
45.00
55.
54
55
64
30.00
56.
55
30
65
76.00
57.
54
56
66
44.00
58.
56
57
67
89.00
59.
57
58
68
40.00
60.
58
59
69
67.00
61.
59
30
72
47.00
62.
56
51
73
136.00
63.
57
62
74
37.00
64.
62
63
75
22.00
65.
63
64
76
51.00
66.
64
65
77
67.
65
66
78
49.00
68.
66
67
79
48.00
69.
67
68
80
52.00
70.
68
71
83
65.00
71.
71
72
84
187.00
72.
72
73
85
20.00
73.
73
74
86
100.00
74.
74
75
90
115.00
From
To
50.
50
51
51.
51
52.
200
150
41.00
100
116
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
91
76
87
55.00
76
77
88
103.00
78.
77
29
89
156.00
79.
73
78
92
25.00
80.
78
79
93
117.00
81.
79
80
94
134.00
82.
80
81
95
182.00
83.
81
82
96
28.00
84.
82
83
97
104.00
85.
83
84
98
155.00
86.
84
85
99
109.00
87.
85
86
100
120.00
88.
86
02
101
116.00
89.
67
87
102
99.00
90.
87
88
103
68.00
91.
88
64
104
50.00
92.
87
89
105
48.00
93.
89
63
106
141.00
94.
89
90
107
80.00
95.
90
91
108
92.00
96.
91
92
109
78.00
97.
92
93
110
129.00
98.
93
94
111
53.00
99.
94
95
112
From
To
75.
75
65
76.
74
77.
200
150
100
109.00
137.00
117
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
150
100
113
68.00
96
114
76.00
96
100
118
116.00
103.
100
51
119
68.00
104.
100
62
120
102.00
105.
100
101
121
140.00
106.
101
102
122
97.00
107.
102
50
123
68.00
108.
101
103
124
30.00
109.
103
105
125
125.00
110.
105
49
126
118.00
111.
101
107
129
25.00
112.
107
114
136
66.00
113.
114
115
137
111.00
114.
115
116
138
112.00
115.
116
117
139
43.00
116.
117
118
140
31.00
117.
118
119
141
65.00
118.
119
120
142
98.00
119.
120
121
143
55.00
120.
121
122
144
58.00
121.
122
140
145
51.00
122.
117
124
147
86.00
123.
124
125
148
72.00
124.
125
126
149
51.00
From
To
100.
95
92
101.
89
102.
200
118
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
150
73.00
128
151
55.00
128
125
152
81.00
128.
128
129
153
28.00
129.
129
130
154
29.00
130.
130
116
155
109.00
131.
130
131
156
104.00
132.
131
114
157
86.00
133.
107
132
158
55.00
134.
132
133
159
56.00
135.
133
135
161
27.00
136.
135
129
162
76.00
137.
135
136
163
46.00
138.
136
137
164
40.00
139.
137
138
165
25.00
140.
138
139
166
62.00
141.
139
141
168
74.00
142.
141
136
169
70.00
143.
138
142
170
123.00
144.
142
145
173
137.00
145.
145
146
174
406.00
146.
146
147
175
265.00
147.
147
148
176
268.00
148.
148
149
177
302.00
149.
149
150
178
From
To
125.
126
127
126.
127
127.
240.00
119
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
179
81.00
152
180
93.00
152
153
181
91.00
153.
153
154
182
106.00
154.
154
155
183
71.00
155.
155
156
190
33.00
156.
156
157
191
56.00
157.
157
151
192
52.00
158.
155
158
184
51.00
159.
158
159
185
167.00
160.
159
160
186
147.00
161.
160
161
187
126.00
162.
161
162
188
46.00
163.
162
163
189
300.00
164.
162
164
193
109.00
165.
164
165
194
86.00
166.
165
166
195
131.00
167.
166
167
196
90.00
168.
167
168
197
75.00
169.
168
170
199
108.00
170.
170
171
200
107.00
171.
171
173
202
66.00
172.
173
174
203
38.00
173.
174
176
205
121.00
174.
176
177
78.00
From
To
150.
145
151
151.
151
152.
200
150
100
120
GoM : Phed
Sl.
No.
Node No.
Pipe No.
From
To
500
450
400
200
150
100
175.
177
178
135.00
176.
178
189
127.00
177.
177
179
98.00
178.
179
180
67.00
179.
180
184
11.00
180.
181
185
98.00
181.
185
186
49.00
182.
186
188
60.00
183.
188
187
127.00
184.
184
190
77.00
185.
190
191
80.00
186.
191
192
38.00
187.
182
193
39.00
188.
193
194
12.00
189.
194
190
31.00
190.
196
199
470.00
191.
115
103
118.00
192.
105
113
85.00
193.
173
110
133.00
194.
127
137
62.00
195.
196
193
446.00
196.
101
102
564.00
197.
150
163
120.00
198.
189
199
100.00
564.00
4476.00
2741.00
9397.00
Total :
479.00
121
ZONE-III
(tJ
1. Laitumkhrah
"
"
"4
'"
'MRl
.,
~6
GoM :Phed
122
Elevation
25.00
81
50.00
82
75.00
176
1555
177
1556
100.00
80
1553
1552
78
73
1550
83
1557
72
71
68
1547
1546
1545
66
1548
75
74
84
77
1558
1549
1559
1550
1552
16
1554
14
1
1596
1557
13
1559
1560
3
1555
1557
5
1556
6
1555
11
25
1554
7
1554
8
1553
1554
24
1553
1554
26
10
27
9 1553
1554
1552
1552
1518
1540
50
1546 105
49
101
1541
1541
115
1539
1545
1547
136
1537
131
135
1534
137
1538
1535
130
1533
139
138
117
1549
39
128
1534
127
1533
1534
120
121 1536
1540122
1539
1538
1510
125
1508
162
1511
148
1509
161
1512
1532
1507
147
1512
142
1520
145
124
1538
1539
1537
119 118
40
164
1519
163
149
1531
129
1538
1550
199
1518
150
1533
1536
1535
44
154743
45
1546
42
1545
46
1542
1544 41
165
1511
1515
132
1538
GoM : Phed
1516 186
133
107
47
35
196
1510
102
1548
1551
34
185
1530
116
1550
33
1512
1519
189
52 1547
48
32
1532
166
193
1520
1516
94
1517
1515
1550
231555
190
1513
192
194
188
51
31
22
1517
167
1540
1541
18
1556
1556
12
1558
4
53
17
1515
168
1515 1514
141
1548
54
15
1518
184
93
56
55
191
1544 100
1546
1547
30
1553
1559
57
180
1531
1538
95
170
1515
1540
62
1545
1533
173
1517 1516
92
90
1539
96
1540
59
1519
1536
1539
1539
63
29
28
1537
91
1540
64 1538
89
58
179
1544
87
88
1548
178
67
1540
65
1542
76 1547
85
174
1520
79
86
171
1518
146
1513
160
1507
1514
126
151
1536
1512
15341532
152
1510
156
157
1510
1511
159
155
1507
158
1506
1506
153
154
1508
1506
123
Page 1
6/20/2008 2:37:05 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Laitumkhrah.net
Zone III
Link - Node Table:
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------2
2
3
15
300
3
3
4
157
250
4
4
5
16
250
5
5
6
103
250
6
6
7
102
200
7
7
8
28
200
8
8
9
25
200
9
9
10
87
200
10
10
11
52
200
11
11
12
23
200
12
12
13
29
200
14
13
14
84
200
15
14
15
39
200
17
15
16
17
200
18
16
17
93
200
19
17
18
50
200
23
18
22
39
200
24
22
23
32
200
25
23
24
70
200
26
24
25
66
200
27
25
12
107
200
28
24
26
63
200
29
26
27
69
200
30
27
9
45
200
31
16
28
141
200
32
28
29
95
200
33
29
30
68
200
34
30
31
77
200
35
31
32
101
200
36
32
24
75
200
37
32
33
62
200
38
33
34
48
200
39
34
24
81
200
40
34
35
71
200
44
35
39
91
200
45
39
40
99
200
46
40
41
50
150
GoM : Phed
124
Page 2
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------47
41
42
36
150
48
42
43
48
150
49
43
44
92
150
50
44
45
46
150
51
45
46
47
150
52
46
39
86
150
53
45
35
102
150
54
44
47
68
200
55
47
32
32
200
56
47
48
47
200
57
48
49
143
200
58
49
50
66
150
59
50
51
49
150
60
51
52
63
150
61
52
53
62
150
62
53
48
103
200
63
53
54
45
200
64
54
55
30
200
65
55
30
76
200
66
54
56
44
200
67
56
57
89
200
68
57
58
40
200
69
58
59
67
200
72
59
30
47
200
73
56
51
136
150
74
57
62
37
150
75
62
63
22
100
76
63
64
51
100
77
64
65
41
150
78
65
66
49
100
79
66
67
48
100
80
67
68
52
100
83
68
71
65
150
84
71
72
187
150
85
72
73
20
150
86
73
74
100
150
90
74
75
115
150
91
75
65
109
150
87
74
76
55
200
88
76
77
103
200
89
77
29
156
200
92
73
78
25
200
93
78
79
117
200
94
79
80
134
200
95
80
81
182
200
96
81
82
28
200
97
82
83
104
200
GoM : Phed
125
Page 3
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------98
83
84
155
200
99
84
85
109
200
100
85
86
120
200
101
86
2
116
200
102
67
87
99
100
103
87
88
68
100
104
88
64
50
100
105
87
89
48
100
106
89
63
141
100
107
89
90
80
100
108
90
91
92
100
109
91
92
78
100
110
92
93
129
100
111
93
94
53
100
112
94
95
137
100
113
95
92
68
100
114
89
96
76
200
118
96
100
116
150
119
100
51
68
150
120
100
62
102
150
121
100
101
140
150
122
101
102
97
150
123
102
50
68
150
124
101
103
30
150
125
103
105
125
150
126
105
49
118
150
129
101
107
25
150
136
107
114
66
100
137
114
115
111
100
138
115
116
112
100
139
116
117
43
100
140
117
118
31
150
141
118
119
65
150
142
119
120
96
150
143
120
121
55
150
144
121
122
58
150
145
122
40
51
150
147
117
124
86
100
148
124
125
72
100
149
125
126
51
100
150
126
127
73
100
151
127
128
55
150
152
128
125
81
100
153
128
129
28
100
154
129
130
29
100
155
130
116
109
100
156
130
131
104
100
GoM : Phed
126
Page 4
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------157
131
114
86
100
158
107
132
55
100
159
132
133
56
100
161
133
135
27
100
162
135
129
76
100
163
135
136
46
100
164
136
137
40
100
165
137
138
25
100
166
138
139
62
100
168
139
141
74
100
169
141
136
70
100
170
138
142
123
100
173
142
145
137
100
174
145
146
406
100
175
146
147
265
100
176
147
148
268
100
177
148
149
302
100
178
149
150
240
100
179
145
151
81
100
180
151
152
93
100
181
152
153
91
100
182
153
154
106
100
183
154
155
71
100
190
155
156
33
100
191
156
157
56
100
192
157
151
52
100
184
155
158
51
100
185
158
159
167
100
186
159
160
147
100
187
160
161
126
100
188
161
162
46
100
189
162
163
300
100
193
162
164
109
100
194
164
165
86
100
195
165
166
131
100
196
166
167
90
100
197
167
168
75
100
199
168
170
108
100
200
170
171
107
100
202
171
173
66
100
203
173
174
38
100
205
174
176
121
100
206
176
177
78
100
209
177
178
135
100
210
178
89
127
100
207
177
179
98
100
208
179
180
67
100
GoM : Phed
127
Page 5
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------214
180
184
11
100
215
184
185
98
100
216
185
186
49
100
218
186
188
60
100
219
188
189
127
100
220
184
190
77
100
221
190
191
80
100
222
191
192
38
100
223
192
193
39
100
224
193
194
12
100
231
194
190
31
100
229
196
199
470
100
16
15
3
118
250
13
5
13
85
250
230
173
170
133
100
232
127
137
62
100
226
196
193
446
100
1
1
2
564
350
20
150
163
120
100
21
189
199
100
100
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------2
3.44
1574.18
14.18
3
5.00
1573.32
15.32
4
1.56
1568.74
11.74
5
1.56
1568.28
12.28
6
1.26
1567.73
12.73
7
1.26
1566.17
12.17
8
1.26
1565.76
12.76
9
1.26
1565.41
13.41
10
5.94
1565.60
12.60
11
5.94
1565.77
11.77
12
2.50
1565.89
10.89
13
1.56
1567.37
11.37
14
0.06
1567.69
8.69
15
5.84
1567.84
13.84
16
5.32
1566.19
13.19
17
2.50
1564.51
7.51
18
2.50
1563.66
7.66
22
2.50
1563.05
8.05
23
2.50
1562.59
8.59
24
2.50
1561.66
8.66
25
7.18
1563.10
9.10
GoM : Phed
128
Page 6
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------26
4.68
1562.85
8.85
27
4.68
1564.33
12.33
28
5.32
1561.50
9.50
29
5.00
1558.68
8.68
30
1.88
1557.90
8.90
31
3.12
1558.18
8.18
32
0.30
1558.64
8.64
33
2.48
1558.78
7.78
34
0.30
1558.92
8.92
35
0.00
1557.56
14.56
39
5.30
1556.55
9.55
40
6.26
1555.50
15.50
41
6.26
1555.54
15.54
42
6.26
1555.65
13.65
43
6.26
1555.97
9.97
44
6.26
1557.06
10.06
45
7.48
1556.95
11.95
46
15.56
1556.58
12.58
47
3.42
1557.58
8.58
48
1.24
1557.12
9.12
49
2.18
1556.25
9.25
50
2.18
1556.00
10.00
51
3.12
1556.12
9.12
52
5.30
1556.48
16.48
53
1.24
1557.08
16.08
54
1.24
1557.12
8.12
55
2.48
1557.33
8.32
56
3.12
1557.01
9.01
57
3.10
1557.01
11.01
58
1.24
1557.22
12.22
59
1.24
1557.61
10.61
62
1.86
1556.26
12.26
63
1.56
1555.75
15.75
64
1.56
1555.67
16.67
65
1.56
1555.73
15.73
66
8.02
1555.25
15.25
67
3.12
1555.26
11.26
68
4.90
1555.96
10.96
71
4.90
1556.24
10.24
72
4.90
1557.62
10.62
73
8.34
1557.85
9.85
74
5.00
1557.65
10.65
75
6.46
1556.38
14.38
76
5.00
1557.75
9.75
77
5.00
1558.04
9.04
78
3.44
1558.04
8.04
79
3.44
1559.11
7.11
GoM : Phed
129
Page 7
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------80
3.44
1560.51
7.51
81
3.44
1562.67
7.67
82
3.44
1563.05
7.05
83
3.44
1564.60
7.60
84
3.44
1567.18
9.18
85
3.44
1569.19
10.19
86
3.44
1571.61
12.61
87
3.12
1554.75
15.75
88
4.98
1554.97
16.97
89
2.18
1554.41
15.41
90
0.36
1550.37
12.37
91
0.18
1545.95
9.95
92
3.12
1542.30
9.30
93
3.12
1541.50
10.50
94
3.12
1541.47
11.47
95
3.12
1541.69
9.69
96
2.18
1554.54
14.54
100
2.50
1555.52
15.52
101
2.40
1554.69
15.69
102
2.90
1555.37
10.37
103
2.40
1554.76
13.76
105
8.02
1555.21
10.21
107
0.80
1553.84
15.84
114
0.94
1548.89
7.89
115
6.24
1547.11
8.11
116
6.26
1546.83
8.83
117
5.62
1547.25
8.25
118
5.62
1547.49
15.49
119
5.62
1548.32
14.32
120
5.62
1550.09
14.09
121
5.62
1551.48
13.48
122
5.62
1553.38
14.38
124
0.64
1546.62
8.62
125
0.64
1546.19
9.19
126
0.64
1546.11
10.11
127
0.88
1546.03
12.03
128
0.64
1546.11
13.11
129
1.58
1546.30
12.30
130
6.88
1546.37
11.37
131
6.24
1546.95
8.95
132
0.94
1550.72
13.72
133
0.94
1547.82
11.82
135
0.94
1546.55
11.55
136
1.08
1545.42
11.42
137
2.64
1545.17
12.17
138
1.08
1544.57
13.57
139
0.00
1544.79
12.79
GoM : Phed
130
Page 8
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------141
1.08
1545.05
12.05
142
0.24
1535.94
15.94
145
0.52
1526.61
12.61
146
0.26
1525.64
12.64
147
0.21
1525.13
13.13
148
0.16
1524.69
12.69
149
0.10
1524.27
13.27
150
0.05
1523.97
13.97
151
2.18
1522.94
10.94
152
2.18
1522.58
12.58
153
2.18
1522.47
14.47
154
2.18
1522.47
16.47
155
2.18
1522.52
15.52
156
2.18
1522.53
12.53
157
2.18
1522.65
11.65
158
0.08
1522.61
16.61
159
0.08
1522.92
16.92
160
0.08
1523.21
16.21
161
0.08
1523.47
16.47
162
0.17
1523.57
14.57
163
0.09
1523.89
15.89
164
0.32
1523.72
13.72
165
0.64
1523.87
12.87
166
0.96
1524.26
12.26
167
1.28
1524.72
11.72
168
1.36
1525.38
11.38
170
0.94
1526.85
11.85
171
0.94
1527.25
12.25
173
0.94
1527.65
11.65
174
0.00
1528.67
11.67
176
0.00
1531.90
13.90
177
0.00
1533.99
13.99
178
0.00
1544.51
7.51
179
1.32
1532.32
13.32
180
1.22
1531.54
13.54
184
1.06
1531.46
14.46
185
0.32
1531.41
15.41
186
0.24
1531.40
16.40
188
0.16
1531.39
16.39
189
0.08
1531.37
13.37
190
0.50
1531.32
15.32
191
0.50
1531.30
16.30
192
0.50
1531.30
14.30
193
0.50
1531.30
12.30
194
0.50
1531.30
11.30
196
0.24
1531.32
13.32
199
0.08
1531.36
12.36
GoM : Phed
131
Page 9
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------1
-425.56
1596.00
0.00
Reservoir
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------2
349.88
4.95
57.04
Open
3
150.93
3.08
29.22
Open
4
149.37
3.04
28.66
Open
5
60.34
1.23
5.35
Open
6
59.08
1.88
15.25
Open
7
57.82
1.84
14.65
Open
8
56.56
1.80
14.07
Open
9
-20.39
0.65
2.13
Open
10
-26.33
0.84
3.41
Open
11
-32.27
1.03
4.98
Open
12
-113.70
3.62
51.26
Open
14
-27.79
0.89
3.77
Open
15
-27.85
0.89
3.79
Open
17
160.26
5.10
96.81
Open
18
64.91
2.07
18.16
Open
19
62.41
1.99
16.88
Open
23
59.91
1.91
15.65
Open
24
57.41
1.83
14.46
Open
25
54.91
1.75
13.32
Open
26
-71.75
2.29
21.86
Open
27
-78.93
2.51
26.08
Open
28
-66.33
2.11
18.90
Open
29
-71.01
2.26
21.44
Open
30
-75.69
2.41
24.13
Open
31
90.03
2.87
33.27
Open
32
84.71
2.70
29.72
Open
33
50.75
1.62
11.51
Open
34
-27.56
0.88
3.71
Open
35
-30.68
0.98
4.53
Open
36
-99.71
3.18
40.20
Open
37
-21.30
0.68
2.30
Open
38
-23.78
0.76
2.83
Open
39
-90.78
2.89
33.79
Open
40
66.70
2.12
19.09
Open
44
49.94
1.59
11.17
Open
45
48.48
1.54
10.57
Open
46
-5.37
0.30
0.73
Open
47
-11.63
0.66
3.06
Open
48
-17.89
1.01
6.78
Open
49
-24.15
1.37
11.82
Open
GoM : Phed
132
Page 10
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------50
10.12
0.57
2.36
Open
51
19.40
1.10
7.88
Open
52
3.84
0.22
0.39
Open
53
-16.76
0.95
6.01
Open
54
-40.53
1.29
7.59
Open
55
-90.04
2.87
33.28
Open
56
46.08
1.47
9.63
Open
57
36.00
1.15
6.09
Open
58
13.14
0.74
3.83
Open
59
-10.20
0.58
2.39
Open
60
-16.36
0.93
5.74
Open
61
-21.66
1.23
9.65
Open
62
-8.84
0.28
0.45
Open
63
-14.05
0.45
1.07
Open
64
-37.85
1.21
6.69
Open
65
-40.33
1.28
7.52
Open
66
22.56
0.72
2.56
Open
67
1.83
0.06
0.03
Open
68
-33.62
1.07
5.37
Open
69
-34.86
1.11
5.74
Open
72
-36.10
1.15
6.12
Open
73
17.61
1.00
6.58
Open
74
32.35
1.83
20.29
Open
75
11.89
1.51
22.90
Open
76
2.92
0.37
1.70
Open
77
-7.75
0.44
1.44
Open
78
7.47
0.95
9.69
Open
79
-0.55
0.07
0.08
Open
80
-8.96
1.14
13.58
Open
83
-13.86
0.78
4.22
Open
84
-18.76
1.06
7.40
Open
85
-23.66
1.34
11.37
Open
86
9.28
0.53
2.01
Open
90
23.24
1.32
11.00
Open
91
16.78
0.95
6.01
Open
87
-18.95
0.60
1.86
Open
88
-23.95
0.76
2.87
Open
89
-28.95
0.92
4.07
Open
92
-41.29
1.31
7.85
Open
93
-44.73
1.42
9.11
Open
94
-48.17
1.53
10.45
Open
95
-51.61
1.64
11.87
Open
96
-55.05
1.75
13.38
Open
97
-58.49
1.86
14.97
Open
98
-61.93
1.97
16.64
Open
99
-65.37
2.08
18.39
Open
100
-68.81
2.19
20.22
Open
GoM : Phed
133
Page 11
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------101
-72.25
2.30
22.14
Open
102
5.29
0.67
5.12
Open
103
-4.13
0.53
3.23
Open
104
-9.11
1.16
13.98
Open
105
6.30
0.80
7.06
Open
106
-7.41
0.94
9.53
Open
107
13.02
1.66
50.56
Open
108
12.66
1.61
48.00
Open
109
12.48
1.59
46.74
Open
110
4.22
0.54
6.27
Open
111
1.10
0.14
0.52
Open
112
-2.02
0.26
1.61
Open
113
-5.14
0.66
9.05
Open
114
-17.95
0.57
1.68
Open
118
-20.13
1.14
8.43
Open
119
-20.65
1.17
8.84
Open
120
-18.60
1.05
7.29
Open
121
16.62
0.94
5.91
Open
122
-18.26
1.03
7.04
Open
123
-21.16
1.20
9.25
Open
124
-10.26
0.58
2.42
Open
125
-12.66
0.72
3.57
Open
126
-20.68
1.17
8.86
Open
129
42.74
2.42
34.00
Open
136
22.55
2.87
74.96
Open
137
9.81
1.25
16.06
Open
138
3.57
0.46
2.47
Open
139
-7.48
0.95
9.72
Open
140
-19.49
1.10
7.94
Open
141
-25.11
1.42
12.70
Open
142
-30.73
1.74
18.46
Open
143
-36.35
2.06
25.19
Open
144
-41.97
2.38
32.87
Open
145
-47.59
2.69
41.49
Open
147
6.39
0.81
7.26
Open
148
5.75
0.73
5.97
Open
149
2.89
0.37
1.67
Open
150
2.25
0.29
1.05
Open
151
-7.69
0.44
1.42
Open
152
-2.22
0.28
1.03
Open
153
-6.11
0.78
6.68
Open
154
-3.47
0.44
2.34
Open
155
-4.79
0.61
4.26
Open
156
-5.55
0.71
5.60
Open
157
-11.79
1.50
22.58
Open
158
19.39
2.47
56.71
Open
159
18.45
2.35
51.73
Open
GoM : Phed
134
Page 12
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------161
17.51
2.23
46.95
Open
162
4.22
0.54
3.36
Open
163
12.36
1.57
24.61
Open
164
5.86
0.75
6.18
Open
165
12.28
1.56
24.32
Open
166
-4.34
0.55
3.54
Open
168
-4.34
0.55
3.54
Open
169
-5.42
0.69
5.34
Open
170
15.53
1.98
70.11
Open
173
15.29
1.95
68.12
Open
174
2.50
0.32
2.38
Open
175
2.24
0.29
1.94
Open
176
2.03
0.26
1.62
Open
177
1.88
0.24
1.40
Open
178
1.77
0.23
1.26
Open
179
12.27
1.56
45.31
Open
180
4.59
0.58
3.93
Open
181
2.41
0.31
1.19
Open
182
0.23
0.03
0.01
Open
183
-1.95
0.25
0.81
Open
190
-1.15
0.15
0.30
Open
191
-3.33
0.42
2.17
Open
192
-5.51
0.70
5.51
Open
184
-2.99
0.38
1.77
Open
185
-3.07
0.39
1.86
Open
186
-3.15
0.40
1.96
Open
187
-3.23
0.41
2.05
Open
188
-3.31
0.42
2.14
Open
189
-1.63
0.21
1.08
Open
193
-1.85
0.24
1.36
Open
194
-2.17
0.28
1.83
Open
195
-2.81
0.36
2.95
Open
196
-3.77
0.48
5.09
Open
197
-5.05
0.64
8.75
Open
199
-6.41
0.82
13.61
Open
200
-3.21
0.41
3.78
Open
202
-4.15
0.53
6.08
Open
203
-9.23
1.18
26.73
Open
205
-9.23
1.18
26.73
Open
206
-9.23
1.18
26.73
Open
209
-16.45
2.10
77.95
Open
210
-16.45
2.10
77.95
Open
207
7.22
0.92
16.96
Open
208
5.90
0.75
11.67
Open
214
4.68
0.60
7.60
Open
215
1.44
0.18
0.46
Open
216
1.12
0.14
0.29
Open
GoM : Phed
135
Page 13
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------218
0.88
0.11
0.18
Open
219
0.72
0.09
0.13
Open
220
2.18
0.28
1.85
Open
221
0.67
0.09
0.21
Open
222
0.17
0.02
0.02
Open
223
-0.33
0.04
0.05
Open
224
-0.51
0.06
0.12
Open
231
-1.01
0.13
0.44
Open
229
-0.56
0.07
0.08
Open
16
-193.95
3.95
46.48
Open
13
87.47
1.78
10.64
Open
230
4.14
0.53
6.06
Open
232
9.06
1.15
13.85
Open
226
0.32
0.04
0.05
Open
1
425.56
4.43
38.69
Open
20
1.72
0.22
0.64
Open
21
0.64
0.08
0.10
Open
GoM : Phed
136
g,
,
i
Legends
Pipeline
Road
Zone Boundary
Reservoir
-..)
.03im
.045ba
GoM:PHED
GoM : Phed
Node No.
Pipe No.
500
450
400
200
150
100
20.00
173.00
110.00
4.
75.00
5.
104.00
6.
111.00
7.
122.00
8.
179.00
9.
10
169.00
10.
10
11
10
48.00
11.
11
12
11
70.00
12.
12
13
12
122.00
13.
13
13
108.00
14.
11
17
17
66.00
15.
17
18
18
73.00
16.
18
19
19
50.00
17.
19
20
20
138.00
18.
20
21
21
182.00
19.
21
22
22
143.00
20.
22
23
23
98.00
21.
23
24
162.00
22.
21
24
26
32.00
23.
24
25
27
131.00
From
To
1.
2.
3.
138
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
27
163.00
27
28
60.00
27
18
29
141.00
27.
24
28
30
148.00
28.
28
29
31
105.00
29.
29
30
32
123.00
30.
30
31
33
232.00
31.
31
32
34
122.00
32.
35
37
153.00
33.
35
36
38
243.00
34.
36
37
39
20.00
35.
37
38
40
85.00
36.
38
39
41
198.00
37.
39
40
42
193.00
38.
40
43
45
146.00
39.
43
49
46
110.00
40.
44
45
47
41.00
41.
45
46
48
139.00
42.
46
47
49
78.00
43.
47
48
50
147.00
44.
48
49
51
94.00
45.
49
50
52
84.00
46.
50
51
53
121.00
47.
51
52
54
98.00
48.
52
53
55
49.
53
54
56
From
To
24.
25
26
25.
26
26.
139
GoM : Phed
Sl.
No.
Pipe No.
Node No.
From
To
500
450
400
200
150
100
50.
54
55
57
167.00
51.
55
56
58
204.00
52.
56
38
59
127.00
53.
44
59
62
127.00
54.
59
60
63
145.00
55.
60
61
64
132.00
56.
61
62
65
86.00
57.
62
47
66
77.00
58.
62
63
67
169.00
59.
63
64
68
117.00
60.
64
65
69
167.00
61.
65
66
70
137.00
62.
66
60
71
67.00
63.
66
67
72
10.00
64.
54
68
73
162.00
65.
68
69
74
52.00
66.
69
70
75
75.00
67.
70
71
76
188.00
68.
71
72
77
162.00
69.
72
73
78
96.00
70.
73
74
79
84.00
71.
74
75
80
123.00
72.
75
76
81
115.00
73.
76
77
82
126.00
74.
77
69
83
25.00
75.
77
78
84
75.00
140
GoM : Phed
Sl.
No.
Pipe No.
Node No.
From
To
500
450
400
200
150
100
76.
78
79
85
110.00
77.
79
80
86
54.00
78.
80
75
87
69.00
79.
79
73
88
101.00
80.
72
83
91
7.00
81.
83
84
92
59.00
82.
84
85
93
91.00
83.
85
86
94
51.00
84.
86
87
95
135.00
85.
87
88
96
135.00
86.
88
72
97
120.00
87.
86
89
98
57.00
88.
89
90
99
87.00
89.
90
91
100
74.00
90.
91
92
101
111.00
91.
92
93
102
106.00
92.
93
94
103
158.00
93.
94
95
104
100.00
94.
95
96
105
192.00
95.
96
97
106
76.00
96.
97
84
107
171.00
97.
94
98
108
88.00
98.
98
99
109
87.00
99.
99
91
110
77.00
100.
90
100
111
67.00
101.
100
101
112
85.00
141
GoM : Phed
Sl.
No.
Pipe No.
Node No.
From
To
500
450
400
200
150
100
102.
101
102
113
93.00
103.
102
92
115
133.00
104.
96
104
116
127.00
105.
104
105
117
123.00
106.
105
94
118
86.00
107.
67
32
14
100.00
20.00
504.00
671.00
1818.00
8950.00
Total :
(?)
ZONE - IV
'PROPOSED PIPELINE ROUTE:
AREA OF COVERAGE:
1. Malki
64
2. Dhankheti Areas.
107
65
't-
"
32
~"
"
61
".
31
" f----.j
10'
"
"
104
10
26
9.
12
"
'50
"
74
"
35
36
"
M.in .....rvoir
GoM:Phed
nn
143
N
Elevation
25.00
93
50.00
1620
75.00
102
100.00
1620
92
101
64
1620
100
67
1616
31
1614
26
17
10
27
1609
1610 11
1609
1610
13
8
1620
7
1624
1604
21
1620
6
45
1625
44
1608
1628
22
1625
49
1630
1630
50
71
1632
1632
52
70
1658
35
1645
1645
36
37
1647
1648
1646
78
1633
69
1635
1634
56
1630
1631
1642
38
73
79
53
1650
GoM : Phed
1628
1634
83
72
39
2
84
1626
1628
1630
1635
1640
1645
1626
1635
1630
40
1620
1622
85
87
51
43
97
88
1632
24
23
1630
1622
1625
48
1630
104
1622
1625
46
1610
5
1620
1624
1607
20
1620
1622
1628
28
1604
95
1622
62
59
99
86
47
1609
25
1604
1624
1622
89
1624
29
19
12
1620 60
1610
1605
1615
61
30
1605
18
1620
96
1621
66
1624
1604
91
105
1620
90
1622
63
1617
98
1622
1620
32
1620
1621
65
94
55
54
1640
1636
68
74
1630
80
1631
75
1632
1632
77
76
1635
1634
1634
144
Page 1
6/21/2008 6:42:51 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone IV (Malki).net
ZONE-IV (MALKI & DHANKHETI)
Link - Node Table:
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------1
1
2
20
350
2
2
3
173
250
3
3
4
110
150
4
4
5
75
150
5
5
6
104
150
6
6
7
111
100
7
7
8
122
100
8
8
9
179
100
9
9
10
169
100
10
10
11
48
100
11
11
12
70
100
12
12
13
122
100
13
13
6
108
100
17
11
17
66
150
18
17
18
73
100
19
18
19
50
100
20
19
20
138
100
21
20
21
182
100
22
21
22
143
100
23
22
23
98
150
24
23
5
162
150
25
21
24
32
100
26
24
25
131
100
27
25
26
163
100
28
26
27
60
100
29
27
18
141
100
30
24
28
148
100
31
28
29
105
100
32
29
30
123
100
33
30
31
232
100
34
31
32
122
100
37
2
35
153
300
38
35
36
243
300
39
36
37
20
300
40
37
38
88
300
41
38
39
198
150
42
39
40
193
150
GoM : Phed
145
GoM : Phed
146
Page 3
ZONE-IV (MALKI & DHANKHETI)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------96
87
88
135
100
97
88
72
120
100
98
86
89
57
100
99
89
90
87
100
100
90
91
74
100
101
91
92
111
100
102
92
93
106
100
103
93
94
158
100
104
94
95
100
100
105
95
96
192
100
106
96
97
76
100
107
97
84
171
100
108
94
98
88
100
109
98
99
87
100
110
99
91
77
100
111
90
100
67
100
112
100
101
85
100
113
101
102
93
100
115
102
92
133
100
116
96
104
127
100
117
104
105
123
100
118
105
94
86
100
14
67
32
100
100
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------2
0.00
1657.86
7.86
3
0.11
1656.70
11.70
4
0.11
1647.86
7.86
5
0.00
1641.84
11.84
6
0.00
1639.60
14.60
7
0.03
1637.05
13.05
8
0.03
1634.25
14.25
9
0.03
1630.16
15.16
10
0.00
1626.32
16.32
11
0.00
1625.23
16.23
12
4.70
1626.88
16.88
13
4.70
1632.19
12.19
17
4.68
1624.46
15.46
18
0.00
1620.37
15.37
19
11.34
1619.37
15.37
20
11.34
1619.37
15.37
21
0.00
1623.35
13.35
22
4.70
1636.43
16.43
GoM : Phed
147
Page 4
ZONE-IV (MALKI & DHANKHETI)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------23
4.70
1638.14
13.14
24
6.64
1622.43
14.43
25
6.64
1619.50
15.50
26
6.64
1618.72
14.72
27
6.64
1618.75
13.75
28
2.04
1623.08
16.08
29
1.58
1623.96
14.96
30
1.12
1625.47
15.47
31
0.89
1629.06
15.06
32
0.66
1631.29
15.29
35
0.03
1656.98
11.98
36
0.03
1655.59
8.59
37
0.03
1655.47
7.47
38
0.00
1654.97
9.97
39
3.95
1650.72
8.72
40
0.27
1644.61
9.61
43
3.95
1642.18
12.18
44
0.00
1640.78
12.78
45
0.00
1639.79
7.79
46
6.45
1636.46
6.46
47
0.00
1636.00
8.00
48
3.95
1636.27
6.27
49
3.95
1637.07
7.07
50
3.95
1638.72
6.72
51
3.95
1642.92
7.92
52
3.95
1648.19
14.19
53
3.95
1650.16
16.16
54
0.00
1652.03
16.03
55
3.95
1652.91
12.91
56
3.95
1654.12
8.12
59
2.59
1637.35
13.35
60
0.00
1634.77
10.77
61
3.59
1634.77
10.77
62
0.00
1635.00
11.00
63
1.09
1634.22
13.22
64
1.09
1633.88
12.88
65
1.09
1633.62
13.62
66
1.09
1633.53
13.53
67
0.03
1633.33
16.33
68
0.00
1648.57
14.57
69
0.00
1647.47
12.47
70
0.94
1645.75
12.75
71
0.94
1642.06
10.06
72
0.00
1639.37
9.37
73
0.00
1642.49
12.49
74
0.94
1642.96
12.96
75
0.00
1643.87
11.87
GoM : Phed
148
Page 5
ZONE-IV (MALKI & DHANKHETI)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------76
1.33
1645.25
11.25
77
0.00
1647.23
12.23
78
1.88
1645.58
13.58
79
0.00
1643.83
12.83
80
2.82
1643.82
12.82
83
1.56
1639.09
11.09
84
0.00
1637.16
11.16
85
4.36
1636.23
10.23
86
0.00
1636.12
11.12
87
1.56
1636.81
11.81
88
1.56
1637.92
9.92
89
2.82
1635.41
13.41
90
0.00
1634.89
12.89
91
0.00
1634.71
12.71
92
0.00
1634.71
14.71
93
0.39
1634.69
14.69
94
0.00
1634.68
14.68
95
3.44
1634.68
14.68
96
0.00
1635.18
13.18
97
0.00
1635.79
13.79
98
3.44
1634.51
14.51
99
3.44
1634.51
14.51
100
0.59
1634.82
12.82
101
0.59
1634.77
14.77
102
0.00
1634.74
14.74
104
0.62
1634.94
12.94
105
0.00
1634.79
12.79
1
-169.41
1658.00
0.00
Reservoir
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
169.41
1.76
7.02
Open
2
68.14
1.39
6.70
Open
3
68.03
3.85
80.41
Open
4
67.92
3.85
80.17
Open
5
33.42
1.89
21.56
Open
6
11.92
1.52
23.02
Open
7
11.89
1.52
22.93
Open
8
11.87
1.51
22.83
Open
9
11.84
1.51
22.74
Open
10
11.84
1.51
22.74
Open
11
-12.10
1.54
23.67
Open
12
-16.80
2.14
43.47
Open
13
-21.50
2.74
68.64
Open
GoM : Phed
149
Page 6
ZONE-IV (MALKI & DHANKHETI)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------17
23.94
1.36
11.62
Open
18
19.26
2.45
56.00
Open
19
11.08
1.41
20.09
Open
20
-0.26
0.03
0.02
Open
21
-11.60
1.48
21.90
Open
22
-25.10
3.20
91.43
Open
23
-29.80
1.69
17.43
Open
24
-34.50
1.95
22.87
Open
25
13.50
1.72
28.98
Open
26
11.73
1.49
22.36
Open
27
5.09
0.65
4.77
Open
28
-1.55
0.20
0.53
Open
29
-8.19
1.04
11.48
Open
30
-4.88
0.62
4.40
Open
31
-6.92
0.88
8.40
Open
32
-8.50
1.08
12.30
Open
33
-9.62
1.23
15.47
Open
34
-10.51
1.34
18.23
Open
37
101.27
1.43
5.74
Open
38
101.24
1.43
5.74
Open
39
101.21
1.43
5.74
Open
40
101.18
1.43
5.73
Open
41
33.32
1.89
21.44
Open
42
29.37
1.66
31.66
Open
45
29.10
1.65
16.69
Open
46
25.15
1.42
12.74
Open
47
12.18
1.55
23.95
Open
48
12.18
1.55
23.95
Open
49
5.73
0.73
5.92
Open
50
-3.03
0.39
1.83
Open
51
-6.98
0.89
8.55
Open
52
-10.93
1.39
19.62
Open
53
-14.88
1.90
34.73
Open
54
-18.83
2.40
53.71
Open
55
-22.78
1.29
10.60
Open
56
-26.73
1.51
14.26
Open
57
-59.95
1.22
5.28
Open
58
-63.90
1.30
5.95
Open
59
-67.85
1.38
6.65
Open
62
12.98
1.65
26.95
Open
63
10.39
1.32
17.85
Open
64
-0.18
0.02
0.01
Open
65
-3.77
0.48
2.73
Open
66
-8.76
1.12
13.01
Open
67
4.99
0.64
4.59
Open
68
3.90
0.50
2.91
Open
69
2.81
0.36
1.59
Open
GoM : Phed
150
Page 7
ZONE-IV (MALKI & DHANKHETI)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------70
1.72
0.22
0.64
Open
71
-10.57
1.35
18.41
Open
72
11.20
1.43
20.51
Open
73
33.22
1.88
21.32
Open
74
33.22
1.88
21.32
Open
75
11.88
1.51
22.87
Open
76
10.94
1.39
19.63
Open
77
10.00
1.27
16.62
Open
78
-14.37
1.83
32.56
Open
79
-5.53
0.70
5.55
Open
80
-6.47
0.82
7.43
Open
81
-8.37
1.07
11.97
Open
82
-9.70
1.24
15.73
Open
83
-21.34
1.21
9.39
Open
84
11.64
1.48
22.03
Open
85
9.76
1.24
15.90
Open
86
0.92
0.12
0.20
Open
87
-1.90
0.24
0.77
Open
88
8.84
1.13
13.24
Open
91
15.97
2.03
39.59
Open
92
14.41
1.84
32.72
Open
93
7.67
0.98
10.17
Open
94
3.31
0.42
2.14
Open
95
-5.28
0.67
5.09
Open
96
-6.84
0.87
8.23
Open
97
-8.40
1.07
12.04
Open
98
8.59
1.09
12.54
Open
99
5.77
0.73
6.00
Open
100
3.53
0.45
2.42
Open
101
-0.17
0.02
0.01
Open
102
0.89
0.11
0.19
Open
103
0.50
0.06
0.06
Open
104
-0.22
0.03
0.01
Open
105
-3.66
0.47
2.59
Open
106
-6.74
0.86
8.02
Open
107
-6.74
0.86
8.02
Open
108
3.18
0.41
2.00
Open
109
-0.26
0.03
0.02
Open
110
-3.70
0.47
2.64
Open
111
2.24
0.28
1.04
Open
112
1.65
0.21
0.59
Open
113
1.06
0.13
0.26
Open
115
1.06
0.13
0.26
Open
116
3.08
0.39
1.88
Open
117
2.46
0.31
1.24
Open
118
2.46
0.31
1.24
Open
14
11.17
1.42
20.40
Open
GoM : Phed
151
g,
,
i
Legends
Pipeline
Road
Zone Boundary
Reservoir
.04lm
.06km
GoM:PHED
GoM : Phed
Node No.
Pipe No.
500
450
400
200
150
100
157.00
46.00
31
50.00
4.
31
59.00
5.
48.00
6.
100.00
7.
112.00
8.
70.00
9.
25.00
10.
10
139.00
11.
10
11
45.00
12.
10
12
68.00
13.
13
15
52.00
14.
13
17
19
68.00
15.
17
18
20
70.00
16.
18
19
21
68.00
17.
19
20
22
70.00
18.
20
21
23
118.00
19.
21
22
24
66.00
20.
22
95
25
66.00
21.
95
23
26
39.00
22.
23
24
27
39.00
23.
24
25
28
40.00
From
To
1.
2.
3.
153
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
150
100
29
103.00
27
30
102.00
27
28
31
67.00
27.
28
29
32
67.00
28.
29
33
68.00
29.
27
30
34
53.00
30.
30
31
35
54.00
31.
20
32
36
63.00
32.
32
33
37
64.00
33.
33
34
38
62.00
34.
34
35
39
33.00
35.
35
36
40
65.00
36.
36
37
41
60.00
37.
37
38
42
62.00
38.
38
39
43
57.00
39.
39
40
44
58.00
40.
40
41
45
58.00
41.
41
33
46
56.00
42.
38
42
47
56.00
43.
42
43
48
100.00
44.
43
44
49
85.00
45.
44
47
52
59.00
46.
47
38
53
60.00
47.
43
48
54
70.00
48.
48
49
55
84.00
49.
49
36
56
82.00
50.
42
36
57
70.00
From
To
24.
25
26
25.
26
26.
200
154
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
58
74.00
54
62
23.00
54
56
64
61.00
54.
56
57
65
61.00
55.
57
58
67
59.00
56.
58
59
68
57.00
57.
59
60
69
5.00
58.
60
61
70
60.00
59.
61
62
71
62.00
60.
62
57
72
61.
62
63
73
60.00
62.
63
64
74
50.00
63.
64
65
75
92.00
64.
65
35
76
93.00
65.
64
66
77
81.00
66.
66
65
78
80.00
67.
66
67
79
42.00
68.
67
68
80
134.00
69.
68
69
81
67.00
70.
69
34
82
122.00
71.
68
70
83
121.00
72.
70
71
84
120.00
73.
71
72
85
122.00
74.
72
69
86
120.00
75.
72
73
87
48.00
76.
73
74
88
50.00
From
To
51.
49
50
52.
50
53.
155
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
90
46.00
77
91
71.00
77
79
93
68.00
80.
79
80
94
68.00
81.
80
81
95
111.00
82.
81
82
96
38.00
83.
82
83
97
38.00
84.
83
85
99
42.00
85.
85
76
101
50.00
86.
85
87
102
67.00
87.
87
88
103
54.00
88.
88
89
104
39.00
89.
87
92
107
76.00
90.
92
93
108
77.00
91.
93
95
109
42.00
92.
93
94
110
65.00
93.
94
87
111
68.00
94.
89
21
112
98.00
95.
81
96
113
40.00
96.
96
97
114
48.00
97.
97
98
115
78.00
98.
98
99
116
79.00
99.
99
100
117
77.00
100.
100
102
119
61.00
101.
102
25
120
37.00
102.
97
106
124
67.00
103.
106
108
126
68.00
From
To
77.
74
76
78.
76
79.
156
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
127
68.00
112
129
70.00
112
113
130
72.00
107.
113
114
131
95.00
108.
1147
115
132
69.00
109.
115
113
133
76.00
110.
115
116
134
18.00
111.
116
119
137
178.00
112.
119
120
138
48.00
113.
120
121
139
46.00
114.
121
111
140
75.00
115.
111
109
141
78.00
116.
121
122
142
65.00
117.
122
123
143
87.00
118.
123
124
144
90.00
119.
124
71
145
95.00
120.
80
122
146
149.00
121.
124
125
147
72.00
122.
125
127
149
37.00
123.
127
128
150
71.00
124.
128
129
151
17.00
125.
129
130
152
73.00
126.
130
131
153
47.00
127.
131
132
154
85.00
128.
132
133
155
90.00
129.
133
134
156
80.00
130.
134
67
157
107.00
From
To
104.
108
109
105.
109
106.
157
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
158
80.00
136
159
92.00
136
137
160
66.00
134.
137
138
161
70.00
135.
138
139
162
75.00
136.
139
63
163
77.00
137.
139
140
164
9.00
138.
140
143
167
56.00
139.
143
148
172
74.00
140.
148
150
174
71.00
141.
150
151
175
120.00
142.
151
152
176
118.00
143.
152
154
178
80.00
144.
154
157
181
85.00
145.
157
158
182
90.00
146.
158
159
183
89.00
147.
159
160
184
90.00
148.
160
161
185
92.00
149.
161
163
186
88.00
150.
163
158
187
96.00
151.
154
167
189
35.00
152.
164
165
190
83.00
153.
165
166
191
85.00
154.
166
167
192
90.00
155.
167
168
193
53.00
156.
168
169
194
49.00
157.
169
170
195
33.00
From
To
131.
134
135
132.
135
133.
158
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
196
76.00
172
197
68.00
172
150
198
70.00
161.
171
173
199
82.00
162.
173
143
200
95.00
163.
170
174
201
70.00
164.
174
136
202
85.00
165.
169
175
203
-83.00
166.
175
176
204
-48.00
167.
176
178
206
62.00
168.
178
131
207
65.00
169.
175
179
208
48.00
170.
179
130
209
50.00
171.
179
180
210
60.00
172.
180
181
211
78.00
173.
181
182
212
80.00
174.
182
129
213
89.00
175.
182
183
214
75.00
176.
183
184
215
88.00
177.
184
128
216
148.00
178.
184
185
217
78.00
179.
185
186
218
60.00
180.
186
127
219
78.00
181.
185
187
220
49.00
182.
187
123
221
70.00
183.
187
188
222
44.00
184.
188
122
223
51.00
From
To
158.
170
171
159.
171
160.
159
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
224
99.00
190
225
38.00
190
191
226
114.00
188.
191
193
228
95.00
189.
193
194
229
90.00
190.
194
195
230
105.00
191.
195
196
231
103.00
192.
196
119
232
31.00
193.
189
199
235
58.00
194.
199
184
236
134.00
195.
199
200
237
61.00
196.
200
202
238
70.00
197.
202
204
240
70.00
198.
204
205
241
74.00
199.
205
206
242
34.00
200.
206
207
243
66.00
201.
205
208
255
145.00
202.
208
212
248
10.00
203.
212
214
250
60.00
204.
214
2041
251
71.00
205.
201
200
252
76.00
206.
214
215
253
42.00
207.
215
191
254
79.00
208.
207
217
256
79.00
209.
217
218
257
106.00
210.
218
219
258
44.00
211.
219
221
260
19.00
From
To
185.
188
189
186.
189
187.
160
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
261
112.00
223
263
55.00
223
225
265
141.00
215.
225
230
266
59.00
216.
230
181
267
39.00
217.
225
226
268
105.00
218.
226
227
269
104.00
219.
227
229
271
115.00
220.
229
217
272
120.00
221.
230
231
273
33.00
222.
231
168
274
100.00
223.
231
232
275
80.00
224.
232
234
277
71.00
225.
234
167
279
73.00
226.
245
246
291
154.00
227.
245
250
295
55.00
228.
250
251
296
57.00
229.
251
252
298
87.00
230.
252
253
299
70.00
231.
253
254
300
82.00
232.
254
255
301
77.00
233.
255
256
302
77.00
234.
256
2583
303
72.00
235.
256
257
304
92.00
236.
257
258
305
131.00
237.
258
260
307
34.00
238.
260
261
308
120.00
From
To
212.
221
184
213.
218
214.
161
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
309
90.00
263
310
96.00
263
265
311
100.00
242.
264
207
312
40.00
243.
264
265
313
158.00
244.
265
266
314
110.00
245.
266
267
315
115.00
246.
267
269
317
107.00
247.
269
270
318
110.00
248.
270
271
319
118.00
249.
271
206
320
98.00
250.
265
272
321
55.00
251.
272
273
322
32.00
252.
273
317
323
65.00
253.
311
274
324
70.00
254.
274
275
325
71.00
255.
275
277
327
38.00
256.
277
280
330
34.00
257.
280
281
331
80.00
258.
281
282
332
65.00
259.
282
283
333
90.00
260.
283
284
334
92.00
261.
284
285
335
58.00
262.
285
273
336
73.00
263.
285
286
337
55.00
264.
286
282
338
140.00
265.
286
267
339
29.00
From
To
239.
261
262
240.
261
241.
162
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
150
100
340
132.00
374
341
69.00
281
288
342
144.00
269.
288
289
343
145.00
270.
289
290
344
140.00
271.
290
292
346
272.
292
293
348
133.00
273.
293
262
348
90.00
274.
293
294
349
35.00
275.
294
295
350
100.00
276.
257
294
351
187.00
277.
295
296
352
102.00
278.
296
297
353
85.00
279.
297
281
354
82.00
280.
296
179
355
119.00
281.
298
294
356
189.00
282.
298
299
357
58.00
283.
299
292
358
89.00
284.
299
300
359
78.00
285.
300
301
360
79.00
286.
301
302
361
65.00
287.
301
306
364
90.00
288.
306
307
365
114.00
289.
307
308
366
85.00
290.
308
309
367
83.00
291.
309
305
368
90.00
292.
305
302
369
99.00
From
To
266.
287
381
267.
287
268.
200
141.00
163
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
371
314
374
314
315
375
296.
261
272
376
297.
293
284
377
298.
190
120
378
299.
246
315
379
From
To
293.
307
311
294.
311
295.
Total :
200
150
100
43.00
100.00
101.00
118.00
120.00
45.00
35.00
157.00
228.00
468.00
1461.00
1343.00
18967.00
".
(/)
go
305
ZONE - V
;09
1.
299.
"300
AREA OF COVERAGE:
~98
1. Nongthymmai
306
2. Pohkseh
307 ......... _111
26'
"
314
17
229
Main reservoir
GoM:Phed
165
N
Elevation
25.00
50.00
75.00
100.00
m
277
280
281
288
289
GoM : Phed
166
Page 1
7/24/2008 9:47:05 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone V Nongthymmai.net
Zone - V (Nongthymmai & Pohkseh)
Link - Node Table:
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------1
1
2
157
400
2
2
3
46
300
3
3
31
50
300
4
31
4
59
150
5
4
5
48
150
6
5
6
100
200
7
6
7
112
200
8
7
2
70
300
9
7
8
25
100
10
8
9
139
100
11
9
10
45
100
12
10
8
68
100
15
5
13
52
200
19
13
17
68
250
20
17
18
70
250
21
18
19
68
250
22
19
20
70
250
23
20
21
118
150
24
21
22
66
100
25
22
95
66
100
26
95
23
39
100
27
23
24
39
100
28
24
25
40
100
29
25
26
103
150
30
26
27
102
200
31
27
28
67
150
32
28
29
67
150
33
29
5
68
100
34
27
30
53
200
35
30
31
54
200
36
20
32
63
250
37
32
33
64
250
38
33
34
62
300
39
34
35
33
200
40
35
36
65
250
41
36
37
60
100
42
37
38
62
100
GoM : Phed
167
Page 2
Zone - V (Nongthymmai & Pohkseh)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------43
38
39
57
200
44
39
40
58
200
45
40
41
58
200
46
41
33
56
200
47
38
42
56
200
48
42
43
100
200
49
43
44
85
100
52
44
47
59
100
53
47
38
60
100
54
43
48
70
100
55
48
49
84
100
56
49
36
82
150
57
42
36
70
100
58
49
50
74
100
62
50
54
23
100
64
54
56
61
100
65
56
57
61
100
67
57
58
58
100
68
58
59
59
100
69
59
60
57
100
70
60
61
5
100
71
61
62
60
100
72
62
57
62
150
73
62
63
60
200
74
63
64
50
150
75
64
65
92
150
76
65
35
93
200
77
64
66
81
150
78
66
65
80
150
79
66
67
42
100
80
67
68
134
100
81
68
69
67
100
82
69
34
122
150
83
68
70
121
100
84
70
71
120
100
85
71
72
122
100
86
72
69
120
150
87
72
73
48
100
88
73
74
50
100
90
74
76
46
150
91
76
77
71
150
93
77
79
68
100
94
79
80
68
100
95
80
81
111
100
96
81
82
38
100
97
82
83
38
100
99
83
85
42
100
GoM : Phed
168
Page 3
Zone - V (Nongthymmai & Pohkseh)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------101
85
76
50
100
102
85
87
67
100
103
87
88
54
100
104
88
89
39
100
107
87
92
76
100
108
92
93
77
100
109
93
95
42
100
110
93
94
65
100
111
94
87
68
100
112
89
21
98
100
113
81
96
40
100
114
96
97
48
100
115
97
98
78
100
116
98
99
79
100
117
99
100
77
100
119
100
102
61
100
120
102
25
37
100
124
97
106
67
100
126
106
108
68
100
127
108
109
68
100
129
109
112
70
100
130
112
113
72
100
131
113
114
95
100
132
114
115
69
100
133
115
113
76
100
134
115
116
18
100
137
116
119
178
100
138
119
120
48
100
139
120
121
46
100
140
121
111
75
100
141
111
109
78
100
142
121
122
65
100
143
122
123
87
100
144
123
124
90
100
145
124
71
95
100
146
80
122
149
100
147
124
125
72
100
149
125
127
37
100
150
127
128
71
100
151
128
129
17
100
152
129
130
73
100
153
130
131
47
100
154
131
132
85
100
155
132
133
90
100
156
133
134
80
100
157
134
67
107
100
158
134
135
80
100
GoM : Phed
169
Page 4
Zone - V (Nongthymmai & Pohkseh)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------159
135
136
92
100
160
136
137
66
100
161
137
138
70
100
162
138
139
75
100
163
139
63
77
150
164
139
140
9
150
167
140
143
56
150
172
143
148
74
100
174
148
150
71
100
175
150
151
120
100
176
151
152
118
100
178
152
154
80
100
181
154
157
85
100
182
157
158
90
100
183
158
159
89
100
184
159
160
90
100
185
160
161
92
100
186
161
163
88
100
187
163
158
96
100
189
154
164
35
100
190
164
165
83
100
191
165
166
85
100
192
166
167
90
100
193
167
168
53
100
194
168
169
49
100
195
169
170
33
100
196
170
171
76
100
197
171
172
68
100
198
172
150
70
100
199
171
173
82
100
200
173
143
95
100
201
170
174
70
100
202
174
136
85
100
203
169
175
83
100
204
175
176
48
100
206
176
178
62
100
207
178
131
65
100
208
175
179
48
100
209
179
130
50
100
210
179
180
60
100
211
180
181
78
100
212
181
182
80
100
213
182
129
89
100
214
182
183
75
100
215
183
184
88
100
216
184
128
148
100
217
184
185
78
100
GoM : Phed
170
Page 5
Zone - V (Nongthymmai & Pohkseh)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------218
185
186
60
100
219
186
127
78
100
220
185
187
49
100
221
187
123
70
100
222
187
188
44
100
223
188
122
51
100
224
188
189
99
100
225
189
190
38
100
226
190
191
114
100
228
191
193
95
100
229
193
194
90
100
230
194
195
105
100
231
195
196
103
100
232
196
119
31
100
235
189
199
58
100
236
199
184
134
100
237
199
200
61
100
238
200
202
70
100
240
202
204
70
100
241
204
205
74
100
242
205
206
34
100
243
206
207
66
100
244
205
208
145
100
248
208
212
10
100
250
212
214
60
100
251
214
201
71
150
252
201
200
76
100
253
214
215
42
100
254
215
191
79
100
256
207
217
79
100
257
217
218
106
100
258
218
219
44
100
260
219
221
19
100
261
221
184
112
100
263
218
223
55
100
265
223
225
141
100
266
225
230
59
100
267
230
181
39
100
268
225
226
105
100
269
226
227
104
100
271
227
229
115
100
272
229
217
120
100
273
230
231
33
100
274
231
168
100
100
275
231
232
80
100
277
232
234
71
100
278
234
167
73
150
GoM : Phed
171
Page 6
Zone - V (Nongthymmai & Pohkseh)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------291
245
246
154
100
295
245
250
55
100
296
250
251
57
100
297
251
252
87
100
299
252
253
70
100
300
253
254
82
100
301
254
255
77
100
302
255
256
77
100
303
256
253
72
200
304
256
257
92
100
305
257
258
131
100
307
258
260
34
100
308
260
261
120
100
309
261
262
90
100
310
261
263
96
100
311
263
264
100
100
312
264
207
40
100
313
264
265
158
100
314
265
266
110
100
315
266
267
115
100
317
267
269
107
100
318
269
270
110
100
319
270
271
118
100
320
271
206
98
100
321
265
272
55
100
322
272
273
32
100
323
273
317
65
100
324
317
274
70
100
325
274
275
71
100
327
275
277
38
100
330
277
280
34
100
331
280
281
80
100
332
281
282
65
100
333
282
283
90
100
334
283
284
92
100
335
284
285
58
100
336
285
273
73
100
337
285
286
55
200
338
286
282
140
100
339
286
287
29
100
340
287
281
132
100
341
287
274
69
100
342
281
288
144
100
343
288
289
145
100
344
289
290
140
100
346
290
292
141
100
347
292
293
133
100
GoM : Phed
172
Page 7
Zone - V (Nongthymmai & Pohkseh)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------348
293
262
90
100
349
293
294
35
200
350
294
295
100
100
351
257
294
187
100
352
295
296
102
100
353
296
297
85
100
354
297
251
82
100
355
296
298
119
100
356
298
294
189
100
357
298
299
58
100
358
299
292
89
100
359
299
300
78
200
360
300
301
79
200
361
301
302
65
200
364
301
306
90
100
365
306
307
114
100
366
307
308
85
100
367
308
309
83
100
368
309
305
90
100
369
305
302
99
100
371
307
311
43
100
374
311
314
100
100
375
314
315
101
100
376
261
272
118
100
377
293
284
120
100
378
190
120
45
100
379
246
315
35
100
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------2
0.00
1654.61
14.61
3
2.40
1653.98
14.98
4
1.35
1648.65
15.65
5
0.00
1644.99
12.99
6
2.40
1649.20
16.20
7
0.00
1654.12
17.12
8
0.00
1653.90
17.90
9
3.60
1653.66
18.66
10
3.60
1653.66
18.66
31
0.00
1653.32
16.32
13
2.40
1638.36
10.36
17
2.40
1635.50
10.50
18
2.40
1632.64
11.64
19
2.40
1629.92
13.92
GoM : Phed
173
Page 8
Zone - V (Nongthymmai & Pohkseh)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------20
0.00
1627.19
16.19
21
0.00
1626.44
21.44
22
0.42
1626.48
21.48
95
0.00
1626.54
21.54
23
1.08
1630.99
21.99
24
1.95
1635.76
17.76
25
0.00
1641.27
17.27
26
1.50
1648.04
20.04
27
0.00
1649.77
18.77
28
4.35
1648.85
20.85
29
4.35
1648.19
20.19
30
2.40
1651.49
15.49
32
0.75
1625.16
14.16
33
0.00
1623.12
12.12
34
0.00
1622.59
13.59
35
0.00
1621.78
16.78
36
0.00
1621.77
15.77
37
6.51
1621.77
15.77
38
0.00
1622.29
13.29
39
1.80
1622.43
13.43
40
4.80
1622.59
12.59
41
4.80
1622.82
12.82
42
0.00
1622.24
14.24
43
0.00
1622.21
15.21
44
1.80
1622.20
14.20
47
1.80
1622.20
14.20
48
0.90
1621.85
15.85
49
0.00
1621.53
16.53
50
1.80
1618.63
13.63
54
1.80
1617.90
12.90
56
1.80
1616.41
11.41
57
0.00
1615.30
10.30
58
1.80
1615.09
10.09
59
3.60
1615.00
11.00
60
1.80
1615.01
11.01
61
1.80
1615.02
11.02
62
0.00
1615.25
11.25
63
0.00
1615.25
12.25
64
0.00
1617.48
13.48
65
0.00
1619.75
14.75
66
0.00
1617.81
13.81
67
0.00
1614.78
12.78
68
0.00
1614.84
17.84
69
0.00
1617.36
16.36
70
5.58
1611.02
17.02
71
0.00
1609.53
16.53
72
0.00
1614.84
16.84
GoM : Phed
174
Page 9
Zone - V (Nongthymmai & Pohkseh)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------73
5.79
1612.92
14.92
74
0.00
1612.04
13.04
76
0.00
1611.93
12.93
77
4.65
1611.36
13.36
79
4.65
1608.98
11.98
80
0.00
1607.78
11.78
81
0.00
1609.43
11.43
82
4.80
1609.81
10.81
83
4.80
1610.75
10.75
85
0.00
1612.65
12.65
87
0.00
1619.42
17.42
88
5.40
1620.03
17.03
89
5.40
1621.15
18.15
92
2.40
1620.59
16.59
93
0.00
1622.38
18.38
94
5.40
1620.31
17.31
96
2.40
1609.45
9.45
97
0.00
1609.61
7.61
98
1.80
1615.45
9.45
99
1.80
1622.26
16.26
100
1.80
1629.84
21.84
102
1.80
1636.64
13.64
106
0.48
1606.19
9.19
108
0.48
1602.89
10.89
109
0.00
1599.74
12.74
111
2.58
1598.78
14.78
112
1.26
1598.82
14.82
113
0.00
1598.11
14.11
114
0.75
1597.92
13.92
115
0.00
1597.83
13.83
116
1.26
1597.68
12.68
119
0.00
1596.69
20.69
120
0.00
1596.79
17.79
121
0.00
1598.30
16.30
122
0.00
1599.09
16.09
123
0.00
1599.10
16.10
124
0.00
1600.67
17.67
125
4.20
1598.11
16.11
127
0.00
1597.39
17.39
128
0.00
1596.77
17.77
129
0.00
1596.77
18.77
130
0.00
1597.42
19.42
131
0.00
1597.93
19.93
132
2.85
1599.42
14.42
133
5.58
1601.89
8.89
134
0.00
1606.13
8.13
135
2.40
1605.79
12.79
GoM : Phed
175
Page 10
Zone - V (Nongthymmai & Pohkseh)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------136
0.00
1605.68
15.68
137
2.40
1606.91
13.91
138
2.40
1608.82
13.82
139
0.00
1611.61
11.61
140
2.61
1611.39
14.39
143
0.00
1610.22
18.22
148
1.38
1606.91
16.91
150
0.00
1604.20
18.20
151
1.20
1600.49
15.49
152
1.80
1597.39
14.39
154
0.00
1595.81
12.81
157
0.78
1594.09
11.09
158
0.00
1592.50
9.50
159
2.58
1592.06
9.06
160
2.58
1591.93
9.93
161
2.58
1591.93
9.93
163
2.58
1592.05
9.05
164
0.36
1595.81
13.81
165
3.36
1595.81
13.81
166
0.36
1596.05
15.05
167
0.00
1596.35
15.35
168
0.00
1596.99
16.99
169
0.00
1598.96
13.96
170
0.00
1601.92
15.92
171
0.00
1604.16
18.16
172
1.38
1604.16
18.16
173
2.61
1606.48
18.48
174
1.80
1603.37
15.37
175
0.00
1597.88
20.88
176
1.80
1597.86
20.86
178
1.80
1597.86
20.86
179
0.00
1597.41
18.41
180
0.78
1596.71
20.71
181
0.00
1595.94
19.94
182
0.00
1596.00
19.00
183
2.34
1595.63
19.63
184
0.00
1595.48
19.48
185
0.00
1597.14
18.14
186
2.58
1597.16
18.16
187
0.00
1597.97
16.97
188
0.00
1597.97
17.97
189
0.00
1595.88
17.88
190
0.00
1595.88
17.88
191
0.00
1593.96
18.96
193
1.38
1594.18
19.18
194
1.38
1594.55
18.55
195
1.38
1595.26
18.26
GoM : Phed
176
Page 11
Zone - V (Nongthymmai & Pohkseh)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------196
1.38
1596.27
18.27
199
0.00
1594.44
18.44
200
0.00
1591.10
15.10
201
0.45
1590.89
15.89
202
1.68
1588.54
17.54
204
1.68
1586.48
18.48
205
0.00
1584.78
19.78
206
0.00
1581.72
21.72
207
0.00
1579.98
20.98
208
0.60
1588.68
19.68
212
0.60
1588.97
15.97
214
0.00
1590.87
16.87
215
2.58
1591.69
17.69
217
0.00
1585.57
23.57
218
0.00
1590.22
20.22
219
0.26
1591.22
21.22
221
2.58
1591.67
21.67
223
2.34
1590.47
20.47
225
0.00
1591.79
15.79
226
2.58
1589.06
22.06
227
2.58
1587.27
19.27
229
2.58
1586.13
22.13
230
0.00
1595.36
18.36
231
0.00
1595.98
17.98
232
0.60
1596.13
16.13
234
0.60
1596.31
15.31
245
1.08
1557.57
17.57
246
1.08
1557.47
17.47
250
1.08
1557.67
17.67
251
0.00
1557.84
17.84
252
0.60
1558.12
16.12
253
0.00
1558.40
18.40
254
0.60
1558.40
18.40
255
0.60
1558.40
18.40
256
0.00
1558.42
18.42
257
0.00
1558.99
18.99
258
3.60
1559.51
19.51
260
3.60
1559.90
18.90
261
0.00
1562.62
14.62
262
3.60
1560.33
19.33
263
3.60
1566.92
16.92
264
0.00
1573.31
14.31
265
0.00
1568.41
18.41
266
0.36
1570.30
21.30
267
0.36
1572.41
15.41
269
0.36
1574.50
15.50
270
0.45
1576.78
17.78
GoM : Phed
177
Page 12
Zone - V (Nongthymmai & Pohkseh)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------271
0.36
1579.41
20.41
272
0.00
1563.71
13.71
317
0.36
1561.76
16.76
273
0.00
1562.30
21.30
274
0.00
1561.22
19.22
275
0.36
1561.06
19.06
277
0.36
1560.98
18.98
280
0.36
1560.93
16.93
281
0.00
1560.84
17.84
282
0.00
1560.84
17.84
283
1.20
1560.68
16.68
284
0.00
1560.62
15.62
285
0.00
1561.10
19.10
286
0.00
1561.09
18.09
287
0.00
1561.09
18.09
288
0.90
1560.01
18.01
289
0.90
1559.40
18.40
290
0.90
1559.01
18.01
292
0.00
1558.77
16.77
293
0.00
1559.10
19.10
294
0.00
1559.06
17.06
295
7.20
1558.04
18.04
296
0.00
1558.03
17.03
297
2.58
1557.84
17.84
298
0.00
1558.20
16.20
299
0.00
1558.09
17.09
300
0.30
1558.05
18.05
301
0.00
1558.01
18.01
302
1.05
1558.00
18.00
305
1.05
1557.75
17.75
306
2.58
1557.66
15.66
307
0.00
1557.57
35.57
308
1.05
1557.57
17.57
309
1.05
1557.62
17.62
311
1.08
1557.51
17.51
314
1.08
1557.47
17.47
315
1.08
1557.46
17.46
1
-272.93
1656.00
0.00
Reservoir
GoM : Phed
178
Page 13
Zone - V (Nongthymmai & Pohkseh)
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
272.93
2.17
8.87
Open
2
161.06
2.28
13.56
Open
3
158.66
2.25
13.19
Open
4
67.49
3.82
79.24
Open
5
66.14
3.75
76.33
Open
6
-102.27
3.26
42.13
Open
7
-104.67
3.33
43.98
Open
8
-111.87
1.58
6.90
Open
9
7.20
0.92
9.05
Open
10
2.93
0.37
1.72
Open
11
-0.67
0.08
0.11
Open
12
-4.27
0.54
3.43
Open
15
185.94
5.92
127.49
Open
19
183.54
3.74
41.97
Open
20
181.14
3.69
40.96
Open
21
178.74
3.64
39.96
Open
22
176.34
3.59
38.98
Open
23
17.23
0.98
6.32
Open
24
-1.66
0.21
0.60
Open
25
-2.08
0.26
0.91
Open
26
-28.28
3.60
114.04
Open
27
-29.36
3.74
122.23
Open
28
-31.31
3.99
137.69
Open
29
-61.03
3.46
65.77
Open
30
-62.53
1.99
16.94
Open
31
26.24
1.49
13.77
Open
32
21.89
1.24
9.84
Open
33
17.54
2.23
47.06
Open
34
-88.77
2.83
32.42
Open
35
-91.17
2.90
34.06
Open
36
159.12
3.24
32.22
Open
37
158.37
3.23
31.94
Open
38
125.02
1.77
8.48
Open
39
76.57
2.44
24.66
Open
40
4.97
0.10
0.05
Open
41
-0.35
0.04
0.03
Open
42
-6.86
0.87
8.27
Open
43
-21.95
0.70
2.44
Open
44
-23.75
0.76
2.82
Open
45
-28.55
0.91
3.96
Open
46
-33.35
1.06
5.29
Open
47
12.48
0.40
0.86
Open
48
6.37
0.20
0.25
Open
49
0.99
0.13
0.23
Open
52
-0.81
0.10
0.16
Open
53
-2.61
0.33
1.38
Open
54
5.38
0.68
5.27
Open
GoM : Phed
179
Page 14
Zone - V (Nongthymmai & Pohkseh)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------55
4.48
0.57
3.75
Open
56
-11.43
0.65
2.95
Open
57
6.11
0.78
6.66
Open
58
15.90
2.03
39.26
Open
62
14.10
1.80
31.43
Open
64
12.30
1.57
24.41
Open
65
10.50
1.34
18.21
Open
67
4.48
0.57
3.76
Open
68
2.68
0.34
1.45
Open
69
-0.92
0.12
0.20
Open
70
-2.72
0.35
1.49
Open
71
-4.52
0.58
3.82
Open
72
-6.02
0.34
0.90
Open
73
1.50
0.05
0.02
Open
74
-49.53
2.80
44.67
Open
75
-35.96
2.04
24.69
Open
76
-71.61
2.28
21.77
Open
77
-13.56
0.77
4.06
Open
78
-35.64
2.02
24.29
Open
79
22.08
2.81
72.10
Open
80
-1.41
0.18
0.44
Open
81
-15.54
1.98
37.60
Open
82
-48.45
2.74
42.88
Open
83
14.13
1.80
31.54
Open
84
8.55
1.09
12.44
Open
85
-16.82
2.14
43.56
Open
86
-32.91
1.86
20.95
Open
87
16.09
2.05
40.14
Open
88
10.30
1.31
17.57
Open
90
10.30
0.58
2.44
Open
91
19.60
1.11
8.02
Open
93
14.95
1.90
35.00
Open
94
10.30
1.31
17.55
Open
95
-9.39
1.20
14.81
Open
96
-7.59
0.97
9.99
Open
97
-12.39
1.58
24.75
Open
99
-17.19
2.19
45.38
Open
101
9.29
1.18
14.52
Open
102
-26.49
3.37
101.01
Open
103
-8.08
1.03
11.22
Open
104
-13.48
1.72
28.93
Open
107
-9.60
1.22
15.41
Open
108
-12.00
1.53
23.30
Open
109
-26.20
3.34
99.01
Open
110
14.21
1.81
31.86
Open
111
8.81
1.12
13.14
Open
112
-18.88
2.41
53.98
Open
GoM : Phed
180
Page 15
Zone - V (Nongthymmai & Pohkseh)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------113
-1.80
0.23
0.69
Open
114
-4.20
0.53
3.33
Open
115
-22.52
2.87
74.81
Open
116
-24.32
3.10
86.26
Open
117
-26.12
3.33
98.45
Open
119
-27.92
3.56
111.38
Open
120
-29.72
3.79
125.04
Open
124
18.33
2.33
51.06
Open
126
17.85
2.27
48.61
Open
127
17.37
2.21
46.22
Open
129
8.83
1.12
13.20
Open
130
7.57
0.96
9.93
Open
131
3.19
0.41
2.00
Open
132
2.44
0.31
1.22
Open
133
-4.38
0.56
3.61
Open
134
6.82
0.87
8.19
Open
137
5.56
0.71
5.61
Open
138
-3.34
0.43
2.18
Open
139
-14.43
1.84
32.79
Open
140
-5.96
0.76
6.37
Open
141
-8.54
1.09
12.40
Open
142
-8.47
1.08
12.23
Open
143
-0.43
0.06
0.05
Open
144
-10.27
1.31
17.49
Open
145
-25.37
3.23
93.24
Open
146
19.69
2.51
58.31
Open
147
15.09
1.92
35.64
Open
149
10.89
1.39
19.48
Open
150
7.01
0.89
8.60
Open
151
-0.06
0.01
0.00
Open
152
-7.12
0.91
8.87
Open
153
-7.96
1.01
10.91
Open
154
-10.26
1.31
17.45
Open
155
-13.11
1.67
27.48
Open
156
-18.69
2.38
52.98
Open
157
-23.49
2.99
80.85
Open
158
4.79
0.61
4.26
Open
159
2.39
0.30
1.18
Open
160
-10.65
1.36
18.69
Open
161
-13.05
1.66
27.23
Open
162
-15.45
1.97
37.22
Open
163
-51.03
2.89
47.21
Open
164
35.58
2.01
24.21
Open
167
32.97
1.87
21.02
Open
172
17.04
2.17
44.64
Open
174
15.66
2.00
38.18
Open
175
13.99
1.78
30.97
Open
GoM : Phed
181
Page 16
Zone - V (Nongthymmai & Pohkseh)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------176
12.79
1.63
26.23
Open
178
10.99
1.40
19.81
Open
181
11.10
1.41
20.18
Open
182
10.32
1.31
17.63
Open
183
5.22
0.67
4.99
Open
184
2.64
0.34
1.42
Open
185
0.06
0.01
0.00
Open
186
-2.52
0.32
1.29
Open
187
-5.10
0.65
4.77
Open
189
-0.11
0.01
0.00
Open
190
-0.47
0.06
0.06
Open
191
-3.83
0.49
2.81
Open
192
-4.19
0.53
3.32
Open
193
-8.45
1.08
12.16
Open
194
-16.09
2.05
40.11
Open
195
-24.85
3.17
89.77
Open
196
-13.61
1.73
29.43
Open
197
-0.29
0.04
0.02
Open
198
-1.67
0.21
0.61
Open
199
-13.32
1.70
28.26
Open
200
-15.93
2.03
39.37
Open
201
-11.24
1.43
20.66
Open
202
-13.04
1.66
27.20
Open
203
8.77
1.12
13.03
Open
204
1.30
0.17
0.38
Open
206
-0.50
0.06
0.06
Open
207
-2.30
0.29
1.09
Open
208
7.47
0.95
9.68
Open
209
-0.84
0.11
0.17
Open
210
8.31
1.06
11.80
Open
211
7.53
0.96
9.83
Open
212
-1.86
0.24
0.73
Open
213
-7.06
0.90
8.73
Open
214
5.20
0.66
4.96
Open
215
2.86
0.36
1.64
Open
216
-7.07
0.90
8.74
Open
217
-11.41
1.45
21.24
Open
218
-1.31
0.17
0.38
Open
219
-3.89
0.49
2.89
Open
220
-10.11
1.29
16.96
Open
221
-9.84
1.25
16.15
Open
222
-0.26
0.03
0.02
Open
223
-11.65
1.48
22.06
Open
224
11.39
1.45
21.15
Open
225
-1.01
0.13
0.24
Open
226
10.07
1.28
16.86
Open
228
-3.38
0.43
2.23
Open
GoM : Phed
182
Page 17
Zone - V (Nongthymmai & Pohkseh)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------229
-4.76
0.61
4.21
Open
230
-6.14
0.78
6.74
Open
231
-7.52
0.96
9.81
Open
232
-8.90
1.13
13.40
Open
235
12.40
1.58
24.77
Open
236
-6.63
0.85
7.77
Open
237
19.03
2.42
54.77
Open
238
15.29
1.95
36.51
Open
240
13.61
1.73
29.43
Open
241
11.93
1.52
23.05
Open
242
24.90
3.17
90.05
Open
243
12.82
1.63
26.36
Open
244
-12.97
1.65
26.90
Open
248
-13.57
1.73
29.26
Open
250
-14.17
1.80
31.70
Open
251
-3.29
0.19
0.30
Open
252
-3.74
0.48
2.70
Open
253
-10.87
1.39
19.42
Open
254
-13.45
1.71
28.80
Open
256
-21.87
2.79
70.87
Open
257
-16.87
2.15
43.80
Open
258
-11.87
1.51
22.85
Open
260
-12.13
1.55
23.77
Open
261
-14.71
1.87
33.98
Open
263
-5.00
0.64
4.61
Open
265
-7.34
0.93
9.38
Open
266
-20.08
2.56
60.49
Open
267
-9.39
1.20
14.79
Open
268
12.74
1.62
26.06
Open
269
10.16
1.29
17.14
Open
271
7.58
0.97
9.97
Open
272
5.00
0.64
4.61
Open
273
-10.70
1.36
18.84
Open
274
-7.64
0.97
10.10
Open
275
-3.06
0.39
1.85
Open
277
-3.66
0.47
2.58
Open
278
-4.26
0.24
0.47
Open
291
1.80
0.23
0.70
Open
295
-2.88
0.37
1.66
Open
296
-3.96
0.50
2.99
Open
297
-4.11
0.52
3.20
Open
299
-4.71
0.60
4.12
Open
300
0.36
0.05
0.03
Open
301
-0.24
0.03
0.02
Open
302
-0.84
0.11
0.17
Open
303
5.07
0.16
0.16
Open
304
-5.91
0.75
6.28
Open
GoM : Phed
183
Page 18
Zone - V (Nongthymmai & Pohkseh)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------305
-4.60
0.59
3.96
Open
307
-8.20
1.05
11.53
Open
308
-11.80
1.50
22.61
Open
309
12.58
1.60
25.43
Open
310
-17.09
2.18
44.86
Open
311
-20.69
2.64
63.91
Open
312
-34.70
4.42
166.54
Open
313
14.01
1.78
31.05
Open
314
-10.18
1.30
17.20
Open
315
-10.54
1.34
18.34
Open
317
-10.90
1.39
19.51
Open
318
-11.26
1.43
20.72
Open
319
-11.71
1.49
22.28
Open
320
-12.07
1.54
23.57
Open
321
24.19
3.08
85.40
Open
322
16.90
2.15
43.93
Open
323
6.93
0.88
8.42
Open
324
6.57
0.84
7.63
Open
325
3.48
0.44
2.36
Open
327
3.12
0.40
1.93
Open
330
2.76
0.35
1.54
Open
331
2.40
0.31
1.19
Open
332
-0.09
0.01
0.00
Open
333
2.96
0.38
1.75
Open
334
1.76
0.22
0.67
Open
335
-6.86
0.87
8.28
Open
336
-9.97
1.27
16.54
Open
337
3.11
0.10
0.06
Open
338
3.05
0.39
1.84
Open
339
0.06
0.01
0.00
Open
340
3.15
0.40
1.95
Open
341
-3.08
0.39
1.88
Open
342
5.64
0.72
5.75
Open
343
4.74
0.60
4.17
Open
344
3.84
0.49
2.82
Open
346
2.94
0.37
1.72
Open
347
-3.60
0.46
2.51
Open
348
-8.98
1.14
13.62
Open
349
14.00
0.45
1.06
Open
350
7.72
0.98
10.29
Open
351
-1.30
0.17
0.38
Open
352
0.52
0.07
0.07
Open
353
2.43
0.31
2.26
Open
354
-0.15
0.02
0.01
Open
355
-1.92
0.24
1.45
Open
356
-4.98
0.63
4.57
Open
357
3.06
0.39
1.86
Open
GoM : Phed
184
Page 19
Zone - V (Nongthymmai & Pohkseh)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------358
-6.54
0.83
7.57
Open
359
9.60
0.31
0.53
Open
360
9.30
0.30
0.50
Open
361
4.73
0.15
0.14
Open
364
4.57
0.58
3.90
Open
365
1.99
0.25
0.83
Open
366
-0.53
0.07
0.07
Open
367
-1.58
0.20
0.55
Open
368
-2.63
0.34
1.40
Open
369
-3.68
0.47
2.61
Open
371
2.52
0.32
1.29
Open
374
1.44
0.18
0.46
Open
375
0.36
0.05
0.03
Open
376
-7.30
0.93
9.27
Open
377
-8.62
1.10
12.63
Open
378
-11.09
1.41
20.13
Open
379
0.72
0.09
0.13
Open
GoM : Phed
185
g,
,
i
Legends
Pipeline
Road
Zone Boundary
Reservoir
Distribution Network - Zone - VI: Pastuer Institute, LawmaIi, Part of Mawlai Mawroh, Polo Bazar, Polo Hills, Forest Colony, Nongmali
.03im
.045bn
GoM:PHED
GoM : Phed
Pipe No.
Node No.
From
To
500
450
400
200
150
100
1.
55.00
2.
93.00
3.
46.00
4.
84.00
5.
47.00
6.
10
10
131.00
7.
11
11
94.00
8.
11
12
12
158.00
9.
12
13
15
212.00
10.
13
14
16
94.00
11.
13
15
17
98.00
12.
15
16
18
106.00
13.
16
17
19
123.00
14.
17
18
20
240.00
15.
18
19
21
138.00
16.
19
20
22
281.00
17.
20
21
23
178.00
18.
21
22
24
187.00
19.
15
23
25
69.00
20.
23
24
26
130.00
21.
24
25
27
128.00
22.
25
26
28
161.00
23.
26
27
29
78.00
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
30
199.00
29
31
103.00
29
30
32
280.00
27.
30
31
33
367.00
28.
31
32
34
321.00
29.
32
33
35
187.00
30.
29
34
36
57.00
31.
34
35
37
148.00
32.
35
36
38
56.00
33.
36
37
39
130.00
34.
37
38
40
58.00
35.
38
39
41
52.00
36.
39
41
43
79.00
37.
41
42
44
74.00
38.
42
43
45
65.00
39.
43
44
46
234.00
40.
44
45
47
153.00
41.
45
46
48
60.00
42.
46
47
49
211.00
43.
47
48
50
275.00
44.
48
49
51
368.00
45.
45
50
52
49.00
46.
50
51
53
78.00
47.
50
52
54
91.00
48.
52
53
55
108.00
49.
51
41
57
148.00
From
To
24.
23
28
25.
28
26.
100
188
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
58
140.00
56
59
120.00
56
57
60
210.00
53.
57
58
61
148.00
54.
58
59
62
99.00
55.
59
60
63
83.00
56.
60
36
64
73.00
57.
58
61
65
75.00
58.
57
62
66
123.00
59.
62
63
67
160.00
60.
35
64
68
157.00
61.
64
65
69
153.00
62.
65
66
70
111.00
63.
65
67
71
153.00
64.
67
68
72
169.00
65.
68
69
73
198.00
66.
69
70
74
243.00
67.
70
71
75
127.00
68.
71
72
76
147.00
69.
70
73
77
210.00
70.
73
74
78
350.00
71.
74
75
79
416.00
72.
75
76
80
85.00
73.
76
77
81
71.00
74.
77
78
82
66.00
75.
76
80
84
134.00
From
To
50.
46
55
51.
55
52.
189
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
85
114.00
82
86
176.00
82
75
87
120.00
79.
81
83
88
179.00
80.
83
84
89
170.00
81.
84
85
90
208.00
82.
85
86
91
174.00
83.
86
87
92
160.00
84.
87
88
93
116.00
85.
81
89
94
116.00
86.
89
90
95
139.00
87.
90
91
96
107.00
88.
91
92
97
170.00
89.
92
82
99
52.00
90.
94
95
101
146.00
91.
95
96
102
77.00
92.
96
97
103
74.00
93.
97
98
104
92.00
94.
95
99
105
165.00
95.
99
100
106
159.00
96.
100
101
107
116.00
97.
101
102
108
33.00
98.
102
99
109
103.00
99.
99
103
110
93.00
100.
103
105
112
84.00
101.
105
106
113
108.00
From
To
76.
80
81
77.
81
78.
190
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
13
117.00
15
14
71.00
34
28
114
71.00
105.
51
38
115
106.00
106.
53
37
116
50.00
107.
91
94
100
123.00
108.
22
10
117
100.00
109.
17
118
125.00
110.
18
27
119
150.00
111.
49
78
120
150.00
112.
61
65
121
100.00
113.
66
106
122
150.00
114.
106
33
123
150.00
115.
100
98
124
120.00
116.
72
99
125
150.00
117
63
74
126
150.00
118
49
88
127
250.00
From
To
102.
14
103.
43
104.
Total :
55
309
487
413
2274
480
12269
191
ZONE -VI
'PROPOSED PIPELlNE ROUTE:
(?~
88
AREA OF COVERAGE:
1. Pasteur Institute
2. Lawmali
'0
'4
101
10:
0"
103
27
GoM :Phed
!6
192
N
Elevation
88
87
25.00
1439
50.00
1438
75.00
85
100.00
49
1444
48
1444
83
47
1444
46
56
52
1442
22
1440
10
1442
1442
1448
1438
1441
1439
14
13
1446
1442
42
63
38
37
1440
1440
20
1442
16
59
36
60
1438
1438
1446
1439
1442
17
1442
19
1440
1440
18
25
1439
27
26
1440
1440
24
1440
35
1440
34
23
1438
1440
69
58
1440
1444
15
91
94
1442
1440
1439
65
67
1439
97
1439
1440
1442
99
100
1438
1446
1438
105
1438
98
1445
103
1442
1438
1442
1441
68
61
96
95
72
1441
1441
102
101
1442
1440
1438
66
1438
106
1441
1439
28
1438
1442
1446
1440
71
70
1441
64
1455
1438
1442
1439
1442
73
1442
39
90
1442
1441
1440
53
51
43
1446
21
57
89
1443
92
74
1441
1442
44
82
62
41
1439
1445
1441
50
12
1442
1442
1442
1447
81
75
45
1439
76
55
1441
11
1446
1445
1442
1442
80
77
1438
1440
84
78
86
29
1438
33
30
1438
1439
31
1438
32
1438
1442
GoM : Phed
193
Page 1
6/18/2008 6:15:44 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone VI Lawmali.net
Zone VI (Law Mali, Polo Bazar, Forest Colony etc.)
Link - Node Table:
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------1
0
1
55
400
4
1
4
93
100
5
4
5
46
100
8
5
8
84
100
9
1
9
47
250
10
9
10
131
100
11
9
11
94
200
12
11
12
158
200
15
12
13
212
200
16
13
14
94
350
17
13
15
98
350
18
15
16
106
100
19
16
17
123
100
20
17
18
240
100
21
18
19
138
150
22
19
20
281
100
23
20
21
178
100
24
21
22
187
100
25
15
23
69
300
26
23
24
130
100
27
24
25
128
100
28
25
26
161
100
29
26
27
78
100
30
23
28
199
300
31
28
29
103
100
32
29
30
280
100
33
30
31
367
100
34
31
32
321
100
35
32
33
187
100
36
29
34
57
100
37
34
35
148
300
38
35
36
56
250
39
36
37
130
100
40
37
38
58
100
41
38
39
52
100
43
39
41
79
100
44
41
42
74
100
GoM : Phed
194
GoM : Phed
195
GoM : Phed
196
GoM : Phed
197
Page 5
Zone VI (Law Mali, Polo Bazar, Forest Colony etc.)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------61
0.11
1454.55
15.55
62
0.23
1454.38
13.38
63
0.11
1454.38
13.38
64
0.69
1454.68
16.68
65
0.60
1454.64
16.64
66
0.09
1454.52
13.52
67
0.52
1454.58
12.58
68
0.52
1454.54
14.54
69
0.43
1454.49
13.49
70
0.34
1454.43
14.43
71
0.17
1454.34
15.34
72
0.09
1454.25
15.25
73
0.17
1454.41
14.41
74
0.09
1454.38
16.38
75
0.00
1454.35
12.35
76
0.00
1454.33
12.33
77
0.00
1454.33
9.33
78
0.05
1454.33
10.33
80
0.31
1454.31
8.31
81
0.00
1454.31
9.31
82
0.00
1454.32
11.32
83
0.28
1454.30
15.30
84
0.23
1454.29
12.29
85
0.18
1454.29
14.29
86
0.14
1454.30
16.30
87
0.09
1454.30
16.30
88
0.05
1454.31
15.31
89
0.31
1454.30
12.30
90
0.31
1454.30
12.30
91
0.00
1454.30
12.30
92
0.00
1454.32
12.32
94
0.90
1454.20
8.20
95
0.90
1454.16
13.16
96
0.14
1454.15
12.15
97
0.09
1454.15
12.15
98
0.05
1454.14
9.14
99
0.00
1454.17
16.17
100
0.94
1454.13
8.13
101
0.94
1454.13
14.13
102
0.94
1454.13
12.13
103
0.42
1454.21
16.21
105
0.28
1454.27
16.27
106
0.14
1454.37
15.37
0
-43.83
1455.00
0.00
GoM : Phed
198
GoM : Phed
199
GoM : Phed
200
Page 8
Zone VI (Law Mali, Polo Bazar, Forest Colony etc.)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------106
1.02
0.13
0.24
Open
107
0.49
0.06
0.06
Open
108
-0.45
0.06
0.05
Open
109
-1.39
0.18
0.43
Open
110
-1.38
0.18
0.43
Open
112
-1.80
0.23
0.70
Open
113
-2.08
0.27
0.91
Open
13
-33.27
0.35
0.34
Open
14
-5.82
0.19
0.21
Open
114
-18.95
0.27
0.26
Open
115
-0.80
0.10
0.15
Open
116
-1.22
0.16
0.34
Open
100
1.94
0.25
0.80
Open
117
-1.41
0.18
0.44
Open
118
1.15
0.15
0.30
Open
119
0.01
0.00
0.00
Open
120
-0.19
0.02
0.01
Open
121
-2.01
0.26
0.85
Open
122
2.18
0.28
0.99
Open
123
-0.05
0.01
0.00
Open
124
-0.42
0.05
0.05
Open
125
1.57
0.20
0.54
Open
126
0.02
0.00
0.00
Open
127
0.50
0.06
0.06
Open
GoM : Phed
201
g,
,
i
Legends
Pipeline
Road
Zone Boundary
Reservoir
.03im
.045bn
GoM:PHED
GoM : Phed
Node No.
Pipe No.
500
450
400
200
150
100
22.90
184.00
165.10
4.
260.70
5.
265.80
6.
281.37
7.
173.53
8.
158.00
9.
10
129.20
10.
10
11
10
69.43
11.
12
11
127.10
12.
12
13
12
81.50
13.
13
14
13
90.40
14.
14
15
14
143.60
15.
15
16
15
173.70
16.
14
18
17
116.60
17.
18
19
18
94.95
18.
19
19
95.30
19.
20
20
98.80
20.
20
21
21
143.68
21.
21
22
22
100.72
22.
22
23
23
144.10
From
To
1.
2.
3.
203
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
24
191.10
25
25
206.16
25
26
26
165.80
26.
26
27
27
130.60
27.
27
28
28
141.60
28.
28
29
29
145.90
29.
29
30
30
158.60
30.
30
20
31
119.40
31.
28
31
32
119.36
32.
31
32
33
233.80
33.
32
33
34
42.10
34.
33
34
35
99.74
35.
34
28
36
137.90
36.
33
35
37
195.64
37.
35
25
38
239.29
38.
33
36
39
200.10
39.
36
35
40
185.88
40.
36
37
41
49.40
41.
37
38
42
157.31
42.
38
39
43
164.80
43.
39
40
44
184.00
44.
42
46
138.13
45.
42
18
47
40.00
46.
42
43
48
284.77
47.
43
44
49
189.70
From
To
23.
23
24
24.
24
25.
204
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
50
132.50
46
51
150.30
46
47
52
103.50
51.
47
48
53
100.00
52.
48
49
54
159.10
53.
49
50
55
99.79
54.
50
37
56
175.20
55.
48
51
57
162.00
56.
51
52
58
223.50
57.
52
53
59
89.70
58.
53
54
60
131.60
59.
54
55
61
147.00
60.
55
49
62
236.48
61.
47
56
63
166.98
62.
56
57
64
165.98
63.
57
58
65
59.76
64.
58
59
66
73.44
65.
59
60
67
192.10
66.
60
61
68
199.27
67.
61
62
69
149.30
68.
62
63
70
137.00
69.
63
64
71
161.78
70.
64
57
72
235.76
71.
58
65
73
97.19
From
To
48.
44
45
49.
45
50.
205
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
74
173.10
66
75
36.50
66
67
76
200.00
75.
67
68
77
162.74
76.
68
69
78
184.21
77.
69
70
79
201.38
78.
70
71
80
183.95
79.
71
72
81
1422.00
80.
72
66
82
159.20
81.
49
45
83
183.00
82.
40
54
16
120.00
83.
12
16
45
150.00
84.
11
84
100.00
576.00
650.60
127.10
430.90
1710.15
1446.84
8925.28
From
To
72.
65
59
73.
56
74.
Total:
206
N
Elevation
10
25.00
1458
50.00
9
75.00
8
100.00
m
7
1
1463
1469
12
15
61
62
60
1421
1420
59
43
63
1421
1421
1430
1424
1421
46
1421
66
1424
1424
1420
1420
29
48
1460
28
23
1452
1455
1460
1448
49
1427
1422
1428
51
52
1426
53
1426
37
1448
27
1437
24
1448
26
1448
1448
36
55
35
1452
25
1450
1448
38
1428
54
33
50
1430
1425
22
31
32
1420
71
1463
30
21
34
47
72
70
1456
1428
1427
69
20
42
45
56
67
1465
1453
1430
68
1474
1464
1424
1423
1462
44
57
1463
1434
58
65
1465
1467
1460
64
1472
146718
1458
1485
1470 19
14
1421
1423
13
1467
11
1495
16
1458
1458
1435
39
1429
40
1426
1429
1426
GoM : Phed
208
Page 1
7/25/2008 3:20:11 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone VII pynthorumkhrah-pynthorbah.net
GoM : Phed
209
Page 2
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------39
33
36
200.10
100
40
36
35
185.88
100
41
36
37
49.40
100
42
37
38
157.31
100
43
38
39
164.80
100
44
39
40
184.00
100
46
4
42
138.13
150
47
42
18
40.00
150
48
42
43
284.77
150
49
43
44
189.70
400
50
44
45
132.50
400
51
45
46
150.30
400
52
46
47
103.50
400
53
47
48
30.60
100
54
48
49
159.10
100
55
49
50
99.79
100
56
50
37
175.20
100
57
48
51
162.00
100
58
51
52
223.50
100
59
52
53
89.70
100
60
53
54
131.60
100
61
54
55
147.00
100
62
55
49
236.48
100
63
47
56
166.98
150
64
56
57
165.98
100
65
57
58
59.76
100
66
58
59
73.44
100
67
59
60
192.10
100
68
60
61
199.27
100
69
61
62
149.30
100
70
62
63
137.00
100
71
63
64
161.78
100
72
64
57
235.76
100
73
58
65
97.19
100
74
65
59
173.10
100
75
56
66
36.50
100
76
66
67
200
100
77
67
68
162.74
100
78
68
69
184.21
100
79
69
70
201.38
100
80
70
71
183.95
100
81
71
72
1422
100
82
72
66
159.20
100
83
49
45
183
350
16
40
54
120
100
45
12
16
150
100
84
11
9
100
100
GoM : Phed
210
Page 3
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------2
0.00
1494.70
9.70
3
0.00
1492.30
18.30
4
0.00
1484.63
17.63
5
2.40
1484.59
19.59
6
2.40
1484.46
19.46
7
1.80
1484.15
21.15
8
1.80
1479.72
21.72
9
3.60
1476.69
18.69
10
3.60
1476.40
18.40
11
3.60
1476.41
18.41
12
0.00
1492.15
20.15
13
7.50
1485.02
15.02
14
0.00
1481.00
14.00
15
7.50
1481.29
14.29
16
7.50
1484.57
15.57
18
0.00
1480.75
20.75
19
6.75
1483.76
20.76
20
0.00
1479.81
16.81
21
6.00
1477.51
13.51
22
6.00
1476.18
16.17
23
6.00
1474.64
14.64
24
6.00
1468.16
16.16
25
0.00
1462.87
12.87
26
4.80
1460.50
12.50
27
4.80
1460.18
12.18
28
0.00
1459.95
9.95
29
12.00
1474.15
21.15
30
12.00
1478.48
16.48
31
7.50
1458.65
8.65
32
7.50
1458.63
10.63
33
0.00
1458.99
10.99
34
18.00
1459.15
11.15
35
0.00
1458.99
10.99
36
0.00
1455.77
18.77
37
0.00
1452.80
17.80
38
3.00
1449.09
20.09
39
3.00
1446.80
17.80
40
3.00
1445.59
19.59
42
0.00
1479.84
23.84
43
7.50
1450.64
16.64
44
7.50
1450.51
20.51
45
0.00
1450.43
20.43
46
9.00
1450.37
22.37
47
0.00
1450.34
23.34
48
0.00
1449.95
22.95
49
0.00
1450.42
22.42
GoM : Phed
211
Page 4
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------50
3.00
1450.88
20.88
51
7.50
1445.88
19.88
52
7.50
1444.85
19.85
53
1.50
1444.96
18.96
54
0.00
1445.36
19.36
55
10.50
1445.39
17.39
56
0.00
1446.50
22.50
57
0.00
1437.31
13.31
58
0.00
1436.26
12.26
59
0.00
1435.80
12.80
60
3.30
1433.86
13.86
61
3.30
1433.16
12.16
62
3.30
1433.12
12.12
63
3.30
1433.27
12.27
64
3.30
1434.17
13.17
65
2.64
1435.92
12.92
66
0.00
1445.13
21.13
67
2.58
1442.26
21.26
68
2.58
1440.98
19.98
69
2.58
1440.40
20.40
70
2.58
1440.30
20.30
71
2.58
1440.35
20.35
72
2.58
1444.03
22.03
1
-236.67
1495.00
0.00
Reservoir
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
236.67
2.46
13.05
Open
2
236.67
2.46
13.05
Open
3
193.94
3.95
46.48
Open
4
19.20
0.20
0.12
Open
5
16.80
0.34
0.50
Open
6
14.40
0.46
1.12
Open
7
12.60
1.61
25.51
Open
8
10.80
1.38
19.18
Open
9
3.36
0.43
2.20
Open
10
-0.24
0.03
0.02
Open
11
42.73
0.60
1.16
Open
12
24.51
3.12
87.52
Open
13
17.01
2.17
44.50
Open
14
-3.22
0.41
2.04
Open
15
-10.72
1.37
18.91
Open
17
20.23
0.64
2.10
Open
18
-14.17
1.81
31.71
Open
GoM : Phed
212
Page 5
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------19
-20.92
1.18
9.05
Open
20
110.65
3.52
48.75
Open
21
60.69
1.93
16.03
Open
22
54.69
1.74
13.22
Open
23
48.69
1.55
10.66
Open
24
42.69
2.42
33.93
Open
25
36.69
2.08
25.63
Open
26
26.83
1.52
14.35
Open
27
22.03
0.70
2.45
Open
28
17.23
0.55
1.56
Open
29
-25.95
3.31
97.28
Open
30
-37.95
2.15
27.29
Open
31
-49.95
1.59
11.18
Open
32
7.99
1.02
10.97
Open
33
0.49
0.06
0.06
Open
34
-7.01
0.89
8.62
Open
35
-17.20
0.55
1.55
Open
36
-35.20
1.12
5.84
Open
37
0.36
0.01
0.00
Open
38
-9.87
1.26
16.22
Open
39
9.82
1.25
16.09
Open
40
-10.22
1.30
17.32
Open
41
20.05
2.55
60.30
Open
42
12.07
1.54
23.57
Open
43
9.07
1.16
13.88
Open
44
6.07
0.77
6.60
Open
46
43.17
2.44
34.63
Open
47
-34.40
1.95
22.75
Open
48
77.57
4.39
102.54
Open
49
70.07
0.56
0.71
Open
50
62.57
0.50
0.58
Open
51
52.20
0.42
0.41
Open
52
43.20
0.34
0.29
Open
53
8.58
1.09
12.52
Open
54
-3.93
0.50
2.94
Open
55
-4.98
0.63
4.57
Open
56
-7.98
1.02
10.94
Open
57
12.51
1.59
25.16
Open
58
5.01
0.64
4.62
Open
59
-2.49
0.32
1.27
Open
60
-3.99
0.51
3.04
Open
61
-0.92
0.12
0.20
Open
62
-11.42
1.46
21.28
Open
63
34.62
1.96
23.01
Open
64
19.14
2.44
55.34
Open
65
10.28
1.31
17.49
Open
66
5.91
0.75
6.27
Open
GoM : Phed
213
Page 6
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------67
7.64
0.97
10.09
Open
68
4.34
0.55
3.54
Open
69
1.04
0.13
0.25
Open
70
-2.26
0.29
1.06
Open
71
-5.56
0.71
5.61
Open
72
-8.86
1.13
13.30
Open
73
4.37
0.56
3.59
Open
74
1.73
0.22
0.65
Open
75
15.48
1.97
37.35
Open
76
9.24
1.18
14.37
Open
77
6.66
0.85
7.83
Open
78
4.08
0.52
3.16
Open
79
1.50
0.19
0.50
Open
80
-1.08
0.14
0.27
Open
81
-3.66
0.47
2.58
Open
82
-6.24
0.79
6.94
Open
83
-10.37
0.11
0.04
Open
16
3.07
0.39
1.87
Open
45
18.22
2.32
50.52
Open
84
-3.84
0.49
2.83
Open
GoM : Phed
214
g,
,
i
Legends
Pipeline
Road
Zone Boundary
Reservoir
'"
~
u.
.05km
.075bn
GoM:PHED
GoM : Phed
Pipe No.
500
450
400
200
150
100
221.00
93.00
73.00
4.
78.00
5.
26.00
6.
160.00
7.
10
96.00
8.
10
11
10
121.00
9.
11
13
12
182.00
10.
13
14
13
113.00
11.
13
15
14
336.00
12.
15
16
15
225.00
13.
16
18
17
220.00
14.
10
19
18
199.00
15.
19
20
19
239.00
16.
20
21
20
60.00
17.
21
23
22
179.00
18.
23
24
23
201.00
19.
20
26
25
85.00
20.
26
27
26
156.00
21.
27
27
179.00
22.
28
28
162.00
From
To
1.
MR1
2.
3.
216
GoM : Phed
Sl.
No.
Node No.
Pipe No.
From
To
500
450
400
200
150
100
23.
28
29
29
80.00
24.
29
31
31
38.00
25.
31
33
33
118.00
26.
33
26
34
167.00
27.
28
34
35
44.00
28.
34
35
36
75.00
29.
35
37
38
52.00
30.
37
38
39
29.00
31.
38
39
40
73.00
32.
37
41
42
98.00
33.
41
43
44
80.00
34.
43
46
47
39.00
35.
46
48
49
101.00
36.
48
51
52
153.00
37.
51
52
53
1477.00
38.
52
53
54
53.00
39.
53
56
133.00
40.
51
55
57
112.00
41.
55
56
58
83.00
42.
56
57
59
130.00
43.
57
59
61
106.00
44.
59
60
62
66.00
45.
60
62
64
60.00
46.
62
59
65
92.00
47.
62
63
66
226.00
217
GoM : Phed
Sl.
No.
Node No.
Pipe No.
From
To
500
450
400
200
150
100
48.
63
64
67
150.00
49.
64
66
69
9.00
50.
66
69
72
38.00
51.
64
72
75
79.00
52.
72
73
76
112.00
53.
72
74
77
37.00
54.
74
75
78
77.00
55.
75
76
79
45.00
56.
76
77
80
35.00
57.
73
77
82
75.00
58.
73
69
83
105.00
59.
77
79
84
64.00
60.
79
80
85
76.00
61.
80
81
86
73.00
62.
81
82
87
32.00
63.
82
83
88
44.00
64.
83
84
89
77.00
65.
84
85
90
52.00
66.
85
86
91
84.00
67.
86
87
92
100.00
68.
87
89
94
22.00
69.
89
56
95
62.00
70.
89
90
96
63.00
71.
90
91
97
59.00
72.
91
92
98
115.00
218
GoM : Phed
Sl.
No.
Node No.
Pipe No.
From
To
500
450
400
200
150
100
73.
92
93
99
70.00
74.
92
94
100
40.00
75.
94
96
102
57.00
76.
96
MR2
104
363.00
77.
96
82
105
59.00
78.
93
98
106
118.00
79.
98
99
107
127.00
80.
99
93
108
114.00
81.
93
101
110
123.00
82.
101
102
111
95.00
83.
102
103
112
50.00
84.
102
104
113
50.00
85.
104
105
114
102.00
86.
105
110
119
60.00
87.
110
112
121
61.00
88.
112
113
122
93.00
89.
113
114
123
62.00
90.
114
115
124
103.00
91.
115
117
126
86.00
92.
117
119
128
21.00
93.
119
122
131
108.00
94.
122
123
132
141.00
95.
122
124
133
60.00
96.
124
125
134
119.00
97.
115
126
135
20.00
219
GoM : Phed
Sl.
No.
Node No.
Pipe No.
From
To
500
450
400
200
150
100
98.
126
127
136
61.00
99.
127
129
138
61.00
100.
126
131
140
50.00
101.
114
131
141
60.00
102.
131
132
142
71.00
103.
132
133
143
33.00
104.
133
129
144
33.00
105.
133
134
145
86.00
106.
134
135
146
133.00
107.
135
136
147
137.00
108.
136
137
148
37.00
109.
137
113
149
41.00
110.
136
112
150
80.00
111.
135
138
151
86.00
112.
138
139
152
64.00
113.
139
140
153
63.00
114.
140
141
154
58.00
115.
141
142
155
71.00
116.
142
143
156
20.00
117.
143
112
157
63.00
118.
143
144
158
60.00
119.
144
142
159
62.00
120.
144
145
160
29.00
121.
145
147
162
67.00
122.
147
148
163
65.00
220
GoM : Phed
Sl.
No.
Node No.
Pipe No.
From
To
500
450
400
200
150
100
123.
148
149
164
65.00
124.
149
150
165
58.00
125.
150
151
166
99.00
126.
151
104
167
102.00
127.
150
152
168
99.00
128.
152
154
170
180.00
129.
154
155
171
167.00
130.
155
156
172
95.00
131.
156
157
173
56.00
132.
157
159
175
22.00
133.
159
161
177
64.00
134.
161
162
178
59.00
135.
162
163
179
34.00
136.
163
164
180
42.00
137.
164
165
181
46.00
138.
165
166
182
53.00
139.
166
167
183
39.00
140.
167
168
184
40.00
141.
168
147
185
76.00
142.
167
169
186
65.00
143.
169
170
187
56.00
144.
170
140
188
33.00
145.
170
168
189
1458.00
146.
171
172
190
69.00
147.
172
173
192
73.00
221
GoM : Phed
Sl.
No.
Node No.
Pipe No.
From
To
500
450
400
200
150
100
148.
173
174
193
72.00
149.
174
175
194
77.00
150.
175
176
195
117.00
151.
176
177
196
118.00
152.
177
178
197
17.00
153.
178
179
198
26.00
154.
179
169
200
87.00
155.
174
177
201
86.00
156.
178
181
202
130.00
157.
181
182
203
112.00
158.
182
183
204
81.00
159.
183
176
205
153.00
160.
183
184
206
350.00
161.
184
185
207
100.00
162.
185
187
209
88.00
163.
187
188
210
87.00
164.
188
182
211
74.00
165.
187
189
212
69.00
166.
189
190
213
94.00
167.
190
182
214
94.00
168.
190
191
215
77.00
169.
191
193
217
58.00
170.
193
195
219
92.00
171.
195
196
220
12.00
172.
197
198
221
98.00
222
GoM : Phed
Sl.
No.
Node No.
Pipe No.
From
To
500
450
400
200
150
100
173.
198
199
223
66.00
174.
199
200
224
114.00
175.
200
189
225
128.00
176.
198
201
226
72.00
177.
201
202
227
26.00
178.
202
155
228
49.00
179.
196
156
229
76.00
180.
202
203
230
54.00
181.
203
204
231
43.00
182.
204
205
232
87.00
183.
205
206
233
58.00
184.
204
208
235
67.00
185.
208
209
236
25.00
186.
209
211
238
88.00
187.
211
205
240
68.00
188.
205
213
241
64.00
189.
213
214
242
51.00
190.
214
215
243
56.00
191.
215
218
246
109.00
192.
218
220
248
51.00
193.
220
222
250
123.00
194.
222
224
252
28.00
195.
185
226
254
87.00
196.
226
228
256
66.00
197.
228
230
258
53.00
223
GoM : Phed
Sl.
No.
Node No.
Pipe No.
From
To
500
450
400
200
150
100
198.
230
231
259
65.00
199.
231
232
260
149.00
200.
232
233
261
112.00
201.
233
234
262
137.00
202.
234
235
263
108.00
203.
235
236
264
165.00
204.
236
237
265
85.00
205.
237
238
266
81.00
206.
238
239
267
163.00
207.
239
230
268
232.00
208.
238
240
269
39.00
209.
238
241
270
19.00
210.
241
242
271
131.00
211.
242
243
272
90.00
212.
243
244
273
82.00
213.
244
241
274
154.00
214.
243
245
275
82.00
215.
245
246
276
35.00
216.
246
247
277
68.00
217.
247
248
278
49.00
218.
247
249
279
81.00
219.
249
250
280
56.00
220.
250
172
281
51.00
221.
250
248
282
134.00
222.
248
245
283
136.00
224
GoM : Phed
Sl.
No.
Node No.
Pipe No.
From
To
500
450
400
200
150
100
223.
244
251
284
115.00
224.
251
252
285
64.00
225.
252
253
286
126.00
226.
253
254
287
55.00
227.
254
255
288
84.00
228.
256
257
289
154.00
229.
257
258
293
95.00
230.
258
240
291
137.00
231.
259
260
294
75.00
232.
260
261
297
140.00
233.
261
262
298
124.00
58.00
234.
262
263
299
157.00
235.
263
264
300
66.00
236.
264
265
301
37.00
237.
265
266
302
70.00
238.
266
267
303
76.00
239.
267
268
304
81.00
240.
268
269
305
69.00
241.
269
270
306
42.00
242.
270
271
307
52.00
243.
271
272
308
89.00
244.
272
273
309
66.00
245.
273
274
310
41.00
246.
274
262
311
141.00
247.
273
276
313
90.00
225
GoM : Phed
Sl.
No.
Node No.
Pipe No.
From
To
500
450
400
200
150
100
248.
276
270
314
91.00
249.
276
277
315
97.00
250.
277
265
316
113.00
251.
272
260
317
94.00
252.
271
235
318
100.00
253.
269
233
319
155.00
254.
264
278
320
96.00
255.
278
279
321
95.00
256.
279
281
322
117.00
257.
281
282
323
64.00
258.
282
280
324
38.00
259.
280
279
325
67.00
260.
280
283
326
137.00
261.
283
265
327
101.00
262.
283
284
328
75.00
263.
284
266
329
82.00
264.
284
285
330
80.00
265.
285
286
331
90.00
266.
286
287
332
42.00
267.
287
288
333
36.00
268.
288
289
334
143.00
269.
289
286
335
84.00
270.
289
290
336
82.00
271.
290
291
337
17.00
272.
291
292
338
168.00
226
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
339
116.00
267
340
116.00
292
448
341
87.00
276.
448
232
342
18.00
277.
252
447
343
75.00
278.
447
258
344
122.00
279.
448
294
345
84.00
280.
294
295
346
94.00
281.
295
296
347
54.00
282.
295
297
349
194.00
283.
297
298
350
89.00
284.
298
299
351
80.00
285.
448
296
352
126.00
286.
296
298
353
221.00
287.
299
291
354
176.00
288.
299
300
355
141.00
289.
302
301
356
194.00
290.
301
298
358
185.00
291.
302
303
360
72.00
292.
303
304
361
68.00
293.
305
306
362
87.00
294.
304
307
364
135.00
295.
306
309
365
153.00
296.
307
308
366
112.00
297.
308
309
367
114.00
From
To
273.
292
293
274.
293
275.
227
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
368
138.00
291
369
148.00
306
308
370
117.00
301.
307
311
371
105.00
302.
311
312
372
226.00
303.
312
313
373
183.00
304.
312
314
374
40.00
305.
314
315
376
80.00
306.
314
316
377
82.00
307.
311
317
378
105.00
308.
317
319
380
40.00
309.
319
320
381
72.00
310.
320
321
382
97.00
311.
321
322
383
12.00
312.
322
323
384
32.00
313.
322
324
385
88.00
314.
326
327
386
64.00
315.
327
329
388
32.00
316.
326
332
392
154.00
317.
332
333
393
133.00
318.
333
335
395
17.00
319.
335
336
396
27.00
320.
336
337
397
86.00
321.
337
338
398
113.00
322.
338
339
399
100.00
From
To
298.
309
310
299.
310
300.
228
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
400
153.00
342
402
41.00
342
344
404
87.00
326.
344
346
406
149.00
327.
346
336
407
52.00
328.
317
349
410
181.00
329.
349
350
411
131.00
330.
350
351
412
1480.00
331.
351
352
413
86.00
332.
352
353
414
60.00
333.
353
354
415
20.00
334.
354
355
416
58.00
335.
355
356
417
81.00
336.
356
351
418
33.00
337.
356
357
419
33.00
338.
357
358
420
61.00
339.
358
359
421
59.00
340.
359
354
422
70.00
341.
359
360
423
33.00
342.
360
MR3
424
61.00
343.
360
361
425
88.00
344.
361
362
426
182.00
345.
362
357
427
71.00
346.
324
325
428
94.00
30.00
347.
325
319
429
82.00
From
To
323.
339
340
324.
340
325.
229
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
430
89.00
363
431
220.00
363
281
432
77.00
351.
329
364
433
224.00
352.
364
365
34
278.00
353.
365
366
35
58.00
354.
366
368
37
248.00
355.
366
373
38
118.00
356.
373
369
39
101.00
357.
369
370
40
24.00
358.
370
371
41
90.00
359.
371
372
42
100.00
360.
372
365
43
151.00
361.
368
369
44
278.00
362.
370
377
45
121.00
363.
372
374
46
138.00
364.
374
375
47
88.00
365.
375
376
48
104.00
366.
376
377
49
27.00
367.
376
378
450
84.00
368.
378
379
451
173.00
369.
379
380
452
57.00
370.
380
303
453
21.00
371.
380
381
454
104.00
372.
381
374
455
121.00
From
To
348.
362
288
349.
360
350.
230
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
456
77.00
383
457
139.00
383
384
458
134.00
376.
384
385
459
60.00
377.
385
382
460
37.00
378.
386
386
461
61.00
379.
386
387
462
82.00
380.
387
377
463
56.00
381.
387
388
464
41.00
382.
338
389
465
123.00
383.
323
335
467
164.00
384.
353
339
468
129.00
385.
282
287
469
181.0
386.
390
392
470
139.00
387.
392
393
471
23.00
388.
388
390
474
115.00
389.
393
389
475
44.00
390.
389
386
476
39.00
391.
392
396
477
160.00
392.
396
397
478
62.00
393.
398
399
479
37.00
394.
399
400
481
100.00
395.
400
398
482
59.00
396.
398
397
483
152.00
397.
398
402
485
132.00
From
To
373.
378
382
374.
382
375.
231
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
487
404
488
208.00
383
406
490
220.00
401.
406
297
491
210.00
402.
294
407
492
127.00
403.
407
408
493
146.00
404.
408
297
494
114.00
405.
408
409
495
203.00
406.
409
410
496
108.00
407.
410
404
497
190.00
108.
410
411
498
131.00
409.
411
413
500
141.00
410.
415
416
501
84.00
411.
416
418
502
62.00
412.
418
419
503
68.00
413.
419
420
507
76.00
414.
420
421
508
37.00
415.
414
425
512
41.00
416.
425
426
513
65.00
417.
426
425
514
87.00
418.
420
427
515
113.00
419.
427
428
16
172.00
420.
428
429
17
126.00
421.
429
430
18
40.00
422.
430
432
520
95.00
From
To
398.
402
384
399.
383
400.
200
150
100
37.00
232
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
522
111.00
435
523
70.00
435
436
524
50.00
426.
436
429
525
62.00
427.
436
437
526
98.00
428.
437
435
527
67.00
429.
437
438
528
20.00
430.
438
428
529
63.00
431.
428
439
530
95.00
432.
439
440
431
140.00
433.
440
441
532
140.00
434.
441
437
533
30.00
435.
441
442
534
148.00
436.
442
444
536
171.00
437.
444
445
537
94.00
438.
444
446
538
201.00
439.
256
255
290
152.00
440.
447
254
292
115.00
441.
337
321
348
128.00
442.
324
323
539
118.00
443.
325
326
540
176.00
444.
379
382
541
137.00
445.
407
418
542
81.00
446.
413
418
543
168.00
447.
414
417
544
65.00
From
To
423.
432
434
424.
434
425.
233
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
545
78.00
409
546
123.00
438
439
359
57.00
451.
231
421
389
242.00
452.
240
237
504
76.00
453.
237
259
505
108.00
454.
171
139
506
65.00
455.
103
81
547
68.00
456.
80
104
548
83.00
457.
208
205
550
76.00
458.
52
93
115
115.00
459.
132
137
191
134.00
460.
147
162
551
89.00
461.
74
86
552
55.00
462.
74
84
553
117.00
463.
76
83
554
36.00
464.
91
85
555
78.00
465.
290
284
556
380.00
466.
161
149
557
74.00
467.
197
195
558
87.00
468.
165
196
559
76.00
469.
187
224
560
166.00
470.
198
206
561
85.00
471.
257
259
222
-133.00
472.
302
300
295
185.00
From
To
448.
417
415
449.
417
450.
234
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
296
126.00
304
357
126.00
416
408
363
70.00
476.
399
397
375
100.00
477.
167
163
480
38.00
478.
39
24
16
101.00
479.
14
18
562
45.00
480.
123
125
563
95.00
481.
446
445
564
65.00
482.
316
315
565
45.00
36.00
700.00
3461.00
2205.00
7833.00
35711.00
From
To
473.
303
305
474.
313
475.
Total :
235
C?)
ZONE - VIII
*PROPOSED PIPELINE ROUTE:
AREA OF COVERAGE:
1. Mawlai.
'"
"
,-
.'
GoM :Phed
236
N
Zone VIII (Mawlai)
14
18
1470
16
15
1471
11
13
1470 1471
19
1472 1474
399
10
400
8
27
1478 1481
1472
26
1483
1475
7
1468 1468
1468 1468
331470
31
1485
5
29
3
39
1475
1476
MR1 1491
28
1477
34
1495
2
1468 38 37
35
53
1478 1508
98
1475
1500
52
14691469 1471
1492
41
93
1493
48 51
99
1492
46
92
431469
1494
94
1478
55 1484
101
1492
91
1475
MR21493
1471
60 59 57
1498
96
56
90 1486
1490
1492
89
62
1512
87 86 85 84
14841485 1487 1488
1488
83 821500
1487
63
1485
1491
1492
103 102
1493
1494
1495
152
811495
1486
64
74
1486
75
72
66
1488
1477
76
80 1493
691490
73
1492
77
1493 79
1491
1491
1494
1492
14921493 1494
1491
151
104
150
1485 1484
1482
24
23
Elevation
25.00
50.00
75.00
100.00
m
21
20
426
446
445
434
1471
425
1464
1463
397
1463
1463392
1464
393
398
1463
396
402
1465 389
1467
386
390
368
1465
388
1468
1467
387
369
373
370
1463 384 385
366
1471
1460 1460
432
1466
435 1461
1464377
413 411
444
371
1472
1465
430
414
1463 1464
1470
378 376
442
410 404
1459
1462 436
383 382 1463
365
1464
1472
1460
1471
441 437
4171470
429
375
1461
1473
1467
1464
1460
1463
409
1468
438
1465 1464 1464
1471
415
372
406
1461 1465
1466
1463
379
1466
374
428
1469
364
1466
1466
1470
440 439
427
408
381
416
1468
380
1467
1468
1465
1472
301
302
1465 1468
1466
420 419 1468
1470 297
1469 315
418
1469
313
303
329
314
300
1470298 1473
1473
1467 421
1468
407
1470
1470
295
1472
312
316
1468
1473
1470
211
1474 305 304
1472
296 1473
215
209
1468
327
299
1473
306
311
1471
1469
294
1470 1470
213 214
307
325
1476
20814591459
1460
205
308
1474
1475
317
1471
231
1472
319
326
232
1475 448
1459 1459 218
1471
324
1476
309 1472
204
1459 1459
206
292
1474 1475
332
1475
1459
2301467 1475
310
1477
349
1476
291
203
220
1474
320
1460
228
322 323 333
233
1459
1477
1465
293 1479 290
1476
1476
350
202
1480
1462
1459226 1464 234 1473
1476 321
1478 1476 1479
201
222
154
351
268 1475
1477
1463
1485
155
1463
289
224
1471
356
1478
267 266
1462
198
1459
269
1470
335
1492 352
1476
185
288
286
284
357
235
1465
187
1489
1459
199
355
362
1491
14731484
285
287
1459 200 189
1475 277
1493
265
1479
1462
1490 1491 358
337
1490
1487
1469
197
1460
149
276
270
1459
1492
353
1491
156
1489
1489
336
14591459 188
338
271
1475 1478
361 1494
157
283
1481
184
236
354
1460
105
1479
239
1470
282
1469
359
196 195
1494
1467
190 1458
1479
280
346
1482
1469
1496
1469
193 191
264
274
1486
159
1461
1468
360
1493
339
278
1481
182
1463
273
263
1488
148
1496
14621461
1458
272
1487
1480
344
1460 1459
183
279 281 363 1498
161
1484
1479
1472
1485340 342
181 1458
1486
1478 262
1483
1475
110
1477
1481
163
147
162
241 238 237
1458
1487 1490 1494
1473
MR3
164
176
242
1483 1482
1781458
261
1482
1478
166
260
1468165
1472 167
1471
177
1464 1465
2401467
145168
243
244
1465
1458
1463
1458
1479
1520
144
1478
115 114
143
14681469 1465179
1460
259
112
175
1466
113
1468
1464
1463 258
117
1462170
169
123
1470
245
251
174
142
1458
1468
1472
126
1470
1469
119
257
1475 136
1460
447
1465
140 1460
1311472
1468
141 1463
1461
246
1463
1463
1466
173 1461
137
252
122 1461
1467
248
1468
1470
1465 256
1460
1470
1462
247
124
139
1462
132
171
135 138
1462
1464
1464
1461
1467
1462
127
172 250 249
134
1462
125 1462
1465 1464
255
1461
253
1460
1460
133
254
1465
146314611461
1461
1462
1464 1465 1466
129 1462
1461
GoM : Phed
237
Page 1
6/24/2008 8:24:55 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone VIII Mawlai.NET
Zone VIII (Mawlai)
Link - Node Table:
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------1
MR1
2
221
250
2
2
3
93
150
4
3
5
73
150
6
5
7
78
150
7
7
8
26
100
8
8
9
160
100
9
9
10
96
100
10
10
11
121
100
12
11
13
182
100
13
13
14
113
100
14
13
15
336
100
15
15
16
225
100
17
16
18
220
100
18
10
19
199
100
19
19
20
239
100
20
20
21
60
100
22
21
23
179
100
23
23
24
201
100
25
20
26
85
100
26
26
27
156
100
27
27
8
179
100
28
7
28
162
100
29
28
29
80
100
31
29
31
38
100
33
31
33
118
100
34
33
26
167
100
35
28
34
44
100
36
34
35
75
100
38
35
37
52
100
39
37
38
29
100
40
38
39
73
100
42
37
41
98
100
44
41
43
80
100
47
43
46
39
100
49
46
48
101
100
52
48
51
153
100
53
51
52
1477
100
GoM : Phed
238
Page 2
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------54
52
53
53
200
56
53
2
133
200
57
51
55
112
100
58
55
56
83
100
59
56
57
130
100
61
57
59
106
100
62
59
60
66
100
64
60
62
60
100
65
62
59
92
100
66
62
63
226
100
67
63
64
150
100
69
64
66
9
100
72
66
69
38
100
75
64
72
79
100
76
72
73
112
100
77
72
74
37
100
78
74
75
77
100
79
75
76
45
100
80
76
77
35
100
82
73
77
75
100
83
73
69
105
100
84
77
79
64
100
85
79
80
76
100
86
80
81
73
150
87
81
82
32
250
88
82
83
44
150
89
83
84
77
150
90
84
85
52
150
91
85
86
84
150
92
86
87
100
150
94
87
89
22
150
95
89
56
62
100
96
89
90
63
100
97
90
91
59
100
98
91
92
115
100
99
92
93
70
250
100
92
94
40
250
102
94
96
57
250
104
96
MR2
36
350
105
96
82
59
250
106
93
98
118
100
107
98
99
127
100
108
99
93
114
100
110
93
101
123
150
111
101
102
95
150
112
102
103
50
200
113
102
104
50
200
GoM : Phed
239
Page 3
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------114
104
105
102
150
119
105
110
60
150
121
110
112
61
150
122
112
113
93
100
123
113
114
62
100
124
114
115
103
100
126
115
117
86
100
128
117
119
21
100
131
119
122
108
100
132
122
123
141
100
133
122
124
60
100
134
124
125
119
100
135
115
126
20
100
136
126
127
61
100
138
127
129
61
100
140
126
131
50
100
141
114
131
60
100
142
131
132
71
100
143
132
133
33
100
144
133
129
33
100
145
133
134
86
100
146
134
135
133
100
147
135
136
100
100
148
136
137
37
100
149
137
113
37
100
150
136
112
41
100
151
135
138
80
200
152
138
139
86
200
153
139
140
64
100
154
140
141
63
100
155
141
142
58
100
156
142
143
71
100
157
143
112
20
100
158
143
144
63
100
159
144
142
60
100
160
144
145
62
100
162
145
147
29
100
163
147
148
67
100
164
148
149
65
100
165
149
150
58
200
166
150
151
99
200
167
151
104
102
250
168
150
152
99
100
170
152
154
180
100
171
154
155
167
100
172
155
156
95
100
173
156
157
56
200
GoM : Phed
240
Page 4
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------175
157
159
22
200
177
159
161
64
200
178
161
162
59
100
179
162
163
34
100
180
163
164
42
100
181
164
165
46
100
182
165
166
53
100
183
166
167
39
100
184
167
168
40
100
185
168
147
76
100
186
167
169
65
100
187
169
170
56
100
188
170
140
33
100
189
170
168
1458
100
190
171
172
69
200
192
172
173
73
150
193
173
174
72
150
194
174
175
77
150
195
175
176
117
150
196
176
177
118
150
197
177
178
17
100
198
178
179
26
150
200
179
169
87
150
201
174
177
86
150
202
178
181
130
100
203
181
182
112
100
204
182
183
81
100
205
183
176
153
150
206
183
184
350
150
207
184
185
100
150
209
185
187
88
150
210
187
188
87
100
211
188
182
74
100
212
187
189
69
150
213
189
190
94
100
214
190
182
94
100
215
190
191
77
100
217
191
193
58
100
219
193
195
92
100
220
195
196
12
150
221
197
198
98
150
223
198
199
66
150
224
199
200
114
150
225
200
189
128
150
226
198
201
72
150
227
201
202
26
150
228
202
155
49
100
GoM : Phed
241
Page 5
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------229
196
156
76
100
230
202
203
54
100
231
203
204
43
100
232
204
205
87
100
233
205
206
58
100
235
204
208
67
100
236
208
209
25
100
238
209
211
88
100
240
211
205
68
100
241
205
213
64
100
242
213
214
51
100
243
214
215
56
100
246
215
218
109
100
248
218
220
51
100
250
220
222
123
100
252
222
224
28
100
254
185
226
87
150
256
226
228
66
150
258
228
230
53
150
259
230
231
65
150
260
231
232
149
250
261
232
233
112
100
262
233
234
137
100
263
234
235
108
100
264
235
236
165
100
265
236
237
85
100
266
237
238
81
100
267
238
239
163
100
268
239
230
232
100
269
238
240
39
100
270
238
241
19
100
271
241
242
131
100
272
242
243
90
100
273
243
244
82
250
274
244
241
154
100
275
243
245
82
250
276
245
246
35
250
277
246
247
68
200
278
247
248
49
100
279
247
249
81
200
280
249
250
56
200
281
250
172
51
200
282
250
248
134
100
283
248
245
136
100
284
244
251
115
250
285
251
252
64
250
286
252
253
126
250
GoM : Phed
242
Page 6
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------287
253
254
55
250
288
254
255
84
250
289
256
257
154
250
293
257
258
95
100
291
258
240
137
100
294
259
260
75
250
297
260
261
140
250
298
261
262
124
250
299
262
263
157
250
300
263
264
66
250
301
264
265
37
100
302
265
266
70
100
303
266
267
76
100
304
267
268
81
100
305
268
269
69
100
306
269
270
42
100
307
270
271
52
100
308
271
272
89
100
309
272
273
66
100
310
273
274
41
100
311
274
262
141
100
313
273
276
90
100
314
276
270
91
100
315
276
277
97
100
316
277
265
113
100
317
272
260
94
100
318
271
235
100
100
319
269
233
155
100
320
264
278
96
250
321
278
279
95
250
322
279
281
117
250
323
281
282
64
100
324
282
280
38
100
325
280
279
67
100
326
280
283
137
100
327
283
265
101
100
328
283
284
75
100
329
284
266
82
100
330
284
285
80
100
331
285
286
90
100
332
286
287
42
100
333
287
288
36
150
334
288
289
143
300
335
289
286
84
100
336
289
290
82
250
337
290
291
17
250
338
291
292
168
250
GoM : Phed
243
Page 7
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------339
292
293
116
100
340
293
267
116
100
341
292
448
87
250
342
448
232
18
250
343
252
447
75
100
344
447
258
122
100
345
448
294
34
250
346
294
295
94
150
347
295
296
54
100
349
295
297
194
150
350
297
298
89
100
351
298
299
80
100
352
448
296
126
100
353
296
298
221
100
354
299
291
176
100
355
299
300
141
100
356
302
301
194
100
358
301
298
185
100
360
302
303
72
100
361
303
304
68
150
362
305
306
87
100
364
304
307
135
150
365
306
309
153
100
366
307
308
112
150
367
308
309
114
150
368
309
310
138
150
369
310
291
148
150
370
306
308
117
100
371
307
311
105
150
372
311
312
226
100
373
312
313
183
100
374
312
314
40
100
376
314
315
80
100
377
314
316
82
100
378
311
317
105
150
380
317
319
40
100
381
319
320
72
100
382
320
321
97
100
383
321
322
12
100
384
322
323
32
100
385
322
324
88
100
386
326
327
64
100
388
327
329
32
100
392
326
332
154
100
393
332
333
133
100
395
333
335
17
100
396
335
336
27
100
GoM : Phed
244
Page 8
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------397
336
337
86
100
398
337
338
113
100
399
338
339
100
100
400
339
340
153
100
402
340
342
41
100
404
342
344
87
100
406
344
346
149
100
407
346
336
52
100
410
317
349
181
100
411
349
350
131
100
412
350
351
1480
100
413
351
352
86
100
414
352
353
60
100
415
353
354
20
150
416
354
355
58
150
417
355
356
81
150
418
356
351
33
300
419
356
357
33
300
420
357
358
61
150
421
358
359
59
150
422
359
354
70
150
423
359
360
33
200
424
360
MR3
61
300
425
360
361
88
300
426
361
362
182
300
427
362
357
71
300
428
324
325
30
100
429
325
319
82
100
430
362
288
89
300
431
360
363
220
200
432
363
281
77
200
433
329
364
224
100
434
364
365
278
100
435
365
366
58
100
437
366
368
248
100
438
366
373
118
100
439
373
369
101
100
440
369
370
24
100
441
370
371
80
100
442
371
372
100
100
443
372
365
151
150
444
368
369
278
100
445
370
377
121
100
446
372
374
138
150
447
374
375
88
150
448
375
376
104
100
449
376
377
27
150
GoM : Phed
245
Page 9
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------450
376
378
84
150
451
378
379
173
100
452
379
380
57
100
453
380
303
21
150
454
380
381
104
150
455
381
374
121
150
456
378
382
77
150
457
382
383
139
150
458
383
384
134
100
459
384
385
60
100
460
385
382
37
100
461
385
386
61
100
462
386
387
82
100
463
387
377
56
150
464
387
388
41
100
465
388
389
123
100
467
323
335
164
100
468
353
339
129
150
469
282
287
181
100
470
390
392
139
100
471
392
393
23
100
474
388
390
115
100
475
393
389
44
100
476
389
386
99
100
477
392
396
160
100
478
396
397
62
100
479
398
399
37
100
481
399
400
100
100
482
400
398
59
100
483
398
397
152
100
485
398
402
132
100
487
402
384
37
100
488
383
404
208
150
490
383
406
220
150
491
406
297
218
150
492
294
407
127
250
493
407
408
146
100
494
408
297
114
100
495
408
409
203
100
496
409
410
108
150
497
410
404
190
150
498
410
411
131
100
500
411
413
141
100
501
415
416
84
150
502
416
418
62
150
503
418
419
68
200
507
419
420
76
200
GoM : Phed
246
Page 10
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------508
420
421
37
150
512
414
425
41
100
513
425
426
65
100
514
426
425
87
100
515
420
427
113
150
516
427
428
192
150
517
428
429
126
100
518
429
430
40
100
520
430
432
95
100
522
432
434
111
100
523
434
435
70
100
524
435
436
50
100
525
436
429
62
100
526
436
437
98
100
527
437
435
67
100
528
437
438
20
100
529
438
428
63
100
530
428
439
95
100
531
439
440
140
100
532
440
441
140
100
533
441
437
30
100
534
441
442
148
100
536
442
444
171
100
537
444
445
94
100
538
444
446
201
100
290
256
255
152
250
292
447
254
115
100
348
337
321
128
100
539
324
323
118
100
540
325
326
176
100
541
379
382
137
100
542
407
418
81
250
543
413
414
168
100
544
414
417
65
100
545
417
415
78
150
546
417
409
123
150
359
438
439
57
100
389
231
421
242
150
504
240
237
76
100
505
237
259
108
100
506
171
139
65
200
547
103
81
68
200
548
80
104
83
150
550
208
205
76
100
115
52
93
115
250
191
132
137
134
100
551
147
162
89
150
GoM : Phed
247
Page 11
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------552
74
86
55
100
553
74
84
117
100
554
76
83
36
100
555
91
85
78
100
556
290
284
380
100
557
161
149
74
200
558
197
195
87
150
559
165
196
76
100
560
187
224
166
100
561
198
206
85
100
222
257
259
133
250
295
302
300
185
100
296
303
305
126
100
357
313
304
126
100
363
416
408
70
100
375
399
397
100
100
480
167
163
38
100
16
39
24
101
100
562
14
18
45
100
563
123
125
95
100
564
446
445
65
100
565
316
315
45
100
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------2
0.00
1507.75
7.75
3
2.78
1502.73
7.73
5
2.78
1499.16
8.16
7
4.84
1495.70
10.70
8
5.16
1493.47
10.47
9
3.05
1488.63
7.63
10
3.05
1486.81
8.81
11
0.20
1486.79
12.79
13
0.15
1486.78
14.78
14
0.05
1486.78
15.78
15
0.10
1486.78
15.78
16
0.10
1486.78
16.78
18
0.05
1486.78
16.78
19
3.05
1485.07
13.07
20
3.10
1484.34
16.34
21
0.10
1484.40
16.40
23
0.05
1484.62
16.62
24
0.05
1484.86
16.86
26
5.16
1484.16
14.16
GoM : Phed
248
Page 12
Zone VIII (Mawlai)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------27
5.16
1484.17
9.17
28
4.84
1485.81
7.81
29
2.16
1484.88
7.88
31
2.16
1484.63
8.63
33
2.11
1484.28
9.28
34
2.73
1485.43
10.43
35
2.78
1485.16
14.16
37
2.83
1485.13
16.13
38
0.10
1485.09
16.09
39
0.05
1484.99
16.99
41
2.78
1485.42
16.42
43
2.83
1486.05
15.05
46
2.78
1486.64
11.64
48
2.83
1489.10
11.10
51
4.53
1494.57
10.57
52
4.53
1508.53
16.53
53
2.78
1508.28
16.28
55
1.80
1497.29
11.29
56
3.75
1499.90
11.90
57
2.00
1499.88
12.87
59
2.11
1499.91
14.91
60
0.21
1499.94
15.94
62
2.11
1499.97
14.97
63
1.95
1501.26
15.26
64
2.31
1502.74
12.74
66
0.36
1502.77
11.77
69
0.36
1502.89
10.89
72
2.89
1503.28
12.28
73
0.94
1503.27
10.27
74
2.89
1503.87
11.87
75
1.26
1504.09
11.09
76
2.04
1504.30
10.30
77
1.46
1503.57
9.57
79
0.78
1503.26
12.26
80
1.95
1502.98
10.98
81
2.81
1506.92
13.92
82
2.11
1507.98
12.98
83
1.88
1506.16
11.16
84
1.41
1505.02
11.02
85
1.09
1504.65
11.65
86
2.57
1503.89
11.89
87
2.31
1503.27
12.27
89
4.06
1503.17
16.17
90
2.11
1503.86
15.86
91
2.58
1504.86
12.86
92
3.13
1509.63
16.63
93
2.97
1508.86
14.86
GoM : Phed
249
Page 13
Zone VIII (Mawlai)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------94
1.38
1510.26
12.26
96
0.00
1511.18
11.18
98
0.31
1508.86
15.86
99
0.36
1508.86
16.86
101
0.86
1504.88
14.88
102
2.03
1501.91
15.91
103
2.03
1503.99
15.99
104
3.67
1498.13
13.13
105
2.65
1490.35
9.35
110
2.55
1486.10
8.10
112
3.21
1482.10
7.10
113
0.86
1479.00
7.00
114
1.09
1477.65
7.65
115
0.36
1477.26
9.26
117
0.25
1477.25
12.25
119
0.20
1477.25
16.25
122
0.15
1477.25
16.25
123
0.05
1477.25
16.25
124
0.05
1477.25
15.25
125
0.05
1477.25
15.25
126
2.34
1477.22
10.22
127
2.08
1477.08
12.08
129
2.08
1477.06
16.06
131
3.12
1477.27
7.27
132
3.12
1477.27
16.27
133
2.34
1477.06
15.06
134
0.31
1476.92
15.92
135
0.94
1476.74
16.74
136
1.02
1479.33
9.33
137
1.17
1478.96
14.96
138
0.63
1476.65
16.65
139
2.97
1476.57
11.57
140
4.22
1476.52
16.52
141
1.88
1477.88
15.88
142
2.19
1479.55
13.55
143
3.44
1480.69
8.69
144
4.06
1479.91
9.91
145
3.80
1479.93
11.93
147
4.22
1480.07
8.07
148
2.81
1483.24
8.24
149
5.47
1487.28
8.28
150
5.16
1489.87
7.87
151
2.50
1495.94
11.94
152
2.71
1486.51
9.51
154
2.66
1482.34
12.34
155
3.21
1479.90
14.90
156
3.84
1483.83
16.83
GoM : Phed
250
Page 14
Zone VIII (Mawlai)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------157
2.71
1484.35
15.35
159
3.65
1484.57
12.57
161
3.60
1485.32
12.32
162
1.10
1480.12
9.12
163
0.87
1478.27
10.27
164
0.71
1477.86
12.86
165
2.18
1477.49
12.49
166
1.55
1477.51
8.51
167
2.02
1477.56
9.56
168
1.72
1478.06
16.06
169
4.12
1475.44
15.44
170
3.90
1476.04
13.04
171
2.34
1476.54
12.54
172
8.28
1476.52
13.52
173
8.28
1475.27
13.27
174
9.22
1474.60
13.60
175
6.88
1474.47
14.47
176
8.29
1474.46
16.46
177
4.69
1474.56
14.56
178
5.22
1474.71
16.71
179
3.86
1474.83
16.83
181
2.88
1474.59
16.59
182
4.28
1474.60
16.60
183
8.44
1474.46
16.46
184
7.03
1474.81
13.81
185
7.08
1475.20
13.20
187
5.46
1475.03
15.03
188
0.00
1474.80
16.80
189
5.07
1475.03
16.03
190
2.48
1474.92
16.92
191
2.22
1475.20
16.20
193
2.22
1475.65
15.65
195
2.72
1476.86
15.86
196
2.65
1477.04
15.04
197
1.25
1476.36
16.36
198
5.94
1475.88
16.88
199
4.76
1475.50
16.50
200
4.76
1475.17
16.17
201
1.18
1476.14
14.14
202
1.18
1476.26
13.26
203
0.63
1475.78
13.78
204
0.72
1475.46
15.46
205
4.87
1475.31
16.31
206
4.74
1475.33
16.33
208
0.18
1475.35
16.35
209
0.13
1475.35
16.35
211
0.13
1475.33
16.33
GoM : Phed
251
Page 15
Zone VIII (Mawlai)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------213
0.00
1475.28
16.28
214
0.00
1475.25
16.25
215
0.05
1475.21
15.21
218
0.10
1475.15
16.15
220
0.15
1475.12
16.12
222
0.20
1475.07
16.07
224
0.25
1475.06
16.06
226
5.99
1476.68
13.68
228
5.99
1478.27
14.27
230
7.82
1479.97
14.97
231
3.13
1483.28
16.28
232
4.30
1484.21
9.21
233
3.83
1484.11
11.11
234
2.66
1483.55
12.55
235
3.83
1483.46
14.46
236
3.05
1481.64
13.64
237
2.11
1481.25
14.25
238
2.97
1479.82
14.82
239
7.82
1479.32
16.32
240
1.25
1480.60
14.60
241
7.50
1479.19
15.19
242
6.41
1478.55
15.55
243
6.41
1478.59
14.59
244
1.56
1479.08
16.08
245
6.88
1478.20
15.20
246
0.94
1478.09
16.09
247
1.88
1477.53
15.53
248
7.82
1477.23
15.23
249
0.94
1477.06
16.06
250
6.88
1476.76
15.76
251
1.09
1479.77
16.77
252
1.40
1480.16
16.16
253
0.31
1480.83
16.83
254
1.40
1481.12
16.12
255
1.09
1481.64
15.64
256
0.00
1482.62
15.62
257
2.03
1483.61
15.61
258
2.03
1481.31
13.31
259
2.11
1484.84
15.84
260
1.72
1485.81
7.81
261
0.55
1487.70
8.70
262
1.10
1489.39
7.39
263
0.55
1491.98
8.98
264
0.86
1493.08
9.08
265
1.57
1492.99
14.99
266
1.49
1493.07
9.07
267
2.50
1486.49
13.49
GoM : Phed
252
Page 16
Zone VIII (Mawlai)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------268
1.72
1485.67
9.67
269
2.50
1485.24
10.24
270
1.64
1485.31
16.31
271
2.26
1485.06
16.06
272
2.03
1485.81
8.81
273
1.41
1486.68
8.68
274
1.45
1487.16
8.16
276
1.41
1486.75
16.75
277
1.10
1489.40
14.40
278
0.31
1494.80
8.80
279
0.54
1496.51
9.51
280
1.32
1496.81
9.81
281
0.70
1498.48
8.48
282
0.70
1498.32
10.32
283
1.25
1494.60
8.60
284
2.19
1494.63
7.63
285
1.25
1497.19
8.19
286
1.33
1500.55
10.55
287
1.33
1503.35
14.35
288
2.50
1504.22
14.22
289
2.50
1500.25
11.25
290
3.20
1494.63
9.63
291
4.99
1493.49
13.49
292
3.04
1487.29
8.29
293
1.95
1486.72
11.72
448
3.67
1484.35
7.35
447
2.18
1480.77
15.77
294
1.57
1484.04
9.04
295
0.87
1483.31
10.31
296
1.80
1483.31
7.31
297
6.10
1481.93
11.93
298
4.45
1482.28
9.28
299
3.04
1483.41
8.41
300
1.95
1482.11
8.11
301
2.81
1481.37
8.37
302
3.98
1481.15
8.15
303
5.08
1480.96
12.96
304
1.41
1481.60
11.60
305
0.94
1482.38
12.38
306
2.34
1483.58
12.58
307
3.36
1482.84
11.84
308
3.12
1483.79
11.79
309
2.35
1485.38
11.38
310
3.12
1488.99
12.99
311
1.41
1482.88
10.88
312
1.04
1482.05
11.05
313
1.41
1481.69
9.69
GoM : Phed
253
Page 17
Zone VIII (Mawlai)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------314
0.10
1482.05
12.05
315
0.05
1482.05
12.05
316
0.05
1482.05
13.05
317
3.98
1483.12
9.12
319
1.25
1483.83
8.83
320
1.40
1484.32
8.32
321
1.63
1485.29
7.29
322
0.62
1485.27
7.27
323
0.62
1485.33
9.33
324
0.70
1484.69
8.69
325
1.25
1484.26
8.26
326
1.25
1484.01
9.01
327
0.99
1483.17
9.17
329
1.04
1482.84
9.84
332
0.31
1485.49
8.49
333
0.36
1486.86
7.86
335
0.54
1487.05
8.05
336
0.70
1488.18
9.18
337
1.79
1488.58
7.58
338
1.56
1495.03
13.03
339
1.56
1501.62
16.62
340
0.52
1496.78
13.78
342
0.52
1495.57
13.57
344
0.57
1493.18
12.18
346
0.47
1489.40
9.40
349
3.03
1483.57
7.57
350
3.03
1484.58
7.58
351
3.29
1507.59
15.59
352
1.34
1507.67
14.67
353
1.34
1507.81
13.81
354
0.53
1508.45
15.45
355
0.53
1508.08
16.08
356
2.48
1507.59
16.59
357
2.48
1507.59
16.59
358
0.53
1510.23
16.23
359
0.53
1512.82
16.82
360
0.00
1514.39
16.39
361
0.72
1512.13
16.13
362
0.67
1507.49
16.49
363
0.47
1502.58
8.58
364
0.94
1481.03
9.03
365
1.64
1479.33
8.33
366
1.53
1479.06
9.06
368
0.78
1478.96
10.96
369
1.48
1478.93
12.93
370
1.33
1478.93
13.93
371
1.33
1479.04
8.04
GoM : Phed
254
Page 18
Zone VIII (Mawlai)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------372
2.27
1479.33
9.33
373
1.48
1478.94
7.94
374
1.57
1479.50
11.50
375
1.18
1479.42
13.42
376
0.71
1478.99
14.99
377
0.79
1478.90
14.90
378
0.47
1479.10
15.10
379
2.58
1479.59
12.59
380
1.49
1480.63
11.63
381
1.49
1480.06
11.06
382
0.78
1479.14
15.14
383
5.70
1479.45
14.45
384
2.19
1478.54
15.54
385
2.35
1478.64
14.64
386
2.35
1478.48
15.48
387
0.00
1478.73
14.73
388
0.00
1478.28
11.28
389
3.60
1477.96
10.96
390
1.45
1477.90
12.90
392
3.29
1477.70
13.70
393
3.39
1477.72
12.72
396
1.88
1477.61
14.61
397
2.04
1477.62
14.62
398
2.12
1477.66
14.66
399
0.24
1477.65
14.65
400
0.13
1477.66
13.66
402
1.93
1478.24
15.24
404
3.41
1479.79
12.79
406
5.39
1480.32
12.32
407
1.97
1483.38
11.38
408
4.70
1482.01
12.01
409
4.50
1480.81
11.81
410
3.91
1480.37
12.37
411
0.60
1480.49
10.49
413
0.55
1480.69
8.69
414
0.55
1481.03
8.03
415
0.69
1481.74
15.74
416
1.18
1482.33
14.33
418
1.84
1483.07
13.07
419
1.25
1482.88
14.88
420
1.25
1482.68
15.68
421
1.30
1482.74
14.74
425
0.16
1481.02
9.02
426
0.16
1481.02
10.02
427
0.00
1480.70
14.70
428
0.94
1477.34
12.34
429
3.44
1475.41
12.41
GoM : Phed
255
Page 19
Zone VIII (Mawlai)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------430
3.02
1475.22
14.22
432
3.02
1475.14
16.14
434
2.97
1475.16
14.16
435
3.13
1475.37
13.37
436
3.60
1475.40
12.40
437
2.51
1475.72
10.72
438
2.51
1476.11
10.11
439
2.35
1476.18
8.18
440
1.88
1475.83
10.83
441
0.15
1475.73
14.73
442
0.15
1475.73
15.73
444
0.10
1475.73
15.73
445
0.05
1475.73
15.73
446
0.05
1475.73
15.73
417
1.14
1481.23
15.23
MR1
-26.18
1508.00
0.00
Reservoir
MR2
-320.35
1512.00
0.00
Reservoir
MR3
-452.92
1520.00
0.00
Reservoir
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
26.18
0.53
1.14
Open
2
54.84
3.11
53.94
Open
4
52.06
2.95
48.99
Open
6
49.28
2.79
44.25
Open
7
24.26
3.09
85.83
Open
8
13.81
1.76
30.24
Open
9
10.76
1.37
19.05
Open
10
0.65
0.08
0.11
Open
12
0.45
0.06
0.05
Open
13
0.18
0.02
0.01
Open
14
0.12
0.02
0.00
Open
15
0.02
0.00
0.00
Open
17
-0.08
0.01
0.00
Open
18
7.06
0.90
8.73
Open
19
4.01
0.51
3.06
Open
20
-2.30
0.29
1.10
Open
22
-2.40
0.31
1.19
Open
23
-2.45
0.31
1.23
Open
25
3.21
0.41
2.03
Open
26
-0.13
0.02
0.00
Open
27
-5.29
0.67
51.99
Open
28
20.18
2.57
61.04
Open
29
8.25
1.05
11.64
Open
GoM : Phed
256
Page 20
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------31
6.09
0.78
6.63
Open
33
3.93
0.50
2.95
Open
34
1.82
0.23
0.71
Open
35
7.09
0.90
8.80
Open
36
4.36
0.56
3.58
Open
38
1.58
0.20
0.55
Open
39
2.65
0.34
1.43
Open
40
2.55
0.33
1.33
Open
42
-3.90
0.50
2.91
Open
44
-6.68
0.85
7.88
Open
47
-9.51
1.21
15.16
Open
49
-12.29
1.57
24.37
Open
52
-15.12
1.93
35.77
Open
53
-7.37
0.94
9.45
Open
54
31.44
1.00
4.74
Open
56
28.66
0.91
3.99
Open
57
-12.28
1.56
24.33
Open
58
-14.08
1.79
31.34
Open
59
0.83
0.11
0.16
Open
61
-1.17
0.15
0.31
Open
62
-1.45
0.18
0.46
Open
64
-1.66
0.21
0.60
Open
65
1.84
0.23
0.72
Open
66
-5.60
0.71
5.69
Open
67
-7.55
0.96
9.89
Open
69
-3.69
0.47
2.63
Open
72
-4.05
0.52
3.11
Open
75
-6.18
0.79
6.81
Open
76
0.69
0.09
0.12
Open
77
-9.76
1.24
15.89
Open
78
-3.82
0.49
2.81
Open
79
-5.08
0.65
4.75
Open
80
11.29
1.44
20.82
Open
82
-4.66
0.59
4.03
Open
83
4.41
0.56
3.65
Open
84
5.17
0.66
4.91
Open
85
4.39
0.56
3.62
Open
86
-54.84
3.11
53.94
Open
87
-161.19
3.29
33.00
Open
88
47.53
2.69
41.38
Open
89
27.23
1.54
14.75
Open
90
18.30
1.04
7.07
Open
91
20.91
1.18
9.05
Open
92
17.04
0.96
6.19
Open
94
14.73
0.83
4.73
Open
95
18.66
2.38
52.78
Open
96
-7.99
1.02
10.96
Open
GoM : Phed
257
Page 21
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------97
-10.10
1.29
16.92
Open
98
-16.38
2.09
41.47
Open
99
88.64
1.81
10.90
Open
100
-108.15
2.20
15.76
Open
102
-109.53
2.23
16.13
Open
104
-320.35
3.33
22.87
Open
105
210.82
4.30
54.25
Open
106
0.33
0.04
0.03
Open
107
0.02
0.00
0.00
Open
108
-0.34
0.04
0.03
Open
110
41.66
2.36
32.43
Open
111
40.80
2.31
31.20
Open
112
-101.51
3.23
41.56
Open
113
140.28
4.47
75.65
Open
114
66.13
3.74
76.30
Open
119
63.48
3.59
70.73
Open
121
60.93
3.45
65.56
Open
122
14.57
1.86
33.40
Open
123
11.53
1.47
21.66
Open
124
4.51
0.57
3.80
Open
126
0.75
0.10
0.14
Open
128
0.50
0.06
0.06
Open
131
0.30
0.04
0.02
Open
132
0.06
0.01
0.00
Open
133
0.09
0.01
0.00
Open
134
0.04
0.00
0.00
Open
135
3.40
0.43
2.25
Open
136
3.41
0.43
2.26
Open
138
1.33
0.17
0.40
Open
140
-2.35
0.30
1.14
Open
141
5.94
0.76
6.33
Open
142
0.47
0.06
0.06
Open
143
5.96
0.76
6.38
Open
144
0.75
0.10
0.14
Open
145
2.87
0.37
1.64
Open
146
2.56
0.33
1.33
Open
147
-12.70
1.62
25.89
Open
148
7.60
0.97
10.02
Open
149
-2.18
0.28
0.99
Open
150
-21.32
2.72
67.60
Open
151
14.32
0.46
1.11
Open
152
13.69
0.44
1.02
Open
153
1.90
0.24
0.77
Open
154
-11.54
1.47
21.69
Open
155
-13.42
1.71
28.68
Open
156
-9.83
1.25
16.13
Open
157
-21.82
2.78
70.56
Open
GoM : Phed
258
Page 22
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------158
8.55
1.09
12.44
Open
159
5.78
0.74
6.02
Open
160
-1.29
0.16
0.37
Open
162
-5.09
0.65
4.76
Open
163
-17.58
2.24
47.29
Open
164
-20.39
2.60
62.23
Open
165
-105.42
3.36
44.57
Open
166
-125.26
3.99
61.34
Open
167
-127.76
2.60
21.46
Open
168
14.68
1.87
33.87
Open
170
11.97
1.53
23.21
Open
171
9.31
1.19
14.57
Open
172
-16.35
2.08
41.34
Open
173
-44.98
1.43
9.20
Open
175
-47.69
1.52
10.26
Open
177
-51.34
1.64
11.76
Open
178
24.62
3.14
88.24
Open
179
18.95
2.41
54.34
Open
180
7.47
0.95
9.70
Open
181
6.76
0.86
8.06
Open
182
-1.14
0.15
0.30
Open
183
-2.69
0.34
1.47
Open
184
-8.52
1.09
12.36
Open
185
-12.85
1.64
26.45
Open
186
14.41
1.84
32.72
Open
187
-7.93
1.01
10.83
Open
188
-9.22
1.17
14.31
Open
189
-2.61
0.33
1.38
Open
190
6.48
0.21
0.25
Open
192
29.54
1.67
17.15
Open
193
21.26
1.20
9.33
Open
194
8.38
0.47
1.66
Open
195
1.50
0.08
0.07
Open
196
-5.98
0.34
0.89
Open
197
-7.01
0.89
8.61
Open
198
-14.36
0.81
4.51
Open
200
-18.22
1.03
7.01
Open
201
3.66
0.21
0.36
Open
202
2.13
0.27
0.95
Open
203
-0.75
0.10
0.14
Open
204
2.94
0.37
1.73
Open
205
0.81
0.05
0.02
Open
206
-6.31
0.36
0.98
Open
207
-13.34
0.76
3.93
Open
209
9.04
0.51
1.91
Open
210
3.72
0.47
2.67
Open
211
3.72
0.47
2.66
Open
GoM : Phed
259
Page 23
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------212
0.78
0.04
0.02
Open
213
2.35
0.30
1.14
Open
214
4.25
0.54
3.41
Open
215
-4.37
0.56
3.60
Open
217
-6.59
0.84
7.69
Open
219
-8.81
1.12
13.16
Open
220
-27.86
1.58
15.39
Open
221
15.08
0.85
4.94
Open
223
16.17
0.92
5.62
Open
224
11.41
0.65
2.95
Open
225
6.65
0.38
1.08
Open
226
-12.98
0.74
3.74
Open
227
-14.16
0.80
4.40
Open
228
-22.45
2.86
74.37
Open
229
-24.79
3.16
89.33
Open
230
7.11
0.91
8.84
Open
231
6.48
0.83
7.44
Open
232
2.92
0.37
1.70
Open
233
-1.22
0.15
0.34
Open
235
2.84
0.36
1.62
Open
236
1.12
0.14
0.29
Open
238
0.99
0.13
0.23
Open
240
0.86
0.11
0.18
Open
241
1.66
0.21
0.60
Open
242
1.66
0.21
0.60
Open
243
1.66
0.21
0.60
Open
246
1.61
0.21
0.57
Open
248
1.51
0.19
0.50
Open
250
1.36
0.17
0.42
Open
252
1.16
0.15
0.31
Open
254
-29.46
1.67
17.07
Open
256
-35.45
2.01
24.04
Open
258
-41.44
2.35
32.11
Open
259
-53.09
3.01
50.80
Open
260
-65.95
1.34
6.31
Open
261
2.12
0.27
0.94
Open
262
4.69
0.60
4.09
Open
263
2.03
0.26
0.87
Open
264
8.00
1.02
11.01
Open
265
4.95
0.63
4.53
Open
266
10.36
1.32
17.75
Open
267
3.99
0.51
3.04
Open
268
-3.83
0.49
2.81
Open
269
-11.08
1.41
20.10
Open
270
14.47
1.84
32.96
Open
271
5.15
0.66
4.86
Open
272
-1.26
0.16
0.36
Open
GoM : Phed
260
Page 24
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------273
-64.36
1.31
6.03
Open
274
-1.82
0.23
0.71
Open
275
56.69
1.16
4.76
Open
276
43.49
0.89
2.92
Open
277
42.55
1.36
8.30
Open
278
5.82
0.74
6.10
Open
279
34.85
1.11
5.74
Open
280
33.91
1.08
5.45
Open
281
31.35
1.00
4.72
Open
282
-4.32
0.55
3.51
Open
283
-6.32
0.80
7.10
Open
284
-64.10
1.31
5.98
Open
285
-65.19
1.33
6.17
Open
286
-59.84
1.22
5.27
Open
287
-60.15
1.23
5.32
Open
288
-65.57
1.34
6.24
Open
289
-66.66
1.36
6.43
Open
293
12.26
1.56
24.24
Open
291
5.32
0.68
5.17
Open
294
-97.57
1.99
13.02
Open
297
-99.46
2.03
13.50
Open
298
-100.01
2.04
13.63
Open
299
-110.85
2.26
16.50
Open
300
-111.40
2.27
16.65
Open
301
3.63
0.46
2.55
Open
302
-2.32
0.30
1.11
Open
303
6.96
0.89
86.50
Open
304
7.65
0.97
10.11
Open
305
5.93
0.75
6.31
Open
306
-2.97
0.38
1.76
Open
307
5.12
0.65
4.82
Open
308
-6.94
0.88
8.46
Open
309
-8.81
1.12
13.14
Open
310
-8.29
1.06
11.74
Open
311
-9.74
1.24
15.83
Open
313
-1.93
0.25
0.79
Open
314
9.74
1.24
15.83
Open
315
-13.08
1.67
27.32
Open
316
-14.18
1.81
31.73
Open
317
-0.17
0.02
0.01
Open
318
9.81
1.25
16.04
Open
319
6.40
0.82
7.27
Open
320
-115.89
2.36
17.91
Open
321
-116.20
2.37
18.00
Open
322
-111.86
2.28
16.78
Open
323
3.53
0.45
2.42
Open
324
16.02
2.04
39.81
Open
GoM : Phed
261
Page 25
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------325
4.88
0.62
4.40
Open
326
9.82
1.25
16.08
Open
327
9.79
1.25
16.00
Open
328
-1.22
0.16
0.34
Open
329
10.77
1.37
19.07
Open
330
-14.23
1.81
31.96
Open
331
-15.48
1.97
37.36
Open
332
-21.16
2.70
66.66
Open
333
-35.68
2.02
24.34
Open
334
237.34
3.36
27.80
Open
335
-4.35
0.55
3.56
Open
336
239.19
4.88
68.54
Open
337
236.04
4.81
66.89
Open
338
171.33
3.49
36.94
Open
339
5.14
0.65
4.84
Open
340
3.19
0.41
2.00
Open
341
163.15
3.33
33.75
Open
342
72.37
1.48
7.49
Open
343
-6.75
0.86
8.03
Open
344
-4.91
0.63
4.45
Open
345
80.27
1.64
9.07
Open
346
19.25
1.09
7.76
Open
347
-0.01
0.00
0.00
Open
349
18.39
1.04
7.13
Open
350
-4.60
0.59
3.95
Open
351
-9.18
1.17
14.19
Open
352
6.84
0.87
8.24
Open
353
5.04
0.64
4.67
Open
354
-19.50
2.48
57.26
Open
355
7.28
0.93
9.23
Open
356
-2.35
0.30
1.14
Open
358
-5.16
0.66
4.89
Open
360
3.70
0.47
2.64
Open
361
-21.37
1.21
9.42
Open
362
-9.03
1.15
13.77
Open
364
-21.01
1.19
9.13
Open
365
-8.32
1.06
11.82
Open
366
-20.27
1.15
8.54
Open
367
-26.44
1.50
13.97
Open
368
-37.11
2.10
26.17
Open
369
-40.23
2.28
30.39
Open
370
-3.05
0.39
1.85
Open
371
-4.10
0.23
0.44
Open
372
4.42
0.56
3.67
Open
373
3.18
0.41
1.99
Open
374
0.20
0.03
0.01
Open
376
0.05
0.01
0.00
Open
GoM : Phed
262
Page 26
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------377
0.05
0.01
0.00
Open
378
-9.94
0.56
2.28
Open
380
-10.33
1.32
17.67
Open
381
-6.21
0.79
6.87
Open
382
-7.61
0.97
10.02
Open
383
3.40
0.43
2.26
Open
384
-3.26
0.42
2.09
Open
385
6.04
0.77
6.54
Open
386
8.80
1.12
13.12
Open
388
7.81
0.99
10.51
Open
392
-7.42
0.95
9.57
Open
393
-7.73
0.98
10.33
Open
395
-8.09
1.03
11.23
Open
396
-16.42
2.09
41.67
Open
397
-5.04
0.64
4.68
Open
398
-19.47
2.48
57.13
Open
399
-21.03
2.68
65.89
Open
400
14.16
1.80
31.66
Open
402
13.64
1.74
29.54
Open
404
13.12
1.67
27.49
Open
406
12.55
1.60
25.32
Open
407
12.08
1.54
23.59
Open
410
-3.58
0.46
2.48
Open
411
-6.61
0.84
7.73
Open
412
-9.64
1.23
15.55
Open
413
-2.09
0.27
0.91
Open
414
-3.43
0.44
2.29
Open
415
-41.52
2.35
32.21
Open
416
17.31
0.98
6.37
Open
417
16.78
0.95
6.02
Open
418
10.85
0.15
0.09
Open
419
3.45
0.05
0.01
Open
420
-48.61
2.75
43.14
Open
421
-49.14
2.78
44.02
Open
422
59.35
3.36
62.45
Open
423
-109.02
3.47
47.43
Open
424
-452.92
6.41
92.00
Open
425
227.33
3.22
25.67
Open
426
226.61
3.21
25.52
Open
427
-49.58
0.70
1.53
Open
428
9.25
1.18
14.40
Open
429
5.38
0.68
5.27
Open
430
275.52
3.90
36.64
Open
431
116.56
3.71
53.68
Open
432
116.09
3.70
53.28
Open
433
6.77
0.86
8.07
Open
434
5.83
0.74
6.12
Open
GoM : Phed
263
Page 27
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------435
5.04
0.64
4.68
Open
437
1.36
0.17
0.41
Open
438
2.16
0.27
0.97
Open
439
0.68
0.09
0.11
Open
440
-0.23
0.03
0.01
Open
441
-2.58
0.33
1.36
Open
442
-3.91
0.50
2.92
Open
443
0.86
0.05
0.02
Open
444
0.58
0.07
0.08
Open
445
1.03
0.13
0.25
Open
446
-7.04
0.40
1.20
Open
447
5.94
0.34
0.88
Open
448
4.76
0.61
4.20
Open
449
11.65
0.66
3.06
Open
450
-7.60
0.43
1.39
Open
451
-3.82
0.49
2.80
Open
452
-10.56
1.34
18.38
Open
453
-28.08
1.59
15.62
Open
454
16.04
0.91
5.54
Open
455
14.55
0.82
4.62
Open
456
-4.25
0.24
0.47
Open
457
-9.80
0.55
2.22
Open
458
6.15
0.78
6.76
Open
459
-2.85
0.36
1.62
Open
460
-8.93
1.14
13.48
Open
461
3.73
0.48
2.68
Open
462
-3.99
0.51
3.03
Open
463
-11.88
0.67
3.18
Open
464
7.90
1.01
10.74
Open
465
3.72
0.47
2.66
Open
467
-7.79
0.99
10.47
Open
468
36.75
2.08
47.93
Open
469
-13.19
1.68
27.78
Open
470
2.73
0.35
1.50
Open
471
-2.09
0.27
0.92
Open
474
4.18
0.53
3.31
Open
475
-5.48
0.70
5.46
Open
476
-5.36
0.68
5.25
Open
477
1.53
0.20
0.52
Open
478
-0.35
0.04
0.03
Open
479
1.06
0.14
0.26
Open
481
-0.43
0.05
0.05
Open
482
-0.56
0.07
0.08
Open
483
1.14
0.14
0.30
Open
485
-4.88
0.62
4.40
Open
487
-6.81
0.87
8.16
Open
488
-8.29
0.47
1.63
Open
GoM : Phed
264
Page 28
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------490
-13.36
0.76
3.95
Open
491
-18.75
1.06
7.39
Open
492
59.44
1.21
5.20
Open
493
7.34
0.93
9.37
Open
494
1.86
0.24
0.74
Open
495
5.72
0.73
5.92
Open
496
13.56
0.77
4.06
Open
497
11.70
0.66
3.08
Open
498
-2.05
0.26
0.88
Open
500
-2.65
0.34
1.42
Open
501
-18.23
1.03
7.02
Open
502
-24.36
1.38
12.00
Open
503
23.94
0.76
2.86
Open
507
22.69
0.72
2.59
Open
508
-8.43
0.48
1.69
Open
512
0.32
0.04
0.03
Open
513
0.10
0.01
0.00
Open
514
-0.06
0.01
0.00
Open
515
29.87
1.69
17.51
Open
516
29.87
1.69
17.51
Open
517
9.57
1.22
15.32
Open
518
5.08
0.65
4.75
Open
520
2.06
0.26
0.89
Open
522
-0.96
0.12
0.22
Open
523
-3.93
0.50
2.94
Open
524
-1.65
0.21
0.59
Open
525
-1.04
0.13
0.25
Open
526
-4.20
0.54
3.34
Open
527
5.41
0.69
5.33
Open
528
-10.87
1.39
19.41
Open
529
-10.91
1.39
19.52
Open
530
8.46
1.08
12.20
Open
531
3.63
0.46
2.55
Open
532
1.75
0.22
0.66
Open
533
1.25
0.16
0.35
Open
534
0.35
0.04
0.03
Open
536
0.20
0.03
0.01
Open
537
0.06
0.01
0.00
Open
538
0.04
0.01
0.00
Open
290
66.66
1.36
6.43
Open
292
-4.02
0.51
3.08
Open
348
12.64
1.61
25.66
Open
539
-3.91
0.50
5.45
Open
540
2.63
0.33
1.40
Open
541
4.16
0.53
3.27
Open
542
50.14
1.02
3.79
Open
543
-3.20
0.41
2.01
Open
GoM : Phed
265
Page 29
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------544
-4.07
0.52
3.14
Open
545
-17.54
0.99
6.54
Open
546
12.34
0.70
3.40
Open
359
-2.48
0.32
1.25
Open
389
9.73
0.55
2.20
Open
504
-7.01
0.89
8.60
Open
505
-14.52
1.85
33.17
Open
506
-8.82
0.28
0.45
Open
547
-103.54
3.30
43.11
Open
548
57.28
3.24
58.48
Open
550
1.54
0.20
0.52
Open
115
-43.34
0.88
2.90
Open
191
-8.61
1.10
12.61
Open
551
-4.57
0.26
0.54
Open
552
-1.30
0.17
0.38
Open
553
-7.52
0.96
9.82
Open
554
-18.41
2.35
51.52
Open
555
3.70
0.47
2.64
Open
556
-0.05
0.01
0.00
Open
557
-79.56
2.53
26.47
Open
558
-16.33
0.92
5.72
Open
559
5.73
0.73
5.93
Open
560
-0.91
0.12
0.20
Open
561
5.96
0.76
6.37
Open
222
-80.95
1.65
9.22
Open
295
-5.33
0.68
5.18
Open
296
-8.09
1.03
11.23
Open
357
1.77
0.23
0.67
Open
363
4.95
0.63
4.52
Open
375
1.25
0.16
0.35
Open
480
-10.61
1.35
18.55
Open
16
2.50
0.32
1.28
Open
562
0.13
0.02
0.00
Open
563
0.01
0.00
0.00
Open
564
-0.01
0.00
0.00
Open
565
0.00
0.00
0.00
Open
GoM : Phed
266
g,
,
i
Laitlror PF
Legends
Pipeline
Road
Zone Boundary
Reservoir
Distribution Network - Zone - IX: Laban, Bishnupur, Rilbong & Kench's Trace
o
.04lm
.06km
GoM:PHED
GoM : Phed
Node No.
Pipe No.
700
650
600
550
500
268
300
250
200
150
100
46.35
97.40
67.60
4.
76.40
5.
93.69
6.
39.84
7.
10
10
91.84
8.
10
11
11
59.00
9.
11
12
12
74.92
10.
12
13
13
40.72
11.
13
14
14
64.00
12.
14
15
15
71.76
13.
15
16
16
56.40
14.
16
11
17
56.00
15.
14
17
18
61.30
16.
17
18
19
44.90
17.
18
19
20
100.30
18.
19
20
21
49.31
19.
20
21
22
101.60
20.
21
22
23
60.28
21.
22
23
24
5.26
22.
23
24
25
7.75
23.
24
25
26
63.80
From
To
1.
2.
3.
GoM : Phed
Sl.
No.
Node No.
Pipe No.
700
650
600
550
500
300
250
200
150
100
27
78.86
27
28
27
28
29
43.10
27.
28
29
30
96.08
28.
29
30
31
65.70
29.
30
31
32
87.40
30.
31
32
33
73.75
31.
32
33
34
46.80
32.
33
34
35
101.50
33.
34
35
36
49.40
34.
35
36
37
73.70
35.
36
37
38
45.10
36.
37
38
39
129.80
37.
38
39
40
139.60
38.
39
40
41
131.10
39.
40
41
42
26.10
40.
41
42
43
32.40
41.
42
43
44
50.82
42.
43
44
45
48.10
43.
44
45
46
151.10
44.
45
46
47
190.73
45.
46
47
48
65.10
46.
47
48
49
123.20
47.
48
49
50
168.50
48.
49
50
51
135.98
49.
50
51
52
82.00
From
To
24.
25
26
25.
26
26.
47.67
269
GoM : Phed
Sl.
No.
Node No.
Pipe No.
700
650
600
550
500
53
59.09
53
54
53
54
55
53.
54
55
56
54.
55
56
57
55.
56
57
58
56.
57
58
59
57.
58
59
60
58.
59
60
59.
60
60.
From
To
50.
51
52
51.
52
52.
300
250
200
150
100
36.28
71.50
131.42
69.62
120.00
58.80
74.78
61
57.45
61
62
45.30
61
62
63
127.80
61.
62
63
64
39.50
62.
63
64
65
75.10
63.
64
65
66
36.80
64.
65
66
67
65.86
65.
66
02
68
47.40
66.
57
67
69
66.57
67.
67
68
70
54.80
68.
68
69
71
39.70
69.
69
70
72
49.40
70.
70
71
73
98.53
71.
71
72
74
35.00
72.
72
73
75
73.70
73.
73
74
76
133.60
74.
74
75
77
72.70
75.
75
76
78
52.00
270
GoM : Phed
Sl.
No.
Node No.
Pipe No.
700
650
600
550
500
300
250
200
150
100
79
85.80
78
80
92.00
78
79
81
46.10
79.
79
80
82
55.40
80.
80
81
83
33.30
81.
81
82
84
46.10
82.
81
83
85
35.80
83.
83
84
86
57.50
84.
84
85
87
82.70
85.
85
86
88
74.08
86.
86
22
89
20.10
87.
61
87
90
91.70
88.
87
88
91
19.47
89.
88
89
92
31.23
90.
89
90
93
84.30
91.
90
91
94
67.80
92.
91
92
95
70.83
93.
92
96
109.20
94.
93
97
38.70
95.
93
94
98
96.26
96.
94
95
99
83.80
97.
95
96
100
104.78
98.
96
97
101
70.60
99.
97
89
102
85.43
100.
97
98
103
37.58
101.
98
99
104
28.00
From
To
76.
76
77
77.
77
78.
271
GoM : Phed
Sl.
No.
Node No.
Pipe No.
700
650
600
550
500
300
250
200
150
100
105
13.70
101
106
84.70
101
73
107
36.40
105.
72
102
108
24.50
106.
102
103
109
61.00
107.
103
78
110
121.90
108.
72
104
111
79.23
109.
104
54
112
101.66
110.
55
105
113
61.50
111.
105
51
114
96.31
112.
51
106
115
64.60
113.
106
107
116
65.20
114.
107
108
117
55.70
115.
108
109
118
54.10
116.
109
110
119
77.40
117.
110
111
120
31.30
118.
111
112
121
55.00
119.
112
35
122
120.10
120.
110
33
123
103.10
121.
39
113
124
61.59
122.
113
38
125
84.70
123.
42
114
126
65.80
124.
114
115
127
84.80
125.
115
116
128
64.20
126.
116
117
129
84.80
127.
117
118
130
18.10
From
To
102.
98
100
103.
100
104.
272
GoM : Phed
Sl.
No.
Node No.
Pipe No.
700
650
600
550
500
300
250
150
100
131
28.62
120
132
129.90
120
121
133
37.97
131.
121
122
134
31.93
132.
122
123
135
15.00
133.
123
127
139
60.30
134.
127
128
140
69.60
135.
128
36
141
39.40
136.
122
129
142
48.20
137.
129
130
143
73.92
138.
130
131
144
63.80
139.
131
132
145
59.10
140.
132
34
146
107.30
141.
32
133
147
83.00
142.
133
134
148
77.80
143.
134
135
149
120.80
144.
135
136
150
40.80
145.
136
137
151
55.20
146.
137
138
152
32.00
147.
138
139
153
77.80
148.
139
140
154
102.68
149.
140
141
155
20.20
150.
141
130
156
44.30
151.
140
142
157
85.60
152.
142
143
158
72.20
153.
143
133
159
From
To
128.
118
119
129.
119
130.
200
53.90
273
GoM : Phed
Sl.
No.
Node No.
Pipe No.
700
650
600
550
500
274
300
250
200
150
100
160
55.60
145
161
42.60
145
146
162
75.40
157.
146
147
163
68.60
158.
147
148
164
50.00
159.
148
149
165
40.74
160.
149
150
166
43.00
161.
150
151
167
37.70
162.
151
152
168
49.20
163.
152
153
169
36.90
164.
153
154
170
35.40
165.
154
155
171
41.60
166.
155
156
172
31.00
167.
156
157
173
34.10
168.
157
161
177
45.15
169.
161
162
178
29.20
170.
162
163
179
40.30
171.
163
164
180
68.00
172.
164
165
181
49.90
173.
165
166
182
44.50
174.
166
167
183
25.10
175.
167
168
184
37.30
176.
168
169
185
33.52
177.
169
23
186
60.40
178.
169
170
187
114.10
179.
170
171
188
42.90
180.
171
172
189
34.70
From
To
154.
134
144
155.
144
156.
GoM : Phed
Sl.
No.
Node No.
Pipe No.
700
600
550
500
191
80
192
28
174
193
69.60
185.
174
175
194
44.80
186.
175
145
195
93.90
187.
147
176
196
30.10
188.
176
177
197
52.40
189.
177
178
198
20.20
190.
178
179
199
79.63
191.
179
180
200
60.90
192.
180
167
201
42.60
193.
164
181
202
50.20
194.
181
182
203
49.90
195.
182
178
204
46.20
196.
177
183
205
197.
183
184
206
66.80
198.
184
185
207
70.00
199.
185
161
208
36.75
200.
154
186
209
201.
156
187
210
51.70
202.
187
188
211
55.70
203.
188
189
212
46.60
204.
189
190
213
205.
190
191
214
23.70
206.
191
192
215
35.10
207.
190
193
216
79.95
From
To
181.
172
146
190
182.
28
173
183.
173
184.
650
300
250
200
150
100
120.00
124.00
54.10
48.00
47.41
44.33
GoM : Phed
Sl.
No.
Node No.
Pipe No.
700
650
600
550
500
300
250
200
218
64.30
195
219
29.90
195
196
220
40.00
211.
196
197
221
12.00
212.
197
198
222
69.20
213.
198
199
223
56.90
214.
199
149
224
41.10
215.
197
200
225
216.
200
201
226
217.
201
202
227
218.
202
137
228
219.
200
203
229
220.
203
204
230
221.
203
205
231
222.
205
206
232
223.
206
207
233
224.
207
208
234
225.
208
209
235
226.
209
210
236
227.
210
211
228.
210
229.
From
To
208.
193
194
209.
194
210.
150
100
49.57
276
51.90
22.30
14.30
101.16
87.18
86.25
101.90
88.00
41.50
54.29
237
48.06
212
238
86.50
212
213
239
48.56
230.
213
214
240
42.13
231.
214
188
241
42.50
232.
204
196
242
233.
203
215
243
103.70
234.
215
216
244
73.86
62.00
86.00
GoM : Phed
Sl.
No.
Node No.
Pipe No.
700
650
600
550
500
300
250
200
150
100
245
93.80
218
246
17.88
218
219
247
73.50
238.
219
220
248
30.00
239.
220
221
249
42.0
240.
221
222
250
49.10
241.
222
223
251
115.0
242.
223
224
252
58.80
243.
224
225
253
79.80
244.
225
226
254
83.58
245.
226
211
255
2.72
246.
226
227
256
54.60
247.
227
228
257
44.70
248.
228
229
258
82.10
249.
229
230
259
67.90
250.
230
231
260
63.60
251.
231
232
261
27.70
252.
232
233
262
62.61
253.
233
234
263
254.
234
235
264
255.
235
236
265
80.70
256.
236
237
266
45.90
257.
237
238
267
33.46
258.
238
239
268
57.60
259.
239
240
269
65.38
260.
240
241
270
51.40
From
To
235.
216
217
236.
217
237.
64.00
48.87
277
GoM : Phed
Sl.
No.
Node No.
Pipe No.
700
650
600
550
500
271
242
272
242
243
273
264.
243
244
274
265.
244
245
275
266.
245
208
276
267.
236
246
277
268.
246
247
278
269.
247
248
270.
248
271.
From
To
261.
241
222
262.
219
263.
300
250
200
150
100
16.95
66.40
68.20
124.07
72.70
86.05
20.83
74.90
279
37.08
248
280
76.73
249
250
281
76.70
272..
250
251
282
65.10
273.
251
252
283
68.60
274.
252
253
284
36.80
275.
253
254
285
73.20
276.
254
255
286
74.60
277.
255
256
287
81.90
278.
256
250
288
27.81
279.
256
257
289
32.00
280.
257
258
290
24.20
281.
258
259
291
56.40
282.
259
260
292
55.82
283.
260
261
293
161.75
284.
261
262
294
51.92
285.
262
263
295
50.00
286.
263
264
296
54.77
278
GoM : Phed
Sl.
No.
Node No.
Pipe No.
700
650
600
550
500
300
250
297
266
298
266
218
299
290.
266
267
300
291.
267
268
301
90.80
292.
268
269
302
126.84
293.
269
270
303
113.90
294.
270
271
304
49.70
295.
261
250
305
38.00
296.
263
272
306
27.40
297.
272
273
307
62.29
298.
273
274
308
12.10
299.
274
275
309
61.99
300.
275
276
310
30.60
301.
276
277
311
52.62
302.
277
281
315
58.68
303.
281
282
316
14.70
304.
282
283
317
305.
283
284
318
306.
284
275
319
307.
283
285
320
308.
285
286
321
309.
286
287
322
310.
287
288
323
311.
288
289
324
312.
289
217
325
From
To
287.
264
265
288.
265
289.
200
150
100
51.00
90.10
16.80
18.10
69.00
23.50
73.40
95.60
43.90
48.70
98.80
75.26
93.10
279
GoM : Phed
Sl.
No.
Node No.
Pipe No.
700
650
600
550
500
300
250
326
291
327
61.10
291
292
328
85.81
316.
292
293
329
27.07
317.
293
294
330
60.59
318.
294
295
331
29.50
319.
295
296
332
50.90
320.
296
296
333
65.00
321.
297
298
334
66.80
322.
298
299
335
91.90
323.
299
300
336
27.80
324.
300
289
337
87.09
325.
299
301
338
54.10
326.
301
302
339
69.00
327.
302
303
340
74.70
328.
303
304
341
68.50
329.
304
305
342
64.90
330.
305
306
343
27.30
331.
306
307
344
35.80
332.
307
308
345
55.80
333.
308
309
346
76.70
334.
309
310
347
135.70
35.
310
311
348
65.60
336.
311
312
349
104.80
337.
312
42
350
8.00
338.
312
313
351
63.30
From
To
313.
282
290
314.
290
315.
200
150
100
28.60
280
GoM : Phed
Sl.
No.
Node No.
Pipe No.
700
650
600
550
300
250
200
150
100
352
66.80
315
353
100.00
315
316
354
47.06
342.
316
317
355
53.90
343.
317
318
356
35.10
344.
318
319
357
47.60
345.
319
320
358
105.92
346.
320
321
359
32.22
347.
321
322
360
99.40
348.
322
323
361
70.87
349.
323
324
362
69.60
350.
324
325
363
64.80
351.
325
326
364
56.70
352.
326
300
365
42.75
353.
326
327
366
15.30
354.
327
328
367
56.50
355.
328
323
368
120.54
356.
321
329
369
357.
329
121
370
41.20
358.
329
330
371
40.10
359.
330
331
372
122.20
360.
331
332
373
132.20
361.
332
333
374
31.20
362.
333
138
375
118.40
363.
331
334
376
27.00
364.
334
335
377
36.90
From
To
339.
313
314
340.
314
341.
500
69.20
281
GoM : Phed
Sl.
No.
Node No.
Pipe No.
700
650
600
550
500
300
250
150
100
378
69.60
333
379
97.60
335
337
380
57.44
368.
337
42
386
49.70
369.
342
328
386
15.10
370.
342
343
387
69.70
371.
343
344
388
74.70
372.
344
216
389
58.68
373.
17
346
391
45.00
374.
346
347
392
40.26
375.
347
83
393
38.61
376.
91
64
394
102.40
377.
192
150
216
19.00
378.
306
321
395
76.50
379.
120.00
380.
120.00
772.33
2246.59
2030.10
54.10
2492.99
4471.39
11861.10
From
To
365.
335
336
366.
336
367.
Total :
59.09
200
282
C;j
ZONE -IX
PROPOSED PIPEUNE ROUTE
AREA OF COVERAGE:
1. Laban
2. Bishnapur
3. Rilbong.
4. Kench's Trace
Main reservoir
GoM:Phed
283
253
234 233
230
231
227
211
212
213
214
188
1614 228
226
1610 1610
232 1613
1629
1622
1625
1621
229
235
193 1629
1616 1621
210
1616
225
1610
1612
187 186
1610
1615
1610
1610
194 1634
189
1621
209
224
155 156
1620
248
190
255
237
1630 1630154
157
251
236
161
208
238
1634
1629
1622
195
1620
153
1640 1642
1610
223
1637 1640
1610
1612
1610
240
191 1632
184
1610
1643
152
183
1614
245 1628 207
185
247
196
1634
1636
206
151
222
1626
162
192
256
1616
1635
1646
1636
1628
246
239
1646
1543
1645
1610
1634
178
257
1628
1636
1623
1645
244
241
1610
204
198 1636
182
1614
1615
197
221
271
205
150 177
163
250
1647
1610
181
149
1540
199
1620
258
1636
1645
220
1646
1642
1625
1610
243
1629
1637 1647 179 180 167
1645
Elevation
1610
1647
1642
1645
203
1610
1625
200
1646
164
1540
267
176
259
219
25.00
148
16461646 166 165
242 215
268
270
218
1638 1643
169 168
170
147
1624
1646
1646 1646 1646
1610
1623
1629 202 201 1648
50.00
1623
1624
260
1610
1624
1646
217
216
146
1711647
1646
21
1648
269
1644
172
75.00
23
1643
1610
20
261
1625
266
1629
1646
1647
344
1662
1610
22
1652
289
26
100.00
265
137
24 1657
19 1662
1620
1624
17
1637
175 174 27
145
138
343
1662
262
1625
1667
m
1625 288
1643
1666
1662
18
136 1657 16571658
1668
1667
1643
342
1637
86
1622
139
264
25
1622
1667
337
1650
14
287
28
263
135 144
277 276
140
275
1642
1667
300
173
13
1647
1625
1666
327
29 1667
1642
1662
1655
1622
286 1620
85
335
1655
1624 1625 1625
336
1657
346
1628
333
142
1667
1667 10
141
1635
1667
274 273
284
272
1623
30
1667
326
328
1642
134
84
12
281
334
1642
1665
1642
347
1657
15
1657
1668
16251625
143
299
1623
1622
31
1667
129 130
81
1635
1642 331
1660
1667
1625
1642 332
122
82 1667
325
1667
282
83
11
285
80
1667
8
1657133
1635
301 324
16
1667
1656
1667
298
1656
1667
1642
1642
1656
1635
94
1625
330
1667
9
123
131
1670
1624
1668 76
1660
1674
79
1640 1635
1668
283
121
93
7
1635
32
302
290
297
1675
1642
1675
323
1658
1657
166975
120
1668 77
1625
296
305
1650
101
322
1668
1675
95
132
295
303
304
1665
78
1640
33
2911625 294
96
1630
74 1675
321
1642 329
1650
127
100
92
119
307
1628
1669
1645
1678
1642
90
1673
1658 34
6
1645 1640
1670
1665
1625
292 1630 1630
1669
117
1668
1642
1642
73
1660
1671
1677
306
103
1645
118 1650
110
97
89 1674
1660
1676
293
320
99
1625
318
98
1669
116 1650
1645
1671
128
319
1650
71
1665
309
102 72
91 5
1677 1676
111
308
1630
1643
1675 1678
1646
1648
115
109
1660
1645
1678
1645
1675 1675
88
16761678
112 1665
1645
114
69
108
317
35
113
36
70
316
1646
1668
104
3
1674
1665
1646
1670
87
4
1666
1643
38 37
1658
310
1654
1658
1670
107
1642
68
314
1674
1681
39
315
42
41
1658
1673
1679
1654
53
1645
67
40
1670
106
54
1674
61
1644
1654
1642
164843
1648
63 64
52 1673
313
1669
1648
50
1673
1674
55
1675
44
48
311
1674 66
59
312
46
1648
62 1675 65
1675
60
1644
105
2
57
1671
56
58
51
1675
45
49
1676
1649
1670
1646
1679
1675
1648
1668
47
1
1675
1675
1674
1678
1673 1676 1670
1673
1666
1670
1668
1696
254
GoM : Phed
1610
252
249
284
Page 1
7/25/2008 9:15:35 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone IX Laban, Bishnupur.NET
GoM : Phed
285
Page 2
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------41
39
40
131.1
100
42
40
41
26.1
100
43
41
42
32.4
100
44
42
43
50.82
100
45
43
44
48.1
100
46
44
45
151.1
100
47
45
46
190.73
100
48
46
47
65.1
300
49
47
48
123.2
300
50
48
49
168.5
300
51
49
50
135.98
300
52
50
51
82
300
53
51
52
59.09
500
54
52
53
36.28
350
55
53
54
71.5
350
56
54
55
131.42
400
57
55
56
69.62
350
58
56
57
120
350
59
57
58
58.8
350
60
58
59
74.78
350
61
59
60
57.45
350
62
60
61
45.3
350
63
61
62
127.8
350
64
62
63
39.5
400
65
63
64
75.1
350
66
64
65
36.8
400
67
65
66
65.86
400
68
66
2
47.4
400
69
57
67
66.57
350
70
67
68
54.8
350
71
68
69
39.7
350
72
69
70
49.4
350
73
70
71
98.53
350
74
71
72
90
350
75
72
73
73.7
300
76
73
74
133.6
300
77
74
75
72.7
300
78
75
76
52
300
79
76
77
85.8
300
80
77
78
92
300
81
78
79
46.1
300
82
79
80
55.4
300
83
80
81
33.3
150
84
81
82
46.1
150
85
82
83
35.8
150
86
83
84
57.5
150
87
84
85
82.7
150
GoM : Phed
286
Page 3
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------88
85
86
74.08
100
89
86
22
20.1
100
90
61
87
91.7
350
91
87
88
19.47
350
92
88
89
31.23
350
93
89
90
84.3
300
94
90
91
67.8
300
95
91
92
70.83
400
96
92
6
109.2
400
97
9
93
38.7
100
98
93
94
96.26
100
99
94
95
83.8
100
100
95
96
104.78
150
101
96
97
70.6
200
102
97
89
85.43
350
103
97
98
37.58
300
104
98
99
28
300
105
99
100
13.7
300
106
100
101
84.7
300
107
101
73
36.4
300
108
72
102
24.5
300
109
102
103
61
300
110
103
78
121.9
300
111
72
104
79.23
350
112
104
54
101.6
350
113
55
105
61.5
350
114
105
51
96.31
350
115
51
106
64.6
350
116
106
107
65.2
350
117
107
108
55.7
350
118
108
109
54.1
350
119
109
110
77.4
350
120
110
111
31.3
200
121
111
112
55
200
122
112
35
120.1
200
123
110
33
103.1
250
124
39
113
61.59
100
125
113
38
84.7
100
126
42
114
65.8
150
127
114
115
84.8
150
128
115
116
64.2
150
129
116
117
84.8
150
130
117
118
18.1
150
131
118
119
28.62
150
132
119
120
129.9
150
133
120
121
37.97
150
134
121
122
51.93
150
GoM : Phed
287
Page 4
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------135
122
123
38.8
150
139
123
127
60.3
150
140
127
128
69.6
150
141
128
36
39.4
150
142
122
129
48.2
150
143
129
130
73.92
150
144
130
131
63.8
200
145
131
132
59.1
200
146
132
34
107.3
200
147
32
133
83
200
148
133
134
77.8
200
149
134
135
120.8
200
150
135
136
40.8
200
151
136
137
55.2
150
152
137
138
32
150
153
138
139
77.8
150
154
139
140
102.68
150
155
140
141
20.2
100
156
141
130
44.3
100
157
140
142
85.6
150
158
142
143
72.2
150
159
143
133
53.9
200
160
134
144
55.6
200
161
144
145
42.6
200
162
145
146
75.4
200
163
146
147
68.6
200
164
147
148
50
150
165
148
149
40.74
150
166
149
150
43
150
167
150
151
37.7
100
168
151
152
49.2
100
169
152
153
36.9
100
170
153
154
35.4
100
171
154
155
41.6
100
172
155
156
31
100
173
156
157
34.1
100
177
157
161
45.15
150
178
161
162
29.2
100
179
162
163
40.3
100
180
163
164
68
150
181
164
165
49.9
100
182
165
166
44.5
150
183
166
167
25.1
150
184
167
168
37.3
150
185
168
169
33.52
150
186
169
23
150
150
187
169
170
114.1
100
GoM : Phed
288
Page 5
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------188
170
171
42.9
100
189
171
172
34.7
100
190
172
146
120
100
191
28
173
124
200
192
173
80
54.1
250
193
28
174
69.6
200
194
174
175
44.8
200
195
175
145
93.9
200
196
147
176
30.1
150
197
176
177
52.4
150
198
177
178
20.2
150
199
178
179
79.73
100
200
179
180
60.9
100
201
180
167
42.6
100
202
164
181
50.2
100
203
181
182
49.9
100
204
182
178
46.2
100
205
177
183
48
150
206
183
184
66.8
100
207
184
185
70
100
208
185
161
36.75
100
209
154
186
47.41
150
210
186
187
51.7
100
211
187
188
55.7
100
212
188
189
46.6
100
213
189
190
44.33
150
214
190
191
23.7
100
215
191
192
35.1
100
217
190
193
78.95
100
218
193
194
64.3
100
219
194
195
29.9
100
220
195
196
40
100
221
196
197
12
150
222
197
198
69.2
100
223
198
199
56.9
100
224
199
149
41.1
100
225
197
200
49.57
100
226
200
201
51.9
150
227
201
202
22.3
200
228
202
137
14.3
200
229
200
203
101.16
150
230
203
204
62
100
231
203
205
87.18
150
232
205
206
86.25
150
233
206
207
101.9
150
234
207
208
88
150
235
208
209
41.5
100
GoM : Phed
289
Page 6
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------236
209
210
54.29
100
237
210
211
48.06
150
238
210
212
86.5
150
239
212
213
48.56
150
240
213
214
42.13
150
241
214
188
42.5
150
242
204
196
86
100
243
203
215
103.7
150
244
215
216
73.86
150
245
216
217
93.8
150
246
217
218
17.88
150
247
218
219
73.5
150
248
219
220
30
300
249
220
221
42
300
250
221
222
49.1
150
251
222
223
115
100
252
223
224
58.5
100
253
224
225
79.8
100
254
225
226
83.58
100
255
226
211
2.72
150
256
226
227
54.6
100
257
227
228
44.7
100
258
228
229
82.1
100
259
229
230
67.9
100
260
230
231
63.6
100
261
231
232
27.7
100
262
232
233
62.61
100
263
233
234
64
100
264
234
235
48.87
100
265
235
236
80.7
100
266
236
237
45.9
100
267
237
238
33.46
100
268
238
239
57.6
100
269
239
240
65.38
100
270
240
241
51.4
100
271
241
222
16.95
150
272
219
242
66.4
100
273
242
243
68.2
100
274
243
244
124.07
100
275
244
245
72.7
100
276
245
208
86.05
100
277
236
246
20.83
100
278
246
247
74.9
100
279
247
248
37.08
100
280
248
249
76.73
100
281
249
250
76.7
100
282
250
251
65.1
100
GoM : Phed
290
Page 7
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------283
251
252
68.6
100
284
252
253
36.8
100
285
253
254
73.2
100
286
254
255
74.6
100
287
255
256
81.9
100
288
256
250
27.81
100
289
256
257
32
100
290
257
258
24.2
100
291
258
259
56.4
100
292
259
260
55.82
100
293
260
261
161.75
100
294
261
262
51.92
100
295
262
263
50
100
296
263
264
54.77
100
297
264
265
51
100
298
265
266
90.1
100
299
266
218
16.8
150
300
266
267
18.1
150
301
267
268
90.8
100
302
268
269
126.84
100
303
269
270
113.9
100
304
270
271
49.7
100
305
271
250
38
100
306
263
272
27.4
100
307
272
273
62.29
100
308
273
274
12.1
100
309
274
275
61.99
100
310
275
276
30.6
100
311
276
277
52.62
100
315
277
281
58.68
100
316
281
282
14.7
100
317
282
283
69
100
318
283
284
93.1
100
319
284
275
23.5
100
320
283
285
73.4
100
321
285
286
95.6
100
322
286
287
43.9
100
323
287
288
48.7
100
324
288
289
98.8
100
325
289
217
75.26
150
326
282
290
28.6
100
327
290
291
61.1
100
328
291
292
85.81
100
329
292
293
27.07
100
330
293
294
60.59
100
331
294
295
29.5
100
332
295
296
50.9
100
GoM : Phed
291
Page 8
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------333
296
297
65
100
334
297
298
66.8
100
335
298
299
91.9
100
336
299
300
27.8
100
337
300
289
87.09
150
338
299
301
54.1
150
339
301
302
100
150
340
302
303
100
150
341
303
304
68.5
150
342
304
305
64.9
150
343
305
306
27.3
200
344
306
307
100
100
345
307
308
100
100
346
308
309
100
100
347
309
310
100
100
348
310
311
100
100
349
311
312
100
100
350
312
42
8
150
351
312
313
63.3
100
352
313
314
66.8
200
353
314
315
81.4
100
354
315
316
47.06
100
355
316
317
53.9
100
356
317
318
35.1
100
357
318
319
47.6
100
358
319
320
105.92
100
359
320
321
32.22
100
360
321
322
99.4
100
361
322
323
70.87
100
362
323
324
69.6
100
363
324
325
64.8
100
364
325
326
56.7
100
365
326
300
42.75
150
366
326
327
15.3
100
367
327
328
56.5
100
368
328
323
120.54
100
369
321
329
69.2
150
370
329
121
41.2
150
371
329
330
40.1
100
372
330
331
122.2
100
373
331
332
132.2
100
374
332
333
31.2
100
375
333
138
118.4
100
376
331
334
27
150
377
334
335
36.9
150
378
335
336
69.6
100
379
336
333
97.6
100
GoM : Phed
292
Page 9
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------380
335
337
51.44
150
385
337
342
49.7
150
386
342
328
15.1
150
387
342
343
69.7
100
388
343
344
74.7
100
389
344
216
58.68
100
391
17
346
45
100
392
346
347
40.26
100
393
347
83
38.61
100
394
91
64
102.40
350
216
192
150
19
150
395
306
321
76.5
150
1
1
2
120
400
2
1
3
120
400
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------2
0.00
1694.87
16.87
3
2.40
1695.33
14.33
4
2.40
1695.08
16.08
5
2.40
1694.56
16.56
6
0.00
1694.21
18.21
7
1.56
1690.12
15.12
8
1.56
1685.85
11.85
9
0.00
1684.33
9.33
10
2.10
1684.29
16.29
11
0.00
1684.27
14.27
12
2.10
1682.51
15.51
13
2.10
1681.85
14.85
14
0.00
1681.17
19.17
15
1.20
1682.14
15.14
16
1.20
1683.10
15.10
17
0.00
1681.15
13.15
18
1.80
1679.08
12.08
19
1.80
1675.30
13.30
20
1.80
1673.82
11.82
21
1.80
1671.47
9.47
22
0.00
1670.44
8.44
23
0.00
1670.32
13.32
24
2.70
1670.39
4.39
25
2.70
1671.49
5.49
26
2.70
1673.59
6.59
27
2.70
1675.40
8.40
28
0.00
1675.70
8.70
GoM : Phed
293
Page 10
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------29
1.20
1675.47
8.47
30
1.20
1675.41
8.41
31
1.20
1675.36
8.36
32
0.00
1675.33
10.33
33
0.00
1677.51
12.51
34
0.00
1676.43
16.43
35
0.00
1676.47
18.47
36
0.00
1675.42
17.42
37
1.80
1675.16
17.16
38
0.00
1670.83
16.83
39
0.00
1669.63
15.63
40
1.80
1666.21
18.21
41
1.80
1665.69
17.69
42
0.00
1665.24
17.24
43
0.30
1667.31
19.31
44
0.30
1669.34
20.34
45
0.30
1675.93
9.93
46
0.30
1684.52
16.52
47
0.30
1684.54
16.54
48
0.30
1684.57
14.57
49
0.36
1684.61
14.61
50
0.60
1684.64
13.64
51
0.00
1684.66
11.66
52
1.50
1684.71
9.71
53
1.50
1684.87
11.87
54
0.00
1685.21
11.21
55
0.00
1685.24
10.24
56
0.90
1685.69
12.69
57
0.00
1686.48
10.48
58
0.90
1687.38
17.38
59
0.90
1688.53
9.53
60
0.90
1689.43
14.43
61
0.00
1690.13
15.13
62
0.90
1692.02
17.02
63
1.80
1692.33
17.33
64
0.00
1693.46
19.46
65
0.90
1693.80
18.80
66
0.90
1694.42
18.42
67
2.40
1686.32
17.32
68
2.40
1686.19
12.19
69
2.40
1686.11
16.11
70
2.40
1686.01
16.01
71
2.40
1685.81
7.81
72
0.00
1685.64
10.64
73
0.00
1686.06
17.06
74
2.40
1685.63
17.63
75
1.20
1685.41
10.41
GoM : Phed
294
Page 11
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------76
1.20
1685.26
16.26
77
1.20
1685.02
16.02
78
0.00
1684.77
14.77
79
1.20
1684.20
16.20
80
0.00
1683.52
15.52
81
1.20
1682.82
15.82
82
1.20
1681.91
14.91
83
0.00
1681.25
14.25
84
1.05
1680.37
13.37
85
1.05
1679.21
12.21
86
1.05
1672.20
5.20
87
1.20
1690.13
17.13
88
1.20
1690.14
16.14
89
0.00
1690.14
14.14
90
1.20
1691.96
17.96
91
0.00
1693.44
17.44
92
2.40
1693.74
16.74
93
1.20
1684.95
16.95
94
1.20
1686.85
11.85
95
1.20
1688.85
15.85
96
1.20
1689.26
20.26
97
0.00
1689.34
12.34
98
1.80
1688.70
10.70
99
1.80
1688.23
13.23
100
1.80
1688.01
17.01
101
1.80
1686.64
8.64
102
1.20
1685.53
10.53
103
1.20
1685.27
14.27
104
2.40
1685.45
11.45
105
1.50
1685.01
11.01
106
1.26
1683.84
10.84
107
1.26
1683.03
13.03
108
1.26
1682.33
16.33
109
1.26
1681.67
13.67
110
0.00
1680.73
15.73
111
1.20
1680.05
15.05
112
1.20
1678.90
13.90
113
1.80
1670.00
16.00
114
0.90
1665.22
19.22
115
0.90
1665.21
19.21
116
0.90
1665.21
17.21
117
0.90
1665.21
15.21
118
0.90
1665.21
15.21
119
0.90
1665.21
15.21
120
0.90
1665.23
15.23
121
0.00
1665.25
15.25
122
0.00
1669.74
13.74
GoM : Phed
295
Page 12
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------123
1.80
1670.66
12.66
127
1.80
1672.23
12.23
128
1.80
1674.20
14.20
129
1.80
1670.90
14.90
130
0.00
1672.87
16.87
131
1.20
1673.81
16.81
132
1.20
1674.72
16.72
133
0.00
1671.22
11.22
134
0.00
1668.95
8.95
135
1.20
1666.76
11.76
136
1.20
1666.05
16.05
137
0.00
1662.27
19.27
138
0.00
1662.60
19.60
139
1.80
1665.20
18.20
140
0.00
1668.92
11.92
141
1.80
1670.02
13.02
142
1.20
1670.01
13.01
143
1.20
1671.02
14.02
144
1.20
1668.85
13.85
145
0.00
1668.78
11.78
146
0.00
1665.38
19.38
147
0.00
1662.39
14.39
148
3.60
1658.43
10.43
149
0.00
1655.51
13.51
150
0.00
1653.61
16.61
151
3.90
1651.03
15.03
152
3.90
1648.70
12.70
153
3.90
1647.60
11.60
154
0.00
1647.04
10.04
155
3.30
1648.47
8.47
156
3.30
1650.02
10.02
157
3.30
1652.34
10.34
161
0.00
1652.89
9.89
162
7.80
1653.75
8.75
163
7.80
1656.48
11.48
164
0.00
1657.62
11.62
165
3.60
1661.29
15.29
166
3.60
1661.89
15.89
167
0.00
1662.32
16.32
168
0.90
1663.42
17.42
169
0.00
1665.35
19.35
170
1.20
1665.28
18.28
171
1.20
1665.28
18.28
172
1.20
1665.28
13.28
173
1.05
1682.50
15.50
174
2.10
1673.28
15.28
175
2.10
1671.78
14.78
GoM : Phed
296
Page 13
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------176
2.10
1661.63
15.63
177
0.00
1660.43
13.43
178
0.00
1660.38
13.38
179
3.60
1660.51
14.51
180
3.60
1660.97
14.97
181
3.60
1658.04
11.04
182
3.60
1658.94
12.94
183
4.05
1659.90
13.90
184
4.05
1656.17
10.17
185
4.05
1653.64
8.64
186
8.67
1646.46
16.46
187
4.20
1644.42
14.42
188
0.00
1643.18
14.18
189
4.05
1647.57
18.57
190
0.00
1648.33
16.33
191
2.40
1650.12
15.12
192
2.70
1653.32
17.32
193
2.70
1648.99
14.99
194
2.70
1649.98
15.98
195
2.70
1650.70
16.70
196
0.00
1652.11
18.11
197
0.00
1652.30
10.30
198
3.60
1652.97
7.97
199
3.60
1654.12
9.12
200
0.00
1655.40
12.40
201
1.80
1661.20
17.20
202
1.80
1661.84
18.84
203
0.00
1648.79
10.79
204
3.00
1649.81
13.81
205
3.00
1646.65
17.65
206
3.00
1644.86
16.86
207
3.00
1643.08
15.08
208
0.00
1641.83
13.83
209
6.30
1640.08
18.08
210
0.00
1639.14
18.14
211
0.00
1637.94
16.94
212
3.75
1640.31
18.31
213
3.75
1641.15
16.15
214
3.75
1642.06
13.06
215
3.60
1646.35
17.35
216
0.00
1644.93
15.93
217
0.00
1641.70
16.70
218
0.00
1640.02
16.02
219
0.00
1638.04
15.04
220
3.00
1638.01
13.01
221
3.00
1637.97
12.97
222
0.00
1636.84
13.84
GoM : Phed
297
Page 14
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------223
6.30
1635.72
9.72
224
6.30
1635.70
15.70
225
6.30
1636.09
16.09
226
0.00
1637.87
16.87
227
3.60
1633.00
17.00
228
3.60
1630.02
14.02
229
3.60
1626.15
11.15
230
3.60
1624.05
10.05
231
3.60
1622.92
9.92
232
0.60
1622.70
10.70
233
3.60
1622.27
12.27
234
3.60
1622.19
12.19
235
3.60
1622.20
12.20
236
0.00
1622.52
12.52
237
3.00
1623.64
11.64
238
3.00
1624.85
10.85
239
3.00
1627.78
12.78
240
3.00
1632.17
16.17
241
3.00
1636.59
16.59
242
1.80
1638.17
15.17
243
1.80
1638.47
98.47
244
1.80
1639.44
99.44
245
1.80
1640.33
97.33
246
3.60
1622.31
8.31
247
3.60
1622.08
12.08
248
3.60
1622.08
12.08
249
3.60
1622.23
12.23
250
0.00
1622.85
12.85
251
2.70
1622.29
12.29
252
2.70
1622.05
12.05
253
2.70
1622.03
12.03
254
2.70
1622.05
12.05
255
2.70
1622.26
12.26
256
0.00
1622.88
12.88
257
1.05
1623.28
13.28
258
1.05
1623.65
13.65
259
1.05
1624.71
14.71
260
1.05
1625.95
15.95
261
1.05
1630.18
10.18
262
1.05
1631.75
9.75
263
0.00
1633.48
11.48
264
2.40
1634.59
9.59
265
2.40
1636.06
11.06
266
0.00
1639.60
15.60
267
1.80
1639.44
15.44
268
1.80
1634.67
10.67
269
1.80
1629.16
19.16
GoM : Phed
298
Page 15
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------270
1.50
1625.14
15.14
271
1.80
1623.70
13.70
272
1.80
1633.56
11.56
273
1.80
1633.91
8.91
274
1.80
1634.02
9.02
275
0.00
1634.90
9.90
276
0.60
1635.00
10.00
277
0.60
1635.22
11.22
281
0.60
1635.53
10.53
282
0.00
1635.62
10.62
283
0.00
1635.68
10.68
284
1.35
1635.01
12.01
285
1.35
1636.55
12.55
286
1.35
1638.06
15.06
287
1.35
1638.93
18.93
288
1.35
1640.14
18.14
289
0.00
1643.11
18.11
290
1.35
1635.71
10.71
291
1.35
1636.02
11.02
292
1.35
1636.69
11.69
293
1.35
1636.99
6.99
294
1.35
1637.89
7.89
295
1.35
1638.44
8.44
296
1.35
1639.64
11.64
297
1.35
1641.50
11.50
298
1.35
1643.79
8.79
299
0.00
1647.49
12.49
300
0.00
1646.32
18.32
301
1.80
1648.60
8.60
302
1.80
1650.88
10.88
303
1.80
1653.38
13.38
304
1.80
1655.26
10.26
305
1.80
1657.19
12.19
306
0.00
1657.41
12.41
307
0.45
1658.40
13.40
308
0.45
1659.51
14.51
309
0.45
1660.73
15.73
310
0.45
1662.07
17.07
311
0.45
1663.55
17.55
312
0.00
1665.15
17.15
313
0.90
1663.52
19.52
314
0.90
1663.47
19.47
315
0.90
1661.89
19.89
316
1.80
1661.11
19.11
317
0.90
1660.49
17.49
318
0.90
1660.16
14.16
319
0.90
1659.82
14.82
GoM : Phed
299
Page 16
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------320
0.90
1659.24
16.24
321
0.00
1659.12
17.12
322
1.80
1654.11
12.11
323
0.00
1651.17
9.17
324
1.20
1649.37
14.37
325
1.20
1647.98
12.98
326
0.00
1646.99
11.99
327
1.20
1647.74
12.74
328
0.00
1650.85
8.85
329
0.00
1661.99
19.99
330
1.80
1659.65
17.65
331
0.00
1653.67
11.67
332
1.80
1655.04
13.04
333
0.00
1655.52
13.52
334
1.80
1653.32
11.32
335
0.00
1652.89
10.89
336
1.80
1653.77
11.77
337
1.80
1651.84
9.84
342
0.00
1650.93
8.93
343
1.80
1648.39
11.39
344
1.80
1646.23
9.23
346
1.20
1681.15
16.15
347
1.20
1681.18
14.18
1
-494.19
1696.00
0.00
Reservoir
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------4
209.44
1.67
5.43
Open
5
207.04
1.65
5.32
Open
6
204.64
1.63
5.20
Open
7
18.80
2.39
53.52
Open
8
17.24
2.20
45.59
Open
9
15.68
2.00
38.24
Open
10
25.44
0.36
0.45
Open
11
23.34
0.33
0.38
Open
12
12.02
1.53
23.40
Open
13
9.92
1.26
16.40
Open
14
7.82
1.00
10.56
Open
15
-8.92
1.14
13.46
Open
16
-10.12
1.29
17.00
Open
17
-11.32
1.44
20.92
Open
18
16.74
0.24
0.38
Open
19
17.35
2.21
46.14
Open
20
15.55
1.98
37.66
Open
GoM : Phed
300
Page 17
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------21
13.75
1.75
29.99
Open
22
11.95
1.52
23.13
Open
23
10.15
1.29
17.09
Open
24
34.66
1.96
23.06
Open
25
-7.50
0.95
9.76
Open
26
-10.20
1.30
17.24
Open
27
-12.90
1.64
26.63
Open
28
-15.60
1.99
37.87
Open
29
-18.30
1.04
7.07
Open
30
7.29
0.41
2.39
Open
31
6.09
0.34
0.92
Open
32
4.89
0.28
0.61
Open
33
3.69
0.21
0.36
Open
34
-107.87
3.44
46.51
Open
35
48.61
1.55
10.62
Open
36
-11.93
0.38
0.79
Open
37
56.94
1.81
14.24
Open
38
16.36
0.93
5.74
Open
39
14.56
1.85
33.34
Open
40
7.01
0.89
8.62
Open
41
12.76
1.63
26.11
Open
42
10.96
1.40
19.70
Open
43
9.16
1.17
14.13
Open
44
-16.23
2.07
40.78
Open
45
-16.53
2.11
42.19
Open
46
-16.83
2.14
43.62
Open
47
-17.13
2.18
45.07
Open
48
-17.43
0.25
0.22
Open
49
-17.73
0.25
0.23
Open
50
-18.03
0.26
0.23
Open
51
-18.39
0.26
0.24
Open
52
-18.99
0.27
0.26
Open
53
-132.79
0.68
0.79
Open
54
-134.29
1.40
4.57
Open
55
-135.79
1.41
4.66
Open
56
-41.74
0.33
0.27
Open
57
-162.24
1.69
6.49
Open
58
-163.14
1.70
6.55
Open
59
-258.06
2.68
15.32
Open
60
-258.96
2.69
15.42
Open
61
-259.86
2.70
15.52
Open
62
-260.76
2.71
15.62
Open
63
-253.00
2.63
14.77
Open
64
-253.90
2.02
7.76
Open
65
-255.70
2.66
15.06
Open
66
-280.55
2.23
9.33
Open
67
-281.45
2.24
9.39
Open
GoM : Phed
301
Page 18
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------68
-282.35
2.25
9.44
Open
69
94.92
0.99
2.40
Open
70
92.52
0.96
2.29
Open
71
90.12
0.94
2.19
Open
72
87.72
0.91
2.08
Open
73
85.32
0.89
1.97
Open
74
82.92
0.86
1.87
Open
75
-101.12
1.43
5.72
Open
76
74.05
1.05
3.21
Open
77
71.65
1.01
3.02
Open
78
70.45
1.00
2.93
Open
79
69.25
0.98
2.84
Open
80
68.05
0.96
2.75
Open
81
153.24
2.17
12.36
Open
82
152.04
2.15
12.19
Open
83
33.07
1.87
21.14
Open
84
31.87
1.80
19.74
Open
85
30.67
1.74
18.39
Open
86
27.67
1.57
15.19
Open
87
26.62
1.51
14.14
Open
88
25.57
3.26
94.59
Open
89
24.52
3.12
87.53
Open
90
-7.76
0.08
0.02
Open
91
-8.96
0.09
0.03
Open
92
-10.16
0.11
0.04
Open
93
-207.09
2.93
21.59
Open
94
-208.29
2.95
21.83
Open
95
-183.44
1.46
4.25
Open
96
-185.84
1.48
4.35
Open
97
-9.77
1.24
15.92
Open
98
-10.97
1.40
19.73
Open
99
-12.17
1.55
23.91
Open
100
-13.37
0.76
3.95
Open
101
-14.57
0.46
1.14
Open
102
-196.93
2.05
9.29
Open
103
182.36
2.58
17.06
Open
104
180.56
2.56
16.75
Open
105
178.76
2.53
16.45
Open
106
176.96
2.50
16.14
Open
107
175.16
2.48
15.84
Open
108
87.59
1.24
4.39
Open
109
86.39
1.22
4.28
Open
110
85.19
1.21
4.17
Open
111
96.45
1.00
2.47
Open
112
94.05
0.98
2.36
Open
113
120.50
1.25
3.74
Open
114
119.00
1.24
3.65
Open
GoM : Phed
302
Page 19
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------115
232.80
2.42
12.66
Open
116
231.54
2.41
12.53
Open
117
230.28
2.39
12.41
Open
118
229.02
2.38
12.28
Open
119
227.76
2.37
12.15
Open
120
71.28
2.27
21.59
Open
121
70.08
2.23
20.92
Open
122
68.88
2.19
20.26
Open
123
156.48
3.19
31.24
Open
124
-5.75
0.73
5.96
Open
125
-7.55
0.96
9.87
Open
126
2.89
0.16
0.23
Open
127
1.99
0.11
0.11
Open
128
1.09
0.06
0.04
Open
129
0.19
0.01
0.00
Open
130
-0.71
0.04
0.02
Open
131
-1.61
0.09
0.08
Open
132
-2.51
0.14
0.18
Open
133
-3.41
0.19
0.31
Open
134
-70.77
4.01
86.50
Open
135
-35.18
1.99
23.72
Open
139
-36.98
2.09
26.01
Open
140
-38.78
2.20
28.40
Open
141
-40.58
2.30
30.89
Open
142
-35.58
2.01
24.21
Open
143
-37.38
2.12
26.53
Open
144
-58.14
1.85
14.80
Open
145
-59.34
1.89
15.38
Open
146
-60.54
1.93
15.96
Open
147
111.56
3.55
49.49
Open
148
83.92
2.67
29.21
Open
149
64.82
2.06
18.11
Open
150
63.62
2.03
17.49
Open
151
62.42
3.53
68.57
Open
152
-22.45
1.27
10.32
Open
153
-42.40
2.40
33.50
Open
154
-44.20
2.50
36.18
Open
155
-18.96
2.42
54.38
Open
156
-20.76
2.64
64.33
Open
157
-25.24
1.43
12.82
Open
158
-26.44
1.50
13.97
Open
159
-27.64
0.88
3.74
Open
160
19.09
0.61
1.88
Open
161
17.89
0.57
1.67
Open
162
106.03
3.38
45.05
Open
163
104.07
3.31
43.51
Open
164
67.53
3.82
79.31
Open
GoM : Phed
303
Page 20
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------165
63.93
3.62
71.66
Open
166
49.24
2.79
44.19
Open
167
21.48
2.74
68.54
Open
168
17.58
2.24
47.30
Open
169
13.68
1.74
29.73
Open
170
9.78
1.25
15.97
Open
171
-14.81
1.89
34.41
Open
172
-18.11
2.31
49.95
Open
173
-21.41
2.73
68.10
Open
177
-24.71
1.40
12.32
Open
178
-13.56
1.73
29.24
Open
179
-21.36
2.72
67.83
Open
180
-29.16
1.65
16.75
Open
181
-22.31
2.84
73.51
Open
182
-25.91
1.47
13.46
Open
183
-29.51
1.67
17.12
Open
184
-39.62
2.24
29.55
Open
185
-40.52
2.29
57.44
Open
186
-42.16
2.39
33.15
Open
187
1.64
0.21
0.58
Open
188
0.44
0.06
0.05
Open
189
-0.76
0.10
0.14
Open
190
-1.96
0.25
0.81
Open
191
-117.92
3.76
54.84
Open
192
-118.97
2.43
18.80
Open
193
92.33
2.94
34.87
Open
194
90.23
2.87
33.41
Open
195
88.13
2.81
31.99
Open
196
36.54
2.07
25.43
Open
197
34.44
1.95
22.79
Open
198
11.14
0.63
2.82
Open
199
-2.91
0.37
1.69
Open
200
-6.51
0.83
7.51
Open
201
-10.11
1.29
31.65
Open
202
-6.85
0.87
8.25
Open
203
-10.45
1.33
18.04
Open
204
-14.05
1.79
31.22
Open
205
23.30
1.32
11.05
Open
206
19.25
2.45
55.92
Open
207
15.20
1.94
36.10
Open
208
11.15
1.42
20.34
Open
209
24.59
1.39
12.21
Open
210
15.92
2.03
39.36
Open
211
11.72
1.49
22.32
Open
212
-25.50
3.25
94.14
Open
213
-29.55
1.67
17.17
Open
214
-22.66
2.89
75.64
Open
GoM : Phed
304
Page 21
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------215
-25.06
3.19
91.15
Open
217
-6.89
0.88
8.35
Open
218
-9.59
1.22
15.39
Open
219
-12.29
1.57
24.37
Open
220
-14.99
1.91
35.20
Open
221
-27.93
1.58
15.47
Open
222
-7.49
0.95
9.73
Open
223
-11.09
1.41
20.13
Open
224
-14.69
1.87
33.89
Open
225
-20.45
2.60
62.54
Open
226
-81.27
4.60
111.78
Open
227
-83.07
2.65
28.67
Open
228
-84.87
2.70
29.83
Open
229
60.83
3.44
65.36
Open
230
-9.94
1.27
16.45
Open
231
35.78
2.03
24.46
Open
232
32.78
1.86
20.80
Open
233
29.78
1.69
17.41
Open
234
26.78
1.52
14.30
Open
235
16.52
2.10
42.13
Open
236
10.22
1.30
17.31
Open
237
36.19
2.05
24.99
Open
238
-25.97
1.47
13.51
Open
239
-29.72
1.68
17.35
Open
240
-33.47
1.90
21.62
Open
241
-37.22
2.11
26.32
Open
242
-12.94
1.65
26.81
Open
243
34.99
1.98
23.47
Open
244
31.39
1.78
19.19
Open
245
43.06
2.44
34.47
Open
246
73.98
4.19
93.91
Open
247
37.67
2.13
26.91
Open
248
40.73
0.58
1.06
Open
249
37.73
0.53
0.92
Open
250
34.73
1.97
23.15
Open
251
7.47
0.95
9.69
Open
252
1.17
0.15
0.32
Open
253
-5.13
0.65
4.83
Open
254
-11.43
1.46
21.30
Open
255
-36.19
2.05
24.95
Open
256
24.76
3.15
89.17
Open
257
21.16
2.70
66.66
Open
258
17.56
2.24
47.20
Open
259
13.96
1.78
30.86
Open
260
10.36
1.32
17.77
Open
261
6.76
0.86
8.06
Open
262
6.16
0.79
6.79
Open
GoM : Phed
305
Page 22
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------263
2.56
0.33
1.34
Open
264
-1.04
0.13
0.25
Open
265
-4.64
0.59
4.01
Open
266
-12.26
1.56
24.27
Open
267
-15.26
1.94
36.39
Open
268
-18.26
2.33
50.74
Open
269
-21.26
2.71
67.25
Open
270
-24.26
3.09
85.87
Open
271
-27.26
1.54
14.79
Open
272
-3.06
0.39
1.86
Open
273
-4.86
0.62
4.37
Open
274
-6.66
0.85
7.84
Open
275
-8.46
1.08
12.21
Open
276
-10.26
1.31
17.44
Open
277
7.63
0.97
10.07
Open
278
4.03
0.51
3.09
Open
279
0.43
0.05
0.05
Open
280
-3.17
0.40
1.98
Open
281
-6.77
0.86
8.08
Open
282
6.99
0.89
8.58
Open
283
4.29
0.55
3.48
Open
284
1.59
0.20
0.55
Open
285
-1.11
0.14
0.28
Open
286
-3.81
0.48
2.78
Open
287
-6.51
0.83
7.50
Open
288
2.06
0.26
0.89
Open
289
-8.57
1.09
12.48
Open
290
-9.62
1.23
15.47
Open
291
-10.67
1.36
18.74
Open
292
-11.72
1.49
22.30
Open
293
-12.77
1.63
26.14
Open
294
-13.82
1.76
30.26
Open
295
-14.87
1.89
34.65
Open
296
-11.10
1.41
20.17
Open
297
-13.50
1.72
28.98
Open
298
-15.90
2.03
39.24
Open
299
-36.30
2.06
25.13
Open
300
20.41
1.16
8.64
Open
301
18.61
2.37
52.52
Open
302
16.81
2.14
43.50
Open
303
15.01
1.91
35.27
Open
304
13.51
1.72
29.02
Open
305
11.71
1.49
22.27
Open
306
-3.77
0.48
2.73
Open
307
-5.57
0.71
5.62
Open
308
-7.37
0.94
9.45
Open
309
-9.17
1.17
14.16
Open
GoM : Phed
306
Page 23
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------310
-4.16
0.53
3.26
Open
311
-4.76
0.61
4.19
Open
315
-5.36
0.68
5.22
Open
316
-5.96
0.76
6.37
Open
317
-1.99
0.25
0.83
Open
318
6.36
0.81
7.19
Open
319
5.01
0.64
4.62
Open
320
-8.35
1.06
11.92
Open
321
-9.70
1.24
15.73
Open
322
-11.05
1.41
20.02
Open
323
-12.40
1.58
24.78
Open
324
-13.75
1.75
30.01
Open
325
30.92
1.75
18.67
Open
326
-3.97
0.51
3.00
Open
327
-5.32
0.68
5.16
Open
328
-6.67
0.85
7.84
Open
329
-8.02
1.02
11.04
Open
330
-9.37
1.19
14.73
Open
331
-10.72
1.37
18.90
Open
332
-12.07
1.54
23.55
Open
333
-13.42
1.71
28.65
Open
334
-14.77
1.88
34.22
Open
335
-16.12
2.05
40.24
Open
336
16.50
2.10
42.05
Open
337
44.67
2.53
36.90
Open
338
-32.62
1.85
20.60
Open
339
-34.42
1.95
22.76
Open
340
-36.22
2.05
25.02
Open
341
-38.02
2.15
27.37
Open
342
-39.82
2.25
29.82
Open
343
-41.62
1.33
7.97
Open
344
-7.57
0.96
9.92
Open
345
-8.02
1.02
11.04
Open
346
-8.47
1.08
12.22
Open
347
-8.92
1.14
13.45
Open
348
-9.37
1.19
14.73
Open
349
-9.82
1.25
16.07
Open
350
-22.50
1.27
10.34
Open
351
12.68
1.62
25.81
Open
352
11.78
0.38
0.77
Open
353
10.88
1.39
19.44
Open
354
9.98
1.27
16.57
Open
355
8.18
1.04
11.46
Open
356
7.28
0.93
9.23
Open
357
6.38
0.81
7.23
Open
358
5.48
0.70
5.46
Open
359
4.58
0.58
3.91
Open
GoM : Phed
307
Page 24
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------360
18.19
2.32
50.34
Open
361
16.39
2.09
41.50
Open
362
12.68
1.62
25.81
Open
363
11.48
1.46
21.47
Open
364
10.28
1.31
17.50
Open
365
28.17
1.60
15.71
Open
366
-17.89
2.28
48.85
Open
367
-19.09
2.43
55.09
Open
368
-3.71
0.47
2.65
Open
369
-47.65
2.70
41.58
Open
370
-67.36
3.81
78.94
Open
371
19.70
2.51
58.40
Open
372
17.90
2.28
48.91
Open
373
-7.74
0.99
10.35
Open
374
-9.54
1.22
15.25
Open
375
-19.95
2.54
59.77
Open
376
25.65
1.45
13.20
Open
377
23.85
1.35
11.54
Open
378
-8.61
1.10
12.61
Open
379
-10.41
1.33
17.92
Open
380
32.46
1.84
20.42
Open
385
30.66
1.74
18.37
Open
386
15.39
0.87
5.13
Open
387
15.27
1.95
36.42
Open
388
13.47
1.72
28.87
Open
389
11.67
1.49
22.14
Open
391
-0.60
0.08
0.09
Open
392
-1.80
0.23
0.70
Open
393
-3.00
0.38
1.80
Open
394
-24.85
0.26
0.20
Open
216
-27.76
1.57
15.28
Open
395
-34.05
1.93
22.31
Open
1
282.35
2.25
9.44
Open
2
211.84
1.69
5.55
Open
GoM : Phed
308
g,
,
i
Legends
Pipeline
Road
Zone Boundary
Reservoir
Distribution Network - Zone - X : Mawprem, Jaiaw, Mawkhar, South East Mawkhar, Barapathar
o
w
.03im
.045bn
GoM:PHED
GoM : Phed
Node No.
Pipe No.
500
450
400
200
150
100
77.00
79.00
14.00
4.
30.00
5.
54.00
6.
11
10
47.00
7.
11
13
12
28.00
8.
13
16
15
35.00
9.
16
18
17
36.00
10.
18
19
18
52.00
11.
20
19
86.00
12.
20
21
20
59.00
13.
21
23
22
39.00
14.
23
24
23
80.00
15.
24
27
26
78.00
16.
27
28
27
62.00
17.
28
30
29
91.00
18.
30
33
32
22.00
19.
33
34
33
99.00
20.
34
35
34
48.00
21.
35
36
35
79.00
22.
35
37
36
38.00
23.
37
38
37
70.00
From
To
1.
2.
3.
310
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
38
86.00
40
39
74.00
40
42
41
33.00
27.
42
43
42
54.00
28.
43
44
48
61.00
29.
44
45
44
27.00
30.
37
49
48
35.00
31.
49
50
49
45.00
32.
52
50
52
43.00
33.
52
33
53
41.00
34.
52
53
54
27.00
35.
53
54
55
40.00
36.
54
30
56
40.00
37.
53
55
57
50.00
38.
55
56
58
70.00
39.
56
58
60
78.00
40.
58
57
61
80.00
41.
27
59
62
25.00
42.
59
60
63
56.00
43.
60
61
64
28.00
44.
61
62
65
17.00
45.
62
64
67
56.00
46.
64
66
69
53.00
47.
66
68
71
32.00
48.
68
70
73
48.00
49.
70
71
74
12.00
50.
71
72
75
50.00
From
To
24.
38
39
25.
37
26.
311
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
76
40.00
74
77
30.00
74
75
78
33.00
54.
75
76
79
45.00
55.
76
73
80
92.00
56.
76
77
81
98.00
57.
77
61
82
100.00
58.
71
79
84
78.00
59.
79
80
85
49.00
60.
80
82
87
57.00
61.
82
84
89
112.00
62.
84
85
90
205.00
63.
85
87
92
111.00
64.
87
88
93
41.00
65.
88
89
94
120.00
66.
89
79
95
132.00
67.
88
90
96
61.00
68.
90
92
97
117.00
69.
92
93
99
118.00
70.
93
94
100
105.00
71.
94
95
101
106.00
72.
95
96
102
107.00
73.
96
97
103
108.00
74.
97
98
104
61.00
75.
98
99
105
62.00
76.
99
100
106
34.00
77.
100
101
107
22.00
From
To
51.
72
73
52.
73
53.
312
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
108
18.00
103
109
138.00
103
104
110
140.00
81.
104
106
112
123.00
82.
106
70
113
120.00
83.
106
107
114
68.00
84.
107
108
115
70.00
85.
108
109
116
59.00
86.
109
102
117
60.00
87.
101
110
118
140.00
88.
110
111
119
224.00
89.
111
112
120
112.00
90.
112
108
121
168.00
91.
111
113
122
85.00
92.
113
114
123
65.00
93.
114
115
124
31.00
94.
115
116
125
91.00
95.
116
117
126
340.00
96.
117
118
127
339.00
97.
118
60
128
335.00
98.
116
119
129
99.00
99.
119
120
130
100.00
100.
120
121
131
84.00
101.
121
122
132
83.00
102.
120
123
133
45.00
103.
123
125
135
86.00
104.
125
130
140
41.00
From
To
78.
101
102
79.
102
80.
313
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
141
89.00
132
142
95.00
132
133
143
111.00
108.
133
59
144
115.00
109.
132
134
145
121.00
110.
134
135
146
122.00
111.
135
130
147
81.00
112.
135
137
149
97.00
113.
137
138
150
98.00
114.
138
141
153
64.00
115.
141
142
154
70.00
116.
115
146
159
186.00
117.
146
147
160
187.00
118.
147
148
161
188.00
119.
148
149
162
185.00
120.
149
150
163
190.00
121.
150
151
164
120.00
122.
151
152
165
123.00
123.
152
115
166
125.00
124.
151
153
167
48.00
125.
153
154
168
104.00
126.
154
114
169
155.00
127.
154
155
170
56.00
128.
155
155
171
89.00
129.
155
156
172
30.00
130.
156
151
173
125.00
131.
156
157
174
150.00
From
To
105.
130
131
106.
131
107.
314
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
175
153.00
159
176
69.00
159
160
177
104.00
135.
160
161
178
105.00
136.
161
162
179
105.00
137.
162
163
180
46.00
138.
163
164
181
80.00
139.
163
165
182
82.00
140.
165
166
183
112.00
141.
166
167
184
115.00
142.
167
113
185
164.00
143.
167
168
186
120.00
144.
168
169
187
125.00
145.
169
170
188
65.00
146.
170
171
189
60.00
147.
171
99
190
49.00
148.
100
172
191
159.00
149.
172
113
192
149.00
150.
169
174
194
80.00
151.
174
175
195
90.00
152.
175
97
196
85.00
153.
175
176
197
55.00
154.
176
179
198
55.00
155.
179
177
200
28.00
156.
179
181
202
140.00
157.
181
95
203
120.00
158.
181
182
204
61.00
From
To
132.
157
158
133.
158
134.
315
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
205
101.00
185
207
90.00
185
93
208
29.00
162.
185
187
210
130.00
163.
187
188
211
152.00
164.
188
189
212
143.00
165.
189
190
213
33.00
166.
190
191
214
148.00
167.
191
193
216
89.00
168.
193
195
218
130.00
169.
195
196
219
65.00
170.
196
197
220
83.00
171.
197
182
221
85.00
172.
196
177
222
92.00
173.
195
198
223
73.00
174.
198
199
224
18.00
175.
199
176
225
55.00
176.
199
165
226
143.00
177.
198
200
227
85.00
178.
200
201
228
86.00
179.
201
202
229
26.00
180.
202
193
231
55.0
181.
201
204
232
57.00
182.
204
205
233
30.00
183.
205
207
235
147.00
184.
207
208
286
51.00
185.
208
209
237
99.00
From
To
159.
182
183
160.
183
161.
316
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
238
100.00
210
239
67.00
210
211
240
87.00
189.
211
212
241
88.00
190.
212
161
242
129.00
191.
212
213
243
15.00
192.
213
214
244
36.00
193.
214
215
245
80.00
194.
213
159
246
98.00
195.
215
216
247
85.00
196.
216
217
248
48.00
197.
217
218
249
41.00
198.
218
219
250
73.00
199.
219
214
251
56.00
200.
219
220
252
80.00
201.
220
221
253
85.00
202.
221
222
254
92.00
203.
222
223
255
80.00
204.
223
158
256
85.00
205.
222
224
257
60.00
206.
224
225
258
71.00
207.
225
151
259
129.00
208.
225
226
260
108.00
209.
226
150
261
90.00
210.
226
227
262
74.00
211.
227
228
263
78.00
212.
228
229
264
60.00
From
To
186.
209
162
187.
208
188.
317
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
265
221
266
62.00
229
231
267
32.00
216.
231
228
268
64.00
217.
231
232
269
87.00
218.
232
233
270
52.00
219.
233
234
271
81.00
220.
234
235
272
85.00
221.
235
236
273
104.00
222.
236
237
274
184.00
223.
237
238
275
283.00
224.
238
239
276
140.00
225.
239
228
277
162.00
226.
232
242
280
77.00
227.
242
229
281
56.00
228.
242
243
282
46.00
229.
243
244
283
46.00
230.
244
245
284
40.00
231.
245
217
285
43.00
232.
218
230
286
146.00
233.
245
246
287
114.00
234.
246
216
288
80.00
235.
246
247
289
64.00
236.
247
210
290
68.00
237.
210
248
291
66.00
238.
248
249
292
48.00
239.
249
250
293
From
To
213.
229
230
214.
230
215.
200
150
100
60.00
61.00
318
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
294
36.00
252
295
32.00
252
253
296
73.00
243.
253
246
297
75.00
244.
252
254
298
88.00
245.
254
244
299
90.00
246.
254
255
300
68.00
247.
255
256
301
70.00
248.
256
257
302
80.00
249.
257
258
303
44.00
250.
258
259
304
64.00
251.
259
256
305
145.00
252.
259
243
306
28.00
253.
258
233
307
39.00
254.
233
260
308
83.00
255.
260
257
309
85.00
256.
260
235
310
166.00
257.
260
261
311
118.00
258.
261
262
312
19.00
259.
261
255
313
45.00
260.
262
263
314
62.00
261.
263
251
315
65.00
262.
262
264
316
55.00
263.
264
265
317
42.00
264.
264
267
319
100.00
265.
267
268
320
75.00
266.
268
269
321
70.00
From
To
240.
250
251
241.
251
242.
319
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
322
65.00
271
323
48.00
271
265
324
239.00
270.
272
270
326
76.00
271.
272
273
327
132.00
272.
273
274
328
130.00
273.
274
235
329
133.00
274.
269
275
330
41.00
275.
275
281
336
103.00
276.
281
283
338
63.00
277.
283
284
339
98.00
278.
284
286
341
91.00
279.
286
287
342
92.00
280.
287
289
344
68.00
281.
289
291
346
70.00
282.
291
292
347
69.00
283.
292
293
348
98.00
284.
293
294
349
70.00
285.
294
295
350
121.00
286.
295
249
351
100.00
287.
295
296
352
70.00
288.
296
298
354
70.00
289.
298
267
355
70.00
290.
298
250
356
117.00
291.
295
299
357
131.00
292.
299
300
358
135.00
293.
300
207
359
57.00
From
To
267.
269
270
268.
270
269.
320
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
360
96.00
207
361
70.00
301
302
362
51.00
297.
302
248
363
52.00
298.
300
303
364
87.00
299.
303
304
365
88.00
300.
304
306
367
73.00
301.
306
190
368
86.00
302.
306
307
369
84.00
303.
307
308
370
120.00
304.
308
309
371
125.00
305.
309
300
372
95.00
306.
309
310
373
89.00
307.
310
311
374
90.00
308.
311
312
375
93.00
309.
312
307
376
90.00
310.
312
313
377
57.00
311.
313
314
378
70.00
312.
314
315
379
70.00
313.
315
316
380
72.00
314.
316
311
381
55.00
315.
316
317
382
147.00
316.
317
319
384
116.00
317.
319
320
385
118.00
318.
320
291
386
66.00
319.
315
321
387
84.00
320.
321
322
388
85.00
From
To
294.
300
301
295.
301
296.
321
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
389
83.00
324
390
43.00
324
321
391
124.00
324.
323
326
393
55.00
325.
326
329
396
50.00
326.
329
331
398
26.00
327.
331
335
402
159.00
328.
335
342
409
66.00
329.
342
343
410
53.00
330.
343
344
411
54.00
331.
344
348
415
100.00
332.
348
350
417
102.00
333.
350
352
419
100.00
334.
352
353
420
99.00
335.
353
354
421
171.00
336.
354
190
422
60.00
337.
354
306
423
86.00
338.
353
355
424
130.00
339.
355
189
425
69.00
340.
353
357
427
35.00
341.
357
359
429
52.00
342.
359
360
430
40.00
343.
360
361
431
38.00
344.
361
344
432
100.00
345.
360
363
434
84.00
346.
363
365
436
65.00
From
To
321.
322
323
322.
323
323.
322
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
437
80.00
367
438
72.00
367
369
440
95.00
350.
369
370
441
96.00
351.
370
372
443
95.00
352.
366
373
445
90.00
353.
373
374
446
92.00
354.
374
376
448
28.00
355.
376
378
450
76.00
356.
378
379
451
80.00
357.
379
342
452
82.00
358.
320
292
455
91.00
359.
313
353
456
102.00
360.
381
156
45.00
361.
381
142
457
58.00
362.
204
163
98
95.00
363.
237
228
460
208.00
364.
267
283
454
106.00
365.
372
359
444
96.00
366.
135
145.00
367.
19
36
146.00
368.
39
45
11
210.00
369.
122
115
13
120.00
Total :
553
2905
282
1225
1836
24872
From
To
347.
365
366
348.
366
349.
323
((j
ZONE -X
*PROPOSED PIPELlNE ROUTE
AREA OF COVERAGE:
1. Mawprem
2. Jaiaw
3. Mawkhar
4. South East Mawkhar
5. Barapathar
'87
"
GoM:Phed
324
Elevation
367
ZONE-X (Mawprem)
25.00
370
50.00
1471
75.00
100.00
m
366
373
3691473 1475
3651474
1472
372
374
1472
363
376
1476
378
1478
1479
379
342 335
343 1480
344
187
1472
331
185
359
14791477
85
93
14721473
87
1479
1481 92
1480
329
1479188
348
1476
1480
1473
1484
88
357
1483
355
1480 1479 183
350
1478 189
94
326 1475
84
1480
1482
1474
352
1477
1481
82
190
1479
353
1478
322 1474
89
1480 182
323
1485
80
197
95
354
1479
313
1486
1478
1475
314
191
1474 1473
1489 79 1490
1482 1481 196
315 321
1482 181
324
74
1477
1474
306
312 1473
195 1931479
1496
71
1482
1483
179 177
75
1472 1471
316
317 1472
1496
307
96
72
311
1485
1476
1475
1481
304
1496
176 1483
198
1484
291 289
1494 73
106
1480 319
1478
202
1476
308 310
199
148497 175
1495 70
1479
76
292
104
200
1477
1484
1487
1477 1476
1496
303
320
1479
1493
1486
309 1480
1475
287
1489
201
1495
1495
1485
1485
98
1478
293
68
103
1485
174
107 1495
204
1478 3001481 299
294
1480
1484
2861475
164
99
1488
163
205
1479
1494
109
1493
171
66
56
1485165
284
44
1494
170
1482
1481
42
108
102
1477
1476295
43
301
1474
1483
1490
169
100
207
55
1481
1480
1493
1489
1493
162
283 1473
1485
1492
77
1493
64
302
296
1487 168
1474
101
1493
1492
1491 1492
1475
45
209
40
1485
1487
1478
208
50
531491
1480
298
1472
1492
248
172
281 275
1492
1486
1474
1474
166
52
62
161
1489
249
49
58
1495
212
1479
1491
112
1479
210
211
1491
1490
1475 268 1473
1476 250
110
1487 167
54
39 38 37
269 1474
1486
1492
1478
160
247
61
1474
267
1490 1490
1493
113
1477
1491
213
1478
159
1476
1487
60
35 34 33
1491
1476270
14961497 1490
1472
251
1475
30149128
1480
1477
1493118
215
59
111
1489
263 2641473 271
114
1479
214
36
27
246253
1482
1494
2521473
149114901491 1492
158
1476
272
216
117 1493
133
219 1478
1493
1495
157
1472 1472
1493
265 1478
1479
1491
1494
1475
1476
116 115 1490
262
223
254
1475
1479
1476
218 217
220 1475
1477245244
1492
155 1480
1494
255
24
119
154
1480
132
1491 1490
1473
1476
1475
122
222 1476 14741479 1478
256 1473 261
1490 156
1493134
1492
221
1493
153
1474
273
1495
120 121
243
19
123
230
131
152
224
1491
1475
1482
257
1488
18
23 1496
259
1475
1477
125
1490
242 1485
1475
21
1492
16
1493 1492 1476
1476
225
260
1494
1490 151
258
229
1477
146
130
1474
1493
13
1494
274
1495
1480 1474
1494
1489150
1493
11
1479 227
228 1475231 232 233
20
1474
1480
135 1497
226
1489
1493
1474
8
234
1494
7 1494
147
1476
1479 1478 1475
1487
235
1495
1475
149
1476
1494 4
3
239
237 14781473
1496
1488
2
148
1486
236
1495
1495
1477
1475
1 1497
1487
238
1474
137
1512
381
1476
1494
142
1495
141
1496
138
1495
90
1471
360 361
1496
GoM : Phed
325
Page 1
6/21/2008 7:54:51 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone X Mawprem, Jaiaw, Mawkhar.NET
ZONE-X (Mawprem)
Link - Node Table:
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------1
1
2
77
350
2
2
3
79
300
3
2
4
14
350
6
4
7
30
350
7
7
8
54
100
10
8
11
47
100
12
11
13
28
100
15
13
16
35
100
17
16
18
36
100
18
18
19
52
100
19
7
20
86
300
20
20
21
59
300
22
21
23
39
300
23
23
24
80
300
26
24
27
78
300
27
27
28
62
100
29
28
30
91
100
32
30
33
22
100
33
33
34
99
100
34
34
35
48
100
35
35
36
79
100
36
35
37
38
100
37
37
38
70
100
38
38
39
86
100
39
37
40
74
100
41
40
42
33
100
42
42
43
54
100
43
43
44
61
100
44
44
45
27
100
48
37
49
35
100
49
49
50
45
100
52
52
50
43
100
53
52
33
41
100
54
52
53
27
100
55
53
54
40
100
56
54
30
40
100
57
53
55
50
100
GoM : Phed
326
Page 2
ZONE-X (Mawprem)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------58
55
56
70
100
60
56
58
78
100
61
58
27
80
100
62
27
59
25
300
63
59
60
56
300
64
60
61
28
300
65
61
62
17
300
67
62
64
56
300
69
64
66
53
300
71
66
68
32
300
73
68
70
48
300
74
70
71
12
150
75
71
72
50
100
76
72
73
40
100
77
73
74
30
100
78
74
75
33
100
79
75
76
45
100
80
76
73
92
100
81
76
77
98
100
82
77
61
100
100
84
71
79
78
150
85
79
80
49
100
87
80
82
57
100
89
82
84
112
100
90
84
85
205
100
92
85
87
111
100
93
87
88
41
100
94
88
89
120
100
95
89
79
132
100
96
88
90
61
100
97
90
92
117
100
99
92
93
118
100
100
93
94
105
100
101
94
95
106
100
102
95
96
107
100
103
96
97
108
100
104
97
98
61
150
105
98
99
62
200
106
99
100
34
200
107
100
101
22
150
108
101
102
18
150
109
102
103
138
150
110
103
104
140
150
112
104
106
123
150
113
106
70
120
150
114
106
107
68
100
115
107
108
70
100
GoM : Phed
327
Page 3
ZONE-X (Mawprem)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------116
108
109
59
150
117
109
102
60
150
118
101
110
140
150
119
110
111
224
150
120
111
112
112
150
121
112
108
168
150
122
111
113
85
150
123
113
114
65
250
124
114
115
31
250
125
115
116
91
250
126
116
117
340
300
127
117
118
339
300
128
118
60
335
300
129
116
119
99
300
130
119
120
100
300
131
120
121
84
200
132
121
122
83
200
133
120
123
45
300
135
123
125
86
300
140
125
130
41
300
141
130
131
89
300
142
131
132
95
250
143
132
133
111
300
144
133
59
115
300
145
132
134
121
300
146
134
135
122
300
147
135
130
81
300
149
135
137
97
350
150
137
138
98
350
153
138
141
64
350
154
141
142
70
350
159
115
146
186
100
160
146
147
187
100
161
147
148
188
100
162
148
149
185
100
163
149
150
190
100
164
150
151
120
100
165
151
152
123
100
166
152
115
125
100
167
151
153
48
100
168
153
154
104
100
169
154
114
155
150
170
154
155
56
100
171
155
153
89
100
172
155
156
30
100
173
156
151
125
100
174
156
157
150
100
GoM : Phed
328
Page 4
ZONE-X (Mawprem)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------175
157
158
153
100
176
158
159
69
100
177
159
160
104
100
178
160
161
105
100
179
161
162
105
100
180
162
163
46
100
181
163
164
80
100
182
164
165
82
100
183
165
166
112
200
184
166
167
115
200
185
167
113
164
200
186
167
168
120
100
187
168
169
125
100
188
169
170
65
100
189
170
171
60
100
190
171
99
49
100
191
100
172
159
200
192
172
113
149
200
194
169
174
80
100
195
174
175
90
100
196
175
97
85
100
197
175
176
55
100
198
176
179
55
100
200
179
177
28
100
202
179
181
140
100
203
181
95
120
100
204
181
182
61
100
205
182
183
106
100
207
183
185
90
100
208
185
93
29
100
210
185
187
130
100
211
187
188
152
100
212
188
189
143
100
213
189
190
33
100
214
190
191
148
100
216
191
193
89
100
218
193
195
130
100
219
195
196
65
100
220
196
197
83
100
221
197
182
85
100
222
196
177
92
100
223
195
198
73
100
224
198
199
18
100
225
199
176
55
100
226
199
165
143
200
227
198
200
85
100
228
200
201
86
100
GoM : Phed
329
Page 5
ZONE-X (Mawprem)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------229
201
202
26
100
231
202
193
55
100
232
201
204
57
100
233
204
205
30
100
235
205
207
147
100
236
207
208
51
100
237
208
209
99
100
238
209
162
100
100
239
208
210
67
100
240
210
211
87
100
241
211
212
88
100
242
212
161
129
100
243
212
213
15
100
244
213
214
36
100
245
214
215
80
100
246
213
159
98
100
247
215
216
85
100
248
216
217
48
100
249
217
218
41
100
250
218
219
73
100
251
219
214
56
100
252
219
220
80
100
253
220
221
85
100
254
221
222
92
100
255
222
223
80
100
256
223
158
85
100
257
222
224
60
100
258
224
225
71
100
259
225
151
129
100
260
225
226
108
100
261
226
150
90
100
262
226
227
74
100
263
227
228
78
100
264
228
229
60
100
265
229
230
60
150
266
230
221
62
100
267
229
231
32
100
268
231
228
64
100
269
231
232
87
100
270
232
233
52
100
271
233
234
81
100
272
234
235
85
100
273
235
236
104
100
274
236
237
184
100
275
237
238
283
100
276
238
239
140
100
277
239
228
162
100
GoM : Phed
330
Page 6
ZONE-X (Mawprem)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------280
232
242
77
100
281
242
229
56
100
282
242
243
46
100
283
243
244
46
100
284
244
245
40
100
285
245
217
43
100
286
218
230
146
100
287
245
246
114
100
288
246
216
80
100
289
246
247
64
100
290
247
210
68
100
291
210
248
66
100
292
248
249
48
100
293
249
250
61
150
294
250
251
36
100
295
251
252
32
100
296
252
253
73
100
297
253
246
75
100
298
252
254
88
100
299
254
244
90
100
300
254
255
68
100
301
255
256
70
100
302
256
257
80
100
303
257
258
44
100
304
258
259
64
100
305
259
256
145
100
306
259
243
28
100
307
258
233
39
100
308
233
260
83
100
309
260
257
85
100
310
260
235
166
100
311
260
261
118
100
312
261
262
19
100
313
261
255
45
100
314
262
263
62
100
315
263
251
65
100
316
262
264
55
100
317
264
265
42
100
319
264
267
100
100
320
267
268
75
100
321
268
269
70
100
322
269
270
65
100
323
270
271
48
100
324
271
265
239
100
326
272
270
76
100
327
272
273
132
100
328
273
274
130
100
GoM : Phed
331
Page 7
ZONE-X (Mawprem)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------329
274
235
133
100
330
269
275
41
100
336
275
281
103
100
338
281
283
63
100
339
283
284
98
100
341
284
286
91
100
342
286
287
92
100
344
287
289
68
100
346
289
291
70
100
347
291
292
69
100
348
292
293
98
100
349
293
294
70
100
350
294
295
121
100
351
295
249
100
100
352
295
296
70
100
354
296
298
70
100
355
298
267
70
100
356
298
250
117
100
357
295
299
131
100
358
299
300
135
100
359
300
207
57
100
360
300
301
96
100
361
301
207
70
100
362
301
302
51
100
363
302
248
52
100
364
300
303
87
100
365
303
304
88
100
367
304
306
73
100
368
306
190
86
100
369
306
307
84
100
370
307
308
120
100
371
308
309
125
100
372
309
300
95
100
373
309
310
89
100
374
310
311
90
100
375
311
312
93
100
376
312
307
90
100
377
312
313
57
100
378
313
314
70
100
379
314
315
70
100
380
315
316
72
100
381
316
311
55
100
382
316
317
147
100
384
317
319
116
100
385
319
320
118
100
386
320
294
66
100
387
315
321
84
100
GoM : Phed
332
Page 8
ZONE-X (Mawprem)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------388
321
322
85
100
389
322
323
83
100
390
323
324
43
100
391
324
321
124
100
393
323
326
55
100
396
326
329
50
100
398
329
331
26
100
402
331
335
159
100
409
335
342
66
100
410
342
343
53
100
411
343
344
54
100
415
344
348
100
100
417
348
350
102
100
419
350
352
100
100
420
352
353
99
100
421
353
354
171
100
422
354
190
60
100
423
354
306
86
100
424
353
355
130
100
425
355
189
69
100
427
353
357
35
100
429
357
359
52
100
430
359
360
40
100
431
360
361
38
100
432
361
344
100
100
434
360
363
84
100
436
363
365
65
100
437
365
366
80
100
438
366
367
72
100
440
367
369
95
100
441
369
370
96
100
443
370
372
95
100
445
366
373
90
100
446
373
374
92
100
448
374
376
28
100
450
376
378
76
100
451
378
379
80
100
452
379
342
82
100
455
320
292
91
100
456
313
353
102
100
156
1
381
45
350
457
381
142
58
350
98
204
163
95
100
460
237
228
208
100
454
267
283
106
100
444
372
359
96
100
8
135
3
145
300
GoM : Phed
333
Page 9
ZONE-X (Mawprem)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------9
19
36
146
100
11
39
45
210
100
13
122
115
120
200
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------2
0.00
1511.36
14.36
3
1.14
1511.06
16.06
4
0.00
1511.32
16.32
7
0.00
1511.24
15.24
8
0.00
1510.71
16.71
11
0.00
1510.25
16.25
13
0.00
1509.98
16.98
16
0.00
1509.64
16.64
18
0.32
1509.29
16.29
19
0.12
1508.82
16.82
20
0.70
1510.79
16.79
21
0.00
1510.48
16.48
23
0.22
1510.28
16.28
24
1.58
1509.87
16.87
27
0.00
1509.48
15.48
28
0.00
1508.52
15.52
30
0.00
1507.11
15.11
33
0.00
1506.99
15.99
34
3.12
1506.86
16.86
35
0.00
1506.87
15.87
36
0.06
1507.55
16.55
37
0.00
1506.59
16.59
38
0.82
1506.48
9.48
39
0.20
1506.40
10.40
40
2.64
1506.26
15.26
42
2.14
1506.22
14.22
43
1.40
1506.22
15.22
44
0.20
1506.24
13.24
45
0.36
1506.26
11.26
49
3.12
1506.60
16.60
50
0.00
1506.77
15.77
52
0.00
1506.93
16.93
53
0.00
1506.95
16.95
54
2.94
1506.96
15.96
55
5.46
1506.95
15.95
56
0.00
1507.37
15.37
58
5.46
1507.84
14.84
59
0.00
1509.41
14.41
GoM : Phed
334
Page 10
ZONE-X (Mawprem)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------60
0.00
1508.90
14.90
61
0.00
1508.80
15.80
62
0.00
1508.75
16.75
64
0.00
1508.58
16.58
66
0.00
1508.43
15.43
68
0.00
1508.33
14.33
70
0.00
1508.19
13.19
71
0.00
1507.83
11.83
72
4.16
1507.58
12.58
73
0.00
1507.57
14.57
74
4.36
1507.54
11.54
75
0.00
1507.57
13.57
76
0.00
1507.61
12.61
77
4.16
1507.82
15.82
79
0.00
1506.00
10.00
80
0.00
1504.25
15.25
82
0.00
1502.21
16.21
84
8.04
1498.22
13.22
85
0.00
1496.42
12.42
87
8.04
1495.45
12.45
88
0.00
1495.46
13.46
89
8.04
1498.18
8.18
90
8.96
1494.28
13.28
92
0.00
1494.20
14.20
93
0.00
1494.11
15.11
94
8.96
1494.15
14.15
95
0.00
1496.02
14.02
96
8.96
1497.19
13.19
97
0.00
1501.95
16.95
98
4.10
1502.81
14.81
99
0.00
1503.09
13.09
100
0.00
1503.34
16.34
101
0.00
1503.50
14.50
102
0.00
1503.60
11.60
103
8.96
1503.94
10.94
104
0.00
1505.03
10.03
106
0.00
1505.99
9.99
107
3.12
1504.57
10.57
108
0.00
1503.76
10.76
109
3.12
1503.65
10.65
110
5.38
1503.53
12.53
111
0.00
1503.87
10.87
112
5.48
1503.77
12.77
113
0.00
1504.24
15.24
114
0.00
1505.09
15.09
115
0.00
1505.80
15.80
116
0.00
1507.56
16.56
GoM : Phed
335
Page 11
ZONE-X (Mawprem)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------117
5.48
1507.91
15.91
118
5.48
1508.36
15.36
119
2.50
1507.93
15.93
120
0.00
1508.33
16.33
121
0.72
1507.57
31.57
122
0.40
1506.84
15.84
123
0.00
1508.73
15.73
125
0.00
1509.49
14.49
130
0.00
1509.85
12.85
131
2.50
1509.85
15.85
132
0.00
1509.86
14.86
133
2.50
1509.63
15.63
134
2.50
1510.18
14.18
135
0.00
1510.52
15.52
137
1.06
1510.83
16.83
138
2.74
1511.16
15.16
141
2.74
1511.38
16.38
142
0.00
1511.63
15.63
146
4.36
1499.23
10.23
147
4.36
1495.74
7.74
148
4.36
1494.41
7.41
149
4.36
1494.26
8.26
150
0.00
1494.49
7.49
151
0.00
1497.52
8.52
152
4.06
1500.56
10.57
153
0.00
1498.82
8.82
154
6.34
1501.33
8.33
155
0.00
1498.83
8.83
156
0.00
1497.60
9.60
157
6.34
1492.69
12.69
158
0.00
1490.98
11.98
159
0.00
1490.48
8.48
160
0.30
1490.45
10.45
161
0.00
1490.44
12.44
162
0.00
1490.71
10.71
163
4.68
1491.75
10.75
164
4.68
1494.68
11.68
165
0.00
1499.59
14.59
166
6.34
1500.62
14.62
167
0.00
1501.97
14.97
168
2.50
1501.47
15.47
169
0.00
1501.33
16.33
170
5.72
1501.50
14.50
171
0.00
1502.37
13.37
172
5.72
1503.71
16.71
174
2.50
1500.83
15.83
175
0.00
1500.63
15.63
GoM : Phed
336
Page 12
ZONE-X (Mawprem)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------176
0.00
1499.14
15.14
179
0.00
1497.42
13.42
177
0.00
1497.19
14.19
181
0.00
1496.16
13.16
182
0.00
1495.90
13.90
183
0.00
1494.90
13.90
185
0.00
1494.05
14.05
187
2.56
1491.62
12.62
188
2.56
1489.92
11.92
189
0.00
1489.13
10.13
190
0.00
1489.13
11.13
191
0.00
1491.77
12.77
193
0.00
1493.35
8.35
195
0.00
1496.38
15.38
196
0.00
1496.42
14.42
197
2.56
1496.02
15.02
198
0.00
1497.64
10.64
199
0.00
1499.15
10.15
200
2.40
1495.10
10.10
201
0.00
1493.31
9.31
202
0.00
1493.32
7.32
204
2.68
1491.78
9.78
205
0.00
1491.37
11.37
207
0.00
1489.33
11.33
208
0.00
1489.37
10.37
209
5.00
1489.57
10.57
210
0.00
1489.35
11.35
211
1.18
1489.58
13.58
212
0.00
1489.97
12.97
213
0.00
1489.97
10.97
214
0.00
1489.81
10.81
215
0.46
1489.64
11.64
216
0.00
1489.49
12.49
217
0.00
1489.50
10.50
218
0.00
1489.63
15.63
219
0.00
1489.78
14.78
220
0.72
1489.84
13.84
221
0.00
1489.96
12.96
222
0.00
1490.91
15.91
223
0.74
1490.93
14.93
224
5.38
1491.41
14.41
225
0.00
1493.11
14.11
226
0.50
1492.97
16.97
227
1.08
1491.21
16.21
228
0.40
1489.65
13.65
229
0.00
1489.62
14.62
230
0.00
1489.65
13.65
GoM : Phed
337
Page 13
ZONE-X (Mawprem)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------231
0.30
1489.60
10.60
232
0.00
1489.39
11.39
233
0.00
1489.21
14.21
234
0.30
1489.13
11.13
235
0.00
1489.07
16.07
236
1.64
1489.07
15.07
237
0.00
1489.22
14.22
238
3.28
1489.12
13.12
239
1.64
1489.24
12.24
242
0.00
1489.41
9.41
243
0.30
1489.30
4.30
244
0.00
1489.30
15.30
245
0.00
1489.37
11.37
246
0.00
1489.35
14.35
247
1.18
1489.34
12.34
248
0.00
1489.10
13.10
249
0.00
1488.93
14.93
250
0.00
1488.93
16.93
251
0.00
1488.99
15.99
252
0.00
1489.09
14.09
253
0.92
1489.18
13.18
254
0.56
1489.13
14.13
255
0.56
1489.11
16.11
256
0.00
1489.16
7.16
257
0.30
1489.16
15.16
258
0.00
1489.21
9.21
259
0.00
1489.24
15.24
260
0.00
1489.14
15.14
261
0.00
1489.05
14.05
262
0.00
1488.98
15.98
263
0.92
1488.98
16.98
264
0.00
1488.79
16.79
265
0.00
1488.77
8.77
267
0.00
1488.66
15.66
268
0.70
1488.62
12.62
269
0.00
1488.61
13.61
270
0.00
1488.62
12.62
271
0.84
1488.63
10.63
272
0.84
1488.62
12.62
273
1.40
1488.63
13.63
274
1.40
1488.75
14.75
275
0.00
1488.59
14.59
281
0.00
1488.55
15.55
283
0.00
1488.52
16.52
284
0.00
1488.23
15.23
286
2.70
1487.96
13.96
287
0.00
1487.93
12.93
GoM : Phed
338
Page 14
ZONE-X (Mawprem)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------289
0.00
1487.90
11.90
291
2.70
1487.88
10.88
292
0.00
1487.91
9.91
293
0.56
1487.96
8.96
294
0.00
1488.03
7.03
295
0.00
1488.61
14.61
296
0.84
1488.63
14.63
298
0.00
1488.69
13.69
299
3.12
1488.61
12.61
300
0.00
1488.88
11.88
301
0.00
1489.11
14.11
302
0.76
1489.10
15.10
303
2.70
1488.78
10.78
304
0.00
1488.78
11.78
306
0.00
1488.79
12.79
307
0.00
1488.43
12.43
308
2.70
1488.40
13.40
309
0.00
1488.47
7.47
310
0.60
1488.28
8.28
311
0.00
1488.16
9.16
312
0.00
1488.20
13.20
313
0.00
1488.14
14.14
314
2.08
1488.00
15.00
315
0.00
1487.97
15.97
316
0.00
1487.99
7.99
317
3.26
1487.68
9.68
319
3.12
1487.68
8.68
320
0.00
1487.91
7.91
321
0.00
1487.90
16.90
322
0.60
1487.88
13.88
323
0.00
1487.88
14.88
324
0.69
1487.88
15.88
326
0.09
1487.87
13.87
329
0.00
1487.86
12.86
331
0.00
1487.86
11.86
335
0.00
1487.85
10.85
342
0.00
1487.84
8.84
343
0.92
1487.84
8.84
344
0.00
1487.87
7.87
348
0.00
1487.93
7.93
350
0.00
1488.00
10.00
352
0.64
1488.06
9.06
353
1.34
1488.17
13.17
354
0.70
1488.79
11.79
355
0.76
1488.74
11.74
357
0.70
1488.03
14.03
359
0.64
1487.89
14.89
GoM : Phed
339
Page 15
ZONE-X (Mawprem)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------360
0.00
1487.87
15.87
361
0.00
1487.87
14.87
363
0.00
1487.83
16.83
365
0.92
1487.79
15.79
366
0.00
1487.78
12.78
367
0.00
1487.78
14.78
369
0.92
1487.78
15.78
370
0.00
1487.80
16.80
372
0.92
1487.82
15.82
373
0.92
1487.78
13.78
374
0.00
1487.78
11.78
376
0.00
1487.78
9.78
378
0.92
1487.78
8.78
379
0.00
1487.81
7.81
381
0.00
1511.84
16.84
1
-303.20
1512.00
0.00
Reservoir
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
185.13
1.93
8.28
Open
2
81.36
1.15
3.83
Open
3
103.77
1.08
2.83
Open
6
103.77
1.08
2.84
Open
7
7.50
0.96
9.75
Open
10
7.50
0.96
9.76
Open
12
7.50
0.96
9.75
Open
15
7.50
0.96
9.75
Open
17
7.50
0.96
9.76
Open
18
7.18
0.91
9.00
Open
19
96.27
1.36
5.23
Open
20
95.57
1.35
5.16
Open
22
95.57
1.35
5.16
Open
23
95.35
1.35
5.14
Open
26
93.77
1.33
4.98
Open
27
9.64
1.23
15.54
Open
29
9.64
1.23
15.54
Open
32
5.30
0.68
5.13
Open
33
2.54
0.32
1.32
Open
34
-0.58
0.07
0.09
Open
35
-7.00
0.89
8.58
Open
36
6.42
0.82
7.32
Open
37
2.83
0.36
1.61
Open
38
2.01
0.26
0.85
Open
39
4.93
0.63
4.48
Open
GoM : Phed
340
Page 16
ZONE-X (Mawprem)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------41
2.29
0.29
1.08
Open
42
0.15
0.02
0.01
Open
43
-1.25
0.16
0.35
Open
44
-1.45
0.19
0.47
Open
48
-1.34
0.17
0.40
Open
49
-4.46
0.57
3.73
Open
52
4.46
0.57
3.72
Open
53
-2.76
0.35
1.53
Open
54
-1.70
0.22
0.63
Open
55
-1.40
0.18
0.43
Open
56
-4.34
0.55
3.54
Open
57
-0.30
0.04
0.02
Open
58
-5.76
0.73
5.99
Open
60
-5.76
0.73
5.99
Open
61
-11.22
1.43
20.59
Open
62
72.91
1.03
3.13
Open
63
129.37
1.83
9.04
Open
64
78.25
1.11
3.56
Open
65
70.75
1.00
2.95
Open
67
70.75
1.00
2.96
Open
69
70.75
1.00
2.95
Open
71
70.75
1.00
2.95
Open
73
70.75
1.00
2.95
Open
74
40.14
2.27
30.26
Open
75
5.17
0.66
4.91
Open
76
1.01
0.13
0.24
Open
77
2.32
0.30
1.11
Open
78
-2.04
0.26
0.87
Open
79
-2.04
0.26
0.88
Open
80
1.30
0.17
0.38
Open
81
-3.35
0.43
2.19
Open
82
-7.51
0.96
9.77
Open
84
34.96
1.98
23.44
Open
85
15.11
1.92
35.70
Open
87
15.11
1.92
35.71
Open
89
15.11
1.92
35.70
Open
90
7.07
0.90
8.74
Open
92
7.07
0.90
8.74
Open
93
-0.97
0.12
0.22
Open
94
-11.82
1.51
22.65
Open
95
-19.86
2.53
59.24
Open
96
10.84
1.38
19.32
Open
97
1.88
0.24
0.76
Open
99
1.88
0.24
0.75
Open
100
-1.37
0.17
0.42
Open
101
-10.33
1.32
17.67
Open
102
-7.97
1.01
10.91
Open
GoM : Phed
341
Page 17
ZONE-X (Mawprem)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------103
-16.93
2.16
44.07
Open
104
-26.56
1.50
14.09
Open
105
-30.66
0.98
4.53
Open
106
-40.00
1.27
7.41
Open
107
-18.69
1.06
7.35
Open
108
-16.09
0.91
5.56
Open
109
-10.33
0.58
2.45
Open
110
-19.29
1.09
7.79
Open
112
-19.29
1.09
7.79
Open
113
-30.61
1.73
18.32
Open
114
11.32
1.44
20.92
Open
115
8.20
1.04
11.51
Open
116
8.88
0.50
1.85
Open
117
5.76
0.33
0.83
Open
118
-2.60
0.15
0.19
Open
119
-7.98
0.45
1.52
Open
120
6.16
0.35
0.94
Open
121
0.68
0.04
0.02
Open
122
-14.14
0.80
4.38
Open
123
-97.24
1.98
12.94
Open
124
-132.85
2.71
23.06
Open
125
-120.81
2.46
19.35
Open
126
-40.15
0.57
1.03
Open
127
-45.63
0.65
1.31
Open
128
-51.11
0.72
1.62
Open
129
-80.66
1.14
3.77
Open
130
-83.16
1.18
3.99
Open
131
44.64
1.42
9.07
Open
132
43.92
1.40
8.81
Open
133
-127.80
1.81
8.83
Open
135
-127.80
1.81
8.83
Open
140
-127.80
1.81
8.84
Open
141
-4.67
0.07
0.02
Open
142
-7.17
0.15
0.10
Open
143
58.96
0.83
2.11
Open
144
56.46
0.80
1.95
Open
145
-66.13
0.94
2.61
Open
146
-68.63
0.97
2.79
Open
147
123.12
1.74
8.24
Open
149
-111.53
1.16
3.24
Open
150
-112.59
1.17
3.30
Open
153
-115.33
1.20
3.45
Open
154
-118.07
1.23
3.60
Open
159
15.01
1.91
35.30
Open
160
10.65
1.36
18.70
Open
161
6.29
0.80
7.06
Open
162
1.93
0.25
0.79
Open
GoM : Phed
342
Page 18
ZONE-X (Mawprem)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------163
-2.43
0.31
1.21
Open
164
-12.51
1.59
25.19
Open
165
-12.41
1.58
24.79
Open
166
-16.47
2.10
41.88
Open
167
-13.02
1.66
27.11
Open
168
-12.23
1.56
24.14
Open
169
-35.61
2.02
24.24
Open
170
17.04
2.17
44.60
Open
171
0.79
0.10
0.15
Open
172
16.25
2.07
40.84
Open
173
1.83
0.23
0.72
Open
174
14.42
1.84
32.74
Open
175
8.08
1.03
11.19
Open
176
6.40
0.81
7.27
Open
177
1.05
0.13
0.26
Open
178
0.75
0.10
0.14
Open
179
-3.65
0.47
2.58
Open
180
-11.82
1.51
22.66
Open
181
-15.30
1.95
36.57
Open
182
-19.98
2.55
59.95
Open
183
-44.96
1.43
9.20
Open
184
-51.30
1.63
11.74
Open
185
-56.08
1.79
13.85
Open
186
4.78
0.61
4.23
Open
187
2.28
0.29
1.07
Open
188
-3.61
0.46
2.53
Open
189
-9.33
1.19
14.64
Open
190
-9.33
1.19
14.64
Open
191
-21.31
0.68
2.31
Open
192
-27.03
0.86
3.58
Open
194
5.89
0.75
6.24
Open
195
3.39
0.43
2.24
Open
196
-9.64
1.23
15.54
Open
197
13.03
1.66
27.15
Open
198
14.06
1.79
31.24
Open
200
6.89
0.88
8.34
Open
202
7.17
0.91
8.98
Open
203
2.37
0.30
1.15
Open
204
4.80
0.61
4.27
Open
205
7.38
0.94
9.47
Open
207
7.38
0.94
9.47
Open
208
-3.26
0.41
2.08
Open
210
10.63
1.35
18.63
Open
211
8.07
1.03
11.19
Open
212
5.51
0.70
5.52
Open
213
-0.11
0.01
0.00
Open
214
-10.37
1.32
17.80
Open
GoM : Phed
343
Page 19
ZONE-X (Mawprem)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------216
-10.37
1.32
17.80
Open
218
-11.98
1.53
23.25
Open
219
-1.75
0.22
0.66
Open
220
5.14
0.65
4.84
Open
221
2.58
0.33
1.35
Open
222
-6.89
0.88
8.34
Open
223
-10.23
1.30
17.35
Open
224
-23.95
3.05
83.81
Open
225
1.03
0.13
0.25
Open
226
-24.97
0.80
3.10
Open
227
13.72
1.75
29.85
Open
228
11.32
1.44
20.91
Open
229
-1.61
0.21
0.56
Open
231
-1.61
0.21
0.57
Open
232
12.93
1.65
26.75
Open
233
9.05
1.15
13.83
Open
235
9.05
1.15
13.83
Open
236
-1.85
0.24
0.73
Open
237
-3.16
0.40
1.97
Open
238
-8.16
1.04
11.42
Open
239
1.31
0.17
0.39
Open
240
-3.72
0.47
2.67
Open
241
-4.90
0.62
4.44
Open
242
-4.41
0.56
3.65
Open
243
-0.49
0.06
0.06
Open
244
4.85
0.62
4.35
Open
245
3.35
0.43
2.20
Open
246
-5.34
0.68
5.21
Open
247
2.89
0.37
1.67
Open
248
-0.18
0.02
0.01
Open
249
-4.10
0.52
3.19
Open
250
-3.33
0.42
2.17
Open
251
-1.50
0.19
0.49
Open
252
-1.84
0.23
0.72
Open
253
-2.56
0.33
1.33
Open
254
-7.76
0.99
10.41
Open
255
-0.94
0.12
0.21
Open
256
-1.68
0.21
0.61
Open
257
-6.83
0.87
8.20
Open
258
-12.21
1.56
24.06
Open
259
-14.74
1.88
34.13
Open
260
2.54
0.32
1.31
Open
261
-10.09
1.29
16.90
Open
262
12.13
1.54
23.76
Open
263
11.05
1.41
19.99
Open
264
1.70
0.22
0.62
Open
265
-4.44
0.25
0.51
Open
GoM : Phed
344
Page 20
ZONE-X (Mawprem)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------266
-5.21
0.66
4.97
Open
267
1.69
0.22
0.62
Open
268
-2.06
0.26
0.89
Open
269
3.45
0.44
2.32
Open
270
4.35
0.55
3.56
Open
271
2.14
0.27
0.96
Open
272
1.84
0.23
0.72
Open
273
-0.33
0.04
0.03
Open
274
-1.97
0.25
0.82
Open
275
1.28
0.16
0.37
Open
276
-2.00
0.26
0.85
Open
277
-3.64
0.46
2.56
Open
280
-0.89
0.11
0.19
Open
281
-4.44
0.57
3.70
Open
282
3.55
0.45
2.44
Open
283
0.10
0.01
0.00
Open
284
-3.01
0.38
1.80
Open
285
-3.93
0.50
2.95
Open
286
-0.77
0.10
0.14
Open
287
0.92
0.12
0.20
Open
288
-3.07
0.39
1.86
Open
289
0.60
0.08
0.09
Open
290
-0.58
0.07
0.09
Open
291
4.45
0.57
3.71
Open
292
4.34
0.55
3.54
Open
293
0.26
0.01
0.00
Open
294
-3.00
0.38
1.79
Open
295
-3.87
0.49
2.87
Open
296
-2.47
0.31
1.25
Open
297
-3.39
0.43
2.24
Open
298
-1.41
0.18
0.44
Open
299
-3.10
0.40
1.90
Open
300
1.14
0.14
0.30
Open
301
-1.89
0.24
0.76
Open
302
-0.26
0.03
0.02
Open
303
-1.67
0.21
1.13
Open
304
-1.52
0.19
0.51
Open
305
1.63
0.21
0.58
Open
306
-3.15
0.40
1.96
Open
307
-0.15
0.02
0.01
Open
308
2.06
0.26
0.89
Open
309
-1.11
0.14
0.29
Open
310
1.33
0.17
0.39
Open
311
1.85
0.24
0.73
Open
312
4.31
0.55
3.49
Open
313
-2.46
0.31
1.24
Open
314
0.05
0.01
0.00
Open
GoM : Phed
345
Page 21
ZONE-X (Mawprem)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------315
-0.87
0.11
0.18
Open
316
4.26
0.54
3.43
Open
317
1.66
0.21
0.60
Open
319
2.61
0.33
1.38
Open
320
1.45
0.18
0.46
Open
321
0.75
0.10
0.14
Open
322
-0.67
0.09
0.11
Open
323
-0.82
0.10
0.16
Open
324
-1.66
0.21
0.60
Open
326
-0.14
0.02
0.01
Open
327
-0.70
0.09
0.12
Open
328
-2.10
0.27
0.92
Open
329
-3.50
0.45
2.37
Open
330
1.42
0.18
0.45
Open
336
1.42
0.18
0.45
Open
338
1.42
0.18
0.45
Open
339
3.95
0.50
2.97
Open
341
3.95
0.50
2.97
Open
342
1.25
0.16
0.35
Open
344
1.25
0.16
0.35
Open
346
1.25
0.16
0.35
Open
347
-1.45
0.19
0.47
Open
348
-1.57
0.20
0.54
Open
349
-2.13
0.27
0.94
Open
350
-5.14
0.66
4.85
Open
351
-4.08
0.52
3.16
Open
352
-1.05
0.13
0.26
Open
354
-1.89
0.24
0.76
Open
355
1.37
0.17
0.42
Open
356
-3.26
0.42
2.09
Open
357
-0.01
0.00
0.00
Open
358
-3.13
0.40
1.94
Open
359
-6.75
0.86
8.03
Open
360
-3.51
0.45
2.39
Open
361
-4.15
0.53
3.27
Open
362
0.65
0.08
0.11
Open
363
-0.11
0.01
0.01
Open
364
2.31
0.29
1.10
Open
365
-0.39
0.05
0.04
Open
367
-0.39
0.05
0.04
Open
368
-4.66
0.59
4.04
Open
369
4.77
0.61
4.22
Open
370
1.11
0.14
0.29
Open
371
-1.59
0.20
0.55
Open
372
-4.82
0.61
4.30
Open
373
3.23
0.41
2.05
Open
374
2.63
0.34
1.40
Open
GoM : Phed
346
Page 22
ZONE-X (Mawprem)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------375
-1.44
0.18
0.46
Open
376
-3.65
0.47
2.57
Open
377
2.21
0.28
1.02
Open
378
3.27
0.42
2.10
Open
379
1.19
0.15
0.32
Open
380
-0.82
0.10
0.16
Open
381
-4.07
0.52
3.15
Open
382
3.25
0.41
2.08
Open
384
-0.01
0.00
0.00
Open
385
-3.13
0.40
1.93
Open
386
-3.02
0.38
1.80
Open
387
2.01
0.26
0.85
Open
388
1.06
0.14
0.26
Open
389
0.46
0.06
0.06
Open
390
-0.26
0.03
0.02
Open
391
-0.95
0.12
0.21
Open
393
0.72
0.09
0.13
Open
396
0.63
0.08
0.10
Open
398
0.63
0.08
0.10
Open
402
0.63
0.08
0.10
Open
409
0.63
0.08
0.10
Open
410
-0.61
0.08
0.10
Open
411
-1.53
0.20
0.52
Open
415
-1.69
0.22
0.62
Open
417
-1.69
0.22
0.62
Open
419
-1.69
0.22
0.62
Open
420
-2.33
0.30
1.12
Open
421
-4.41
0.56
3.64
Open
422
-5.61
0.71
5.69
Open
423
0.50
0.06
0.07
Open
424
-4.86
0.62
4.38
Open
425
-5.62
0.72
5.73
Open
427
4.54
0.58
3.85
Open
429
3.84
0.49
2.82
Open
430
1.39
0.18
0.43
Open
431
-0.16
0.02
0.01
Open
432
-0.16
0.02
0.01
Open
434
1.55
0.20
0.52
Open
436
1.55
0.20
0.53
Open
437
0.63
0.08
0.10
Open
438
0.03
0.00
0.00
Open
440
0.03
0.00
0.00
Open
441
-0.89
0.11
0.19
Open
443
-0.89
0.11
0.19
Open
445
0.60
0.08
0.09
Open
446
-0.32
0.04
0.03
Open
448
-0.32
0.04
0.03
Open
GoM : Phed
347
Page 23
ZONE-X (Mawprem)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------450
-0.32
0.04
0.03
Open
451
-1.24
0.16
0.35
Open
452
-1.24
0.16
0.35
Open
455
-0.11
0.01
0.00
Open
456
-1.06
0.13
0.26
Open
156
118.07
1.23
3.60
Open
457
118.07
1.23
3.60
Open
98
1.19
0.15
0.32
Open
460
-3.24
0.41
2.07
Open
454
2.52
0.32
1.30
Open
444
-1.81
0.23
0.70
Open
8
-80.22
1.14
3.73
Open
9
7.06
0.90
8.72
Open
11
1.81
0.23
0.70
Open
13
43.52
1.39
8.66
Open
GoM : Phed
348
g,
,
i
Legends
Pipeline
Road
Zone Boundary
Reservoir
.05km
.075bn
GoM:PHED
GoM : Phed
Node No.
Pipe No.
500
450
400
200
150
100
26.00
81.00
10
95.00
4.
10
11
10
128.00
5.
11
12
11
253.00
6.
12
13
12
130.00
7.
13
14
13
92.00
8.
14
15
14
56.00
9.
15
16
15
132.00
10.
16
12
16
62.00
11.
16
17
17
32.00
12.
15
17
18
143.00
13.
17
18
19
68.00
14.
18
19
20
22.00
15.
19
20
21
200.00
16.
20
21
22
84.00
17.
21
22
23
81.00
18.
22
19
24
75.00
19.
18
23
25
97.00
20.
23
24
26
217.00
21.
24
25
27
72.00
22.
25
26
28
198.00
From
To
1.
2.
3.
350
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
351
200
150
100
29
108.00
28
30
106.00
28
29
31
102.00
26.
29
20
39
218.00
27.
29
30
32
74.00
28.
30
31
33
124.00
29.
31
32
34
203.00
30.
32
33
35
242.00
31.
33
34
36
260.00
32.
34
35
37
60.00
33.
35
16
38
166.00
34.
25
36
40
172.00
35.
36
37
41
252.00
36.
37
38
42
295.00
37.
30
40
44
142.00
38.
40
41
45
20.00
39.
41
42
46
94.00
40.
42
43
47
285.00
41.
43
44
48
132.00
42.
44
45
49
250.00
43.
45
46
50
250.00
44.
44
47
51
158.00
45.
47
48
52
31.10
46.
48
49
53
12.40
47.
49
50
54
138.00
From
To
23.
26
27
24.
27
25.
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
352
200
150
100
55
163.00
52
56
100.00
52
54
58
120.00
51.
54
55
59
198.00
52.
55
56
60
148.00
53.
56
57
61
1532.00
54.
57
58
62
123.00
55.
58
59
63
100.00
56.
59
60
64
185.00
57.
60
61
65
410.00
58.
61
62
66
79.00
59.
62
63
67
156.00
60.
63
64
68
191.00
61.
64
65
69
222.00
62.
65
66
70
100.00
63.
66
67
71
128.00
64.
67
68
72
86.00
65.
68
69
73
120.00
66.
69
70
74
196.00
67.
70
71
75
111.00
68.
71
72
76
187.00
69.
72
73
77
113.00
70.
73
74
78
116.00
71.
74
75
79
155.00
72.
77
59
83
250.00
From
To
48.
50
51
49.
51
50.
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
84
250.00
74
86
250.00
46
83
90
433.00
76.
89
98
57.00
77.
89
99
1000.00
78.
88
89
100
279.00
79.
86
88
341.00
80.
83
85
92
254.00
81.
85
86
93
655.00
82.
86
87
94
238.00
83.
87
42
95
386.00
84.
75
60
100.00
85.
36
38
120.00
Total :
1107.00
1153.00
6229.50
809.00
1644.00
2582.00
2396.00
From
To
73.
77
78
74.
78
75.
353
({j
ZONE -XI
'PROPOSED PIPEUNE ROUTE:
AREA OF COVERAGE:
1. Nongmynsong
!04
25
3:
"
26
"
.,
54,
GoM:Phed
----r,
354
N
Elevation
ZONE XI (Nongmynsong)
25.00
13
14
50.00
75.00
100.00
m
23
24
38
25
36
1556
1584
16
1583
1582
1582
27
1613
1587
1581
1580
32
1564
1560
1580
28
1572
29
31
30
1579
1579
1578
40
41
157642
63
64
681435
55
57
75
77
72
73
1465
1468
71
56
1480
74
1550
86
1580
1582
1577
85
1555
48
1560
43
1574
44
47
1570
1545
1568
1541
1581
45
46
83
1577
1579
1581
60
1435
1433
1440
1443
52
54
66
1438
69
70
51
1444
65
67
146561
1455
1468
87
1575
49
1552
88
33
1580
26
62
1580 1580
20
50
1582
1600
1
21
1557
1596
19158022
1578
35
1581 18
1587
1591
1587
1585
34
1565
37
10
11
17
1559
1558
151583
89
12
1583
1475
78
1479
1482
59
1536
1535
58 1490
1485 1488
1480
1448
GoM : Phed
355
Page 1
6/21/2008 8:12:41 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone XI Nongmynsong.NET
ZONE XI
Nongmynsong
GoM : Phed
356
Page 2
ZONE XI
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------44
30
40
142
150
45
40
41
20
150
46
41
42
94
150
47
42
43
285
300
48
43
44
132
300
49
44
45
250
300
50
45
46
250
300
51
44
47
158
300
52
47
48
311
300
53
48
49
124
300
54
49
50
138
300
55
50
51
163
300
56
51
52
100
300
58
52
54
120
300
59
54
55
198
300
60
55
56
148
300
61
56
57
1532
300
62
57
58
123
300
63
58
59
100
300
64
59
60
185
250
65
60
61
410
200
66
61
62
79
150
67
62
63
156
150
68
63
64
191
150
69
64
65
222
150
70
65
66
100
150
71
66
67
128
150
72
67
68
86
150
73
68
69
120
150
74
69
70
196
150
75
70
71
111
150
76
71
72
187
150
77
72
73
113
200
78
73
74
116
200
79
74
75
155
200
83
77
59
250
200
84
77
78
250
200
86
78
74
250
200
90
46
83
433
300
98
7
89
57
350
99
89
6
1000
450
100
88
89
279
350
6
86
88
341
350
92
83
85
254
300
93
85
86
655
300
94
86
87
238
250
95
87
42
386
250
GoM : Phed
357
Page 3
ZONE XI
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------2
75
60
100
200
3
36
38
120
100
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
Quality
ID
LPS
m
m
---------------------------------------------------------------------2
0.00
1612.76
12.76
0.00
6
0.56
1612.01
16.01
0.00
7
0.00
1602.38
11.38
0.00
10
0.26
1601.69
14.69
0.00
11
0.26
1600.76
15.76
0.00
12
0.00
1598.92
14.92
0.00
13
4.20
1598.12
15.12
0.00
14
4.20
1597.78
14.78
0.00
15
8.40
1597.68
14.68
0.00
16
8.40
1598.14
16.14
0.00
17
4.20
1597.17
16.17
0.00
18
0.00
1594.25
14.25
0.00
19
0.00
1593.11
13.11
0.00
20
0.00
1591.35
11.35
0.00
21
7.04
1591.23
11.23
0.00
22
7.04
1591.52
11.52
0.00
23
9.36
1592.54
14.54
0.00
24
9.36
1578.71
13.71
0.00
25
0.00
1575.91
16.91
0.00
26
9.36
1574.64
14.64
0.00
27
9.36
1575.60
11.60
0.00
28
9.36
1582.10
10.10
0.00
29
0.00
1590.55
11.55
0.00
30
0.00
1594.75
16.75
0.00
31
7.04
1594.98
15.98
0.00
32
7.04
1595.47
15.47
0.00
33
7.04
1596.16
15.16
0.00
34
7.04
1597.06
15.06
0.00
35
10.40
1597.30
15.30
0.00
36
2.34
1573.14
15.14
0.00
37
2.34
1572.95
15.95
0.00
38
2.34
1572.96
16.96
0.00
40
0.08
1591.17
14.17
0.00
41
0.08
1590.67
14.67
0.00
42
0.08
1588.31
13.31
0.00
43
1.16
1585.57
11.57
0.00
44
0.00
1584.32
14.32
0.00
45
0.06
1585.96
8.96
0.00
46
0.06
1587.61
8.61
0.00
GoM : Phed
358
Page 4
ZONE XI
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
Quality
ID
LPS
m
m
---------------------------------------------------------------------47
1.16
1579.77
11.77
0.00
48
1.56
1570.90
10.90
0.00
49
1.56
1567.41
12.41
0.00
50
1.56
1563.56
11.56
0.00
51
1.56
1559.08
9.08
0.00
52
0.00
1556.36
11.36
0.00
54
1.56
1553.10
12.10
0.00
55
1.56
1547.79
11.79
0.00
56
1.56
1543.87
8.87
0.00
57
1.56
1503.77
13.77
0.00
58
1.56
1500.59
12.59
0.00
59
0.00
1498.04
13.04
0.00
60
16.20
1491.59
11.59
0.00
61
10.92
1479.50
11.50
0.00
62
13.18
1472.18
7.18
0.00
63
13.18
1462.17
7.17
0.00
64
13.18
1454.40
10.40
0.00
65
13.18
1449.49
14.49
0.00
66
15.62
1448.60
15.60
0.00
67
15.62
1448.52
13.52
0.00
68
18.42
1448.74
10.74
0.00
69
13.72
1450.72
10.72
0.00
70
13.72
1457.36
14.36
0.00
71
13.72
1463.67
15.67
0.00
72
15.92
1479.57
14.57
0.00
73
15.92
1483.02
15.02
0.00
74
0.00
1487.88
8.88
0.00
75
13.56
1489.74
14.74
0.00
77
5.28
1494.05
12.05
0.00
78
5.28
1490.68
10.68
0.00
83
0.00
1590.47
9.47
0.00
85
0.06
1592.15
11.15
0.00
86
0.00
1596.47
14.47
0.00
87
0.06
1593.36
13.36
0.00
88
0.06
1599.95
12.95
0.00
89
0.00
1602.79
15.79
0.00
1
-380.45
1613.00
0.00
0.00 Reservoir
GoM : Phed
359
Page 5
ZONE XI
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
380.45
2.39
9.24
Open
5
380.45
2.39
9.24
Open
9
172.75
1.80
7.29
Open
10
172.49
1.79
7.26
Open
11
172.23
1.79
7.24
Open
12
17.03
0.96
6.19
Open
13
12.83
0.73
3.66
Open
14
8.63
0.49
1.76
Open
15
-12.42
0.70
3.45
Open
16
-155.20
2.20
12.66
Open
17
40.06
2.27
30.15
Open
18
12.65
0.72
3.57
Open
19
48.51
2.75
42.98
Open
20
18.49
2.36
51.93
Open
21
7.09
0.90
8.80
Open
22
2.68
0.34
1.45
Open
23
-4.36
0.56
3.58
Open
24
-11.40
1.45
21.21
Open
25
30.01
1.70
17.67
Open
26
20.65
2.63
63.72
Open
27
11.29
1.44
38.85
Open
28
4.27
0.54
6.42
Open
29
-5.09
0.65
8.87
Open
30
-14.45
1.84
61.29
Open
31
-23.81
3.03
82.89
Open
39
-4.41
0.56
3.66
Open
32
-19.39
2.47
56.70
Open
33
-55.77
0.79
1.90
Open
34
-62.81
0.89
2.37
Open
35
-69.85
0.99
2.88
Open
36
-76.89
1.09
3.45
Open
37
-83.93
1.19
4.06
Open
38
-94.33
1.34
5.03
Open
40
7.02
0.89
16.10
Open
41
1.92
0.24
0.78
Open
42
-0.42
0.05
0.05
Open
44
36.37
2.06
25.22
Open
45
36.30
2.06
25.12
Open
46
36.22
2.05
25.02
Open
47
133.91
1.90
9.63
Open
48
132.75
1.88
9.48
Open
49
-109.07
1.54
6.59
Open
50
-109.13
1.54
6.59
Open
51
241.82
3.42
28.78
Open
52
240.66
3.41
28.52
Open
53
239.10
3.38
28.18
Open
54
237.54
3.36
27.84
Open
GoM : Phed
360
Page 6
ZONE XI
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------55
235.98
3.34
27.50
Open
56
234.42
3.32
27.17
Open
58
234.42
3.32
27.17
Open
59
232.86
3.30
26.83
Open
60
231.30
3.27
26.50
Open
61
229.74
3.25
26.17
Open
62
228.18
3.23
25.84
Open
63
226.62
3.21
25.52
Open
64
166.06
3.38
34.87
Open
65
84.35
2.69
29.49
Open
66
73.43
4.16
92.63
Open
67
60.25
3.41
64.21
Open
68
47.07
2.67
40.65
Open
69
33.89
1.92
22.12
Open
70
20.71
1.17
8.89
Open
71
5.09
0.29
0.66
Open
72
-10.53
0.60
2.54
Open
73
-28.95
1.64
16.52
Open
74
-42.67
2.42
33.89
Open
75
-56.39
3.19
56.80
Open
76
-70.11
3.97
85.02
Open
77
-86.03
2.74
30.59
Open
78
-101.95
3.25
41.89
Open
79
-51.95
1.65
12.02
Open
83
-60.56
1.93
15.96
Open
84
55.28
1.76
13.48
Open
86
50.00
1.59
11.20
Open
90
-109.19
1.55
6.60
Open
98
-172.75
1.80
7.28
Open
99
-379.89
2.39
9.22
Open
100
-207.14
2.15
10.20
Open
6
-207.08
2.15
10.19
Open
92
-109.19
1.55
6.60
Open
93
-109.25
1.55
6.61
Open
94
97.83
1.99
13.09
Open
95
97.77
1.99
13.07
Open
2
-65.51
2.09
18.47
Open
3
2.76
0.35
1.53
Open
GoM : Phed
361
g,
,
i
Legends
Pipeline
Road
Zone Boundary
Reservoir
.osm.
.llkm
GoM:PHED
GoM : Phed
Node No.
Pipe No.
500
450
400
200
150
100
25.00
85.00
10
142.00
4.
10
11
10
77.00
5.
11
12
11
82.00
6.
12
13
12
14.00
7.
13
14
13
52.00
8.
14
15
14
33.00
9.
15
16
15
47.00
10.
16
17
16
51.00
11.
17
18
17
24.00
12.
18
19
18
53.00
13.
19
11
19
39.00
14.
13
20
20
38.00
15.
20
21
21
38.00
16.
21
14
22
32.00
17.
21
22
23
22.00
18.
22
23
24
19.00
19.
23
24
25
25.00
20.
24
25
26
24.00
21.
25
26
27
-51.00
22.
26
27
28
47.00
23.
27
28
29
18.00
From
To
1.
2.
3.
363
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
30
18.00
31
32
45.00
31
32
33
103.00
27.
32
35
36
141.00
28.
35
36
37
76.00
29.
36
37
38
65.00
30.
37
38
39
56.00
31.
38
39
40
200.00
32.
39
40
41
32.00
33.
40
12
42
70.00
34.
10
41
43
96.00
35.
41
42
44
86.00
36.
42
43
45
96.00
37.
43
46
34.00
38.
42
44
47
61.00
39.
44
45
48
93.00
40.
45
38
49
72.00
41.
31
46
50
63.00
42.
46
47
51
31.00
43.
47
48
52
59.00
44.
49
50
54
23.00
45.
50
29
55
14.00
46.
48
51
56
111.00
47.
51
52
57
51.00
48.
52
53
58
155.00
49.
53
54
59
131.00
50.
54
55
60
285.00
From
To
24.
28
29
25.
24
26.
364
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
61
71.00
57
62
103.00
57
46
63
136.00
54.
56
58
64
62.00
55.
58
62
68
14.00
56.
62
63
69
84.00
57.
63
64
70
73.00
58.
64
65
71
39.00
59.
65
66
72
57.00
60.
66
67
73
56.00
61.
67
68
74
57.00
62.
68
69
75
42.00
63.
69
70
76
32.00
64.
70
71
77
64.00
65.
71
46
78
78.00
66.
67
75
82
181.00
67.
75
76
83
198.00
68.
76
66
84
97.00
69.
76
77
85
148.00
70.
77
78
86
256.00
71.
78
84
92
59.00
72.
84
85
93
73.00
73.
85
86
94
20.00
74.
86
87
95
598.00
75.
87
88
96
71.00
76.
88
89
97
74.00
77.
89
90
98
139.00
From
To
51.
51
56
52.
56
53.
365
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
99
54.00
91
100
67.00
91
64
101
19.00
81.
87
92
102
752.00
82.
92
93
103
52.00
83.
94
95
105
94.00
84.
95
96
106
48.00
85.
96
97
107
93.00
86.
97
98
108
58.00
87.
98
99
109
91.00
88.
99
100
110
145.00
89.
100
95
111
31.00
90.
100
101
112
90.00
91.
101
102
113
178.00
92.
102
103
114
97.00
93.
103
104
115
452.00
94.
104
105
116
148.00
95.
105
106
117
245.00
96.
106
107
118
259.00
97.
62
108
119
48.00
98.
108
94
120
95.00
99.
108
109
121
8.00
100.
109
111
123
128.00
101.
111
112
124
30.00
102.
112
113
125
161.00
103.
113
114
126
99.00
104.
114
1115
127
22.00
From
To
78.
90
78
79.
86
80.
366
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
128
14
117
129
58
117
118
130
74
108.
117
217
131
58
109.
217
98
132
299
110.
99
229
133
70
111.
229
103
134
176
112.
113
119
135
108
113.
119
214
136
58
114.
214
114
137
47
115.
119
120
138
74
116.
120
131
139
104
117.
121
112
140
152
118.
111
122
141
54
119.
122
123
142
107
120.
111
124
143
108
121.
124
125
144
140
122.
125
126
145
26
123.
126
127
146
23
124.
127
128
147
274
125.
123
184
148
59
126.
184
183
149
113
127.
183
120
150
103
128.
128
155
151
277
129.
155
161
152
26
130.
161
126
153
102
131.
155
156
154
437
From
To
105.
115
116
106.
116
107.
367
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
155
434.00
158
156
461.00
128
162
159
87.00
135.
162
163
160
153.00
136.
163
144
161
85.00
137.
144
141
162
127.00
138.
141
130
165
514.00
139.
130
129
166
217.00
140.
129
232
167
88.00
141.
232
128
168
376.00
142.
130
131
170
443.00
143.
131
132
171
51.00
144.
132
133
173
56.00
145.
133
136
175
16.00
146.
136
137
176
39.00
147.
237
134
178
27.00
148.
234
135
179
104.00
149.
135
136
180
77.00
150.
135
176
181
129.00
151.
176
181
182
38.00
152.
181
154
183
65.00
153.
154
153
184
12.00
154.
153
152
185
34.00
155.
152
127
186
133.00
156.
152
125
187
103.00
157.
153
180
188
82.00
158.
180
123
189
97.00
From
To
132.
156
157
133.
157
134.
368
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
190
76.00
177
191
43.00
177
176
192
97.00
162.
177
178
193
38.00
163.
178
179
194
69.00
164.
179
123
195
187.00
165.
179
230
196
264.00
166.
230
185
197
77.00
167.
185
184
198
99.00
168.
184
213
199
128.00
169.
213
212
200
140.00
170.
119
212
201
26.00
171.
212
205
202
42.00
172.
205
206
203
22.00
173.
206
207
204
18.00
174.
206
210
207
93.00
175.
210
211
208
26.00
176.
211
215
209
152.00
177.
215
115
210
52.00
178.
207
216
211
187.00
179.
216
116
212
143.00
180.
118
218
213
45.00
181.
218
108
214
148.00
182.
118
221
217
431.00
183.
221
223
219
240.00
184.
223
224
220
240.00
185.
224
225
221
282.00
From
To
159.
181
182
160.
182
161.
369
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
222
170.00
227
223
236.00
227
228
224
418.00
189.
94
234
225
35.00
190.
93
234
104
11.00
191.
179
202
226
349.00
192.
202
203
227
377.00
193.
203
204
228
369.00
194.
177
186
229
559.00
195.
186
200
230
559.00
196.
200
201
231
328.00
197.
134
175
232
31.00
198.
175
187
233
275.00
199.
187
231
234
100.00
200.
231
186
235
111.00
201.
144
145
236
38.00
202.
145
164
237
70.00
203.
164
147
238
268.00
204.
147
148
239
595.00
205.
145
146
241
86.00
206.
146
147
242
403.00
207.
148
150
243
96.00
208.
150
151
244
239.00
209.
151
165
245
459.00
210.
151
172
249
20.00
211.
172
171
250
32.00
212.
171
170
251
70.00
From
To
186.
225
226
187.
226
188.
370
GoM : Phed
Sl.
No.
Node No.
Pipe No.
500
450
400
200
150
100
252
69.00
168
253
23.00
168
165
254
58.00
216.
172
169
255
77.00
217.
187
197
256
63.00
218.
197
196
257
242.00
219.
196
199
258
107.00
220.
199
168
259
48.00
221.
175
173
260
47.00
222.
173
170
262
88.00
223.
170
198
263
43..00
224.
198
197
264
48.00
225.
72.00
226.
111
97
285
118.00
227.
93
101
286
256.00
228.
236
151
287
214.00
229.
150
236
248
229.00
230.
55
156
120.00
231.
201
204
30.00
232.
107
228
100.00
233.
158
162
100.00
234.
17
157
100.00
235.
19
48
31
100.00
433.00
627.00
1844.00
7882.00
17175.00
From
To
213.
170
169
214.
169
215.
Total:
371
({N)
ZONE - XII
'PROPOSEO PIPELINE ROlJTE :
AREA OF COVERAGE:
,224
1. Madanryting
2B
~8'
176
135
GoM:Phed
nn
372
N
Elevation
25.00
50.00
228
75.00
226
1675
1675
107
106
225
224
1675
1675
223
1675
100.00
m
227
105
104
1676
221
216
207
218
118
1682
1680
1679 1682 1683
206
210
103
1677
215
1681 1680
102
211 1680 1681
117
1688
116 115 1682
88
205
1690
229
89
101
217 1683
214 1680
1683
1683
90
1690
1681
1691
114
98
87
1690
119 212
1692
1682
99 1684
92
78
1690
85
100
1683
93
97
84
113
1683 1682
1692 1692
86 1692 1693
1692
213
96
120
1694
1694 95
234
1695
77
1693
1692
1685
1695
91
1694
121 1684 1680
169694 1695 111 112
203 204
1696
183
63
76
1697
62
64
65
185 230
75
1692 1686
109
1670 1669
1682
1081697
1692
201
202
1701 17001698 1699
122
179
1700
184
56
66
1676
1675
68170367
58 1698 1698
124
69
1667
57
1689
1674 1673
1678
1706
200
1702
178
123
51 1702
1687
1711 1709
71 1705
1709
46
125
70
1861665 231
1672
48 1708
1685
180
177
182
1714 1714 47
52
1687
1713
31
1662
1661
1709
152 1683
126
135
1678 1675
24 1712
53
153
1706
154
49
176
32
134
1715
181
187
1685
1687
1664
35
1716
1704
1684
23
25 26
1684
137
1710
54
175
161
1674
127
1720
1663
1680
1659
50
132
133 136
1725
27
131
1718 17161715
1665
1702
155 1685
129
1661
1691
197
22
232
21
173
36
1712
55
1669 1669 1667
29
1714
1670
128
1692
1670
28
1719
1675
198 1658
172014
1660
20
1732
130
1713 1700 156
15
1687
196
37
13
1657
1724 1713
1724
1672
1698
170
172416
141
236
1656
1735
1728
157
171
40
12
39
38
1664
162
17
1675
1658
1716158
1723
1663
169
151
172
1732
1730
19
146
150
18 1723
45 1736 1734
1686
199
11
1690
1662
16571665
165
168
10
1731
1668
1660
1727
148
1736
164
1658
41
1733
163
1658
1660
1736
147
1662
44
1667
1673 144 145
42 1739
1665
1739
1670
9
1742
1671
43
1739
1745
3
zr
2
1742
1761 1744
1677
GoM : Phed
373
Page 1
6/21/2008 4:17:38 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: madanryting.net
Zone XII
Link - Node Table:
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------1
zr
2
25
250
2
2
3
85
250
9
9
10
142
250
10
10
11
77
300
11
11
12
82
200
12
12
13
14
250
13
13
14
52
250
14
14
15
33
150
15
15
16
47
150
16
16
17
51
150
17
17
18
24
200
18
18
19
53
200
19
19
11
39
200
20
13
20
38
150
21
20
21
38
150
22
21
14
32
250
23
21
22
22
250
24
22
23
19
250
25
23
24
25
250
26
24
25
24
200
27
25
26
51
200
28
26
27
47
200
29
27
28
18
200
30
28
29
18
150
32
24
31
45
200
33
31
32
103
200
36
32
35
141
200
37
35
36
76
200
38
36
37
65
200
39
37
38
56
200
40
38
39
200
200
41
39
40
32
200
42
40
12
70
200
43
10
41
96
200
44
41
42
86
200
45
42
43
96
300
46
43
zr
34
300
GoM : Phed
374
Page 2
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------47
42
44
61
300
48
44
45
93
300
49
45
38
72
300
50
31
46
63
250
51
46
47
31
200
52
47
48
59
150
54
49
50
23
150
55
50
29
14
150
56
48
51
111
200
57
51
52
51
100
58
52
53
155
100
59
53
54
131
100
60
54
55
285
100
61
51
56
71
200
62
56
57
103
200
63
57
46
136
200
64
56
58
62
250
68
58
62
14
250
69
62
63
84
150
70
63
64
73
150
71
64
65
39
150
72
65
66
57
150
73
66
67
56
150
74
67
68
57
150
75
68
69
42
150
76
69
70
32
200
77
70
71
64
200
78
71
46
78
200
82
67
75
181
100
83
75
76
198
100
84
76
66
97
100
85
76
77
148
100
86
77
78
256
100
92
78
84
59
100
93
84
85
73
100
94
85
86
20
100
95
86
87
598
100
96
87
88
71
100
97
88
89
74
100
98
89
90
139
100
99
90
78
54
100
100
86
91
67
100
101
91
64
19
150
102
87
92
752
100
103
92
93
52
100
105
94
95
94
200
106
95
96
48
100
GoM : Phed
375
Page 3
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------107
96
97
93
100
108
97
98
58
100
109
98
99
91
100
110
99
100
145
100
111
100
95
31
100
112
100
101
90
100
113
101
102
178
100
114
102
103
97
100
115
103
104
452
100
116
104
105
148
100
117
105
106
245
100
118
106
107
259
100
119
62
108
48
200
120
108
94
95
200
121
108
109
8
200
123
109
111
128
200
124
111
112
30
150
125
112
113
161
100
126
113
114
99
100
127
114
115
22
100
128
115
116
14
100
129
116
117
58
100
130
117
118
74
100
131
117
217
58
100
132
217
98
299
100
133
99
229
70
100
134
229
103
176
100
135
113
119
108
100
136
119
214
58
100
137
214
114
47
100
138
119
120
74
100
139
120
121
104
100
140
121
112
152
100
141
111
122
54
150
142
122
123
107
150
143
111
124
108
100
144
124
125
140
100
145
125
126
26
150
146
126
127
23
150
147
127
128
274
150
148
123
184
59
100
149
184
183
113
100
150
183
120
103
100
151
128
155
277
100
152
155
161
26
150
153
161
126
102
150
154
155
156
437
200
GoM : Phed
376
Page 4
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------155
156
157
434
150
156
157
158
461
150
159
128
162
87
100
160
162
163
153
150
161
163
144
85
150
162
144
141
127
150
165
141
130
514
150
166
130
129
217
100
167
129
232
88
100
168
232
128
376
100
170
130
131
443
150
171
131
132
51
150
173
132
133
56
150
175
133
136
16
150
176
136
137
39
150
178
137
134
27
100
179
134
135
104
100
180
135
136
77
100
181
135
176
129
100
182
176
181
38
150
183
181
154
65
150
184
154
153
12
150
185
153
152
34
150
186
152
127
133
150
187
152
125
103
150
188
153
180
82
150
189
180
123
97
150
190
181
182
76
100
191
182
177
43
100
192
177
176
97
100
193
177
178
38
100
194
178
179
69
100
195
179
123
187
100
196
179
230
264
100
197
230
185
77
100
198
185
184
99
100
199
184
213
128
100
200
213
212
140
100
201
119
212
26
100
202
212
205
42
100
203
205
206
22
100
204
206
207
18
100
207
206
210
93
100
208
210
211
26
100
209
211
215
152
100
210
215
115
52
100
211
207
216
187
100
GoM : Phed
377
Page 5
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------212
216
116
143
100
213
118
218
45
100
214
218
104
148
100
217
118
221
431
100
219
221
223
240
100
220
223
224
240
100
221
224
225
282
100
222
225
226
170
100
223
226
227
236
100
224
227
228
418
100
225
94
234
35
100
104
93
234
11
100
226
179
202
349
150
227
202
203
377
150
228
203
204
369
150
229
177
186
559
100
230
186
200
559
150
231
200
201
328
150
232
134
175
31
150
233
175
187
275
100
234
187
231
100
100
235
231
186
111
100
236
144
145
38
150
237
145
164
70
150
238
164
147
268
150
239
147
148
595
150
241
145
146
86
100
242
146
147
403
100
243
148
150
96
150
244
150
151
239
150
245
151
165
459
100
249
151
172
20
100
250
172
171
32
100
251
171
170
70
100
252
170
169
69
100
253
169
168
23
100
254
168
165
58
100
255
172
169
77
100
256
187
197
63
100
257
197
196
242
100
258
196
199
107
100
259
199
168
48
100
260
175
173
47
100
262
173
170
88
100
263
170
198
43
100
264
198
197
48
100
8
3
9
72
250
GoM : Phed
378
Page 6
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------285
111
97
118
100
286
93
101
256
100
287
236
151
214
100
248
150
236
229
100
3
55
156
120
100
4
201
204
30
150
5
107
228
100
100
6
158
162
100
150
7
17
157
100
200
31
49
48
100
150
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------2
0.00
1760.03
16.03
3
0.00
1756.71
14.71
9
1.40
1753.90
14.90
10
0.00
1748.45
12.45
11
0.00
1745.80
12.80
12
0.00
1740.14
10.14
13
0.00
1739.37
11.37
14
0.00
1737.59
13.59
15
0.94
1737.67
13.67
16
0.94
1737.79
14.79
17
0.94
1737.95
14.95
18
0.94
1739.55
12.55
19
0.94
1743.13
12.13
20
3.74
1737.76
13.76
21
0.00
1736.38
16.38
22
3.12
1735.10
16.10
23
3.12
1734.03
16.03
24
0.00
1732.66
16.66
25
1.88
1732.13
16.13
26
1.88
1731.07
16.07
27
1.88
1730.14
16.14
28
1.88
1729.80
16.80
29
2.06
1728.49
15.49
31
0.00
1729.25
14.25
32
0.00
1733.86
13.86
35
3.12
1740.18
15.18
36
3.12
1743.77
11.77
37
3.12
1747.00
12.00
38
0.00
1749.94
13.94
39
6.88
1742.93
8.93
40
6.88
1741.96
9.96
GoM : Phed
379
Page 7
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------41
5.16
1751.74
12.74
42
0.00
1755.00
13.00
43
1.40
1759.42
14.42
44
3.76
1753.59
14.59
45
3.76
1751.50
15.50
46
0.00
1724.70
10.70
47
6.56
1721.69
9.69
48
0.00
1719.97
10.97
49
1.88
1726.05
16.05
50
1.88
1727.54
15.54
51
4.84
1715.66
7.66
52
0.16
1715.08
9.08
53
0.12
1713.38
9.38
54
0.08
1711.98
9.98
55
0.04
1708.99
8.99
56
0.00
1713.55
7.55
57
12.50
1717.77
8.77
58
8.00
1710.89
8.89
62
0.00
1710.33
10.33
63
12.50
1709.54
10.54
64
0.00
1709.41
11.41
65
14.08
1709.91
9.91
66
0.00
1711.56
9.56
67
0.00
1713.89
8.89
68
7.82
1716.99
8.00
69
8.12
1719.92
8.92
70
7.82
1720.61
7.61
71
7.82
1722.28
8.28
75
0.62
1712.08
9.08
76
0.00
1710.40
9.40
77
6.26
1704.98
8.98
78
6.74
1701.44
9.44
84
9.38
1701.44
9.44
85
9.38
1702.62
8.62
86
0.00
1703.74
8.74
87
0.00
1702.06
10.06
88
3.12
1701.52
11.52
89
3.12
1701.35
11.35
90
3.12
1701.35
11.35
91
10.94
1708.99
11.99
92
0.00
1703.19
10.19
93
0.00
1703.26
8.26
94
0.00
1704.84
7.84
95
0.00
1704.33
9.33
96
3.12
1702.47
8.47
97
0.00
1700.07
7.07
98
0.00
1699.29
7.29
GoM : Phed
380
Page 8
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------99
0.00
1699.50
7.50
100
0.00
1702.86
8.86
101
0.00
1702.32
10.32
102
3.12
1699.29
9.29
103
0.00
1698.45
10.45
104
3.30
1691.91
8.91
105
0.18
1691.79
9.79
106
0.12
1691.63
12.63
107
0.06
1691.48
14.48
108
0.00
1705.90
7.90
109
0.00
1705.54
7.54
111
0.00
1699.74
7.74
112
0.00
1699.13
7.13
113
0.00
1692.60
7.60
114
0.00
1691.41
8.41
115
0.00
1691.20
8.20
116
0.00
1691.20
8.20
117
0.00
1691.49
8.49
118
0.00
1691.45
11.45
217
5.62
1691.95
7.95
229
6.24
1698.64
7.64
119
0.00
1691.48
8.48
214
3.74
1691.40
9.40
120
0.00
1691.67
7.67
121
7.08
1693.08
7.08
122
18.02
1696.11
7.11
123
0.00
1692.31
7.31
124
12.50
1695.36
8.36
125
0.00
1694.69
7.69
126
0.00
1694.96
7.96
127
0.00
1694.71
9.71
128
0.00
1694.71
7.71
184
0.00
1691.14
13.14
183
5.82
1691.13
9.13
155
3.62
1700.09
8.09
161
3.12
1698.94
7.94
156
0.50
1707.75
9.75
157
0.40
1732.42
16.42
158
0.30
1701.58
11.58
162
3.12
1694.95
8.95
163
3.12
1686.82
13.82
144
0.00
1682.78
11.78
141
0.00
1682.12
7.12
130
0.00
1679.48
7.48
129
17.18
1679.18
9.18
232
0.00
1682.13
7.13
131
0.00
1677.86
7.86
GoM : Phed
381
Page 9
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------132
12.50
1677.67
8.67
133
0.00
1677.67
8.67
136
0.00
1677.67
10.67
137
1.84
1677.56
12.56
212
0.00
1691.15
9.15
205
3.12
1690.67
9.67
206
0.00
1690.57
9.57
207
2.04
1690.57
10.57
134
0.00
1677.18
14.18
135
0.00
1679.11
15.11
176
0.00
1687.81
13.81
181
0.00
1688.59
8.59
154
0.00
1691.22
7.22
153
0.00
1691.70
7.70
152
0.00
1693.24
8.24
180
20.30
1691.69
8.69
182
9.36
1686.06
8.06
177
0.00
1685.85
10.85
178
7.80
1685.51
13.51
179
8.22
1685.52
11.52
230
1.56
1688.17
13.17
185
1.56
1689.26
13.26
213
0.30
1691.14
11.14
210
4.68
1690.08
10.08
211
4.68
1690.07
10.07
215
4.68
1690.53
8.53
216
1.56
1690.78
8.78
218
3.60
1691.45
10.45
221
1.06
1691.10
14.10
223
0.80
1691.06
15.06
224
0.64
1691.06
16.06
225
0.48
1691.08
16.08
226
0.32
1691.12
16.12
227
0.16
1691.21
16.21
228
0.08
1691.42
16.42
234
9.36
1703.36
7.36
202
0.42
1684.03
11.03
203
0.28
1682.51
12.51
204
0.14
1681.08
12.08
201
0.24
1680.97
13.97
200
0.48
1679.76
14.76
186
8.28
1677.85
15.85
175
0.00
1676.93
15.93
187
5.58
1674.16
15.16
231
7.80
1674.71
13.71
145
0.00
1681.84
11.84
164
3.12
1681.14
14.14
GoM : Phed
382
Page 10
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------147
0.00
1679.12
14.12
148
12.68
1674.06
12.06
146
12.50
1679.26
11.26
150
0.00
1673.93
13.93
151
0.00
1673.73
16.73
165
3.32
1673.22
15.22
172
0.00
1673.65
8.65
171
3.12
1673.64
10.64
170
0.00
1673.70
9.70
169
0.00
1673.47
11.47
168
0.00
1673.23
13.23
197
0.00
1673.54
15.54
196
6.18
1672.75
16.75
199
4.68
1672.85
14.85
173
0.00
1675.80
15.80
198
9.36
1673.43
16.43
236
0.60
1673.79
15.79
zr
-489.52
1761.00
0.00
Reservoir
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
176.37
3.60
38.99
Open
2
176.37
3.60
38.99
Open
9
174.97
3.57
38.42
Open
10
266.43
3.77
34.44
Open
11
133.51
4.25
69.03
Open
12
212.32
4.33
54.97
Open
13
164.21
3.35
34.16
Open
14
-9.81
0.56
2.22
Open
15
-10.75
0.61
2.64
Open
16
-11.69
0.66
3.08
Open
17
-131.04
4.17
66.68
Open
18
-131.98
4.20
67.57
Open
19
-132.92
4.23
68.46
Open
20
48.11
2.72
42.33
Open
21
44.37
2.51
36.44
Open
22
-174.02
3.55
38.03
Open
23
218.39
4.45
57.91
Open
24
215.27
4.39
56.38
Open
25
212.15
4.32
54.89
Open
26
71.85
2.29
21.91
Open
27
69.97
2.23
20.86
Open
28
68.09
2.17
19.83
Open
29
66.21
2.11
18.84
Open
GoM : Phed
383
Page 11
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------30
64.33
3.64
72.49
Open
32
140.30
4.47
75.67
Open
33
-105.68
3.37
44.77
Open
36
-105.68
3.37
44.77
Open
37
-108.80
3.47
47.25
Open
38
-111.92
3.56
49.79
Open
39
-115.04
3.66
52.39
Open
40
92.57
2.95
35.04
Open
41
85.69
2.73
30.37
Open
42
78.81
2.51
26.01
Open
43
-91.45
2.91
34.25
Open
44
-96.61
3.08
37.92
Open
45
-311.75
4.41
46.06
Open
46
-313.15
4.43
46.45
Open
47
215.13
3.05
23.17
Open
48
211.37
2.99
22.43
Open
49
207.61
2.94
21.70
Open
50
245.98
5.01
72.19
Open
51
45.89
1.46
97.20
Open
52
39.33
2.23
29.15
Open
54
-60.39
3.42
64.48
Open
55
-62.27
3.53
68.26
Open
56
97.84
3.12
38.81
Open
57
8.16
1.04
11.40
Open
58
8.00
1.02
10.99
Open
59
7.88
1.00
10.68
Open
60
7.80
0.99
10.48
Open
61
84.84
2.70
29.81
Open
62
-100.83
3.21
41.04
Open
63
-113.33
3.61
50.96
Open
64
185.67
3.78
42.88
Open
68
177.67
3.62
39.52
Open
69
21.36
1.21
9.41
Open
70
8.86
0.50
1.84
Open
71
-25.16
1.42
12.74
Open
72
-39.24
2.22
29.02
Open
73
-47.60
2.70
41.50
Open
74
-55.18
3.12
54.56
Open
75
-63.00
3.57
69.74
Open
76
-71.12
2.27
21.50
Open
77
-78.94
2.51
26.08
Open
78
-86.76
2.76
31.07
Open
82
7.58
0.97
9.95
Open
83
6.96
0.89
8.49
Open
84
-8.36
1.07
11.94
Open
85
15.32
1.95
36.64
Open
86
9.06
1.15
13.85
Open
GoM : Phed
384
Page 12
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------92
-0.49
0.06
0.06
Open
93
-9.87
1.26
16.23
Open
94
-19.25
2.45
55.93
Open
95
3.83
0.49
2.81
Open
96
6.55
0.83
7.60
Open
97
3.43
0.44
2.29
Open
98
0.31
0.04
0.03
Open
99
-2.81
0.36
1.58
Open
100
-23.08
2.94
78.26
Open
101
-34.02
1.93
22.29
Open
102
-2.72
0.35
1.49
Open
103
-2.72
0.35
1.49
Open
105
33.47
1.07
5.33
Open
106
15.81
2.01
38.84
Open
107
12.69
1.62
25.85
Open
108
8.89
1.13
13.37
Open
109
-3.45
0.44
2.32
Open
110
-11.95
1.52
23.13
Open
111
-17.66
2.25
47.70
Open
112
5.71
0.73
5.90
Open
113
10.14
1.29
17.05
Open
114
7.02
0.89
8.63
Open
115
9.28
1.18
14.47
Open
116
1.94
0.25
0.80
Open
117
1.76
0.22
0.67
Open
118
1.64
0.21
0.59
Open
119
156.31
4.98
92.44
Open
120
49.98
1.59
11.19
Open
121
106.33
3.39
45.30
Open
123
106.33
3.39
45.29
Open
124
32.21
1.82
20.14
Open
125
16.18
2.06
40.56
Open
126
8.42
1.07
12.10
Open
127
7.39
0.94
9.51
Open
128
-1.27
0.16
0.36
Open
129
-5.20
0.66
4.95
Open
130
1.52
0.19
0.51
Open
131
-6.72
0.86
7.96
Open
132
-12.34
1.57
24.54
Open
133
8.50
1.08
12.31
Open
134
2.26
0.29
1.06
Open
135
7.76
0.99
10.40
Open
136
2.71
0.35
1.49
Open
137
-1.03
0.13
0.25
Open
138
-3.61
0.46
2.52
Open
139
-8.95
1.14
13.54
Open
140
-16.03
2.04
39.85
Open
GoM : Phed
385
Page 13
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------141
61.75
3.50
67.20
Open
142
43.73
2.48
35.47
Open
143
16.17
2.06
40.50
Open
144
3.67
0.47
4.85
Open
145
-22.84
1.29
10.65
Open
146
23.22
1.31
10.97
Open
147
-0.08
0.00
0.00
Open
148
11.02
1.40
19.92
Open
149
0.48
0.06
0.06
Open
150
-5.34
0.68
5.20
Open
151
-10.88
1.39
19.43
Open
152
49.17
2.78
44.08
Open
153
46.05
2.61
39.04
Open
154
-63.67
2.03
17.52
Open
155
-56.42
3.19
56.85
Open
156
61.60
3.49
66.90
Open
159
-3.80
0.48
2.76
Open
160
54.38
3.08
53.11
Open
161
51.26
2.90
47.61
Open
162
15.42
0.87
5.15
Open
165
15.42
0.87
5.15
Open
166
2.59
0.33
1.36
Open
167
-14.59
1.86
33.47
Open
168
-14.59
1.86
33.47
Open
170
12.83
0.73
3.66
Open
171
12.83
0.73
3.66
Open
173
0.33
0.02
0.01
Open
175
0.33
0.02
0.00
Open
176
11.00
0.62
2.76
Open
178
9.16
1.17
14.14
Open
179
-10.62
1.35
18.60
Open
180
10.67
1.36
18.76
Open
181
-21.30
2.71
67.44
Open
182
-32.42
1.84
20.39
Open
183
-46.97
2.66
40.49
Open
184
-46.97
2.66
40.48
Open
185
-49.81
2.82
45.14
Open
186
-23.30
1.32
11.05
Open
187
-26.51
1.50
14.04
Open
188
2.84
0.16
0.22
Open
189
-17.46
0.99
6.47
Open
190
14.54
1.85
33.28
Open
191
5.18
0.66
4.92
Open
192
-11.13
1.42
20.27
Open
193
7.09
0.90
8.80
Open
194
-0.71
0.09
0.12
Open
195
-15.25
1.94
36.33
Open
GoM : Phed
386
Page 14
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------196
-7.61
0.97
10.04
Open
197
-9.17
1.17
14.18
Open
198
-10.73
1.37
18.96
Open
199
-0.19
0.02
0.01
Open
200
-0.49
0.06
0.06
Open
201
8.66
1.10
12.75
Open
202
8.17
1.04
11.43
Open
203
5.05
0.64
4.69
Open
204
-0.32
0.04
0.03
Open
207
5.37
0.68
5.26
Open
208
0.69
0.09
0.12
Open
209
-3.99
0.51
3.03
Open
210
-8.67
1.10
12.76
Open
211
-2.36
0.30
1.15
Open
212
-3.92
0.50
2.94
Open
213
-0.43
0.06
0.05
Open
214
-4.03
0.51
3.09
Open
217
1.96
0.25
0.81
Open
219
0.90
0.11
0.19
Open
220
0.10
0.01
0.00
Open
221
-0.54
0.07
0.08
Open
222
-1.02
0.13
0.24
Open
223
-1.34
0.17
0.40
Open
224
-1.50
0.19
0.50
Open
225
16.51
2.10
42.07
Open
104
-7.15
0.91
8.93
Open
226
13.93
0.79
4.27
Open
227
13.51
0.77
4.03
Open
228
13.23
0.75
3.88
Open
229
9.22
1.17
14.31
Open
230
-12.37
0.70
3.42
Open
231
-12.85
0.73
3.67
Open
232
19.79
1.12
8.17
Open
233
7.62
0.97
10.06
Open
234
-5.51
0.70
5.52
Open
235
-13.31
1.70
28.26
Open
236
35.84
2.03
24.53
Open
237
22.09
1.25
10.01
Open
238
18.97
1.07
7.55
Open
239
20.22
1.14
8.50
Open
241
13.75
1.75
30.01
Open
242
1.25
0.16
0.36
Open
243
7.54
0.43
1.37
Open
244
5.84
0.33
0.85
Open
245
2.33
0.30
1.12
Open
249
4.61
0.59
3.97
Open
250
1.12
0.14
0.29
Open
GoM : Phed
387
Page 15
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------251
-2.00
0.25
0.84
Open
252
4.23
0.54
3.37
Open
253
7.72
0.98
10.30
Open
254
0.99
0.13
0.23
Open
255
3.49
0.45
2.37
Open
256
7.56
0.96
9.90
Open
257
4.13
0.53
3.24
Open
258
-2.05
0.26
0.88
Open
259
-6.73
0.86
7.98
Open
260
12.16
1.55
23.90
Open
262
12.16
1.55
23.90
Open
263
5.94
0.76
6.33
Open
264
-3.42
0.44
2.28
Open
8
176.37
3.60
38.99
Open
285
-3.80
0.48
2.77
Open
286
4.42
0.56
3.67
Open
287
1.10
0.14
0.28
Open
248
1.70
0.22
0.63
Open
3
7.76
0.99
10.38
Open
4
-13.09
0.74
3.80
Open
5
1.58
0.20
0.55
Open
6
61.30
3.47
66.30
Open
7
118.41
3.77
55.27
Open
31
58.51
3.31
60.82
Open
GoM : Phed
388
Chainage ( m)
GoM:Phed
Scour Valve
Airvalve
Horizontal 1:50
Vertical
1838.00
1830.00
1835.00
1832.00
1838.00
1828.00
1835.00
1837.00
1825.00
1730.00
1910.00
1960.00
2100.00
2180.00
2240.00
2290.00
2360.00
2370.00
1847.00
1834.00
2630.00
1834.00
1831.00
1430.00
1440.00
1450.00
1829.00
1831.00
1300.00
2580.00
1836.00
1190.00
1813.00
886.00
1830.00
1802.00
862.00
1130.00
1784.00
850.00
1828.00
1769.00
1778.00
1781.00
807.00
818.00
823.00
1050.00
1747.00
1832.00
1729.00
780.00
1010.00
1711.00
756.00
768.00
1830.00
1714.00
738.00
986.00
1707.00
722.00
1832.00
1694.00
705.00
971.00
1689.00
687.00
1818.00
1662.00
1666.00
1677.00
647.00
659.00
662.00
1824.00
1822.00
1828.00
1657.00
628.00
912.00
920.00
927.00
1642.00
1644.00
1645.00
605.00
608.00
613.00
901.00
1629.00
1638.00
1608.00
508.00
574.00
582.00
1596.00
1596.00
1603.00
471.00
476.00
478.00
1612.00
1585.00
424.00
1617.00
1595.00
1591.00
404.00
413.00
522.00
1592.00
362.00
533.00
1607.00
324.00
1607.00
214.00
1607.00
1610.00
195.00
285.00
1611.00
1592.00
1589.00
168.00
135.00
22.00
1576.00
0.00
Inlet to Treatment
Plant
Datum : 1400.00
1:100
I----~-------I
Gangway bridge
=~===================================
o
===================================
=r=
~~
11
y\.
f~
~'--r0
/r
OJ
Co
===========.....$.
.,"'
.,'"
~1
//
f5
===========
~\~I
T
o
"
"'
t
~
""'
1,.11
.",
IIit
!I IS
II
'T"a
Ifb
1~.20
--.L
1J
'""'"
Raw water Stage-I Pumping System: Pump House layout plan & elevation
Scale : 1:200
GoM:Phed
GoM:PHED
390
9000mm
7.5 ton capacity
30000mm
Original Ground
10000mm
6000mm
MCC
Rl: 1585.60m
Road
Rl: 1583.20m
Section At EE
1577.00m Water Level
Rl :1575.00m
Sluice Gate
400mm
8200mm
400mm
Rl: 1567.00m
Sluice Gate
1547.00m
Raw Water Stage-I Pumping System : Intake Structure, Pump House, Inlets & Typical Pump Installations
Scale - 1:500
GoM : Phed
GoM : PHED
391
--
115DD
---
I
I
I
I
Plan
Raw water Stage-II Pumping System: Layout plan of pump house, RCC sump and pumping installations
Scale: 1:100
GoM:Phed
GoM:PHED
392
SectIonIIIE_tIon
""',"ow
DO
RL : 1772.00m
EfBlRltIon DfCleilr
w._
PumpingSiation
Scale: 1:100
GoM:Phed
GoM:PHED
393
RCC Cover
slab
Flow meter
Pulley
RCC cover
slab
Thread
Orifice
1860.00
1000
1220
1858.00
Steel shaft
1200
Alum solution
A
A'
RCC cover
slab
1856.00
Section at A- A'
Scale 1:40
Scale 1:20
1854.00
1852.00
Parshall flume
1850.00
(+) 1847.00 (W.L.)
1848.00
(+) 1846.20(W.L.)
GL
1846.00
(+) 1844.40(W.L.)
(AT INLET POINT OF FILTER HOUSE)
30000
(+) 1846.50(W.L.)
(+) 1846.00(W.L.)
31150
(+) 1844.10(W.L.)
(+) 1844.85(G.L.)
(+) 1842.90 GL
1844.00
(+) 1841.15
(+) 1841.90(GL)
1842.00
(+) 1840.80
TO SLUDGE PIT
FLASH MIXER
1840.00
CLARIFLOCCULATOR
FILTER HOUSE
(+) 1837.15
35000
1838.00
Scale 1:200
TO DISTRIBUTION
NETWORK
1836.00
1834.00
(+) 1834.50
(+)1834.00 GL
GL
1832.00
1830.00
1828.00
1826.00
1824.00
1822.00
Datum 1820.00
GoM:Phed
GoM : PHED
394
Diameter:
30.00m~,i,
't-
Parshall ftume
Channel
.-I
From intennediate_~ _ _ !!
pumpIng 5tatl~--~
III:::I
ol:
.
w
!:i
~
FIOCCUI.tor~;,
IL
FLASH MIXER
Inlet stilling chamber
Parshall flume
CLARIFLOCCULATOR
Design consideration
. : Civil structure including treatment unit considered for intermediate stage
: Civil structure excluding treatment unit considered for ultimate stage
Scale : 1 :500
GoM:Phed
GoM:PHED
395
f--------4775
4800
1500
4500
4500
- - - - - - - -L - - - - - - ~~b~~~ - - - - c!y
700
D$J f250
rDi"1
D$J
0 1
Ll' L[J
=u
!Ll
:J;~.~
1500
----
"U
4800
4775-----------1
r - - - - - - - IJ!bI
L
[!i
500.0000
walkwav
"
"""
f+'"
750,.750 haunch
Op=ting Platfonn
-151
II I
""
1'1
lifO
In1ine booster
1 200
~I
80
::
Iw.j
D, ,
Iw.j
'W,
I 0.
''''
W>
t
t
t
t
t
t
t
t
t
t
t
t
t
t
JK.
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
t
,~
~tJ
Clear water channel
"
"
"
r'OO
",0
ti
t t
.L
t t
t t
t t
t t
t t
t t
'00
t
t
t
t
t
t
t
J.J.
t
t
t
t
t
t
::
t
t
t
t
t
t
t
t
t
t
t
t
t
t
"
t
t
t
t
t
t
~'8OD""
"
-- D
t=* D
t t
1.01,-
I'"
"
"
'
200
t
t
t
t
t
t
t
lir ~
"
" 00
t
t
t
t
t
t
,L,
t t
t
t
t
t
t
t
rl~a
"
:;'1
j-t t
150- j-- - j--1"
r----&!>10DD
t t
t t
t t
t t
~.
::
--nr
I :
Design consideration
::
..
::
j
",0
,,001 t}T
From back wash tank
::
t
t
t
t
t
t
t
:t:10DD
100
'"
!.
I~ ~
1000 I--
Scale: 1:100
+.:
f"" OJ
tw.1
Scale : 1:200
channel
Plan
Platform
- of
-- Oneratin
-,...-----..... --------
Clearwater
In1inc booater
Fwi1
,,,--I--I-ooo-J.,,,..J.oo 1----",,---1 "'" 1--,,,,,,--1 "'" 1--",,1-- '00 1---"66---1 "'" 1--"10--1 "'" 1--,,00--1 "'" 1-2088--1 "'" 1--",,1-- .,.J-j..".
80
To back
w..btmk
750*750 haunch
t t
t t
I---'\'T
t
t
t
t
t
150~
~~"
t
t
t
t
t
t
t
t
t
t
t
t t
10DD r----M
t
t
t
t
t
t
700
Scale : 1:200
Scale : As indicated
GoM:Phed
GoM:PHED
396
25
----l
\\
Diameter =800cm
Height = 300cm
250.00
Office
:>
.7 T
1-
280.00
~10~ ~ 45.40
lJ
l-------
~
I
'!i
~~
~.
280.00
ZI\
17
I
I
ML _______
~./!
..;i
I]!
"'T
'C../
NO.6
_No.2
t<:::::..
~ld"
.
~
375-----,
Rolling Shutter
'GI
"
250
---fj
==1
750
/ Gate valve
o of pump
Q~
No.1
7
-I
"'T
250.00
Toilet
W/C
250
W
*300 dnr
Rolling Shutter
/)
Plan
Scale: 1:100
GoM:Phed
GoM:PHED
398
SectIonIIIE_tIon
""',"ow
DO
RL : 1772.00m
EfBlRltIon DfCleilr
w._
PumpingSiation
Scale: 1:100
GoM:Phed
GoM:PHED
399
Laltkor
RI:1930 m
Pumping main
6570 Rm
Madanrltlng
(Zone XII)
BOOO Rm
Nongthymmal
(Zone - V)
RI:1656 m
Upper Nongtttymmal
7.44 LG
RI:1471
200 mm
--- -
"0
Upper Malld
3.85 LG
Lumshylap
(Zone-VII)
RI:14!15 m
Upper Lumpartng
LG
Nongmynsong
(Zone-XI)
RI:1610 m
Nongrimmaw
0.13 LG
Farro cement
0.10 LG
50 mm.
100
mm
mm
300mm
Lower Malld
4.40 LG
Upper Lachumelre
0.43 LG
250 mm
Proposed WTP
6th Mile
III 1 ) ( Upper Shiliong
LG
1000/900 mm "
0.1. water main
300 mm
250mm
200
350 mm
RI:1834
6 Mile Upper Shiliong
Bifurcation Point
RI:1775 m
300mm
~
Complex 0.75 LG
LG(PII)
Bara Bazaar
Mawlal
PIIawroh
1.50 LG
2.64 LG
~
3
3
150 mm I/J
RI:140B m
760Rm
146Rm
OH
PIIawlai Nongitwar
(Part of Zone-VDI)
RI:1442 m
100 mm"
Mawlal Iewrynghep
(Part of Zone-VIII)
RI:1434 m
4180 Rm
2730 Rm
150 mm
150 mm"
0.50 LG
~
3
3
0.66 LG (M)
PIIawpram
Banlpathar
0.75 LG
stage II pum~~~~tI::.n
""m
Legends:
_ U ~ wRiver_
Schematic single line diagram of components executed under GSWSP (Phase I & II) and components proposed under GSWSP (phase III)
GoM:PHED
400
2.3
Environmental
measures
2.3.1
The river Umiew, the source of the Greater Shillong Water Supply Project originates at an
altitude of 1849m. The catchment boundary extends from longitudes 91-46 to
91-56 E and latitudes 25-27 to 25-32 N approximately. The catchment in the
upper most reaches, drains to the southern slope of the Shillong peak which is the
highest peak in the Khasi Hills having an altitude of 1964m (6441 ft). The river initially
flows in the easternly direction for about 10Km, then it flows towards the west upto its
confluence with its major tributaries, the river Umtyngngar and river Umjyllieng. The river
flows towards the south below the confluence along the southern slope of the Khasi Hills
and enters Bangladesh beyond Shella in the Indo-Bangladesh border and joins the Surma.
There are some paddy fields in the flat areas. The catchment areas upto the dam site, at
Mawphlang is 115 sq.km.
2.3.2
Silt content in Umiew river water is abnormally high throughout the year and rises to a
maximum in a storm turning the otherwise clear water into a muddy water. The source of
the Umiew river is not muddy, it turns muddy at its middle reaches after it confluence with
its major tributaries the river Umtyngngar and river Umjyllieng on account of human
activity through stone and sand quarrying along its major tributaries.
GoM:Phed
compliance/
protection
measures/
improvement
401
2.3.3
Though with the construction of the dam across the river Umiew, sufficient water is
available for pumping by the system, the high rate of siltation/sedimentation may have a far
reaching effect on the life of the Dam as silt trapped behind dams often leads to their
premature closure.
Mass gravity concrete dam of the GSWSP (Phase I & II) commissioned in 2003
GoM:Phed
402
2.3.4
Sustainability of the river Umiew is vital for the project and remedial measure both short
term and long term is called for to protect the major water shed of the river. For short term
measures, construction of silt retention dam across the Umiew river and its tributaries
provides control on the flow of silt from vulnerable areas of the catchment into the dam.
Few silt retention dam constructed by the state Phed under the scheme sanctioned and
funded by the state government appears to be quite useful. The silt carried away by storm
water from the quarries, are retained by the dam and after the storm water receeded, the
villagers collect the sand accumulated for commercial use. Providing long term solution to
the problem would however depends on the response of the villagers residing in
the catchment and their willingness to adopt the remedial measures for a long term
solution. Such measures are :
Bench terracing on steeply sloping and unduly land where intensive farming is practice.
Providing series of check bunds/ponds of suitable size in each micro Catchment Area to retain silt.
Providing of staggered contour trenches across the slope of dykes and bunds across drainage ways. For agriculture
land, subsidiary bunds along field boundaries in conjunction with provision for one or more small storage in the
lowest reaches of every small Catchment.
Adoption of organic system of farming which are both productive and ecologically sustainable.
Intensive afforestation to increase the forest cover in the Catchment Areas. Natural regeneration in the interim.
Suitable steps for checking hazardous exploitation of minerals like stones and sand within the Catchment.
Ban on charcoal burning within the Catchment Areas and strict fire protection measures to stop degradation of
dryness of the Catchment.
Possibility of taking over of catchment Area by the State Government (Forest or PHE Department) to ensure that
forest cover is maintained & enhanced should be explored.
Possibility of declaration of areas as Catchment area under section 5 of the Protection of Catchment Areas Act.
1990 should be explored.
Training & awareness campaign for the villagers residing in the catchment.
2.4
2.4.1
Sizeable area of land was donated by the Hima of Mawphlang at the Intake site and at the
WTP site where Intake & Intermediate structure and WTP were constructed respectively.
The land which is under the control of State Phed has enough area for creating additional
infrastructure for generation and treatment of water. In addition to, State Phed has under its
control an area of about 60 acres of land at Mawphlang near the source. Housing facility for
officers & staff, administrative offices, stores and stockyards are all constructed and
established in this area of land. The area has enough space for additional construction of
buildings and offices considered under the project. Gravity feeder main, distribution
systems are proposed to be laid by the side of state roads, lanes and national highway.
2.4.2
GoM:Phed
403
2.5
2.5.1
State Phed which is a well structured organization with proper hierarchy and has at its
disposal technical competent engineers in the cadre with well acquired experience in project
design, project execution & supervision, project management including O&M services of
major water supply system. For implementation of different components of the project
under consideration, State Phed shall take the responsibility of providing services for
design, execution & supervision, project management including O&M services on post
commissioning of the project.
2.5.2
Feasibility study on raising the height of the mass gravity concrete dam for possible
increase of live storage of the dam constructed under Phase II of the GSWSP, State Phed
recommend that Central Water Commission (CWC) be requested to provide the necessary
service. CWC as a consultant, provided the necessary design and supervision for the
construction of mass gravity concrete dam at Mawphlang under Phase II of GSWSP.
2.6
Other information.
2.6.1
Detail surveys and investigations have been carried out in respect of different components
considered under the project and according to the assessment, no major utilities are required
to be shifted for implementation of different components of the project.
2.6.2
Necessary clearance shall be required from the State Public Works Department for laying of
feeder main/distribution system along the side of the state roads and from Ministry of
Surface Transport (MoST) for laying of feeder main/distribution system along the side of
national highway and from the Ministry of Forest and Environment for laying of portion of
feeder main along some portion of the forest land.
2.6.3
The project area lies in the seismic region. The basic performance requirements and
compliance criteria for design and construction of building and civil engineering works
including basic rules for the seismic design of the structural aspects of integrated facilities,
composed of pipeline systems and of storage tanks of different types and established
requirements, criteria and rules for the seismic design of tall, slender structures like Intake
towers shall be followed with the sole objectives that human lives are protected, damage is
limited; and structures of vital importance for the system remain operational in the event
of earthquakes. Cost for these special design and construction has been included in the
estimate.
GoM:Phed
404
3.
Project Cost.
Sl.No
3.01
3.02
I
i)
ii)
iii)
iv)
v)
II
i)
III
i)
ii)
IV
i)
ii)
V
i)
VI
3.03
3.04
3.05
3.06
3.07
3.08
3.09
3.10
1.
2.
3.
4.
3.11
3.12
Unit : Rs.
Amount
1,30,91,884.00
Specific components
Land acquisition/site development.
Physical infrastructure component-wise cost
Source development
Type of source
0
Diversion structure
0
Intake & Intermediate structure
6,54,39,807.00
Plant and machinery (raw water pumps, motors, electrical, instrumentation)
7,18,14,900.00
Other structure (staff quarter, approach roads, etc..)
1,58,98,316.00
Raw water transmission system
Raw water transmission main (pumping/gravity)
4,79,26,000.00
Water treatment plant
Civil works, plants & machineries, electrical, etc.
5,67,76,681.00
Laboratory equipments
24,35,814.00
Clear water transmission system
Transmission main (pumping/gravity)
57,27,63,200.00
Booster stations and control rooms
3,67,66,154.00
Service reservoirs
Overhead service reservoirs
21,10,23,600.00
Distribution system
Distribution pipeline
68,30,85,400.00
Environmental compliance cost
0
Rehabilitation & resettlement cost
0
Cost of surveys & investigations
0
Cost of shifting utilities
0
Cost of consultancy services
0
2) Design
0
b) Supervision
0
c) Quality assurance
Other statutory compliance costs if applicable
0
Finance/interest cost during construction
0
Any other:
Electromagnetic Flow meter including UFW assessment and leak deduction
59,53,107.00
programme
Instrumentation, Automation Control & Visualisation System including SCADA
3,00,00,000.00
Chlorinators
15,64,915.00
Consumers meters.
5,50,00,000.00
Total : 1,86,95,39,778.00
Contingency @3%
5,60,86,193.00
Cost for establishing project implementation mechanism and for consultancy charges
towards project preparation (as per CSMC approval in the 25th Meeting on 5.3.2007) at
93,47,699.00
0.5% of the project cost.
Grand Total : 1,93,49,73,670.00
(T.G. Abraham)
Chief Engineer, PHE.,
Meghalaya, Shillong
GoM:Phed
(S.K. Sunn)
Addl. Chief Engineer, PHE.,
Zone-I, Meghalaya, Shillong
405
Land Acquisition
Total :
1.1
Rs.
Rs.
1,30,91,884.00
1,30,91,884.00
Detailed estimate.
Ref : As per current registration value of land fixed by Deputy Commissioner, East Khasi Hills District, Shillong, Meghallaya.
Station
Sl.
No
From
Component of
the Project
To
1.
Stage I
WTP
Part of Rising
Main
2.
WTP
Mawkriah
3.
Mawkriah
Sadew
Amount
Rs.
Rs.
4000
215.00
8,60,000.00
Clear Water
main
12,188
269.00
32,78,572.00
Clear Water
Main
23,812
376.00
89,53,312.00
Total :
1,30,91,884.00
1.4
1.5
Other structures
Rs.
Rs.
Total :
Say :
GoM:Phed
Rs.
Rs.
Rs.
6,54,39,807.00
7,18,14,900.00
1,58,98,316.00
15,31,53,023.00
15,31,53,100.00
406
1.2
Diversion structure.
Diversion structure
1.3
1.3.1
Intake structure.
Sl.
Description
Unit
No.
1
2
3
1. Earthwork in excavation in foundation trenches,
including dressing of sides and ramming of the
bottom including stacking of serviceable stones,
disposal and removal of excavated earth within a
lead of 50m and lift of 1.50m complete as
directed.
e) Hard rock.
M
2. Capacity of twin intake well
Rate
(Rs.)
5
Amount
(Rs.)
6
6000.00
168.00
10,08,000.00
28,27,440.00
10.00
2,82,74,400.00
@ 20%
3. Construction of pump house on top of intake
well. Plinth area of pump house
18.00x10.40
= 187.20m
M
187.20
8100.00
Add cost of internal electrifications of pump house @15%
Add price escalation from 2005-06 to 2008-09 @ 6% p.a. : i.e 24% for item 3
only
4. Construction of approach steel bridge of 40m
span connecting the road with the intake
structure and pump house. The bridge shall have
two parts, the upper part in level with the pump
floor and the lower part in level with pipe
delivery floor. The lower part shall carry the
delivery pipe of MS emerging out of the pump
house and the upper part shall provide walkway
for transportation of machineries, equipments
and personnel. The bridge shall be designed to
carry a load of 10 tons.
56,54,880.00
1x(10.00)x36.00
= 28,27,440.00 Lts
4
Add mechanical works like sluice gates and
penstock, etc
Lts
Qnty.
4
GoM:Phed
15,16,320.00
2,27,448.00
4,18,504.32
70,00,000.00
12,00,000.00
4,52,99,552.32
4,52,99,552.00
407
1.3.2
Intermediate structure.
Sl.
Description
Unit
Qnty.
Rate
No.
(Rs)
1
2
3
4
5
1. Construction of RCC Circular sump of
dia : 10.50m and height of 3.30m
20.00
Ltrs. 8,39,750.00
Capacity : 8,39,750Ltrs.
2. Construction of Pump House for raw
water pumps on RCC framed
construction (RCC Roof) in brick
walling with normal specifications.
Plinth area :
273.00 8,100.00
M
13.00mx21.00m
= 273.00m
Add cost for sanitary fittings @ 7%
(+)
Add cost for internal Electrifications of pump house 15%
(+)
Add price escalation from 2005-06 to 2008-09 @ 6% p.a i.e. 24% for item 3
(+)
Total
:
Say
:
1.4
1.4.1
2.
Particulars
2
Supply, installation, testing & commissioning of vertical turbine pumps of reputed make
viz. Voltas Ltd., Kirloskar Bros. Ltd., Jyoti Ltd., etc. capable of lifting 70Lps of water
against a total head of 112m coupled to 200Kw high tension vertical motors mounted on
a motor stool/pump housing with operating power supply of AC 3 phase, 6.6Kv 10%,
50Hz 5%, complete with foundation bolts, and sets of accessories comprising of
column and bowl assembly with strainer, coupling, ratchet pin housing, ratchet pin etc.
butterfly valve and non-return valve of suitable pressure rating for individual unit
including priming arrangement but excluding motor control center and pump foundation.
For compatibility with VVVF drives, the HT motors shall have phase segregated neutral
terminal box and shall also be suitable for use with VVVF drives i.e. A.C. drives with
speed variation 50% to 100% and with variable torque. The motors shall also have RTDs
and BTDs for winding temperature and bearing temperature measurement. These RTDs
signals will be connected to the PLC for condition monitoring of the HT motors.
@ Rs. 13,000/Kw for 3x170 Kw.
Supply, installation, testing & commissioning of high tension motor control center for
3x170Kw comprising of 1 incoming feeder unit fitted with bus coupler, circuit breaker
and 3 outgoing feeder unit fitted with isolator switches, D.O.L. Starters, voltmeter,
ammeter, sets of pilot lamp including cabling from MCC to motors. The HT panel
board for motors shall be capable to provide the following signals/data to the PLC for
automation/visualization.
Voltage on either side of the bus coupler, current for each outgoing feeder, energy consumed as well as
Amount
(Rs.)
6
1,67,95,000.00
22,11,300.00
1,54,791.00
3,31,695.00
6,47,468.64
2,01,40,254.64
2,01,40,255.00
Amount
(Rs.)
3
66,30,000.00
incoming frequency.
3.
4.
GoM:Phed
The HT panel board shall be capable for switching on/off from local (pump house) or remote (i.e. from PLC
via the MMI).
Basic information of each breaker such as breaker on/off/trip, in test/service position etc. to be informed to
PLC.
Pump foundation, cable trench, cable trays, chequered plate over cable trench etc
Add cost of submersible 20Kw desilting pump coupled with discharge pipe,
submersible cable and MCC
70,00,000.00
25,00,000.00
5,00,000.00
408
5.
6.
Supply, installation, testing & commissioning of horizontal pumps of reputed make viz.
Voltas Ltd., Jyoti Ltd., KSB, Mather & Plat etc. capable of lifting 70Lps of water against
a total head of 190m coupled to 315Kw high tension Horizontal motors mounted on a
common base plate with operating power supply of AC 3 phase, 6.6Kv 10%, 50 Hz.
5%, complete with coupling, coupling guards, foundation bolts, set of accessories
comprising of butterfly valve on both suction and delivery side including non-return
valve with bypass arrangement of suitable pressure rating for individual unit excluding
motor control center and pump foundation. For compatibility with VVVF drives, the HT
motors shall have phase segregated neutral terminal box and shall also be suitable for use
with VVVF drives i.e. A.C. drives with speed variation 50% to 100% and with variable
torque. The motors shall also have RTDs and BTDs for winding temperature and bearing
temperature measurement. These RTDs signals will be connected to the PLC for condition
monitoring of the HT motors.
@ Rs. 13,000/Kw for 3x315Kw.
Supply, installation, testing & commissioning of high tension motor control center for
3x315Kw comprising of 1 incoming feeder unit fitted with bus coupler circuit breaker and
3 outgoing feeder unit fitted with isolator
switches, D.O.L. starter, voltmeter,
ammeter,
sets of pilot lamp including cabling from MCC to motors. The HT panel
board for motors shall be capable to provide the following signals/data to the PLC for
automation/visualization.
Voltage on either side of the bus coupler, current for each outgoing feeder, energy consumed as well as
1,22,85,000.00
incoming frequency.
7.
1.4.2
The HT panel board shall be capable for switching on/off from local (pump house) or remote (i.e. from PLC
via the MMI).
Basic information of each breaker such as breaker on/off/trip, in test/service position etc. to be informed to
PLC.
Pump foundation, cable trench, cable trays, chequered plate over cable trench etc
Total
1,00,00,000.00
25,00,000.00
4,14,15,000.00
Electric power.
Sl.
No.
1
1.
2.
3.
4.
5.
6.
7.
Particulars
Amount
2
Construction of 33/6.6Kv sub:station
@ Rs. 78,83,725.00/each
Installations of 1 no. 33/6.6kv 2.5Mva transformer
@ Rs. 45,47,800.00/each
Installations of 1 no. 33/0.433kv 500Kva transformer
@ Rs. 18,15,120.00/each
Laying of 6.6Kv, 150mm 3 core XLPE underground cable for intake
pumping station.
@ Rs. 4,163.44 for 2x800m
Laying of 6.6Kv, 150mm 3 core XLPE underground cable for intermediate
pumping station.
@ Rs. 4,163.44 for 2x800m
Laying of 3 core 120mm 1.1Kv armoured PVC cable for supply of low
tension power to Intake pump house.
@ Rs. 1099.73/Rm for 800Rm
Laying of 3 core 150mm 1.1Kv armoured PVC cable for supply of low
tension power to Intermediate pump house.
@ Rs. 1295.16/Rm for 800Rm
Total
:
Total
Say
GoM:Phed
:
:
(+)
78,83,725.00
45,47,800.00
18,15,120.00
66,61,504.00
66,61,504.00
8,79,784.00
10,36,128.00
2,94,85,565.00
9,14,335.20
3,03,99,900.20
3,03,99,900.00
409
33/6.6Kv sub:station.
1.4.2.1
Material Description
1
2
Preliminary works
1A
Plan alignments etc.
Civil works
2A
Leveling of S/S retaining wall, fencing
2B
Construction of Control Room building
150Sqm
@ Rs. 8100/m
2C
Water supply and sanitary installation @
7% on 2B
2D
Electrification & S/S lighting @ 10% on
2B
Add 6% p.a. from 2005-06 to 2008-09 i.e. 24%
Construction of 33/6.6Kv 2.5Mva S/S
3 i)
33Kv lightning arrester
Unit
Rate
(Rs.)
5
Amount
(Rs)
6
L.S
25,000.00
L.S
1,65,000.00
12,15,000.00
85,050.00
1,21,500.00
(+)
3,41,172.00
3.00
Set
41,250.00
1,23,750.00
3 ii)
2.00
Nos.
39,600.00
79,200.00
3 iii)
2.00
Nos.
34,100.00
68,200.00
3 iv)
3.00
Nos.
33,000.00
99,000.00
3 v)
3.00
Nos.
14,300.00
42,900.00
3 vi)
3 vii)
1.00
1.00
1.00
1.00
1.00
Nos.
Nos.
Nos.
Nos.
Nos.
2,86,000.00
1,00,000.00
1,00,000.00
3,00,000.00
3,00,000.00
2,86,000.00
1,00,000.00
1,00,000.00
3,00,000.00
3,00,000.00
a) Steel structures
14.80
MT
30552.00
4,52,169.00
3 viii)
3 ix)
3 x)
3 xi)
3 xii)
GoM:Phed
Qty.
LS
91,000.00
LS
1,98,000.00
LS
15,000.00
A
B
3,07,958.00
6,15,916.10
4,92,732.80
61,591.60
(+)
42,07,941.00
19,51,219.00
61,59,160.00
2,46,366.40
78,83,724.80
78,83,725.00
410
1.4.2.2
Sl
No
Item Description
Qty.
Unit
1
a)
2
Supply of 33/6.6Kv, 2.5Mva, ONAN power transformer
3
1
4
No.
b)
Lot
c)
Lot
d)
Ex-works price
e)
Excise duty
f)
Sales tax
g)
Transportation
h)
i)
Total Price
(Rs)
5
37,20,000.00
2,79,000.00
37,200.00
1,11,600.00
[for
1
Lot
4,00,000.00
45,47,800.00
45,47,800.00
1.4.2.3
Sl
No
Item Description
Unit
Total Price
(Rs)
5
1
a)
2
Supply of 33/0.433Kv, 500Kva, ONAN power
transformer
3
1
4
No.
b)
Lot
c)
Lot
d)
Ex-works price
e)
Excise duty
f)
Sales tax
14,880.00
g)
Transportation
44,640.00
h)
i)
14,88,000.00
1,11,600.00
Total
GoM:Phed
Qty.
[for
Lot
1,56,000.00
18,15,120.00
18,15,120.00
411
6.6Kv 120mm 3 core XLPE underground cable for intake pumping station.
1.4.2.4
Sl No.
1
1.
Description
2
Laying of 6.6Kv 120mm 3 core XLPE underground cable in
trench including trenching and refilling of trench
@ Rs. 4163.44 for 2x800m
Total :
Amount (Rs.)
3
66,61,504.00
66,61,504.00
6.6Kv 120mm 3 core XLPE underground cable for intermediate pumping station.
1.4.2.5
Sl No.
1
1.
Description
2
Laying of 6.6Kv 120mm 3 core XLPE underground cable in
trench including trenching and refilling of trench
@ Rs. 4163.44 for 2x800m
Total :
Amount (Rs.)
3
66,61,504.00
66,61,504.00
3 core 120mm 1.1Kv armoured PVC cable for intake pump house.
1.4.2.6
Sl No.
1
1.
Description
2
Laying 3 core 120mm 1.1Kv armoured PVC cable for supply of
low tension power to intake pump house.
@ Rs. 1099.73/Rm for 800Rm
Total :
Amount
(Rs.)
3
8,79,784.00
8,79,784.00
3 core 150mm 1.1Kv armoured PVC cable for intermediate pump house.
1.4.2.7
Sl.
No.
1.
GoM:Phed
Description
Laying 3 core 150mm 1.1Kv armoured PVC cable for supply of low
tension power to intermediate pump house.
@ Rs. 1295.16/Rm for 800Rm
Total :
Amount
(Rs.)
10,36,128.00
10,36,128.00
412
1.4.3
Description
Amount
(Rs.)
1. Supply, dragging, erecting and grouting of steel swaged street lighting pole 9.5m
height as per given designed including excavation of poles pit and foundation
complete.
@ Rs. 13,271.32/Each for 12 Nos.
2. Excavation, foundation concrete preservative treatment etc.
@ Rs. 1000/each for 12 Nos.
3. Supply, laying, testing & commissioning of underground cable of 1100V grade PVC
(aluminium) armoured cable including cost of digging of trenches, sand cushioning
and refilling the same in layers. 3 core x 25mm
@ Rs. 345.47/Rm for 3000Rm
4. Supply, fitting, fixing and commissioning of main road, lighting lanterns on street
lighting pole including commissioning complete with all accessories
250W HPSV BJMIP 50SV
@ Rs. 9,296.74/each for 24 Nos.
5. Supply, fitting and fixing load kontaket miniature circuit breakers (MCB) single
pole 0.05-4 Amp single pole MCB.
@ Rs. 864.06/Each for 12 Nos.
6. Supply, fitting & fixing sheet metal enclosures for DBs when MCB to be used
single pole and neutral
12 way with 200amp rated busbar.
@ Rs. 1210.49/each for 4 Nos.
7. Supply, fitting, fixing isolator single pole with neutral.
@ Rs. 587.88/each for 1 No.
Add price escalation from 2007-08 to 2008-09 @ 6% p.a
Total
Say
1.4.4
(+)
:
:
1,59,255.84
12,000.00
10,36,410.00
2,23,121.76
10,368.72
4,841.96
587.88
14,46,586.16
86,795.17
15,33,381.33
15,33,381.00
1
1.
2.
3.
4.
GoM:Phed
Description
Amount
(Rs.)
2
Supply, dragging, erecting and grouting of steel swaged street lighting pole
9.5m height as per given designed including excavation of poles pit and
foundation complete.
@ Rs. 13,271.32/Each for 25Nos.
Excavation, foundation concrete preservative treatment etc.
@ Rs. 1000/each for 25 Nos.
Supply, laying, testing & commissioning of underground cable of 1100V grade
PVC (aluminium) armoured cable including cost of digging of trenches, sand
cushioning and refilling the same in layers.
3 core x 25mm
@ Rs. 345.47/Rm for 2500Rm
Supply, fitting, fixing and commissioning of main road, lighting lanterns on
street lighting pole including commissioning complete with all accessories
250W HPSV BJMIP 50SV
@ Rs. 9,296.74/each for 50 Nos.
3,31,783.00
25,000.00
8,63,675.00
4,64,837.00
413
1
5.
6.
7.
2
Supply, fitting and fixing load kontaket miniature circuit breakers (MCB) single
pole 0.05-4 Amp single pole MCB.
@ Rs. 864.06/Each for 25 Nos.
Supply, fitting & fixing sheet metal enclosures for DBs when MCB to be used
single pole and neutral
12 way with 200amp rated busbar.
@ Rs. 1210.49/each for 4 Nos.
Supply, fitting, fixing isolator single pole with neutral.
@ Rs. 587.88/each for 1 No.
Add price escalation. from 2007-08 to 2008-09 @ 6% p.a
Total
Say
1.5
Other structures.
1.5.1
(+)
:
:
Description
21,601.50
4,841.96
587.88
17,12,326.34
1,02,739.58
18,15,065.92
18,15,100.00
Amount
Rs.
60,48,766.56
Rs.
60,48,766.56
Rs.
10,88,777.98
Total :
Rs.
71,37,545.54
Say :
Rs.
71,37,546.00
Total :
Add price escalation from 2006-07, 2007-08 to 2008-09 @ 6% p.a.
(+)
Specification
GoM:Phed
1,631.00
10,57,500.00
414
GoM:Phed
14,42,000.00
19,055.00
39,000.00
2,880.00
1,66,875.00
1,31,625.00
1,88,250.00
3,44,250.00
415
(v) Labour for laying soling stone of size 75mm to150mm uniformly to the proper
grade and camber, including filling the interstices with stone chippings. The rate
is also inclusive of applying blindage and earth edging including rolling with 8 to
10 tones roller, complete as directed. Extra for carriage of soling aggregates,
chips, screenings and crusher dust, beyond the initial lead of 200m is payable
under the relevant item of carriage.
Qnty. of metal
= 937.50m
@ Rs.142.00/m
(vi) Consolidation of hard broken stone metals (making water bound macadam)
including rolling the road sub grade to the proper camber, super elevation and
grade using templates, straight edges and spirit levels, in layers not exceeding
100mm to 130mm thick. Dry and wet rolling is then commenced with 8 to 10
tones roller, beginning from the lower edges, including earth-edging 30cm wide
on both sides of the specified quantity. The rate is also inclusive of the
local carriage of all grades of metal, screening and binding materials thereafter
wet rolling again with copious quantity of water complete as directed
(a) With 45mm-90mm metal
Qnty = 487.50m
@ Rs.250.00/m
GoM:Phed
1,33,125.00
1,21,875.00
2,03,250.00
3,63,750.00
= 3750.00m
1,65,000.00
416
(ii) Extra for carriage of earth and stone aggregates stone chips building stones, thup
stones blindage etc. beyond the initial lead of 200 meters including loading and
unloading.
Quarry of stone chip from Laitkor
Distance = 13.00Km.
Qnty. @ 100 %
=
487.50m
Qnty. @ 100 %
=
750.00m
12mm@ 0.18m/10m
=
675.00m
10mm@ 0.09m/10m
=
337.50m
6mm@ 0.18m/10m
=
675.00m
=
2925.00m
@ Rs. (49+9x13) / m
= Rs. 754.00/m
Total :
1.5.4
Staff Quarter
Sl.
Description
No.
1
2
1. Construction of 10 nos. staff quaters with (RCC frame and roof construction)
normal specification.
Total plinth area : 510.00m
@ Rs. 8,100/m
Total
:
Add cost of sanitary fitting @ 7%
(+)
Add cost of electrification @ 10%
(+)
Total
:
1.5.5
22,05,450.00
60,48,766.56
Amount
(Rs)
3
41,31,000.00
41,31,000.00
2,89,170.00
4,13,100.00
48,33,270.00
GoM:Phed
Amount
(Rs.)
3
11,01,519.56
83,000.00
2,76,376.00
7,71,629.42
417
1
2
5. Supply, fitting and fixing load kontaket miniature circuit breakers (MCB) single
pole & neutral 5 to 30 Amp.
@ Rs. 864.06/Each for 83 Nos.
6. Supply, fitting & fixing sheet metal enclosures for DBs when MCB to be used
single pole and neutral
12 way with 200amp rated busbar.
@ Rs. 1210.49/each for 7 Nos.
7. Supply, fitting, fixing isolator single pole with neutral.
@ Rs. 587.88/each for 1 No.
:
Add price escalation from 2007-08 to 2008-09 @6 % p.a.
(+)
Total
:
Say
:
1.5.6
71,716.98
8,473.43
587.88
23,13,303.27
1,38,798.20
24,52,101.47
24,52,200.00
:
:
200.00Rm
200.00Rm
400.00Rm
GoM:Phed
Amount
(+)
3,58,400.00
68,648.00
4,27,048.00
25,622.88
4,52,670.88
4,52,700.00
418
1.5.7
(f)
2.
Description
Amount
2
Supplying, fitting, fixing chain link security fencing 1.83m gate with 7.5cm
mesh of 10SWC G.I. wire quality as per IS 2721 1061 with 3 stirrups of double
plug 125WG GI B/Wire onward moreover portion in the top with MS Angle
intermediate post of 50x50x60mmx2.73m long including 45cm onward lineable
on top 2.3cm cc with corner post, straining post of MS Angle
65mmx65mmx6mmx2.73m with necessary staged. The straining post is to be
provided at 10m cc corner post at every corner including digging foundation for
MS Angle post and filling up the sides after completed of work with
0.45x0.45x0.60m c.c. base for corner straining and end post in c.c. in prop
1:2:4 complete as directed.
Residential colony
: 1000.00Rm
@ Rs. 896.00/Rm for 1000 Rm
Providing fitting and fixing in position steel gates with RSJ posts
(100mmx5mm) with label frame and diagonally brand with MS Angles
(25mmx25mmx6mm) and gasket plate of 100mmx100mmx6m with chain link
wire netting of 10SWGI wire 100mmx100mm diamond mesh including bolts,
nuts hooks etc complete.
@ Rs. 3432.40/m for 20m
3.
68,648.00
9,64,648.00
57,878.00
10,22,526.88
10,22,600.00
3.1
(+)
8,96,000.00
Rs. 4,79,26,000.00
d)
2.
GoM:Phed
Particulars
Unit
Qnty.
2
Earthwork in excavation to the proper level and
grade including light dressing & stacking of
serviceable stone as directed.
2560.00x2.00x1.50
= 7680.00m
Soft or laminated rock
30% of the total length for 7680.00m
Laying of ERW Mild Steel Pipes conforming to
IS: 3589 and having a thickness of 9.5mm below
ground or above ground. The work is inclusive of
carriage of pipes from stockyard to the site within a
distance of 8km, fabrication of all bends and Tees
including supply and fabrication of flanges for
keeping provision for installation of isolation valves,
scour valves and air valves wherever found
necessary. Trenching, sand filling, earth filling,
providing pipe supports, anchor blocks and supply &
installation of valves is exclusive and shall be paid
extra.
500mm dia.
7680.00
83.00
6,37,440.00
Rm
3200.00
7736.98
2,47,58,336.00
Rate
Rs.
5
Amount
Rs.
6
419
1
3.
5.
2
Add cost of specials & valves for installation of
different location of the main viz. non-return valves,
isolation valves, scour valves, air valves, pressure
reducing valves, etc..
@ 15% for Item No.2
Add cost for installation of protective device against
surge pressure for Stage I and Stage II rising main
Construction of valve chamber
6.
4.
7.
8.
9.
`
-
37,13,750.40
90,00,000.00
7,42,750.00
12,37,916.80
1050.00
629.00
6,60,450.00
4576.18
950.00
43,47,371.21
Qtl./Km
5440.32
1.65
(0.569x2560) = 4576.18m
Carriage of MS pipe from PHE store to work site
500mm dia.
MS pipe: 3500.00Rm
@ 152.39Kg/Rm
Add 2% for specials
10.
= 5333.65 qtl.
= 106.67 qtl.
= 5440.32 qtl.
By truck load : 6Km
= 5440.32 qtl.
Compensation to PWD for making the road damage
due to laying of pipeline state road/village road
Black topped road.
4.
Rm
100.00
612.50
Total
:
Add price escalation from 2007-08 to 2008-09 @ 6% p.a. (+)
Total
:
Say
:
53,859.17
61,250.00
4,52,13,123.58
27,12,787.41
4,79,25,910.99
4,79,26,000.00
Rs.
4,36,00,000.00
4.2
Rs.
55,92,420.00
4.3
Rs.
65,61,661.00
4.4
Rs.
10,22,600.00
4.5
Laboratory equipments
Rs.
24,35,814.00
Total
GoM:Phed
Rs.
5,92,12,495.00
420
4.1
2.
Descriptions
Amount
(Rs)
Construction of Civil structure of 8Mld WTP excluding plants & machineries and
equipments but including sludge well and drain for desludging of sludge to safe place
@ Rs. 35,00,000/Mld for 8 Mld.
Construction of overhead reservoirs with sufficient staging for storage of water for
backwashing of filter beds
@ Rs. 20.00/Lts. for 50Kl.
As the WTP is proposed for installation with automation control and visualization
system for compatibility with existing WTP, all the plants & machineries and
equipments proposed under new WTP shall be compatible for automation control
system.
2,80,00,000.00
10,00,000.00
Plants
Motor control center for drives comprising of 1 incoming feeder unit fitted with
MCB, ammeter, voltmeter and sets of pilot lamps, bus bar section comprising of bus
bar with RYB and neutral bus and outgoing feeder units totaling 13 in numbers. Each
outgoing feeder unit shall be fitted with isolator switch/MCB, DOL starter, ammeter
and sets of pilot. The MCC for drives shall be capable to provide the following
signals/data to the PLC for automation/visualization.
Voltage on either side of the bus coupler, current for each outgoing feeder, energy consumed as well as
incoming frequency.
3.
4.2
The panel board shall be capable for switching on/off from local (control room) or remote (i.e. from PLC
via the MMI).
Basic information of each breaker such as breaker on/off/trip, in test/service position etc. to be informed
to PLC.
(+)
Total :
56,00,000.00
2,01,00,080.00
Total :
90,00,000.00
4,36,00,000.00
Particulars
Construction of control room building with panel boards
@ Rs. 30,90,866.00/each
Installations of 1 no. 33/0.433kv 500 Kva transformer
@ Rs. 18,15,120.00/each
Laying of 3 core 150mm 1.1Kv armoured PVC cable for supply of low
tension power.
@ Rs. 1295.16/Rm for 500Rm
Add price escalation from 2007-08 to 2008-09 @ 6% p.a. for item 3
Total
:
Say
:
GoM:Phed
Amount
(+)
30,90,866.00
18,15,120.00
6,47,580.00
55,53,566.00
38,854.80
55,92,420.80
55,92,420.00
421
4.2.1.
Material Description
Qty.
Unit
Rate
(Rs.)
L.S
Amount
(Rs)
Preliminary works
1A
Plan alignments etc.
Civil works
25,000.00
2A
3 i)
3 ii)
4.2.2.
12,15,000.00
85,050.00
1,21,500.00
3,41,172.00
1.00
1.00
Nos.
Nos.
1,00,000.00
1,00,000.00
1,00,000.00
1,00,000.00
1.00
Nos.
3,00,000.00
3,00,000.00
22,87,722.00
2,88,000.00
25,75,722.00
1,28,786.10
2,57,572.20
25,757.22
1,03,028.88
30,90,866.40
30,90,866.40
Sl
No
a)
b)
c)
d)
e)
f)
g)
h)
i)
GoM:Phed
Item Description
Supply of 33/0.433Kv, 500Kva, ONAN power transformer
Supply of erection & earthing material
Design & Engineering
Ex-works price
Excise duty
Sales tax
Transportation
Erection, installation, testing & commissioning [for item
(a) to (c)]
Total for destination price [item (a) to (h)]
Total
Qty.
Unit
1
1
1
No.
Lot
Lot
Total Price
(Rs)
14,88,000.00
1,11,600.00
48,000.00
44,640.00
1,56,000.00
Lot
18,15,120.00
18,15,120.00
422
4.2.3.
Sl.No.
Description
1.
Laying 3 core 150mm 1.1Kv armoured PVC cable for supply of low
tension power to water treatment plant.
@ Rs. 1295.16/Rm for 500Rm
Total :
4.3
Amount
Rs. 6,47,580.00
Rs. 6,47,580.00
6,63,566.00
7.
GoM:Phed
50,000.00
44,91,110.00
9,29,674.00
43,203.00
12,104.90
Amount
(Rs.)
3
:
:
587.88
61,90,245.78
3,71,414.75
65,61,660.53
65,61,661.00
423
4.4
(c)
2.
Description
Amount
2
Supplying, fitting, fixing chain link security fencing 1.83m gate with
7.5cm mesh of 10SWC G.I. wire quality as per IS 2721 1061 with
3 stirrups of double plug 125WG GI B/Wire onward moreover
portion in the top with MS Angle intermediate post of
50x50x60mmx2.73m long including 45cm onward lineable on top
2.3cm cc with corner post, straining post of MS Angle
65mmx65mmx6mmx2.73m with necessary staged. The straining
post is to be provided at 10m cc corner post at every corner including
digging foundation for MS Angle post and filling up the sides after
completed of work with 0.45x0.45x0.60m c.c. base for corner
straining and end post in c.c. in prop 1:2:4 complete as directed.
Water treatment
complex
plant
1000.00Rm
8,96,000.00
68,648.00
9,64,648.00
57,878.88
10,22,526.88
10,22,600.00
4.5
(+)
Laboratory equipments.
Sl.
No.
1
1.
Details of Equipments
Name
Description :
Make
Model
GoM:Phed
:
:
2
Lovibond Spectro photometric
colorimeters
Lovibond
RYBN,
AOCSTintometer,
Gardner,
PtCo/Hazen/APHA, FAC, beta
Carotenem, Iodine, Hess-Ives
Units, Klett (blue filter KS 42), Kreis value Chlorophyll
A&B,
CIE Values, Spectral
England.
Lovibond, England
PFX995
Distributor/
Manufacturer
3
The
Tintometer
Ltd. (UK) Sunjay
Technologies
a
Scientific
Corporation Sunjay
Technologies Pvt.
Ltd., Wadala
Mumbai 400 031
Rate
(Rs)
4
Qnty
8,00,000.00
1 No.
Amount
(Rs.)
6
8,00,000.00
424
1
2.
3.
2
Name
: Cyber scan pH Meter
Description : Colour touch screen cyber
scan PH
6500-2 channel PH/
H
P FET/mV/Ion RS 232,USB,
IRDA meter with PH electrode
EC 6201 30, ATC probe,
electrode holder & universal
power adapter (U.S., U.K.,
Euro, Japan) ORP electrode not
included.
Make
Model
Name
: Singapore
: pH 6500; pH 6000
: Deluxe Bench & Water proof
Turbidity Meters
Description : Cyber scan TB 1000 infrared
Turbidity bench meter
(NTU) with Calibration Kit
(ECTBDIRCALKT)
220V
AC
power
adapter
(EC220ADA800)
Make
Model
: Singapore
: Cyber scan TB1000; TN100
Name
: Conductivity/TDS
meters
Bench
Description : Cyber
scan
Con
6000
conductivity/TDS/Resistivity/
Salinity bench meter with USB,
RJ45,1rDA, SD card reader,
RS232C meter with 4-cell
electrode, integral
electrode
holder, conductivity sachets &
SMPS power adapter.
5.
Make
: Singapore
Model
1,60,650.00
1 No.
1,60,650.00
1,14,000.00
1 No.
1,14,000.00
1,52,550,.00
1 No.
1,52,550,.00
1,21,800.00
1 No.
1,21,800.00
Eutech Instruments,
International trade
links, Kandi Vali
(E)
Mumbai 400 101
Eutech Instruments,
International trade
links, Kandi Vali
(E)
Mumbai 400 101
Name
: Horizontal
Laminar
flow Narang
Scientific
Cabinet
Works Pvt. Ltd.,
Description : With Acrylic glass door and New Delhi 64.
U.V. light complete structure
made
of stainless steel 304
qlty. With cock for gas or
vacuum line.
Size Inside
LFH 2(S/S) 600x600x600mm
Make
Model
GoM:Phed
3
Eutech Instruments,
International Trade
Links, Kandi Vali
(E)
Mumbai 400 101
: India
: NSW 201
425
1
6.
2
3
Name
: Incubator Universal
Narang
Scientific
Description : Temperature upto
70oC. Works Pvt. Ltd.,
Heating elements are placed in New Delhi 64
ribs at the bottom and sides.
Double walled inside anodized
Aluminium/Stainless Steel, the
door has synthetic
Make
Model
8.
GoM:Phed
69,900.00
1 No.
69,900.00
Name
: Oven Universal
Narang
Scientific
Description : Temperature range few degree Works Pvt. Ltd.,
above ambient to 250oC. New Delhi 64
Heating elements are placed in
ribs at the bottom and sides.
Double walled inside anodized
Aluminium/ stainless steel. The
door has synthetic rubber
gasket. Outside mild steel
painted in Epoxy powder
coating
with
perforated
adjustable
shelves,
two
indicators and on/off switch. To
work on 220/230 volts A.C.
With one number air circulating
fan & digital temperature
controller cum-Indicator.
Aluminium Inside
Size inside chamber
OSA-2-355x355x355mm-45
Ltrs
Make
: India
Model
: NSW-143 Super deluxe
24,600.00
1 No.
24,600.00
Name
: Rectangular Muffle Furnace
Description : Outer casing of mild steel
sheet painted in epoxy powder
coating. Working temperature
maximum 900oC. Temperature
control by energy regulator,
with indicators, pyrometer,
thermocouple, silver fuse etc..
16,900.00
1 No.
16,900.00
Narang Scientific
Works Pvt. Ltd.,
New Delhi 64
426
9.
Make
Model
2
Heating elements made of
Kanthal wire special high
temperature alloy to ensure
uniform distribution of heat. To
work on 220/230 volt A.C.
Chamber size inside
MF-1-100x100x225-1.6KW
: India
: NSW-101
Name
: Vertical Autoclave
Narang Scientific
Works Pvt. Ltd.,
New Delhi 64
Dia. Depth
VA-3-355x550mm 50 ltrs.
10.
Make
: India
Model
Name
: NSW-227
: Perfit Water Distillation
11
Make
: India
Model
Name
: 202/08
: Analytical Balance
GoM:Phed
91,400.00
1 No.
91,400.00
29,500.00
1 No.
29,500.00
85,000.00
1 No.
85,000.00
Gupta
Scientific
Industries Ambala
Cantt-133001
Sunjay
Technologies Pvt.
Ltd., Wadala
Mumbai 400 031
: Shimadzu, Japan
: XB220
427
1
12.
Name
2
: Flame Phometer
Description : Micro-controller
based
automation
for
ease
of
operation. Determination upto
four elements with single
aspiration (Na,K,Li and Ca).
Curve fitting correction for nonlinear emission characteristics
of
element,
at
higher
concentration; maximum five
point
calibration.
Storing
facility for Set-Ups and results
(date wise & batch wise,
maximum 700 results); the
same can be recalled whenever
need arise. Four line 20characters
LCD
readout.
Facility for re-standardization
with single standard. Multi
standard graph in dot matrix
print out. Built-in real time
clock for date and time of
analysis. Centronics printer port
provided for print out of results
(simultaneous with analysis or
recalled) on EPSON compatible
Dot Matrix printer; supply of
printer is optional. Printout
facility
for
individual
sample, batch sample, total
days; samples, or entire results
in the memory (700 max.). Air
compressor with built-in air
regulator and air filter. PC Link
software for transferring data to
computer & manipulation of
data in computer using RS232(Optional).
13.
Make
Model
Name
:
:
:
Description :
Make
Model
GoM:Phed
India
FPH
Hot Plate
This is for general purpose
having maximum temperature
370oC with Thermostat and
Pyrometer
Size 455x605mm
3
Loba Chemic Pvt.
Ltd..
Mumbai 400 005
92,150.00
1 No.
92,150.00
22,000
1 No.
22,000
Narang Scientific
Works Pvt. Ltd.
New Delhi - 64
: India
: NSW-225
428
1
14.
15.
2
Water Bath Rectangular (Double
Wall) Thermostatic Control
Description : Temperatures range from few
degree
above
ambient
temperature
to
100oC.
Thermostatic control with an
accuracy of plus minus 0.5oC.
Double walled inside stainless
steel 304 qlty and outside Mild
Steel sheet painted in epoxy
powder coating. Top of the bath
and concentric rings are also of
stainless steel. To work on
220/230 volts A.C.
BRS-2-355x405x100mm size
Make
: India
Model
: NSW-128
Name
: Jar Testing (Floculator)
Description : Stirrer-6
Nos.
: Flocculator has been specially
designed for use in water
treatment plants as Jar Testing
Apparatus to correctly estimate
the dosing of alum and such other
coagulants for treatment of water
and sewage. It provides identical
test conditions for all samples, it
is suitable for continuous run in
any busy laboratory. Illuminator
base consists of fluorescent tube
mounted
below
translucent
plastic plate to provide diffused
cold light through floc samples.
Flocculator consists of geared
continuous run heavy duty 1/20
H.P. variable speed motor
from 10 to 100 RPM with built in
speed control. Stainless steel
stirring rods are provided with
adjustable spacers to adjust the
depth of stirring paddles. The
stirring shaft can be removed
without disturbing other stirrers.
It
is supplied with either
two, four or six stirrers working
on 220 volts A.C. This
unit
is supplied without beakers.
Make
: India
Model
: 11-198
Name
Narang
Scientific Works
Pvt. Ltd.
New Delhi-64
11,400.00
1 No.
11,400.00
25,000.00
1 No.
25,000.00
18,38,350.00
2,29,793.75
1,37,876.25
Macro Scientific
Works,
New
Delhi - 110007
GoM:Phed
(+)
(+)
(+)
:
(+)
:
:
91,917.50
22,97,938.00
1,37,876.28
24,35,814.28
24,35,814.00
429
5.
5.1
Transmission main
5.1.1
d)
2.
3.
4.
5.
6.
7.
GoM:Phed
Description
Unit
2
Earthwork in excavation to the proper level
and grade including light dressing and
stacking of serviceable stone as directed and
removal of spoils upto 30m and all lift.
For 1000mm dia.
70% of the total length
i.e. 70% of 13500 = 9450.00Rm
b) Soft or laminated rock
9450x1.50x2.00
= 28,350.00m
DI :
44563.00x1.50x1.00
= 66,844.50m
= 95,194.50m
Soft or laminated rock
Supplying & laying in trenches including
carrying in line and level socket & spigot
centrifugally cost ductile iron pipes
conforming to IS 8329/94 including clearing
the inside surface of the pipe all complete as
directed.
1000mm
900mm
750mm
300mm
250mm
200mm
150mm
100mm
Add cost of DI specials & valves @ 15% for
item No. 2
Construction of valve chamber @ 3% for item
No.2
Construction of supporting pillars/anchor
blocks @ 5% for item No.2
(iii) Sand filling trenches and in plinth in
20cm layers each including ramming
watering, consolidation complete as directed.
PWD compensation
= 58,063.00
5) Considering 2/3 of total as side berm
portion
(i) Considering 1/3 of total as black topped
portion
Rs.
Rs.
Rs.
Qnty.
Rate
Rs.
4
83.00
95,194.50
Rm
Rm
Rm
Rm
Rm
Rm
Rm
Rm
23,618.30
19,258.36
14,045.74
3,567.05
2,789.93
2,089.29
1,429.22
1,014.09
2976.00
7724.00
2800.00
9530.00
12170.00
9047.00
13270.00
546.00
57,27,63,200.00
3,67,66,154.00
60,95,29,354.00
Amount
Rs.
6
79,01,143.50
7,02,88,060.80
14,87,51,572.60
3,93,28,072.00
3,39,93,986.50
3,39,53,448.10
1,89,01,806.63
1,89,65,749.40
5,53,693.14
36,47,36,388.40
5,47,10,458.20
1,09,42,091.64
1,82,36,819.40
629.00
17,418.90
1,09,56,488.10
Rm
126.00
38,708.67
48,77,292.42
Rm
1,018.00
19,354.33
1,97,02,707.94
430
1
8.
5.1.2
2
3
4
Carriage of DI pipes from PHE store to work
site
5) 1000mm dia. DI pipe: 13500.00Rm
Distance : 13.50Km
@ 421.62 Kg/m
Qtl./Km
1.65
Qnty.
: 56918.70 qtl.
ii) Carriage of cement, rod pipes and fittings
etc. from the PHE store to the work site
including loading and unloading all complete
as directed.
By truck load
Distance : 25km
Qtl/km
1.65
By head load
Distance : 3km
Qtl/km
45.00
Total
:
Add price escalation from 2007-08 to 2008-09@ 6% p.a.
Total
:
Say
:
56918.70
12,67,864.04
19,336.43
7,97,627.74
19,336.43
26,10,418.05
49,67,39,298.50
2,98,04,357.90
52,65,43,656.40
52,65,43,700.00
(+)
2.
3.
4.
5.
6.
7.
GoM:Phed
Particulars
Unit
Qnty.
2
Earthwork in excavation to the proper level and
grade including light dressing & stacking of
serviceable stone as directed.
5250.00
Rm
7500.00
44,12,126.20
30,00,000.00
8,82,425.25
14,70,708.75
5250.00
629.00
33,02,250.00
Rate
Rs.
5
83.00
Amount
Rs.
6
4,35,750.00
3921.89 2,94,14,175.00
431
8.
9.
5678.25
1.65
Rm
126.00
750.00
94,500.00
Rm
Rm
612.50
52.00
5.00
3926.25
3,062.50
2,04,165.00
4,36,03,296.61
26,16,197.78
4,62,19,494.09
4,62,19,500.00
5.2
(+)
:
:
3,84,133.61
Sl.
Description
No
1
2
1. Construction of Pump House for clear water
pumps on RCC framed construction (RCC
Roof) in brick walling with normal
specifications.
Plinth area :
16.30mx11.05m = 180.12m
Add: 7% for sanitary fittings
Unit
Qnty.
180.12
Rate
(Rs)
5
8100.00
Amount
(Rs.)
6
14,58,972.00
1,02,128.04
1,45,897.20
GoM:Phed
Ltrs.
100000
20.00
Total :
Say :
1,20,511.04
4,38,601.99
20,00,000.00
42,66,110.23
42,66,200.00
432
5.2.2
Particulars
1.
2.
Amount
(Rs.)
3
44,20,000.00
as incoming frequency.
3.
5.2.3
The HT panel board shall be capable for switching on/off from local (pump house) or remote (i.e.
from PLC via the MMI).
Basic information of each breaker such as breaker on/off/trip, in test/service position etc. to be
informed to PLC.
Pump foundation, cable trench, cable trays, chequered plate over cable trench etc
Total :
70,00,000.00
25,00,000.00
1,39,20,000.00
Electric power.
Sl.
No.
1
1.
2.
3.
4.
5.
6.
Particulars
Amount
2
Drawal of power line with ACSR raccoon conductor @
Rs. 15,14,766.00/Km for 2 Km.
Construction of 33/6.6KV Sub-Station. @ Rs. 78,83,725.00/each
Installations
of
1 no. 33/6.6kv 500KVA transformer @
Rs. 22,32,000.00/each
Installations of 1 no. 33/0.433kv 250KVA transformer @
Rs. 8,85,560.00/each
Laying of 6.6Kv 150mm 3 core XLPE underground cable for energizing
the motor @ Rs. 4163.44 for 500m
Laying of 3 core 150mm 1.1Kv armoured PVC cable for auxiliary
supply @ Rs. 1295.16/Rm for 500Rm
Add price escalation from 2007-08 to 2008-09 @ 6% p.a. for item No. 1, 5,
&6
(+)
Total
:
Say
:
GoM:Phed
30,29,532.00
78,83,725.00
22,32,000.00
8,85,560.00
20,81,720.00
6,47,580.00
1,67,60,117.00
3,45,529.92
1,71,05,646.92
1,71,05,647.00
433
5.2.3.1
Item Description
Qty.
Unit
1
1.
2.
3
26.00
4
Nos.
8.00
Nos.
2493.52
19,948.16
18.00
66.00
24.00
Nos.
Nos.
Nos.
874.42
806.56
10546.34
15,739.56
53,232.96
2,53,112.16
7.
8.
2
Steel tabular pole-SP-39/9.5M.H/D
33Kv
channel
X-ARM,100*50*6*3050mm
33Kv Y X-ARM, with 75*15*6mm
angle X-ARM
33Kv pin insulator with H/W fitting
33Kv Disc insulator with H/W fitting
HT stay set, with 7/10SWG stay wire
and guy insulator
d)
ACSR Raccoon conductor
Pole Clamp with flat iron (40*6)mm
Rate
(Rs.)
5
12411.17
22.00
3.15
52.00
Set
Km
Nos.
672.83
115676.04
144.27
14,802.26
3,64,379.53
7,502.04
9.
14.80
LS
10,000.00
10.
4.00
2.00
26.00
Set
Nos.
Nos.
1400.12
12241.82
1385.92
5,600.48
24,483.64
36,033.92
3.
4
5.
6.
11.
12.
13.
A
B
C
D
E
F
G
5.2.3.2
LS
5,000.00
11,32,535.13
11,32,535.13
56,626.76
1,13,253.51
11,325.35
45,301.40
33,976.05
1,21,747.53
15,14,765.73
15,14,766.00
33/6.6Kv sub:station.
Sl.No
Material Description
Qty.
Unit
1
2
3
Preliminary works
1A
Plan alignments etc.
L.S
Civil works
2A
Leveling of S/S retaining wall, fencing
L.S
2B
Construction of Control Room building
150Sqm
@ Rs. 8,100/m
2C
Water supply and sanitary installation
@ 7%
2D
Electrification & S/S lighting @ 10%
Add price escalation from 2005-06 to 2008-09 @ 6% p.a i.e. 24%
GoM:Phed
:
:
Amount
(Rs)
6
3,22,690.42
Rate
(Rs.)
4
Amount
(Rs)
5
25,000.00
1,65,000.00
12,15,000.00
85,050.00
(+)
1,21,500.00
3,41,172.00
434
1
2
Construction of 500Kva S/S
3 i)
33Kv lightning arrester
3 ii)
33Kv isolator with earth blade
3 iii)
33Kv isolator without earth blade
3 iv)
33Kv current transformer 2 sets
3 v)
33Kv potential transformer 1 set
3 vi)
33Kv circuit breakers SF6
3 vii)
e) 33Kv C&R panel for transformer
f) 33Kv C&R panel for feeder
3 viii)
e) 6.6Kv indoor panel 4 panel
f) 0.433Kv panel for low tension
supply
3 ix)
Sub-station structure:
a) Steel structures
3 x)
3 xi)
3 xii)
A
B
C
D
E
F
5.2.3.1
3.00
2.00
2.00
3.00
3.00
1.00
1.00
1.00
1.00
Set
Nos.
Nos.
Nos.
Nos.
No.
No.
No.
No.
41,250.00
39,600.00
34,100.00
33,000.00
14,300.00
2,86,000.00
1,00,000.00
1,00,000.00
3,00,000.00
1,23,750.00
79,200.00
68,200.00
99,000.00
42,900.00
2,86,000.00
1,00,000.00
1,00,000.00
3,00,000.00
1.00
No.
3,00,000.00
3,00,000.00
14.80
MT
30552.00
452169.60
LS
91000.00
LS
198000.00
LS
15000.00
Add price escalation from 1997-98 to 2008-09 @ 6% p.a for item No. 3
Total cost of equipments.
Transportation Charge @ 5% on the cost of equipments
Erection charge @ 10% on the cost of equipments
Grouting charge @ 8% on the cost of equipment
Insurance charge @ 1% on the cost of equipments
Central & Sales tax charge @ 4% on the cost of equipments.
Total
:
Say
:
(+)
42,07,941.00
19,51,219.00
61,59,160.00
3,07,958.00
6,15,916.00
4,92,732.80
61,591.60
2,46,366.40
78,83,724.80
78,83,725.00
Sl
No
1
a)
b)
c)
d)
e)
f)
g)
h)
i)
GoM:Phed
Item Description
Qty.
Unit
2
Supply of 33/6.6Kv, 500Kva, ONAN power transformer
Supply of erection & earthing material
Design & Engineering
Ex-works price
Excise duty
Sales tax
Transportation
Erection, installation, testing & commissioning [for
item (a) to (c)]
Total for destination price [item (a) to (h)]
Total
:
3
1
1
1
4
No.
Lot
Lot
Total Price
(Rs)
5
18,00,000.00
1,26,000.00
18,000.00
54,000.00
2,34,000.00
1
Lot
22,32,000.00
22,32,000.00
435
5.2.3.4
Sl
No
1
a)
b)
c)
d)
e)
f)
g)
h)
Item Description
2
Supply of 33/0.433Kv, 500Kva, ONAN power transformer
Supply of erection & earthing material
Design & Engineering
Ex-works price
Excise duty
Sales tax
Transportation
Erection, installation, testing & commissioning [for item
(a) to (c)]
Total for destination price [item (a) to (h)]
Total
:
i)
5.2.3.5
Qty.
Unit
3
1
1
1
4
No.
Lot
Lot
Total Price
(Rs)
5
7,44,000.00
55,800.00
7,440.00
22,320.00
1
Lot
56,000.00
8,85,560.00
8,85,560.00
Sl No.
1
1.
Description
2
Laying of 6.6Kv 120mm 3 core XLPE underground cable in trench
including trenching and refilling of trench
Amount (Rs.)
3
20,81,720.00
20,81,720.00
5.2.3.6
Sl No.
1
1.
5.2.4
Description
2
Laying 3 core 150mm 1.1Kv armoured PVC cable for supply of low
tension power.
@ Rs. 1295.16/Rm for 500Rm
Total :
Amount (Rs.)
3
External electrification.
Sl.
Description
No
1
2
1. Supply, dragging, erecting and grouting of steel swaged street lighting pole 9.5m
height as per given designed including excavation of poles pit and foundation
complete.
@ Rs. 13,271.32/Each for 8Nos.
2. Excavation, foundation concrete preservative treatment etc.
@ Rs. 1000/each for 8 Nos.
GoM:Phed
6,47,580.00
6,47,580.00
Amount
(Rs.)
3
1,06,170.56
8,000.00
436
1
2
3. Supply, laying, testing & commissioning of underground cable of 1100V grade
PVC (aluminium) armoured cable including cost of digging of trenches, sand
cushioning and refilling the same in layers.
3 core x 25mm
@ Rs. 345.47/Rm for 2000Rm
4. Supply, fitting, fixing and commissioning of main road, lighting lanterns on street
lighting pole including commissioning complete with all accessories
250W HPSV BJMIP 50SV
@ Rs. 9,296.74/each for 16 Nos.
5. Supply, fitting and fixing load kontaket miniature circuit breakers (MCB) single
pole 0.05-4 Amp single pole MCB.
@ Rs. 864.06/Each for 8 Nos.
6. Supply, fitting & fixing sheet metal enclosures for DBs when MCB to be used
single pole and neutral
12 way with 200amp rated busbar.
@ Rs. 1210.49/each for 2 Nos.
7. Supply, fitting, fixing isolator single pole with neutral.
@ Rs. 587.88/each for 1 No.
Add price escalation from 2007-08 to 2008-09@ 6% p.a.
Total
Say
5.2.5
:
:
6,90,940.00
1,48,747.84
6,912.48
2,420.98
587.88
9,63,779.74
57,826.78
10,21,606.52
10,21,607.00
Security fencing.
Sl.
Description
No.
1
2
1. Supplying, fitting, fixing chain link security fencing 1.83m gate with
7.5cm mesh of 10SWC G.I. wire quality as per IS 2721 1061 with
3 stirrups of double plug 125WG GI B/Wire onward moreover portion
in the top with MS Angle intermediate post of 50x50x60mmx2.73m
long including 45cm onward lineable on top 2.3cm cc with corner post,
straining post of MS Angle 65mmx65mmx6mmx2.73m with necessary
staged. The straining post is to be provided at 10m cc corner post at
every corner including digging foundation for MS Angle post and
filling up the sides after completed of work with 0.45x0.45x0.60m c.c.
base for corner straining and end post in c.c. in prop 1:2:4 complete as
directed.
(d) 6 mile pumping station
: 400.00Rm
@ Rs. 896.00/Rm for 400 Rm
2. Providing fitting and fixing in position steel gates with RSJ posts
(100mmx5mm) with label frame and diagonally brand with MS Angles
(25mmx25mmx6mm) and gasket plate of 100mmx100mmx6m with
chain link wire netting of 10SWGI wire 100mmx100mm diamond mesh
including bolts, nuts hooks etc complete.
@ Rs. 3432.40/m for 20m
Add price escalation from 2007-08 to 2008-09@ 6% p.a.
Total
Say
GoM:Phed
(+)
:
:
Amount
3
3,58,400.00
68,640.00
4,27,040.00
25,622.40
4,52,662.40
4,52,700.00
437
6.
Service reservoirs
6.1
6.2
6.3
6.4
Booster Stations/Control
Equipment)
Rs. 21,10,23,546.00
0
Rooms
(Civil,
Plant,
Total :
Say :
6.1
0
Rs. 21,10,23,546.00
Rs. 21,10,23,600.00
6.2
6.2.1
Service reservoirs.
Sl.
Description
No.
1. Construction of service reservoirs of capacity 11.64Mld.
@ Rs. 18/Lt for 1,16,40,000lts.
6.2.2
Amount
Rs. 20,95,20,000.00
GoM:Phed
(+)
:
:
Amount
3
10,75,200.00
3,43,240.00
14,18,440.00
85,106.40
15,03,546.40
15,03,546.00
438
6.3
6.4
7.
Distribution system.
7.1
7.1
Rs. 68,30,85,400.00
Distribution networks.
Sl.
No.
1
1.
Description
Unit
2
Earthwork in excavation to the proper level
and grade including light dressing and
stacking of serviceable stone as directed and
removal of spoils upto 30m and all lift.
a)
b)
c)
GoM:Phed
Rate
Rs.
4
Qnty.
5
Amount
Rs.
6
24,910.92m
39.00
2,46,746.20
96,23,102.75
30% of total
Loose boulder above one size or soil mixed
with boulder above one man size of soft shale.
54.00
1,85,059.66
99,93,221.75
30% of total
63.00
1,85,059.66
1,16,58,758.58
439
1
2.
2
Supplying and lying in trenching including
carriage within 8km of ISI marked
centrifugally cast (spun) Ductile Iron pipes
with socket and spigot end conforming to IS
829/2000 in standard length of 4.00mt to
6.00mt suitable for push on join (rubber gasket
D.join) complete.
500mm
450mm
400mm
350mm
300mm
250mm
200mm
150mm
100mm
3.
4.
5.
6.
7.
8.
Rm
Rm
Rm
Rm
Rm
Rm
Rm
Rm
Rm
7,736.98
6,531.84
5,456.17
4,445.31
3,567.05
2,789.93
2,089.29
1,429.22
1,014.09
59.00
1,107.11
3,010.69
5,592.19
13,776.77
7,384.70
23,427.14
36,826.23
1,81,676.10
4,56,481.82
72,31,465.38
1,64,26,836.46
2,48,59,018.13
4,91,42,427.43
2,06,02,796.07
4,89,46,089.33
5,26,32,784.44
18,42,35,916.20
(-)
-
40,45,33,815.20
2,02,26,690.75
6,06,80,072.25
1,21,36,014.45
2,02,26,690.76
629.00
53,870.40
3,38,84,481.60
Rm
126.00
1,91,001.95
2,40,66,245.70
Rm
1,018.00
81,851.98
8,33,31,393.10
1.65
85,164.47
:
(+)
:
:
35,13,034.39
64,44,20,134.80
3,86,65,208.00
68,30,85,342.90
68,30,85,400.00
By truck load
Distance : 25km
Qtl/km
Total
Add price escalation from 2007-08 to 2008-09@ 6% p.a.
Total
Say
GoM:Phed
440
Particulars
Location
2
Supply,
installation,
testing
and
commissioning
of
electromagnetic
induction flow meter with accessories
comprising expander-reducer, remote
panel based display and tantalizer
including inter connecting cables complete
as directed.
a)
DN-1000
b)
Qnty. :
1 no.
@ Rs. 4,77,000/each
DN-400
c)
Qnty. :
1 no.
@ Rs. 2,31,000/each
DN-350
d)
Qnty. :
1 no.
@ Rs. 2,20,000/each
DN-300
e)
Qnty. :
7 nos.
@ Rs. 2,05,000/each
DN-250
f)
Qnty. :
1 no.
@ Rs. 1,70,000/each
DN-200
3
1000mm dia feeder main at 6th Mile
4,77,000.00
i)
2,20,000.00
i)
14,35,000.00
1,70,000.00
Bifurcation point between Zone I, Zone VI
& Zone VIII.
Qnty. :
1 no.
@ Rs. 1,09,000/each
GoM:Phed
Amount (Rs.)
1,09,000.00
441
1
2.
3.
2
Construction of metering room for housing
the inverters and its accessories at different
installations of size 3.00mx3.00m.
Qnty. : 12 nos. x 9m
: 108.00m
@ Rs. 8100.00/m
Add 7% electrification
Add 10% water and sanitation
8,74,800.00
61,236.00
87,480.00
(+)
(+)
i)
2.
i)
Make-INDO-Hongkong
Capacity : 800 VA
Battery : 1x(12volts/180AH)
Qnty. :
10 nos.
@ Rs. 19,200.00/set
17,400.00
Bifurcation point at 6 mile transfer
main to Laitkor .
v)
x)
3.
Make-Sukam
Capacity : 1400 VA
Battery : 2x(12volts/180AH)
Qnty. : 1 no.
@ Rs. 38,880.00/set
2.
(+)
:
:
38,880.00
39,13,796.00
11,00,000.00
2,34,827.76
52,48,623.76
52,48,700.00
GoM:Phed
Particulars
Location
Amount (Rs.)
3,00,00,000.00
3,00,00,000.00
442
3.
Particulars
Location
A m o u n t (Rs.)
1.
Supply,
installation,
testing
and
commissioning of chlorination meter with
capacity of 5Kg/hr. including supply of toners
complete as directed..
a) Flow rate
: 2.57ml/hr
Qnty.
: 1 nos.
@ Rs. 1,00,000/each
b)
c)
d)
2.
No. of toners
: 2 nos.
@ Rs. 36,500.00/each
Flow rate
: 0.40ml/hr
Qnty.
: 1 no.
@ Rs. 1,00,000.00/each
No. of toners
: 1 nos.
@ Rs. 36,500.00/each
Flow rate
: 2.97ml/hr
Qnty.
: 1 no.
@ Rs. 1,00,000.00/each
No. of toners
: 2 nos.
@ Rs. 36,500.00/each
Flow rate
: 1.99ml/hr
Qnty.
: 1 no.
@ Rs. 1,00,000.00/each
73,000.00
WTP at Mawphlang GSWSP (Phase
III)
1,00,000.00
36,500.00
1000mm dia. gravity feeder main of
GSWSP (Phase III) at 6th mile Upper
Shillong
1,00,000.00
73,000.00
4 mile reservoir
(Phase I & II)
of
GSWSP
1,00,000.00
No. of toners
: 2 no.
@ Rs. 36,500.00/each
Construction of metering room for housing the
chlorination meter and its accessories
complete as directed of size 4.00mx4.00m.
Qnty. : 4 nos. x 16m
: 64.00m
@ Rs. 8100.00/m for 64m
Add 7% electrification
Add 10% water and sanitation
Total
Add price escalation from 2005-06 to 2008-09 @ 6% p.a i.e. 24%
Total
Say
4.
1,00.000.00
73,000.00
(+)
(+)
:
:
:
5,18,400.00
36,288.00
51,840.00
12,62,028.00
3,02,886.72
15,64,914.72
15,64,915.00
Description
Amount
(Rs.)
GoM:Phed
5,50,00,000.00
5,50,00,000.00
443
4.
4.1
4.1.1
State Phed is a well structured organization with proper hierarchy and which has at its
disposal technical competent engineers in the cadre with well acquired experiences in
project design, project execution & supervision, project management including O&M
services of major urban water supply system, shall undertake the responsibility for various
phases of construction of the project.
4.1.2
State Phed comes under the administrative control of Commissioner & Secretary. At the
directorate/operational level, Chief Engineer is the head of Phed and is responsible for
overall management. The office of Chief Engineer, Phed; comprise of 2 wings
viz. Administrative Wing and Technical Wing. In addition to, there are Monitoring Cell,
Human Resource Development and Sanitation Cell. Pheds operations are divided into
Zones and Circles. Each zone is headed by Additional Chief Engineer and each Circle is
headed by Superintending Engineer. Under the Circles, there are Divisions and under the
Division, there are Sub:Divisions. While the Divisions are controlled by the Executive
Engineers, the Sub:Divisions are controlled by the Sub:Divisional Officers.
4.1.3
Providing water supply to all urban areas in the state is the responsibility of State Phed. The
Greater Shillong Water Supply Project (Phase I & II) was implemented by State Phed and
falls under the purview of Additional Chief Engineer, Zone-I. Under Additional Chief
Engineer, Zone-I, the Superintending Engineer, Greater Shillong Circle is responsible for
water supply services and Superintending Engineer, Electrical Circle is responsible for
production from Umiew river which includes pumping and treatment. An organization
chart of Phed structure to be involved in construction phases of the project is given in
Fig.4.1.
Minister
i/c PHE Department
Principal Secretary
PHE Department
Chief Engineer
EE
Planning : Design Cell
EE
Investigations : Planning
EE
Monitoring
S.E.
G.S. Circle, Shillong
E.E.
GSWS Division I
Shillong
S.D.O.
Colony Sub:Division
Shillong
S.D.O.
Water Main Sub:Division
Shillong
EE
Resource Management
CAO cum VO
S.E.
Electrical Circle, Shillong
E.E.
GSWS Division II
Mawphlang
S.D.O.
Dam Sub:Division
Mawphlang
S.D.O.
Reservoir Sub:Division
Mawphlang
E.E.
Electrical Division
Mawphlang
E.E.
Electrical Division
Shillong
S.D.O.
Electrical Sub:Division
Mawphlang
S.D.O.
Electrical Sub:Division
Shillong
Figure : 4.1
GoM:Phed
444
4.1.4
The project shall be implemented by State Public Health Engineering Department through
State Level Nodal Agency (MUDA). For improved co-ordination and/or working
arrangement, the state government in the UAD has notified a mission team of JNNURM,
Shillong, for identification, review and monitoring the projects of JNNURM as well as
review of implementation of the reforms agenda as required under the programme. The
team under the Chairmanship of Secretary, UAD comprise among others officers from
UAD, MUDA, C.E./Addl. C.E, Phed and PWD.
4.2
4.2.1
Construction works under the project are envisaged to be tendered out under the
supervision/management of state Phed. For the purpose of tendering, different components
of the project shall be brought under different packages.
4.2.2
The contract for procurement of pipes viz. MS, DI & GI is proposed to be tendered
separately under separate package and the contract for other packages shall include turnkey
jobs comprising components of civil works, machineries/equipments, erection and
commissioning. Tenders shall be invited in accordance with competitive bidding
procedures.
4.3
4.3.1
State Phed shall provide the necessary services required for O&M on post commissioning
period of the project.
4.4
4.4.1
State Phed which is a well structured organization with proper hierarchy and has at its
disposal technical competent engineers in the cadre with well acquired experiences in
project design, project execution & supervision, project management including O&M
services of major urban water supply system shall undertake the responsibility for the entire
construction phases of the project.
4.4.2
Areas of involvement of the private sector in the construction phases is indicated table 4.4.2.
Table 4.4.2
Project Feasibility Study
Project Engineering Design
Specialized Surveys
Construction Works
Supervision Consultants
Quality Assurance Consultants
Any other
GoM:Phed
x
x
x
x
x
x
Feasibility study on raising the height of the mass gravity concrete dam for
possible increase of live storage of the dam constructed under Phase II of
the GSWSP, State Phed recommend that Central Water Commission
(CWC) be requested to provide the necessary service. CWC as a consultant,
provided the necessary design and supervision for the construction of mass
gravity concrete dam at Mawphlang under Phase II of GSWSP.
445
4.5
4.5.1
Brief description of strategy for the overall works programme including information on
indicative packages for tendering is indicated in table 4.5.1.
Table 4.5.1
GoM:Phed
List of tender
packages
Package Description
Amount
Rs.in lakhs
1.
Package No.1
2.
Package No.2
9019.93
3.
Package No.3
2503.71
4.
Package No.4
1289.14
5.
Package No.5
2290.10
6.
Package No.6
1132.99
7.
Package No.7
3839.72
8.
Package No.8
2343.04
9.
Package No.9
59.53
10.
Package No.10
Installation of chlorinators.
15.65
11.
Package No.11
Construction of buildings
48.33
12.
Package No.12
71.38
550.00
446
5.
5.1
5.1.1
Sl
No
1.
2.
Govt.
Central
State
3
4.
5.
6.
7
8.
9.
ULB/
Parastatal
Amount
(Rs.lakhs)
% share
by
specific
source
90.00
9.80
ACA Grant
Grant towards its share in
project
Loan taken by state govt.
towards its share in project
Devolved funds
Own surplus resources
Debt/term loan taken from
state govt.
Debt /term loan taken from
bank/FI
Debt from accessing capital
market
21889.34
2383.51
Private
equity/community
resource funding; others.
48.64
0.20
24321.49
100%
% share by
govt. entity
Remarks on when
and how stage and
ULB shares would be
arranged.
Not applicable
5.1.2
SCB is one of the beneficiary. SCB may be requested to finance a part of the cost of the
project say for an amount of Rs. 46.64 lakhs which works out to 0.2% of the cost. The
balance 9.8% of the cost being the state share, MoDONER may be requested to finance.
5.2
5.2.1
The GSWSP (Phase I & II) was implemented with the budgetary allocation under the state
plan outlay. The project implementation which commenced in the year 1978-79 dragged on
for almost 3 decades to complete the project on account of resource constraint under the
state plan. Availing loan from financial institutions to finance part of the cost for
implementation of project was only possible in 1983 where a one time loan of Rs. 250 lakhs
was extended by LIC. Though sincere efforts were made to explore the possibility of
availing additional plan loan, LIC expressed extreme difficulty to extend additional plan
loan on account of huge outstanding dues payable by the state government who stands
guarantor on behalf on State Electricity Board. Loan from other financial institutions
viz. HUDCO though applied and sincerely pursued in 1999-2000, did not materialize.
Completion of the GSWSP (Phase I & II) was only possible when the project was included
for finance under Non-Lapsable Central Pool of Resources (NLCPR) by MoDONER in
1998-99. DoNER finance a total amount of Rs. 3579.00 lakhs for the project. SCB is one of
the beneficiary.
GoM:Phed
447
5.2.2
Like any other state government departments and/or state government undertakings MUDA
is mainly dependent upon the grants provided by the state budget for their operation.
Likewise, SMBs financial position is in precarious condition and could barely manage their
establishment. The endeavours made by the Board to augment their revenues will take
sometime to fructify. Under the circumstances, considering the credit worthiness of the
agencies at this juncture, availing loan from financial institutions to finance part of the cost
for implementation of the project would be met with negative response.
5.2.3
In this part of the country, water is considered as a free gift of nature. As such, charging for
water is not liked by the people. Providing water supply was not considered to be a
commercial or even a no-profit-no-loss activity. Considering the present scenerio, there is
very little chance for private sector to participate in financing construction of infrastructure
project.
5.2.4
Having examined the scope and options for institutional debts and/or private sector
participation, Shillong Cantonment Board being one of the main beneficiary, may be
persuaded to finance some amount towards the cost of the project. For remaining percentage
of State share towards the cost of the project, MoDONER may be approached to finance the
same.
6.
Project phasing.
6.1
6.1.1
6.1.2
The responsibility for various phases of construction of the project shall be undertaken by
the State Phed. Schedule for tendering/selection for procurement of other services viz.
consultant/firms for supervision etc. is not further required.
6.2
Schedule for bringing in State level and ULB level contributions to the
project.
6.2.1
As mentioned in Para 5.1.2, SCB is one of the beneficiary. SCB may be requested to furnish
a part of the cost of the project for an amount of Rs. 50.00 lakhs which is 0.02% of the cost.
The balance 9.8% of the cost being the state share which works out to Rs.2459.01,
MoDONER may be requested to finance.
6.2.2.
GoM:Phed
448
6.3
6.3.1
Necessary clearance shall be required from the State Public Works Department for laying of
feeder main/distribution system along the side of the state roads and from Ministry of
Surface Transport (MoST) for laying of feeder main/distribution system along the side of
national highway and from the Ministry of Forest and Environment for laying of portion of
feeder main along some portion of the forest land. The schedule for obtaining clearances are
indicated in table 6.3.1.
Table 6.3.1
Sl
No.
Clearance date
List of clearance to be
2008-09
Q3
1.
2.
MoST
3.
State PWD
2009-10
Q4
Q1
Q2
6.4
6.4.1
Detail surveys and investigations have been carried out in respect of different components
considered under the project and according to the assessment, no major utilities are required
to be shifted for implementation of different components of the project.
6.5
6.5.1
GoM:Phed
449
Table 6.5.1
Tender packages
Package description
Package
No.
Source development
i)
Type of source
ii)
Diversion structure
iii)
Intake structure
iv)
v)
Other structure
Offices, housing
Roads, etc..
II
i)
III
i)
ii)
iii)
iv)
Rapid mixing
v)
vi)
vii)
viii)
IV
i)
ii)
Service reservoirs
i)
ii)
iii)
iv)
VI
Distribution system
i)
Distribution pipeline
Release
date
2008-09
Q2
Tendering
Award date
2008-09
Q3
Q4
2009-10
Q1
Q2
Completion
Schedule date
Q1
2008-2009
Q2
Q3
Q4
Q1
2009-2010
Q2
Q3
Q4
Q1
2010-2011
Q2
Q3
Q4
7.
7.1
7.1.1
The State Phed which is responsible for project design, project execution & supervision and
project management shall also be engaged in O&M services of the created infrastructure
assets/enhanced infrastructure assets. Re-organisation of available technical man power and
staff under State Phed shall be carried out for the purpose.
7.1.2
Cost recovery is being implemented from consumers provided with individual service
connection to households and other institutions through unmetered supply as well as bulk
supply. The extent of cost recovery is not satisfactory as realization of charges from all
bulk consumers could not be effected. The extent of cost recovery during the last 5 years
has already been indicated in table 1.5.2.
7.1.3
Despite the high cost of production of water as a result of very high electricity charges
levied on public water works in the state water is supplied to some bulk consumers free of
cost without any charges. Under the project, the strategy for cost recovery aims at recovery
expenditure for O&M charges, shall be fully implemented. Therefore, to incorporate proper
financial discipline in cost recovery measures, institutional and financial performance
described here below are under serious considerations.
To realize the cost of production and supply of water from the consumers as per the new tariff.
Metering and consumer survey programme : to undertake a time bound metering programme for all
Industrial, Commercial & Industrial users and also to introduce production meters and zonal meters.
Management water users: To stress the importance of a proper meter reading, billing collection and
repair programme to ensure cash flow.
Periodical revision of water tariff : to stress the importance of periodical revision of the water tariff for
all category of supply to ensure that the tariff rates are applicable to meet the cost of O&M.
7.1.4
7.1.5
The annual requirement of man power, energy, spares and consumable etc. for O&M of the
project on the basis of existing usage norm has been worked out and explicitly defined.
7.1.5.1
Requirement of man power has been considered on the basis that each personnel is to work for 8
hrs. a day. The pumping stations, water treatment plants are designed for operation 24 hrs. a day.
Technical personnel and helpers shall be deployed to operate and monitor the performance of
the machineries and other associated equipments. A group of technicians and helpers shall be
assigned for different stations and each group shall work for 8 hrs. a day. For 24 hrs. operation
of the plant, the number of groups required for each station would be 4. The duty shall be on
roaster basis i.e. morning, evening, night and off after performing 2 night duty continuously.
GoM:Phed
451
The arrangement of shift duty for a particular station with 4 groups of technicians and helper is
indicated in Table 7.1.5.1
Table 7.1.5.1
Grouping of operating
personnel
Day
1
Group I
Group II
Group III
Group IV
7.1.5.2
On the basis of the above arrangement, the requirement of manpower for consideration under
the project is indicated in table 7.1.2.
Table 7.1.2
Designation of
technical personnel
33/6.6Kv
Sub:station
Stage I pumping
system
Stage II pumping
system
WTP
Clear water
pumping system
1. Tech. Gr.I
2. Helper/Khalasi
3. Security Guard
For 4 groups
Tech. Gr.I
Helper
Security Guard
Staff for shift duty requirement
Staff for non shift duty requirement
Staff for laboratory
Total
7.1.5.3
:
:
:
:
:
:
:
4 x 5 = 20
4 x 7 = 28
4 x 4 = 16
64
3
1
68
Requirement of power required under the project (Phase III) is indicated in table below:
Table 7.1.3
GoM:Phed
Period
Year
Water requirement
Mld
Demand
Kva
Initial
2011
49.06
4112
23,68,238
Intermediate
2021
58.06
4728
27,23,436
Ultimate
2026
62.88
5058
29,13,653
452
7.1.5.4
Spares required for fast moving items of plant and machineries shall be assessed and required to
be kept in stock to meet emergency requirement. Consumables and lubricants for machineries
including chemicals for treatment of water. Detailed calculation on the requirement of chemicals
was arrived at and indicated in the design for WTP.
7.2
7.2.1
The steep increase in O&M of water works vis--vis inapplicability of the existing rates of
water charges to commensurate with the expenditure necessitated state Phed to reframe the
water tariff, revising and refixing the standard rates and charges for different category of
supply. The revised water tariff as finalized has already been indicated in Table 1.5.3.
7.2.2.
Experiences, indicate that SEB revised its electricity tariff every year since 2001. The
corresponding increase in electricity tariff is about 10 to 15%. To keep pace with the
increased cost of energy and other inputs, the water tariff is proposed to be revised in every
alternate year @30% to ensure the project self sustainability.
8.1
8.1.1
The complete supporting project cash flow projections alongwith underlying assumptions
have been presented in Annexures. The likely O&M cost, status of water supply, water
supply tariff and expected revenue generation from the project upto 2024-25 has been
bought out and indicated in Annexures. The graph of O&M cost versus expected revenue to
be generated, established the self sustainability of the project during the next 15 years
including recovering the capital cost. Following Annexures provide information on
financial viability and sustainability.
Annexure 4a
Annexure 4c
Annexure 4d
Annexure 4e
Water tariff, standard rates and charges and propose hike in rates.
GoM:Phed
453
9.
9.1
9.1.1
Comments
Yes
Yes
To improve
To improve
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
9.2
9.2.1
The proposed project would influence the environment in two distinct phases.
Identification of adverse impacts facilitates planning for possible counter measures and also
recognize possible trade-offs in taking up the project. The project dis-benefit assessment is
indicated in table 9.2.1
Table 9.2.1
Sl.
Societal adverse impacts
No.
1.
Pollution; environmental distortions
GoM:Phed
Comments
Little or no effect
2.
Negligible
Negligible impact
3.
Do not foresee
No impact
4.
Little chances
5.
Displacement of inhabitants
No displacement of inhabitant
6.
No
7.
Possible
haphazard
development
around/ adjacent project site areas
(e.g. Resulting in slums)
No impact
Possibility is ruled out.
454
Annexure : 2
Package description
Contract
type
Unit/rate/
turnkey
percentage/
others
Unit rate
Percentage
Cost
Tendering
Flow of fund.
2008-09
2010-11
4019.93
5000.00
Turnkey
1000.00
1000.00
503.71
Turnkey
1000.00
289.14
Percentage
Turnkey
1000.00
132.99
Construction of reservoir
Percentage
2300.00
43.04
Percentage
3800.00
39.72
Unit rate
59.33
10
Installation of chlorinators.
Unit rate
15.65
11
Construction of buildings
Percentage
48.33
12
Percentage
50.00
500.00
16273.31
1508.60
Total :
GoM:Phed
71.38
2009-10
290.10
5381.41
2000.00
Release
date
2008-09
Q2
Completion
Award date
2008-09
Q3
Q4
2009-10
Q1
Q2
Schedule date
Q1
2008-2009
Q2 Q3
Q4
Q1
2009-2010
Q2
Q3
Q4
Q1
2010-2011
Q2 Q3
Q4
455
Annexure : 3
Schedule for financial contribution and sources
Sl
No
Sources
Q1
Q2
FY 08-09
Q3
Q4
Total
Q1
GoI
State
ULB
Others
Total
Q2
FY 09-10
Q3
Q4
48.64
6566.80
FY 09-10
FY 10-11
Total
Schedule amount
Schedule amount
Schedule amount
Total
5472.33
5472.33
10944.66
10944.66
4377.87
21889.33
1191.75
1191.75
2383.51
2383.51
2383.51
48.64
48.64
13328.17
13328.17
4377.87
6615.44
24323.48
GoM:Phed
For year of sanction of project and following year, provide quarterly schedule (month-year and amount). For subsequent years provide annual schedule month-year and amount.
456
Annexure 4a
Unit: Rs. in lakhs
Particulars
2009
Block 1I Duration
2010
2011
4377.87
2026
2041
2691.05
4400.32
6566.80
5472.33
5472.33
1191.76
1191.76
48.64
6615.44
6664.09
6664.09
4377.87
6605.44
6654.09
6654.09
4367.87
10.00
10.00
10.00
10.00
6615.44
6664.09
6664.09
4377.87
Outflows
Capital expenditure (Note 1)
Interest during construction
Project related Establishment charges
Others (Please specify)
34.87
34.87
34.87
1535.34
1252.13
1293.13
1418.13
56.66
1287.00
1328.00
1453.00
1595.00
1287.00
1328.00
1453.00
1595.00
2587.00
4044.00
1287.00
1328.00
1453.00
1595.00
2587.00
4044.00
104.05
356.32
104.05
356.32
GoM:Phed
457
Annexure 4c
Particulars
1
2008
2011
2026
2041
Electricity
600
750
1560
2784
10
13
20
25
Consultancy/Professional charges
Office Maintenance
Communication Expenses
10
Insurance
Consumption of Stores
150
200
350
450
142
184
200
300
Bank charges
380
442
450
475
Total :
1287
1595
2587
4044
GoM:Phed
458
Annexure 4d
Statement showing O&M cost, rate of supply, water tariff and expected revenue generation.
The proposed tariff and revenue generation has been considered keeping in view the high cost of water
production on account of high cost of electricity charges. As available sources of water are diminishing and
judicious use of water is called for, the tariff provides higher rate at higher consumption and subsidised rate
at lower consumption.
A. Year 2011 : Population : 3.16 Lakhs
Generation : 55.75Mld
Population
Slab of
consumption per
month
In Lakhs
Kl
Proposed yearly
revenue generation.
Kl
Rs./Kl
Rs. In Lakhs
60
1.90
5,70,000
8.00
547.20
25
0.79
3-5
3,95,000
9.50
450.30
10
0.32
5-7
1,98,000
12.00
285.12
0.16
78
and above
1,17,000
18.00
252.72
Monthly consumption
12,80,000
Generation : 62.88Mld
Yearly Revenue
1535.34
Yearly Expenditure
1595.00
60
2.43
7,29,000
11.00
962.28
25
1.01
3-5
4,84,800
13.00
756.29
10
0.41
5-7
2,66,500
16.00
511.68
0.20
78
and above
1,60,000
24.00
460.80
Monthly consumption
16,40,300
Generation : 79.49Mld.
Yearly Revenue
2691.05
Yearly Expenditure
2587.00
60
3.07
9,21,000
14.00
1547.28
25
1.28
3-5
6,40,000
17.00
1305.60
10
0.51
5-7
GoM:Phed
0.26
3,06,000
21.00
771.12
78
and above
2,06,000
31.00
776.32
Monthly consumption
20,73,000
Yearly Revenue
4400.32
Yearly Expenditure
4044.00
459
Annexure : 4e
Water supply tariff : Existing standard rates & charges and proposed hike in the
rates.
Standard rates and charges
Category of supply
Category I
2008
2011
2026
2041
: Domestic unmetered
15mm
194
194
258
345
20mm
388
388
516
686
25mm
581
581
775
1031
: Rs. per kl
11
15
: Rs. per kl
12
12
16
21
: Rs. per kl
18
18
24
32
Bulk supply
: Rs. per kl
9.5
9.5
13
17
Category II
GoM:Phed
: Domestic metered
: Commercial metered
460
Appendix : 1
Name of town/village
Classification
2
Shillong (M)
3
Urban
2.
Urban
2,476
12,396
3.
Mawlai (CT)
Urban
6,878
38,303
4.
Pynthorumkhrah (CT)
Urban
4,423
22,115
5.
Nongmynsong (CT)
Urban
2,307
11,371
6.
Nongthymmai (CT)
Urban
7,287
34,292
7.
Madanrting (CT)
Urban
3,220
16,318
Total :
2,67,662
GoM:Phed
461
Appendix : 2
## POPULATION FORECASTING ##
@@ Using Six
methods of calculation @@
::
::
13.06.2008
DATA
2007
2022
1961
2001
5
POPULATION
3
102398
122752
174703
223366
267662
DECADE
2
1961
1971
1981
1991
2001
1.
2.
3.
4.
5.
RESULTS
PROSPECTIVE
POPULATION
3
ULTIMATE
POPULATION
4
1. Arithmetic Mean
292451
354425
2. Geometric Mean
307634
435666
3. Incremental Increase
296282
380402
4. Yearly Variation
308601
440478
322281
470351
305630
418420
SL.NO
METHOD
It is suggested that :
The Prospective Population for the year 2007 may be taken as 296000.
The Ultimate
Population for the year 2022 may be taken as 380000.
GoM:Phed
462
## POPULATION FORECASTING ##
@@ Using Six
methods of calculation @@
::
::
13.06.2008
DATA
2011
2026
1961
2001
DECADE
2
1961
1971
1981
1991
2001
POPULATION
3
102398
122752
174703
223366
267662
RESULTS
PROSPECTIVE
POPULATION
3
ULTIMATE
POPULATION
4
1. Arithmetic Mean
308978
370952
2. Geometric Mean
337546
478027
3. Incremental Increase
316958
405867
4. Yearly Variation
339316
484319
356466
520242
332286
455205
SL.NO
METHOD
It is suggested that :
The Prospective Population for the year 2011 may be taken as 316000.
The Ultimate Population for the year 2026 may be taken as 405000.
GoM:Phed
463
## POPULATION FORECASTING ##
@@ Using Six
methods of calculation @@
::
::
13.06.2008
DATA
2021
2036
1961
2001
DECADE
2
1961
1971
1981
1991
2001
POPULATION
3
102398
122752
174703
223366
267662
RESULTS
PROSPECTIVE
POPULATION
3
ULTIMATE
POPULATION
4
1. Arithmetic Mean
350294
412268
2. Geometric Mean
425676
602836
3. Incremental Increase
374236
475115
4. Yearly Variation
430153
613974
458645
669366
409718
562872
SL.NO
METHOD
It is suggested that :
The Prospective Population for the year 2021 may be taken as 374000.
The Ultimate Population for the year 2036 may be taken as 475000.
GoM:Phed
464
## POPULATION FORECASTING ##
@@ Using Six
methods of calculation @@
::
::
13.06.2008
DATA
2031
2046
1961
2001
DECADE
2
1961
1971
1981
1991
2001
POPULATION
3
102398
122752
174703
223366
267662
RESULTS
PROSPECTIVE
POPULATION
3
ULTIMATE
POPULATION
4
1. Arithmetic Mean
391610
453584
2. Geometric Mean
536817
760231
3. Incremental Increase
439494
552344
4. Yearly Variation
545307
778338
590112
861235
506019
698041
SL.NO
METHOD
It is suggested that :
The Prospective Population for the year 2031 may be taken as 439000.
The Ultimate Population for the year 2046 may be taken as 552000.
GoM:Phed
465
## POPULATION FORECASTING ##
@@ Using Six
methods of calculation @@
::
::
13.06.2008
DATA
2041
2056
1961
2001
DECADE
2
1961
1971
1981
1991
2001
POPULATION
3
102398
122752
174703
223366
267662
RESULTS
PROSPECTIVE
POPULATION
3
ULTIMATE
POPULATION
4
1. Arithmetic Mean
432926
494900
2. Geometric Mean
676975
958721
3. Incremental Increase
512732
637554
4. Yearly Variation
691288
986703
759264
1108102
626573
868564
SL.NO
METHOD
It is suggested that :
The Prospective Population for the year 2041 may be taken as 512000.
The Ultimate
Population for the year 2056 may be taken as 637000.
GoM:Phed
466
Appendix : 3
Zonewise
Classification
1.
2.
II
Areas of Coverage
Population
as per
2001
census
Area in
Hectare
Police Bazaar
1529
9.9
1574
1594
2488
2637
3125
4371
Jail Road
4988
73.49
5140
5213
6268
6534
7276
8452
&
Oakland
Assembly Areas
Total
Zone I :
4261
70.28
4413
4483
5389
5578
6456
7482
11127
11290
14145
14749
16857
20305
10778
2007
2011
Projected population
2021
2026
2031
2041
Lachumiere
6133
53.05
6763
7178
9621
11531
12049
15474
Secretariat
4753
77.92
4923
5011
5914
6112
6766
8021
11686
12189
15535
17643
18815
23495
16695
18175
22405
24090
27610
34477
Total
Zone II :
10886
3.
III
Laitumkhrah
16695
18175
22405
24090
27610
34477
4.
IV
Malki
7494
46.73
7986
9393
10247
10896
12046
14646
Dhankheti Areas
3413
18.57
3637
3822
5121
5481
6276
8122
Total
Zone III :
Total
5.
15140
Zone IV :
Nongthymmai
Pohkseh
Total
6.
VI
Zone V :
18322
22768
35224
37496
38138
39742
6264
53.44
6372
6699
7207
8034
8914
10404
37142
38085
42431
45530
47052
50146
34292
529
609
782
Lawmali
640
9.43
660
670
818
853
941
1127
820
12.13
849
861
1018
1058
1149
1343
1150
17.08
1196
1213
1384
1434
1530
1709
Polo Hills
730
10.78
755
765
918
955
1045
1235
Forest Colony
420
6.10
427
433
571
600
685
861
Nongmali
428
6.13
429
435
574
602
635
863
4674
4741
5777
6031
6594
7920
16967
161.59
20469
21870
27574
29712
30709
31784
5148
49.41
6254
6757
8850
9545
10944
12092
26723
28627
36424
39257
41653
43876
614
41858
42748
46090
48012
49128
50756
41858
42748
46090
48012
49128
50756
Mawlai
Zone VI :
Pynthorumkhrah
Zone VII :
Mawlai
Zone VIII :
Laban
4536
22115
38303
Bishnupur
GoM:Phed
16377
31386
494
Total
IX
15368
30770
364
Total
9.
13215
239.56
358
Pynthorbah
VIII
10907
5.06
Total
8.
11623
28028
348
Polo Bazar
VII
15140
Pasteur Institute
Part
of
Mawroh
7.
131.65
Zone IX :
38303
22769
225.26
24599
25979
32015
34608
37772
45384
3589
32.43
3709
3741
4707
4891
5517
6775
12052
38410
49.10
13615
41923
15335
45055
20840
57562
24350
63849
28289
71578
39589
91748
467
Sl
No.
Zonewise
Classification
10.
Areas of Coverage
Population
as per
2001
census
Area in
Hectare
Mawprem
10620
39.52
11440
12319
15466
17236
19406
25253
Jaiaw
11115
56.20
11521
11858
13536
14104
15053
17190
8200
30.60
8385
8537
9709
10011
10693
12186
Mawkhar
South
Mawkhar
East
Barapathar
Total
11.
XI
12.
XII
8900
Zone X :
Nongmynsong
Total
Zone XI :
Madanriting
Happy Valley areas
Total
13.
XIII
GoM:Phed
Zone XII :
Shillong
Cantonment Area
Total
3375
Zone XIII :
Grand Total :
11.25
36.33
42210
11371
1034
11371
14037
173.30
2281
28.70
16318
12396
12396
267662
184
2007
3449
2011
3517
Projected population
2021
2026
4487
4685
2031
5262
2041
6534
10053
14841
15606
18230
21268
29907
44848
51072
58804
64266
71682
91070
15613
16057
18077
18943
21380
22941
15613
16057
18077
18943
21380
22941
16757
18388
22586
23799
24087
25617
2669
2730
3161
4277
4941
6466
19426
21118
25747
28076
29028
32083
12662
13628
15635
18177
19301
20415
12662
296000
13628
316000
15635
374000
18177
405000
19301
439000
20415
512000
468
Appendix: 4
GoM : Phed
Zonewise
Classifica
tion
1.
Areas of Coverage
Police Bazar
Jail Road
Oakland & Assembly
Areas
Total
Zone I :
2.
II
III
IV
2021
2026
2031
2041
2007
2011
2021
2026
2031
2041
1529
154
159
161
251
266
316
442
1574
1594
2488
2637
3125
4371
73.49
4988
68
70
71
85
89
99
115
5140
5213
6268
6534
7276
8452
70.28
4261
61
63
64
77
79
92
106
4413
4483
5389
5578
6456
7482
11127
11290
14145
14749
16857
20305
10778
135
181
217
227
292
6763
7178
9621
11531
12049
15474
Secretariat
77.92
4753
61
63
64
76
78
87
103
4923
5011
5914
6112
6766
8021
11686
12189
15535
17643
18815
23495
16695
18175
22405
24090
27610
34477
16695
18175
22405
24090
27610
34477
7986
9393
10247
10896
12046
14646
Zone II :
Laitumkhrah
10886
131.65
Zone III :
Malki
18.57
Zone IV :
Nongthymmai
15140
115
127
138
170
183
210
262
15140
46.73
Total
VI
2011
9.9
127
Pohkseh
6.
2007
Projected population
116
Total
V
6133
Dhankheti Areas
5.
Populat
ion
Density
in PPH
2001
53.05
Total
4.
Population
as per 2001
census
Lachumiere
Total
3.
Area in
Hectare
7494
160
171
201
219
233
258
313
3413
184
196
206
276
295
338
437
10907
3637
3822
5121
5481
6276
8122
11623
13215
15368
16377
18322
22768
239.56
28028
117
128
131
147
157
159
166
30770
31386
35224
37496
38138
39742
53.44
6264
117
119
125
135
150
167
195
6372
6699
7207
8034
8914
10404
37142
38085
42431
45530
47052
50146
Pasteur Institute
5.06
348
69
71
72
98
105
120
155
358
364
494
529
609
782
Lawmali
9.43
640
68
70
71
87
90
100
120
660
670
818
853
941
1127
12.13
820
68
70
71
84
87
95
111
849
861
1018
1058
1149
1343
Polo Bazar
17.08
1150
67
70
71
81
84
90
100
1196
1213
1384
1434
1530
1709
Polo Hills
10.78
730
68
70
71
85
89
97
115
755
765
918
955
1045
1235
Forest Colony
6.10
420
69
70
71
94
98
112
141
427
433
571
600
685
861
Nongmali
6.13
428
70
70
71
94
98
104
141
429
435
574
602
635
863
4674
4741
5777
6031
6594
7920
Total
Zone V :
Zone VI :
34292
4536
469
GoM : Phed
Sl No.
7.
Zonewise
Classifica
tion
VII
Areas of Coverage
Pynthorumkhrah
Pynthorbah
Total
8.
VIII
Mawlai
IX
Rilbong
Trace
&
Total
10.
Kenchs
2041
2007
2011
2021
2026
2031
2041
135
171
184
190
197
20469
21870
27574
29712
30709
31784
49.41
5148
104
127
137
179
193
221
245
6254
6757
8850
9545
10944
12092
26723
28627
36424
39257
41653
43876
41858
42748
46090
48012
49128
50756
41858
42748
46090
48012
49128
50756
22115
38303
62
68
70
75
78
80
83
38303
225.26
22769
101
109
115
142
154
168
201
24599
25979
32015
34608
37772
45384
32.43
3589
111
114
115
145
151
170
209
3709
3741
4707
4891
5517
6775
12052
245
277
312
424
495
576
806
49.10
38410
13615
15335
20840
24350
28289
39589
41923
45055
57562
63849
71578
91748
289
312
391
436
491
640
11440
12319
15466
17236
19406
25253
Jaiaw
56.20
11115
198
205
211
241
251
268
306
11521
11858
13536
14104
15053
17190
Mawkhar
30.60
8200
268
274
279
317
327
349
398
8385
8537
9709
10011
10693
12186
3375
300
307
313
399
416
468
580
3449
3517
4487
4685
5262
6534
8900
245
277
408
430
502
585
823
10053
14841
15606
18230
21268
29907
44848
47555
58804
64266
71682
91070
15613
16057
18077
18943
21380
22941
15613
16057
18077
18943
21380
22941
Zone X :
Total
42210
1034
Zone XI :
Madanriting
Shillong
Area
11.25
36.33
Nongmynsong
Total
XIII
2031
269
13.
2026
10620
Total
XII
2021
39.52
Total
12.
2011
Mawprem
Barapathar
XI
2007
Projected population
127
Zone IX :
11.
105
Zone VIII :
Bishnupur
Populat
ion
Density
in PPH
2001
16967
614
Laban
Population
as per 2001
census
161.59
Zone VII :
Total
9.
Area in
Hectare
Zone XIII :
Grand Total :
11
15
16
17
18
21
22
11371
173.30
14037
81
97
106
130
137
139
148
16757
18388
22586
23799
24087
25617
28.70
2281
79
93
95
110
149
172
225
2669
2730
3161
4277
4941
6466
19426
21118
25747
28076
29028
32083
67
69
74
85
99
105
111
12662
13628
15635
18177
19301
20415
12662
296000
13628
316000
15635
374000
18177
405000
19301
439000
20415
512000
Zone XII :
Cantonment
11371
16318
184
12396
12396
267662
470
Appendix : 5
Zone wise breakup of water requirement under Shillong Urban Agglomeration.
Sl.
Zonewise classification
No
Zone I
2007
2011
Projected Year
2021
2026
2031
2041
11127
11290
14145
14749
16857
20305
1502145
1524150
1909575
1991115
2275695
2741175
1727467
1752773
2196011
2289782
2617049
3152351
Total Zone I :
1727467
1752773
2196011
2289782
2617049
3152351
11686
12189
15535
17643
18815
23485
1.
Population
2.
3.
Zone II
1.
Population
2.
1577610
1645515
2097225
2381805
2540025
3170475
3.
1814252
1892342
2411809
2739076
2921029
3646046
Total Zone II :
1814252
1892342
2411809
2739076
2921029
3646046
16695
18175
22405
24090
27610
34477
Zone III
1.
Population
2.
2253825
2453625
3024675
3252150
3727350
4654395
3.
2591899
2821669
3478376
3739973
4286453
5352554
2591899
2821669
3478376
3739973
4286453
5352554
11623
13215
15368
16377
18322
22768
Zone IV
1.
Population
2.
1569105
1784025
2074680
2210895
2473470
3073680
3.
1804471
2051629
2385882
2542529
2844491
3534732
Total Zone IV :
1804471
2051629
2385882
2542529
2844491
3534732
37142
38085
42431
45530
47052
50146
Zone V
GoM:Phed
1.
Population
2.
5014170
5141475
5728185
6146550
6352020
6769710
3.
5766296
5912696
6587413
7068533
7304823
7785167
Total Zone V :
5766296
5912696
6587413
7068533
7304823
7785167
471
Zone VI
1.
Population
4674
4741
5777
6031
6594
7920
2.
630990
640035
779895
814185
890190
1069200
3.
725639
736040
896879
936313
1023719
1229580
Total Zone VI :
725639
736040
896879
936313
1023719
1229580
26723
28627
36424
39257
41653
43876
Zone VII
1.
Population
2.
3607605
3864645
4917240
5299695
5623155
5923260
3.
4148746
4444342
5654826
6094649
6466628
6811749
4148746
4444342
5654826
6094649
6466628
6811749
41858
42748
46090
48012
49128
50756
Zone VIII
1.
Population
2.
5650830
5770980
6222150
6481620
6632280
6852060
3.
6498455
6636627
7155473
7453863
7627122
7879869
6498455
6636627
7155473
7453863
7627122
7879869
41923
45055
57562
63849
71578
91748
Zone IX
1.
Population
2.
5659605
6082425
7770870
8619615
9663030
12385980
3.
6508546
6994789
8936501
9912557
11112485
14243877
Total Zone IX :
6508546
6994789
8936501
9912557
11112485
14243877
44848
51072
58804
64266
71682
91070
Zone X
1.
Population
2.
6054480
6894720
7938540
8675910
9677070
12294450
3.
6962652
7928928
9129321
9977297
11128631
14138618
Total Zone X :
6962652
7928928
9129321
9977297
11128631
14138618
15613
16057
18077
18943
21380
22941
Zone XI
GoM:Phed
1.
Population
2.
2107755
2167695
2440395
2557305
2886300
3097035
3.
2423918
2492849
2806454
2940901
3319245
3561590
Total Zone XI :
2423918
2492849
2806454
2940901
3319245
3561590
472
Zone XII
1.
Population
19426
21118
25747
28076
29028
32083
2.
2622510
2850930
3475845
3790260
3918780
4331205
3.
3015887
3278570
3997222
4358799
4506597
4980886
3015887
3278570
3997222
4358799
4506597
4980886
12662
13628
15635
18177
19301
20415
Zone XIII
GoM:Phed
1.
Population
2.
1709370
1839780
2110725
2453895
2605635
2756025
3.
1965776
2115747
2427334
2821979
2996480
3169429
1965776
2115747
2427334
2821979
2996480
3169429
Grand Total :
45954004
49059001
58063501
62876251
68154752
79486448
473
Appendix : 6
650
600
550
500
450
400
350
300
250
Zone I
20.00
99.00
1208.00
8687.00
Zone II
118.00
91.00
324.00
2975.00
22579.00
Zone III
564.00
479.00
4976.00
2751.00
9397.00
Zone IV
504.00
671.00
2018.00
8950.00
Zone V
157.00
228.00
268.00
1461.00
1343.00
18967.00
Zone - VI
55.00
591.00
487.00
413.00
2774.00
480.00
12155.67
Zone - VII
576.00
650.60
127.10
430.90
1710.15
Zone - VIII
886.36
36.00
700.00
3461.00
3205.00
7833.00
35711.00
Zone IX
2246.59
2030.10
2492.99
4471.39
11861.10
Zone X
835.00
2905.00
539.70
1725.00
1836.00
24872.00
Zone - XI
1061.11
1153.00
5765.57
809.00
2144.00
2582.00
2396.00
Zone - XII
433.00
627.00
2516.00
7882.00
17175.00
59.00
1107.11
3010.69
5592.19
13776.77
7384.70
23427.14
36826.23
Total :
46.00
59.00
772.33
GoM:Phed
60.00
20.00
-
54.10
200
150
1446.84
100
8925.28
181676.10
2,72,859.93 Rm.
474
Appendix : 7
Diameter of pipes in mm
1000
900
750
300
250
200
150
100
2976
7724
2800
9530
337
4170
8000
4750
Rilbong to Jhalupara
400
5600
2730
JN to Jhalupara to JN to Iewrynghep
4180
760
146
3960
2976
7724
2800
9530
12170
9047
13270
546
Total :
Total length of all size of pipes for clear water gravity mains
GoM:Phed
58,063 Rm.
475
Appendix : 8
Description
1.
900
750
600
550
500
450
400
350
300
250
200
150
100
3200
3200
2.
Clear
water
gravity main
2976
7724
2800
9530
12170
9047
13270
546
58063
3.
Clear
water
rising main
7500
7500
4.
Distribution
system
59
1107
3011
5592
13777
7385
23427
36826
181676
GoM:Phed
Total
272860
476
Appendix : 9
1. The source of GSWSP (Phase I & II) is the river Umiew originating from Shillong Peak
RL 1964m above mean sea level. A mass gravity concrete dam was constructed across the river at
Mawphlang. The dam which is 135m wide and about 50m high, provide 9.145MCM of live storage.
2. The GSWSP (Phase I & II) is designed to lift about 51.30Mld and till September 2007, about
34.0 Mld was lifted by the system. Following the commissioning of the replacement works of
pumping machineries for both stage I and Stage II raw water pumping system in October 2007, the
system started lifting about 51.30Mld from the dam.
3. River Umiew is one of the major river in the state perennially flowing through out the year. The
existing GSWSP (Phase I & II) cover only a part of SUA. For coverage of the remaining area of
SUA including area earmarked under GSPA, the existing infrastructure available under GSWSP at
Mawphlang requires to be enhanced to meet the additional demand.
4. For meeting the additional demand, possibility of exploiting another source of supply has been
under investigation by the state PHED. The source is the river Umngot which is situated about
25Km east of the city. Investigation was carried out for comparison of the cost effectiveness of
developing the source at Umngot with that of enhancement of the available infrastructure at Umiew
river at Mawphlang to meet the additional demand.
5. Comparative study, indicate that construction cost of developing of productive system including
operational cost of production at Umngot would not be cheaper than Umiew. Further, large area of
land will have to be acquired for developing the source at Umngot. In all probability, for the same
quantity of production, augmentation of the source at Mawphlang, would be less costly, as compared
to developing another source at Umngot river.
6. For ascertaining the reliability of the existing source viz. river Umiew to meet the additional
supply, a study on spilling of water from the dam was conducted. For spilling of water, 3 nos. of
radial gates each of 9m wide were installed. Depending on the incoming flow, and the desire to
maintain required level, water is spilled with the height of opening of gates adjusted accordingly.
The record on spilling of water for the period from July 2006 to September 2007 is attached.
Summary of the record is reproduced in table herein below.
GoM:Phed
477
Least quantity
of water spilled
in a day during
the month
Ml
2
Ml
Average
quantity of
water spilled in
a day during
the month
Ml
Average quantity
of water lifted by
the system in a
day during the
month
Ml
Maximum quantity
of water spilled in
a day during the
month
Mld
Jul
2006
75
292
113
34
109
Aug
2006
71
160
97
34
105
Sep
2006
72
283
142
34
106
Oct
2006
71
214
119
34
105
Nov
2006
71
199
111
34
105
Dec
2006
69
100
77
34
103
Jan
2007
62
81
70
34
96
Feb
2007
63
71
64
34
97
Mar
2007
66
110
80
34
100
Apr
2007
72
110
83
34
106
May
2007
72
110
85
34
106
Jun
2007
95
3547
410
34
129
Jul
2007
80
1129
259
34
114
Aug
2007
72
169
104
34
106
Sep
2007
86
817
200
34
120
7. The least quantity of water spilled in a day during the month varies from 71Mld to 95Mld for
the monsoon months and from 62Mld to 71Mld during the non-monsoon months.
8. GSWSP (Phase I & II) lifted about 34Mld of water for supply to consumers. The inflow into the
dam is, therefore, the sum of water lifted by the system and the water spilled by the dam. For
computing the inflow, the least Quantity of water spilled in any day during the month has been taken
as the basis for consideration. It could be seen, the inflow during the monsoon months exceeded
100Mld and in the non-monsoon months is about 96Mld.
9. Considering the inflow of 96 Mld in the lean season and the available storage of 9.145MCM,
the source could be relied upon to provide the additional supply of 51.30Mld.
10. Feasibility study to raise the height of the dam which is 8.60m below pump floor level, is,
however necessary. Possible increase in the height of the dam by 3m would provide considerable
quantity of additional storage.
GoM:Phed
478
Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of July 2006.
Date
Duration of spilling
Spilling details
Gate
No. II
Gate
No. III
(Hrs.)
Gate
No. I
01.07.2006
0.20
23
02.07.2006
0.13
0.15
24
03.07.2006
0.14
04.07.2006
Gate
No. II
Gate
No. III
M/sec
M/hr.
ML
1.779
6404.45
147302.49
147.00
2.080
7516.03
175769.52
176.00
24
1.040
3744.00
89856.00
90.00
0.13
24
0.930
3356.00
80550.00
81.00
05.07.2006
0.13
23
0.930
3356.23
77193.40
77.00
06.07.2006
0.18
24
1.518
5468.22
131237.30
131.00
07.07.2006
0.10
4.516
16251.60
292204.80
292.00
08.07.2006
0.15
23
1.155
4159.81
95675.78
96.00
09.07.2006
0.14
24
1.040
3744.00
89856.00
90.00
10.07.2006
0.18
0.08
1.970
7068.00
86880.00
87.00
11.07.2006
0.10
3.108
11214.80
123683.13
124.00
12.07.2006
0.15
23
1.155
4159.81
95675.78
96.00
13.07.2006
0.15
23
1.155
4159.81
95675.78
96.00
14.07.2006
0.15
22
1.155
4159.81
91515.82
92.00
15.07.2006
0.15
24
1.150
4140.00
99360.00
99.00
16.07.2006
0.21
24
1.910
6876.00
158148.00
158.00
17.07.2006
0.15
24
1.150
4159.81
99835.60
99.00
18.07.2006
0.13
24
0.930
3356.00
80550.00
81.00
19.07.2006
0.13
24
0.930
3356.00
80550.00
81.00
20.07.2006
0.14
21.07.2006
22.07.2006
0.17
23.07.2006
24.07.2006
0.10
0.30
0.25
24
23
24
24
23
17
24
1.040
3744.00
74880.00
75.00
1.740
6268.77
103366.99
103.00
15
1.390
5004.00
75068.00
75.00
0.30
24
3.260
11765.74
282377.70
282.00
0.13
24
0.930
3348.00
80352.00
80.00
25.07.2006
0.15
24
1.155
4158.00
99792.00
100.00
26.07.2006
0.13
23
0.930
3348.00
77004.00
77.00
27.07.2006
0.13
23
0.930
3348.00
77004.00
77.00
28.07.2006
0.17
24
1.390
5018.92
120454.18
120.00
29.07.2006
0.17
30.07.2006
0.10
31.07.2006
0.13
0.05
0.18
13
17
24
0.10
24
24
24
1.390
5018.92
120454.18
120.00
1.250
4528.62
108686.88
109.00
0.930
3348.00
80352.00
80.00
3491.00
113.00
No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.
GoM : Phed
479
Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of August 2006.
Date
Duration of spilling
Spilling details
Gate
No. II
Gate
No. III
(Hrs.)
Gate
No. I
Gate
No. II
Gate
No. III
M/sec
M/hr.
ML
01.08.2006
0.18
20
1.520
5472.00
109440.00
109.00
02.08.2006
0.15
20
1.150
4160.00
83200.00
83.00
03.08.2006
0.14
21
1.040
3744.00
78624.00
78.00
04.08.2006
0.12
24
0.820
2976.00
71424.00
71.00
05.08.2006
0.12
24
0.820
2976.52
71436.53
71.00
06.08.2006
0.13
24
0.930
3348.00
80352.00
80.00
07.08.2006
0.13
24
0.930
3348.00
80352.00
80.00
08.08.2006
0.17
20
1.390
5004.00
10080.00
100.00
09.08.2006
0.13
24
0.930
3348.00
80352.00
80.00
10.08.2006
0.14
20
1.040
3751.00
75020.00
75.00
11.08.2006
0.05
1.375
4450.00
114889.00
115.00
12.08.2006
0.12
23
0.930
3348.00
77004.00
77.00
13.08.2006
0.12
24
0.820
2976.52
71436.50
71.00
14.08.2006
0.12
24
0.820
2976.52
71436.50
71.00
15.08.2006
0.13
24
0.930
3348.00
80352.00
80.00
16.08.2006
0.14
19
1.040
3751.00
71269.00
71.00
17.08.2006
0.14
19
1.040
3751.00
71269.00
71.00
18.08.2006
0.05
1.370
4932.00
118368.00
118.00
19.08.2006
0.18
24
1.518
5468.22
131237.00
131.00
20.08.2006
0.25
18
2.480
8951.0
160704.00
160.00
21.08.2006
0.20
15
1.700
6120.00
91800.00
92.00
22.08.2006
0.16
2.150
6203.00
148877.00
149.00
23.08.2006
0.15
24
1.150
4159.80
99895.50
100.00
24.08.2006
0.12
23
0.930
3348.00
77004.00
77.00
25.08.2006
0.19
24
1.650
5930.17
142324.00
142.00
26.08.2006
0.14
24
1.041
3750.84
90020.00
90.00
27.08.2006
0.17
24
1.390
5004.00
120096.00
120.00
28.08.2006
0.16
24
1.270
4582.60
109983.00
110.00
29.08.2006
0.16
23
1.270
4582.00
105386.00
105.00
30.08.2006
0.17
24
1.300
5018.00
120454.00
120.00
31.08.2006
0.15
24
1.150
4159.80
0.15
0.15
0.08
24
24
24
23
24
24
99835.00
100.00
2997.00
97.00
No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.
GoM : Phed
480
Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of September 2006.
Date
Duration of spilling
Spilling details
Gate
No. II
Gate
No. III
(Hrs.)
Gate
No. I
Gate
No. II
Gate
No. III
M/sec
M/hr.
ML
01.09.2006
0.14
24
1.040
3750.00
90020.00
90.00
02.09.2006
0.14
24
1.040
3750.00
90020.00
90.00
03.09.2006
0.15
24
1.150
4160.00
99840.00
100.00
04.09.2006
0.16
24
1.270
4572.00
109728.00
110.00
05.09.2006
0.12
22
0.830
2988.00
71712.00
72.00
06.09.2006
0.15
22
1.150
4140.00
91080.00
91.00
07.09.2006
0.15
23
1.150
4140.00
9522.00
95.00
08.09.2006
0.19
24
1.650
5930.17
142324.00
142.00
09.09.2006
0.25
24
2.490
8964.00
215136.00
215.00
10.09.2006
0.23
24
2.190
7898.00
189552.00
189.00
11.09.2006
0.17
24
1.39
5004.00
120096.00
120.00
12.09.2006
0.15
24
1.155
4159.81
99835.60
100.00
13.09.2006
0.28
24
2.950
10608.99
254615.00
255.00
14.09.2006
0.30
24
3.270
11765.73
282377.00
283.00
15.09.2006
0.14
24
1.040
3750.00
90020.00
90.00
16.09.2006
0.16
20
1.270
4583.00
91660.00
92.00
17.09.2006
0.18
24
1.518
5468.22
131237.00
131.00
18.09.2006
0.22
20
2.050
7389.00
147780.00
148.00
19.09.2006
0.25
24
2.486
8950.00
214812.00
215.00
20.09.2006
0.18
24
1.510
5436.00
130464.00
130.00
21.09.2006
0.21
24
1.910
6890.75
165377.00
165.00
22.09.2006
0.26
18
2.640
9504.00
171072.00
171.00
23.09.2006
0.23
15
2.190
7898.00
118470.00
118.00
24.09.2006
0.18
24
1.518
5468.22
131237.00
131.00
25.09.2006
0.16
24
1.270
4572.00
109728.00
110.00
26.09.2006
0.15
24
1.150
4160.00
99840.00
100.00
27.09.2006
0.15
24
1.150
4160.00
99840.00
100.00
28.09.2006
0.25
24
2.486
8950.50
214812.00
215.00
29.09.2006
0.25
24
2.486
8950.50
214812.00
215.00
30.09.2006
0.22
23
2.050
7380.00
169740.00
170.00
4253.00
142.00
No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.
GoM : Phed
481
Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of October 2006.
Date
Duration of spilling
Spilling details
Gate
No. II
Gate
No. III
the day
(Hrs.)
Gate
No. I
Gate
No. II
Gate
No. III
M/sec
M/hr.
ML
01.10.2006
0.13
23
0.930
3348.00
77004.00
77.00
02.10.2006
0.13
24
0.930
3348.00
80352.00
80.00
03.10.2006
0.25
20
2.480
8951.00
179020.00
179.00
04.10.2006
0.25
20
2.480
8951.00
179020.00
179.00
05.10.2006
0.18
20
1.520
5472.00
109440.00
109.00
06.10.2006
0.15
20
1.150
4140.00
82800.00
83.00
07.10.2006
0.16
24
1.212
4528.00
109983.00
109.00
08.10.2006
0.15
24
1.150
4140.00
99360.00
99.00
09.10.2006
0.18
24
1.518
5468.22
131237.00
131.00
10.10.2006
0.14
23
1.040
3744.00
86112.00
86.00
11.10.2006
0.14
22
1.040
3744.00
82368.00
82.00
12.10.2006
0.13
13.10.2006
0.30
14.10.2006
0.15
15.10.2006
24
0.930
3356.0
80549.00
81.00
2.300
8280.00
194580.00
194.00
24
1.150
4140.00
99360.00
99.00
0.18
21
1.520
5472.00
114912.00
114.00
16.10.2006
0.14
24
1.040
3751.00
90024.00
90.00
17.10.2006
0.14
24
1.040
3751.00
90024.00
90.00
18.10.2006
0.17
24
1.390
5004.00
120096.00
120.00
19.10.2006
0.16
24
1.15
4572.00
109728.00
110.00
20.10.2006
0.15
24
1.150
4140.00
99360.00
99.00
21.10.2006
0.15
18
1.150
4140.00
74520.00
74.00
22.10.2006
0.18
2.450
8820.00
191592.00
192.00
23.10.2006
0.25
19
2.300
8418.00
202053.00
202.00
24.10.2006
0.25
24
2.190
7898.00
189557.00
189.00
25.10.2006
0.25
24
2.480
8928.00
214272.00
214.00
26.10.2006
0.25
24
2.480
8928.00
214272.00
214.00
27.10.2006
0.14
24
1.040
3750.00
20020.00
90.00
28.10.2006
0.13
24
0.900
3356.00
80549.00
80.00
29.10.2006
0.13
19
0.900
3356.00
80549.00
80.00
30.10.2006
0.12
24
0.820
2976.00
71436.00
71.00
31.10.2006
0.10
24
0.820
2976.00
0.15
0.13
24
24
23
18
71436.00
71.00
3688.00
119.00
No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.
GoM : Phed
482
Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of November 2006.
Date
Duration of spilling
Spilling details
Gate
No. II
Gate
No. III
(Hrs.)
Gate
No. I
Gate
No. II
Gate
No. III
M/sec
M/hr.
ML
01.11.2006
0.20
24
1.800
6480.00
155520.00
155.00
02.11.2006
0.15
24
1.150
4156.81
99835.50
100.00
03.11.2006
0.15
24
1.150
4156.81
99835.50
100.00
04.11.2006
0.15
24
1.150
4156.00
99835.00
100.00
05.11.2006
0.15
24
1.150
4159.80
99835.00
100.00
06.11.2006
0.15
22
1.150
4140.00
91088.00
91.00
07.11.2006
0.15
22
1.150
4140.00
91088.00
91.00
08.11.2006
0.10
09.11.2006
0.13
10.11.2006
0.12
24
11.11.2006
0.14
24
12.11.2006
0.14
13.11.2006
0.15
24
14.11.2006
0.15
15.11.2006
0.15
16.11.2006
0.20
17.11.2006
0.16
18.11.2006
0.10
0.18
24
19.11.2006
0.10
0.18
24
20.11.2006
0.16
24
21.11.2006
0.15
22.11.2006
23.11.2006
0.10
24
1.250
4529.00
108696.00
108.00
24
0.930
3348.00
80352.00
80.00
0.830
2976.00
71436.00
71.00
1.040
3751.00
90024.00
90.00
2.190
7911.00
164900.00
164.00
1.150
4140.00
99360.00
99.00
24
1.150
4140.00
99360.00
99.00
24
1.150
4140.00
99360.00
99.00
2.420
8741.00
198993.00
199.00
1.390
5004.00
120096.00
120.00
24
2.140
7700.00
184807.00
184.00
24
2.140
7700.00
184807.00
184.00
1.390
5004.00
120096.00
120.00
24
1.150
4140.00
99360.00
99.00
0.15
23
1.150
4140.00
95220.00
95.00
0.14
24
1.040
3744.00
89856.00
90.00
24.11.2006
0.14
24
1.040
3751.00
62965.00
90.00
25.11.2006
0.30
24
0.930
3356.0
90021.00
80.00
26.11.2006
0.13
24
0.930
3356.00
80550.00
80.00
27.11.2006
0.16
24
1.300
4680.00
80550.00
112.00
28.11.2006
0.15
1.870
6752.00
112320.00
162.00
29.11.2006
0.14
24
1.040
3751.00
162048.00
90.00
30.11.2006
0.14
24
1.040
3751.00
90021.00
90.00
3342.00
111.00
0.15
0.10
24
24
24
18
20
24
0.11
24
10
No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.
GoM : Phed
483
Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of December 2006.
Date
Duration of spilling
Spilling details
Gate
No. II
Gate
No. III
(Hrs.)
Gate
No. I
Gate
No. II
Gate
No. III
M/sec
M/hr.
ML
01.12.2006
0.14
24
1.040
3750.00
90020.00
90.00
02.12.2006
0.13
24
0.930
3356.00
80549.00
81.00
03.12.2006
0.12
24
0.830
2988.00
71712.00
72.00
04.12.2006
0.12
24
0.830
2988.00
71712.00
72.00
05.12.2006
0.12
24
0.830
2988.00
71712.00
72.00
06.12.2006
0.12
24
0.830
2988.00
71712.00
72.00
07.12.2006
0.15
24
1.150
4160.00
99840.00
100.00
08.12.2006
0.11
1.450
5225.00
80352.00
80.00
09.12.2006
0.13
23
0.930
3348.00
77004.00
77.00
10.12.2006
0.13
23
0.930
3348.00
77004.00
77.00
11.12.2006
0.13
23
0.930
3348.00
77004.00
77.00
12.12.2006
0.13
13.12.2006
0.11
14.12.2006
0.14
15.12.2006
0.11
24
23
0.930
3348.00
77004.00
77.00
1.170
4232.00
78897.00
79.00
24
1.040
3750.00
90020.00
90.00
0.15
24
1.150
4160.00
99840.00
100.00
16.12.2006
0.14
24
1.040
3750.00
90020.00
90.00
17.12.2006
0.13
24
0.930
3356.00
80549.00
81.00
18.12.2006
0.12
24
0.830
2988.00
71712.00
72.00
19.12.2006
0.12
24
0.830
2988.00
71712.00
72.00
20.12.2006
0.12
24
0.830
2988.00
71712.00
72.00
21.12.2006
0.12
24
0.830
2988.00
71712.00
72.00
22.12.2006
0.12
24
0.830
2988.00
71712.00
72.00
23.12.2006
0.12
24
0.830
2988.00
71712.00
72.00
24.12.2006
0.12
24
0.830
2988.00
71712.00
72.00
25.12.2006
0.12
23
0.830
2988.00
68678.00
69.00
26.12.2006
0.12
23
0.830
2988.00
68678.00
69.00
27.12.2006
0.12
23
0.830
2988.00
68678.00
69.00
28.12.2006
0.12
23
0.830
2988.00
68678.00
69.00
29.12.2006
0.12
23
0.830
2988.00
68678.00
69.00
30.12.2006
0.12
23
0.830
2988.00
68678.00
69.00
31.12.2006
0.12
23
0.830
2988.00
68678.00
0.80
24
10
69.00
2374.00
77.00
No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.
GoM : Phed
484
Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of January 2007.
Date
Duration of spilling
Spilling details
Gate
No. II
Gate
No. III
(Hrs.)
Gate
No. I
Gate
No. II
Gate
No. III
M/sec
M/hr.
ML
01.01.2007
0.13
24
0.930
3348.00
80352.00
80.00
02.01.2007
0.13
24
0.930
3348.00
80352.00
80.00
03.01.2007
0.12
24
0.83
2988.00
71712.00
72.00
04.01.2007
0.12
24
0.83
2988.00
71712.00
72.00
05.01.2007
0.12
24
0.83
2988.00
71712.00
72.00
06.01.2007
0.12
24
0.83
2988.00
71712.00
72.00
07.01.2007
0.12
24
0.83
2988.00
71712.00
72.00
08.01.2007
0.12
24
0.83
2988.00
71712.00
72.00
09.01.2007
0.12
24
0.83
2988.00
71712.00
72.00
10.01.2007
0.12
24
0.83
2988.00
71712.00
72.00
11.01.2007
0.13
24
0.930
3356.00
80550.00
81.00
12.01.2007
0.12
24
0.830
2988.00
71712.00
71.00
13.01.2007
24
0.830
2988.00
71712.00
71.00
14.01.2007
0.12
0.12
24
0.830
2988.00
71712.00
71.00
15.01.2007
0.12
24
0.830
2988.00
71712.00
71.00
16.01.2007
0.12
24
0.830
2988.00
71712.00
71.00
17.01.2007
0.12
24
0.830
2988.00
71712.00
71.00
18.01.2007
0.12
24
0.830
2988.00
71712.00
71.00
19.01.2007
0.12
24
0.830
2988.00
71712.00
71.00
20.01.2007
0.12
24
0.830
2988.00
71712.00
71.00
21.01.2007
0.12
24
0.830
2988.00
71712.00
71.00
22.01.2007
0.12
24
0.830
2988.00
71712.00
71.00
23.01.2007
0.12
24
0.830
2988.00
71712.00
71.00
24.01.2007
0.12
24
0.830
2988.00
71712.00
71.00
25.01.2007
0.11
24
0.720
2592.00
62208.00
62.00
26.01.2007
0.11
24
0.720
2592.00
62208.00
62.00
27.01.2007
0.11
24
0.720
2592.00
62208.00
62.00
28.01.2007
0.11
24
0.720
2592.00
62208.00
62.00
29.01.2007
0.11
24
0720
2592.00
62208.00
62.00
30.01.2007
0.11
24
0.720
2592.00
62208.00
62.00
31.01.2007
0.11
24
0.720
2592.00
62208.00
62.00
2174.00
70.00
No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.
GoM : Phed
485
Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of February 2007.
Date
Duration of spilling
Spilling details
Gate
No. II
Gate
No. III
(Hrs.)
Gate
No. I
Gate
No. II
Gate
No. III
M/sec
M/hr.
ML
01.02.2007
0.11
24
0.720
2612.00
62688.00
63.00
02.02.2007
0.11
24
0.720
2612.00
62688.00
63.00
03.02.2007
0.11
24
0.720
2612.00
62688.00
63.00
04.02.2007
0.11
24
0.720
2612.00
62688.00
63.00
05.02.2007
0.12
24
0.830
3976.00
71436.00
71.00
06.02.2007
0.11
24
0.720
2612.00
62696.00
63.00
07.02.2007
0.11
24
0.720
2612.00
62696.00
63.00
08.02.2007
0.11
24
0.720
2612.00
62696.00
63.00
09.02.2007
0.11
24
0.720
2612.00
62696.00
63.00
10.02.2007
0.11
24
0.720
2612.00
62696.00
63.00
11.02.2007
0.11
24
0.720
2612.00
62696.00
63.00
12.02.2007
0.11
24
0.720
2612.00
62696.00
63.00
13.02.2007
0.11
24
0.720
2612.00
62696.00
63.00
14.02.2007
0.11
24
0.720
2612.00
62696.00
63.00
15.02.2007
0.11
24
0.720
2612.00
62696.00
63.00
16.02.2007
0.14
24
1.040
3751.00
90020.00
90.00
17.02.2007
0.11
24
0.730
2628.00
63072.00
63.00
18.02.2007
0.13
24
0.730
2628.00
63072.00
63.00
19.02.2007
0.13
24
0.730
2628.00
63072.00
63.00
20.02.2007
0.13
24
0.730
2628.00
63072.00
63.00
21.02.2007
0.13
24
0.730
2628.00
63072.00
63.00
22.02.2007
0.11
24
0.720
2612.00
62696.00
63.00
23.02.2007
0.11
24
0.720
2612.00
62696.00
63.00
24.02.2007
0.11
24
0.720
2612.00
62696.00
63.00
25.02.2007
0.11
24
0.720
2612.00
62696.00
63.00
26.02.2007
0.11
24
0.720
2612.00
62696.00
63.00
27.02.2007
0.11
24
0.720
2612.00
62696.00
63.00
28.02.2007
0.11
24
0.720
2612.00
62696.00
63.00
1799.00
64.00
No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.
GoM : Phed
486
Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of March 2007.
Date
Duration of spilling
Spilling details
Gate
No. II
Gate
No. III
(Hrs.)
Gate
No. I
Gate
No. II
Gate
No. III
M/sec
M/hr.
ML
01.03.2007
0.12
22
0.830
2988.00
65736.00
66.00
02.03.2007
0.12
22
0.830
2988.00
65736.00
66.00
03.03.2007
0.12
22
0.830
2988.00
65736.00
66.00
04.03.2007
0.12
22
0.830
2988.00
65736.00
66.00
05.03.2007
0.12
24
0.820
2952.00
70848.00
71.00
06.03.2007
0.11
24
0.720
2612.00
62696.00
71.00
07.03.2007
0.11
24
0.720
2612.00
62696.00
71.00
08.03.2007
0.11
24
0.720
2612.00
62696.00
71.00
09.03.2007
0.11
24
0.720
2612.00
62696.00
71.00
10.03.2007
0.11
24
0.720
2612.00
62696.00
71.00
11.03.2007
0.13
24
0.930
3348.00
80352.00
71.00
12.03.2007
0.12
24
0.830
2988.00
71712.00
72.00
13.03.2007
0.12
24
0.830
2988.00
71712.00
72.00
14.03.2007
0.12
24
0.830
2988.00
71712.00
72.00
15.03.2007
0.12
24
0.830
2988.00
71712.00
72.00
16.03.2007
0.12
24
0.830
2988.00
71712.00
72.00
17.03.2007
0.12
24
0.830
2988.00
71712.00
72.00
18.03.2007
0.12
24
0.830
2988.00
71712.00
72.00
19.03.2007
0.15
24
0.150
4140.00
99360.00
99.00
20.03.2007
0.12
24
0.82.
2952.00
70848.00
71.00
21.03.2007
0.12
24
0.820
2952.00
70848.00
71.00
22.03.2007
0.13
0.930
80352.00
80.00
23.03.2007
0.15
18
1.150
4160.00
99840.00
100.00
24.03.2007
0.14
24
1.040
3751.00
90024.00
90.00
25.03.2007
0.14
24
1.040
3751.00
90024.00
90.00
26.03.2007
0.14
24
1.040
27.03.2007
0.14
24
1.040
28.03.2007
0.14
24
1.040
29.03.2007
0.16
24
30.03.2007
0.16
31.03.2007
0.16
3348.00
3751.00
90024.00
90.00
90024.00
90.00
3751.00
90024.00
90.00
1.270
4583.00
109984.00
110.00
24
1.270
4583.00
109984.00
110.00
24
1.270
4583.00
109984.00
110.00
2466.00
80.00
3751.00
No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.
GoM : Phed
487
Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of April 2007.
Date
Duration of spilling
Spilling details
Gate
No. II
Gate
No. III
(Hrs.)
Gate
No. I
Gate
No. II
Gate
No. III
M/sec
M/hr.
ML
01.04.2007
0.15
24
1.150
4160.00
99840.00
100.00
02.04.2007
0.15
24
1.150
4160.00
99840.00
100.00
03.04.2007
0.15
24
1.150
4160.00
99840.00
100.00
04.04.2007
0.15
24
1.150
4160.00
99840.00
100.00
05.04.2007
0.15
24
1.150
4160.00
99840.00
100.00
06.04.2007
0.15
24
1.150
4160.00
99840.00
100.00
07.04.2007
0.15
24
1.150
4160.00
99840.00
100.00
08.04.2007
0.16
24
1.270
4583.00
109984.00
110.00
09.04.2007
0.14
24
1.040
3751.00
90024.00
90.00
10.04.2007
0.15
24
1.150
4160.00
99840.00
100.00
11.04.2007
0.12
24
0.830
2988.00
71712.00
72.00
12.04.2007
0.13
24
0.930
3356.00
80544.00
81.00
13.04.2007
0.13
24
0.930
3356.00
80544.00
81.00
14.04.2007
0.13
24
0.930
3356.00
80544.00
81.00
15.04.2007
0.12
24
0.830
2988.00
71712.00
72.00
16.04.2007
0.12
24
0.830
2988.00
71712.00
72.00
17.04.2007
0.12
24
0.830
2988.00
71712.00
72.00
18.04.2007
0.12
24
0.830
2988.00
71712.00
72.00
19.04.2007
0.12
24
0.830
2988.00
71712.00
72.00
20.04.2007
0.12
24
0.830
2988.00
71712.00
72.00
21.04.2007
0.12
24
0.830
2988.00
71712.00
72.00
22.04.2007
0.12
24
0.830
2988.00
71712.00
72.00
23.04.2007
0.12
24
0.830
2988.00
71712.00
72.00
24.04.2007
0.12
24
0.830
2988.00
71712.00
72.00
25.04.2007
0.12
24
0.830
2988.00
71712.00
72.00
26.04.2007
0.13
24
0.930
3348.00
80352.00
80.00
27.04.2007
0.12
24
0.830
2988.00
71712.00
72.00
28.04.2007
0.12
24
0.830
2988.00
71712.00
72.00
29.04.2007
0.12
24
0.830
2988.00
71712.00
72.00
30.04.2007
0.12
24
0.830
2988.00
71712.00
72.00
2475.00
83.00
No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.
GoM : Phed
488
Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of May 2007.
Date
Duration of spilling
Spilling details
Gate
No. II
Gate
No. III
the day
(Hrs.)
Gate
No. I
Gate
No. II
Gate
No. III
M/sec
M/hr.
ML
01.05.2007
0.12
24
0.83
2988.00
71712.00
72.00
02.05.2007
0.12
24
0.83
2988.00
71712.00
72.00
03.05.2007
0.15
24
1.150
4160.00
99840.00
100.00
04.05.2007
0.12
24
0.830
2988.00
71712.00
72.00
05.05.2007
0.13
22
0.930
3356.00
73832.00
74.00
06.05.2007
0.16
24
1.270
4583.00
109984.00
110.00
07.05.2007
0.12
24
0.830
2986.00
71712.00
72.00
08.05.2007
0.13
24
0.930
3356.00
80550.00
81.00
09.05.2007
0.12
24
0.830
2988.00
71712.00
72.00
10.05.2007
0.12
24
0.830
2988.00
71712.00
72.00
11.05.2007
0.13
24
0.830
3356.00
80550.00
81.00
12.05.2007
0.12
24
0.830
2988.00
71712.00
72.00
13.05.2007
0.14
24
1.040
3744.00
89856.00
90.00
14.05.2007
0.15
24
1.150
4160.00
99840.00
100.00
15.05.2007
0.16
24
1.270
4583.00
109984.00
110.00
16.05.2007
0.14
24
1.040
3744.00
89856.00
90.00
17.05.2007
0.13
24
0.930
3356.00
80550.00
81.00
18.05.2007
0.13
24
0.930
3356.00
80550.00
81.00
19.05.2007
0.12
24
0.830
2988.00
71712.00
72.00
20.05.2007
0.15
24
1.150
4160.00
99840.00
100.00
21.05.2007
0.15
24
1.150
4160.00
99840.00
100.00
22.05.2007
0.14
24
1.040
3744.00
89856.00
90.00
23.05.2007
0.16
24
1.270
4583.00
109984.00
110.00
24.05.2007
0.13
24
0.930
3356.00
80550.00
81.00
25.05.2007
0.12
24
0.830
2988.00
71712.00
72.00
26.05.2007
0.12
24
0.830
2988.00
71712.00
72.00
27.05.2007
0.13
24
0.930
3356.00
80550.00
81.00
28.05.2007
0.13
24
0.930
3356.00
80550.00
81.00
29.05.2007
0.13
24
0.930
3356.00
80550.00
81.00
30.05.2007
0.14
24
0.930
3356.00
80550.00
81.00
31.05.2007
0.15
24
1.150
4160.00
99840.00
100.00
2623.00
85.00
No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.
GoM : Phed
489
Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of June 2007.
Date
Duration of spilling
Spilling details
Gate
No. II
Gate
No. III
(Hrs.)
Gate
No. I
Gate
No. II
Gate
No. III
M/sec
M/hr.
ML
01.06.2007
0.15
24
1.150
4160.00
99840.00
100.00
02.06.2007
0.15
24
1.150
4160.00
99840.00
100.00
03.06.2007
0.16
24
1.270
4572.00
109728.00
110.00
04.06.2007
0.16
24
1.270
4572.00
109728.00
110.00
05.06.2007
0.16
24
1.270
4572.00
109728.00
110.00
06.06.2007
0.15
24
1.150
4160.00
99840.00
100.00
07.06.2007
0.50
24
7.030
25315.83
607580.08
608.00
08.06.2007
0.15
0.15
24
20
4.600
8280.00
182160.00
183.00
09.06.2007
0.55
0.48
24
24
14.710
53018.70
1272450.00
1272.00
10.06.2007
1.15
0.85
24
24
40.110
144421.28
3466110.00
3466.00
11.06.2007
1.20
1.00
24
18
46.03
165708.00
3597368.00
3547.00
12.06.2007
0.18
24
1.510
5468.22
131237.30
131.00
13.06.2007
0.50
24
7.030
25315.80
607580.00
608.00
14.06.2007
0.20
24
1.780
6404.45
153706.90
154.00
15.06.2007
0.20
24
1.780
6404.45
153706.90
154.00
16.06.2007
0.22
24
2.050
7388.75
177330.00
177.00
17.06.2007
0.15
23
1.150
4140.00
95220.00
95.00
18.06.2007
0.15
23
1.150
4140.00
95220.00
95.00
19.06.2007
0.15
23
1.150
4140.00
95220.00
95.00
20.06.2007
0.15
23
1.150
4140.00
95220.00
95.00
21.06.2007
0.15
24
1.150
4159.81
99835.90
100.00
22.06.2007
0.19
24
1.650
5930.17
142324.25
142.00
23.06.2007
0.15
24
1.150
4140.00
95220.00
95.00
24.06.2007
0.15
24
1.150
4140.00
95220.00
95.00
25.06.2007
0.15
24
1.150
4140.00
95220.00
95.00
26.06.2007
0.15
22
1.150
4140.00
95220.00
95.00
27.06.2007
0.15
24
1.150
4140.00
95220.00
95.00
28.06.2007
0.15
24
1.150
4140.00
95220.00
95.00
29.06.2007
0.15
24
1.150
4140.00
95220.00
95.00
30.06.2007
0.15
24
1.150
4140.00
95220.00
95.00
12312.00
410.00
No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.
GoM : Phed
490
Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of July 2007.
Date
Duration of spilling
Spilling details
Gate
No. II
01.07.2007
0.10
02.07.2007
(Hrs.)
Gate
No. I
Gate
No. II
Gate
No. III
0.09
24
24
1.170
0.10
0.10
24
24
03.07.2007
0.13
0.12
04.07.2007
0.14
05.07.2007
0.07
06.07.2007
0.22
07.07.2007
0.22
08.07.2007
0.11
0.08
24
09.07.2007
0.11
0.08
10.07.2007
0.11
0.08
11.07.2007
0.11
12.07.2007
13.07.2007
14.07.2007
0.25
15.07.2007
ML
4212.00
101088.00
101.00
1.250
4500.00
108000.00
108.00
24
1.760
6336.00
110232.00
110.00
24
1.040
3744.00
89856.00
90.00
6.360
22896.00
139104.00
139.00
24
2.050
7388.75
177120.00
177.00
24
2.050
7388.75
177120.00
177.00
18
1.170
4212.00
91368.00
91.00
24
18
1.170
4212.00
91368.00
91.00
24
18
1.170
4212.00
91368.00
91.00
0.08
24
18
1.170
4212.00
91368.00
91.00
0.11
0.08
24
18
1.170
4212.00
91368.00
91.00
0.11
0.08
24
18
1.170
4212.00
91368.00
91.00
18
2.480
8928.00
160704.00
160.00
0.23
18
2.190
7884.00
189216.00
189.00
16.07.2007
0.25
24
2.480
8950.50
214812.00
215.00
17.07.2007
0.25
24
2.480
8928.00
214272.00
214.00
18.07.2007
0.26
24
2.630
9468.00
227232.00
227.00
19.07.2007
0.25
0.15
24
3.630
13068.00
247392.00
247.00
20.07.2007
0.34
0.05
24
4.160
14996.21
346299.00
346.00
21.07.2007
0.15
24
1.150
4159.81
99835.90
100.00
22.07.2007
0.16
24
1.270
4572.00
109728.00
110.00
23.07.2007
0.13
24
0.930
3348.00
80352.00
80.00
24.07.2007
0.33
24
3.770
13572.00
326728.00
326.00
25.07.2007
0.60
0.40
24
18
14.270
54372.00
1124280.00
1129.00
26.07.2007
0.40
0.30
24
24
8.290
298.50
716412.00
715.00
27.07.2007
0.17
0.20
24
24
3.170
11426.00
274224.00
274.00
28.07.2007
0.20
1.780
6408.00
153792.00
153.00
29.07.2007
0.50
0.27
24
24
9.820
35361.50
848678.39
849.00
30.07.2007
0.48
0.33
24
24
10.380
37368.00
897268.00
897.00
31.07.2007
0.15
0.29
24
21
4.255
15342.19
0.45
Gate
No. III
24
24
M/sec
M/hr.
334665.00
335.00
8014.00
259.00
No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.
GoM : Phed
491
Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of August 2007.
Date
Duration of spilling
Spilling details
Gate
No. II
01.08.2007
0.09
02.08.2007
0.09
03.08.2007
0.13
04.08.2007
0.15
05.08.2007
(Hrs.)
Gate
No. I
Gate
No. II
Gate
No. III
0.15
24
24
1.680
0.25
24
13
ML
6068.00
145632.00
146.00
3.010
10883.00
162748.00
169.00
24
0.930
3356.23
80519.63
81.00
24
1.150
4160.00
99840.00
100.00
0.15
24
1.150
4160.00
99840.00
100.00
06.08.2007
0.20
24
1.800
6480.00
155520.00
156.00
07.08.2007
0.19
24
1.270
4572.00
109728.00
110.00
08.08.2007
0.13
24
0.930
3348.00
80352.00
80.00
09.08.2007
0.13
24
0.930
3348.00
80352.00
80.00
10.08.2007
0.18
24
1.520
5472.00
131328.00
131.00
11.08.2007
0.16
24
1.270
4572.00
109728.00
110.00
12.08.2007
0.17
24
1.390
5019.00
120456.00
120.00
13.08.2007
0.20
24
1.780
6404.45
153792.00
154.00
14.08.2007
0.18
24
1.520
5468.22
131237.29
131.00
15.08.2007
016
0.08
24
1.900
6840.00
121068.00
121.00
16.08.2007
0.16
0.08
24
1.900
6840.00
121068.00
121.00
17.08.2007
0.16
24
1.270
4572.00
109728.00
110.00
18.08.2007
0.13
24
0.930
3356.23
80549.60
81.00
19.08.2007
0.15
24
1.150
4140.00
99360.00
99.00
20.08.2007
0.15
24
1.150
4140.00
99360.00
99.00
21.08.2007
0.14
24
1.040
3751.00
90024.00
90.00
22.08.2007
0.14
24
1.040
3751.00
90024.00
90.00
23.08.2007
0.14
24
1.040
3751.00
90024.00
90.00
24.08.2007
0.14
24
1.040
3751.00
90024.00
90.00
25.08.2007
0.17
24
1.390
5019.00
120456.00
120.00
26.08.2007
0.13
24
0.930
3356.23
80549.60
81.00
27.08.2007
0.12
24
0.830
2988.30
71712.60
72.00
28.08.2007
0.12
24
0.830
2988.30
71712.60
72.00
29.08.2007
0.12
24
0.830
2988.30
71712.60
72.00
30.08.2007
0.12
24
0.830
2988.30
71712.60
72.00
31.08.2007
0.12
24
0.830
2988.30
Gate
No. III
M/sec
M/hr.
71712.60
72.00
3220.00
104.00
No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.
GoM : Phed
492
Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of September 2007.
Date
Duration of spilling
Spilling details
Gate
No. II
Gate
No. III
(Hrs.)
Gate
No. I
Gate
No. II
Gate
No. III
M/sec
M/hr.
ML
01.09.2007
0.14
24
1.040
3744.00
89856.00
90.00
02.09.2007
0.14
24
1.040
3744.00
86112.00
86.00
03.09.2007
0.15
1.040
3751.00
90024.00
90.00
04.09.2007
0.20
0.95
24
10
20.710
72705.80
816720.00
817.00
05.09.2007
0.27
0.48
24
9.400
33857.00
383971.00
384.00
06.09.2007
0.30
0.50
24
08.30
37080.00
459684.00
460.00
07.09.2007
0.35
0.25
24
24
6.590
23724.00
569376.00
569.00
08.09.2007
0.35
0.25
24
24
6.590
23724.00
569376.00
569.00
09.09.2007
0.30
24
3.270
11765.73
282377.00
282.00
10.09.2007
0.18
24
1.520
5468.22
131237.29
131.00
11.09.2007
0.21
0.17
24
17
3.300
11909.66
250699.60
251.00
12.09.2007
0.25
0.33
24
24
6.250
22524.50
347257.00
347.00
13.09.2007
0.14
0.10
24
24
1.661
6015.14
144363.00
144.00
14.09.2007
0.08
0.10
24
24
1.070
3884.51
93228.70
93.00
15.09.2007
0.14
1.040
3744.00
89856.00
90.00
16.09.2007
0.05
0.12
24
24
1.040
3777.07
90649.84
91.00
17.09.2007
0.17
0.07
19
19
1.758
6345.04
120555.9
121.00
18.09.2007
0.16
24
1.270
4572.00
109728.00
109.00
19.09.2007
0.15
24
1.150
4140.00
99360.00
99.00
20.09.2007
0.16
24
1.270
4582.65
109983.70
110.00
21.09.2007
0.14
24
1.040
3744.00
89856.00
90.00
22.09.2007
0.22
15
2.050
7388.75
110931.30
111.00
23.09.2007
0.20
24
1.800
6480.00
155520.00
155.00
24.09.2007
0.18
24
1.510
5436.00
130464.00
130.00
25.09.2007
0.17
23
1.390
5004.00
115092.00
115.00
26.09.2007
0.16
20
1.270
4572.00
91440.00
91.00
27.09.2007
0.16
20
1.270
4572.00
91440.00
91.00
28.09.2007
0.16
20
1.270
4572.00
91440.00
91.00
29.09.2007
0.16
24
1.270
4572.00
91440.00
91.00
30.09.2007
0.15
24
1.040
3751.00
90024.00
90.00
5988.00
200.00
24
24
No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.
GoM : Phed
493
Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of October 2007.
Date
Duration of spilling
Spilling details
Gate
No. II
Gate
No. III
(Hrs.)
Gate
No. I
Gate
No. II
Gate
No. III
M/sec
M/hr.
ML
01.10.2007
0.15
24
1.150
4140.00
99360.00
99.00
02.10.2007
0.15
24
1.150
4140.00
99360.00
99.00
03.10.2007
0.15
24
1.150
4140.00
99360.00
99.00
04.10.2007
0.14
24
1.040
3744.00
89856.00
90.00
05.10.2007
0.13
24
0.930
3240.00
77760.00
78.00
06.10.2007
0.16
24
1.270
4572.00
109728.00
110.00
07.10.2007
0.17
24
1.390
5004.00
120096.00
120.00
08.10.2007
0.45
24
6.000
21615.04
518760.90
519.00
09.10.2007
0.15
24
1.150
4140.00
99360.00
99.00
10.10.2007
0.17
24
1.390
5004.00
120096.00
120.00
11.10.2007
0.14
24
1.041
3750.85
90020.33
90.00
12.10.2007
0.15
24
1.150
4159.80
99835.59
100.00
13.10.2007
0.14
24
1.041
3750.85
90020.33
90.00
14.10.2007
0.11
24
0.725
2612.31
62695.67
93.00
1806.00
120.00
No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.
GoM : Phed
494
Appendix : 10
2.
Sender's reference
3.
No .EE/PHE/ElectlTB-145(Pt-I)/200S-09/4SI
Dated 24th June 200S
Raw water (Dam of GSWSS Mawphlang)
Co ll ected by P.H.E Dept!.
4.
5.
24.6.0S.
6.
Laboratory reference
G/137/0S
6.7
Turbidity (NTU)
735.0
5.0
3.
Conductivity (~mho/cm)
20.S
SOO.O
4.
Chloride (mg/I)
4.0
250.0
5.
S.O
300.0
6.
Alkalinity (mgl1)
S.O
200.0
7.
[ron (mg/I)
0.6
0.3
8.
920
10
SINo
Parameters
I.
pH
2.
Results
Remarks: As the Turbidity and Total Coliform (MPN/ IOOml) is above the permissible limit the
water has to be treated before supplying to the consumer
l?". N~
~ated, Shillong,
Sr.Sci~
S>E
Mem~y\
495
GoM:Phed
467
496
GoM:Phed
451
497
PHONE
email: mspcb@sancharneUn
TELEFAX
A.
B.
Source of water
C.
Place of collection
D.
E.
Date of receipt
: 0364 - 2521217
2521764
2521 514
0364 - 2521533
13 ..f!' JV~~7
Fkhu:a.I ,Qit74-WJrL/ &. ~lAkI'
!(aw- ~/Vt
~.A.N,<C< M~/1'
:;:s. tflt77. at 9. t:JOa?n .
,(;5 oj.
~r
PHYSICAL CHARACTERISTICS
l.
Turbidity
2.
Odour
3.
PH
fQZ-er. oo N7U.
CHEMICAL CHARACTERISTICS
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
8.
Total Iron
BACTERIOLOGICAL TEST
Date of Report
GoM:Phed
_ _
Member Secretary
Meghalaya State Pollution Control Board
Shillong
498
email : mspcb@sancharnet.in
A.
B.
Source of water
C.
Place of collection
D.
E.
Date of receipt
PHONE
TELEFAX:
0364 - 2521217
2521764
2521514
0364 - 2521533
g. g. 6 7
PHYSICAL CHARACTERISTICS
I.
Turbidity
2.
Odour
3.
PH
CHEMICAL CHARACTERISTICS
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
8.
Total Iron
,
BACTERIOLOGICAL TEST
Probable number of coliform baccilli in IOOml of water is _ __ I,-t=-O
",--_+_
as per Mac Crady.
Date of Report
GoM:Phed
PI 8 Cr .
_ _
Member Secretary
Meghalaya State Pollution Control Board
Shillong
499
PHONE
email : mspcb@sancharnet.in
/3.
TELEFAX:
0364 - 2521217
2521764
2521514
0364 - 2521533
g. ,1VU'a~.
A.
B.
Source of water
C.
Place of collection
g, S . fj.~ . S.
D.
E.
Date of receipt
106 r 0 "7 .
1aw-
JJalM
jvfa-N~7 '
cJ
1-Z.'t>O(N)
PHYSICAL CHARACTERISTICS
I.
Turbidity
2.
Odour
3.
PH
I () '10 00 /l it.!
CHEMICAL CHARACTERISTICS
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
8.
Total Iron
BACTERIOLOGICAL TEST
Date of Report
GoM:Phed
Member Secretary
Meghalaya State Pollution Control Board
Shillong
500
PHONE
TELEFAX:
email: mspcb@sancharneUn
A.
B.
Source of water
C.
Place of collection
D.
/9.
E.
Date of receipt
1<1. ()r;. 07
Nar:;PMal,'
S.H.5.S.,
()6 0'7
0364 - 2521217
2521764
2521514
0364 - 2521533
a.f
J30
,&7- .
PHYSICAL CHARACTERISTICS
I.
Turbidity
2.
Odour
3.
PH
CHEMICAL CHARACTERISTICS
II /
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
8.
Total Iron
If
6 5 .?
#fn
,
BACTERIOLOGICAL TEST
Probable number of coliform baccilli in 100ml of water is _ _ ...:.-/...::g:....:{)=---f-~_ _
as per Mac Crady.
Date of Report
GoM:Phed
ht
"<:'7/6
Member Secretary
Megbalaya State Pollution Control Board
Sbillong
501
PHONE
email: mspcb@sancharnet.in
TELEFAX :
0364 - 2521217
2521764
2521514
0364 - 2521533
B.
Source of water
C.
Place of collection
D.
E.
Date of receipt
l/uJl-ucal IJilrii6/b)
Ifa+v lJaJV-t
jJh'E Na~AJr:;7J1
PHYSICAL CHARACTERISTICS
I.
Turbidity
2.
Odour
3.
PH
'loa DO
N7U
7/
CHEMICAL CHARACTERISTICS
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
8.
Total Iron
BACTERIOLOGICAL TEST
/6D
Date of Report
22/5 J0
f
GoM:Phed
'
r.
--
Member Secretary
Meghalaya State Pollution Control Board
Shillong
502
PHONE
email: mspcb@sancharnet.in
TELEFAX
0364 - 2521217
2521764
2521514
0364 - 2521533
CU~~~.f'-ff
ttl ed-~ t//v-i'..&WI1.; Pf/ ftZa MJI'J.ia.
J3 . .. - I
A.
B.
Source of water
M t!r
fJeV-Vi
4 s .II .[;,.$.
C. Place of collection
D.
E.
Date of receipt
;;Zli- il '
a7
PHYSICAL CHARACTERISTICS
1.
Turbidity
2.
Odour
3.
PH
;:;~/)() . 0 0
/'II 7 L/
CHEMICAL CHARACTERISTICS
1// f/,hv
4.
Total hardness
5.
Carbonate hardness
6",6 Ap;r...
6.
Non-Carbonate hardness
1-;, 6- It tho
7.
Chloride
6 1 ffh--v
8.
Total Iron
(). 8 PPf-r-....-
Ii
BACTERIOLOGICAL TEST
oi
t
Fe
II /', /\ )
Date of Report
GoM:Phed
0-1/.61D7
I'
Member Secretary
Meghalaya State Pollution Control Board
Shillong
503
PHONE
email: mspcb@sancharnet.in
TELEFAX :
0364 - 2521217
2521764
2521514
0364 - 2521533
.8 . -fl.
/Ci..n t 4. f'f!
/{,/edr'-UCd ~ &~ , PJlI:, /Y!av,,/2J-.il7
A.
B.
Source of water
C.
Place of collection
D.
13- ..3
E.
Date of receipt
13 3. 6 7
4J
Lj t7 0
4H
PHYSICAL CHARACTERISTICS
1.
Turbidity
2.
Odour
3.
PH
/ 9 8
{JO
IY Tf-I
tJd t>?vt/U<f.
67
CHEMICAL CHARACTERISTICS
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
8.
Total Iron
/m..-
15 ' 5
8 g
!
rn.
G 7 fflrv
#hv
7 I-;
I
tJ .5S fj?m.
BACTERIOLOGICAL TEST
r
{
Fe
I
Date of Report
GoM:Phed
;2 ~/~/o 7
Member Secretary
Meghalaya State Pollution Control Board
Shillong
504
PHONE
email : mspcb@sanchamet.in
TELEFAX
A.
B.
Source of water
C.
Place of collection
D.
E.
Date of receipt
CJ ~ .
61 c:J
0(' . 0 .2 - CJ 7' .
06-
0364 - 2521217
2521764
2521514
0364 - 2521533
(
/J ()
/fA! .
PHYSICAL CHARACTERISTICS
I.
Turbidity
;:.3 6
CJD N I II
2.
Odour
odo W
-t..le.S
3.
PH
6 8
CHEMICAL CHARACTERISTICS
13 2>
/?f 'l-r.
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
0 It Ifl
8.
Total Iron
() ' 35 !ph)..
It. it f-"'f~
g. "1#h-v
r"...
BACTERIOLOGICAL TEST
Probable number of coliform baccilli in IOOml of water is
as per Mac Crady.
GoM:Phed
Fe
' ,t:;".o ,
_ - 'v'-'l _
_ _ __
M ber Secretary
Meghalaya State Pollution Control Board
Shillong
505
PHONE
TELEFAX :
email : mspcb@sancharnetin
0364 - 2521217
2521764
2521514
0364 - 2521533
A.
B.
Source of water
,fa ,4'
C.
Place of collection
-G.'!;.u$ S
Z,3. ()/.{)
H afe/t.-
!l1c.Vv j:'/,)?/LC)c
'1 af
(j
-<.3 . 6/ - 07
Date ofreceipt
PHYSICAL CHARACTERISTICS
1.
Turbidity
2.
Odour
3.
PH
'iZo, ()()
N 7L/
CHEMICAL CHARACTERISTICS
8 ff !fin,.
It If ,? fin.
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
7 5
#m
8.
Total Iron
67
If"'"
tI
4 . 1; It~
Fe-
BACTERIOLOGICAL TEST
t .~ )
Probable number of coliform baccilli in 100ml of water is _-==..J~_
as per Mac Crady.
Date of Report
GoM:Phed
3()/ /; /0 7
;
____
Member Secretary
Meghalaya State Pollution Control Board
Shillong
506
PHONE
email : mspcb@sancharnet.in
A.
B.
Source of water
C.
Place of collection
TELEFAX :
Ie;. 12 '()6
E.
19 IJ; . '0 6
Date of receipt
0364 - 2521217
2521764
2521514
0364 - 2521533
PHYSICAL CHARACTERISTICS
1.
Turbidity
./ r)6 t) ()
2.
Odour
tJdok'tlU6
3.
PH
Nrt.l
65
CHEMICAL CHARACTERISTICS
//. / ,P;knv
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
6 . .5 ,p/? '"'"
8.
Total Iron
() , .z !tin.
klfl t m.
II
{, . 7 ,P,P 1YJ..,
1 Fe .
BACTERIOLOGICAL TEST
Probable number of coliform baccilli in lOOml of water is
as per Mac Crady.
Date of Report
GoM:Phed
5r/1/0
7
,
_ --''=-_
'''-:> ' ___ _
I
~k
507
B.
Source of water
C.
Place of collection
D.
E.
Date of receipt
PHYSICAL CHARACTERISTICS
l.
Appearance
2.
Odour
PH
CHEMICAL CHARACTERISTICS
4.
Total hardness
I~,
5.
Carbonate hardness
02, $
6.
Non-Carbonate hardness
7.
Chloride
8.
Total Iron
-.-vV
J'7 ~
~ ;lf::: 1 6<
BACTERIOLOGICAL TEST
Regn. No.
37
r-'-l.:g,.:c .O::::-7'_'~_____
Date of Report
. .
'fUb~ "
Gove~ent of Meghalaya
31 lhe Dirc(:lornlC of Prill tillIt & Stationery, Mcghalaya, SlliUong 12412005 Hcahh., 5,QOO.24.ll .2005
GoM:Phed
508
~f~
4~o~ ___
Regn. No. _ _
A.
B.
Source of water
C.
Place of collection
J.a.vv . N~Y
.b ~
qS
7:
&Vl~
'2-~
I
A).5 S .
!>?~~
-=
O_~
Date of receipt
PHYSICAL CHARACTERISTICS
l.
Appearance
2.
Odour
PH
oJ.
ocku....y ( t.V.KJ
CHEMICAL CHARACTERISTICS
l7 ' O ~
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
vvv
.3 , 5 11rvv
{J 9 lfrv
8.
Total Iron
O. 6 ~
/3 , S
:j- Fe-
BACTERIOLOGICAL TEST
Regn. No._---'. ~/3
~--'5~
.-_ _
) 0+ 1
1 <'15-"-=-_
Probable number of coliform baccilli in 100ml of water is _ _ _--"
_~_~_ _ _
as per Mac Crady.
R~ ~. :'\RKS
Date of Report
~ ~
~ ;J :.o
~d~ '~f:r L~ ~~ .
y~ ~
,r
4~U~
' fubhc Arialyst
Govet0ment of Meghalaya
Pasteur Institute, Shillong.
Printed allhc Dircctornlc orPrinling & Stationery, Mcghalaya, Shillong 124/2005 Health, ~ .OOO.24. 11.2005
GoM:Phed
509
Regn. N o.
.t '
_~,-/v
,,-,I _ _ _ __
A.
B.
Source of water
C.
Place of collection
D.
E.
Date of receipt
6L'To24 ~
?i:
1JC4v-v
gSIJSS ,
~\W~ , PJlF,flJ7?
1lZ~
/ 8 ' ,f, , 08
PHYSICAL CHARACTERISTICS
I.
Appearance
2.
Odour
PH
J.
b~
b'7
CHEMICAL CHARACTERISTICS
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
8.
Total Iron
BACTERIOLOGICAL TEST
Regn. No.
/17
r
1. )
/ 8 0 _ _ _ __
Probable number of coliform baccilli in 100ml of water is _ _ _ _ _--'~~
as per Mac Crady.
~~~~'
r-tlnwJ~
f4.-~
~
Vublic ~
Date of Report
Gov<tnment of Meghalaya
Pasteur Institute, Shillong.
Printed althe Dircct()ralC ofPrinling & Stationery, McgllllJaya, SlIiUol1g )24nOOS Hcahh, 5,000-24.11 .2005
GoM:Phed
510
1.
2.
Sender's reference
3.
No.EE/PHE/ElectlTB- 145(Pt-I)12008-09/481
Dated 24th June 2008
Treated water (Reservoir of GSWSS
Mawphlang)
4.
5.
24.6.08.
6.
Laboratory reference
G/138/08
SI No
Parameters
Results
1.
pH
8.0
6.5-8.5
2.
Turbidity (NTU)
0.5
5.0
3.
Conductivity ( ~ mho/cm)
86.1
800.0
4.
Chloride (mgll)
6.0
250.0
S.
22.0
300.0
6.
Alkalinity (mgll)
12.0
200.0
7.
Iron (mgll)
0.06
0.3
8.
10
Dated, Shillong,
The 27'hJ une 2008
~ N
L.
Sr.Sc~-
Shm'~
/II.
o~ '
~
s.,
1
GoM:Phed
511
467
GoM:Phed
512
451
th
GoM:Phed
513
PHONE
TELEFAX :
email: mspcb@sancharnet.in
A.
B.
Source of water
C.
Place of collection
D.
E.
Date of receipt
0364 - 2521217
2521764
2521514
0364 - 2521533
PHYSICAL CHARACTERISTICS
I.
Turbidity
2.
Odour
3.
PH
6 '1
CHEMICAL CHARACTERISTICS
4.
Total hardness
2.;(,
fj; 9n
5.
Carbonate hardness
/9. q
?;pm
6.
Non-Carbonate hardness
fm
7.
Chloride
,z 3
"1 ./j
8.
Total Iron
().:/
#J7V
BACTERIOLOGICAL TEST
Probable number of coliform baccilli in lOOml of water is
as per Mac Crady.
Date of Report
()3;!o/0 7
/
GoM:Phed
n -rn
1 ~e-
I
>
()
Member Secretary
Meghalaya State Pollution Control Board
Shillong
514
email: mspcb@sancharnet.in
A.
B.
Source of water
C.
Place of collection
D.
E.
Date of receipt
g . S . 6 ",
'3. '3. {) 7 .
at
PHONE
TELEFAX
0364 - 2521217
2521764
2521514
0364 - 2521533
cr..Or) am
PHYSICAL CHARACTERISTICS
l.
Turbidity
2.
Odour
3.
PH
CHEMICAL CHARACTERISTICS
3/ 0
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
8.
Total Iron
IPjzrn-
BACTERIOLOGICAL TEST
I A'
Date of Report
GoM:Phed
/,1.
g. 6 '1- .
Member Secretary
Meghalaya State Pollution Control Board
Shillong
515
PHONE
email : mspcb@sancharnet.in
A.
B.
Source of water
C.
Place of collection
D.
E.
Date of receipt
TELEFAX :
q. 5. /-I. S ..5/
!(). () -;:. 0
7.
0364 - 2521217
2521764
2521514
0364 - 2521533
Iv1cuvrfiJa;if
aI 1;::,.' t:?O (N)
PHYSICAL CHARACTERISTICS
I.
Turbidity
2.
Odour
3.
PH
(). SO
N7tf
CHEMICAL CHARACTERISTICS
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
8.
Total Iron
BACTERIOLOGICAL TEST
Probable number of coliform baccilli in 100ml of water is
as per Mac Crady.
Date of Report
GoM:Phed
18/01/0 t
J
_ _
--'-0_ ___
Membe
eretary
Megbalaya Slta e Pollution Control Board
Sbillong
516
PHONE
TELEFAX :
email: mspcb@sancharnet.in
A.
B.
Source of water
C.
Place of collection
0364 - 2521217
2521764
2521514
0364 - 2521533
;vj~a-J1
at
/.30 ;P?7'Z>
,
Date of receipt
PHYSICAL CHARACTERISTICS
I.
Turbidity
2.
Odour
3.
PH
o f)()
N1!1
CHEMICAL CHARACTERISTICS
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
8.
Total Iron
BACTERIOLOGICAL TEST
Date of Report
~!.:~,
21/b jo t
I
GoM:Phed
517
PHONE
TELEFAX:
email : mspcb@sancharnet.in
A.
B.
Source of water
C.
Place of collection
D.
E.
Date of receipt
0364 - 2521217
2521 764
2521 514
0364 - 2521533
PHYSICAL CHARACTERISTICS
1.
Turbidity
2.
Odour
3.
PH
alo
#7U
7 3 .
CHEMICAL CHARACTERISTICS
37.
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
8.
Total Iron
C;
33.3
b. b
35
BACTERIOLOGICAL TEST
I () J
Date of Report
22/5/01.
I
I
GoM:Phed
Member Secretary
Meghalaya State Pollution Control Board
Shillong
518
email : mspcb@sancharnet.in
A.
B.
Source of water
C.
Place of collection
D.
E.
Date of receipt
-41.$. /./. $ . $.
-</-;' /f . {) 7
;2),;. 1; . {) 7
PHONE
TELEFAX
0364 - 2521217
2521764
2521514
0364 - 2521533
MaNjdv/ei"j
cd I e{) 0 F~
PHYSICAL CHARACTERISTICS
7 {) N'7C/
1.
Turbidity
y) .
2.
Odour
octo [{hIV,Yi
3.
PH
7, /
CHEMICAL CHARACTERISTICS
4.
3 3 3
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
3 / CJ
~. 3
11,
7. Chloride
8.
I7Pfh
#rr..fttr-
f;Pff>
tJ tJ 5
Total Iron
m. 1 re
BACTERIOLOGICAL TEST
Date of Report
GoM:Phed
()
,.
Member Secretary
Meghalaya State Pollution Control Board
Shillong
519
email : mspcb@sancharnet.in
PHONE
TELEFAX
0364 - 2521217
2521764
2521 514
0364 - 2521533
A.
;S . 4 . -rw~
luI.L~ /J [y/&;or., PRIf iY!a.W/J,Ja"!
B.
Source of water
1h Ci..JeA
C.
Place of collection
D.
13 ,3 .
CJ
hiq}Ot
MOt 'vj>Aio.7
1 cd 9. CJc; /M/
13 ;3 {)7
E. Date of receipt
PHYSICAL CHARACTERISTICS
I.
Turbidity
2.
Odour
3.
PH
(J 70
N T!.;
/"1
CHEMICAL CHARACTERISTICS
Itg& PfMI
;39. 9 # hv
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
13
8.
Total Iron
() ,
8 1/;b /'rv
1#
tJ 5 # f>-. -
In.
BACTERIOLOGICAL TEST
Probable number of coliform baccilli in IOOml of water is
as per Mac Crady.
GoM:Phed
;2.! /22/07
7
l'
Fe
10 I
~.
Member Secretary
Meghalaya State Pollution Control Board
Shillong
520
PHONE
email : mspcb@sancharneUn
B.
Source of water
C.
Place of collection
~'::-1-,Lz~C~/ Jj';yr~~1 Pm
MaW;Aki
/h~.L.f--ed ..-z'./aJe--'1.
-fJ"$' . H~!!.
TELEFAX :
0364 - 2521217
2521764
2521514
0364 - 2521533
/OH-<a.~
13. 1/,
A.
Mcuuf AjJI."(J
'1
Date of receipt
PHYSICAL CHARACTERISTICS
1.
Turbidity
2.
Odour
3.
PH
.0 , 70
/yjL!
7-1
CHEMICAL CHARACTERISTICS
,<-'=""
bc.:.,-'6
"'--;,f::.
/i'
F hv
:...:.-"._ _ _ _ _ _ _ _
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
8.
Total Iron
.~
A~'''<
Ir rn,
.~
BACTERIOLOGICAL TEST
Probable number of coliform baccilli in lOOml of water is
as per Mac Crady.
Date of Report
IZ/-<"/tJ7
7
GoM:Phed
(0
- --
- --
MeJ2::.ry
Meghalaya State Pollution Control Board
Shillong
521
email : mspcb@sancharneUn
PHONE
TELEFAX
0364 - 2521217
2521764
2521514
0364 - 2521533
A.
/ec.J"-c~W
B.
Source of water
C.
Place of collection
{}:;.w ,s .c
D.
;;2'3, () /'
E.
Date of receipt
;(.,3, ()/' (J 7
(J
"1
/J ['vis-Im-..
'p'H
/J1a"flJ..a(J
MGt?W l'if
cd
PHYSICAL CHARACTERISTICS
(), 7CJ
/Y l tj
l.
Turbidity
2.
Odour
.Od crw-dvU
3.
PH
0 -7
CHEMICAL CHARACTERISTICS
4.
Total hardness
2Z -<.
5.
Carbonate hardness
17, 7
6.
Non-Carbonate hardness
7.
Chloride
8.
Total Iron
It , s1 (J,8
L') , CJ5
# t-rv
'P/'m-
If rr...
/1?h-t..-
# Ih. t;f
BACTERIOLOGICAL TEST
Probable number of coliform baccilli in lOOml of water is
as per Mac Crady.
Date of Report
GoM:Phed
3 D/I/D 7
'1
Fe.
'0'
~,
Member Secretary
Meghalaya State Pollution Control Board
Shillong
522
PHONE
email: mspcb@sancharnet.in
T ELEFAX :
0364 - 2521217
2521764
2521514
0364 - 2521533
A.
B.
Source of water
~A.J-e.d trfcJV1..
C.
Place of collection
D.
19.
E.
Date of receipt
11/;;2 . 0 6 .
'061 cd
/ ,R .
1?"; tJ O ~
PHYSICAL CHARACTERISTICS
I.
Turbidity
2.
Odour
3.
PH
' 0-
70 NIlI
7,a
CHEMICAL CHARACTERISTICS
II{; . 8'
/# m-
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
,?fm.IG .Z /t r-r-. .
8.
Total Iron
0 .05 Pj?Jn.
;Z 7 0
;
# rrv
/9 g
BACTERIOLOGICAL TEST
Fe
10 )
DateofReport~O 7
GoM:Phed
Member Secretary
Meghalaya State Pollution Control Board
Shillong
523
/ S-O
Regn. No.
A.
B.
Source of water
C.
Place of collection
D.
E.
Date of receipt
PHYSICAL CHARACTERISTICS
I.
Appearance
2.
Odour
3..
PH
~/Y
CHEMICAL CHARACTERISTICS
G 1VV'v
t 8 .~t~
~6.
4.
Total hardness
5.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
9 ~
8.
Total Iron
O o S-
"'It:
!fr"
/
p/F~
BACTERIOLOGICAL TEST
Regn. No.
/ 3G
~O )
.
Probable number of coliform baccilli in IOOml of water is _ _--'--'~
_ _~_ _ _ _ _
as per Mac Crady.
F rfr
R~ ~. L\RKS:
Date of Report
\tu~
() 1/07/0R
I
~ ~d-u.:" ..
Gove\1ment of Megba\aya
Pasteur InstiMe, Sbillong.
P:inted lithe Din:ctOI'llIC of Printing & SlIuioAl."'f)', Megllalroya., Shitklll8 12412005 HClhh, S,000-24.ll.2005
GoM:Phed
524
I 9(lQ
,
Regn. No. _ _ ----'--""
-"'--'-_ _ _
A.
B.
Source of water
C.
Place of collection
D.
E.
Date of receipt
PHYSICAL CHARACTERISTICS
dc.o..y
1. . Appearance
2.
Odour
~
~.
PH
O~
7- 1
CHEMICAL CHARACTERISTICS
4.
Total hardness
/ Q o.
5.
Carbonate hardness
l oS
6.
Non-Carbonate hardness
5-4~
1'1 ' ~J #
rvv
7 0 . 0 ~
7. . Chloride
8.
oft.-vv
O I 05 ~
Total Iron
~Fe..
BACTERIOLOGICAL TEST
Regn. No.
I al 't
~Prfr~~ '
\public Analyst
Gover\ment of Mcghalaya
Pasteur Institute, Shillong.
Primed al the Dirtclor'lc of Prinlillg & StaliorlCry. Mcghalaya, Shilklllg 124/2005 HCllhh. 5,000-24.1] .2005
GoM:Phed
525
(Z8
Regn. No.
Source of water
C.
Place of collection
D.
E.
Date of receipt
T'rgp,kj~ M1vc
~ '
/~ .
6 . oR
I S' . h . Q 8
. PHYSICAL CHARACTERISTICS
I.
Appearance
2.
Odour
PH
J .
~
O~
~9
CHEMICAL CHARACTERISTICS
4.
Total hardness
S.
Carbonate hardness
6.
Non-Carbonate hardness
7.
Chloride
8.
Total Iron
1NV
i:L ,9
vvv
0 - V 5 Jpw
.
ft/ Ec
BACTERIOLOGICAL TEST
Regn. No.
/IG
-=__~_____
R~ M.ARKS:
Date of Report
~
~ 'i . 06
~ Pr ~~
~-e?~
~ublicAna~
. 08
.
Gove~ent of Meghalaya
Pasteur Institute, Shillong.
Printed al the Din:ctor.tc o( Pril1l ing &. Salionery, Meghalaya. SlImo", 12412005 Healt h. 5,000-24.1 1.2005
GoM:Phed
526