Government of Meghalaya

Public Health Engineering Department

Greater Shillong Water Supply Project


(Phase III)

Umiew River, source of Greater Shillong Water Supply Project

JNNURM
DPR
for
Augmentation of water supply to
Shillong Urban Centres

Jawaharlal Nehru National Urban Renewal Mission

DPR on Greater Shillong Water Supply Project (Phase III)


for augmentation of water supply to Shillong Urban Centres

July 2008

CONTENTS
Sl.
No.

Descriptions

1
1.1
1.2
1.3

1.4

1.5
1.6

1.7

Sector Background context & Broad project rationale.


Existing status of the physical infrastructure.
Baseline information in terms of user coverage & access.
List of various projects proposed for the sector in the city development plan
(CDP) and confirmation/explanation of how this project is aligned with
stated CDP priorities.
List of other capital expenditure projects supported by other schemes for the
sector (sanctioned projects that have yet to commence as well as ongoing
projects).
Existing tariff and cost recovery methods and extent of cost recovery.
Existing areas of private sector/community participation in the sector for
design, construction project management, and/or O&M services (including
billing & collection).
Any other qualitative information

Project definition, concept and scope.

2.1
2.2
2.2.6
2.2.8
2.2.8.1

Land.
Physical infrastructure components.
Design consideration
Detailed design engineering
Design on economic size of rising transmission main for intake pumping
station.
2.2.8.2 Design of RCC Sump for intermediate pumping station.
2.2.8.3 Design on economic size of transmission main for intermediate pumping
station.
2.2.8.4 Design calculation of pumping plant for intake pumping station.
2.2.8.5 Design calculation for pumping plant of intermediate pumping station.
2.2.8.6 Design of 8 Mld. water treatment plant
2.2.8.7 Process design of the treatment plant units.
2.2.8.8 Design of RCC sump for clear water pumping station
2.2.8.9 Design of clear water rising main
2.2.8.10 Design calculation for a pumping plant of clear water rising main for 6th
Mile to Laitkor
2.2.8.11 Design of clear water gravity transmission main
2.2.8.12 Design and computation for capacity of service reservoir
2.2.8.13 Design of storage reservoir
Map showing town under SUA and area covered by GSWSP (Phase I & II)
Map showing zoning of project area
2.2.8.14 Design of distribution system
Map, length and route of pipe lines

Map showing distribution network Zone-I

Length of pipe line Zone-I

Proposed pipeline route Zone-I

GoM : Phed

DPR of GSWSP (Phase-III)

Page
No.
1
1
6
8

10
11
15
15
17
17
18
24
39
39
43
43
47
49
51
51
62
63
67
69
71
72
73
74
75
76
77
82

Sl.
No.

Descriptions
Map showing distribution network Zone-II
Length of pipe line Zone-II
Proposed pipeline route Zone-II
Map showing distribution network Zone-III
Length of pipe line Zone-III
Proposed pipeline route Zone-III
Map showing distribution network Zone-IV
Length of pipe line Zone-IV
Proposed pipeline route Zone-IV
Map showing distribution network Zone-V
Length of pipe line Zone-V
Proposed pipeline route Zone-V
Map showing distribution network Zone-VI
Length of pipe line Zone-VI
Proposed pipeline route Zone-VI
Map showing distribution network Zone-VII
Length of pipe line Zone-VII
Proposed pipeline route Zone-VII
Map showing distribution network Zone-VIII
Length of pipe line Zone-VIII
Proposed pipeline route Zone-VIII
Map showing distribution network Zone-IX
Length of pipe line Zone-IX
Proposed pipeline route Zone-IX
Map showing distribution network Zone-X
Length of pipe line Zone-X
Proposed pipeline route Zone-X
Map showing distribution network Zone-XI
Length of pipe line Zone-XI
Proposed pipeline route Zone-XI
Map showing distribution network Zone-XII
Length of pipe line Zone-XII
Proposed pipeline route Zone-XII

Page
No.
92
93
100
113
114
122
137
138
143
152
152
165
186
187
192
202
203
207
215
216
236
267
268
283
309
310
324
349
350
354
362
363
372

Drawings

GoM : Phed

Long section of Raw water rising main


Raw water stage I pumping system, pump house layout plan & elevation
Raw water stage I pumping system, Intake structure, pump house, inlet
and typical pump installations.
Raw water stage II pumping system, layout plan of pump house, RCC
sump and pumping installations
Raw water stage II pumping system, elevation and pumping installation.
Hydraulic flow diagram of water treatment plant

DPR of GSWSP (Phase-III)

389
390
391
392
393
394

ii

Sl.
No.

Descriptions

2.3
2.4
2.5
2.6

3
3.12
3.12.2
3.12.4

4
4.1
4.2
4.3
4.4
4.5

5.
5.1
5.2

6
6.1
6.2
6.3
6.4
6.5

7
7.1
7.2

8.
8.1

9.
9.1
9.2

GoM : Phed

Water treatment plant of 8 Mgd Layout plan


Water treatment plant of 8 Mgd Layout plan of Filter house
Long section of clear water gravity main from WTP, Mawphlang to 6th
Mile, Upper Shillong.
Clear water pump house and RCC sump : Layout plan
Clear water pump house and RCC sump : Elevation
Schematic flow diagram of gravity/pumping transmission mains
Environmental compliance/protection measures/improvement measures
Rehabilitation and resettlement
Specialised procured services for design, independent supervision and
quality assurance
Other information

Page
No.
395
396
397
398
399
400
401
403
404
404

Project cost

405

Cost estimation
Physical infrastructure detail estimate
Any other detail estimate

406
406
441

Project Institution framework for construction.

444

Roles of different institutions involved in the construction phase of the


project.
Manner of undertaking construction works.
Involvement of the construction entity in the subsequent O&M activities.
Areas of involvement of the private sector in the construction phase.
Construction packages for works construction.

444

Project Financial Structuring.


Overall financial structuring of the project
Review of option of institutional depth and/or private sector participation

Project phasing
Schedule for tendering/selection for procurement of services
Schedule for bring instate level and ULB level contribution to the project
Schedule for obtaining all clearances
Schedule for shifting utilities
Project infrastructure component-wise implementation

Project O & M
Institution framework (organisation and operation) strategy
Tariff and user cost recovery.

Project financial viability & sustainability


Overall project perspective

445
445
445
446
447
447
447
448
448
448
449
449
449
451
451
453
453

Project benefits assessment

453
454

A list of benefits from societal perspective


A list of negative externalities

454
454

DPR of GSWSP (Phase-III)

iii

Sl.
No.

Descriptions

Page
No.

Annexures
2.
3.
4 (a)
4 (c)
4 (d)

Project implementation planning


Schedule for financial contribution and sources
Project cash flow for JNNURM
Details of Operation & Maintenance Charges
Statement showing Operation & Maintenance cost, status of supply,
water tariff and expected revenue generation.

455
456
457
458
459

4 (e)

Water supply tariff

460

Appendixes
1
2
3
4
5
6
7
8
9
10

GoM : Phed

Constituents of Shillong Urban Agglomeration


Population forecasting
Zone wise breakup of population of areas under Shillong Urban
Agglomeration.
Zone wise breakup of population of areas under Shillong Urban
Agglomeration
Zone wise breakup of water requirement under Shillong Urban
Agglomeration
Statement on pipe requirement for distribution network
Statement on pipe requirement for clear water gravity main
Statement on pipe requirement for the whole project
Source reliability study and report on Umiew river
Analysis report on water source

DPR of GSWSP (Phase-III)

461
462
467
469
471
474
475
476
478
495

iv

1.

Sector Background context & Broad project rationale.

1.1

Existing status of the physical infrastructure.

1.1.1

Shillong, the capital of Meghalaya occupies the northern slopes and foothills of Shillong
peak at an average altitude of 1496 metres above mean sea level. The city derived its name
from a deity named Shillong, whose dwelling place is known as Shillong Peak. He is
believed to have established the art of democratic governance and rule of justice in the
formation of the princely State of Shillong (Hima Shillong), which was subsequently
bifurcated into Mylliem State and Khyrim State in 1830. During the British Rule, Shillong
consisted of only a few scattered clusters of hamlets. The British Administration shifted the
headquarters of United Khasi and Jaintia Hills District from Cherrapunjee to Shillong. In
1874 the State of Assam was created out of Bengal and the city became its provincial
capital. In 1972, when the State of Meghalaya became a separate State, the city became its
capital.

1.1.2

The city is situated in the East Khasi Hills District and is also the district headquarter. It is
well connected by a network of roads within the State and with all important cities in the
neighboring States. It is connected with the rest of the country through Guwahati by road,
rail and by air. Helicopter service is also available between Shillong-Guwahati-Shillong and
Shillong-Tura. There is a minor airport at Umroi, 35 kms from Shillong. All the State
Government offices and important Central Government offices are located in Shillong.
Some of the other important institutions which are located in Shillong are the headquarter of
the North Eastern Council, North- Eastern Hill University, Headquarter of Eastern Air
Command; 101 Communication Zone of the Army and other Para military organizations.
The schools, colleges and other educational institutions attract students from all over the
North Eastern Region. The Shillong State Central Library and Museum offers scope for
study and research of the ethnic cultures in the region. It is one of the few hill stations with
motorable roads all round the city. Shillong has its own charm, different from other hill
stations, and presents a natural scenic beauty with waterfalls, brooks, pine grooves and
gardens. The place, the people, the flora and fauna and the climate all combine make
Shillong an ideal resort throughout the year.

1.1.3.

The mission statement as per Shillong City Development Plan envisages planned
development of Greater Shillong Planning Area (GSPA) covering an area of 174 sq.km
including an area of 10.73sq.km falling under Shillong Municipal jurisdiction. The Greater
Shillong Planning Area comprises of 7 urban centres and 32 villages surrounding the Urban
Centres. The present structure of GSPA, its problems and magnitude of the problems to be
faced by it in future have been indicated in the Shillong CDP. The city of Shillong despite
its physical threshold and constrains is likely to expand and grow. Population of the
Shillong Urban Centres (SUA) has increased from 1.56 lakhs in 1971 to 2.68 lakhs in 2001
and expected to increase to 3.16 lakhs by 2011. The existing problems which required
immediate attention and large magnitude of investment would assume challenging
propositions in case not addressed and taken care of.

GoM:Phed

DPR of GSWSP (Phase III)

1.1.4

The existing main supply sources to the project area (SUA) is the Greater Shillong Water
Supply Project (GSWSP) designed to cover the areas under Shillong Urban Agglomeration
(SUA) in existence during the period (1978) viz. Shillong Municipal Board (SMB),
Shillong Cantonment Board (SCB), Mawlai and Nongthymmai. Phase I of the project
whose implementation commenced in the year 1978-79 was completed and commissioned
in the year 1986. The source of supply is the river Umiew at Mawphlang about 30km away
from Shillong. The project (phase-I) envisages lifting of water from the run-off the river in
2 stages against a total head of 312m and convey via 2.42km parallel M.S. rising main of
600mm dia. to the water treatment plant at Mawphlang. The treatment plant constructed
under Phase I of the project has a capacity of 34.05Mld. Treatment comprises of chemical
coagulation, flocculation, settlement, filtration and post chlorination. A total length of about
30km of pipes varying in size from 750mm dia. to 150mm dia. were laid to convey the
treated water by gravitational flow from Mawphlang towards different parts of Greater
Shillong Area and zonal reservoirs of total storage capacity of about 6.81Ml were
constructed under Phase I of the project.

Intake structure and pumping system constructed under GSWSP (Phase I) in 1985-86 consist of
2 Nos. R.C.C. Well of 8.20m clear diameter of about 36 m in height, a Pump House on top of the well and
an approach bridge of span about 40m.

Under Phase I, 6 Nos. Vertical Turbine, Kirloskar Make BHR 35-30 4 Stage Self Water Lubricated
Pumps coupled to 6 Nos. KEC Make 300Kw squirrel cage induction motor were installed. Each Pump has a
suspended column assembly length of 38m. The pumps capable of lifting 51.30 Mld of water against a
Head of 122m and conveying it to the RCC Sump at the Intermediate pumping station via a 0.32 Km.
parallel main of 0.600m diameter were commissioned in the year 1986. The pumps were designed to
develop the required discharge pressure at a speed of 1482 Rpm.

GoM:Phed

DPR of GSWSP (Phase III)

The Intermediate structure & pumping system constructed under Phase I consist of RCC Raw Water
Sump 2 Nos.x14.00 dia. x 4.30m and a Pump House, 6 Nos. Kirloskar make MN 54-30o 2 Stage Horizontal
Pumps coupled 6 Nos. Kirloskar Electric make motors 530 Kw. The pumps designed to lift 51.30 Mld of
water against a Head of 190m and conveying it to the Treatment Plant at Mawphlang via a 2.10 Km.
parallel main of 0.600m diameter were installed and commissioned in the year 1986. The pumps which
were designed to develop the required discharge pressure at a speed of 1482 Rpm, failed, on account of
the fluctuation in the frequency of power system leading to installation of Booster Pumps Station after
stage II pumping system.

The Treatment Plant constructed under Phase I of the Project and commissioned in the year 1986 has a
capacity of 34.05 Mld.

GoM:Phed

DPR of GSWSP (Phase III)

1.1.5

Phase II of the project comprises construction of mass gravity concrete dam of about 130m
wide and 50m high across the river Umiew at Mawphlang downstream of the existing
intake structure; construction of additional water treatment plant of capacity 17.25Mld
(3.8Mgd), gravity feeder main of a total length of about 25km varying in size from
400mm dia. to 150mm dia. and construction of zonal reservoirs of total storage capacity of
11.40Ml.

Gravity concrete dam of about 130m wide and 50m high across river Umiew downstream of Intake structure was
constructed under Phase II of the GSWSP. The dam which was taken up for construction in 1997 and completed
in 2003, provides storage of 9.145MCM. The dam is meant solely for drinking water supply and is owned and
maintained by State PHED.

GoM:Phed

DPR of GSWSP (Phase III)

1.1.6

Works for distribution of water supply were taken up from 1980 onwards on a piecemeal
basis depending on availability of fund. The pattern of existing water distribution in the
project area is from the zonal tank to the supply tank (GI Tank) and from the supply tank to
consumers trough a lengthy service lines mostly of GI pipes. A bunch of as many as 50
service lines take off from a single supply tank. The service lines are 15mm G.I and are
laid over ground and usually inside the drain.

1.1.7

The pumping machineries for Stage I and Stage II pumping system which were
commissioned in the year 1986 have been replaced through the scheme sanctioned and
funded under State Plan. The pumping machineries have since been commissioned and the
Greater Shillong Water Supply Project (Phase I & II) are now meeting the designed
capacity of 51.30Mld. Though following the commissioning of the new pumping
machineries for both Stage I and Stage II pumping system of Greater Shillong Water
Supply Project, the generation and supply has improved considerably; however, considering
the high percentage of UFW in clear water main and distribution networks including supply
to enroute to villages, the total available supply in the project area from all sources of
supply including Greater Shillong Water Supply Project is about 23.60Mld. The water
availability in the project area is indicated in table 1.1.1.
Table 1.1.1.

Sl.
No.
1.

Quantity available
Mld

Name of Schemes in SUA


GSWSP
Quantity generated

51.30 Mld

Less treatment losses @ 3%

(-) 1.54 Mld

Less supply to enroute to villages

(-) 2.60 Mld

Less UFW in clear water main between Mawphlang


and other Zonal reservoirs @ 20%
(-) 10.26 Mld
Less UFW in the distribution system
mainly in SMB areas @ 35%
(-) 17.95 Mld

2.
3.

Available supply from GSWS for urban areas

19.15

Available supply from other sources of PHED


Available supply from 7 nos. traditional sources

1.95
2.50
23.60

Total :

GoM:Phed

DPR of GSWSP (Phase III)

1.2

Baseline information in terms of user coverage & access.

1.2.1.

The Shillong Urban Agglomeration comprises of 7 urban centres. The total population of
SUA as per 2001 census is 2.68 lakhs. The Project under consideration takes into account
initial period of the Project as 2011, intermediate period as 2026 and ultimate period as
2041. Population forecasting was arrived at using the programme developed by CPHEEO.
The print out of the population forecasting is appended as Appendices.

1.2.2

The Population of Shillong Urban Agglomeration as worked out on the basis of 6 decades
of population (1961-2001) is indicated in table 1.2.1.
Table 1.2.1

Shillong Urban Agglomeration

1.2.3

Year

Population

2001

2,67,662

2008

3,01,000

2011

3,16,000

2021

3,74,000

2026

4,05,000

2031

4,39,000

2041

5,12,000

Remarks

Initial stage
Intermediate stage
Ultimate stage

The population of Shillong Urban Agglomeration for 2007, 2011, 2021, 2026, 2031 and
2041 and the corresponding water requirement @135 Lpcd including UFW @15% as
worked out is indicated in the table 1.2.2.
Table 1.2.2

Year

Population
@135Lpcd
Mld

GoM:Phed

Daily water requirement


Total with UFW @15%
Mld

2008

3,01,000

40.63

46.72

2011

3,16,000

42.66

49.06

2021

3,74,000

50.49

58.06

2026

4,05,000

54.68

62.88

2031

4,39,000

59.27

68.15

2041

5,12,000

69.12

79.49

DPR of GSWSP (Phase III)

1.2.4

The Greater Shillong Water Supply Project (Phase I & II) which was originally formulated
in the year 1978 was designed to cater supply to areas covered under SUA which at the time
comprises of 4 towns viz. SMB comprising areas under Shillong Municipality, SCB
comprising areas of cantonment and 2 census town viz. Mawlai and Nongthymmai. While
both SMB and SCB have civic status of municipality and cantonment board respectively;
Nongthymmai and Mawlai are the non municipality town since 1971 census. At the time
(1978), Madanriting, Pynthorumkhrah and Nongmynsong were still regarded as rural areas
and are therefore, outside the coverage of Greater Shillong Water Supply Project
(Phase I & II). Madanriting and Pynthorumkhrah came into existence as census town in
1981 census and Nongmynsong came into existence as census town only in 1991 census.

1.2.5

GoM:Phed

The Shillong Urban Agglomeration (SUA) comprises of 7 Urban Centres. Water supply
poses a serious problem as major areas of SUA are yet to be covered with organized water
supply system. The areas which are covered by Greater Shillong Water Supply Project have
access to organized water supply system and other areas outside coverage of Greater
Shillong Water Supply project depends on other small water supply schemes like deep bore
wells and other local sources for water supply. High leakage losses occurred in the
consumers lengthy service lines as well as in the supply tank. The losses in the transmission
main and distribution system account to about 55%. Though the existing project generate its
full desired capacity, available supply at consumers end is about 78 Lpcd.

DPR of GSWSP (Phase III)

1.3

List of various projects proposed for the sector in the city


development plan (CDP) and confirmation/explanation of how this
project is aligned with stated CDP priorities.

1.3.1

UFW in GSWSP accounted for the loss in treatment process @ 3%, losses in clear water
main between treatment plant and different zonal reservoirs @ 20% and loses in distribution
networks as a result of lengthy service lines @ 35% totalling to 58%. Taking into
consideration implementation of various measures for UFW reduction through replacement
of 750mm C.I. water main and improvement in the existing distribution system like
replacement of the existing bunched connection system prevailing in the SMB areas to the
sub main system including reducing the losses in feeder main etc., the UFW can be brought
down from the present level of about 58% to about 15%. The water availability against
daily water requirement of the project area keeping in view the present UFW @ 58% and
future improvement in UFW @15% is indicated in table 1.3.1
Table 1.3.1

Year

Daily water requirement

Water availability

2008

Mld
46.72

With 58% UFW


Mld
23.60

With 15% UFW


Mld
-

2011

49.06

55.75

- 6.69

2021

58.06

55.75

2.31

2026

62.88

55.75

7.13
Say 8.00

2031

68.15

55.75

12.40

2041

79.49

55.75

23.74
Say 24.00

Shortfall
Mld
23.12

1.3.2

For the project under consideration, the shortfall on water availability for 2026 and 2041 is
8Mld and 24Mld respectively. Taking this into consideration, infrastructure for generation
and distribution of additional quantity of water to meet the shortfall is required to be created
without any loss of time.

1.3.3

River Umiew the source of GSWSP is a dependable river. The Dam constructed across the
river Umiew at Mawphlang provide storage of 9.145 MCM of water for pumping by the
system. The catchments of river Umiew is about 115sqkm and large area of the catchment
is in close proximately to Cherrapunjee. As a result, the catchment receives a fairly good
amount of rain in comparison to other areas. During the dry weather months of
2007 & 2008, Umiam reservoir (Barapani) water level dropped alarmingly low warranted
State Electricity Board to resort to load shedding to conserve water. The situation was
comparatively different with Umiew river. Records available indicate daily spilling of water
almost 24 hrs. a day despite lifting about 51.30 Mld, indicating that the river has the
potential to cater to the additional and future increase in population of the Shillong Urban
Centres.

GoM:Phed

DPR of GSWSP (Phase III)

1.3.4

Due to very high pressure, the 750mm C.I. clear water main is reported to be frequently
prone to bursting disrupting the supply to the city for days together. Further, the clear water
main of C.I Pipes with lead joints accounts for very high percentage of UFW. The clear
water main has also outlived its useful life. Frequent disruption of water supply as a result
of frequent bursting of clear water main including control of losses in the main would only
be possible through replacement of the main. The proposed project viz. GSWSP (Phase III),
therefore, include provision for replacement of the existing CI 750mm water main with a
new D.I. water main of 1000/900 mm , capable to convey both the existing supply of
GSWS (Phase I & II) and additional supply of GSWSP (Phase III).

1.3.5

The project also takes into consideration improvement of the existing distribution networks
of GSWSP (Phase I & II) and laying of distribution networks to all uncovered areas of
Shillong Urban Centres. Key improvement to the existing distribution system shall be the
replacement of existing bunched connection system to the sub main system so that UFW
can be considerably reduced, contamination of water due to leakages in lengthy service
lines can be checked as roadside drain continue to be the carrier of storm water. This
conversion shall be critical towards.

Supply of adequate quantity of water to consumers end with sufficient pressure.


Reduction of high UFW present in the system.
Conversion of un-metered supply to metered supply to ensure control and equitable supply of water to
all areas.
Ensuring water quality at the consumers end.

1.3.6

Though considering the high difference in level between pump floor level of the existing
intake structure with the water level of dam, there may be a scope for increasing the height
of the existing Dam to increase live storage, taking up feasibility study for increasing the
height of the dam is not necessary at this stage as sufficient water is available to meet the
additional demand.

1.3.7

All above proposals considered under the project is in line with the various provision of
water supply sector under the City Development Plan (CDP).

GoM:Phed

DPR of GSWSP (Phase III)

1.4 List of other capital expenditure projects supported by other schemes


for the sector (sanctioned projects that have yet to commence as well as
ongoing projects).
1.4.1

The pumping machineries for Stage I & Stage II pumping station were commissioned in
1986 and have since outlived the designed life of 15 years. Prioritizing the urgent needs of
phasing out the existing machineries for the pumping system, new machineries were
installed for Stage I & Stage II pumping station of the GSWS project (phase I & II) under
the scheme sanctioned by State Government with fund made available under State Plan.
While installation of new pumping machineries for Stage I was completed in March 2006,
installation of new pumping machineries for Stage II pumping station was completed in
October 2007. The new pumps installed, discharged water directly into Water Treatment
Plant by-passing the existing Booster Pumps Station. The system GSWS (Phase I & II) is
now lifting about 51.30Mld of water from the dam.

1.4.2

The scheme which comprise replacement of pumping machineries and treatment units of
34.05 Mld. Water Treatment Plant also includes installation of VVVF drives for pumping
system, Automation Control and visualization system for pumping system and water
treatment plant. Excepting replacement of pumping machineries for Stage I and Stage II,
which were completed and successfully commissioned, other components of the scheme are
ongoing.

A battery of 6 units Voltas Ltd. make VH 350-4S/036 self water lubricated vertical turbine pumps coupled to
Crompton Greaves 6.6Kv 310Kw squirrel cage induction motor for the Stage I Pumping System installed and
commissioned in 2006. The pumps were designed to lift 51.30Mld of water against a head of 112m. Pumps were
designed to develop the required discharge pressure at a speed of 1400 Rpm.

GoM:Phed

DPR of GSWSP (Phase III)

10

A battery of 6 units KBL make MN 54-30 2 stage horizontal pumps coupled to SIMO Xian make 6.6Kv 630Kw
squirrel cage induction motor for Stage II pumping system installed and commissioned in 2007. The pumps were
designed to lift 51.30Mld of water against a head of 190m. Pumps were designed to develop the required
discharge pressure at a speed of 1400 Rpm.

1.4.3

The GSWSP (Phase I & II) which was originally designed to cater supply to
Greater Shillong Area was also designed to cater supply to enroute to villages for a total
population of 40,000. Following the necessity to delink the supply to villages from that of
Greater Shillong Area, state government has sanctioned a scheme for supply of water
to
the enroute villages separately and from a separate source to delink the GSWSP from
enroute villages. The scheme is ongoing.

1.5

Existing tariff and cost recovery methods and extent of cost recovery.

1.5.1

The Shillong Urban Agglomeration comprises of 7 towns viz. SMB, SCB, Mawlai,
Nongthymmai, Madanriting, Pynthorumkhrah and Nongmynsong. While both SMB and
SCB have civic status of municipality and cantonment board respectively, Mawlai,
Nongthymmai, Madanriting, Pynthorumkhrah and Nongmynsong are non municipality
town. As per present arrangement, areas under the control of SMB, supply is made by State
Phed in bulk and individual services to households and other institutions is being extended
by SMB. Similarly, water is only supplied in bulk to SCB for distribution to consumers by
the Cantonment Board. In areas outside of SMB and SCB, individual services to household
and other institutions is being extended by State Phed.

GoM:Phed

DPR of GSWSP (Phase III)

11

1.5.2

The old water tariff formulated by the state Phed is a simple tariff and provides realization
of cost of unmetered supply made to consumers on the basis of fixed charges base on
ferrule size. The tariff also provides for realization of cost of supply to bulk consumers as
per bulk supply rates. The tariff which has been in existence for the last many years is
indicated in table 1.5.1.
Table 1.5.1

Sl.
No.

Category of supply

1.

Domestic

2.

1.5.3

Ferrule size

Monthly water tax

15mm

Rs. 70.00 per connection per month

20mm

Rs. 96.00 per connection per month

25mm

Rs. 144.00 per connection per month


Rs.

Commercial

1.50 per Kl

Though cost recovery is being implemented from consumers provided with individual
service connection to households and other institutions through unmetered supply as well as
metered bulk supply, the extent of cost recovery is not satisfactory as realization of charges
from all bulk consumers could not be effected. Supply is presently made to SMB in bulk
free of cost and without any charges. The cost of supply from other bulk consumers
viz.SCB and other private organizations though regularly recovered, the amount of recovery
is negligible in comparison with the cost of O&M. The number of individual services to
household in other census towns viz. Pynthorumkhrah, Madanriting and Nongmynsong is
also negligibly less as these areas are still outside of the coverage of GSWSP (Phase I & II).
The extent of cost recovery during the last 5 years is indicated in table 1.5.2.
Table 1.5.2
Year

GoM:Phed

Yearly cost recovery from

Yearly cost recovery from

Unmetered supply through individual service


to households in the census town area outside
of SMB and SCB

Metered supply to bulk consumers

Total yearly
revenue from
both
unmetered
supply and
bulk supply

No. of
connection
of 15mm
ferrule size

Applicable
rate per
connection/
month

Yearly revenue

Applicable
rate
Per kl

SMB

SCB &
MES

Other private
agencies

Yearly
revenue

2002

2920

Rs. 70.00

Rs.23,23,800

Rs.1.50

Nil

Rs.4,54,500

Rs.1,29,000

Rs.5,83,500

Rs.29,07,300

2003

2953

Rs. 70.00

Rs.24,80,520

Rs.1.50

Nil

Rs.4,54,500

Rs.1,29,000

Rs.5,83,500

Rs.30,64,020

2004

3168

Rs. 70.00

Rs.26,61,120

Rs.1.50

Nil

Rs.4,54,500

Rs.1,29,000

Rs.5,83,500

Rs.32,44,620

2005

3213

Rs. 70.00

Rs.26,98,920

Rs.1.50

Nil

Rs.4,54,500

Rs.1,29,000

Rs.5,83,500

Rs.32,82,420

2006

3378

Rs. 70.00

Rs.28,53,480

Rs.1.50

Nil

Rs.4,54,500

Rs.1,29,000

Rs.5,83,500

Rs.34,36,980

DPR of GSWSP (Phase III)

12

1.5.4

In Meghalaya, available water in rivers, streams and dams including ground water is
required to be lifted and transported against considerable head and distance to a place of
treatment to make it safe for drinking and thereafter required to be transported again over
long distance to consumers in urban areas. Tremendous amount of Electrical Energy is
required for lifting and transportation of water. In Meghalaya especially, the electricity
tariff applicable to water works is not only the highest in the country but the highest among
all category of supply much higher than rates applicable to commercial and industries. In
addition to the high cost of electricity, cost of salary and wages and other inputs,
considerable amount of chemicals are also required in the treatment process to make the
water safe for drinking. The high cost of electricity charges on public water works has had a
direct bearing on cost of production of water.

1.5.5

The steep increase in O&M of water works vis--vis inapplicability of the existing rates of
water charges to commensurate with the expenditure necessitated state Phed to reframe the
water tariff, revising and refixing the standard rates and charges for different category of
supply. The revised water tariff as finalized is indicated in table 1.5.3.
Table 1.5.3

Category of supply
Category 1:
Domestic
connection

unmetered

Applicability

Rates per
connection/month

Premises used purely for residential purposes.

15mm : Rs. 194.00

Hostels of educational institutions, working womens


hostels and hostels attached with educational
institutions having separate water connections.

20mm : Rs. 388.00


25mm : Rs. 581.00

Destitute homes, homes for physically & mentally


challenged and orphanages.
Religious premises and cremation grounds.
Same as above

Category 2 :
Domestic
connection

Rs. 8.00 per 1000 ltrs.

metered

Category 3:

Shops, non-AC restaurants, office premises.

Non Domestic/commercial
metered connection

Household industry requiring water only for drinking


purpose.

Rs. 12.00 per 1000 ltrs.

Government/MCD schools/educational institutions


Public urinals and
vegetable/milk booths.

latrines,

cattle

troughs,

Government institutions, professional training


institutions, jails, crches, libraries, reading rooms,
dairies, dry cleaners.
Office of PSUS, Govt. undertakings, local bodies,
banks.
Government hospitals and Govt. dispensaries.
Health care centres without in patient facilities like
clinics.

GoM:Phed

DPR of GSWSP (Phase III)

13

Category of supply

Applicability

Rates per
connection/month

Animal husbandry unit.


Playgrounds, zoo,
professional services.

any

unit/concern

offering

Non AC-Guest houses maintained by Govt. or public


sector undertaking or corporate bodies.
Category 4:
Non domestic/commercial
metered connection

Hotels with lodging and boarding facilities, any


industrial unit run in factory area/industrial area, guest
house, AC restaurants, banquet halls.

Rs. 18.00 per 1000 ltrs.

Cinema halls, private hospitals, AC/Non-AC nursing


homes.
Factories, ice factories, ice cream factories, aerated
water factories
Cooling plant, cold storage.
Horticultural activities, hot mix-plants.
Swimming pools excluding of education institutions.
Private educational institutions.
Petrol pumps with or without service stations,
petroleum depots, laundries, printing press, bakeries,
flour mills, theatres, circus.
Motor garage/workshop.
Power generation plants, gas oil installations, photo
labs.
Manufacturing works of RCC/PCC/marble/ mosaic
tiles, marble and stone cutting shops.
Warehouse/godowns,
clubs/race course.

recreational/sports

club/golf

AC/Non-AC beauty treatment parlours/clinics and


AC/Non-AC massage parlours/centres.
All types of industries excluding households industries
mentioned under category-II.
Yard/workshop.
Exhibition grounds, ISBT/DTC Depot.
Fountains

for

ornamental

use

of

water,

poultry/agricultural/horticultural farms and allied agro


based activities, Stadium.

Bulk Supply

GoM:Phed

Municipalities/local bodies.

DPR of GSWSP (Phase III)

Rs. 9.50 per 1000 ltrs.

14

1.5.6

The basis, assumptions and method of calculations in arriving at the standard rates and
charges as per revised water tariff is indicated herein below :

Water availability in the project area which excludes


New Shillong Township

37.62 Mld

Yearly generation

1,34,43,200 Kl

In an area where supply of water is made from a number of


sources/ schemes, production cost of water in the system could
only be worked out by combining the O&M cost of all the
sources/schemes. The O & M cost of the schemes under
SUA.

Rs. 1,286.60 lakh

:
:

Rs. 9.35
Rs. 9.50

Cost of production per Kl


Say

1.5.7

Analysis of monthly water tax on individual service to household for unmetered connection
base on ferrule size is worked out accordingly based on the generation cost, average flow in
the pipe according to ferrule size and average hours of supply.

1.6

Existing areas of private sector/community participation in the sector


for design, construction project management, and/or O&M services
(including billing & collection).

1.6.1

Private sector/community participation in any areas of the sector is presently nil. The state
Phed has all along shouldered the responsibility of project design, project execution, project
management and/or O&M services of all water supply system in the state including Greater
Shillong Water Supply Project. State Phed which is a well structured organization with
proper hierarchy has at its disposal, technically competent engineers in the cadre for
maintaining urban and rural water supplies.

1.7

Any other qualitative information.

1.7.1

The list of key issues that are of importance to this sector and the project are :

GoM:Phed

Protection of water sources : Though major watersheds of the Umiew river, the source of GSWSP
needs to be protected and flow of silt into the Umiew river needs to be controlled, the same is excluded
from the scope of the project.

Enhancement of source : As water impounded by the dam would be sufficient to meet the additional
demand, feasibility study for enhancement of the capacity of source would not be necessary and
excluded from the scope of the project.

Enhancement of production capacity : Creation of necessary infrastructure for generation, treatment


and supply of additional 24 Mld to fulfill long term requirements.

DPR of GSWSP (Phase III)

15

Inadequate distribution networks and inefficiency in distribution system : High leakage losses
occurred in the consumers lengthy service lines as well as in the supply tank. The losses in the
transmission main and distribution system account to about 55%. Though the existing project generate
its full desired capacity, available supply at consumers end is far below the designated norm.

Needs for modification of distribution : Bunched connection system for distribution of water needs to
be changed. Modification and laying of distribution network for changing over to sub:main system in
already covered areas is required to be undertaken.

Distribution system for non-covered areas : All uncovered areas to be extended with new distribution
system.

Establishment of a full fledge dedicated and well equipped laboratory: The existing laboratory at
Mawphlang is not fully equipped. A full fledged laboratory equipped with all necessary equipments is
required to be set up at the water treatment plant at Mawphlang.

Installation of chlorinators : Chlorinators are required to be installed at some strategic location to


supplement the treatment provided at the treatment plant so as to ensure the availability of adequate free
residual chlorine at consumers end for improved water quality.

Metered connection : Conversion of all unmetered connection to metered connection through


installation of water meters.

Cost recovery measures : Realization of cost of supply on the basis of realistic water tariff for ensuring
system self sustainability.

UFW assessment and leak reduction programme :

Production and transmission losses upto the zonal reservoirs accounts for about 20.35% which may
be due to losses in the treatment process, leakages in the supply main, old sluice valves and air
valves.

Distribution losses accounts for about 15% which is mainly due to long length of individual service
lines, leakages from service tanks, air valves and sluice valves, overflowing from storage tanks,
continuous running of water from stand posts and inefficient use of domestic connections.

The need to conduct study for UFW assessment and possible reduction of UFW from the existing
level of 30.35% to about 18% and then to 15%.

Installation of bulk water meters at generation end, reservoirs and pipelines for assessment of water
losses.

Institutional arrangement : Institutional restructuring for ensuring efficient management of the


services.

1.7.2

The project under consideration is intended to materialize the vision envisages under the
CDP in respect of water supply sector viz. to provide to consumers with an equitable,
adequate and sustainable water supply.

1.7.3

The project is designed to address all key issues/problems of the water supply sector under
the CDP and it is expected that upon implementation, the project would provide solution to
all key issues/problems under this sector.

GoM:Phed

DPR of GSWSP (Phase III)

16

2.

Project definition, concept and scope.

2.1

Land.

2.1.1

The GSWSP (Phase I & II) was implemented after an agreement was entered into by the
government in Phed with the Hima of Mawphlang. The agreement provides for the Hima of
Mawphlang to donate raid land or community land free of cost to State Phed for
implementation of different components of the project, and in return, State government
would provide employment in the project for eligible youths of the Hima. Following the
agreement, sizeable area of land was donated by the Hima of Mawphlang at the Intake site
and at the WTP site where Intake & Intermediate structure and WTP were constructed
respectively. The land which was acquired and under the control of state Phed has enough
area for creating additional infrastructure for generation and treatment of water.

2.1.2

For the project under consideration viz. GSWSP (Phase III), further acquisition of land for
construction of intake structure (Stage I) and intermediate structure (Stage II) including
construction of WTP would not be necessary as these components are proposed to be
constructed in the area of land already acquired and under the control of state Phed.
Additional land is required to be acquired for only a few portion of the rising main and for
laying of clear water gravity main that passes through land of private parties. Since the land
to be acquired is located in rural areas, acquisition of land would not therefore pose any
problem.

2.1.3

Clear water gravity feeder mains of smaller diameter from 6th Mile, Upper Shillong towards
different zonal reservoirs are proposed to be laid along the state road and by the side berm
of the road. Acquisition of land in this context may not be necessary since compensation for
restoration of damaged portion of the road as a result of pipe trenching is to be paid to
PWD.

2.1.4

Distribution networks is also proposed to be laid along the state road by the side berm as far
as possible avoiding laying of pipes along land of private parties. Though compensation is
required to be made for restoration of damaged road as a result of trenching along the
piping routes, acquisition of land is not necessary except incase where pipes passes private
land.

2.1.5

The quantum of land required is indicated in table 2.1.1.


Table 2.1.1.

Sl.
No.
1.

GoM:Phed

Particulars
Source development (Intake structure, Intermediate structure,
building for offices, housing and roads).

2.
3.
4.

Raw water rising main


Water treatment
Clear water transmission system (clear water gravity main,
booster station and control room & clear water rising main).

5.
6.

Service Reservoir.
Distribution system

Area of land required to be acquired


M
Nil
4,000.00
Nil
36,000.00
Nil
Nil

DPR of GSWSP (Phase III)

17

2.2

Physical infrastructure components.

2.2.1

The population of Shillong Urban Agglomeration for 2008, 2011, 2021, 2026, 2031 and
2041 and the corresponding water requirement @135 Lpcd including UFW @15% as
worked out is indicated in the table 2.2.1.
Table 2.2.1

Year

Population
@135Lpcd
Mld

2.2.2

Daily water requirement


Total with UFW @15%
Mld

2008

3,01,000

40.63

46.72

2011

3,16,000

42.66

49.06

2021

3,74,000

50.49

58.06

2026

4,05,000

54.68

62.88

2031

4,39,000

59.27

68.15

2041

5,12,000

69.12

79.49

The daily water requirement, the water availability keeping in view the present UFW @
58% and future improvement in UFW @15% is indicated in table 2.2.2.
Table 2.2.2

Year

Daily water requirement


Mld

Water availability

Shortfall

With 58% UFW


Mld

With 15% UFW


Mld

Mld

2008

46.72

23.60

23.12

2011

49.06

55.75

- 6.69

2021

58.06

55.75

2.31

2026

62.88

55.75

7.13
Say 8.00

2031

68.15

55.75

12.40

2041

79.49

55.75

23.74
Say 24.00

GoM:Phed

DPR of GSWSP (Phase III)

18

2.2.3

For the project under consideration, the shortfall on water availability for 2026 and 2041 is
8 Mld and 24Mld respectively. Taking this into consideration, infrastructure for generation
and distribution of additional quantity of water to meet the shortfall is required to be created
without any loss of time. Considering the potentiality of the river Umiew to cater to
additional water requirement, the project proposed to create an infrastructure at Mawphlang
for lifting and treatment of additional 24Mld of water.

2.2.4

The infrastructure to be created with the source from Umiew river at Mawphlang shall be
designed to cater to the stages of design as indicated in table 2.2.3.
Table 2.2.3

Stages of design

2.2.5

Year

Daily water requirement


Mld

Initial stage

2011

Intermediate stage

2026

8.00

Ultimate stage

2041

24.00

The proposed project viz. GSWSP (Phase III) which is described herein below (excepting
pumping machineries) is designed to provide 24Mld of water service to all the category of
consumers, improve the period of service and extend the distribution service to the urban
poor.

1.

Source development.

(i)

Type of source : The source of the project is the river Umiew. A mass gravity concrete dam across the river
has already been constructed under Phase II of the GSWSP. The project (GSWSP Phase III) does not bear
any provision for further enhancement/augmentation of the source.

(ii)

Diversion structure : This component has not been included under the project.

(iii) Raw Water Intake structure and pump house (Stage I) : 1 no. RCC well of 10m clear diameter of about
36m in height is proposed to be constructed. An RCC pump house shall be constructed on top of the intake
structure alongwith an approach bridge of span about 40m. 3 nos. vertical turbine 4 Stage Self Water
Lubricated Pumps coupled to 200Kw electric motor are proposed to be installed. The Pumps considered is
designed to lift 8Mld of water against a total head of 112m. VVVF drives including automation control and
visualization system is proposed to be installed and as such the pumping machineries and other associated
equipments shall be compatible with VVVF drives including automation control and visualization system.

(iv) Raw Water Intermediate structure and pump house (Stage II): Located at about 0.70Km from Intake
Pumping Station. This consist of RCC Raw Water Sump 9.00 x 4.30m and a pump house. 3 Nos. 2 Stage
Horizontal Pumps coupled to 315Kw electric motor. The pumps considered is designed to lift 8Mld of water
against a head of 190m. VVVF drives including automation control and visualization system is proposed to
be installed and as such the pumping machineries and other associated equipments shall be compatible with
VVVF drives including automation control and visualization system.

(v) Other structure : Approach road to Stage I & Stage II pumping system, water treatment plants, colony
areas of total length of about 1km including construction of minimum number of staff quarters to provide
accommodation for housing facilities for O&M staff.

GoM:Phed

DPR of GSWSP (Phase III)

19

2.

Raw water transmission main : About 0.70km of 500mm MS rising main is proposed to
be laid to convey 24 Mld of raw water to be lifted by the Stage I pumping system to the
RCC sump at Stage II pumping system and about 2.5kms of 500mm MS rising main is
proposed to be laid to convey 24 Mld of raw water lifted by the stage II pumping system to
the Water Treatment Plant.

3.

Water treatment plant : For providing effective treatment to raw water lifted by the
pumps, Water Treatment Plant with conventional treatment having a capacity of 8 Mld of
civil structure and to be installed with machineries/treatment units of capacity 8 Mld is
proposed to be constructed at the site of the existing water treatment plant of GSWSP
(Phase I & II) to produce and maintain water that is hygienically safe, aesthetically
attractive and palatable in economical manner. Treatment shall comprise of chemical
coagulation, flocculation, settlement, filtration and post chlorination. The water treatment
plant shall comprise of the following units.

(i)

Inlet works: The inlet works shall comprise of stilling chamber and measuring channel.

(ii)

Chemical house and dosing systems: Chemical house of adequate size for storage of chemicals and for
preparation of chemical solution required for treatment is proposed for construction. Alum with a solution
strength of 5 to 10% is proposed to be used as coagulant. For preparation of alum solution, 2 alum mills are
proposed to be installed each alum solution tank shall have a capacity to hold 8 hrs. requirement at the
maximum demand of chemical at the designed flow. The solution shall gravitate to a constant head dosing
tank placed over the raw water channel and the solution shall flow directly from the dosing tank into raw
water channel through a taper needle valve at a preset dosage which shall adjust itself automatically to any
change in flow rate of raw water. For PH adjustment, lime solution is proposed to be used. For preparation of
lime solution, 2 lime mills are proposed to be installed. Lime dosage shall gravitate to the raw water inlet
stilling chamber, an area of maximum turbulence, for proper mixing of the solution.

(iii) Rapid mixing : For rapid mixing of raw water with the coagulant, flash mixer is proposed to be installed.
After measuring channel, raw water alongwith coagulant shall enter a flash mixing well where the coagulant
added shall be rapidly and intimately mixed with raw water by the agitator assembly.
(iv)

Clari-flocculator : Primary treatment : From the flash mixer, dosed water shall flow through a hume pipe of
600mm bore to the central shaft of the clarifier and enter the flocculating zone at the top of the shaft through
4 openings in the shaft wall, each opening 600mm high and 150mm wide. In the flocculating zone, which
shall be 8.4m dia. with an effective flocculating depth of 3.5 m, the water while flowing downwards shall be
stirred by 4 sets of flocculator paddles. It shall then passes below the flocculator wall to the settling zone of
the clarifier flowing radially outwards and upwards to the outlet launder. The clarifier has a diameter of 20m
and side water depth of 3 m. The detention time of flocculator shall be 30 minutes and that of clarifier
2.8Hrs.

(v)

Filters House and associated plant and equipments: Settled water from the clarifier shall pass through a
battery of 2 nos. rapid gravity sand filters. Filter cleansing shall be effected by first agitating the beds with
compressed air. After agitating the beds with compressed air, water at the suitable rate per m of bed surface
area shall be allowed to flow in the reverse process. The associated plant and equipments to be installed shall
be compatible with automation control and visualization system provided with centrally control and
monitoring.

(vi)

Clear water reservoir : Filtered water from each of the 2 filters shall flow into the common channel
chlorinated enroute into the reservoir having the capacity of 8 Ml. Water from the reservoir shall be
simultaneously transferred to the supply main maintaining maximum pressure in the reservoir at all time.

GoM:Phed

DPR of GSWSP (Phase III)

20

(vii) Disinfection : For sterilization of the filtrate, chlorination with chlorine solution shall be used. The flow of
chlorine from the chlorine cylinder into the absorption tower shall be adjusted and control by the chlorinator
control panel.
(viii) Control room & laboratory : The various process of the plant shall be centrally monitored and control
from the control room of the existing WTP through automation control and visualization system. A full
fledged dedicated and well equipped laboratory is also proposed to be set up.

4.

Clear water transmission system : The areas demarcated for covering under the project
(GSWSP Phase III) is divided into 13 zones including 9 zones which were earlier
demarcated for coverage under GSWSP (Phase I & II). These zones are Zone I to Zone X
excluding Zone VII comprising areas of Pynthorumkhrah. Although substantial works were
carried out under the scheme which includes substantive improvement in reservoir and
primary pipe line, considerable amount of works are yet to be done in distribution of water.
Clear water from the water treatment plant at Mawphlang shall be transmitted to reservoirs
constructed/proposed to be constructed for each zones. Under the project, a total length of
about 58.063km of pipes varying in sizes from 1000mm to 100mm are proposed to be laid.

Booster arrangement is proposed to be installed at 6th Mile, Upper Shillong for lifting water
via. a 300mm dia. DI rising main to the main reservoir at Laitkor for distribution to
Madanriting. The zonewise breakup of population is appended as appendices and the
summary of the zonewise breakup of population is indicated in table 2.2.4. The zonewise
break up of daily water requirement of all the zone under the project area as worked out is
appended as appendices. The summary of the zonewise daily water requirement is indicated
in table 2.2.5
GoM:Phed

DPR of GSWSP (Phase III)

21

Table 2.2.4
Zonewise
Classifica
tion

Areas of Coverage

Projected population

Police Bazar, Jail Road, Oakland &


Assembly Areas

11127

11290

14145

14749

16857

20305

II

Lachumiere, Secretariat

11686

12189

15535

17643

18815

23495

III

Laitumkhrah

16695

18175

22405

24090

27610

34477

IV

Malki, Dhankheti Areas

11623

13215

15368

16377

18322

22768

Nongthymmai, Pohkseh

37142

38085

42431

45530

47052

50146

VI

Pasteur Institute, Lawmali, Part of Mawlai


Mawroh, Polo Bazar, Polo Hills, Forest
Colony, Nongmali

4674

4741

5777

6031

6594

7920

VII

Pynthorumkhrah, Pynthorbah

26723

28627

36424

39257

41653

43876

VIII

Mawlai

41858

42748

46090

48012

49128

50756

IX

Laban, Bishnupur, Rilbong & Kenchs


Trace

41923

45055

57562

63849

71578

91748

Mawprem, Jaiaw, Mawkhar, South East


Mawkhar, Barapathar

44848

51072

58804

64266

71682

91070

XI

Nongmynsong

15613

16057

18077

18943

21380

22941

XII

Madanriting, Happy Valley areas.

19426

21118

25747

28076

29028

32083

XIII

Shillong Cantonment Area

12662

13628

15635

18177

19301

20415

296000

316000

374000

405000

439000

512000

2007

Total :

2011

2021

2026

2031

2041

Table 2.2.5
Daily water requirement worked out @ 135 Lpcd for of the population
Zone

and UFW @15%


2007

2021

2026

2031

2041

1727467

1752773

2196011

2289782

2617049

3152351

II

1814252

1892342

2411809

2739076

2921029

3646046

III

2591899

2821669

3478376

3739973

4286453

5352554

IV

1804471

2051629

2385882

2542529

2844491

3534732

5766296

5912696

6587413

7068533

7304823

7785167

VI

725639

736040

896879

936313

1023719

1229580

VII

4148746

4444342

5654826

6094649

6466628

6811749

VIII

6498455

6636627

7155473

7453863

7627122

7879869

IX

6508546

6994789

8936501

9912557

11112485

14243877

6962652

7928928

9129321

9977297

11128631

14138618

XI

2423918

2492849

2806454

2940901

3319245

3561590

XII

3015887

3278570

3997222

4358799

4506597

4980886

XIII

1965776

2115747

2427334

2821979

2996480

3169429

45954004

49059001

58063501

62876251

68154752

79486448

Total:

GoM:Phed

2011

DPR of GSWSP (Phase III)

22

5.

Service reservoir : The capacity of storage reservoir is computed on the basis of 20 hours.
pumping and the capacity required, the capacity of reservoir in existence under GSWSP
(Phase I & II) and additional capacity required to be constructed is indicated in table 2.2.6.
Table 2.2.6
Capacity of
storage reservoir
required

Existing
reservoir
capacity

(Ml)
3

(Ml)
4

Proposed
capacity of
storage
reservoir
(Ml)
5

6 Mile

3.30

4 Mile

2.90

Police Bazar, Jail Road, Oakland and Assembly areas.

1.09

1.16

Lachumiere and Secretariat

1.26

1.12

0.14

III

Laitumkhrah

1.85

0.23

1.12

IV

Malki and Dhankheti areas

1.22

3.75

Nongthymmai and Pohkseh

2.69

3.38

Pasteur Institute, Lawmali, parts of Mawlai Mawroh,


Polo Bazar, Polo Hills, Forest Colony and Nongmali

0.43

0.34

0.09

Pynthorumkhrah, Pynthorbah and Lyngkien shyiap

2.36

1.00

Mawlai

2.73

1.39

0.84

Laban, Bishnupur, Rilbong and Kenchs Trace

4.93

1.25

1.03

Mawprem, Jaiaw, Mawkhar, South-east Mawkhar and


Barapathar

4.89

0.34

1.17

Nongmynsong, Ishyrwat, Mawpat and Lyngkien

1.23

1.23

Madanriting, Happy Valley areas and Mawshabuit

1.72

1.72

Shillong cantonment area.

1.10

27.50

15.86

11.64

Zones

Areas proposed to be covered

I
II

VI

VII
VIII
IX
X

XI
XII
XIII

Total :

6.

GoM:Phed

Distribution System : Control of the very high UFW under the existing distribution system
is extremely difficult. The project, therefore, proposed to lay a well planned distribution
network for the entire project area. The proposed distribution system is a Loop System and
designed to ensure residual pressure differential at various node to remain in a manageable
band of 7 meters to 17 meters. DI pipes has been considered for use in the distribution
system. Considering the topographical condition of the project area, installation of pressure
reducing valves are proposed to be used at some strategic location in the distribution
networks to ensure equitable distribution of water.

DPR of GSWSP (Phase III)

23

2.2.6 Design consideration.


2.2.6.1

All components of the scheme are designed/considered as per the norms and standard laid
down in the Manual on Water Supply and Treatment published by CPHEEO, Ministry of
Urban Development, Government of India as far as practicable.

2.2.6.2

The scheme is designed to meet the requirement over a period of 30 years after completion.
The time lag of 3 years between design and completion of the project have been taken into
account thereby making 2011 as the initial period, 2026 and 2041 as the intermediate and
ultimate period of the scheme respectively. The 30 years period of the project is however
modified in regard to certain components of the project depending on their useful life and/or
the facility for carrying out the extensions when required so that expenditure far ahead of
utility is avoided

2.2.6.3

In forecasting the population of the town, the programme developed by MoU, CPHEEO is
adopted to arrive at the initial, intermediate and ultimate period of the scheme.

2.2.6.4

As implementation of sewerage project is contemplated in the project area, the per capita
rate of supply is considered as 135Lpcd.

2.2.6.5

The source of the existing water supply project i.e. GSWSP (Phase I & II) is the river
Umiew. A mass gravity dam across the river has already been constructed under Phase I of
GSWSP. The dam constructed provide storage of 9.145Mcm of water for pumping by the
system. The catchment of the river Umiew is about 115 sq.km and a large area of the
catchment is in close proximity to Cherrapunjee. As a result, the catchment receive a fairly
good amount of rain in comparison to other areas. During the dry weather months of
2006-07, Umiam reservoir (Barapani) water level dropped alarmingly low warranted the
State Electricity Board to resort to load shedding for a pretty long period of time. The
situation was comparatively different with Umiew river. During the same period, water
from the dam of GSWSP is spilled daily for almost 24 hr. a day despite lifting about
34.00Mld of water indicating that the river has the potential to cater to the additional
requirement. The project under consideration, has, therefore, no provision for
enhancement/augmentation of the source.

2.2.6.6

Considering the weather condition of the area, the necessity for construction of all weather
road to different work sites viz. pumping stations, sub:stations, WTP & staff quarters for
transportation of construction materials during construction and pre-commissioning period
and to facilitate O&M of the project on post commissioning period including construction
of minimum numbers of staff quarters for O&M personnel is absolutely necessary and
therefore considered.

2.2.6.7

The site for construction of the intake structure under the project is located a few distance
away from the intake structure of the existing source (Phase I & II). The source being the
same i.e. water impounded by the dam, construction of intake structure is to be considered
with respect to HFL and LWL of the dam and the level position of intake structure of the
existing project (Phase I & II) is also to be considered to ensure same level is adopted for
pump floor level and delivery floor level. Considering the topographical and soil condition
of the site, considerable excavation may have to be carried out for proper foundation of the
Intake well.

GoM:Phed

DPR of GSWSP (Phase III)

24

The size of the intake structure is arrived at taking into consideration the space requirement
and the out planning of pumping system for the ultimate stage. The factors considered are
as under:

2.2.6.8

2.2.6.9

GoM:Phed

The minimum water level/crest level of dam is at RL 1562.00m above mean sea level and the high flood level is
at RL 1577.00m above mean sea level. In order to keep the operating floor free from obstruction and pipe work,
delivery is taken below the pump floor level i.e. at RL 1583.20m, 2.40m below the pump floor level which is at
RL 1585.60m and 8.6m above the high flood level in keeping the same level with the existing intake structure

The depth of the Intake well has been considered taking into consideration the minimum water depth required
upto minimum WL to satisfy NPSHR for VT Pump to avoid air entry during drawdown.

Provision for prevention of vortex formation.

Provision for obtaining uniform distribution of the in-flow to all the operating pumps and to prevent starvation of
any pump.

Though civil structure has been designed to cater to the demand of the ultimate stage, the pumping units has
been considered to cater to the demand of the intermediate stage.

The size of the pump houses is arrived at taking into consideration the space requirement
and the out planning of pumping system for the ultimate stage. The factors considered are
as under :

The availability of sufficient space in the pump house to locate the pump, motor, valves, pipings, control panels
and cable trays in a rational manner with easy access and with sufficient space around each equipment for the
maintenance and repairs.

The availability of sufficient space between two adjoining pumps/motors.

The provision of sufficient space for the control panels as per the Indian Electricity (I.E.) Rules.

The provision of service bay in the station with different space to accommodate overhauling and repairs of the
largest equipment.

Provision of a ramp or a loading and unloading bay so that all pipings and valves can be laid on the lower floor
permitting free movement in the upper floor.

Provision of a head room and material handling tackle with adequate clearance to lift the motor clear off the face
of the coupling and also carry the motor to the service bay without interference with any other apparatus
including adequate clearance to dismantle and lift the largest column assembly.

Though civil structure has been designed to cater to the demand of the ultimate stage, the pumping units has
been considered to cater to the demand of the intermediate stage.

The size of RCC sump at the Intermediate pump house is arrived at taking into
consideration, the storage requirement and the out planning of the pumping system for the
ultimate stage. The factors considered are :

Avoidance on starvation of pumps in the event of sudden tripping of pumps of the Intake Pumping
station for a duration of about 30 minutes or so.

Avoidance of mutual interference between two adjoining pumps by maintaining sufficiency clearance.

Avoidance of dead spots by keeping rear clearance from the center line of the pump.

Avoidance of sudden change in the direction of flow by provision of a stilling chamber to reduce the
velocity gradually to about 0.3 m/s near the suction bellmouth.

Avoidance of dead spots at the suction bell mouth by maintaining the bottom clearance.

Provision for adequate submergence of the inlet of pump under the LWL, so as to prevent entry of air
during draw-down and to satisfy NPSHr.

DPR of GSWSP (Phase III)

25

2.2.6.10

In a water supply projects, pipelines are a major investment and constitute a major part of
the assets. Pipes represent a large proportion of the capital invested in water supply projects
and therefore are of particular importance. Pipe materials for the project have therefore been
judiciously selected not only from the point of view of durability, life and overall cost
which includes, besides the pipe cost, the installation and maintenance costs necessary to
ensure the required function and performance of the pipeline through out its designed
lifetime.

2.2.6.11

The final choice of pipe materials for the project was arrived at taking into consideration the
technical factors such as internal pressure, co-efficient of roughness i.e. C value, hydraulic
and operating conditions, maximum permissible diameter, internal and external corrosion
problems, laying and jointing, type of soil, special condition etc.. For the raw water rising
main, the alignment passes through very difficult terrain. In view of the site conditions, the
choice of pipe materials are governed by the following factors :

The ease or difficulty of transportation, handling and laying and jointing.

The safety, economy and availability of manufactured size of pipes and specials.

The availability of skilled personnel in construction and commissioning of pipelines.

The ease or difficulty of Operation & Maintenance.

2.2.6.12

Considering the factors, the choice of pipe materials for raw water rising main and is
limited to MS pipes. Pipes proposed to be laid underground shall be protected against
external corrosion by providing necessary treatment like hot applied coal-tar asphaltic
enamel reinforced with fibre glass fabric yarn and those proposed to be laid on/above
ground shall be properly painted. The economical diameter for rising main was arrived at,
using computer software viz. Ecodia.

2.2.6.13

Since the pumps to be installed for Stage I pumping system are vertical turbine pumps, the
frequency of breakdown of pumps is comparatively higher than that of a horizontal pumps.
Since pumps with parameter to suit the scheme would have to be tailor made and
considering the remoteness of the location of the site, 3 units of vertical turbine pumps are
proposed to be installed. The vertical turbine pumps shall be of 1400Rpm, 4 stage self
water lubricated. Out of the 3 units, 2 would be in operation at a time on roaster basis to
cater to the demand of intermediate stage of 8 Mld.

2.2.6.14

To facilitate correlation of discharge of the pumps of the Intake and Intermediate pumping
stations; 3 units. of horizontal pumps are also proposed to be installed at the Intermediate
pumping station. Out of the 3 units, 2 units will be in operation at a time to cater to the
demand of intermediate stage of 8 Mld.

2.2.6.15

Frequency in the power system is a vital parameter which determines the quality of AC
supply. The rated frequency in the country is 50 Hz.. and all electrical equipments as well
as the whole power system are designed for obtaining the optimum efficiency when
connected to a power supply of this rated frequency. The performance of the electrical
equipments and the power system changes when the frequency deviates from 50 Hz. and
though it is necessary to maintain the system frequency as close to 50 Hz. as possible, so as
to have the best efficiency of operation, frequency fluctuate whenever load connected in
the system does not match with that of generation.

GoM:Phed

DPR of GSWSP (Phase III)

26

2.2.6.16

In a hydraulic machineries, the laws of interrelation between discharge Q, head H and


speed N are as under :
Q

2.2.6.17

N and

Likewise, the laws of interrelation between speed N of electric motor and frequency f of
power system is as under :
Ns =

120f
P

Where,
Ns = Synchronous speed of field in Rpm
F

= Frequency in cycle per sec or hertz. (C/s or Hz.)

= No. of stator poles of motor.

As P is constant, Ns f
2.2.6.18

Frequency of power system in the state is highly fluctuating. The frequency dips as low as
47.50 Hz. and shoots as high as 51.50 Hz.. The highly fluctuating frequency of power
system in the state has had an adverse impact on the original pumping system of GSWS
(Phase I & II) where the 2 stage pumping system commissioned in 1986 had to be
converted to a 3 stage pumping system through the installation of Booster Pumps station in
1996 following continuous problem encountered in lifting of water by the system on
account of continued fluctuation in frequency of power system.

2.2.6.19

Though following the replacement of the original pumping units with new ones in 2007
Booster Pumps station was eliminated and stage II pumping system could discharge
directly into the WTP, special consideration in designing of pumps units were taken into
account to overcome fluctuation in the frequency of power system, the new pumps
installed and commissioned were designed to develop required discharge pressure at a
speed of 1400Rpm corresponding of motor speed when connected to power system with
frequency of 47.50 Hz.. The motor capacity was considered taking into consideration the
power to be drawn by the pump when speed suddenly shoots up as a result of sudden
fluctuation in the frequency of power system to the upper limit.

2.2.6.20

The pumping units under the project i.e. GSWS (Phase III) has been considered taking into
consideration the highly fluctuating frequency of power system in the region.

2.2.6.21

The electric motor for the project shall preferably have the following characteristics :
(a)

Intake raw water pumping system : Stage I

Type of enclosure

SPDP suitable for IP.23

Class of duty

- S1 suitable for continuous duty.


- suitable for minimum 3 equally spaced starts per hr.
- suitable for atleast 1hot restart.

GoM:Phed

Class of insulation

Preferably Class F on account of dampness, high humidity content


and lightning proneness of the area.

System voltage

6.6Kvfor easy O&M.

DPR of GSWSP (Phase III)

27

(b)

Intermediate raw water pumping system : Stage II

Type of enclosure

SPDP suitable for IP.23

Class of duty

- S1 suitable for continuous duty.


- suitable for minimum 3 equally spaced starts per hr.
- suitable for atleast 1hot restart.

Class of insulation

Preferably Class F on account of dampness, high humidity content


and lightning proneness of the area.

System voltage

6.6Kv for easy O&M.

2.2.6.22

In a pumping system generated flow of water increases or decreases with the increase in
motor speed corresponding to the upward or downward fluctuation in the power system
frequency. Though the generated flow could be controlled by mechanical means through
throttling process, these mechanical means of achieving flow control have a major
disadvantage, in terms of friction, resulting in energy loss and overall poor efficiency.

2.2.6.23

Further, energy is a scarce commodity particularly in developing and underdeveloped


countries. Cost of energy is increasing spirally day-by-day. Generally pumping installations
consume huge amount of energy. The proportion of energy cost can be as high as 70% of
overall cost of operation and maintenance of water works. The need for conservation of
energy, therefore, cannot be over emphasized. All possible steps need to be identified and
adopted to conserve energy and reduce energy cost so that water tariff can he kept as low as
possible and gap between high cost of production of water and price affordable by
consumers can be reduced.

2.2.6.24

The GSWS project being a high head pumping scheme envisages multi stages pumping
system, the consumption of energy for lifting of water from the river/dam is exceptionally
high. Considering the high cost in procurement of energy, and the practical difficulties
encountering in operation of the machineries on account of wide range of fluctuation in the
system frequency that adversely affects the efficiency of the pumping system, there is a
necessity for installation of suitable equipment\devices which could maintain a stable
output voltage and frequency thereby enable controlling the generated flow of water during
the process of pumping without effecting conventional mean of flow fluid control viz.
throttling. In such circumstances energy is saved as frictional losses accounted for through
the process of throttling is eliminated.

2.2.6.25

For ensuring stable output voltage/frequency to the pumping system irrespective of


fluctuation of voltage and frequency in the system and also for ensuring that sufficient
energy is saved during the process of pumping, the project GSWS (Phase III) envisages
among others, installation of VVVF drives.

2.2.6.26

In the case of Stage I pumping system, the total pump head is 112m. Considering the total
pump head, the valves inside the pump house including the delivery manifold should have a
working pressure of not less than 1.5 times the working pressure i.e. not less than
20Kg/cm. Good quality, quick closing non-return valve is proposed to be provided in the

GoM:Phed

DPR of GSWSP (Phase III)

28

transmission main downstream of the delivery manifold. In the case of Stage II pumping
system, the picture is comparatively bad as the total pump head is 190m. In such a situation,
water hammering would be quite severe in the event of power failure. Considering the total
pump head, the valves inside the pump house including the delivery manifold should have a
working pressure of not less than 30Kg/cm. Non return valves on the individual pump
delivery lines are proposed to be provided with dash pot arrangement to dampen the rate of
closure towards the end of closure. Air valves are also proposed to be provided in the rising
main.
2.2.6.27

Though good quality, quick closing non-return valves are proposed to be provided, the
situation may not be sufficient to withstand against severe water hammering in the event of
power failure. Providing protection devices against surge pressure is therefore absolutely
necessary for the safety of plant and machineries. Provision, is, therefore included in the
project estimated cost.

2.2.6.28

Raw water is proposed to be lifted from the river against the total head of 112m in the case
of Stage I pumping system and 190m in the case of Stage II pumping system. Sudden
tripping of pumps in the event of power failure or breakdown of machinery, severe water
hammering may be set up in either the pump discharge and/or suction piping which may
have sufficient magnitude to rupture the pipe or damage the connected equipment.
Normally in a pumping system, the strength of the pipes and valves in the pump house will
be as good or better than the strength of pipes and valves in the transmission main. The test
pressure for the pipes and valves are normally fixed in relation to the pump head. This
makes the pipes and valves in the pump house, upto and including the delivery manifold
relatively vulnerable to surge pressure/water hammering. Hence, the surge protection
system, if any, should provide protection essentially for this small vulnerable reach.

2.2.6.29

Though the wall thickness (9.50mm) of the pipes for rising main may be sufficient to
withstand very severe surge pressure, the valves in the pump house including the delivery
manifold is required to be properly selected so as to prevent the damage of the machineries
in the event of sudden tripping of pumps as a result of power failure.

2.2.6.30

The Water Treatment Plant under consideration is designed to produce and maintain water
i.e. hygienically safe, aesthetically attractive and palatable, in an economical manner.
Evaluation of water quality shall not be confined to the end of the treatment facilities but
shall be extended to the points of consumers use. Considering the nature of raw water
quality constituents and the desired standards of water quality including the comparative
economics of alternative treatment steps applicable, the sequence of treatment and units of
operation proposed to be employed in the WTP, shall comprise of chemical coagulation,
flocculation (rapid and slow mixing) and clarification, filtration and post chlorination.
Though, the civil structure for the WTP has been designed to cater to the demand of the
ultimate stage, the treatment units/machineries including electrical-mechanical equipments
considered under the project would cater to the demand of the intermediate stage.

(i)

GoM:Phed

Inlet works : For meeting the demand of ultimate stage, 2 nos. of inlet works are proposed under the project.
Each inlet works shall include raw water stilling chamber at right angle to the flow, a raw water channel with
parshall flume for measurement of flow rate. The raw water channel shall be 2m wide and the parshall flume
shall have a threat width of 1.22m.. Measuring equipment for measurement of flow shall be installed.

DPR of GSWSP (Phase III)

29

Calibration of the measurement device shall initially be carried out and periodically be checked to ensure
accuracy. Since only 1 No. inlet works would be able to cater to the demand of intermediate stage, the other
inlet works considered under the project is only for civil structure and without any electro-mechanical units.
(ii)

Dosing system : Alum solution of 5-10% strength is proposed to be used as a coagulant and lime suspension
is proposed to be applied for PH correction. Alum solution shall be prepared in 2 alum mills and each alum
solution tank shall have the capacity to hold 8 hrs. requirement at the maximum demand of chemical at the
designed flow. The alum solution tank shall be provided with a free board of 0.3m. The solution tank shall
be constructed with reinforced cement concrete with suitable lining of rubber to resist corrosion. The alum
solution tank shall be located inside the chemical house where chemicals shall be stored and shall be located
at a suitable elevation to facilitate gravity feed of the chemical solution. A lifting tackle for lifting the
chemicals to die elevated tanks shall be provided. The solution tank shall be also be provided with a platform
of at least 0.75m wide to allow the workers sufficient space for handling the chemicals and preparing the
solution. The platform shall be provided with a railing upto a minimum height of 0.75m. The platform shall
be located at an elevation to have clear head room of 2m from the ceiling. The top of the solution tank shall
not be higher than 1m from the floor of the platform.
Dissolving box with the pipe manifold having holes either at bottom or at sides for dissolving chemicals
shall be constructed. Each solution tank shall be provided with mechanical agitator for maintaining
homogeneity of the prepared chemical solution. Alum solution from the solution tank shall gravitate via.
chemical feed lines to a constant head dosing tank placed over the raw water channel and solution shall flow
directly from the dosing tank into raw water through a taper needle valve at a preset dosage which adjust
itself automatically to any change in flow rate of raw water.
Lime suspension shall be prepared in 2 lime mills, each having capacity to hold 8 hrs. of requirement at the
maximum demand of chemicals at the designed flow. Dosage shall be adjusted by regulating a variable V
notch. The dose shall gravitate via. the chemical feed lines to the raw water stilling chamber, an area of
maximum turbulence in the raw water channel.

(iii) Chemical house, administrative building & laboratory : An RCC building to provide for storage of
chemicals, rooms for control and administration including laboratory is proposed to be constructed. The
building to be constructed, takes into consideration the space necessary for storage of chemicals viz. alum,
lime & chlorine gas cylinder for a minimum of 3 months requirement, space required for installation of
2 alum mills, 2 lime mills and chlorination room in one floor, administration & control, electrical &
laboratory in the other floor. The building shall have sufficient space with access for handling bulk storage
allowing for negotiating of vehicles and cranes likely to be used for unloading of chemicals including
loading of empty chlorine gas cylinder. Though, the civil structure for the chemical house, administrative
building & laboratory has been designed to cater to the demand of the ultimate stage, the treatment
units/machineries including electrical-mechanical equipments considered under the project would cater to
the demand of the intermediate stage. The electro-mechanical equipments considered under the project is
2 units of alum mill and 2 units of lime mill.
(iv)

GoM:Phed

Rapid mixing : For meeting the demand of the ultimate stage, 2 Nos. of rapid mixing units would be
required. For each flash mixing unit, mechanical flash mixer unit is proposed to be installed for rapid mixing
of the coagulant. The flash mixer shall be capable of creating velocity gradient of 300s-1. The flash mixing
well shall be deep and circular. The ratio of impeller dia. to tank dia. is 0.2 to 0.4 and the shaft speed of
propeller shall be greater than 100 rpm, imparting a tangent shell velocity greater than 3 m/s at the tip of the
blade. The ratio of tank height to dia. has been considered for proper dispersal. The vertical strips or baffles,
projecting 1/10th to 1/12th tank dia. at a minimum of 4 places along the walls of the tank shall be provided to
reduce vortex formation or rotational movement of water above the impeller shaft. The mixing chamber is
placed below the chemical feed flow ensuring short chemical feed lines. The mechanical agitator drive is an
electric motor with continuous duty operating through a reduction gear. Though civil structure for 2 mixing
unit to cater to the demand of ultimate stage has been considered under the project, the electro-mechanical
equipments for only 1 unit has been considered under the project to cater to the intermediate stage.

DPR of GSWSP (Phase III)

30

(v)

Primary treatment (Clari-flocculation) : Considering the nature of raw water quality constituents where
content of iron is less than 1Mg/l, the process of aeration is not desirable and has not been considered. For
each clari-flocculator, the coagulation and sedimentation processes is incorporated in a single unit in the
clari-flocculator. The unit consist of 4 flocculating paddles placed equi-distantly. The paddles rotate on the
vertical axis. The flocculating paddles shall be of rotor stator type rotating in opposite direction around this
vertical axis. Dosed water from the flash mixer gravitate through a hume pipe of 600mm bore to the central
shaft of the clarifier and enter the flocculating zone at the top of the shaft through 4 openings in the shaft
wall, each opening 600mm high around 50mm wide. In the flocculating zone, which is 8.60m dia. with an
effective flocculating depth of 3.5m, the water while flowing downwards is stirred by 4 sets of flocculator
paddles, it then passes below the flocculator wall to the settling zone of the clarifier flowing radially
outwards and upwards to the outlet launder. The clarifier has a dia. of 20m and side water depth of 3.5m the
detention time of flocculator is 30 mins. and that of clarifier 2.8 hrs..
Diameter of the clarifier is governed by the structural requirement of the trusses that carry the scraping
mechanism, as well as wind effects on the trusses. Keeping this into consideration including site condition,
the diameter of the clariflocculator is arrived at. The clariflocculator is designed to provide pre-treatment
8Mld. in 20 hrs duration per day. The surface loading of the clari-flocculator has been considered as
24.882m/m/day. Weir loading has been considered at 209.43m/m. Sludge is proposed to be removed under
hydrostatic pressure through pipes of 300mm diameter. Mechanical scrappers are provided for scraping the
sludge and the floor slopes considered is greater than 1 in 12 to ensure continuous and proper connection of
sludge. The scraping mechanism shall rotate slowly to complete 1 revolution in about 30 to 40 minutes.
Sludge and wash water shall be properly disposed off. Reclamation of water from the sludge removed from
the settling basin has not however, been considered. Settling tank shall be capable of giving settled/clarified
water having turbidity less than 10 NTU. Though, the civil structure for 2 nos. clariflocculator has been
considered under the project the electro-mechanical equipments of only 1 unit has been considered under the
project to meet the demand of intermediate stage.

(vi)

Rapid sand filter : For meeting the demand of the intermediate stage, 2 Nos. of rapid sand filter would be
required. For each rapid sand filter clarified water from the clari-flocculator shall pass through a battery of
rapid sand filters and then to the filtered water reservoir being chlorinated enroute. 2 filters are provided,
each filter will be made up of 2 sections, each section will be 5.8m wide and 4.3m long having an area of
25m. Filter cleansing will be effected by first agitating the beds with compressed air and backwashing at a
wash rate of 600 Lpm of bed surface area. The under drain system will comprise of AC pressure pipe,
strainers of 80mm bore perforated at intervals for admission of filtrate and egress of agitating air and
backwash water. Strainers will fit into RCC Tee pieces opening into a header channel below the floor of the
bed, connected to the filter outlet pipe. The filters has been designed at a normal rate of filtration of
5.5m/hr/m but with the inlet and outlet control arrangement designed to permit a 100% overload for
emergent occasion. The capacity of the rapid sand filters has been arrived at taking into consideration the
number of units that can take care of the total quantity of water to be filtered and is optimum to keep the
filters working without undue overloading at any time. The number of units was arrived at, keeping in view
the rate of backwashing and the hydraulic problems for securing uniform distribution of wash water for large
unit area. Though, the civil structure for the 6 units rapid sand filter has been considered under the project,
the electro-mechanical equipments for only 3 units has been considered under the project to cater to the
intermediate stage.
The unit consist essentially of :
1.
2.
3.
4.
5.
6.
7.
8.

GoM:Phed

Inlet, outlet, drain & by-pass arrangement


Gullet and gutter for entry of clarified water and exit of wash water
Filter sand media supported on gravel media
Pipe under drainage
Loss of head and rate of flow gauge
Rate setter
Inspection cum weir chamber and clear water channel to receive the filtrate
Air and water backwashing arrangement and waste water disposal arising out of filter backwash
DPR of GSWSP (Phase III)

31

(vii)

Filter Sand : The shape, size and quality of filter sand shall satisfy the following norms :
a)
b)
c)
d)
e)
f)
g)
h)

(viii)

Sand shall be of hard and resistant quartz or quartzite and free of clay, fine particles, soft grains and dirt
of every description.
Effective size shall be 0.45 to 0.70mm
Uniformity coefficient shall not be more than 1.7 nor less than 1.3
Ignition loss should not exceed 0.7 percent by weight.
Soluble fraction in hydraulic acid shall not exceed 5.0% by weight.
Silica content should not be less than 90%
Specific gravity shall be in the range between 2.55 to 2.65.
Wearing loss shall not exceed 3%

Sterilization and Chlorination: For sterilization of the filtrate, chlorination with chlorine solution is
proposed to be used. Providing an effective chlorination system is one of the major objectives under the
project. The distance between the point of treatment and the point at the consumers end is about 30km.
Considering the distance, chlorinators are proposed to be installed at suitable location in the distribution
system to supplement the treatment provided at the treatment plant so as to ensure availability of adequate
free residual chlorine at consumers end for improved water quality.
Chlorination room of size 4m x 4m x 4m shall be constructed in each location for installation of chlorinators.
Each chlorinator shall be provided with a pump capable of developing head higher than the line pressure at
that point. The discharge of the pump will be small as it has to pump a small quantity through the venturi to
develop enough vacuum to draw the liquid chlorine from the toner. Chlorine toner shall also be provided at
each location. Each location shall have adequate number of toners as a standby.
The location where chlorinators are proposed to be installed, rate of flow of water in the location, capacity of
chlorinators and the number of toners required to be kept are indicated in table 2.2.7:
Table 2.2.7
Sl
No

Location

Flow rate
Mld

2.2.6.31

GoM:Phed

1.

WTP at Mawphlang (GSWSP Phase I & II)

2.

WTP at Mawphlang (GSWSP Phase III)

3.
4.

Ml/hr

Capacity of
chlorinators
Kg/hr.

No. of
toners

51.30

2.57

1+1

8.00

0.40

1+1

1000mm gravity feeder main of GSWSP (Phase III) at


6th Mile, Upper Shillong.

59.30

2.97

4 Mile reservoir of GSWSP (Phase I & II)

39.80

1.99

1+1

Excepting one zone, all zones considering under the project area are located at an elevation
lower than the water treatment plant at Mawphlang rendering flow of water by gravity from
water treatment plant towards Shillong, possible. The entire stretch of 750 mm C.I. clear
water main of the existing scheme linking the GSWS water works at Mawphlang with the
main reservoir at 4 Mile, Upper Shillong are prone to bursting. When bursting occurs,
supply to the state capital is disrupted for days together. Further, leakages in the 750 mm
CI clear water main of the scheme accounted for high percentage of UFW. As the existing
750 mm CI clear water main of the scheme is no longer reliable, it is proposed to replace
DPR of GSWSP (Phase III)

32

the existing CI 750mm water main with a new D.I. water main of 1000mm , capable to
convey both the existing supply of GSWS (Phase I & II) and additional supply of GSWS
(Phase III). The 1000mm gravity feeder main is proposed to be bifurcated at 6th Mile to
different branches for conveying treated water to zonal reservoirs. For conveying of treated
water from 6th Mile towards reservoir at Laitkor which at higher elevation than Mawphlang,
Booster pumps is proposed to be installed. The diameter of pipe for all gravity feeder main
are worked out separately. For conveying treated water from 6th Mile to Laitkor, a clear
water rising main is proposed to be laid. As DI pipes exhibits higher C value of 140 and
considering other technical factor, DI pipes are proposed to be use for all clear water gravity
main and clear water rising main.
2.2.6.32

In the design of the reservoirs, the following data were taken into considerations :

The total daily water demand :


24 Mld.
Duration of pumping
:
20 hrs..
The scheme is to cater supply to urban areas and the supply is continuous.
The peak factor considered
:
2.25

2.2.6.33

The provision for zonal reservoirs with adequate staging height is considered for use
principally as a distributing reservoirs. The reservoirs are considered for construction at
different locations of the locality with a view to provide a suitable reserve of treated water
with minimum interruptions of supply due to failure of mains, pumps etc. including meeting
the widely fluctuating demands as a result of intermittent pumping. The capacity of zonal
and service reservoirs were arrived at on the basis of 20 hrs. pumping keeping in mind the
capacity of the existing service reservoirs. The design calculation for arriving at the
capacity of the service reservoir is based on the Manual on Water Supply and Treatment.

2.2.6.34

The altitude of the project area varies between 1400m to 1900m above mean sea level.
Considering the maximum differences in the altitude of the project area, zoning of the
project area is absolutely necessary to ensure equalization of supply through the area.
Accordingly, the project area is divided into 13 zones. Each zone shall be served by
separate system. The project provides for inter connection of the neighbouring zones to
provide emergency supplies. The isolated valves between the zones shall however be kept
under closed condition and to be opened only in case of emergency.

2.2.6.35

The distribution system is designed to cover the ultimate population. The peak factor
adopted in the design of distribution network is 2.5. The proposed distribution of water
under the project takes into consideration coverage of all streets, lanes, paths and stairways
under the project area. Extensive survey was carried out for the purpose. The distribution
main/sub:main are also designed to replace all bunch and lengthy service lines from the
service tanks.

GoM:Phed

DPR of GSWSP (Phase III)

33

2.2.6.36

Distribution system has been designed to convey wholesome water at adequate residual
pressure in sufficient quantity and at convenient points to consumers 24 hrs. a day. The
system of designed adopted for distribution of water is a grid pattern or loop system where
the different mains are interconnected, keeping dead ends to the minimum. The system
facilitate any one point being fed from atleast two different directions. The system would
prove efficient and equitable in distribution of water.

2.2.6.37

Network analysis was carried out using Epanet and after the initial designs, proper judgement

had been made on the links, reducing the diameters of some select links to bring
optimization into the system so that residual pressure differential at various nodes remains
in a manageable band of 7 meters to 17 meters as per the manual. DI pipes has been
considered for use in the distribution system and the minimum size of pipe is 100mm .
2.2.6.38

Considering the topographical condition of the project area, installation of special valves
viz. Plunger valves/automatic pressure reducing valves are proposed to be used at some
strategic location in the distribution networks to ensure equitable distribution of water.

2.2.6.39

UFW Reduction programme : Under UFW reduction programme, water auditing is


proposed to be carried out separately for production and distribution systems.
Water

auditing in Production System : Flow meters are proposed to be installed at the entry
of the existing plants of both 34.05Mld and 17.25Mld WTP. The quantity of flow at the entry
and exit points shall be recorded and the corresponding losses shall be assessed. Effort shall then
be made to reduce the losses to a specified minimum level over a period of time.

Water

auditing in Distribution System : Assessment and reduction of losses in the distribution


system shall be carried out by dividing the system in to study zones of manageable sizes and
carrying out the assessment and reduction zone by zone. The following steps shall be involved
in the assessment and reduction of UFW in distribution system.
Identification of study areas for assessment of UFW
Preparation of these areas for carrying out the program by way of :
Installation of boundary valves for isolating the area
Installation of the bulk meters for estimation of inflow in to the zone
Installation of consumer meters on all connections including public stand posts
Supplying water to the distribution system of the area at designed pressures
Observing readings of all bulk and consumer meters and tabulating the difference, which is the amount
of UFW.
Identifying locations of leaks and losses and repairing them all
Charging the system again and take similar observations
Repeating the exercise till figure of 15 % or less is achieved
Carrying similar exercise in other study areas one by one covering the entire city

GoM:Phed

DPR of GSWSP (Phase III)

34

For

carrying out water auditing in production system, water meters have been installed at the
entry and exit points of both the WTP of the existing water supply project viz. GSWSP
(Phase I & II). The meters installed are PC based inline full bore electromagnetic inductive flow
meter. The details are indicated in table 2.2.8:
Table 2.2.8

Sl

Location of installation

Size

No
1.

Entry to 7.5Mgd WTP of GSWSP (Phase I & II)

DN 600

2.

Entry to 3.8 Mgd WTP of GSWSP (Phase I & II)

DN 400

3.

Outlet No. 1 of 7.5Mgd WTP of GSWSP (Phase I & II)

DN 750

4.

Outlet No. 2 of 7.5Mgd WTP of GSWSP (Phase I & II)

DN 150

5.

Outlet of 3.8Mgd WTP of GSWSP (Phase I & II)

DN 400

6.

Inlet to backwash tank

DN 150

7.

Desludging pipe of clari-flocculator of 7.5Mgd WTP

DN 300

8.

Desludging pipe of clari-flocculator of 3.8Mgd WTP

DN 300

9.

Outlet #1 of backwash tank of 7.5Mgd WTP

DN 300

10.

Outlet #2 of backwash tank of 3.8Mgd WTP

DN 450

Though

some mechanical meters as well as inline full bore electromagnetic induction flow
meter have been installed in some primary and secondary lines of the existing project, additional
number of meters are proposed to be installed to facilitate assessment of UFW of the complete
project. Table 2.2.9 indicates the status of installation of meters on primary and secondary lines.
Table 2.2.9

Sl.
No.

Location of installation

Details and status of installation

GoM:Phed

Sizes

Type

Status

1.

1000mm feeder main at 6 Mile

DN 1000

Electromagnetic

Proposed

2.

Bifurcation point at 6 Mile transfer main to Laitkor

DN 300

Electromagnetic

Proposed

3.

Inlet to reservoir at 4 Mile

DN 400

Electromagnetic

Completed

4.

Bifurcation point at 3 Mile

DN 350

Electromagnetic

Proposed

5.

Bifurcation point at 3 Mile

DN 300

Electromagnetic

Proposed

6.

Bifurcation point between Zone II and Zone I, VIII &VI

DN 300

Electromagnetic

Proposed

7.

Bifurcation point between Zone IX and Zone III, IV & V

DN 400

Electromagnetic

Proposed

th

DPR of GSWSP (Phase III)

35

8.

Bifurcation point between Zone III and Zone IV

DN 300

Electromagnetic

Proposed

9.

Bifurcation point between Zone III, Zone IV & Zone V

DN 300

Electromagnetic

Proposed

10.

Bifurcation point between Zone III and Zone V

DN 300

Electromagnetic

Proposed

11.

Bifurcation point between Zone I, Zone VI and Zone VIII

DN 200

Electromagnetic

Proposed

12.

Bifurcation point between transfer point to Mawprem and


Bara Bazaar

DN 250

Electromagnetic

Proposed

13.

Inlet to reservoir of Assembly

DN 200

Mechanical

Completed

14.

Lachumiere reservoir

DN 150

Mechanical

Completed

15.

Lachumiere

DN 200

Mechanical

Completed

16.

St. Edmunds reservoir

DN 250

Mechanical

Completed

17.

Lower Malki reservoir

DN 250

Mechanical

Completed

18.

Upper Nongthymmai reservoir

DN 250

Mechanical

Completed

19.

Pasteur Institute reservoir

DN 150

Mechanical

Completed

20.

Mawlai Mawroh reservoir

DN 200

Mechanical

Completed

21.

Upper Lumparing reservoir

DN 250

Mechanical

Completed

22.

Upper Malki reservoir

DN 300

Mechanical

Proposed

23.

Barapathar reservoir

DN 150

Mechanical

Completed

24.

Mawprem reservoir

DN 150

Mechanical

Completed

20.

Bara Bazar reservoir

DN 250

Mechanical

Completed

21.

Outlet of Assembly reservoir

DN 350

Mechanical

Completed

In

line full bore electromagnetic induction flow meter has the advantage over mechanical type
water meter as the meter has a system capable of providing easy access of the flow in the system
through the PC at any point of time. The electromagnetic flow meters are being proposed for
installation on account of the following advantages.
No mechanical movements and hence no wear and tear, negligible maintenance cost.
No obstruction-negligible pressure drops.
Suspended solids/scaling have no effect on the performance of the meter.
Factor calibrated instruments with guaranteed with accuracy over an extensive turn down.
Stable performance over extended periods of time.

GoM:Phed

DPR of GSWSP (Phase III)

36

2.2.6.40

Consumer water meter : Consumer water meters are proposed to be installed covering the
entire supply network. All existing individual services to household and other institutions
shall be provided with water meters. It is estimated that the number of individual services to
households and other institutions would rise to about 44,000 by 2011. The project under
consideration include installation of 44,000 consumer water meters. Though consumer
meters of various types are available, meters proposed to be installed shall be of class B
magnetic meters with ISO certification. The consumer meters to be installed shall broadly
conform to the following specification.
Inferential, multijet, superdry, straight reading type, hermetically sealed with magnetic drive, brass body

and coupling.
Stainless steel cap.
Sealed against tempering
leak proof and totally dry.
The totalizer should be oriented 360
2.2.6.41

The raw water pumping stations are located about 6.5Km. away from the nearest habitation
viz. Mawphlang and about 24Km. away from the Shillong. Since the staff are to be
accommodated at the site providing residential accommodation to various categories of
Operation & Maintenance personnel viz. Technicians, Lineman, Electricians, Operators,
Watchman etc. is therefore absolutely necessary. The number of buildings for staff quarters
proposed for construction is based on appendix 13.7 of the Manual on Water Supply
and Treatment wherein a typical staff pattern for (50 to 7.5Mld system) with
conventional treatment is recommended. Since the recommendations is for a single
stage raw water pumping, the Table 2.2.10 would indicate the typical staff pattern for a
2 stage raw water pumping system in the light of the recommendations. The necessity of
having separate staff pattern for Stage II pump house located 1km away from Stage I
including clear water booster station located about 12km away from WTP is highly
necessary.
Table 2.2.10
Sl
No.

1.
2.
3.
4.
5.
6.
7.

Note :

GoM:Phed

Category of staff

Superintending
Manager (A.E.E)
Supervisor/Asst.
Manager (A.E.)
Assistant
Supervisor/Junior
Manager
Operators
Helpers/Fitters
Electrician/
Mechanic
Watchman

System component as per flow line


Treatmen
Clear
Booster
t work
water
station and
gravit
clear water
y main rising main
1
-

Stage I
Pump
house

Stage II
pump
house

Raw
water
rising
main
-

7
6
-

7
6
-

1
-

Service
reservoir

Distribution
system

7
6+2(lab)
3

4
-

3
-

1.

The above staffing pattern does not include personnel for billing, collection an accounting for water charges.

2.

Above staffing pattern includes the operating staff required for one off-day in a week for staff. Suitable
adjustments may have to be made between personnel in Pump House and Treatment works.

DPR of GSWSP (Phase III)

37

2.2.7.42

The plinth area of the Buildings proposed for construction is based on the recommendation
of the Buildings sub-committee Report 1982. The type of buildings, official entitlement and
the recommended plinth area as per the Building Sub-Committee Report 1982 is indicated
in Table 2.2.11.
Table : 2.2.11
Sl.
Type of Quarters
No.

2.2.7.43

Officials Entitlement

1.

III

Sub:Divisional Officer, Assistant Engineers.

90M

2.

IV

Junior Engineers, Lineman, Technician I

60M

3.

Sectional Assistant, Electrician, Pump Operator

50M

4.

VI

Khalasi, Security Guards

33M

Though as per table 2.2.11 the number of quarters required for system component as per
flow line of the project is 62 units, a minimum of 10 units only is proposed to be
constructed. Table 2.2.12 provides total unit and plinth area of building required to be
constructed.
Table : 2.2.12
Sl
No

Category of staff

1.

J.E.

2.

Technician/Operator/Electrician/Mechanic
Total :

2.2.7.44

GoM:Phed

Recommended Plinth Area

No. of units
proposed for
construction

Type of
Quarter

Recommended
plinth area

Total plinth
area

IV

60m

60m

50m

450m

10

510m

For raw water pumping station, a 33Kv power is available at the site near the Stage I
pumping system of GSWSP (Phase I & II), a 33/6.6Kv sub:station is proposed to be
constructed and 33/6.6Kv transformer is proposed to be installed for stepping down the
power to 6.6Kv and 33/0.415Kv for raw water pumping machineries and for low tension
supply respectively. For water treatment plant, a 33Kv power is available at the site near the
existing WTP of GSWS (Phase I & II). A 33/0.415Kv transformer is proposed to be
installed for energizing plant & machineries of the proposed WTP. For clear water pumping
station, power is proposed to be drawn from the nearest available point of SEB and the
33Kv power shall be stepped down to 6.6Kv and 0.415Kv respectively for energizing the
clear water pumping machineries and for low tension supply.

DPR of GSWSP (Phase III)

38

2.2.8 Detailed design engineering.


2.2.8.1

Design on Economic size of Rising Transmission Main for Intake Pumping Station.

1.

Water requirements

Year

Discharge

Initial

2011

0.10 mld

Intermediate

2026

8.00 mld

Ultimate

2041

24.00 mld

2.

Length of pumping main

700 m

3.

Static head for pump

112 m

4.

Design period

30 years

5.

Combined efficiency of pumping set

70%

6.

Cost of pumping unit

Rs.15,000 per Kw

7.

Interest rate

10%

8.

Life of electric motor and pump

15 years

9.

Energy charges

545 paise/unit

10.

Pumping hrs.

20 hrs.

11.

Residual head

1m

Input Data
Pipe Data

At Site rate

Diameter

Type

Class

HWC

Rs./m

350

MS

GR 410

100

6917.96

400

MS

GR 410

100

8167.96

450

MS

GR 410

100

9417.96

500

MS

GR 410

100

10667.96

550

MS

GR 410

100

11920.22

600

MS

GR 410

100

13250.00

Solution

2nd 15 years

1.

Discharge at installation

0.10 Mld

8.00 Mld

2.

Discharge at the end 15 years

8.00 Mld

24.00 Mld

3.

Average discharge

4.05 Mld

16.00 Mld

4.

Ave. hours of pumping ave. discharge

10.13 hrs.

13.33 hrs.

5.

Kw required at the above combined


efficiency of pumping set

1.56 *H1

4.67 *H2

20154.40 *Kw1

26540.77 *Kw2

6.

GoM:Phed

1st 15 years

Annual cost (Rs.) of electrical energy

DPR of GSWSP (Phase III)

39

TABLE I : Table showing velocity and loss of Head for different pipe size
Sl.
No.

Pipe
Size
in
mm

Frictional Head
Loss per 1000M
2nd
1st
stage
stage
flow
flow

Velocity in m/s
1st
stage
flow

2nd
stage
flow

Total Head in m for 700m pipe lengths including 112m of static head

Frictional
loss

1st Stage Flow


Other
Total
losses
Losses

Avg.
Line
pressure
Kg/cm

Frictional
loss

2nd Stage Flow


Other
Total
losses
Losses

Avg.
Line
pressure
Kg/cm

M
7

H1
9

10

m
11

12

H2
13

14

1.

350

6.00

45.91

1.16

3.47

4.20

0.42

117.62

11.76

32.14

3.21

148.35

14.83

2.

400

3.13

23.96

0.88

2.65

2.19

0.22

115.41

11.54

16.77

1.68

131.45

13.14

3.

450

1.76

13.50

0.70

2.10

1.24

0.12

114.36

11.44

9.45

0.94

123.39

12.34

4.

500

1.06

8.08

0.57

1.70

0.74

0.07

113.81

11.38

5.66

0.57

119.22

11.92

5.

550

0.66

5.08

0.47

1.40

0.46

0.05

113.51

11.35

3.56

0.36

116.91

11.69

6.

600

0.43

3.32

0.39

1.18

0.30

0.03

113.33

11.33

2.33

0.23

115.56

11.56

150
148
146
144
142
140
138
136
134
132

Total Head (M) 130


128
126
124
122
120
118
116
114
112
110
350

400

450

500

550

600

Diameter of pipe (mm)

GoM:Phed

DPR of GSWSP (Phase III)

40

TABLE II : Table showing Kilowatts required and cost of pump sets for different pipe size

Sl.
No.

Pipe
size
in
mm

Class
of
pipe

1st Stage Flow of 8.00 Mld


Cost of
H1
Kw required
pump
(rounded to
(Total
nearest ten
head loss
@ Rs.15000
including
per Kw
in mm)
50% standby)
(Rs.in
thousands)
4
5
6

2nd Stage Flow of 24.00 Mld


H2
Cost of pump
Kw required
(rounded to
(Total
@ Rs.15000
per Kw
nearest ten
Head in
(Rs. In
including
mm)
thousand)
50%
standby)
7
8
9

Cost of pipe
per unit
length
(Rs.)

Cost of
700 m
pipeline
(Rs. In
thousand)

10

11

1.

350

MS

118

275

4118

148

1039

15583

6918

4843

2.

400

MS

115

269

4041

131

920

13807

8168

5718

3.

450

MS

114

267

4004

123

864

12961

9418

6593

4.

500

MS

114

266

3985

119

835

12523

10668

7468

5.

550

MS

114

265

3974

117

819

12281

11920

8344

6.

600

MS

113

265

3968

116

809

12139

13250

9275

Note : Assuming other losses = 10% of frictional loss.

16
15
14
13
12
11
10

Cost of Pump
(Rs. in Million)

9
8
7
6
5
4
3
2
350

400

450

500

550

600

Dia. of pipes (mm)

GoM:Phed

DPR of GSWSP (Phase III)

41

TABLE III: Table showing Comparative Statement of Overall Cost structure of pumping main L for Different pipe size
1st Stage Flow of 8.00 Mld
Capitalized
CapitaAnnual
total cost
lized
Energy
(Rs. in
Energy
Cost
thousands)
cost
(Rs. in
(Rs. in
thousthousands
ands)
)

2nd Stage Flow of 24.00 Mld


Initial
Capitalized
Annual
investEnergy cost
Energy
ments for
(Rs. in
Cost
pump &
thousands)
(Rs. in
Annual
thousenergy
ands)
cost (Rs. in
thousands)
9
10
11

Sl.
No.

Pipe
size
in
mm

Class
of
pipe

1.

350

MS

4118.39

3689.05

28059.2

32177.58

15582.85

18381.4

139810.2

37199.87

74220.02

2.

400

MS

4041.02

3619.75

27532.08

31573.09

13807.39

16287.1

123880.6

32961.41

70252.08

3.

450

MS

4004.16

3586.73

27280.94

31285.09

12961.49

15289.2

116291.2

30942.07

68819.74

4.

500

MS

3985.06

3569.62

27150.83

31135.89

12523.25

14772.3

112359.3

29895.89

68499.34

5.

550

MS

3974.48

3560.15

27078.77

31053.25

12280.55

14486

110181.8

29316.51

68713.92

6.

600

MS

3968.30

3554.61

27036.64

31004.94

12138.64

14318.6

108908.5

28977.73

69257.67

Cost of
pump Set
(Rs. in
thousands)

Cost of
pump Set
(Rs. in
thousands)

Grand total
of
capitalized
cost for 30
yrs. (Rs. in
thousands)

12

*Cost of pipe includes cost of specials (10% of actual pipe cost).

80

78

76

Capitalised Cost
(Rs. in Million)

74

72

70

68

66
350

400

450

500

550

600

Dia. of pipes (mm)

REMARKS : As seen from the Graph, the most economical sizes of rising main is 500mm.

GoM:Phed

DPR of GSWSP (Phase III)

42

2.2.8.2 Design of RCC Sump for Intermediate pumping station.


1.
2.
3.

Ultimate demand
Hour of pumping
Combined discharge of pump in parallel

4.

Rate of total discharge with 20 Hrs. running of pumps per day

5.
6.

Detention time
Capacity of CWR
Considering circular sump assuming
Area

H
d
4
d
d
Say

Providing free board


Actual capacity of RCC Sump

24.00 mld
20 hrs./day
24.00 x 24/20
28.80 mld
400 Lps
24,000 Lpm
30 min
7,20,000 Ltrs.
3.00m
240.00m
4 x 240.00/
17.48m
18.00m
0.30
x 18.00 x 18.00 x 3.30
4
839.75m
8,39,750.00 Ltrs.

2.2.8.3 Design on Economic size of Rising Transmission Main for Intermediate


Pumping Station.
1.

Water requirements

Year

Discharge

Initial

2011

0.10 Mld

Intermediate

2026

8.00 Mld

Ultimate

2041

24.00 Mld

2.

Length of pumping main

2500 m

3.

Static head for pump

190 m

4.

Design period

30years

5.

Combined efficiency of pumping set

70%

6.

Cost of pumping unit

Rs.15,000per Kw

7.

Interest rate

10%

8.

Life of electric motor and pump

15 years

9.

Energy charges

Rs. 545 per unit

10.

Pumping hrs.

20 hrs.

11.

Residual head

1m

Input Data
Pipe Data
Diameter
350
400
450
500
550
600

GoM:Phed

At Site rate
Type
MS
MS
MS
MS
MS
MS

Class
GR 410
GR 410
GR 410
GR 410
GR 410
GR 410

DPR of GSWSP (Phase III)

HWC

Rs./m

100
100
100
100
100
100

6917.96
8167.96
9417.96
10667.96
11920.22
13250.00

43

Solution

1st 15 years

2nd 15 years

1.

Discharge at installation

0.10 Mld

8.00 Mld

2.

Discharge at the end 15 years

8.00 Mld

24.00 Mld

3.

Average discharge

4.50 Mld

16.00 Mld

4.

Ave. hours of pumping ave. discharge

10.13 hrs.

13.33 hrs.

5.

Kw required at the above combined


efficiency of pumping set

1.56 *H1

4.67 *H2

Annual cost (Rs.) of electrical energy

20154.40 *Kw1

26540.77 *Kw2

6.

TABLE I : Table showing velocity and loss of Head for different pipe size
Sl.
No.

Pipe
Size
in
mm

Frictional Head
Loss per 1000M
1st stage 2nd stage
flow
flow

Velocity in m/s
1st stage
flow

2nd stage
flow

Total Head in m for 2500m pipe lengths including 190m of static head
1st Stage Flow
Other
Total
losses
Losses

2nd Stage Flow


Other
Total
losses

Frictional
loss
m
11

12

H2
13

Avg.
Line
pressure
Kg/cm
14

H1
9

Avg.
Line
pressure
Kg/cm
10

15.00

1.50

207.50

20.75

114.77

11.48

317.25

31.72

2.65

7.83

0.78

199.61

19.96

59.89

5.99

256.88

25.69

0.70

2.10

4.41

0.44

195.85

19.59

33.74

3.37

228.12

22.81

8.08

0.57

1.70

2.64

0.26

193.90

19.39

20.20

2.02

213.22

21.32

0.66

5.08

0.47

1.40

1.66

0.17

192.83

19.28

12.70

1.27

204.97

20.50

0.43

3.32

0.39

1.18

1.09

0.11

192.20

19.22

8.31

0.83

200.14

20.01

Frictional
loss
M
7

1.

350

6.00

45.91

1.16

3.47

2.

400

3.13

23.96

0.88

3.

450

1.76

13.50

4.

500

1.06

5.

550

6.

600

320
310
300
290
280
270
260

Total Head (M) 250


240
230
220
210
200
190
180
350

400

450

500

550

600

Diameter of pipe (mm)

GoM:Phed

DPR of GSWSP (Phase III)

44

TABLE II : Table showing Kilowatts required and cost of pump sets for different pipe size
1st Stage Flow of 8.00 Mld
Cost of
H1
Kw required
pump
(rounded to
(Total
nearest ten
head loss
@ Rs.15000
per Kw
including
in mm)
(Rs.in
50% standby)
thousands)
4
5
6

2nd Stage Flow of 24.00 Mld


H2
Cost of pump
Kw required
(rounded to
(Total
@ Rs.15000
nearest ten
per Kw
Head in
including
(Rs. In
mm)
50%
thousand)
standby)
7
8
9

Cost of pipe
per unit
length
(Rs.)

Cost of
2500 m
pipeline
(Rs. In
thousand)

10

11

33324

6918

17295

1799

26983

8168

20420

228

1597

23962

9418

23545

6789

213

1493

22397

10668

26670

450

6752

205

1435

21530

11920

29801

449

6730

200

1402

21023

13250

33125

Sl.
No.

Pipe
size
in
mm

Class
of
pipe

1.

350

MS

208

484

7266

317

2222

2.

400

MS

200

466

6989

257

3.

450

MS

196

457

6858

4.

500

MS

194

453

5.

550

MS

193

6.

600

MS

192

Note : Assuming other losses = 10% of frictional loss.

36
32
28
24

Cost of Pump 20
(Rs. in Million) 16
12
8
4
0
350

400

450

500

550

600

Dia. of pipes (mm)

GoM:Phed

DPR of GSWSP (Phase III)

45

TABLE III : Table showing Comparative Statement of Overall Cost structure of pumping main L for Different pipe size
1st Stage Flow of 8.00 Mld
Capitalize
CapitaAnnual
d total cost
lized
Energy
(Rs. in
Energy
Cost
thousands)
cost
(Rs. in
(Rs. in
thous-ands)
thousands
)

2nd Stage Flow of 24.00 Mld


Initial
CapitaAnnual
investlized
Energy
ments for
Energy
Cost
pump &
cost
(Rs. in
Annual
(Rs. in
thousenergy cost
thousands)
ands)
(Rs. in
thousands)
9
10
11

Sl.
No.

Pipe
size
in
mm

Class
of
pipe

1.

350

MS

7265.54

6508.119

49501.27

56766.82

33324.12

39308.80

298985.80

79552.35

153614.07

2.

400

MS

6989.23

6260.609

47618.69

54607.92

26983.16

31829.10

242094.40

64415.02

139442.84

3.

450

MS

6857.58

6142.687

46721.77

53579.35

23962.11

28265.50

214989.40

57203.08

134327.34

4.

500

MS

6789.38

6081.594

46257.09

53046.47

22396.96

26419.20

200946.80

53466.71

133183.08

5.

550

MS

6751.61

6047.76

45999.75

52751.35

21530.18

25396.80

193169.90

51397.50

133949.40

6.

600

MS

6729.52

6027.977

45849.27

52578.79

21023.35

24798.90

188622.60

50187.57

135891.37

Cost of
pump
Set
(Rs. in
thousands)

Cost of
pump Set
(Rs. in
thousands)

Grand total
of
capitalized
cost for 30
yrs. (Rs. in
thousands)

12

*Cost of pipe includes cost of specials (10% of actual pipe cost).

155

150

145

Capitalised Cost
(Rs. in Million)
140

135

130
350

400

450

500

550

600

Dia. of pipes (mm)

REMARKS : As seen from the Graph, the most economical sizes of rising main is 500mm.

GoM:Phed

DPR of GSWSP (Phase III)

46

2.2.8.4 Design calculations of a pumping plant for Intake Pumping station.


1.1
1.2
1.3
1.3.1
1.3.2
1.3.3
1.4
1.4.1
1.4.2
1.4.3
1.5
1.6
1.6.1
1.6.2
1.7
1.8
1.9
1.10
2.0
2.1

2.2

2.3

2.4

Column pipes
Design velocity

a.
b.
c.
d.
e.
f.
g.
h.

1.5m/s
1.00m

2.5m/s
0.300m

Bell mouth at discharging point


Design velocity
Bell mouth diameter

0.80m/s
1.00m

Rate of total flow with 20 hrs running of pumps per day


Discharge of each pump
Mean static head (1664.00m-1562.00m)
Frictional loss in straight pipe of rising main for combined
discharge.
Frictional losses in bends, valves & in rising main @ 10%
of (3.5)
Frictional loss in taper, delivery valve, NRV & individual
delivery pipe of Nb 300mm
Velocity head lost at atmosphere at the exit, as v/2g, where
v = 0.82 m/s
Design head = (3.4)+(3.5)+(3.6)+(3.7)+(3.8)
System Resistance Curves

3.9
3.10

700Rm
500mm
100
1664.00m
3
2
1
1585.60m
1577.00m
1587.00m
30C

Delivery pipes and valves


Design velocity
Diameter of delivery pipe, delivery valve & NRV

3.2
3.3
3.4
3.5

3.8

1577.00
1575.00m
1562.00m

Column pipe diameter

Hydraulic calculations
Combined discharge of 2 pumps in parallel

3.7

8.00 Mld
20 hrs per day

2.5 to 3m/s
Say,2.75 m/s
0.300m

3.0
3.1

3.6

GoM:Phed

Daily demand of water


Hours of pumping, considering loss of one hour due to
tripping and other minor interruption.
Water levels in the sump, by RLs
Maximum (High flood level)
Mean
Minimum
Rising main
Length
Diameter
Friction coefficient for m.s. steel pipes
RL of point of discharge
No. of pumps
Duty pumps
Stand by pumps
RL of ground level at the pumping station
RL of high flood level
Altitude of the site above MSL
Ambient temperature
Size of pipes and fittings for the pumping system
Inlet bell mouth
Design velocity
Bell mouth diameter

8.00 x 24
20

9.60 mld
0.133 m/s
0.07 m/s
102.00m
0.74m
0.074 m
0.074 m
0.034m
102.92 m 103.00 m

System resistant curves are prepared by calculating total head of flows and based on following level conditions in sump at
minimum, mean and maximum WLs. The head losses worked out are as tabulated :
Combined Q m/s.
0.06
0.07
0.08
0.09
0.10
0.11
Max. Static head
102.00 m
Mean static head
89.00 m
Min. static head
87.00 m
Friction in rising main
0.10
0.13
0.14
0.18
0.24
0.34
Friction in valves and fittings@ 10% of
0.01
0.013
0.014
0.018
0.024
0.034
(e)
Velocity head loss
0.16
0.18
0.25
0.28
0.30
0.32
Total friction (e)+(f)+(g)
0.270
0.320
0.40
0.48
0.56
0.690

DPR of GSWSP (Phase III)

47

i.

Total head
Min WL
27.54
32.64
Mean WL
24.03
28.48
Max WL
23.49
27.84
Note : Station losses in individual delivery pipe taper and
curve but should not be deducted from pumps H-Q curve.

40.80
35.60
34.80
valves are

48.96
57.12
42.72
49.84
41.76
48.72
not added for system

70.38
61.41
60.03
resistance

80
70
60

(Hstat) 50
40
30
20
0.06

0.07

0.08

0.09

0.10

0.11

Discharge Q m/sec
Min WL

Max WL

80
70

(Hstat) LWL
of Suction Sump

60

(Hstat) HWL
of Suction Sump

50
40
30
20
0.06

0.07

0.08

0.09

0.10

0.11

Discharge Q m/sec

(i)
(ii)
(ii)
4.0

Thus, design duties and Head variation shall be as under :


Discharge Q = 0.07 m/s i.e. 70 l/s
Duty
H = 102.88m 103.00m
head
Head range : Pump should be suitable for operation in all variations from solo operation to 2 pumps in parallel and level
variation in sump from min. WL to max. WL

Selection of type, number of stages and running speed


Pump Head as per 3 (h), H= 103m
Head loss at entrance to bellmouth
Hi = 0.05 V/2g = 0.002m
Head loss in column pipe, assuming presently, 10m length of column and as per figure (3) in IS:1710-1972
HC = 0.052m
Head loss in discharge bend/tee = 0.02m
Margin between duty head & shut-off head = 6m
Hence bowl Head, H=103+0.002+0.052+0.02+6.00 = 111.07 112
For selecting the suitable pump, the following options in combinations of type of pump, number of stages and running
speed are taken into accounts :

Option
a.
b.
c.
d.
e.
f.

Type
Vertical turbine or Hor. End-suction
Hor. Double Suction
Vertical turbine
Vertical turbine
Vertical turbine
Vertical turbine

Stages
1
1
2
3
4
6

Suctions
1
2
1
1
1
1

Speed
1400,980
1400,980
1400,980
1400,980
1400,980
1400,980

Out of the above available options, 4 stage single suction 1400Rpm Vertical turbine pump under option (e) appears to be
the most suitable choice to provide a maximum and stable efficiency. The calculations are as under.
4 stage single suction, 1400Rpm
H, Head per stage = 112./4 =28m
Nq = 3.65 NxQ0.5/H0.75 = 3.65x1400x(0.07)0.5/(28)0.75 = 111
Attainable efficiency as per the curve = 75%

GoM:Phed

DPR of GSWSP (Phase III)

48

Suction head required as per figure 11.3 = 5.00m @ 30 degree C.


Add say 0.02m for frictional losses in suction pipes.
Add 0.75m for difference in atmospheric pressure at mean sea level and site altitude 1587m (Ref:Table:11.12 of Manual
on water supply & treatment)
a)

Hence minimum suction head required @ site condition for


V.T. pump = 5.00+0.02+0.75 = 5.77m
In case of VT pump, eye of impeller will be above bottom of sump by distance = bottom clearance + Length of bell mouth
& bowl upto impeller eye.
= D/2+0.75 = 1.15m above bottom of sump = 0.80/2 +1.50 = 1.90m
Thus minimum water depth required upto minimum WL to satisfy NPSHR for VT pump
= 1.90+5.77 = 7.67m

Observations : Considering the site condition, the observations are as under :


Choice for horizontal centrifugal pumps with pump house at the site is ruled out in view of very high suction head and
limiting the suction head by having a pump house at lower level would involve the risk of flood.
Considering the flood risk, a 4 stage vertical pumps with pump house above the Intake well/sump would be the ideal
choice.
In order to keep the operating flow free from obstruction and pipe work, delivery is taken below the pump floor level.
The Vertical turbine pumps shall be self lubricated.
5.
(a)

2.2.8.5

Design calculations for a pumping plant of intermediate pumping station.


1.
1.1
1.2
1.3
1.3.1
1.3.2
1.3.3
1.4
1.4.1
1.4.2
1.4.3
1.5
1.6
1.6.1
1.6.2
1.7
1.8
1.9
1.10
2.
2.1

GoM:Phed

Sizes of associated components/equipment


Motor
Lowest bowl efficiency as per 4 above is 75%
Allowing 5% margin, quoted bowl efficiency is 0.70
Input to bowl assembly (clause 3.17 of IS 1710)
70x112x60 = 109.80Kw ~ 110Kw
6120x0.70
Power loss in thrust bearing and line shaft bearing
15 Kw
Input to pump
125 Kw
As the pump is designed to develop the required discharge pressure at a speed of 1400Rpm correspond
to a motor speed when connected to a power system with a frequency of 47.50Hz., the motor capacity
should have ample margin of power to take care in the event of sudden increase in the input power to
pumps, when speed suddenly shoots up as a result of sudden fluctuation in the frequency of power
system to the upper limit of 51.50Hz.. Taking this into consideration, 30% margin of power is provided
in the motor and considering the commercial rating, the power rating of motor shall be
170 Kw
As motor are to be installed in doors, SPDP motors with IP 23 protection with voltage rating of 6.6Kv is adopted to
facilitate O&M.

Data of the Scheme


Daily demand of water
Hours of pumping, considering loss of one hour due to tripping
and other minor interruption.
Water levels in the sump, by RLs. Assuming height of sump
Maximum
Mean
Minimum
Rising main
Length
Diameter
Friction coefficient for m.s. steel pipes
RL of point of discharge
No. of pumps
Duty pumps
Stand by pumps
RL of ground level at the pumping station
RL of high flood level
Altitude of the site above MSL
Ambient temperature
Size of pipes and fittings for the pumping system
Inlet bell mouth
Design velocity
Bell mouth diameter

DPR of GSWSP (Phase III)

8.00 Mld
20 hrs per day
3.30m
1664.00m
1661.50m
1661.00m
2500m
500mm
100
1847.00m
3
2
1
1661.00m
30C

1.5m/s
1.00m
Say 1000mm

49

2.2

Delivery pipes and valves


Design velocity
Diameter of delivery pipe, delivery valve & NRV

2.3

Bell mouth at discharging point


Design velocity
Bell mouth diameter

3.
3.1
3.2
3.3
3.4
3.5

2.5m/s
0.300m
Say 300mm
0.8m/s
1.00m
Say 1000mm

Hydraulic calculations
Combined discharge of 2 pumps in parallel 8.00x24/20
9.60 mld
Rate of total flow with 20 hrs running of pumps per day
0.133 m/s
Discharge of each pump
0.07 m/s
Static Delivery Head (1847.00 1664.00)m
183 m
Frictional loss in straight pipe of rising main for combined
discharge.
2.64m
Frictional losses in bends, valves & in rising main @ 10%
of(3.5)
0.264m
Frictional loss in taper, delivery valve, NRV & individual
delivery pipe of Nb 450mm
0.264m
Velocity head lost at atmosphere at the exit, as v/2g, where v
= 0.875 m/s
0.030m
Static Suction Head (1664.00 1661.00)m
3.00m
Head Loss at entrance to bellmouth
Hi = 0.05 V/2g
0.30m
Head Loss in discharge bend/tee
0.40m
Margin between duty head and shut off head
6.00m
Total head = (3.4) + (3.5) + (3.6) + (3.7) + (3.8) - (3.9) +
(3.10) + (3.11) + (3.12)
189.90m
Thus, design duties and Head variation shall be as under :
Discharge Q = 0.07m/s i.e. 70 l/s
Duty
H = 190.10m 190.00m
head
Head range : Pump should be suitable for operation in all variations from solo operation to 2 pumps in parallel and
level variation in sump from min. WL to max. WL

3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13

(i)
(ii)
(iii)
4.

Selection of type, number of stages and running speed


For selecting the suitable pump, the following options in combinations of type of pump, number of stages as running
speed are taken into accounts :

Option
a.
b.
c.
d.

Type
Hor. End-suction
Hor. End-suction
Hor. End-suction
Hor. End-suction

Stages
1
2
3
4

Suctions
1
1
1
1

Speed
2900, 1400, 980
2900, 1400, 980
2900, 1400, 980
2900, 1400, 980

Out of the above available options, 2 stage single suction 1480Rpm Horizontal End Suction pump under option (b)
appears to be the most suitable choice to provide a maximum and stable efficiency. The calculations are as under.
2 stage single suction, 1400.00 Rpm
H, Head per stage = 190.00/2= 95 m
Nq = 3.65 NxQ0.5/H0.75 = 3.65x1400x(0.07)0.5/(95.00)0.75 = 45 Rpm
Attainable efficiency as per the curve = 65 %

5.
(a)
(b)

6.
(a)

GoM:Phed

Observations : Considering the site condition, the observations are as under :


Choice for horizontal centrifugal pumps with pump house at the site adjacent to the sump would be ideal.
Sump Dimensions
Clearance between bottom of sump and lip of suction bellmouth,
C=D/3=800/3 = 266.66mm,Say 270 mm
Spacing between pumps
Desirable spacing between pumps is 2.5D i.e.1000 mm. However, size of lower flange of head gear/discharge head
(accommodating stuffing box, thrust bearing and flexible coupling) would be approximately 3.5 times column pipe
diameter i.e.1400mm. Keeping about 600mm clearance, spacing will be 2000mm.
Sizes of associated components/equipment
Motor
Efficiency as per 4 above is 65%
Allowing 5% margin, quoted efficiency is 0.60%

DPR of GSWSP (Phase III)

50

Input power
190x70x60 = 217.32Kw 220 Kw
6120x0.60
Power loss in bearings
15 Kw
Input to pump
235 Kw
As the pump is designed to develop the required discharge pressure at a speed of 1400Rpm
correspond to a motor speed when connected to a power system with a frequency of 47.50Hz., the
motor capacity should have ample margin of power to take care in the event of sudden increase in
the input power to pumps, when speed suddenly shoots up as a result of sudden fluctuation in the
frequency of power system to the upper limit of 51.50Hz.. Taking this into consideration, 30%
margin of power is provided in the motor and considering the commercial rating, the power rating
of motor shall be
315 Kw
As motor are to be installed in doors, SPDP motors with IP 23 protection and voltage rating of 6.6Kv is adopted to
facilitate O&M

2.2.8.6

Design of 8 Mld water treatment plant


Considering the nature of raw water quality constituents where content of iron is less than 1
Mg/1, the process of aeration is not desirable and has not been considered. The coagulation and
sedimentation processes is incorporated in a single unit in the clariflocculator. The
clariflocculator is designed to provide pre-treatment 8 Mld in 20 Hrs. duration per day.

2.2.8.7

Process design of the treatment plant units


Water Treatment Plant of 8 Mld capacity
Salient parameters of the TP design:
Hour of operation of TP

20 hrs.

Flash mixer detention time

30 sec.

Free board in flash mixer chamber

0.3 m

Storage time in flocculator

0.5 hrs.

Detention time in clarifier

2.25 hrs

Loss in sludge removal from Clarifier

2.0%

Filter rate through filter bed

5.5m/m/hr

Filter backwash rate

36m/m/hr

Duration of backwash

10 minutes/day

Distribution loss

10%

No. of flash mixers

1 nos.

Detention time of flash mixer

30 sec.

Freeboard in flash mixer chamber

0.3m

(Range = 30 to 60 sec)

(Range = 2 to 2.5)

(Range = 4.5 to 6)

Estimation of size of flash mixer.

GoM:Phed

DPR of GSWSP (Phase III)

51

Sl.
No.

Rate of flow
(m/hr)

Inlet pipe dia


(mm)

Dia of flash mixer


(m)

Depth required
(m)

Design depth
(m)

1.

400.00

0.600

2.30

2.240

2.50

Dia. of pipe from flash mixer to clariflocculator:


Number of pipes considered
Velocity through pipe
Flow in each pipe

:
:
:

1
0.9m/sec
400.00m/hr.

Sl.
No.

Rate of flow
(m/hr)

Flow through each pipe


(cumec)

Pipe dia. required


(mm)

Pipe dia. taken


(mm)

1.

400.00

0.111

0.588

600

Estimation of size of clarifier


No. of clarifier in each TP
Storage time
Depth of flocculator
Side water depth of clarifier
Dia. of central shafts
Area of central shaft
Flow rate through flocculator
Wall thickness of flocculator
Width of weir at the perimeter of the clarifier

Sl.
No

Rate of
flow

Flow
through
each
clarifier

Volume of
flocculator

Area
required
for
flocculator

(m/hr.)

(m/hr.)

(m)

400.00

400.00

200.00

:
:
:
:
:
:
:
:
:

1
0.5 hrs.
3.8m
3.5m
0.9m
1.32m
24.882m/m/day
0.125m
0. 5m

Required
dia. of
flocculator

Design
dia. of
flocculator

Outer dia.
of
flocculator

Area
required
for
clarifier

Total area
required for
clariflocculator

Required dia.
of
clariflocculator

(m)

Area of
flocculator
including
central
shaft
(m)

(m)

(m)

(m)

(m)

(m)

(m)

52.63

53.95

8.28

8.30

8.55

257.14

311.09

20.00

Perimeter check and detention time check for clarifier


Sl.
No.

Inner diameter of
weir (m)

Perimeter of weir
(m)

Weir loading
(m/m)

Volume of clarifier
(m)

Detention time at clarifier


(hr.)

19.00

60.00

209.43

1028.56

2.50

Allowable weir loading


Detention time
Estimation of size of Filter beds
No. of filter houses
Loss in sludge removal from clarifier
Filter rate through filter beds
Consider individual filter bed size

GoM:Phed

DPR of GSWSP (Phase III)

:
:

300 (m/m)
2.25 hr.

:
:
:
:

1
2%
5.5m/m/hr
50m

OK
OK

52

Sl.
No.

Rate of flow
(m/hr)

Loss in clarifier
(m/hr)

Input to filter
(m/hr)

Bed area required


(m)

No. of bed
required

No. of beds
provided

400.00

8.00

392.00

71.27

1.42

2 Nos.

2 Nos. of filters are proposed to be provided. Each filter will be made up of 2 sections. Each section will be
5.80mx4.30m, having and area of 24.94m

Design of inlet pipe.


Discharge of 2 section of filter
Q

:
:
:

5.5x24.94x2
274.34m/hr.
0.076m/sec

In designing inlet pipe the discharge is taken as twice the actual to provide 100% overload
Diameter of inlet pipe

2(0.076m/sec)x4
2
0.097
300mm

Design of outlet pipe.


Discharge of 1 section of filter

:
:
:

5.5x24.94
137.17m/hr.
0.038m/sec

Diameter of outlet pipe

2(0.038m/sec)x4
2

0.22
250mm

Estimation of size of chemical house


Chemical storage area:
a) Alum storage area
Although there is some relation between turbidity of the raw water and the proper coagulant dosage, the
exact quantity can be determined only by trial. Umiew river water is turbid throughout the year and
extremely turbid during the monsoon months. Coagulant dosage for the water treatment plant of existing
project has been determined using jar test and the dosage is adopted in this project.
Consider alum dosing @ 160 ppm for 7 months and 100ppm for 5 months
Quantity of alum required for 3 months storage

: 3x8.00(106x160x7x30+106x100x5x30)
12 10
106
106
:
92.20 Mt

For storage height of 2m and specific gravity of alum as 1.8t/m


Storage area
: 97.20
2x1.8
: 27m
Considering circulation area @ 20% of total area
Total floor area required
: 32.40m
Size
: 5.70m x 5.704m each
GoM:Phed

DPR of GSWSP (Phase III)

53

b) Lime storage area


Considering lime dosing @ 80 ppm for 7 months and 50ppm for 5 months
: 3x8.00(106x80x7x30+106x50x5x30)
12 10
106
106
:
48.60Mt

Quantity of lime require for 3 unit storage

For storage height of 2m and specific gravity of lime as 1.4t/m


Storage area
:
:
Considering circulation area @ 20% of total area
Total floor area required
Size

:
:
:

Specific gravity of lime


Assuming storage height
Area required

:
:
:
:
:

Circulation space required


Total lime floor area required
Hence, provide 2 nos. of lime storage of size

:
:
:
:

20.83m
4.56m x 4.56m each
8.00x10x80x10-3x7x30+8.00x10
x50x10-3x5x30
194400 Kg
194.40 t
1.4t/m
2.00m
194.40
2.00x1.4
69.43m
20%
83.31m
9.12m x 9.12m

c) Bleaching powder storage area


d) Polyelectrolyte store room size

:
:

5.5mx5.5m
2mx3.5m

:
:
:

8.00x10x160x10-3
1280 Kg/day
1.28 t/day

:
:
:
:
:
:
:
:

5%
25.60 m
25.60/4
6.40 m
1.5m
4.26m
2.06m x 2.06m x 1.50m
2.06m x 2.06m x 1.50m
(with 300mm freeboard)

:
:
:
:

8.00 x 10 x 80 x 10-3
640.00 Kg/day
0.64 t/day
1.50%

i.e

Solution Tank:
a) Alum
Requirement of alum
i.e.
Considering strength of solution
Volume of solution required
Volume of each tank
Assuming height of tank
Area of tank required
Size of tank required
Provided 4 tanks of size

b) Lime
Volume of lime solution required

Considering strength of solution


GoM:Phed

200
2x1.4
71.36m

DPR of GSWSP (Phase III)

54

Therefore, volume of solution required

4.27m

Volume of each tank

:
:
:
:
:
:

4.27/2
2.13m
1.50m
1.42m
1.20m x 1.20m x 1.50m
1.20m x 1.20m x 1.50m

:
:

5x50
250Kg/day

Assuming height of tank


Area of tank required
Size of tank
Provided 4 tanks of size
c) Bleaching powder solution tank
Considering prechlorination requirement @ 5ppm
Requirement

Requirement of bleaching powder per day considering potency of 25% 200Kg/day


Considering 5% solution strength, requirement
Volume of solution
:
4000 ltrs.
Provide 2 tanks of capacity 1800ltrs each
:
1.8m each
Assuming height of tank
:
0.75m
Area of tanks required
:
2.40m
Provided 2 tanks of size
:
1.20mx1.20mx0.75m ht.

d) Polyelectrolyte Tank
Considering polyelectrolyte requirement @ 1ppm
Strength
Flow
Alum required
Consider holding capacity
Volume of tank required
Considering height
Area required
Diameter required

:
:
:
:
:
:
:
:

10%
400.00m/hr.
400.00Kg/hr.
12 hrs.
2.5Kg/hr/hr
1.5m
1.67m
1.29m

:
:

8.00 Mld
2.50hr.

Design of clear water reservoir


Flow rate
Detention time

Capacity of
reservoir (m)

No. of reservoir

Diameter
(m)

Depth
(m)

Actual depth with


free board 0.30m

833

20.60

3.0

3.30

Hydraulic calculation for treatment plant units.


Water treatment plant of 8 Mld capacity
Channel from stilling chamber to flash mixer
Flow through channel
Assuming velocity through channel to flash mixer
Width of channel
Hence depth required
GoM:Phed

DPR of GSWSP (Phase III)

:
:
:
:

400.00m/hr
2m/sec
0.60m
400.00/0.60/3600
55

Area of flow
Wetted perimeter
Hydraulic radius
Length of channel
Mannings coefficient

Required slope to attain the flow


i.e.
Loss of head
Inlet stilling chamber
Water level at flash mixer
Head available

0.20m

:
:
:
:
:
:
:
:

0.20x0.60
0.120m
2.x0.12+0.60
0.84m
0.120m/0.84
0.143m
20m
0.015 (for sand and cement plaster
finish, refer table 6.2 of CPHEEO
manual)
0.01406m/m
1 in 71
0.281m
1847.00m
1846.50m
0.5m
Hence OK

:
:
:
:
:
:

Pipeline from flash mixer to clariflocculator


Length of pipe from flash mixer to clariflocculator
Consider dia. of pipe
Discharge through pipe
Velocity of water through pipe
Friction loss

Total friction loss


No. of bends in pipe along the length
Considering 90 bend, bend loss coefficient K as per
table 6.5 CPHEEO manual
i.e. bend loss per bend

Total bend loss


Total head loss
GL at flash mixer
Water level at flash mixer
GL at clariflocculator
Water level at clariflocculator
Head available

:
:
:
:
:
:

:
:
:
:

30m
600mm
400.00m/hr.
400.00/(3600x0.785x0.6^2)
0.40 m/sec
1.60m/Km (from modified Hazen
Williams chart, appendix 6.3 or
from the formula given in article
6.2.4 CPHEEO manual)
1.60x30/1000
0.048m
3 nos.

:
:
:
:
:
:
:
:
:
:

0.8
:
KV^2/2/g
0.8x1.028^2/2/g
0.043m
0.043x3
0.129m
0.177m
1844.00m
1846.50m
1843.00m
1846.20m
0.3m
Hence OK

:
:
:
:
:
:

400.00m/hr
1m/sec
400.00/1/0.45/3600/2
0.40m
0.45x0.40
0.18m

Channel around clariflocculator


Flow through channel
Assume velocity
Hence depth required
Area of flow

GoM:Phed

DPR of GSWSP (Phase III)

56

Wetted perimeter
Hydraulic radius
Length of channel (half perimeter of clariflocculator)
Mannings coefficient

Required slope to attain the flow


i.e
Loss of head
Say
Water level at inlet of clariflocculator
Drop between flocculator chamber and clarifier chamber
Hence water level at outlet of clariflocculator
Freeboard in channel
Invert level of channel at the upper end
Invert level of channel at the lower end (at outlet point)

:
:
:
:
:
:

:
:
:
:
:
:
:
:
:
:

2.x0.40+0.45
1.25m
0.18/1.25
0.144m
30.00m
0.015 (for sand and cement plaster
finish, refer table 6.2 of CPHEEO
manual)
0.00339m/m
1 in 295
0.207m
0.20m
1846.20m
0.10m
1845.90m
0.30m
1845.50m
1845.20m

Channel from clariflocculator to filter house


Flow through channel
Assume velocity
Width of channel
Hence depth required
Area of flow
Wetted perimeter
Hydraulic radius
Length of channel
Mannings coefficient

Required slope to attain the flow


i.e.
Loss of head
GL at clariflocculator
Water level at outlet of clariflocculator
GL at filter house
Water level at filter house inlet
Head available

:
:
:
:
:
:
:
:
:
:
:
:
:

:
:
:
:
:
:
:
:

400.00m/hr.
2m/sec
0.40m
400.00/1/0.4/3600
0.40m
0.40x0.40
0.160m
2x0.40+0.4
1.20m
(0.160/1.20)
0.133
15m
0.015 (for sand and cement plaster
finish, refer table 6.2 of CPHEEO
manual)
0.01406m/m
1 in 71
0.210m
1842.40m
1845.90m
1841.90m
1843.90m
1.79m
Hence OK

:
:
:
:

15m
500mm
400.00m^3/hr.
400.00/(3600x0.785x0.5^2)

Pipeline from filter bed to reservoir


Length of pipe from filter bed to CWR
Consider dia. of pipe
Discharge through pipe
Velocity of water through pipe
GoM:Phed

DPR of GSWSP (Phase III)

57

:
:

Friction loss with velocity of

Total friction loss


No. of bends in pipe along the length
Considering 90 bend, bend loss coefficient K as per
table 6.5 CPHEEO manual
i.e. bend loss per bend

Total bend loss

Total head loss


GL at filter house
Water level at filter house inlet
Water level at filter house outlet
GL at CWR
Water level at CWR
Head available

:
:
:

1.00m/s
4.00m/Km(from modified Hazen
Williams chart, appendix 6.3 or
from the formula given in article
6.2.4 CPHEEO manual)
4.00x1.5/1000
0.06m
3 nos.

:
:
:
:
:
:

0.8
KV^2/2/g
0.8x3.63^2/2/g
0.53m
0.53x3
1.6m

:
:
:
:
:
:
:

1.66m
1841.90m
1843.90m
1840.80m
1834.00m
1837.40m
1.74m

Hence OK

Parts, equipments, machineries, valves, metering and instrumentation have been


considered for installation under the Water Treatment Plant

GoM:Phed

1.

Raw water inlet stilling chamber.

i)

600mm D.I. Flanged tail piece grouted into stilling chamber.

ii)

Flow meter comprising Mahindra Flow Transmitter having local


mechanically operated dial indicator and remote reading indicator
recorder and continuous integrator, remote instruments located in
the annunciator panel in the control room.

iii)

600mm butterfly valve with motorize actuator and position


indicator.

2.

Equipments for chemical laboratory preparation and dosing


system

i)

Alum agitator paddle of hardwood mounted on MS vertical shaft


suspended from gear box and rotating below in a GM bush grouted
into alum tank floor. Shaft driven through gearing by a 1 Hp motor,
complete with starter.

Intermediate
1 no.

1 set
1 set

2 sets

ii)

50mm MS rubber lined wall pipe for solution and sludge outlet.

2 nos.

iii)

50mm C.I. rubber lined diaphragm valve for solution and sludge.

2 nos.

iv)

PVC header pipe interconnecting solution outlets and connected


through PVC piping or rubber hose to dosing tank.

2 range

DPR of GSWSP (Phase III)

58

v)

PVC header pipe interconnecting sludge outlets and connected


through PVC piping or rubber hose to drain.

2 range

vi)

Stainless steel 50mm inlet float valve with PVC float and
adjustable stem for maintaining a constant level in the dosing tank
at any preset head

2 nos.

vii)
viii)

Lining of wetted surface of alum tank and alum dosing tank with
chlorinated rubber paint or bitumen.

ix)

Lime agitator paddle of MS arms mounted on a horizontal MS


shaft and fitted with hardwood paddle blades and lime lifting cups

2 nos.
2 item

2 sets

Lime agitator drive comprising 3 Hp electric motor with starter,


coupled through speed reducing gear-box to paddle shaft. Shaft
provided with stuffing box at wall entry point.

2 sets

xi)

MS sheet, lime receiving tray with excess flow back lime and dose
regulating adjustable V-Notch and dose diluting hopper

2 sets

xii)

G.I. Pipe interconnecting two hoppers and carrying lime to raw


water inlet stilling chamber.

2 ranges

xiii)

G.I. service water piping from wash water tank to units in chemical
house.

2 ranges

xiv)

1 ton capacity chain pulley block with trolley running on monorail,


both block and trolley hand operated

1 no.

xv)

1 ton capacity Avery platform scale with yard arm

1 no.

x)

Flash mixer

i)

Agitator assembly of MS construction comprising vertical MS shaft


suspended from special bearing assembly and carrying MS cross
arms with impeller blades thereon. Impeller blades with adjustable
pitch mounted to create maximum turbulence.

ii)

Agitator drive comprising 5 Hp electric motor coupled to agitator


shaft through speed reducing gear, complete with couplings and
motor starter.

4.

Clarifier-cum-flocculator

i)

MS fabricated bridge rotating round central pivot and resting on


four carriages on flocculator walls; carriages running on light rail
track fixed to the top flocculator and clarifier walls.

ii)
iii)

iv)

GoM:Phed

Stainless steel taper needle valve operated by a float to adjust


dosage proportionate to raw water flow rate automatically.

Sludge scraper assembly under slung from bridge sweeping entire


clarifier and flocculator area.

1 no.

1 set

1 no.

1 set.

Bridge drive comprising 3 Hp electric motor driving bridge through


speed reducing gear unit and chain and sprocket transmission to
wheel axle.

1x1 set.

Flocculator paddle assembly of MS cross arms holding MS plate


blades, arms fixed to MS vertical shaft, shaft suspended from
special bearing assembly resting on bridge.

1x4 sets.

DPR of GSWSP (Phase III)

59

v)

1x4 sets

vi)

Central pivot assembly of CI with radial and thrust bearing and


cable duct.

1x1 no.

vii)

Current transfer slip ring unit at central pivot and one carriage on
clarifier wall.

1 no.

viii)

300mm DI sludge pipe for desludging, from sludge collecting pit


inflocculator floor to common sludge well, with 300x300x150 tee
at end in sludge well; main end of tee fitted with 300mm butterfly
valve with motorised actuator and position indicator, extended
spindle, head stock and hand wheel and branch of tee fitted with
150mm DI butterfly valve with motorised actuator and position
indicator.

ix)

Constant bleed arrangement comprising 50mm GI piping with


50mm GM valve

1x1 range

1x1 range

x)

80mm CI cable pipe from outside clarifier below floor, to central


shaft.

Filters.

i)

Inlet penstock 400mm C.I. circular with motorize actuator and


position indicator.

6 nos.

ii)

Inlet wall pipe C.I. 400mm flanged and plain end.

6 nos.

iii)

Wash waste butterfly valve, 400mm with motorize actuator and


position indicator.

3 nos.

iv)

Wash waste wall pipe C.I. 400mm flanged and plain end.

3 nos.

v)

Filter outlet wall pipe C.I. 250mm flanged and plain end.

6 nos.

vi)

Filter outlet C.I. Tee 300x300x250

6 nos.

vii)

Filter outlet butterfly valve 250mm with motorize actuator and


position indicator.

6 nos.

Wash inlet butterfly valve 250mm with motorize actuator and


position indicator.

6 nos.

Outlet control valve 350mm outlet and twin 250mm inlet with
control fittings.

3 nos.

x)

250mm C.I. piping from filter isolating valve to control valve.

6 nos.

xi)

100mm butterfly valve for filter rinse with motorize actuator and
position indicator

3 nos.

Filter flow rate indicator signal to be provided to control


monitoring system

3 nos.

Filter head loss indicator, probe type with signal to be provided to


control monitoring system.

3 nos.

viii)
ix)

xii)
xiii)

GoM:Phed

Flocculator paddle drive comprising 2 Hp electric motor coupled


through speed reducing gear box and pulley V-belt to vertical
paddle shaft.

DPR of GSWSP (Phase III)

1x1 range.

60

xiv)

Control chamber inspection cover of sheet steel with glass


inspection window.

xv)

Underdrain comprising:

3 sets.

R.C.C. Tees
A.C. strainer
xvi)

Filter media comprising graded gravel and filter grade sand

xvii)

C.I. wash main 400mm from wash water tank to wash inlet valve of
10 filters.

xviii)

Wash water tank level indicator with signal to be provided to


control monitoring system.

1 set.

80mm C.I. air distribution pipes in filters with 80mm G.I.


connecting pieces.

6 lines

xix)
xx)

Air blower of 500 cfm capacity at 5 psi complete with motor and
accessories and pneumatically operated bypass valve.

xxi)

80mm C.I. ring main connecting blower to filters.

xxii)

80mm C.I. air valve with motorize actuator and position indicator.

xxiii)

Wash water tank filling where booster pumps of capacity approx.


60 lps at 20m head with suction pipe in filtered water sump and
delivery header and piping to wash water tank. Pumps to be started
from control center monitoring system.

xxiv)
xxv)

1 no.
1 range.
6 nos.

1 no.

3 nos.

(a)

Syphon 600mm wide (C.I.)

6 nos.

(b)

B.M Syphon activators with G.I. piping to siphon.

6 sets.

Sterilization.

i)

Gaseous chlorinator of 8Kg /hr. capacity with P.T.C. dissolving


tower and P.V.C. piping for solution from the dissolving tower to
filtered water sump in filter house.
Pressure gauge for chlorine cylinder fitted with audiovisual alarm
to indicate empty chlorine cylinder

1 set.

1 no.

Clear water storage tank.

i)

Scour outlet short pipe with C.I. sluice valve with hand wheel,
150mm size

ii)

Electronic level indicator with high and low level audiovisual


alarm indicator panel mounted in chemical house with satellite
indicator in filter house

1 no.

Interlocking of wash water filling pumps with alarm system in


wash water tank level indicator in 5 (xviii) above for automatic
switching on of pumps at low level and off at high level

1 lot

iii)

GoM:Phed

1 range

Control center monitoring system for operating of filter and all


associated equipments.

ii)

1 lot

DPR of GSWSP (Phase III)

2 nos.

61

Motor control center for operating the following.

i)

Alum agitator drive motor

2 nos.

ii)

Lime mill drive motor

2 nos.

iii)

Flash mixer drive motor

1 no.

iv)

Flocculator drive motor

4 nos.

v)

Clarifier bridge drive motor

1 no.

Motor control center : Free standing, floor mounted, single front,


non-draw-out type, with aluminium busbars. Each MCC shall be
provided with a single incomer having SFU of 400 A rating.
Indication lamps for R, Y, B phases together with Ammeter &
Voltmeter shall be provided at the incomer panel. Outgoing feeders
will be having switch-fuse units, contactor, bimetallic overload
relay for motor feeders and only switch-fuse units for power supply
feeders. As the feeders shall have on/off/push button together with
on/off/trip indication lamps, enabling control of the MCC from the
control room. The MCC shall be suitable for data communication
with PLC panels using control cable. Degree of protection shall be
IP54.

1 No.

2.2.8.8 Design of RCC Sump for Clear water pumping station.

1.
2.
3.

Ultimate demand
Hour of pumping
Combined discharge of pump in parallel

4.

Rate of total discharge with 20 Hrs. running of pumps per day

5.
6.

Detention time
Capacity of CWR
Considering circular sump assuming
Area

H
d
4
d
d
Say

Providing free board


Actual capacity of CWR

GoM:Phed

DPR of GSWSP (Phase III)

4.98 mld
20 hrs./day
4.98 x 24/20
5.98 mld
83.00 Lps
4980 Lpm
30 min
1,49,400 Ltrs.
3.00m
49.80m
4 x 49.80/
7.96m
8.00m
0.30
x 8.00 x 8.00 x 3.30
4
165.88m
1,65,880.00 Ltrs.

62

2.2.8.9 Design of Clear water rising main.


1.

Water requirements

Year

Discharge

Initial

2011

3.28

Intermediate

2026

4.36

Ultimate

2041

4.98

2.

Length of pumping main

6570 m

3.

Static head for pump

163 m

4.

Design period

30years

5.

Combined efficiency of pumping set

70%

6.

Cost of pumping unit

Rs.12,000 per Kw

7.

Interest rate

10%

8.

Life of electric motor and pump

15 years

9.

Energy charges

Rs. 545 per unit

10.

Pumping hrs.

20 hrs.

11.

Residual head

1m

Input Data
Pipe Data

Diameter

Type

Class

HWC

Rs./m

200

DI

K9

140

2402.06

250

DI

K9

140

3156.97

300

DI

K9

140

3921.89

350

DI

K9

140

4992.31

400

DI

K9

140

5989.16

450

DI

K9

140

7131.78

Solution

1st 15 years

1.

Discharge at installation

3.28 Mld

4.36 Mld

2.

Discharge at the end 15 years

4.36 Mld

4.98 Mld

3.

Average discharge

3.82 Mld

4.67 Mld

4.

Ave. hours of pumping ave. discharge

17.52 hrs.

5.

Kw required at the above


efficiency of pumping set

0.85 *H1

0.97 *H2

34880.42 *Kw1

37332.96 *Kw2

6.

GoM:Phed

At Site rate

2nd 15 years

18.76 hrs.

combined

Annual cost (Rs.) of electrical energy

DPR of GSWSP (Phase III)

63

TABLE I : Table showing velocity and loss of Head for different pipe size.
Sl.
No.

Pipe
Size
in
mm

Frictional Head
Loss per 1000M

Velocity in m/s

1st stage
flow

2nd stage
flow

1st stage
flow

2nd stage
flow

Total Head in m for 6570m pipe lengths including 163m of static head

1st Stage Flow


Other
Total
losses
Losses

2nd Stage Flow


Other
Total
losses
Losses

Frictional
loss
m
11

12

H2
13

Avg.
Line
pressure
Kg/cm
14

H1
9

Avg.
Line
pressure
Kg/cm
10

104.90

10.49

279.39

27.94

134.19

13.42

311.61

31.16

1.41

35.38

3.54

202.92

20.29

45.26

4.53

213.78

21.38

0.86

0.98

14.56

1.46

180.01

18.00

18.62

1.86

184.48

18.45

1.34

0.63

0.72

6.87

0.69

171.56

17.16

8.79

0.88

173.67

17.37

0.55

0.70

0.48

0.55

3.59

0.36

167.94

16.79

4.59

0.46

169.05

16.90

0.31

0.39

0.38

0.44

2.02

0.20

166.22

16.62

2.58

0.26

166.84

16.68

Frictional
loss
M
7

1.

200

15.97

20.42

1.93

2.20

2.

250

5.39

6.89

1.23

3.

300

2.22

2.83

4.

350

1.05

5.

400

6.

450

320

300

280

260

Total Head (M) 240


220

200

180

160
200

250

300

350

400

450

Diameter of pipe (mm)

GoM:Phed

DPR of GSWSP (Phase III)

64

TABLE II : Table showing Kilowatts required and cost of pump sets for different pipe size.
1st Stage Flow of 4.36 Mld
Cost of
H1
Kw required
pump
(rounded to
(Total
nearest ten
head loss
@ Rs.12000
per Kw
including
in mm)
(Rs.in
50% standby)
thousands)
4
5
6

2nd Stage Flow of 4.98 Mld


H2
Cost of pump
Kw required
(rounded to
(Total
@ Rs.12000
nearest ten
per Kw
Head in
including
(Rs. In
mm)
50%
thousand)
standby)
7
8
9

Cost of pipe
per unit
length
(Rs.)

Cost of
6570 m
pipeline
(Rs. In
thousand)

10

11

5434

2402

15782

311

3728

3157

20741

184

268

3217

3922

25767

2619

174

252

3028

4992

32799

214

2564

169

246

2948

5989

39349

211

2538

167

242

2909

7132

46856

Sl.
No.

Pipe
size
in
mm

Class
of
pipe

1.

200

DI

279

355

4265

312

453

2.

250

DI

203

258

3098

214

3.

300

DI

180

229

2748

4.

350

DI

172

218

5.

400

DI

168

6.

450

DI

166

Note : Assuming other losses = 10% of frictional loss.

Cost of Pump (Rs. in


4
Million)

2
200

250

300

350

400

450

Dia. of pipes (mm)

GoM:Phed

DPR of GSWSP (Phase III)

65

TABLE III : Table showing Comparative Statement of Overall Cost structure of pumping main L for Different pipe size.
1st Stage Flow of 4.36 Mld
Capitalized
CapitaAnnual
total cost
lized
Energy
(Rs. in
Energy
Cost
thousands)
cost
(Rs. in
(Rs. in
thousthousands
ands)
)

nd

2 Stage Flow of 4.98 Mld


Initial
Capitalized
Annual
investEnergy
Energy
ments for
cost
Cost
pump &
(Rs. in
(Rs. in
Annual
thousands)
thousenergy cost
ands)
(Rs. in
thousands)
9
10
11

Sl.
No.

Pipe
size
in
mm

Class
of
pipe

1.

200

DI

4265.21

8265.12

62865.16

67130.37

5433.50

11269.4

85715.73

21820.40

104732.31

2.

250

DI

3097.76

6002.84

45658.1

48755.86

3727.74

7731.52

58806.57

14970.22

84467.37

3.

300

DI

2748.10

5325.27

40504.4

43252.49

3216.84

6671.9

50746.98

12918.51

81937.82

4.

350

DI

2619.02

5075.14

38601.89

41220.91

3028.24

6280.73

47771.77

12161.12

86181.50

5.

400

DI

2563.85

4968.23

37788.75

40352.60

2947.63

6113.55

46500.15

11837.41

91538.79

6.

450

DI

2537.57

4917.3

37401.35

39938.91

2909.23

6033.9

45894.3

11683.18

98477.88

Cost of
pump Set
(Rs. in
thousands)

Cost of
pump Set
(Rs. in
thousands)

Grand total
of
capitalized
cost for 30
yrs. (Rs. in
thousands)

12

*Cost of pipe includes cost of specials (10% of actual pipe cost).

110

105

100

Capitalised Cost
(Rs. in Million)

95

90

85

80
200

250

300

350

400

450

Dia. of pipes (mm)

REMARKS : As seen from the graph, the most economical sizes of rising main is 300mm.

GoM:Phed

DPR of GSWSP (Phase III)

66

2.2.8.10 Design calculations for a pumping plant of Clear water rising main for 6th Mile

to Laitkor.
1.
1.1
1.2
1.3
1.3.1
1.3.2
1.3.3
1.4
1.4.1
1.4.2
1.4.3
1.5
1.6
1.6.1
1.6.2
1.7
1.8
1.9
1.10
2.
2.1

2.2

2.3

3.
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13

(i)
(ii)
(iii)

GoM:Phed

Data of the Scheme


Daily demand of water
Hours of pumping, considering loss of one hour due to tripping
and other minor interruption.
Water levels in the sump, by RLs. Assuming height of sump
Maximum
Mean
Minimum
Rising main
Length
Diameter
Friction coefficient for m.s. steel pipes
RL of point of discharge
No. of pumps
Duty pumps
Stand by pumps
RL of ground level at the pumping station
RL of high flood level
Altitude of the site above MSL
Ambient temperature
Size of pipes and fittings for the pumping system
Inlet bell mouth
Design velocity
Bell mouth diameter
Delivery pipes and valves
Design velocity
Diameter of delivery pipe, delivery valve & NRV
Bell mouth at discharging point
Design velocity
Bell mouth diameter

4.36 Mld
20 hrs per day
4.50 m
1775.00 m
1771.50 m
1772.00 m
6570 m
0.30m
140m
1935.00m
3
2
1
1772.00m
30C

1.5m/s
0.60m
Say 600mm
2.5m/s
1.50m
Say 150mm
0.8m/s
0.60m
Say 600mm

Hydraulic calculations
Discharge of pumps 4.36 x 24/20
5.22 mld
Rate of total flow with 20 hrs running of pumps per day
0.07 m/s
Discharge of each pump
0.04 m/s
Static Delivery Head (1935.00 1772.00)m
163 m
Frictional loss in straight pipe of rising main for combined 14.56 m
discharge.
Frictional losses in bends, valves & in rising main
1.456 m
@ 10% of(3.5)
Frictional loss in taper, delivery valve, NRV & individual 1.456 m
delivery pipe
Velocity head lost at atmosphere at the exit, as v/2g,
0.03m
where v = 0.875 m/s
Static Suction Head (1775.00 1772.00)m
3.00m
Head Loss at entrance to bell mouth
Hi = 0.05 V/2g
0.006m
Head Loss in discharge bend/tee
0.57m
Margin between duty head and shut off head
6.00m
Total head = (3.4) + (3.5) + (3.6) + (3.7) + (3.8) - (3.9) + (3.10)
+ (3.11) + (3.12)
184.08 m
Thus, design duties and Head variation shall be as under :
Discharge Q = 0.04m/s i.e. 40 l/s
Duty
H = 184.08m 184.00m
head
Head range : Pump should be suitable for operation in all variations from solo operation to 2 pumps in parallel and level
variation in sump from min. WL to max. WL

DPR of GSWSP (Phase III)

67

4.

Selection of type, number of stages and running speed


For selecting the suitable pump, the following options in combinations of type of pump, number of stages as running
speed are taken into accounts :

Option
a.
b.
c.
d.

Type
Hor. End-suction
Hor. End-suction
Hor. End-suction
Hor. End-suction

Stages
1
2
3
4

Suctions
1
1
1
1

Speed
2900, 1400, 980
2900, 1400, 980
2900, 1400, 980
2900, 1400, 980

Out of the above available options, 2 stage single suction 1400Rpm Horizontal End Suction pump under option (d)
appears to be the most suitable choice to provide a maximum and stable efficiency. The calculations are as under.
2 stage single suction, 1400.00 Rpm
H, Head per stage = 184.00/2 = 92.00 m
Nq = 3.65 NxQ0.5/H0.75 = 3.65x1400x(0.04)0.5/(92.00)0.75 = 35 Rpm
Attainable efficiency as per figure 11.1 = 64 %

5.
(a)
(b)

6.
(a)

GoM:Phed

Observations : Considering the site condition, the observations are as under :


Choice for horizontal centrifugal pumps with pump house at the site adjacent to the sump would be ideal.
Sump Dimensions
Clearance between bottom of sump and lip of suction bell mouth,
C=D/3=400/3 = 133.33mm,Say 150 mm
Spacing between pumps
Desirable spacing between pumps is 2.5D i.e.1000 mm. However, size of lower flange of head gear/discharge head
(accommodating stuffing box, thrust bearing and flexible coupling) would be approximately 3.5 times column pipe
diameter i.e.1400mm. Keeping about 600mm clearance, spacing will be 2000mm.
Sizes of associated components/equipment
Motor
Efficiency as per 4 above is 64%
Allowing 5% margin, quoted efficiency is 0.59
Input to bowl assembly (clause 3.17 of IS 1710)
184x40x60 = 122.29Kw 125 Kw
6120x0.59
Power loss in bearings
Input to pump
As the pump is designed to develop the required discharge pressure at a speed of 1400Rpm
correspond to a motor speed when connected to a power system with a frequency of 47.50Hz., the
motor capacity should have ample margin of power to take care in the event of sudden increase in
the input power to pumps, when speed suddenly shoots up as a result of sudden fluctuation in the
frequency of power system to the upper limit of 51.50Hz.. Taking this into consideration, 20%
margin of power is provided in the motor and considering the commercial rating, the power rating
of motor shall be
As motor are to be installed in doors, SPDP motors with IP 23 protection with voltage rating of
facilitate O&M

DPR of GSWSP (Phase III)

15 Kw
140 Kw

170 Kw
6.6Kv is adopted to

68

2.2.8.11 Design of clear water gravity transmission main.


1.

Detail of pipe sizes and lengths.


Ref : Design sheet
Sl.
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.

2.

From
Mawphlang WTP
Reservoir at 6th mile
Jc bifur at Lumshyiap
Jc bifur at Lumshyiap
Reservoir at 6th mile
Reservoir at 6th mile
Rilbong
Rilbong
Reservoir at 4 mile
Junction to Jhalupara
Junction to Iewrynghep
Junction to Iewrynghep
Reservoir at Laitkor

To

Dia.
(mm)
1000
300
200
250
250
200
100
150
150
150
150
100
200

Reservoir at 4 Mile
Jc bifur at Lumshyiap
Reservoir at Lumshyiap
Reservoir at Nongmynsong
Reservoir Nongthymmai
Rilbong
Jhalupara
Rhino area
Junction to Jhalupara
Junction to Iewrynghep
Nongkwar
Iewrynghep
Reservoir at Madanrting

Length
(m)
13500.00
9530.00
337.00
4170.00
8000.00
4750.00
400.00
5600.00
2730.00
4180.00
760.00
146.00
3960.00

From WTP to 4 Mile.


Ultimate water requirement
RL at sending end

:
:

32.97Mld
1834.00m

Ref: Long section of Clear water Feeder Main and Table 2.2.13
Table : 2.2.13
Sl.No.

800mm

Hydraulic Level
m
900mm

1000mm

1821.40

1827.04

1829.96

1827.00

1821.02

1826.83

1829.84

2429.00

1826.00

1820.73

1826.67

1829.74

4.

2932.00

1831.00

1817.98

1825.16

1828.85

5.

2976.00

1835.00

1817.74

1825.03

1828.77

6.

3047.00

1834.00

1817.35

1824.82

1828.65

Chainage
m

R.L. of ground
m

1.

2305.00

1825.00

2.

2375.00

3.

Options :

DI pipe 800mm dia, 900mm dia and 1000mm dia were opted to compute the feasibility of the main for possible
transmission of the required quantity of clear water from the clear water storage reservoir at Mawphlang to 4 Mile
Upper Shillong.

Summary :

GoM : Phed

In between the sending end at Mawphlang and the receiving end at 4 Mile Upper Shillong the alignment for the main
passes through 6 humps at chainage 2305.00m, 2375.00m, 2429.00m, 2932.00m, 2976.00m, 3047.00m before the exit
point.

As seen from the table above, utilization of 800mm & 900mm dia pipes would not be feasible in view of high cost
involved in excavations of pipe trench to the required level to facilitate the flow of water.

Inview of the above, a 1000mm dia pipe is selected.

DPR of GSWSP (Phase-III)

69

3.

For other locations.


Line

Length

Population
(2041)

Population
to be
benefited
by the line

Water
demand

Quantity of
water
already
available

Balance
quantity to be
supplied
(Discharge)

Size of pipe

Frictional head
loss/1000m

Total frictional head


loss including 20%
extra in specials for
C=140

(m)
2

mile to Jc bifur at

9530

66,817

66,817

Jc bifur at Lumshyiap to reservoir at


Lumshyiap (VII)

337

43,876

Jc bifur at Lumshyiap to reservoir at


Nongmynsong (XI)

4170

22,941

Spot level

Level of hydraulic
gradient line

Terminal pressure

(Kld)
5

(Kld)
6

(Kld)
7 (5-6)

(mm)
8

(m)
9

(m)
10

11

12

13

10,373.34

1640.00

8733.34

300

12.00

115.28

Reservoir at 6th mile


Jc bifur at Lumshyiap

A: 1775
B : 1471

1659.72

188.72

43,876

6,811.75

1400.00

5411.75

200

34.00

11.55

Reservoir at Lumshyiap

C : 1495

1648.17

153.17

22,941

3,561.59

240.00

3321.59

250

4.50

18.92

Reservoir at Nongmynsong

1640.80

30.80

Zone - VII, XI
Reservoir at 6th
Lumshyiap

D: 1610

Zone - V
Reservoir at 6th mile to reservoir at
Nongthymmai site (V)

8000

50,146

50,146

7,785.17

1800.00

5985.17

250

13.00

104.83

Reservoir at 6th mile


Reservoir Nongthymmai

A: 1775
F : 1656

1670.17

14.17

Reservoir at 6th mile to Rilbong

4750

20,415

20,415

3,169.43

3169.43

200

12.90

61.77

Reservoir at 6th mile


Rilbong

A : 1775
H : 1472

1713.23

241.23

Rilbong to Jhalupara

400

8415

8415

1,306.43

1306.43

100

65.00

26.21

Jhalupara

I : 1494

1687.02

193.02

Rilbong to Rhino area (XIX)

5600

12,000

12,000

1,863.00

1863.00

150

19.50

110.07

Rhino

J : 1533

1603.16

70.16

2730

14,719

14,719

2,285.13

2285.13

150

28.00

77.05

Reservoir at 4 mile
Jn Jhalupara

K : 1714
U : 1494

1636.95

142.95

Zone XIX

Parts of Zone VIII


Reservoir at 4
Jhalupara

mile to JN to

JN to Jhalupara to JN to Iewrynghep

4180

14,719

14,719

2,285.13

2285.13

150

28.00

117.98

Jn Iewrynghep

N : 1408

1518.97

110.97

JN to Iewrynghep to reservoir at
Nongkwar site.

760

11,719

11,719

1,819.38

1819.38

150

19.50

14.94

Reservoir Nongkwar

M : 1442

1504.03

62.03

JN to Iewrynghep to reservoir at
Iewrynghep site.

146

3000

3000

465.75

465.75

100

11.50

1.69

Reservoir at Iewrynghep

O : 1434

1502.34

68.34

3960

32,083

32,083

4,980.89

200.00

4780.89

200

27.00

107.78

Reservoir at Laitkor
Reservoir at Madanrting

Q :1908
R :1734

1800.22

66.22

Zone : XII
Reservoir at Laitkor to reservoir at
Madanrting (XII)

GoM : Phed

DPR of GSWSP (Phase III)

70

2.2.8.12

Design and Computation for capacity of service reservoir


Given data 20 hr. pumping; Pumping rate : 24xa= 1.20a, Peak factor = 2.25
20

Period in hours

Hourly Demand

Cumulative
demand

Cumulative
pumping

Cumulative deficit or
surplus

04-05

0.40a

0.40a

1.20a

(+) 0.80a

05-07

0.80a

2.00a

3.60a

(+) 1.60a

07-10

2.25a

8.75a

7.20a

(-) 1.55a

10-12

10.75a

9.60a

(-) 1.15a

12-13

0.60a

11.35a

10.80a

(-) 0.55a

13-16

0.70a

13.45a

14.40a

(+) 0.95a

16-19

2.25a

20.20a

14.40a

(-) 5.80a

19-20

0.90a

21.10a

14.40a

(-) 6.70a

20-22

0.70a

22.50a

16.80a

(-) 5.70a

22-23

0.40a

22.90a

18.00a

(-) 4.90a

23-03

0.20a

23.70a

22.80a

(-) 0.90a

03-04

0.30a

24.00a

24.00a

0.00a

Capacity of Reservoirs at 20 Hrs. pumping operation.


Pumping
hours

20

Maximum
cumulative
surplus

Maximum cumulative
deficit

Capacity of storage
reservoir

1.60a

6.70a

8.30a

Water requirement
Storage reservoir required

GoM:Phed

Capacity of storage
reservoir in litres
Substituting values of
a = 3.3118ML.

8.30 x 3.3118 = 27.48794ML


Say
: 27.50ML.

= 7,94,86,448 lpcd
= 2,75,00,000 litres

DPR of GSWSP (Phase III)

71

2.2.8.13 Design of storage reservoir.


Sl
No

Type of
reservoir

Location

Ref.
Point

Areas proposed to be covered

2.

2
Main
Main

3
6 Mile
4 Mile

4
-

5
-

3.

Zonal

Zone I

Zone II

1.

4.

Designed
population
(2041)

Total demand
Including
15% UFW
@ 135 Lpcd

Existing
reservoir
capacity

8
-

(Ml)
9
-

Capacity of
storage
reservoir
required
8.30(a)
(Ml)
10
-

(Ml)
11
2.90

12
3.30
-

13
RCC
-

Peak factor

Average hourly demand


= Daily demand Mld = a

24

Proposed capacity
of storage
reservoir

Type of
construction

Height
of reservoir

(m)
14
6.00

(m)
15
4.00
-

16
4.30
-

4.00
4.00

4.30
4.30

(Ml)

6
-

7
-

Police Bazar, Jail Road, Oakland & Assembly


Areas.

20,305

31,52,351

2.25

0.1313

1.09

1.16

Lachumiere Secretariat

23,495

36,46,046

2.25

0.1519

1.26

1.12

0.14

Height
of
reservoir with free
board
(m)

Staging
Height

5.

Zone III

Laitumkhrah

34,477

53,52,554

2.25

0.223

1.85

0.23

1.12

RCC
RCC

6.00

6.

Zone IV

Malki, Dhankheti Areas

22,768

35,34,732

2.25

0.1473

1.22

3.75

RCC

4.00

4.30

4.00

4.30

3.00

50,146

77,85,167

2.25

0.3244

2.69

3.38

RCC

7,920

12,29,580

2.25

0.0512

0.43

0.34

0.09

RCC

6.00

4.00

4.30

Pynthorumkhrah & Pynthorbah

43,876

68,11,749

2.25

0.2838

2.36

1.00

RCC

6.00

4.00

4.30

Mawlai

50,756

78,79,869

2.25

0.3283

2.73

1.39

0.84

RCC

3.00

4.00

4.30

Laban, Bishnupur, Rilbong & Kenchs Trace

91,748

1,42,43,877

2.25

0.5935

4.93

1.25

1.03

RCC

3.00

4.00

4.30

4.00

4.00

4.30

7.

Zone V

Nongthymmai, Pohkseh

8.

Zone VI

Pasteur Institute, Lawmali, Part of Mawlai


Mawroh, Polo Bazar, Polo Hills, Forest Colony,
Nongmali

9.

Zone VII

10.

Zone VIII

11.

Zone IX

12.

Zone X

Mawprem, Jaiaw, Mawkhar, South East Mawkhar,


Barapathar

91,070

1,41,38,618

2.25

0.5891

4.89

0.34

1.17

RCC

13.

Zone XI

Nongmynsong

22,941

35,61,590

2.25

0.1484

1.23

1.23

RCC

3.00

4.00

4.30

14.

Zone XII

Madanriting & Happy Valley areas

32,083

49,80,886

2.25

0.2075

1.72

1.72

RCC

2.00

4.00

4.30

15.

Zone XIII

Shillong Cantonment Area

20,415

31,69,429

2.25

0.1321

1.10

RCC

4.00

4.30

5,12,000

7,94,86,448

3.3118

27.50

15.86

11.64

Total :

GoM : Phed

DPR of GSWSP (Phase III)

72

g,

,
i

Shillong Urban Centres


_

C:=J
C:=J
_

C:=J
C:=J
C:=J

Shillong Municipal Board


Shillong Cantonment Board
Nongthymmai
Part of Mawlai
Pynthornmkhrah
Nongmynsong
Madaoryting

~ Covered area of GSWSP (phase I & II)

C:=J

Areas outside SUA but within GSPA

Town under SUA and area covered by GSWSP (Phase I & II)
o

<;l

O.2km

O.3km

Greater Shillong Water Supply Project (Phase III)

GoM:PHED

Legends

c::::J
c::::J

g,

,
i

Zone - I
Zone - II

Zone-ill

Zone-IV

c::::J

Zone - V

Zone-VI

c::::J

Zone - VII

Zone-Vill

Zone-IX

c::::J
c::::J
c::::J

Zone - X
Zone - XI
Zone - XII

r----l ShIlIong Cantonment


L--...J Board
r----l Outside of designed
L--...J project area

Zoning of Project Area


o

:;;!

O.2km

O.3km

Greater Shillong Water Supply Project (Phase III)

GoM:PHED

2.2.8.14

GoM : Phed

Design of Distribution system


1. Zone I

Police Bazar, Jail Road, Oakland & Assembly Areas.

2. Zone II

Lachumiere Secretariat

3. Zone III

Laitumkhrah

4. Zone IV

Malki, Dhankheti Areas

5. Zone V

Nongthymmai, Pohkseh

6. Zone VI

Pasteur Institute, Lawmali, Part of Mawlai Mawroh, Polo Bazar,


Polo Hills, Forest Colony, Nongmali

7. Zone VII

Pynthorumkhrah, Pynthorbah, Lyngkien Shyiap

8. Zone VIII

Mawlai

9. Zone IX

Laban, Bishnupur, Rilbong & Kenchs Trace

10. Zone X

Mawprem, Jaiaw, Mawkhar, South East Mawkhar, Barapathar

11. Zone XI

Nongmynsong

12. Zone XII

Madanriting & Happy Valley areas

13. Zone XIII

Shillong Cantonment Area

DPR of GSWSP (Phase-III)

75

g,

,
i

Legends
Pipeline
Road
Zone Boundary

Reservoir

Distribution Network - Zone - I: Police Bazar, Jail Road, Oakland & Assembly Areas
o

.Ol2km

.Ol8km

Greater Shillong Water Supply Project (Phase III)

GoM:PHED

GoM : Phed

Length of pipe line required diameterwise


Zone I
Area of Coverage : Police Bazaar, Jail road, Oakland & Assembly areas
Sl.
No.

Pipe No.

Node No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

200

150

100

20.00

37.00

104

4.

10.00

5.

89.00

6.

10

83.00

7.

10

11

10

100.00

8.

11

12

11

95.00

9.

12

13

12

72.00

10.

13

13

75.00

11.

12

14

14

28.00

12.

14

15

15

22.00

13.

15

17

17

100.00

14.

17

18

118.00

15.

12

18

19

118.00

16.

18

19

20

82.00

17.

19

20

21

113.00

18.

20

21

22

69.00

19.

21

22

23

47.00

20.

22

23

24

79.00

21.

23

24

25

76.00

22.

24

25

26

103.00

23.

25

10

27

40.00

24.

25

26

28

77.00

From

To

1.

2.

3.

77

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

200

150

100

29

72.00

28

30

44.00

28

23

31

78.00

28.

21

29

32

91.00

29.

29

30

33

77.00

30.

30

31

34

121.00

31.

31

32

35

95.00

32.

32

33

36

37.00

33.

32

34

37

44.00

34.

34

35

38

79.00

35.

35

36

39

50.00

36.

36

37

40

50.00

37.

37

38

41

46.00

38.

38

19

42

3.00

39.

38

39

43

69.00

40.

39

40

44

48.00

41.

40

33

45

47.00

42.

39

41

46

51.00

43.

41

37

47

57.00

44.

35

42

48

185.00

45.

42

43

49

83.00

46.

43

15

50

89.00

47.

43

44

51

54.00

48.

44

14

52

58.00

49.

44

45

53

65.00

50.

45

37

54

67.00

51.

46

55

62.00

From

To

25.

26

27

26.

27

27.

78

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

200

150

100

56

84.00

48

57

48.00

48

49

58

98.00

55.

49

50

59

130.00

56.

50

51

60

59.00

57.

51

52

61

49.00

58.

52

47

62

73.00

59.

50

53

63

59.00

60.

53

54

64

24.00

61.

54

51

65

83.00

62.

54

55

66

28.00

63.

55

56

67

82.00

64.

56

57

68

48.00

65.

57

58

69

50.00

66.

58

59

70

42.00

67.

59

60

71

52.00

68.

60

55

72

39.00

69.

59

61

73

30.00

70.

61

62

74

64.00

71.

62

63

75

106.00

72.

63

64

76

64.00

73.

64

27

77

136.00

74.

63

65

78

34.00

75.

65

66

79

66.00

76.

66

67

80

89.00

77.

67

27

81

72.00

78.

65

68

82

68.00

From

To

52.

46

47

53.

47

54.

79

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

200

150

100

83

64.00

70

84

40.00

70

71

85

19.00

82.

71

72

86

54.00

83.

72

75

89

35.00

84.

75

76

90

53.00

85.

76

77

91

55.00

86.

77

78

92

56.00

87.

78

66

93

70.00

88.

78

79

94

15.00

89.

79

75

95

134.00

90.

79

70

96

61.00

91.

69

80

97

103.00

92.

80

81

98

70.00

93.

81

82

99

120.00

94.

82

83

100

58.00

95.

83

62

101

10.00

96.

83

84

102

65.00

97.

84

85

103

75.00

98.

85

86

104

53.00

99.

86

87

105

65.00

100.

87

88

106

73.00

101.

88

89

107

108.00

102.

89

80

108

29.00

103.

85

90

109

37.00

104.

90

57

110

84.00

105.

90

91

111

56.00

From

To

79.

68

69

80.

69

81.

80

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

200

150

100

112

107.00

94

114

101.00

94

95

115

137.00

109.

95

96

116

81.00

110.

96

97

117

88.00

111.

97

87

118

112.00

112.

95

98

119

69.00

113.

98

99

120

99.00

114.

99

100

121

120.00

115.

100

101

122

134.00

116.

101

102

123

100.00

117.

102

103

124

75.00

118.

103

104

125

81.00

119.

104

105

126

68.00

120.

105

106

127

139.00

121.

106

107

128

103.00

122.

107

108

129

151.00

123.

108

109

130

98.00

124.

109

112

133

133.00

125.

112

98

16

1000.00

20.00

99.00

1208.00

8687.00

From

To

106.

91

92

107.

92

108.

Total :

81

ZONE-I

C;~)

PROPOSEO PIPELlNE ROUTE:


AREA OF COVERAGE:

1. Police Bazar
2. Jail Road
3. Oakland & Assembly Areas

.
9

21

"
'20

31
40

109
, 08
-.....~.------..I

"

106

10'

103

GoM:Phed

DPR of GSWSP (phase Ill)

82

N
Elevation

Zone - I (Jail Road, Police Bazar, Oakland etc.)

25.00
50.00

89
71

72

75.00
76

100.00

1477
77

1476

78

67

29

1476 69

30

22
20

40

1488

39
38

1491

1490
41
1489

1490
36

1488

1480

1478

1480

1477
84

83

1483
61
59

35
1489
1488

1489
25

1491

11

1493
43
1493

60

51
52

1498

1495

13

1500

15

17

1496

1501

1496

1491

48
1494

90

98

1476

1478

109
108

1477

1477

1478

99

1479
92

1476

94

1476

1477

100

107

1477

1477

101
106

1478

1476

102

105

1476

50

103

1492

1475

104

1475

1475

1505

1497

1502

1517

1495
14

46

53

1494

47

1490

1490

1491

1479

112
95

1488
55

54

57
1489

56

1489

1496

44

1491

26

12

1491

42

24

1497

1492

45

1488

10
18

1481

1476

1480 91

58

1482

96

85

1480

1479

1481
1487

1476

1476
86

64
27

97

82

147962

1493

1490

37

1492

34

19

1488

33

1488

1480

87

68

1488

31

32

65

63

1487

1489

1493
1492

23

21

1490

1477
1479

1476

1479

1482

1485

88

81

79

1479
66

28

1477

70

1478

1478

80

1478

1476
75

49
3
1493
1502
4
1503

GoM : Phed

DPR of GSWSP (Phase III)

83

Page 1
7/24/2008 5:12:16 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone I Jail Road.NET
Zone - I (Jail Road, Police Bazar, Oakland etc.)
Link - Node Table:
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------1
1
2
20
250
2
2
3
37
200
3
3
4
104
150
7
3
8
10
150
8
8
9
89
100
9
9
10
83
100
10
10
11
100
100
11
11
12
95
100
12
12
13
72
100
13
13
8
75
100
14
12
14
28
100
15
14
15
22
100
17
15
17
129
100
18
17
4
118
100
19
12
18
118
100
20
18
19
82
100
21
19
20
113
100
22
20
21
69
100
23
21
22
47
100
24
22
23
79
100
25
23
24
76
100
26
24
25
103
100
27
25
10
40
100
28
25
26
77
100
29
26
27
72
100
30
27
28
44
100
31
28
23
78
100
32
21
29
91
100
33
29
30
77
100
34
30
31
121
100
35
31
32
95
100
36
32
33
37
100
37
32
34
44
100
38
34
35
79
100
39
35
36
50
100
40
36
37
50
100
41
37
38
46
100

GoM : Phed

DPR of GSWSP (Phase-III)

84

Page 2
Zone - I (Jail Road, Police Bazar, Oakland etc.)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------42
38
19
3
100
43
38
39
69
100
44
39
40
48
100
45
40
33
47
100
46
39
41
51
100
47
41
37
57
100
48
35
42
185
100
49
42
43
83
100
50
43
15
89
100
51
43
44
54
100
52
44
14
58
100
53
44
45
65
100
54
45
37
67
100
55
2
46
62
200
56
46
47
84
150
57
47
48
48
150
58
48
49
98
150
59
49
50
130
150
60
50
51
59
150
61
51
52
49
150
62
52
47
73
150
63
50
53
59
150
64
53
54
24
150
65
54
51
83
150
66
54
55
28
150
67
55
56
82
150
68
56
57
48
150
69
57
58
50
100
70
58
59
42
100
71
59
60
52
150
72
60
55
39
150
73
59
61
30
100
74
61
62
64
100
75
62
63
106
100
76
63
64
64
100
77
64
27
136
100
78
63
65
34
100
79
65
66
66
100
80
66
67
89
100
81
67
27
72
100
82
65
68
68
100
83
68
69
64
100
84
69
70
40
100
85
70
71
19
100
86
71
72
54
100
89
72
75
35
100
90
75
76
53
100

GoM : Phed

DPR of GSWSP (Phase-III)

85

Page 3
Zone - I (Jail Road, Police Bazar, Oakland etc.)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------91
76
77
55
100
92
77
78
56
100
93
78
66
70
100
94
78
79
15
100
95
79
75
134
100
96
79
70
61
100
97
69
80
103
100
98
80
81
70
100
99
81
82
120
100
100
82
83
58
100
101
83
62
10
100
102
83
84
65
100
103
84
85
75
100
104
85
86
53
100
105
86
87
65
100
106
87
88
73
100
107
88
89
108
100
108
89
80
29
100
109
85
90
37
100
110
90
57
84
100
111
90
91
56
100
112
91
92
107
100
114
92
94
101
100
115
94
95
137
100
116
95
96
81
100
117
96
97
88
100
118
97
87
112
100
119
95
98
69
100
120
98
99
99
100
121
99
100
120
100
122
100
101
134
100
123
101
102
100
100
124
102
103
75
100
125
103
104
81
100
126
104
105
68
100
127
105
106
139
100
128
106
107
103
100
129
107
108
151
100
130
108
109
98
100
133
109
112
133
100
16
112
98
1000
100

GoM : Phed

DPR of GSWSP (Phase-III)

86

Page 4
Zone - I (Jail Road, Police Bazar, Oakland etc.)
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------2
0.00
1516.68
11.68
3
0.00
1516.29
14.29
4
0.63
1515.90
12.90
8
0.00
1516.05
16.05
9
3.18
1511.48
13.48
10
0.00
1508.49
11.49
11
1.05
1509.07
13.07
12
0.00
1509.83
14.83
13
1.05
1512.69
15.69
14
0.00
1509.81
14.81
15
0.00
1509.94
13.94
17
0.33
1512.97
11.97
18
0.63
1508.61
16.61
19
0.00
1507.89
17.89
20
1.56
1506.77
18.77
21
0.00
1506.32
17.32
22
1.68
1505.62
17.62
23
0.00
1504.79
17.79
24
1.56
1505.13
16.13
25
0.00
1505.89
12.89
26
3.18
1503.38
12.38
27
0.00
1501.90
14.90
28
1.68
1502.78
17.78
29
0.36
1506.53
16.53
30
0.36
1506.75
13.75
31
0.36
1507.15
15.15
32
0.00
1507.51
19.51
33
1.95
1507.51
15.51
34
0.60
1507.63
19.63
35
0.00
1507.92
19.92
36
2.46
1507.91
18.91
37
0.00
1507.95
17.95
38
0.00
1507.89
17.89
39
0.00
1507.77
19.77
40
1.95
1507.58
16.58
41
0.45
1507.84
18.84
42
0.60
1508.80
17.80
43
0.00
1509.29
16.29
44
0.00
1509.28
16.28
45
0.63
1508.57
17.57
46
1.50
1515.67
13.67
47
0.00
1510.40
14.40
48
0.60
1509.87
15.87
49
0.60
1508.83
15.83
50
0.00
1507.52
15.52
51
0.00
1507.56
16.56
52
3.18
1508.59
14.59

GoM : Phed

DPR of GSWSP (Phase-III)

87

Page 5
Zone - I (Jail Road, Police Bazar, Oakland etc.)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------53
0.60
1506.64
15.64
54
0.00
1506.29
16.29
55
0.00
1504.80
14.80
56
1.68
1503.74
15.74
57
0.00
1503.20
14.20
58
8.94
1503.13
22.13
59
0.00
1503.43
15.43
60
3.18
1504.14
15.14
61
3.18
1501.67
19.67
62
0.00
1498.95
15.95
63
0.00
1498.99
18.99
64
3.18
1499.55
18.55
65
0.00
1498.80
19.80
66
0.00
1498.90
18.90
67
2.58
1500.23
18.23
68
3.06
1497.99
19.99
69
0.00
1497.66
21.66
70
0.00
1497.73
21.73
71
0.90
1497.73
19.73
72
0.90
1497.75
21.75
75
0.00
1497.78
19.78
76
0.90
1497.78
20.78
77
0.90
1497.81
21.81
78
0.00
1497.88
18.88
79
0.00
1497.83
18.83
80
0.00
1496.42
19.42
81
5.64
1496.45
17.45
82
3.24
1497.46
17.46
83
0.00
1498.45
19.45
84
3.30
1497.76
17.76
85
0.00
1497.47
18.47
86
3.60
1495.68
18.68
87
0.00
1494.68
18.68
88
2.43
1494.99
17.99
89
2.43
1495.97
17.97
90
0.00
1497.71
17.71
91
3.24
1495.72
16.72
92
3.24
1493.31
15.31
94
3.24
1492.05
15.05
95
0.00
1490.73
14.73
96
3.24
1491.13
15.13
97
3.24
1492.20
16.20
98
0.00
1489.48
12.48
99
0.90
1488.65
12.65
100
0.90
1487.88
10.88
101
0.90
1487.24
9.24
102
0.90
1486.91
10.91

GoM : Phed

DPR of GSWSP (Phase-III)

88

Page 6
Zone - I (Jail Road, Police Bazar, Oakland etc.)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------103
0.90
1486.75
11.75
104
0.90
1486.66
11.66
105
0.90
1486.62
11.62
106
0.90
1486.61
10.61
107
0.90
1486.61
9.62
108
0.90
1486.67
8.67
109
0.60
1486.76
9.76
112
0.90
1486.95
10.95
1
-109.47
1517.00
0.00
Reservoir
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
109.47
2.23
16.12
Open
2
48.46
1.54
10.57
Open
3
13.03
0.74
3.77
Open
7
35.44
2.01
24.02
Open
8
18.37
2.34
51.29
Open
9
15.19
1.94
36.07
Open
10
-5.67
0.72
5.81
Open
11
-6.72
0.86
7.96
Open
12
-16.02
2.04
39.79
Open
13
-17.07
2.17
44.76
Open
14
1.58
0.20
0.55
Open
15
-5.65
0.72
5.78
Open
17
-12.07
1.54
23.55
Open
18
-12.40
1.58
24.75
Open
19
7.72
0.98
10.30
Open
20
7.09
0.90
8.80
Open
21
7.56
0.96
9.92
Open
22
6.00
0.77
6.47
Open
23
9.46
1.20
14.99
Open
24
7.78
0.99
10.44
Open
25
-4.91
0.63
4.45
Open
26
-6.47
0.82
7.42
Open
27
-20.86
2.66
64.87
Open
28
14.39
1.83
32.62
Open
29
11.21
1.43
20.54
Open
30
-11.00
1.40
19.86
Open
31
-12.68
1.62
25.83
Open
32
-3.45
0.44
2.32
Open
33
-3.81
0.49
2.79
Open
34
-4.17
0.53
3.30
Open
35
-4.53
0.58
3.84
Open
36
-0.73
0.09
0.13
Open

GoM : Phed

DPR of GSWSP (Phase-III)

89

Page 7
Zone - I (Jail Road, Police Bazar, Oakland etc.)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------37
-3.80
0.48
2.77
Open
38
-4.40
0.56
3.64
Open
39
0.69
0.09
0.12
Open
40
-1.77
0.23
0.67
Open
41
2.52
0.32
1.29
Open
42
0.47
0.06
0.05
Open
43
2.05
0.26
1.64
Open
44
4.63
0.59
3.99
Open
45
2.68
0.34
1.45
Open
46
-2.58
0.33
1.35
Open
47
-3.03
0.39
1.82
Open
48
-5.09
0.65
4.76
Open
49
-5.69
0.73
5.86
Open
50
-6.41
0.82
7.30
Open
51
0.72
0.09
0.13
Open
52
-7.23
0.92
9.13
Open
53
7.95
1.01
10.88
Open
54
7.32
0.93
9.34
Open
55
61.01
1.94
16.18
Open
56
59.51
3.37
62.76
Open
57
23.39
1.32
11.13
Open
58
22.79
1.29
10.61
Open
59
22.19
1.26
10.10
Open
60
-5.22
0.30
0.69
Open
61
-32.94
1.87
20.99
Open
62
-36.12
2.05
24.89
Open
63
27.41
1.55
14.93
Open
64
26.81
1.52
14.32
Open
65
-27.72
1.57
15.25
Open
66
54.53
3.09
53.38
Open
67
25.26
1.43
12.83
Open
68
23.58
1.34
11.30
Open
69
2.62
0.33
1.40
Open
70
-6.32
0.80
7.10
Open
71
-26.09
1.48
13.63
Open
72
-29.27
1.66
16.86
Open
73
19.77
2.52
58.79
Open
74
16.59
2.11
42.49
Open
75
-1.42
0.18
0.45
Open
76
-7.04
0.90
8.67
Open
77
-10.22
1.30
17.30
Open
78
5.62
0.72
5.71
Open
79
-2.76
0.35
1.53
Open
80
-9.42
1.20
14.88
Open
81
-12.00
1.53
23.29
Open
82
8.38
1.07
11.97
Open
83
5.32
0.68
5.16
Open

GoM : Phed

DPR of GSWSP (Phase-III)

90

Page 8
Zone - I (Jail Road, Police Bazar, Oakland etc.)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------84
-3.06
0.39
1.85
Open
85
-0.20
0.03
0.02
Open
86
-1.10
0.14
0.28
Open
89
-2.00
0.26
0.85
Open
90
-0.66
0.08
0.11
Open
91
-1.56
0.20
0.53
Open
92
-2.46
0.31
1.24
Open
93
-6.66
0.85
14.60
Open
94
4.20
0.53
3.33
Open
95
1.35
0.17
0.41
Open
96
2.85
0.36
1.63
Open
97
8.37
1.07
11.97
Open
98
-1.28
0.16
0.37
Open
99
-6.92
0.88
8.41
Open
100
-10.16
1.29
17.14
Open
101
-18.01
2.29
49.46
Open
102
7.85
1.00
10.63
Open
103
4.55
0.58
3.87
Open
104
10.47
1.33
33.77
Open
105
6.87
0.88
15.48
Open
106
-4.80
0.61
4.27
Open
107
-7.23
0.92
9.11
Open
108
-9.66
1.23
15.59
Open
109
-5.92
0.75
6.30
Open
110
-20.95
2.67
65.44
Open
111
15.03
1.92
35.38
Open
112
11.79
1.50
22.57
Open
114
8.55
1.09
12.45
Open
115
5.31
0.68
9.61
Open
116
-5.19
0.66
4.93
Open
117
-8.43
1.07
12.11
Open
118
-11.67
1.49
22.12
Open
119
10.50
1.34
18.20
Open
120
6.89
0.88
8.34
Open
121
5.99
0.76
6.43
Open
122
5.09
0.65
4.76
Open
123
4.19
0.53
3.32
Open
124
3.29
0.42
2.12
Open
125
2.39
0.30
1.17
Open
126
1.49
0.19
0.49
Open
127
0.59
0.07
0.09
Open
128
-0.31
0.04
0.03
Open
129
-1.21
0.15
0.33
Open
130
-2.11
0.27
0.93
Open
133
-2.71
0.35
1.48
Open
16
-3.61
0.46
2.52
Open

GoM : Phed

DPR of GSWSP (Phase-III)

91

g,

,
i

Legends
Pipeline
Road
Zone Boundary

Reservoir

Distribution Network - Zone - IT: Lachumiere, Secretariat


o

.03im

.045bn

Greater Shillong Water Supply Project (Phase III)

GoM:PHED

GoM : Phed

Length of pipe line required diameterwise


Zone II
Area of Coverage : Lachumiere & Secretariat
Sl.
No.

Pipe No.

Node No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

From

To

500

450

400

200

150

100

46.00

60.00

59.00

59.00

44.00

161.00

98.00

71.00

10

58.00

10

10

11

186.00

11

10

11

12

138.00

12

11

12

13

43.00

13

12

10

14

109.00

14

12

13

15

84.00

15

13

14

16

145.00

16

14

15

17

104.00

17

15

16

18

96.00

18

16

17

19

45.00

19

17

20

298.00

20

13

16

21

167.00

21

17

18

22

120.00

22

18

19

23

102.00

23

19

21

25

103.00

93

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

27

90.00

23

28

91.00

23

25

30

42.00

27

25

26

31

62.00

28

26

32

104.00

29

26

27

33

135.00

30

27

28

34

182.00

31

28

29

35

122.00

32

29

10

37

192.00

33

26

37

44

71.00

34

37

39

46

149.00

35

39

40

47

240.00

36

40

41

48

190.00

37

41

42

49

254.00

38

42

43

50

175.00

39

43

44

51

333.00

40

44

46

53

112.00

41

46

47

54

109.00

42

47

49

56

76.00

43

49

51

58

101.00

44

51

59

102.00

45

51

52

60

100.00

46

52

61

117.00

47

46

53

62

184.00

48

53

54

63

153.00

49

54

55

64

95.00

From

To

24

21

25

26

94

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

66

102.00

18

68

174.00

54

59

69

122.00

53

59

60

70

59.00

54

60

61

71

119.00

55

61

62

72

66.00

56

62

63

73

40.00

57

63

64

74

85.00

58

64

65

75

52.00

59

65

60

76

85.00

60

65

66

77

87.00

61

66

67

78

126.00

62

67

68

79

90.00

63

68

59

80

111.00

64

67

70

82

232.00

65

70

18

83

171.00

66

67

71

84

218.00

67

71

72

85

238.00

68

72

75

86

79.00

69

75

76

87

212.00

70

76

15

88

144.00

71

67

77

91

43.00

72

77

78

92

199.00

73

78

74

93

94.00

74

79

80

94

132.00

75

80

64

95

81.00

From

To

50

55

57

51

57

52

95

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

96

192.00

82

97

125.00

82

83

98

148.00

79

83

84

99

118.00

80

84

85

100

177.00

81

85

81

101

188.00

82

84

86

102

220.00

83

86

87

103

142.00

84

87

88

104

100.00

85

88

83

105

267.00

86

88

89

106

54.00

87

89

90

107

105.00

88

90

91

108

230.00

89

91

87

109

376.00

90

91

92

110

66.00

91

92

94

112

221.00

92

94

95

113

136.00

93

95

96

114

169.00

94

96

97

115

70.00

95

97

98

116

76.00

96

98

99

117

135.00

97

99

95

118

265.00

98

99

100

119

142.00

99

100

101

120

87.00

100

101

102

121

116.00

101

102

99

122

178.00

From

To

76

79

81

77

81

78

96

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

123

84.00

104

124

42.00

104

105

125

57.00

105

105

106

126

60.00

106

106

108

128

103.00

107

108

109

129

75.00

108

109

104

130

76.00

109

108

113

134

201.00

110

113

114

135

48.00

111

114

101

136

264.00

112

114

78

137

122.00

113

114

115

138

183.00

114

115

116

139

269.00

115

116

117

140

123.00

116

117

72

141

125.00

117

63

118

142

163.00

118

118

119

143

136.00

119

119

121

145

198.00

120

121

122

146

114.00

121

122

123

147

195.00

122

123

124

148

57.00

123

124

118

149

93.00

124

124

125

150

131.00

125

125

126

151

96.00

126

126

122

152

66.00

127

122

89

153

332.00

From

To

102

102

103

103

103

104

97

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

154

33.00

122

155

124.00

127

128

156

134.00

131

128

129

157

238.00

132

129

61

158

155.00

133

128

46

159

86.00

134

127

130

160

104.00

135

130

131

161

227.00

136

131

132

162

84.00

137

132

41

163

261.00

138

132

133

164

271.00

139

133

134

165

230.00

140

134

135

166

254.00

141

135

40

167

362.00

142

134

136

168

154.00

143

136

137

169

234.00

144

137

138

170

252.00

145

138

139

171

177.00

146

139

140

172

179.00

147

130

143

175

173.00

148

143

144

176

281.00

149

144

145

177

237.00

150

145

146

178

150.00

151

146

147

179

172.00

152

147

148

180

244.00

153

148

149

181

197.00

From

To

128

126

127

129

127

130

98

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

182

146.00

151

183

143.00

151

152

184

167.00

157

152

150

185

198.00

158

152

140

186

353.00

159

146

156

190

282.00

160

156

157

191

202.00

161

157

158

192

132.00

162

158

159

193

122.00

163

159

160

194

162.00

164

160

161

195

284.00

165

161

162

196

158.00

166

162

163

197

158.00

167

163

159

198

133.00

168

163

164

199

130.00

169

164

157

200

287.00

170

157

165

201

269.00

171

165

166

202

239.00

172

166

167

203

135.00

173

167

170

206

234.00

174

170

171

207

74.00

175

171

122

208

261.00

176

171

145

211

157.00

46.00

60.00

118.00

91.00

324.00

2975.00

22579.00

From

To

154

149

150

155

150

156

Total :

99

160

ZONE - II

((j

161'

*PROPOSED PIPEUNE ROUTE:


AREA OF COVERAGE:

162

1. Lachumiere

163

2. Secretariat

------------- 140
~ \ .""
16~

...t49

139

151

'148

138

167

37
147

17

136

'40

11

37
27

11

GoM:Phed

DPR of GSWSP (phase III)

100

N
Elevation

Zone II( Lachumier & Secretariat

25.00

160

50.00

159

158

1510

1510 157

161 1508

75.00
100.00

1508
162

163

1509

1510

152
1518

1512

164
1511
165

m
167
166
1515
170
92
94

1513

96
97

1513
95

91
1513
87

90

86 1513 88

122
121

1514

151

1517

1516

146
1518

147

145

1520

1516

149
1514

148
1511

139
1522

171

1519

138
1523

144

137

1518

1517
1520
143
127
1514
126
1514
1513
119 1516
130
1521
1514
123
84
83
98
1520
1518
1517
1522
125
124 1516
1515
1515 118
134
1514 99
128
131
85
1515
1516 1291517
106
102
1526
105
1518
1522
104 103
1526
63
82
133
1516
100
1514
1516
62
1514 1514
1521
81
46
132
1514
1520641519
1527
44
109
61
1516
135
1520
53
108
1521 80
1520
1525
1528
101
60
1527
1514
1520 54
79
1529
65
47
1528
1515
1522
113
1517
1522
1522
59
1529
1522
1537
78
49
66
1516
114
55
68
41
1527
43
42
1523 77
1538
51
1523
40
1518
1531
1526
52
1530
1528
1529
152467
1539
1531
1539
2
39
57
3
115
1524
21
23
15401541
1532
70
1533
1518
4
1
37
1539 0
153625
19
5
1532
1543 1537
1535
1533
26
71
27
1551
9
1538
1539
6
8
18
116
1534 1533
1522
1538
1542
1538
17
10
28
29
1534
12
1516
117
1535
1537 1531 1532
13 1536
16
72
11
1518
75
76
1535
1534
15
1520
1536
1524
1531
1532
14
1513

150

1510

1516

1513
89
1513

1513

156

140

136

1525

1525

1534

GoM : Phed

DPR of GSWSP (Phase III)

101

Page 1
6/21/2008 5:44:28 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone II (Lachumiere).net
Zone II( Lachumiere & Secretariat
Link - Node Table:
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------1
0
1
46
450
2
1
2
60
350
3
2
3
59
300
4
3
4
59
300
5
4
5
44
150
6
5
6
161
150
7
6
1
98
150
9
5
8
71
100
10
8
9
58
150
11
9
10
186
150
12
10
11
138
150
13
11
12
43
150
14
12
10
109
150
15
12
13
84
150
16
13
14
145
100
17
14
15
104
100
18
15
16
96
100
19
16
17
45
150
20
17
8
298
150
21
13
16
167
100
22
17
18
120
150
23
18
19
102
150
25
19
21
103
150
27
21
2
90
150
28
4
23
91
250
30
23
25
42
200
31
25
26
62
200
32
26
9
104
150
33
26
27
135
100
34
27
28
182
100
35
28
29
122
100
37
29
10
192
100
44
26
37
71
200
46
37
39
149
200
47
39
40
240
150
48
40
41
190
150
49
41
42
254
100

GoM : Phed

DPR of GSWSP (Phase-III)

102

Page 2
Zone II( Lachumiere & Secretariat
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------50
42
43
175
100
51
43
44
333
100
53
44
46
112
100
54
46
47
109
100
56
47
49
76
100
58
49
51
101
100
59
51
3
102
100
60
51
52
100
100
61
52
2
117
150
62
46
53
184
100
63
53
54
153
100
64
54
55
95
100
66
55
57
102
100
68
57
18
174
100
69
54
59
122
100
70
59
60
59
100
71
60
61
119
100
72
61
62
66
100
73
62
63
40
100
74
63
64
85
100
75
64
65
52
100
76
65
60
85
100
77
65
66
87
100
78
66
67
126
100
79
67
68
90
100
80
68
59
111
100
82
67
70
232
150
83
70
18
171
150
84
67
71
218
100
85
71
72
238
100
86
72
75
79
100
87
75
76
212
100
88
76
15
144
100
91
67
77
43
150
92
77
78
199
150
93
78
79
94
100
94
79
80
132
100
95
80
64
81
100
96
79
81
192
100
97
81
82
125
100
98
82
83
148
100
99
83
84
118
100
100
84
85
177
100
101
85
81
188
100
102
84
86
220
100
103
86
87
142
100
104
87
88
100
100

GoM : Phed

DPR of GSWSP (Phase-III)

103

Page 3 Zone II( Lachumiere & Secretariat


Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------105
88
83
267
100
106
88
89
54
100
107
89
90
105
100
108
90
91
230
100
109
91
87
376
100
110
91
92
66
100
112
92
94
221
100
113
94
95
136
100
114
95
96
169
100
115
96
97
70
100
116
97
98
76
100
117
98
99
135
100
118
99
95
265
100
119
99
100
142
100
120
100
101
87
100
121
101
102
116
100
122
102
99
178
100
123
102
103
84
100
124
103
104
42
100
125
104
105
57
100
126
105
106
60
100
128
106
108
103
100
129
108
109
75
100
130
109
104
76
100
134
108
113
201
100
135
113
114
48
100
136
114
101
264
100
137
114
78
122
100
138
114
115
183
100
139
115
116
269
100
140
116
117
123
100
141
117
72
125
100
142
63
118
163
100
143
118
119
136
100
145
119
121
198
100
146
121
122
114
100
147
122
123
195
100
148
123
124
57
100
149
124
118
93
100
150
124
125
131
100
151
125
126
96
100
152
126
122
66
100
153
122
89
332
100
154
126
127
33
100
155
127
122
124
100
156
127
128
134
100
157
128
129
238
100

GoM : Phed

DPR of GSWSP (Phase-III)

104

Page 4 Zone II( Lachumiere & Secretariat


Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------158
129
61
155
100
159
128
46
86
100
160
127
130
104
100
161
130
131
227
100
162
131
132
84
100
163
132
41
261
100
164
132
133
271
100
165
133
134
230
100
166
134
135
354
100
167
135
40
362
100
168
134
136
154
100
169
136
137
234
100
170
137
138
252
100
171
138
139
177
100
172
139
140
179
100
175
130
143
173
100
176
143
144
281
100
177
144
145
237
100
178
145
146
150
100
179
146
147
172
100
180
147
148
244
100
181
148
149
197
100
182
149
150
146
100
183
150
151
143
100
184
151
152
167
100
185
152
150
198
100
186
152
140
353
100
190
146
156
282
100
191
156
157
202
100
192
157
158
132
100
193
158
159
122
100
194
159
160
162
100
195
160
161
284
100
196
161
162
158
100
197
162
163
158
100
198
163
159
133
100
199
163
164
130
100
200
164
157
287
100
201
157
165
269
100
202
165
166
239
100
203
166
167
135
100
206
167
170
234
100
207
170
171
74
100
208
171
122
261
100
211
171
145
157
100

GoM : Phed

DPR of GSWSP (Phase-III)

105

Page 5 Zone II( Lachumiere & Secretariat


Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------1
0.00
1550.94
7.94
2
0.00
1550.73
10.73
3
0.00
1550.54
9.54
4
0.00
1550.40
13.40
5
0.00
1550.36
11.36
6
0.00
1550.72
8.72
8
0.00
1547.61
9.61
9
0.00
1547.65
9.65
10
0.00
1546.82
9.82
11
0.92
1546.66
10.66
12
1.56
1546.62
10.62
13
0.00
1546.02
11.02
14
0.92
1544.58
10.58
15
0.00
1543.76
11.76
16
0.00
1545.06
11.06
17
0.00
1545.07
10.07
18
0.00
1544.33
10.33
19
0.00
1546.54
8.54
21
0.00
1548.78
9.78
23
0.00
1549.94
13.94
25
0.60
1549.32
14.32
26
0.00
1548.41
14.41
27
0.00
1547.87
14.87
28
1.56
1547.14
15.14
29
1.66
1546.91
15.91
37
0.00
1548.02
15.02
39
3.66
1547.19
15.19
40
0.00
1542.80
11.80
41
0.00
1541.01
11.01
42
4.58
1537.19
8.19
43
4.58
1536.42
8.42
44
0.00
1536.41
9.41
46
0.00
1536.41
11.41
47
0.00
1541.29
4.29
49
0.00
1544.69
6.69
51
0.00
1549.21
10.21
52
3.12
1550.38
11.38
53
3.74
1536.22
8.22
54
0.00
1536.31
7.31
55
0.00
1538.36
7.36
57
0.00
1540.57
7.57
59
0.00
1534.29
7.29
60
0.00
1533.25
11.25
61
0.00
1532.51
12.51
62
3.12
1532.04
12.04
63
0.00
1531.97
12.97
64
0.00
1532.23
12.23

GoM : Phed

DPR of GSWSP (Phase-III)

106

Page 6 Zone II( Lachumiere & Secretariat


Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------65
0.00
1532.93
10.93
66
2.50
1533.24
10.24
67
0.00
1534.30
10.30
68
0.00
1534.30
8.30
70
5.12
1539.43
7.43
71
5.92
1532.64
10.64
72
2.28
1532.62
12.62
75
3.74
1533.51
9.51
76
3.74
1538.32
7.32
77
3.43
1533.94
9.94
78
0.00
1532.77
9.77
79
0.00
1531.87
9.87
80
4.40
1531.88
9.88
81
0.00
1529.84
8.84
82
4.68
1529.39
9.39
83
0.00
1529.39
14.39
84
0.00
1529.38
14.38
85
2.96
1529.40
13.40
86
2.80
1529.33
15.33
87
0.00
1529.42
16.42
88
0.00
1529.44
16.44
89
0.00
1529.48
16.48
90
0.62
1529.47
16.47
91
0.00
1529.46
16.46
92
0.00
1529.47
16.47
94
1.40
1529.48
16.48
95
0.00
1529.59
15.59
96
0.78
1529.59
16.59
97
0.78
1529.60
15.60
98
0.78
1529.64
15.64
99
0.00
1529.80
14.80
100
1.60
1529.88
13.88
101
0.00
1530.07
13.07
102
0.00
1530.04
14.04
103
0.60
1530.07
16.07
104
0.00
1530.11
16.11
105
0.31
1530.12
16.12
106
0.40
1530.14
16.14
108
0.40
1530.20
15.20
109
0.91
1530.14
16.14
113
0.60
1530.84
14.84
114
0.00
1531.03
13.03
115
2.18
1531.03
13.03
116
2.18
1531.28
15.28
117
2.18
1531.70
13.70
118
0.00
1530.48
12.48
119
0.00
1530.26
13.26

GoM : Phed

DPR of GSWSP (Phase-III)

107

Page 7
Zone II( Lachumiere & Secretariat
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------121
3.72
1529.95
13.95
122
0.00
1529.97
11.97
123
2.08
1530.03
14.03
124
0.00
1530.15
14.15
125
4.06
1530.11
13.11
126
0.00
1530.27
12.27
127
0.00
1530.62
10.62
128
0.00
1533.30
11.30
129
3.74
1532.52
11.52
130
0.00
1530.73
8.73
131
0.92
1533.71
7.71
132
0.00
1535.04
7.04
133
2.50
1534.77
7.77
134
0.00
1534.78
8.78
135
2.50
1537.61
8.61
136
0.36
1533.66
8.66
137
0.27
1532.14
7.14
138
0.55
1530.63
7.63
139
0.37
1529.76
7.76
140
0.00
1528.98
8.98
143
1.24
1529.39
8.39
144
1.24
1527.92
7.92
145
0.00
1527.15
8.15
146
0.00
1526.62
8.62
147
0.09
1526.77
16.77
148
0.09
1526.99
15.99
149
0.09
1527.18
13.18
150
0.00
1527.33
11.33
151
1.08
1527.35
11.35
152
1.50
1527.45
9.45
156
2.34
1524.59
7.59
157
0.00
1523.99
11.99
158
1.88
1523.79
13.79
159
0.00
1523.76
13.76
160
0.30
1523.76
15.76
161
0.30
1523.75
15.75
162
0.30
1523.75
14.75
163
0.00
1523.76
13.76
164
1.88
1523.76
12.76
165
2.34
1524.02
11.02
166
2.34
1524.45
10.45
167
0.00
1525.16
10.16
170
2.34
1526.39
10.39
171
0.00
1527.15
10.15
0
-127.75
1551.00
0.00
Reservoir

GoM : Phed

DPR of GSWSP (Phase-III)

108

Page 8
Zone II( Lachumiere & Secretariat
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
127.75
0.80
1.23
Open
2
117.87
1.23
3.59
Open
3
72.94
1.03
3.13
Open
4
64.16
0.91
2.46
Open
5
5.90
0.33
0.87
Open
6
-9.87
0.56
2.25
Open
7
-9.87
0.56
2.25
Open
9
15.77
2.01
38.67
Open
10
-4.50
0.25
0.53
Open
11
14.25
0.81
4.45
Open
12
6.89
0.39
1.16
Open
13
5.97
0.34
0.89
Open
14
-8.79
0.50
1.82
Open
15
13.20
0.75
7.20
Open
16
7.57
0.96
9.93
Open
17
6.65
0.85
7.81
Open
18
-8.92
1.14
13.47
Open
19
-3.29
0.19
0.29
Open
20
-20.27
1.15
8.54
Open
21
5.63
0.72
5.75
Open
22
16.98
0.96
6.16
Open
23
-33.53
1.90
21.69
Open
25
-33.53
1.90
21.69
Open
27
-33.53
1.90
21.69
Open
28
58.26
1.19
5.01
Open
30
58.26
1.86
14.86
Open
31
57.66
1.84
14.58
Open
32
18.75
1.06
7.40
Open
33
4.65
0.59
4.03
Open
34
4.65
0.59
4.03
Open
35
3.09
0.39
1.89
Open
37
1.43
0.18
0.46
Open
44
34.25
1.09
5.56
Open
46
34.25
1.09
5.56
Open
47
30.59
1.73
18.30
Open
48
21.36
1.21
9.41
Open
49
9.47
1.21
15.04
Open
50
4.89
0.62
4.42
Open
51
0.31
0.04
0.03
Open
53
0.31
0.04
0.03
Open
54
-17.07
2.17
44.77
Open
56
-17.07
2.17
44.77
Open
58
-17.07
2.17
44.77
Open
59
-8.78
1.12
13.08
Open
60
-8.29
1.06
11.74
Open
61
-11.41
0.65
2.94
Open
62
2.18
0.28
0.99
Open

GoM : Phed

DPR of GSWSP (Phase-III)

109

Page 9
Zone II( Lachumiere & Secretariat
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------63
-1.56
0.20
0.54
Open
64
-11.52
1.47
21.63
Open
66
-11.52
1.47
21.63
Open
68
-11.52
1.47
21.63
Open
69
9.96
1.27
16.51
Open
70
10.35
1.32
17.72
Open
71
5.87
0.75
6.19
Open
72
6.29
0.80
7.04
Open
73
3.17
0.40
1.98
Open
74
-4.05
0.52
3.12
Open
75
-8.89
1.13
13.38
Open
76
-4.48
0.57
3.76
Open
77
-4.41
0.56
3.65
Open
78
-6.91
0.88
8.38
Open
79
0.39
0.05
0.04
Open
80
0.39
0.05
0.04
Open
82
-33.87
1.92
22.10
Open
83
-38.99
2.21
28.68
Open
84
6.55
0.83
7.60
Open
85
0.63
0.08
0.10
Open
86
-8.09
1.03
11.24
Open
87
-11.83
1.51
22.71
Open
88
-15.57
1.98
37.77
Open
91
20.02
1.13
8.35
Open
92
16.59
0.94
5.89
Open
93
7.40
0.94
9.53
Open
94
-0.44
0.06
0.05
Open
95
-4.84
0.62
4.34
Open
96
7.84
1.00
10.60
Open
97
4.37
0.56
3.59
Open
98
-0.31
0.04
0.03
Open
99
0.56
0.07
0.08
Open
100
-0.51
0.07
0.07
Open
101
-3.47
0.44
2.35
Open
102
1.07
0.14
0.27
Open
103
-1.73
0.22
0.64
Open
104
-1.02
0.13
0.24
Open
105
0.87
0.11
0.18
Open
106
-1.89
0.24
0.76
Open
107
0.80
0.10
0.16
Open
108
0.18
0.02
0.01
Open
109
0.71
0.09
0.12
Open
110
-0.52
0.07
0.07
Open
112
-0.52
0.07
0.07
Open
113
-1.92
0.25
0.79
Open
114
-0.01
0.00
0.00
Open
115
-0.79
0.10
0.15
Open

GoM : Phed

DPR of GSWSP (Phase-III)

110

Page 10 Zone II( Lachumiere & Secretariat


Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------116
-1.57
0.20
0.54
Open
117
-2.35
0.30
1.14
Open
118
1.91
0.24
0.78
Open
119
-1.69
0.22
0.62
Open
120
-3.29
0.42
2.13
Open
121
1.12
0.14
0.29
Open
122
2.57
0.33
1.35
Open
123
-1.45
0.19
0.47
Open
124
-2.05
0.26
0.89
Open
125
-0.90
0.12
0.19
Open
126
-1.22
0.15
0.33
Open
128
-1.62
0.21
0.57
Open
129
2.06
0.26
0.89
Open
130
1.15
0.15
0.30
Open
134
-4.08
0.52
3.16
Open
135
-4.68
0.60
4.08
Open
136
4.41
0.56
3.65
Open
137
-9.19
1.17
14.22
Open
138
0.10
0.01
0.00
Open
139
-2.08
0.27
0.91
Open
140
-4.26
0.54
3.43
Open
141
-6.44
0.82
7.37
Open
142
7.22
0.92
9.10
Open
143
2.83
0.36
1.60
Open
145
2.83
0.36
1.60
Open
146
-0.89
0.11
0.19
Open
147
-1.16
0.15
0.31
Open
148
-3.24
0.41
2.06
Open
149
-4.39
0.56
3.62
Open
150
1.15
0.15
0.30
Open
151
-2.91
0.37
1.69
Open
152
4.96
0.63
4.55
Open
153
2.69
0.34
1.46
Open
154
-7.87
1.00
10.68
Open
155
5.37
0.68
5.26
Open
156
-11.04
1.41
19.98
Open
157
4.16
0.53
3.28
Open
158
0.42
0.05
0.05
Open
159
-15.21
1.94
36.14
Open
160
-2.20
0.28
1.01
Open
161
-8.81
1.12
13.14
Open
162
-9.73
1.24
15.80
Open
163
-11.89
1.51
22.90
Open
164
2.16
0.27
0.97
Open
165
-0.34
0.04
0.03
Open
166
-6.73
0.86
7.99
Open
167
-9.23
1.18
14.34
Open

GoM : Phed

DPR of GSWSP (Phase-III)

111

Page 11
Zone II( Lachumiere & Secretariat
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------168
6.39
0.81
7.25
Open
169
6.03
0.77
6.51
Open
170
5.75
0.73
5.97
Open
171
5.21
0.66
4.96
Open
172
4.84
0.62
4.33
Open
175
6.60
0.84
7.71
Open
176
5.36
0.68
5.25
Open
177
4.12
0.53
3.23
Open
178
4.33
0.55
3.52
Open
179
-1.98
0.25
0.83
Open
180
-2.07
0.26
0.90
Open
181
-2.17
0.28
0.98
Open
182
-2.26
0.29
1.06
Open
183
-0.61
0.08
0.09
Open
184
-1.69
0.22
0.62
Open
185
1.65
0.21
0.59
Open
186
-4.84
0.62
4.33
Open
190
6.31
0.80
7.20
Open
191
3.97
0.51
3.00
Open
192
2.74
0.35
1.51
Open
193
0.86
0.11
0.18
Open
194
0.49
0.06
0.06
Open
195
0.19
0.02
0.01
Open
196
-0.11
0.01
0.00
Open
197
-0.41
0.05
0.04
Open
198
-0.37
0.05
0.03
Open
199
-0.04
0.01
0.00
Open
200
-1.92
0.24
0.78
Open
201
-0.69
0.09
0.12
Open
202
-3.03
0.39
1.82
Open
203
-5.37
0.68
5.26
Open
206
-5.37
0.68
5.26
Open
207
-7.71
0.98
10.28
Open
208
-7.91
1.01
10.78
Open
211
0.20
0.03
0.01
Open

GoM : Phed

DPR of GSWSP (Phase-III)

112

g,

,
i

Legends
Pipeline
Road
Zone Boundary

Reservoir

Distribution Network - Zone - III : Laitumkbrah

.03im

.045bn

Greater Shillong Water Supply Project (Phase III)

GoM:PHED

GoM : Phed

Length of pipe line required diameterwise


Zone : III
Area of coverage : Laitumkhrah
Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

From

To

500

450

400

200

150

100

1.

15.00

2.

157.00

3.

16.00

4.

103.00

5.

102.00

6.

28.00

7.

25.00

8.

10

87.00

9.

10

11

10

52.00

10.

11

12

11

23.00

11.

12

13

12

29.00

12.

13

14

14

84.00

13.

14

15

15

39.00

14.

15

16

17

17.00

15.

16

17

18

93.00

16.

17

18

19

50.00

17.

18

22

23

39.00

18.

22

23

24

32.00

19.

23

24

25

70.00

20.

24

25

26

66.00

21.

25

12

27

107.00

22.

24

26

28

63.00

23.

26

27

29

69.00

24.

27

30

45.00

114

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

31

141.00

29

32

95.00

29

30

33

68.00

28.

30

31

34

77.00

29.

31

32

35

101.00

30.

32

24

36

75.00

31.

32

33

37

62.00

32.

33

34

38

48.00

33.

34

24

39

81.00

34.

34

35

40

71.00

35.

35

39

44

91.00

36.

39

40

45

99.00

37.

40

41

46

50.00

38.

41

42

47

36.00

39.

42

43

48

48.00

40.

43

44

49

92.00

41.

44

45

50

46.00

42.

45

46

51

47.00

43.

46

39

52

86.00

44.

45

35

53

102.00

45.

44

47

54

68.00

46.

47

32

55

32.00

47.

47

48

56

47.00

48.

48

49

57

143.00

49.

49

50

58

From

To

25.

16

28

26.

28

27.

66.00

115

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

59

49.00

52

60

63.00

52

53

61

62.00

53.

53

48

62

103.00

54.

53

54

63

45.00

55.

54

55

64

30.00

56.

55

30

65

76.00

57.

54

56

66

44.00

58.

56

57

67

89.00

59.

57

58

68

40.00

60.

58

59

69

67.00

61.

59

30

72

47.00

62.

56

51

73

136.00

63.

57

62

74

37.00

64.

62

63

75

22.00

65.

63

64

76

51.00

66.

64

65

77

67.

65

66

78

49.00

68.

66

67

79

48.00

69.

67

68

80

52.00

70.

68

71

83

65.00

71.

71

72

84

187.00

72.

72

73

85

20.00

73.

73

74

86

100.00

74.

74

75

90

115.00

From

To

50.

50

51

51.

51

52.

200

150

41.00

100

116

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

91

76

87

55.00

76

77

88

103.00

78.

77

29

89

156.00

79.

73

78

92

25.00

80.

78

79

93

117.00

81.

79

80

94

134.00

82.

80

81

95

182.00

83.

81

82

96

28.00

84.

82

83

97

104.00

85.

83

84

98

155.00

86.

84

85

99

109.00

87.

85

86

100

120.00

88.

86

02

101

116.00

89.

67

87

102

99.00

90.

87

88

103

68.00

91.

88

64

104

50.00

92.

87

89

105

48.00

93.

89

63

106

141.00

94.

89

90

107

80.00

95.

90

91

108

92.00

96.

91

92

109

78.00

97.

92

93

110

129.00

98.

93

94

111

53.00

99.

94

95

112

From

To

75.

75

65

76.

74

77.

200

150

100

109.00

137.00

117

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

150

100

113

68.00

96

114

76.00

96

100

118

116.00

103.

100

51

119

68.00

104.

100

62

120

102.00

105.

100

101

121

140.00

106.

101

102

122

97.00

107.

102

50

123

68.00

108.

101

103

124

30.00

109.

103

105

125

125.00

110.

105

49

126

118.00

111.

101

107

129

25.00

112.

107

114

136

66.00

113.

114

115

137

111.00

114.

115

116

138

112.00

115.

116

117

139

43.00

116.

117

118

140

31.00

117.

118

119

141

65.00

118.

119

120

142

98.00

119.

120

121

143

55.00

120.

121

122

144

58.00

121.

122

140

145

51.00

122.

117

124

147

86.00

123.

124

125

148

72.00

124.

125

126

149

51.00

From

To

100.

95

92

101.

89

102.

200

118

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

150

73.00

128

151

55.00

128

125

152

81.00

128.

128

129

153

28.00

129.

129

130

154

29.00

130.

130

116

155

109.00

131.

130

131

156

104.00

132.

131

114

157

86.00

133.

107

132

158

55.00

134.

132

133

159

56.00

135.

133

135

161

27.00

136.

135

129

162

76.00

137.

135

136

163

46.00

138.

136

137

164

40.00

139.

137

138

165

25.00

140.

138

139

166

62.00

141.

139

141

168

74.00

142.

141

136

169

70.00

143.

138

142

170

123.00

144.

142

145

173

137.00

145.

145

146

174

406.00

146.

146

147

175

265.00

147.

147

148

176

268.00

148.

148

149

177

302.00

149.

149

150

178

From

To

125.

126

127

126.

127

127.

240.00

119

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

179

81.00

152

180

93.00

152

153

181

91.00

153.

153

154

182

106.00

154.

154

155

183

71.00

155.

155

156

190

33.00

156.

156

157

191

56.00

157.

157

151

192

52.00

158.

155

158

184

51.00

159.

158

159

185

167.00

160.

159

160

186

147.00

161.

160

161

187

126.00

162.

161

162

188

46.00

163.

162

163

189

300.00

164.

162

164

193

109.00

165.

164

165

194

86.00

166.

165

166

195

131.00

167.

166

167

196

90.00

168.

167

168

197

75.00

169.

168

170

199

108.00

170.

170

171

200

107.00

171.

171

173

202

66.00

172.

173

174

203

38.00

173.

174

176

205

121.00

174.

176

177

78.00

From

To

150.

145

151

151.

151

152.

200

150

100

120

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

From

To

500

450

400

DPR of GSWSP (Phase III)

200

150

100

175.

177

178

135.00

176.

178

189

127.00

177.

177

179

98.00

178.

179

180

67.00

179.

180

184

11.00

180.

181

185

98.00

181.

185

186

49.00

182.

186

188

60.00

183.

188

187

127.00

184.

184

190

77.00

185.

190

191

80.00

186.

191

192

38.00

187.

182

193

39.00

188.

193

194

12.00

189.

194

190

31.00

190.

196

199

470.00

191.

115

103

118.00

192.

105

113

85.00

193.

173

110

133.00

194.

127

137

62.00

195.

196

193

446.00

196.

101

102

564.00

197.

150

163

120.00

198.

189

199

100.00

564.00

4476.00

2741.00

9397.00

Total :

479.00

121

ZONE-III

(tJ

'PROPOSED PIPELINE ROUTE:


AREA OF COVERAGE:

1. Laitumkhrah

"

"

"4

'"

'MRl

.,
~6

GoM :Phed

DPR of GSWSP (phase ill)

122

Elevation

Zone III (Laitumkhrah)

25.00
81

50.00
82

75.00

176

1555

177

1556

100.00

80

1553
1552

78

73

1550

83
1557

72

71

68

1547

1546

1545
66

1548

75

74

84

77

1558

1549

1559

1550

1552
16

1554
14

1
1596

1557

13
1559

1560
3

1555

1557
5
1556
6
1555

11

25
1554

7
1554
8
1553

1554
24

1553
1554
26
10
27
9 1553
1554
1552
1552

1518

1540

50

1546 105
49

101

1541

1541
115
1539

1545

1547

136

1537
131

135

1534
137

1538

1535

130

1533

139
138

117

1549

39

128

1534

127
1533
1534

120
121 1536

1540122

DPR of GSWSP (Phase III)

1539

1538

1510

125

1508
162

1511
148

1509
161

1512

1532

1507

147
1512

142
1520
145

124

1538
1539
1537
119 118

40

164

1519
163

149

1531

129

1538

1550

199

1518
150

1533
1536

1535

44
154743
45
1546
42
1545
46
1542
1544 41

165
1511

1515

132

1538

1545 1539 114


103

1543 1547 1540

GoM : Phed

1516 186

133

107

47

35

196

1510

102

1548

1551
34

185

1530

116

1550
33

1512
1519

189

52 1547

48

32

1532

166
193

1520

1516

94

1517

1515

1550

231555

190

1513

192

194

188

51

31
22

1517

167

1540

1541

18
1556

1556
12

1558
4

53

17

1515

168

1515 1514

141

1548
54

1549 1549 1549

15

1518
184
93

56

55

191

1544 100

1546

1547
30

1553

1559

57

180

1531

1538
95

170

1515

1540

62

1545

1533

173

1517 1516

92

90

1539
96

1540

59

1519

1536

1539

1539
63

29

28

1537

91

1540
64 1538
89

58

179

1544
87

88

1548

178

67

1540

65

1542

76 1547

85

174

1520
79

86

171
1518

146
1513

160
1507

1514

126

151

1536

1512

15341532
152
1510

156
157

1510

1511

159
155
1507

158

1506

1506

153

154

1508

1506

123

Page 1
6/20/2008 2:37:05 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Laitumkhrah.net
Zone III
Link - Node Table:
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------2
2
3
15
300
3
3
4
157
250
4
4
5
16
250
5
5
6
103
250
6
6
7
102
200
7
7
8
28
200
8
8
9
25
200
9
9
10
87
200
10
10
11
52
200
11
11
12
23
200
12
12
13
29
200
14
13
14
84
200
15
14
15
39
200
17
15
16
17
200
18
16
17
93
200
19
17
18
50
200
23
18
22
39
200
24
22
23
32
200
25
23
24
70
200
26
24
25
66
200
27
25
12
107
200
28
24
26
63
200
29
26
27
69
200
30
27
9
45
200
31
16
28
141
200
32
28
29
95
200
33
29
30
68
200
34
30
31
77
200
35
31
32
101
200
36
32
24
75
200
37
32
33
62
200
38
33
34
48
200
39
34
24
81
200
40
34
35
71
200
44
35
39
91
200
45
39
40
99
200
46
40
41
50
150

GoM : Phed

DPR of GSWSP (Phase-III)

124

Page 2
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------47
41
42
36
150
48
42
43
48
150
49
43
44
92
150
50
44
45
46
150
51
45
46
47
150
52
46
39
86
150
53
45
35
102
150
54
44
47
68
200
55
47
32
32
200
56
47
48
47
200
57
48
49
143
200
58
49
50
66
150
59
50
51
49
150
60
51
52
63
150
61
52
53
62
150
62
53
48
103
200
63
53
54
45
200
64
54
55
30
200
65
55
30
76
200
66
54
56
44
200
67
56
57
89
200
68
57
58
40
200
69
58
59
67
200
72
59
30
47
200
73
56
51
136
150
74
57
62
37
150
75
62
63
22
100
76
63
64
51
100
77
64
65
41
150
78
65
66
49
100
79
66
67
48
100
80
67
68
52
100
83
68
71
65
150
84
71
72
187
150
85
72
73
20
150
86
73
74
100
150
90
74
75
115
150
91
75
65
109
150
87
74
76
55
200
88
76
77
103
200
89
77
29
156
200
92
73
78
25
200
93
78
79
117
200
94
79
80
134
200
95
80
81
182
200
96
81
82
28
200
97
82
83
104
200

GoM : Phed

DPR of GSWSP (Phase-III)

125

Page 3
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------98
83
84
155
200
99
84
85
109
200
100
85
86
120
200
101
86
2
116
200
102
67
87
99
100
103
87
88
68
100
104
88
64
50
100
105
87
89
48
100
106
89
63
141
100
107
89
90
80
100
108
90
91
92
100
109
91
92
78
100
110
92
93
129
100
111
93
94
53
100
112
94
95
137
100
113
95
92
68
100
114
89
96
76
200
118
96
100
116
150
119
100
51
68
150
120
100
62
102
150
121
100
101
140
150
122
101
102
97
150
123
102
50
68
150
124
101
103
30
150
125
103
105
125
150
126
105
49
118
150
129
101
107
25
150
136
107
114
66
100
137
114
115
111
100
138
115
116
112
100
139
116
117
43
100
140
117
118
31
150
141
118
119
65
150
142
119
120
96
150
143
120
121
55
150
144
121
122
58
150
145
122
40
51
150
147
117
124
86
100
148
124
125
72
100
149
125
126
51
100
150
126
127
73
100
151
127
128
55
150
152
128
125
81
100
153
128
129
28
100
154
129
130
29
100
155
130
116
109
100
156
130
131
104
100

GoM : Phed

DPR of GSWSP (Phase-III)

126

Page 4
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------157
131
114
86
100
158
107
132
55
100
159
132
133
56
100
161
133
135
27
100
162
135
129
76
100
163
135
136
46
100
164
136
137
40
100
165
137
138
25
100
166
138
139
62
100
168
139
141
74
100
169
141
136
70
100
170
138
142
123
100
173
142
145
137
100
174
145
146
406
100
175
146
147
265
100
176
147
148
268
100
177
148
149
302
100
178
149
150
240
100
179
145
151
81
100
180
151
152
93
100
181
152
153
91
100
182
153
154
106
100
183
154
155
71
100
190
155
156
33
100
191
156
157
56
100
192
157
151
52
100
184
155
158
51
100
185
158
159
167
100
186
159
160
147
100
187
160
161
126
100
188
161
162
46
100
189
162
163
300
100
193
162
164
109
100
194
164
165
86
100
195
165
166
131
100
196
166
167
90
100
197
167
168
75
100
199
168
170
108
100
200
170
171
107
100
202
171
173
66
100
203
173
174
38
100
205
174
176
121
100
206
176
177
78
100
209
177
178
135
100
210
178
89
127
100
207
177
179
98
100
208
179
180
67
100

GoM : Phed

DPR of GSWSP (Phase-III)

127

Page 5
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------214
180
184
11
100
215
184
185
98
100
216
185
186
49
100
218
186
188
60
100
219
188
189
127
100
220
184
190
77
100
221
190
191
80
100
222
191
192
38
100
223
192
193
39
100
224
193
194
12
100
231
194
190
31
100
229
196
199
470
100
16
15
3
118
250
13
5
13
85
250
230
173
170
133
100
232
127
137
62
100
226
196
193
446
100
1
1
2
564
350
20
150
163
120
100
21
189
199
100
100
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------2
3.44
1574.18
14.18
3
5.00
1573.32
15.32
4
1.56
1568.74
11.74
5
1.56
1568.28
12.28
6
1.26
1567.73
12.73
7
1.26
1566.17
12.17
8
1.26
1565.76
12.76
9
1.26
1565.41
13.41
10
5.94
1565.60
12.60
11
5.94
1565.77
11.77
12
2.50
1565.89
10.89
13
1.56
1567.37
11.37
14
0.06
1567.69
8.69
15
5.84
1567.84
13.84
16
5.32
1566.19
13.19
17
2.50
1564.51
7.51
18
2.50
1563.66
7.66
22
2.50
1563.05
8.05
23
2.50
1562.59
8.59
24
2.50
1561.66
8.66
25
7.18
1563.10
9.10

GoM : Phed

DPR of GSWSP (Phase-III)

128

Page 6
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------26
4.68
1562.85
8.85
27
4.68
1564.33
12.33
28
5.32
1561.50
9.50
29
5.00
1558.68
8.68
30
1.88
1557.90
8.90
31
3.12
1558.18
8.18
32
0.30
1558.64
8.64
33
2.48
1558.78
7.78
34
0.30
1558.92
8.92
35
0.00
1557.56
14.56
39
5.30
1556.55
9.55
40
6.26
1555.50
15.50
41
6.26
1555.54
15.54
42
6.26
1555.65
13.65
43
6.26
1555.97
9.97
44
6.26
1557.06
10.06
45
7.48
1556.95
11.95
46
15.56
1556.58
12.58
47
3.42
1557.58
8.58
48
1.24
1557.12
9.12
49
2.18
1556.25
9.25
50
2.18
1556.00
10.00
51
3.12
1556.12
9.12
52
5.30
1556.48
16.48
53
1.24
1557.08
16.08
54
1.24
1557.12
8.12
55
2.48
1557.33
8.32
56
3.12
1557.01
9.01
57
3.10
1557.01
11.01
58
1.24
1557.22
12.22
59
1.24
1557.61
10.61
62
1.86
1556.26
12.26
63
1.56
1555.75
15.75
64
1.56
1555.67
16.67
65
1.56
1555.73
15.73
66
8.02
1555.25
15.25
67
3.12
1555.26
11.26
68
4.90
1555.96
10.96
71
4.90
1556.24
10.24
72
4.90
1557.62
10.62
73
8.34
1557.85
9.85
74
5.00
1557.65
10.65
75
6.46
1556.38
14.38
76
5.00
1557.75
9.75
77
5.00
1558.04
9.04
78
3.44
1558.04
8.04
79
3.44
1559.11
7.11

GoM : Phed

DPR of GSWSP (Phase-III)

129

Page 7
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------80
3.44
1560.51
7.51
81
3.44
1562.67
7.67
82
3.44
1563.05
7.05
83
3.44
1564.60
7.60
84
3.44
1567.18
9.18
85
3.44
1569.19
10.19
86
3.44
1571.61
12.61
87
3.12
1554.75
15.75
88
4.98
1554.97
16.97
89
2.18
1554.41
15.41
90
0.36
1550.37
12.37
91
0.18
1545.95
9.95
92
3.12
1542.30
9.30
93
3.12
1541.50
10.50
94
3.12
1541.47
11.47
95
3.12
1541.69
9.69
96
2.18
1554.54
14.54
100
2.50
1555.52
15.52
101
2.40
1554.69
15.69
102
2.90
1555.37
10.37
103
2.40
1554.76
13.76
105
8.02
1555.21
10.21
107
0.80
1553.84
15.84
114
0.94
1548.89
7.89
115
6.24
1547.11
8.11
116
6.26
1546.83
8.83
117
5.62
1547.25
8.25
118
5.62
1547.49
15.49
119
5.62
1548.32
14.32
120
5.62
1550.09
14.09
121
5.62
1551.48
13.48
122
5.62
1553.38
14.38
124
0.64
1546.62
8.62
125
0.64
1546.19
9.19
126
0.64
1546.11
10.11
127
0.88
1546.03
12.03
128
0.64
1546.11
13.11
129
1.58
1546.30
12.30
130
6.88
1546.37
11.37
131
6.24
1546.95
8.95
132
0.94
1550.72
13.72
133
0.94
1547.82
11.82
135
0.94
1546.55
11.55
136
1.08
1545.42
11.42
137
2.64
1545.17
12.17
138
1.08
1544.57
13.57
139
0.00
1544.79
12.79

GoM : Phed

DPR of GSWSP (Phase-III)

130

Page 8
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------141
1.08
1545.05
12.05
142
0.24
1535.94
15.94
145
0.52
1526.61
12.61
146
0.26
1525.64
12.64
147
0.21
1525.13
13.13
148
0.16
1524.69
12.69
149
0.10
1524.27
13.27
150
0.05
1523.97
13.97
151
2.18
1522.94
10.94
152
2.18
1522.58
12.58
153
2.18
1522.47
14.47
154
2.18
1522.47
16.47
155
2.18
1522.52
15.52
156
2.18
1522.53
12.53
157
2.18
1522.65
11.65
158
0.08
1522.61
16.61
159
0.08
1522.92
16.92
160
0.08
1523.21
16.21
161
0.08
1523.47
16.47
162
0.17
1523.57
14.57
163
0.09
1523.89
15.89
164
0.32
1523.72
13.72
165
0.64
1523.87
12.87
166
0.96
1524.26
12.26
167
1.28
1524.72
11.72
168
1.36
1525.38
11.38
170
0.94
1526.85
11.85
171
0.94
1527.25
12.25
173
0.94
1527.65
11.65
174
0.00
1528.67
11.67
176
0.00
1531.90
13.90
177
0.00
1533.99
13.99
178
0.00
1544.51
7.51
179
1.32
1532.32
13.32
180
1.22
1531.54
13.54
184
1.06
1531.46
14.46
185
0.32
1531.41
15.41
186
0.24
1531.40
16.40
188
0.16
1531.39
16.39
189
0.08
1531.37
13.37
190
0.50
1531.32
15.32
191
0.50
1531.30
16.30
192
0.50
1531.30
14.30
193
0.50
1531.30
12.30
194
0.50
1531.30
11.30
196
0.24
1531.32
13.32
199
0.08
1531.36
12.36

GoM : Phed

DPR of GSWSP (Phase-III)

131

Page 9
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------1
-425.56
1596.00
0.00
Reservoir
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------2
349.88
4.95
57.04
Open
3
150.93
3.08
29.22
Open
4
149.37
3.04
28.66
Open
5
60.34
1.23
5.35
Open
6
59.08
1.88
15.25
Open
7
57.82
1.84
14.65
Open
8
56.56
1.80
14.07
Open
9
-20.39
0.65
2.13
Open
10
-26.33
0.84
3.41
Open
11
-32.27
1.03
4.98
Open
12
-113.70
3.62
51.26
Open
14
-27.79
0.89
3.77
Open
15
-27.85
0.89
3.79
Open
17
160.26
5.10
96.81
Open
18
64.91
2.07
18.16
Open
19
62.41
1.99
16.88
Open
23
59.91
1.91
15.65
Open
24
57.41
1.83
14.46
Open
25
54.91
1.75
13.32
Open
26
-71.75
2.29
21.86
Open
27
-78.93
2.51
26.08
Open
28
-66.33
2.11
18.90
Open
29
-71.01
2.26
21.44
Open
30
-75.69
2.41
24.13
Open
31
90.03
2.87
33.27
Open
32
84.71
2.70
29.72
Open
33
50.75
1.62
11.51
Open
34
-27.56
0.88
3.71
Open
35
-30.68
0.98
4.53
Open
36
-99.71
3.18
40.20
Open
37
-21.30
0.68
2.30
Open
38
-23.78
0.76
2.83
Open
39
-90.78
2.89
33.79
Open
40
66.70
2.12
19.09
Open
44
49.94
1.59
11.17
Open
45
48.48
1.54
10.57
Open
46
-5.37
0.30
0.73
Open
47
-11.63
0.66
3.06
Open
48
-17.89
1.01
6.78
Open
49
-24.15
1.37
11.82
Open

GoM : Phed

DPR of GSWSP (Phase-III)

132

Page 10
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------50
10.12
0.57
2.36
Open
51
19.40
1.10
7.88
Open
52
3.84
0.22
0.39
Open
53
-16.76
0.95
6.01
Open
54
-40.53
1.29
7.59
Open
55
-90.04
2.87
33.28
Open
56
46.08
1.47
9.63
Open
57
36.00
1.15
6.09
Open
58
13.14
0.74
3.83
Open
59
-10.20
0.58
2.39
Open
60
-16.36
0.93
5.74
Open
61
-21.66
1.23
9.65
Open
62
-8.84
0.28
0.45
Open
63
-14.05
0.45
1.07
Open
64
-37.85
1.21
6.69
Open
65
-40.33
1.28
7.52
Open
66
22.56
0.72
2.56
Open
67
1.83
0.06
0.03
Open
68
-33.62
1.07
5.37
Open
69
-34.86
1.11
5.74
Open
72
-36.10
1.15
6.12
Open
73
17.61
1.00
6.58
Open
74
32.35
1.83
20.29
Open
75
11.89
1.51
22.90
Open
76
2.92
0.37
1.70
Open
77
-7.75
0.44
1.44
Open
78
7.47
0.95
9.69
Open
79
-0.55
0.07
0.08
Open
80
-8.96
1.14
13.58
Open
83
-13.86
0.78
4.22
Open
84
-18.76
1.06
7.40
Open
85
-23.66
1.34
11.37
Open
86
9.28
0.53
2.01
Open
90
23.24
1.32
11.00
Open
91
16.78
0.95
6.01
Open
87
-18.95
0.60
1.86
Open
88
-23.95
0.76
2.87
Open
89
-28.95
0.92
4.07
Open
92
-41.29
1.31
7.85
Open
93
-44.73
1.42
9.11
Open
94
-48.17
1.53
10.45
Open
95
-51.61
1.64
11.87
Open
96
-55.05
1.75
13.38
Open
97
-58.49
1.86
14.97
Open
98
-61.93
1.97
16.64
Open
99
-65.37
2.08
18.39
Open
100
-68.81
2.19
20.22
Open

GoM : Phed

DPR of GSWSP (Phase-III)

133

Page 11
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------101
-72.25
2.30
22.14
Open
102
5.29
0.67
5.12
Open
103
-4.13
0.53
3.23
Open
104
-9.11
1.16
13.98
Open
105
6.30
0.80
7.06
Open
106
-7.41
0.94
9.53
Open
107
13.02
1.66
50.56
Open
108
12.66
1.61
48.00
Open
109
12.48
1.59
46.74
Open
110
4.22
0.54
6.27
Open
111
1.10
0.14
0.52
Open
112
-2.02
0.26
1.61
Open
113
-5.14
0.66
9.05
Open
114
-17.95
0.57
1.68
Open
118
-20.13
1.14
8.43
Open
119
-20.65
1.17
8.84
Open
120
-18.60
1.05
7.29
Open
121
16.62
0.94
5.91
Open
122
-18.26
1.03
7.04
Open
123
-21.16
1.20
9.25
Open
124
-10.26
0.58
2.42
Open
125
-12.66
0.72
3.57
Open
126
-20.68
1.17
8.86
Open
129
42.74
2.42
34.00
Open
136
22.55
2.87
74.96
Open
137
9.81
1.25
16.06
Open
138
3.57
0.46
2.47
Open
139
-7.48
0.95
9.72
Open
140
-19.49
1.10
7.94
Open
141
-25.11
1.42
12.70
Open
142
-30.73
1.74
18.46
Open
143
-36.35
2.06
25.19
Open
144
-41.97
2.38
32.87
Open
145
-47.59
2.69
41.49
Open
147
6.39
0.81
7.26
Open
148
5.75
0.73
5.97
Open
149
2.89
0.37
1.67
Open
150
2.25
0.29
1.05
Open
151
-7.69
0.44
1.42
Open
152
-2.22
0.28
1.03
Open
153
-6.11
0.78
6.68
Open
154
-3.47
0.44
2.34
Open
155
-4.79
0.61
4.26
Open
156
-5.55
0.71
5.60
Open
157
-11.79
1.50
22.58
Open
158
19.39
2.47
56.71
Open
159
18.45
2.35
51.73
Open

GoM : Phed

DPR of GSWSP (Phase-III)

134

Page 12
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------161
17.51
2.23
46.95
Open
162
4.22
0.54
3.36
Open
163
12.36
1.57
24.61
Open
164
5.86
0.75
6.18
Open
165
12.28
1.56
24.32
Open
166
-4.34
0.55
3.54
Open
168
-4.34
0.55
3.54
Open
169
-5.42
0.69
5.34
Open
170
15.53
1.98
70.11
Open
173
15.29
1.95
68.12
Open
174
2.50
0.32
2.38
Open
175
2.24
0.29
1.94
Open
176
2.03
0.26
1.62
Open
177
1.88
0.24
1.40
Open
178
1.77
0.23
1.26
Open
179
12.27
1.56
45.31
Open
180
4.59
0.58
3.93
Open
181
2.41
0.31
1.19
Open
182
0.23
0.03
0.01
Open
183
-1.95
0.25
0.81
Open
190
-1.15
0.15
0.30
Open
191
-3.33
0.42
2.17
Open
192
-5.51
0.70
5.51
Open
184
-2.99
0.38
1.77
Open
185
-3.07
0.39
1.86
Open
186
-3.15
0.40
1.96
Open
187
-3.23
0.41
2.05
Open
188
-3.31
0.42
2.14
Open
189
-1.63
0.21
1.08
Open
193
-1.85
0.24
1.36
Open
194
-2.17
0.28
1.83
Open
195
-2.81
0.36
2.95
Open
196
-3.77
0.48
5.09
Open
197
-5.05
0.64
8.75
Open
199
-6.41
0.82
13.61
Open
200
-3.21
0.41
3.78
Open
202
-4.15
0.53
6.08
Open
203
-9.23
1.18
26.73
Open
205
-9.23
1.18
26.73
Open
206
-9.23
1.18
26.73
Open
209
-16.45
2.10
77.95
Open
210
-16.45
2.10
77.95
Open
207
7.22
0.92
16.96
Open
208
5.90
0.75
11.67
Open
214
4.68
0.60
7.60
Open
215
1.44
0.18
0.46
Open
216
1.12
0.14
0.29
Open

GoM : Phed

DPR of GSWSP (Phase-III)

135

Page 13
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------218
0.88
0.11
0.18
Open
219
0.72
0.09
0.13
Open
220
2.18
0.28
1.85
Open
221
0.67
0.09
0.21
Open
222
0.17
0.02
0.02
Open
223
-0.33
0.04
0.05
Open
224
-0.51
0.06
0.12
Open
231
-1.01
0.13
0.44
Open
229
-0.56
0.07
0.08
Open
16
-193.95
3.95
46.48
Open
13
87.47
1.78
10.64
Open
230
4.14
0.53
6.06
Open
232
9.06
1.15
13.85
Open
226
0.32
0.04
0.05
Open
1
425.56
4.43
38.69
Open
20
1.72
0.22
0.64
Open
21
0.64
0.08
0.10
Open

GoM : Phed

DPR of GSWSP (Phase-III)

136

g,

,
i

Legends
Pipeline
Road
Zone Boundary

Reservoir

Distribution Network - Zone - IV : Malld, Dhankheti Areas

-..)

.03im

.045ba

Greater Shillong Water Supply Project (Phase III)

GoM:PHED

GoM : Phed

Length of pipe line required diameterwise


Zone : IV
Area of coverage : Malki, Dhankheti.
Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

200

150

100

20.00

173.00

110.00

4.

75.00

5.

104.00

6.

111.00

7.

122.00

8.

179.00

9.

10

169.00

10.

10

11

10

48.00

11.

11

12

11

70.00

12.

12

13

12

122.00

13.

13

13

108.00

14.

11

17

17

66.00

15.

17

18

18

73.00

16.

18

19

19

50.00

17.

19

20

20

138.00

18.

20

21

21

182.00

19.

21

22

22

143.00

20.

22

23

23

98.00

21.

23

24

162.00

22.

21

24

26

32.00

23.

24

25

27

131.00

From

To

1.

2.

3.

138

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

27

163.00

27

28

60.00

27

18

29

141.00

27.

24

28

30

148.00

28.

28

29

31

105.00

29.

29

30

32

123.00

30.

30

31

33

232.00

31.

31

32

34

122.00

32.

35

37

153.00

33.

35

36

38

243.00

34.

36

37

39

20.00

35.

37

38

40

85.00

36.

38

39

41

198.00

37.

39

40

42

193.00

38.

40

43

45

146.00

39.

43

49

46

110.00

40.

44

45

47

41.00

41.

45

46

48

139.00

42.

46

47

49

78.00

43.

47

48

50

147.00

44.

48

49

51

94.00

45.

49

50

52

84.00

46.

50

51

53

121.00

47.

51

52

54

98.00

48.

52

53

55

49.

53

54

56

From

To

24.

25

26

25.

26

26.

139

GoM : Phed

Sl.
No.

Pipe No.

Node No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

From

To

500

450

400

200

150

100

50.

54

55

57

167.00

51.

55

56

58

204.00

52.

56

38

59

127.00

53.

44

59

62

127.00

54.

59

60

63

145.00

55.

60

61

64

132.00

56.

61

62

65

86.00

57.

62

47

66

77.00

58.

62

63

67

169.00

59.

63

64

68

117.00

60.

64

65

69

167.00

61.

65

66

70

137.00

62.

66

60

71

67.00

63.

66

67

72

10.00

64.

54

68

73

162.00

65.

68

69

74

52.00

66.

69

70

75

75.00

67.

70

71

76

188.00

68.

71

72

77

162.00

69.

72

73

78

96.00

70.

73

74

79

84.00

71.

74

75

80

123.00

72.

75

76

81

115.00

73.

76

77

82

126.00

74.

77

69

83

25.00

75.

77

78

84

75.00

140

GoM : Phed

Sl.
No.

Pipe No.

Node No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

From

To

500

450

400

200

150

100

76.

78

79

85

110.00

77.

79

80

86

54.00

78.

80

75

87

69.00

79.

79

73

88

101.00

80.

72

83

91

7.00

81.

83

84

92

59.00

82.

84

85

93

91.00

83.

85

86

94

51.00

84.

86

87

95

135.00

85.

87

88

96

135.00

86.

88

72

97

120.00

87.

86

89

98

57.00

88.

89

90

99

87.00

89.

90

91

100

74.00

90.

91

92

101

111.00

91.

92

93

102

106.00

92.

93

94

103

158.00

93.

94

95

104

100.00

94.

95

96

105

192.00

95.

96

97

106

76.00

96.

97

84

107

171.00

97.

94

98

108

88.00

98.

98

99

109

87.00

99.

99

91

110

77.00

100.

90

100

111

67.00

101.

100

101

112

85.00

141

GoM : Phed

Sl.
No.

Pipe No.

Node No.

Length of pipes diameterwise


RM
350
300
250

From

To

500

450

400

200

150

100

102.

101

102

113

93.00

103.

102

92

115

133.00

104.

96

104

116

127.00

105.

104

105

117

123.00

106.

105

94

118

86.00

107.

67

32

14

100.00

20.00

504.00

671.00

1818.00

8950.00

Total :

DPR of GSWSP (Phase III)


142

(?)

ZONE - IV
'PROPOSED PIPELINE ROUTE:
AREA OF COVERAGE:

1. Malki

64

2. Dhankheti Areas.

107

65

't-

"

32

~"

"
61

".

31

" f----.j

10'

"

"

104

10

26

9.

12

"

'50

"

74

"
35
36

"

M.in .....rvoir

GoM:Phed

DPR of GSWSP (phase

nn

143

N
Elevation

ZONE-IV (MALKI & DHANKHETI)

25.00

93

50.00

1620

75.00

102

100.00

1620

92

101
64

1620
100

67

1616

31
1614

26
17
10

27

1609

1610 11

1609

1610

13
8
1620

7
1624

1604
21

1620
6

45

1625

44

1608

1628

22

1625

49
1630

1630

50

71

1632

1632

52

70

1658

35
1645

1645
36

37

1647

1648

1646

78

1633
69
1635

1634
56

1630

1631

1642
38

73

79

53

1650

GoM : Phed

1628

1634

83

72

39
2

84
1626

1628

1630

1635

1640

1645

1626

1635

1630

40

1620

1622

85

87

51

43

97

88

1632

24

23

1630

1622

1625

48

1630

104
1622

1625

46

1610
5

1620

1624

1607

20

1620

1622

1628

28

1604

95

1622
62

59

99

86

47

1609

25

1604

1624

1622

89

1624

29

19
12

1620 60

1610

1605

1615

61

30

1605

18

1620

96

1621

66

1624

1604

91

105

1620

90

1622

63

1617

98

1622

1620
32

1620

1621

65

94

55

54

1640

1636

68

74
1630

80
1631
75

1632

1632
77

76

1635

1634

1634

DPR of GSWSP (Phase III)

144

Page 1
6/21/2008 6:42:51 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone IV (Malki).net
ZONE-IV (MALKI & DHANKHETI)
Link - Node Table:
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------1
1
2
20
350
2
2
3
173
250
3
3
4
110
150
4
4
5
75
150
5
5
6
104
150
6
6
7
111
100
7
7
8
122
100
8
8
9
179
100
9
9
10
169
100
10
10
11
48
100
11
11
12
70
100
12
12
13
122
100
13
13
6
108
100
17
11
17
66
150
18
17
18
73
100
19
18
19
50
100
20
19
20
138
100
21
20
21
182
100
22
21
22
143
100
23
22
23
98
150
24
23
5
162
150
25
21
24
32
100
26
24
25
131
100
27
25
26
163
100
28
26
27
60
100
29
27
18
141
100
30
24
28
148
100
31
28
29
105
100
32
29
30
123
100
33
30
31
232
100
34
31
32
122
100
37
2
35
153
300
38
35
36
243
300
39
36
37
20
300
40
37
38
88
300
41
38
39
198
150
42
39
40
193
150

GoM : Phed

DPR of GSWSP (Phase-III)

145

Page 2 ZONE-IV (MALKI & DHANKHETI)


Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------45
40
43
146
150
46
43
44
110
150
47
44
45
41
100
48
45
46
139
100
49
46
47
78
100
50
47
48
147
100
51
48
49
94
100
52
49
50
84
100
53
50
51
121
100
54
51
52
98
100
55
52
53
186
150
56
53
54
131
150
57
54
55
167
250
58
55
56
204
250
59
56
38
127
250
62
44
59
127
100
63
59
60
145
100
64
60
61
132
100
65
61
62
86
100
66
62
47
77
100
67
62
63
169
100
68
63
64
117
100
69
64
65
167
100
70
65
66
137
100
71
66
60
67
100
72
66
67
10
100
73
54
68
162
150
74
68
69
52
150
75
69
70
75
100
76
70
71
188
100
77
71
72
162
100
78
72
73
96
100
79
73
74
84
100
80
74
75
123
100
81
75
76
115
100
82
76
77
126
100
83
77
69
25
150
84
77
78
75
100
85
78
79
110
100
86
79
80
54
100
87
80
75
69
100
88
79
73
101
100
91
72
83
7
100
92
83
84
59
100
93
84
85
91
100
94
85
86
51
100
95
86
87
135
100

GoM : Phed

DPR of GSWSP (Phase-III)

146

Page 3
ZONE-IV (MALKI & DHANKHETI)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------96
87
88
135
100
97
88
72
120
100
98
86
89
57
100
99
89
90
87
100
100
90
91
74
100
101
91
92
111
100
102
92
93
106
100
103
93
94
158
100
104
94
95
100
100
105
95
96
192
100
106
96
97
76
100
107
97
84
171
100
108
94
98
88
100
109
98
99
87
100
110
99
91
77
100
111
90
100
67
100
112
100
101
85
100
113
101
102
93
100
115
102
92
133
100
116
96
104
127
100
117
104
105
123
100
118
105
94
86
100
14
67
32
100
100
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------2
0.00
1657.86
7.86
3
0.11
1656.70
11.70
4
0.11
1647.86
7.86
5
0.00
1641.84
11.84
6
0.00
1639.60
14.60
7
0.03
1637.05
13.05
8
0.03
1634.25
14.25
9
0.03
1630.16
15.16
10
0.00
1626.32
16.32
11
0.00
1625.23
16.23
12
4.70
1626.88
16.88
13
4.70
1632.19
12.19
17
4.68
1624.46
15.46
18
0.00
1620.37
15.37
19
11.34
1619.37
15.37
20
11.34
1619.37
15.37
21
0.00
1623.35
13.35
22
4.70
1636.43
16.43

GoM : Phed

DPR of GSWSP (Phase-III)

147

Page 4
ZONE-IV (MALKI & DHANKHETI)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------23
4.70
1638.14
13.14
24
6.64
1622.43
14.43
25
6.64
1619.50
15.50
26
6.64
1618.72
14.72
27
6.64
1618.75
13.75
28
2.04
1623.08
16.08
29
1.58
1623.96
14.96
30
1.12
1625.47
15.47
31
0.89
1629.06
15.06
32
0.66
1631.29
15.29
35
0.03
1656.98
11.98
36
0.03
1655.59
8.59
37
0.03
1655.47
7.47
38
0.00
1654.97
9.97
39
3.95
1650.72
8.72
40
0.27
1644.61
9.61
43
3.95
1642.18
12.18
44
0.00
1640.78
12.78
45
0.00
1639.79
7.79
46
6.45
1636.46
6.46
47
0.00
1636.00
8.00
48
3.95
1636.27
6.27
49
3.95
1637.07
7.07
50
3.95
1638.72
6.72
51
3.95
1642.92
7.92
52
3.95
1648.19
14.19
53
3.95
1650.16
16.16
54
0.00
1652.03
16.03
55
3.95
1652.91
12.91
56
3.95
1654.12
8.12
59
2.59
1637.35
13.35
60
0.00
1634.77
10.77
61
3.59
1634.77
10.77
62
0.00
1635.00
11.00
63
1.09
1634.22
13.22
64
1.09
1633.88
12.88
65
1.09
1633.62
13.62
66
1.09
1633.53
13.53
67
0.03
1633.33
16.33
68
0.00
1648.57
14.57
69
0.00
1647.47
12.47
70
0.94
1645.75
12.75
71
0.94
1642.06
10.06
72
0.00
1639.37
9.37
73
0.00
1642.49
12.49
74
0.94
1642.96
12.96
75
0.00
1643.87
11.87

GoM : Phed

DPR of GSWSP (Phase-III)

148

Page 5
ZONE-IV (MALKI & DHANKHETI)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------76
1.33
1645.25
11.25
77
0.00
1647.23
12.23
78
1.88
1645.58
13.58
79
0.00
1643.83
12.83
80
2.82
1643.82
12.82
83
1.56
1639.09
11.09
84
0.00
1637.16
11.16
85
4.36
1636.23
10.23
86
0.00
1636.12
11.12
87
1.56
1636.81
11.81
88
1.56
1637.92
9.92
89
2.82
1635.41
13.41
90
0.00
1634.89
12.89
91
0.00
1634.71
12.71
92
0.00
1634.71
14.71
93
0.39
1634.69
14.69
94
0.00
1634.68
14.68
95
3.44
1634.68
14.68
96
0.00
1635.18
13.18
97
0.00
1635.79
13.79
98
3.44
1634.51
14.51
99
3.44
1634.51
14.51
100
0.59
1634.82
12.82
101
0.59
1634.77
14.77
102
0.00
1634.74
14.74
104
0.62
1634.94
12.94
105
0.00
1634.79
12.79
1
-169.41
1658.00
0.00
Reservoir
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
169.41
1.76
7.02
Open
2
68.14
1.39
6.70
Open
3
68.03
3.85
80.41
Open
4
67.92
3.85
80.17
Open
5
33.42
1.89
21.56
Open
6
11.92
1.52
23.02
Open
7
11.89
1.52
22.93
Open
8
11.87
1.51
22.83
Open
9
11.84
1.51
22.74
Open
10
11.84
1.51
22.74
Open
11
-12.10
1.54
23.67
Open
12
-16.80
2.14
43.47
Open
13
-21.50
2.74
68.64
Open

GoM : Phed

DPR of GSWSP (Phase-III)

149

Page 6
ZONE-IV (MALKI & DHANKHETI)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------17
23.94
1.36
11.62
Open
18
19.26
2.45
56.00
Open
19
11.08
1.41
20.09
Open
20
-0.26
0.03
0.02
Open
21
-11.60
1.48
21.90
Open
22
-25.10
3.20
91.43
Open
23
-29.80
1.69
17.43
Open
24
-34.50
1.95
22.87
Open
25
13.50
1.72
28.98
Open
26
11.73
1.49
22.36
Open
27
5.09
0.65
4.77
Open
28
-1.55
0.20
0.53
Open
29
-8.19
1.04
11.48
Open
30
-4.88
0.62
4.40
Open
31
-6.92
0.88
8.40
Open
32
-8.50
1.08
12.30
Open
33
-9.62
1.23
15.47
Open
34
-10.51
1.34
18.23
Open
37
101.27
1.43
5.74
Open
38
101.24
1.43
5.74
Open
39
101.21
1.43
5.74
Open
40
101.18
1.43
5.73
Open
41
33.32
1.89
21.44
Open
42
29.37
1.66
31.66
Open
45
29.10
1.65
16.69
Open
46
25.15
1.42
12.74
Open
47
12.18
1.55
23.95
Open
48
12.18
1.55
23.95
Open
49
5.73
0.73
5.92
Open
50
-3.03
0.39
1.83
Open
51
-6.98
0.89
8.55
Open
52
-10.93
1.39
19.62
Open
53
-14.88
1.90
34.73
Open
54
-18.83
2.40
53.71
Open
55
-22.78
1.29
10.60
Open
56
-26.73
1.51
14.26
Open
57
-59.95
1.22
5.28
Open
58
-63.90
1.30
5.95
Open
59
-67.85
1.38
6.65
Open
62
12.98
1.65
26.95
Open
63
10.39
1.32
17.85
Open
64
-0.18
0.02
0.01
Open
65
-3.77
0.48
2.73
Open
66
-8.76
1.12
13.01
Open
67
4.99
0.64
4.59
Open
68
3.90
0.50
2.91
Open
69
2.81
0.36
1.59
Open

GoM : Phed

DPR of GSWSP (Phase-III)

150

Page 7
ZONE-IV (MALKI & DHANKHETI)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------70
1.72
0.22
0.64
Open
71
-10.57
1.35
18.41
Open
72
11.20
1.43
20.51
Open
73
33.22
1.88
21.32
Open
74
33.22
1.88
21.32
Open
75
11.88
1.51
22.87
Open
76
10.94
1.39
19.63
Open
77
10.00
1.27
16.62
Open
78
-14.37
1.83
32.56
Open
79
-5.53
0.70
5.55
Open
80
-6.47
0.82
7.43
Open
81
-8.37
1.07
11.97
Open
82
-9.70
1.24
15.73
Open
83
-21.34
1.21
9.39
Open
84
11.64
1.48
22.03
Open
85
9.76
1.24
15.90
Open
86
0.92
0.12
0.20
Open
87
-1.90
0.24
0.77
Open
88
8.84
1.13
13.24
Open
91
15.97
2.03
39.59
Open
92
14.41
1.84
32.72
Open
93
7.67
0.98
10.17
Open
94
3.31
0.42
2.14
Open
95
-5.28
0.67
5.09
Open
96
-6.84
0.87
8.23
Open
97
-8.40
1.07
12.04
Open
98
8.59
1.09
12.54
Open
99
5.77
0.73
6.00
Open
100
3.53
0.45
2.42
Open
101
-0.17
0.02
0.01
Open
102
0.89
0.11
0.19
Open
103
0.50
0.06
0.06
Open
104
-0.22
0.03
0.01
Open
105
-3.66
0.47
2.59
Open
106
-6.74
0.86
8.02
Open
107
-6.74
0.86
8.02
Open
108
3.18
0.41
2.00
Open
109
-0.26
0.03
0.02
Open
110
-3.70
0.47
2.64
Open
111
2.24
0.28
1.04
Open
112
1.65
0.21
0.59
Open
113
1.06
0.13
0.26
Open
115
1.06
0.13
0.26
Open
116
3.08
0.39
1.88
Open
117
2.46
0.31
1.24
Open
118
2.46
0.31
1.24
Open
14
11.17
1.42
20.40
Open

GoM : Phed

DPR of GSWSP (Phase-III)

151

g,

,
i

Legends
Pipeline
Road
Zone Boundary

Reservoir

Distribution Network - Zone - V : Nongthymmai, Pohkseh

.04lm

.06km

Greater Shillong Water Supply Project (Phase III)

GoM:PHED

GoM : Phed

Length of pipe line required diameterwise


Zone : V
Area of coverage : Nongthymmai, Pohkseh.
Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

200

150

100

157.00

46.00

31

50.00

4.

31

59.00

5.

48.00

6.

100.00

7.

112.00

8.

70.00

9.

25.00

10.

10

139.00

11.

10

11

45.00

12.

10

12

68.00

13.

13

15

52.00

14.

13

17

19

68.00

15.

17

18

20

70.00

16.

18

19

21

68.00

17.

19

20

22

70.00

18.

20

21

23

118.00

19.

21

22

24

66.00

20.

22

95

25

66.00

21.

95

23

26

39.00

22.

23

24

27

39.00

23.

24

25

28

40.00

From

To

1.

2.

3.

153

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

150

100

29

103.00

27

30

102.00

27

28

31

67.00

27.

28

29

32

67.00

28.

29

33

68.00

29.

27

30

34

53.00

30.

30

31

35

54.00

31.

20

32

36

63.00

32.

32

33

37

64.00

33.

33

34

38

62.00

34.

34

35

39

33.00

35.

35

36

40

65.00

36.

36

37

41

60.00

37.

37

38

42

62.00

38.

38

39

43

57.00

39.

39

40

44

58.00

40.

40

41

45

58.00

41.

41

33

46

56.00

42.

38

42

47

56.00

43.

42

43

48

100.00

44.

43

44

49

85.00

45.

44

47

52

59.00

46.

47

38

53

60.00

47.

43

48

54

70.00

48.

48

49

55

84.00

49.

49

36

56

82.00

50.

42

36

57

70.00

From

To

24.

25

26

25.

26

26.

200

154

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

58

74.00

54

62

23.00

54

56

64

61.00

54.

56

57

65

61.00

55.

57

58

67

59.00

56.

58

59

68

57.00

57.

59

60

69

5.00

58.

60

61

70

60.00

59.

61

62

71

62.00

60.

62

57

72

61.

62

63

73

60.00

62.

63

64

74

50.00

63.

64

65

75

92.00

64.

65

35

76

93.00

65.

64

66

77

81.00

66.

66

65

78

80.00

67.

66

67

79

42.00

68.

67

68

80

134.00

69.

68

69

81

67.00

70.

69

34

82

122.00

71.

68

70

83

121.00

72.

70

71

84

120.00

73.

71

72

85

122.00

74.

72

69

86

120.00

75.

72

73

87

48.00

76.

73

74

88

50.00

From

To

51.

49

50

52.

50

53.

155

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

90

46.00

77

91

71.00

77

79

93

68.00

80.

79

80

94

68.00

81.

80

81

95

111.00

82.

81

82

96

38.00

83.

82

83

97

38.00

84.

83

85

99

42.00

85.

85

76

101

50.00

86.

85

87

102

67.00

87.

87

88

103

54.00

88.

88

89

104

39.00

89.

87

92

107

76.00

90.

92

93

108

77.00

91.

93

95

109

42.00

92.

93

94

110

65.00

93.

94

87

111

68.00

94.

89

21

112

98.00

95.

81

96

113

40.00

96.

96

97

114

48.00

97.

97

98

115

78.00

98.

98

99

116

79.00

99.

99

100

117

77.00

100.

100

102

119

61.00

101.

102

25

120

37.00

102.

97

106

124

67.00

103.

106

108

126

68.00

From

To

77.

74

76

78.

76

79.

156

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

127

68.00

112

129

70.00

112

113

130

72.00

107.

113

114

131

95.00

108.

1147

115

132

69.00

109.

115

113

133

76.00

110.

115

116

134

18.00

111.

116

119

137

178.00

112.

119

120

138

48.00

113.

120

121

139

46.00

114.

121

111

140

75.00

115.

111

109

141

78.00

116.

121

122

142

65.00

117.

122

123

143

87.00

118.

123

124

144

90.00

119.

124

71

145

95.00

120.

80

122

146

149.00

121.

124

125

147

72.00

122.

125

127

149

37.00

123.

127

128

150

71.00

124.

128

129

151

17.00

125.

129

130

152

73.00

126.

130

131

153

47.00

127.

131

132

154

85.00

128.

132

133

155

90.00

129.

133

134

156

80.00

130.

134

67

157

107.00

From

To

104.

108

109

105.

109

106.

157

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

158

80.00

136

159

92.00

136

137

160

66.00

134.

137

138

161

70.00

135.

138

139

162

75.00

136.

139

63

163

77.00

137.

139

140

164

9.00

138.

140

143

167

56.00

139.

143

148

172

74.00

140.

148

150

174

71.00

141.

150

151

175

120.00

142.

151

152

176

118.00

143.

152

154

178

80.00

144.

154

157

181

85.00

145.

157

158

182

90.00

146.

158

159

183

89.00

147.

159

160

184

90.00

148.

160

161

185

92.00

149.

161

163

186

88.00

150.

163

158

187

96.00

151.

154

167

189

35.00

152.

164

165

190

83.00

153.

165

166

191

85.00

154.

166

167

192

90.00

155.

167

168

193

53.00

156.

168

169

194

49.00

157.

169

170

195

33.00

From

To

131.

134

135

132.

135

133.

158

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

196

76.00

172

197

68.00

172

150

198

70.00

161.

171

173

199

82.00

162.

173

143

200

95.00

163.

170

174

201

70.00

164.

174

136

202

85.00

165.

169

175

203

-83.00

166.

175

176

204

-48.00

167.

176

178

206

62.00

168.

178

131

207

65.00

169.

175

179

208

48.00

170.

179

130

209

50.00

171.

179

180

210

60.00

172.

180

181

211

78.00

173.

181

182

212

80.00

174.

182

129

213

89.00

175.

182

183

214

75.00

176.

183

184

215

88.00

177.

184

128

216

148.00

178.

184

185

217

78.00

179.

185

186

218

60.00

180.

186

127

219

78.00

181.

185

187

220

49.00

182.

187

123

221

70.00

183.

187

188

222

44.00

184.

188

122

223

51.00

From

To

158.

170

171

159.

171

160.

159

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

224

99.00

190

225

38.00

190

191

226

114.00

188.

191

193

228

95.00

189.

193

194

229

90.00

190.

194

195

230

105.00

191.

195

196

231

103.00

192.

196

119

232

31.00

193.

189

199

235

58.00

194.

199

184

236

134.00

195.

199

200

237

61.00

196.

200

202

238

70.00

197.

202

204

240

70.00

198.

204

205

241

74.00

199.

205

206

242

34.00

200.

206

207

243

66.00

201.

205

208

255

145.00

202.

208

212

248

10.00

203.

212

214

250

60.00

204.

214

2041

251

71.00

205.

201

200

252

76.00

206.

214

215

253

42.00

207.

215

191

254

79.00

208.

207

217

256

79.00

209.

217

218

257

106.00

210.

218

219

258

44.00

211.

219

221

260

19.00

From

To

185.

188

189

186.

189

187.

160

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

261

112.00

223

263

55.00

223

225

265

141.00

215.

225

230

266

59.00

216.

230

181

267

39.00

217.

225

226

268

105.00

218.

226

227

269

104.00

219.

227

229

271

115.00

220.

229

217

272

120.00

221.

230

231

273

33.00

222.

231

168

274

100.00

223.

231

232

275

80.00

224.

232

234

277

71.00

225.

234

167

279

73.00

226.

245

246

291

154.00

227.

245

250

295

55.00

228.

250

251

296

57.00

229.

251

252

298

87.00

230.

252

253

299

70.00

231.

253

254

300

82.00

232.

254

255

301

77.00

233.

255

256

302

77.00

234.

256

2583

303

72.00

235.

256

257

304

92.00

236.

257

258

305

131.00

237.

258

260

307

34.00

238.

260

261

308

120.00

From

To

212.

221

184

213.

218

214.

161

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

309

90.00

263

310

96.00

263

265

311

100.00

242.

264

207

312

40.00

243.

264

265

313

158.00

244.

265

266

314

110.00

245.

266

267

315

115.00

246.

267

269

317

107.00

247.

269

270

318

110.00

248.

270

271

319

118.00

249.

271

206

320

98.00

250.

265

272

321

55.00

251.

272

273

322

32.00

252.

273

317

323

65.00

253.

311

274

324

70.00

254.

274

275

325

71.00

255.

275

277

327

38.00

256.

277

280

330

34.00

257.

280

281

331

80.00

258.

281

282

332

65.00

259.

282

283

333

90.00

260.

283

284

334

92.00

261.

284

285

335

58.00

262.

285

273

336

73.00

263.

285

286

337

55.00

264.

286

282

338

140.00

265.

286

267

339

29.00

From

To

239.

261

262

240.

261

241.

162

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

150

100

340

132.00

374

341

69.00

281

288

342

144.00

269.

288

289

343

145.00

270.

289

290

344

140.00

271.

290

292

346

272.

292

293

348

133.00

273.

293

262

348

90.00

274.

293

294

349

35.00

275.

294

295

350

100.00

276.

257

294

351

187.00

277.

295

296

352

102.00

278.

296

297

353

85.00

279.

297

281

354

82.00

280.

296

179

355

119.00

281.

298

294

356

189.00

282.

298

299

357

58.00

283.

299

292

358

89.00

284.

299

300

359

78.00

285.

300

301

360

79.00

286.

301

302

361

65.00

287.

301

306

364

90.00

288.

306

307

365

114.00

289.

307

308

366

85.00

290.

308

309

367

83.00

291.

309

305

368

90.00

292.

305

302

369

99.00

From

To

266.

287

381

267.

287

268.

200

141.00

163

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

371

314

374

314

315

375

296.

261

272

376

297.

293

284

377

298.

190

120

378

299.

246

315

379

From

To

293.

307

311

294.

311

295.

Total :

200

150

100

43.00

100.00

101.00

118.00

120.00

45.00

35.00

157.00

228.00

468.00

1461.00

1343.00

18967.00

DPR of GSWSP (Phase III)


164

".

(/)

go
305

ZONE - V

;09

PROPOSED PIPELINE ROUTE:


292

1.

299.

"300

AREA OF COVERAGE:
~98

1. Nongthymmai

306

2. Pohkseh
307 ......... _111

26'

"

314

17

229

Main reservoir

GoM:Phed

DPR of GSWSP (phase Ill)

165

Zone - V (Nongthymmai & Pohkseh)

N
Elevation
25.00
50.00
75.00
100.00
m

277

280

281

288

289

1544 1543 2821542 1541290


305
309
302
1542
283
275
300
1543
1541
292 299
1540 1540 1540
286
308
287
274
284
1544
301
1542
1540
298
306
285
293
1542 1541
1543
1540
273
1542
1545
1540
317 1543
307
294
1542
1542
1542 262 1540
295 296 297
272
1541261
311
1545
1522
1542
1541
1540
1541
1540
267 266 265
260
1550
257 256
263 1548
1540314
251
258
269 15491550
1541
1540
1540315
253
270 1557
255 1540
264 1550
1540250
1540
2711559
252
1540254 1540
1559
246 1540
207
208 1559
1540 245
206
1559
205
1540 1542
212 1569
1540
1559 229
217
1540
194
204 15651560
227
1564
214 1573
218
1562
2021568
1576
159
226 1568
158
215 1574
195
201
219
1570223
191
232 234
2001571
157
1583
193
1583
225 1567
1574 1575
1577
1570
221
1570
163
165
160
1575
166
196
231 1580 1581
1576
1583
190
164
230
167
199
168
1575
1576
154
181
1583
184 1570
183
189
1581 1582
161 1582
1578
1578169
175
180
1578
182
1582
1577
1581
1576
1580
1521583
119 120
185 1576 1576
1576
179 176
1578
188
1582
121
15771585170 171
1576
186
1577
187
130
172
116
122
1583
1576 1579
1579
128 129
1579 1577
1580
151
1111582
127
174 1586 1586
178
125
1579
123
1581
131
1578
1586
115
1585
1583
173
109
15791578
112
150 1585
1584
1580
1588
1577
136
132
148
80
1583 124 1582
1578135 137
1584113
1588
108
133
1587 81
79
1584
1586
143
1590138
1583 71 70
106
1585
1590
114
1596
77
1592 96
1593 134 1593 1593 140
1584
159776
1598
1592
97
82
74
1597
73
15931594 67 1598
1584
139
1595
1598
83
1597
72
9816021600 1599
85 1599
68
15991598
60
1602
1600
63
61
99
59
1600
66 64
1598
1606
1600
62
1597
69
87
1604
88
58
100 1606
1603 1604 1604
94
16041604
1604 57
65
89
1601
1602
34
102
1605
1608
1603 92 1603
1605
93
56
35 1605
1603 33
1609
1623
1604
32
25
54 1605
24 23 95 160422
21
1611
1605
36 49
50
1624
201611
1605
26 161816091605 1605 1605
40 37 1606 1605
19 41
1605
48
1611
28
162827
1610 1606 42
18
29
1616 161039 38
43 1606
1628
1631
30
1608
1628 171621
1609 1609
4
1607
31
1636
13 1625
47 44
3
1637 16335
1628
1608 1608
6
2
1639 7
1
1632
1640 81637 1633
1656
9
10 1636
1635 1635

GoM : Phed

DPR of GSWSP (Phase III)

166

Page 1
7/24/2008 9:47:05 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone V Nongthymmai.net
Zone - V (Nongthymmai & Pohkseh)
Link - Node Table:
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------1
1
2
157
400
2
2
3
46
300
3
3
31
50
300
4
31
4
59
150
5
4
5
48
150
6
5
6
100
200
7
6
7
112
200
8
7
2
70
300
9
7
8
25
100
10
8
9
139
100
11
9
10
45
100
12
10
8
68
100
15
5
13
52
200
19
13
17
68
250
20
17
18
70
250
21
18
19
68
250
22
19
20
70
250
23
20
21
118
150
24
21
22
66
100
25
22
95
66
100
26
95
23
39
100
27
23
24
39
100
28
24
25
40
100
29
25
26
103
150
30
26
27
102
200
31
27
28
67
150
32
28
29
67
150
33
29
5
68
100
34
27
30
53
200
35
30
31
54
200
36
20
32
63
250
37
32
33
64
250
38
33
34
62
300
39
34
35
33
200
40
35
36
65
250
41
36
37
60
100
42
37
38
62
100

GoM : Phed

DPR of GSWSP (Phase-III)

167

Page 2
Zone - V (Nongthymmai & Pohkseh)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------43
38
39
57
200
44
39
40
58
200
45
40
41
58
200
46
41
33
56
200
47
38
42
56
200
48
42
43
100
200
49
43
44
85
100
52
44
47
59
100
53
47
38
60
100
54
43
48
70
100
55
48
49
84
100
56
49
36
82
150
57
42
36
70
100
58
49
50
74
100
62
50
54
23
100
64
54
56
61
100
65
56
57
61
100
67
57
58
58
100
68
58
59
59
100
69
59
60
57
100
70
60
61
5
100
71
61
62
60
100
72
62
57
62
150
73
62
63
60
200
74
63
64
50
150
75
64
65
92
150
76
65
35
93
200
77
64
66
81
150
78
66
65
80
150
79
66
67
42
100
80
67
68
134
100
81
68
69
67
100
82
69
34
122
150
83
68
70
121
100
84
70
71
120
100
85
71
72
122
100
86
72
69
120
150
87
72
73
48
100
88
73
74
50
100
90
74
76
46
150
91
76
77
71
150
93
77
79
68
100
94
79
80
68
100
95
80
81
111
100
96
81
82
38
100
97
82
83
38
100
99
83
85
42
100

GoM : Phed

DPR of GSWSP (Phase-III)

168

Page 3
Zone - V (Nongthymmai & Pohkseh)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------101
85
76
50
100
102
85
87
67
100
103
87
88
54
100
104
88
89
39
100
107
87
92
76
100
108
92
93
77
100
109
93
95
42
100
110
93
94
65
100
111
94
87
68
100
112
89
21
98
100
113
81
96
40
100
114
96
97
48
100
115
97
98
78
100
116
98
99
79
100
117
99
100
77
100
119
100
102
61
100
120
102
25
37
100
124
97
106
67
100
126
106
108
68
100
127
108
109
68
100
129
109
112
70
100
130
112
113
72
100
131
113
114
95
100
132
114
115
69
100
133
115
113
76
100
134
115
116
18
100
137
116
119
178
100
138
119
120
48
100
139
120
121
46
100
140
121
111
75
100
141
111
109
78
100
142
121
122
65
100
143
122
123
87
100
144
123
124
90
100
145
124
71
95
100
146
80
122
149
100
147
124
125
72
100
149
125
127
37
100
150
127
128
71
100
151
128
129
17
100
152
129
130
73
100
153
130
131
47
100
154
131
132
85
100
155
132
133
90
100
156
133
134
80
100
157
134
67
107
100
158
134
135
80
100

GoM : Phed

DPR of GSWSP (Phase-III)

169

Page 4
Zone - V (Nongthymmai & Pohkseh)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------159
135
136
92
100
160
136
137
66
100
161
137
138
70
100
162
138
139
75
100
163
139
63
77
150
164
139
140
9
150
167
140
143
56
150
172
143
148
74
100
174
148
150
71
100
175
150
151
120
100
176
151
152
118
100
178
152
154
80
100
181
154
157
85
100
182
157
158
90
100
183
158
159
89
100
184
159
160
90
100
185
160
161
92
100
186
161
163
88
100
187
163
158
96
100
189
154
164
35
100
190
164
165
83
100
191
165
166
85
100
192
166
167
90
100
193
167
168
53
100
194
168
169
49
100
195
169
170
33
100
196
170
171
76
100
197
171
172
68
100
198
172
150
70
100
199
171
173
82
100
200
173
143
95
100
201
170
174
70
100
202
174
136
85
100
203
169
175
83
100
204
175
176
48
100
206
176
178
62
100
207
178
131
65
100
208
175
179
48
100
209
179
130
50
100
210
179
180
60
100
211
180
181
78
100
212
181
182
80
100
213
182
129
89
100
214
182
183
75
100
215
183
184
88
100
216
184
128
148
100
217
184
185
78
100

GoM : Phed

DPR of GSWSP (Phase-III)

170

Page 5
Zone - V (Nongthymmai & Pohkseh)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------218
185
186
60
100
219
186
127
78
100
220
185
187
49
100
221
187
123
70
100
222
187
188
44
100
223
188
122
51
100
224
188
189
99
100
225
189
190
38
100
226
190
191
114
100
228
191
193
95
100
229
193
194
90
100
230
194
195
105
100
231
195
196
103
100
232
196
119
31
100
235
189
199
58
100
236
199
184
134
100
237
199
200
61
100
238
200
202
70
100
240
202
204
70
100
241
204
205
74
100
242
205
206
34
100
243
206
207
66
100
244
205
208
145
100
248
208
212
10
100
250
212
214
60
100
251
214
201
71
150
252
201
200
76
100
253
214
215
42
100
254
215
191
79
100
256
207
217
79
100
257
217
218
106
100
258
218
219
44
100
260
219
221
19
100
261
221
184
112
100
263
218
223
55
100
265
223
225
141
100
266
225
230
59
100
267
230
181
39
100
268
225
226
105
100
269
226
227
104
100
271
227
229
115
100
272
229
217
120
100
273
230
231
33
100
274
231
168
100
100
275
231
232
80
100
277
232
234
71
100
278
234
167
73
150

GoM : Phed

DPR of GSWSP (Phase-III)

171

Page 6
Zone - V (Nongthymmai & Pohkseh)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------291
245
246
154
100
295
245
250
55
100
296
250
251
57
100
297
251
252
87
100
299
252
253
70
100
300
253
254
82
100
301
254
255
77
100
302
255
256
77
100
303
256
253
72
200
304
256
257
92
100
305
257
258
131
100
307
258
260
34
100
308
260
261
120
100
309
261
262
90
100
310
261
263
96
100
311
263
264
100
100
312
264
207
40
100
313
264
265
158
100
314
265
266
110
100
315
266
267
115
100
317
267
269
107
100
318
269
270
110
100
319
270
271
118
100
320
271
206
98
100
321
265
272
55
100
322
272
273
32
100
323
273
317
65
100
324
317
274
70
100
325
274
275
71
100
327
275
277
38
100
330
277
280
34
100
331
280
281
80
100
332
281
282
65
100
333
282
283
90
100
334
283
284
92
100
335
284
285
58
100
336
285
273
73
100
337
285
286
55
200
338
286
282
140
100
339
286
287
29
100
340
287
281
132
100
341
287
274
69
100
342
281
288
144
100
343
288
289
145
100
344
289
290
140
100
346
290
292
141
100
347
292
293
133
100

GoM : Phed

DPR of GSWSP (Phase-III)

172

Page 7
Zone - V (Nongthymmai & Pohkseh)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------348
293
262
90
100
349
293
294
35
200
350
294
295
100
100
351
257
294
187
100
352
295
296
102
100
353
296
297
85
100
354
297
251
82
100
355
296
298
119
100
356
298
294
189
100
357
298
299
58
100
358
299
292
89
100
359
299
300
78
200
360
300
301
79
200
361
301
302
65
200
364
301
306
90
100
365
306
307
114
100
366
307
308
85
100
367
308
309
83
100
368
309
305
90
100
369
305
302
99
100
371
307
311
43
100
374
311
314
100
100
375
314
315
101
100
376
261
272
118
100
377
293
284
120
100
378
190
120
45
100
379
246
315
35
100
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------2
0.00
1654.61
14.61
3
2.40
1653.98
14.98
4
1.35
1648.65
15.65
5
0.00
1644.99
12.99
6
2.40
1649.20
16.20
7
0.00
1654.12
17.12
8
0.00
1653.90
17.90
9
3.60
1653.66
18.66
10
3.60
1653.66
18.66
31
0.00
1653.32
16.32
13
2.40
1638.36
10.36
17
2.40
1635.50
10.50
18
2.40
1632.64
11.64
19
2.40
1629.92
13.92

GoM : Phed

DPR of GSWSP (Phase-III)

173

Page 8
Zone - V (Nongthymmai & Pohkseh)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------20
0.00
1627.19
16.19
21
0.00
1626.44
21.44
22
0.42
1626.48
21.48
95
0.00
1626.54
21.54
23
1.08
1630.99
21.99
24
1.95
1635.76
17.76
25
0.00
1641.27
17.27
26
1.50
1648.04
20.04
27
0.00
1649.77
18.77
28
4.35
1648.85
20.85
29
4.35
1648.19
20.19
30
2.40
1651.49
15.49
32
0.75
1625.16
14.16
33
0.00
1623.12
12.12
34
0.00
1622.59
13.59
35
0.00
1621.78
16.78
36
0.00
1621.77
15.77
37
6.51
1621.77
15.77
38
0.00
1622.29
13.29
39
1.80
1622.43
13.43
40
4.80
1622.59
12.59
41
4.80
1622.82
12.82
42
0.00
1622.24
14.24
43
0.00
1622.21
15.21
44
1.80
1622.20
14.20
47
1.80
1622.20
14.20
48
0.90
1621.85
15.85
49
0.00
1621.53
16.53
50
1.80
1618.63
13.63
54
1.80
1617.90
12.90
56
1.80
1616.41
11.41
57
0.00
1615.30
10.30
58
1.80
1615.09
10.09
59
3.60
1615.00
11.00
60
1.80
1615.01
11.01
61
1.80
1615.02
11.02
62
0.00
1615.25
11.25
63
0.00
1615.25
12.25
64
0.00
1617.48
13.48
65
0.00
1619.75
14.75
66
0.00
1617.81
13.81
67
0.00
1614.78
12.78
68
0.00
1614.84
17.84
69
0.00
1617.36
16.36
70
5.58
1611.02
17.02
71
0.00
1609.53
16.53
72
0.00
1614.84
16.84

GoM : Phed

DPR of GSWSP (Phase-III)

174

Page 9
Zone - V (Nongthymmai & Pohkseh)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------73
5.79
1612.92
14.92
74
0.00
1612.04
13.04
76
0.00
1611.93
12.93
77
4.65
1611.36
13.36
79
4.65
1608.98
11.98
80
0.00
1607.78
11.78
81
0.00
1609.43
11.43
82
4.80
1609.81
10.81
83
4.80
1610.75
10.75
85
0.00
1612.65
12.65
87
0.00
1619.42
17.42
88
5.40
1620.03
17.03
89
5.40
1621.15
18.15
92
2.40
1620.59
16.59
93
0.00
1622.38
18.38
94
5.40
1620.31
17.31
96
2.40
1609.45
9.45
97
0.00
1609.61
7.61
98
1.80
1615.45
9.45
99
1.80
1622.26
16.26
100
1.80
1629.84
21.84
102
1.80
1636.64
13.64
106
0.48
1606.19
9.19
108
0.48
1602.89
10.89
109
0.00
1599.74
12.74
111
2.58
1598.78
14.78
112
1.26
1598.82
14.82
113
0.00
1598.11
14.11
114
0.75
1597.92
13.92
115
0.00
1597.83
13.83
116
1.26
1597.68
12.68
119
0.00
1596.69
20.69
120
0.00
1596.79
17.79
121
0.00
1598.30
16.30
122
0.00
1599.09
16.09
123
0.00
1599.10
16.10
124
0.00
1600.67
17.67
125
4.20
1598.11
16.11
127
0.00
1597.39
17.39
128
0.00
1596.77
17.77
129
0.00
1596.77
18.77
130
0.00
1597.42
19.42
131
0.00
1597.93
19.93
132
2.85
1599.42
14.42
133
5.58
1601.89
8.89
134
0.00
1606.13
8.13
135
2.40
1605.79
12.79

GoM : Phed

DPR of GSWSP (Phase-III)

175

Page 10
Zone - V (Nongthymmai & Pohkseh)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------136
0.00
1605.68
15.68
137
2.40
1606.91
13.91
138
2.40
1608.82
13.82
139
0.00
1611.61
11.61
140
2.61
1611.39
14.39
143
0.00
1610.22
18.22
148
1.38
1606.91
16.91
150
0.00
1604.20
18.20
151
1.20
1600.49
15.49
152
1.80
1597.39
14.39
154
0.00
1595.81
12.81
157
0.78
1594.09
11.09
158
0.00
1592.50
9.50
159
2.58
1592.06
9.06
160
2.58
1591.93
9.93
161
2.58
1591.93
9.93
163
2.58
1592.05
9.05
164
0.36
1595.81
13.81
165
3.36
1595.81
13.81
166
0.36
1596.05
15.05
167
0.00
1596.35
15.35
168
0.00
1596.99
16.99
169
0.00
1598.96
13.96
170
0.00
1601.92
15.92
171
0.00
1604.16
18.16
172
1.38
1604.16
18.16
173
2.61
1606.48
18.48
174
1.80
1603.37
15.37
175
0.00
1597.88
20.88
176
1.80
1597.86
20.86
178
1.80
1597.86
20.86
179
0.00
1597.41
18.41
180
0.78
1596.71
20.71
181
0.00
1595.94
19.94
182
0.00
1596.00
19.00
183
2.34
1595.63
19.63
184
0.00
1595.48
19.48
185
0.00
1597.14
18.14
186
2.58
1597.16
18.16
187
0.00
1597.97
16.97
188
0.00
1597.97
17.97
189
0.00
1595.88
17.88
190
0.00
1595.88
17.88
191
0.00
1593.96
18.96
193
1.38
1594.18
19.18
194
1.38
1594.55
18.55
195
1.38
1595.26
18.26

GoM : Phed

DPR of GSWSP (Phase-III)

176

Page 11
Zone - V (Nongthymmai & Pohkseh)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------196
1.38
1596.27
18.27
199
0.00
1594.44
18.44
200
0.00
1591.10
15.10
201
0.45
1590.89
15.89
202
1.68
1588.54
17.54
204
1.68
1586.48
18.48
205
0.00
1584.78
19.78
206
0.00
1581.72
21.72
207
0.00
1579.98
20.98
208
0.60
1588.68
19.68
212
0.60
1588.97
15.97
214
0.00
1590.87
16.87
215
2.58
1591.69
17.69
217
0.00
1585.57
23.57
218
0.00
1590.22
20.22
219
0.26
1591.22
21.22
221
2.58
1591.67
21.67
223
2.34
1590.47
20.47
225
0.00
1591.79
15.79
226
2.58
1589.06
22.06
227
2.58
1587.27
19.27
229
2.58
1586.13
22.13
230
0.00
1595.36
18.36
231
0.00
1595.98
17.98
232
0.60
1596.13
16.13
234
0.60
1596.31
15.31
245
1.08
1557.57
17.57
246
1.08
1557.47
17.47
250
1.08
1557.67
17.67
251
0.00
1557.84
17.84
252
0.60
1558.12
16.12
253
0.00
1558.40
18.40
254
0.60
1558.40
18.40
255
0.60
1558.40
18.40
256
0.00
1558.42
18.42
257
0.00
1558.99
18.99
258
3.60
1559.51
19.51
260
3.60
1559.90
18.90
261
0.00
1562.62
14.62
262
3.60
1560.33
19.33
263
3.60
1566.92
16.92
264
0.00
1573.31
14.31
265
0.00
1568.41
18.41
266
0.36
1570.30
21.30
267
0.36
1572.41
15.41
269
0.36
1574.50
15.50
270
0.45
1576.78
17.78

GoM : Phed

DPR of GSWSP (Phase-III)

177

Page 12
Zone - V (Nongthymmai & Pohkseh)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------271
0.36
1579.41
20.41
272
0.00
1563.71
13.71
317
0.36
1561.76
16.76
273
0.00
1562.30
21.30
274
0.00
1561.22
19.22
275
0.36
1561.06
19.06
277
0.36
1560.98
18.98
280
0.36
1560.93
16.93
281
0.00
1560.84
17.84
282
0.00
1560.84
17.84
283
1.20
1560.68
16.68
284
0.00
1560.62
15.62
285
0.00
1561.10
19.10
286
0.00
1561.09
18.09
287
0.00
1561.09
18.09
288
0.90
1560.01
18.01
289
0.90
1559.40
18.40
290
0.90
1559.01
18.01
292
0.00
1558.77
16.77
293
0.00
1559.10
19.10
294
0.00
1559.06
17.06
295
7.20
1558.04
18.04
296
0.00
1558.03
17.03
297
2.58
1557.84
17.84
298
0.00
1558.20
16.20
299
0.00
1558.09
17.09
300
0.30
1558.05
18.05
301
0.00
1558.01
18.01
302
1.05
1558.00
18.00
305
1.05
1557.75
17.75
306
2.58
1557.66
15.66
307
0.00
1557.57
35.57
308
1.05
1557.57
17.57
309
1.05
1557.62
17.62
311
1.08
1557.51
17.51
314
1.08
1557.47
17.47
315
1.08
1557.46
17.46
1
-272.93
1656.00
0.00
Reservoir

GoM : Phed

DPR of GSWSP (Phase-III)

178

Page 13
Zone - V (Nongthymmai & Pohkseh)
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
272.93
2.17
8.87
Open
2
161.06
2.28
13.56
Open
3
158.66
2.25
13.19
Open
4
67.49
3.82
79.24
Open
5
66.14
3.75
76.33
Open
6
-102.27
3.26
42.13
Open
7
-104.67
3.33
43.98
Open
8
-111.87
1.58
6.90
Open
9
7.20
0.92
9.05
Open
10
2.93
0.37
1.72
Open
11
-0.67
0.08
0.11
Open
12
-4.27
0.54
3.43
Open
15
185.94
5.92
127.49
Open
19
183.54
3.74
41.97
Open
20
181.14
3.69
40.96
Open
21
178.74
3.64
39.96
Open
22
176.34
3.59
38.98
Open
23
17.23
0.98
6.32
Open
24
-1.66
0.21
0.60
Open
25
-2.08
0.26
0.91
Open
26
-28.28
3.60
114.04
Open
27
-29.36
3.74
122.23
Open
28
-31.31
3.99
137.69
Open
29
-61.03
3.46
65.77
Open
30
-62.53
1.99
16.94
Open
31
26.24
1.49
13.77
Open
32
21.89
1.24
9.84
Open
33
17.54
2.23
47.06
Open
34
-88.77
2.83
32.42
Open
35
-91.17
2.90
34.06
Open
36
159.12
3.24
32.22
Open
37
158.37
3.23
31.94
Open
38
125.02
1.77
8.48
Open
39
76.57
2.44
24.66
Open
40
4.97
0.10
0.05
Open
41
-0.35
0.04
0.03
Open
42
-6.86
0.87
8.27
Open
43
-21.95
0.70
2.44
Open
44
-23.75
0.76
2.82
Open
45
-28.55
0.91
3.96
Open
46
-33.35
1.06
5.29
Open
47
12.48
0.40
0.86
Open
48
6.37
0.20
0.25
Open
49
0.99
0.13
0.23
Open
52
-0.81
0.10
0.16
Open
53
-2.61
0.33
1.38
Open
54
5.38
0.68
5.27
Open

GoM : Phed

DPR of GSWSP (Phase-III)

179

Page 14
Zone - V (Nongthymmai & Pohkseh)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------55
4.48
0.57
3.75
Open
56
-11.43
0.65
2.95
Open
57
6.11
0.78
6.66
Open
58
15.90
2.03
39.26
Open
62
14.10
1.80
31.43
Open
64
12.30
1.57
24.41
Open
65
10.50
1.34
18.21
Open
67
4.48
0.57
3.76
Open
68
2.68
0.34
1.45
Open
69
-0.92
0.12
0.20
Open
70
-2.72
0.35
1.49
Open
71
-4.52
0.58
3.82
Open
72
-6.02
0.34
0.90
Open
73
1.50
0.05
0.02
Open
74
-49.53
2.80
44.67
Open
75
-35.96
2.04
24.69
Open
76
-71.61
2.28
21.77
Open
77
-13.56
0.77
4.06
Open
78
-35.64
2.02
24.29
Open
79
22.08
2.81
72.10
Open
80
-1.41
0.18
0.44
Open
81
-15.54
1.98
37.60
Open
82
-48.45
2.74
42.88
Open
83
14.13
1.80
31.54
Open
84
8.55
1.09
12.44
Open
85
-16.82
2.14
43.56
Open
86
-32.91
1.86
20.95
Open
87
16.09
2.05
40.14
Open
88
10.30
1.31
17.57
Open
90
10.30
0.58
2.44
Open
91
19.60
1.11
8.02
Open
93
14.95
1.90
35.00
Open
94
10.30
1.31
17.55
Open
95
-9.39
1.20
14.81
Open
96
-7.59
0.97
9.99
Open
97
-12.39
1.58
24.75
Open
99
-17.19
2.19
45.38
Open
101
9.29
1.18
14.52
Open
102
-26.49
3.37
101.01
Open
103
-8.08
1.03
11.22
Open
104
-13.48
1.72
28.93
Open
107
-9.60
1.22
15.41
Open
108
-12.00
1.53
23.30
Open
109
-26.20
3.34
99.01
Open
110
14.21
1.81
31.86
Open
111
8.81
1.12
13.14
Open
112
-18.88
2.41
53.98
Open

GoM : Phed

DPR of GSWSP (Phase-III)

180

Page 15
Zone - V (Nongthymmai & Pohkseh)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------113
-1.80
0.23
0.69
Open
114
-4.20
0.53
3.33
Open
115
-22.52
2.87
74.81
Open
116
-24.32
3.10
86.26
Open
117
-26.12
3.33
98.45
Open
119
-27.92
3.56
111.38
Open
120
-29.72
3.79
125.04
Open
124
18.33
2.33
51.06
Open
126
17.85
2.27
48.61
Open
127
17.37
2.21
46.22
Open
129
8.83
1.12
13.20
Open
130
7.57
0.96
9.93
Open
131
3.19
0.41
2.00
Open
132
2.44
0.31
1.22
Open
133
-4.38
0.56
3.61
Open
134
6.82
0.87
8.19
Open
137
5.56
0.71
5.61
Open
138
-3.34
0.43
2.18
Open
139
-14.43
1.84
32.79
Open
140
-5.96
0.76
6.37
Open
141
-8.54
1.09
12.40
Open
142
-8.47
1.08
12.23
Open
143
-0.43
0.06
0.05
Open
144
-10.27
1.31
17.49
Open
145
-25.37
3.23
93.24
Open
146
19.69
2.51
58.31
Open
147
15.09
1.92
35.64
Open
149
10.89
1.39
19.48
Open
150
7.01
0.89
8.60
Open
151
-0.06
0.01
0.00
Open
152
-7.12
0.91
8.87
Open
153
-7.96
1.01
10.91
Open
154
-10.26
1.31
17.45
Open
155
-13.11
1.67
27.48
Open
156
-18.69
2.38
52.98
Open
157
-23.49
2.99
80.85
Open
158
4.79
0.61
4.26
Open
159
2.39
0.30
1.18
Open
160
-10.65
1.36
18.69
Open
161
-13.05
1.66
27.23
Open
162
-15.45
1.97
37.22
Open
163
-51.03
2.89
47.21
Open
164
35.58
2.01
24.21
Open
167
32.97
1.87
21.02
Open
172
17.04
2.17
44.64
Open
174
15.66
2.00
38.18
Open
175
13.99
1.78
30.97
Open

GoM : Phed

DPR of GSWSP (Phase-III)

181

Page 16
Zone - V (Nongthymmai & Pohkseh)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------176
12.79
1.63
26.23
Open
178
10.99
1.40
19.81
Open
181
11.10
1.41
20.18
Open
182
10.32
1.31
17.63
Open
183
5.22
0.67
4.99
Open
184
2.64
0.34
1.42
Open
185
0.06
0.01
0.00
Open
186
-2.52
0.32
1.29
Open
187
-5.10
0.65
4.77
Open
189
-0.11
0.01
0.00
Open
190
-0.47
0.06
0.06
Open
191
-3.83
0.49
2.81
Open
192
-4.19
0.53
3.32
Open
193
-8.45
1.08
12.16
Open
194
-16.09
2.05
40.11
Open
195
-24.85
3.17
89.77
Open
196
-13.61
1.73
29.43
Open
197
-0.29
0.04
0.02
Open
198
-1.67
0.21
0.61
Open
199
-13.32
1.70
28.26
Open
200
-15.93
2.03
39.37
Open
201
-11.24
1.43
20.66
Open
202
-13.04
1.66
27.20
Open
203
8.77
1.12
13.03
Open
204
1.30
0.17
0.38
Open
206
-0.50
0.06
0.06
Open
207
-2.30
0.29
1.09
Open
208
7.47
0.95
9.68
Open
209
-0.84
0.11
0.17
Open
210
8.31
1.06
11.80
Open
211
7.53
0.96
9.83
Open
212
-1.86
0.24
0.73
Open
213
-7.06
0.90
8.73
Open
214
5.20
0.66
4.96
Open
215
2.86
0.36
1.64
Open
216
-7.07
0.90
8.74
Open
217
-11.41
1.45
21.24
Open
218
-1.31
0.17
0.38
Open
219
-3.89
0.49
2.89
Open
220
-10.11
1.29
16.96
Open
221
-9.84
1.25
16.15
Open
222
-0.26
0.03
0.02
Open
223
-11.65
1.48
22.06
Open
224
11.39
1.45
21.15
Open
225
-1.01
0.13
0.24
Open
226
10.07
1.28
16.86
Open
228
-3.38
0.43
2.23
Open

GoM : Phed

DPR of GSWSP (Phase-III)

182

Page 17
Zone - V (Nongthymmai & Pohkseh)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------229
-4.76
0.61
4.21
Open
230
-6.14
0.78
6.74
Open
231
-7.52
0.96
9.81
Open
232
-8.90
1.13
13.40
Open
235
12.40
1.58
24.77
Open
236
-6.63
0.85
7.77
Open
237
19.03
2.42
54.77
Open
238
15.29
1.95
36.51
Open
240
13.61
1.73
29.43
Open
241
11.93
1.52
23.05
Open
242
24.90
3.17
90.05
Open
243
12.82
1.63
26.36
Open
244
-12.97
1.65
26.90
Open
248
-13.57
1.73
29.26
Open
250
-14.17
1.80
31.70
Open
251
-3.29
0.19
0.30
Open
252
-3.74
0.48
2.70
Open
253
-10.87
1.39
19.42
Open
254
-13.45
1.71
28.80
Open
256
-21.87
2.79
70.87
Open
257
-16.87
2.15
43.80
Open
258
-11.87
1.51
22.85
Open
260
-12.13
1.55
23.77
Open
261
-14.71
1.87
33.98
Open
263
-5.00
0.64
4.61
Open
265
-7.34
0.93
9.38
Open
266
-20.08
2.56
60.49
Open
267
-9.39
1.20
14.79
Open
268
12.74
1.62
26.06
Open
269
10.16
1.29
17.14
Open
271
7.58
0.97
9.97
Open
272
5.00
0.64
4.61
Open
273
-10.70
1.36
18.84
Open
274
-7.64
0.97
10.10
Open
275
-3.06
0.39
1.85
Open
277
-3.66
0.47
2.58
Open
278
-4.26
0.24
0.47
Open
291
1.80
0.23
0.70
Open
295
-2.88
0.37
1.66
Open
296
-3.96
0.50
2.99
Open
297
-4.11
0.52
3.20
Open
299
-4.71
0.60
4.12
Open
300
0.36
0.05
0.03
Open
301
-0.24
0.03
0.02
Open
302
-0.84
0.11
0.17
Open
303
5.07
0.16
0.16
Open
304
-5.91
0.75
6.28
Open

GoM : Phed

DPR of GSWSP (Phase-III)

183

Page 18
Zone - V (Nongthymmai & Pohkseh)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------305
-4.60
0.59
3.96
Open
307
-8.20
1.05
11.53
Open
308
-11.80
1.50
22.61
Open
309
12.58
1.60
25.43
Open
310
-17.09
2.18
44.86
Open
311
-20.69
2.64
63.91
Open
312
-34.70
4.42
166.54
Open
313
14.01
1.78
31.05
Open
314
-10.18
1.30
17.20
Open
315
-10.54
1.34
18.34
Open
317
-10.90
1.39
19.51
Open
318
-11.26
1.43
20.72
Open
319
-11.71
1.49
22.28
Open
320
-12.07
1.54
23.57
Open
321
24.19
3.08
85.40
Open
322
16.90
2.15
43.93
Open
323
6.93
0.88
8.42
Open
324
6.57
0.84
7.63
Open
325
3.48
0.44
2.36
Open
327
3.12
0.40
1.93
Open
330
2.76
0.35
1.54
Open
331
2.40
0.31
1.19
Open
332
-0.09
0.01
0.00
Open
333
2.96
0.38
1.75
Open
334
1.76
0.22
0.67
Open
335
-6.86
0.87
8.28
Open
336
-9.97
1.27
16.54
Open
337
3.11
0.10
0.06
Open
338
3.05
0.39
1.84
Open
339
0.06
0.01
0.00
Open
340
3.15
0.40
1.95
Open
341
-3.08
0.39
1.88
Open
342
5.64
0.72
5.75
Open
343
4.74
0.60
4.17
Open
344
3.84
0.49
2.82
Open
346
2.94
0.37
1.72
Open
347
-3.60
0.46
2.51
Open
348
-8.98
1.14
13.62
Open
349
14.00
0.45
1.06
Open
350
7.72
0.98
10.29
Open
351
-1.30
0.17
0.38
Open
352
0.52
0.07
0.07
Open
353
2.43
0.31
2.26
Open
354
-0.15
0.02
0.01
Open
355
-1.92
0.24
1.45
Open
356
-4.98
0.63
4.57
Open
357
3.06
0.39
1.86
Open

GoM : Phed

DPR of GSWSP (Phase-III)

184

Page 19
Zone - V (Nongthymmai & Pohkseh)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------358
-6.54
0.83
7.57
Open
359
9.60
0.31
0.53
Open
360
9.30
0.30
0.50
Open
361
4.73
0.15
0.14
Open
364
4.57
0.58
3.90
Open
365
1.99
0.25
0.83
Open
366
-0.53
0.07
0.07
Open
367
-1.58
0.20
0.55
Open
368
-2.63
0.34
1.40
Open
369
-3.68
0.47
2.61
Open
371
2.52
0.32
1.29
Open
374
1.44
0.18
0.46
Open
375
0.36
0.05
0.03
Open
376
-7.30
0.93
9.27
Open
377
-8.62
1.10
12.63
Open
378
-11.09
1.41
20.13
Open
379
0.72
0.09
0.13
Open

GoM : Phed

DPR of GSWSP (Phase-III)

185

g,

,
i

Legends
Pipeline
Road
Zone Boundary

Reservoir

Distribution Network - Zone - VI: Pastuer Institute, LawmaIi, Part of Mawlai Mawroh, Polo Bazar, Polo Hills, Forest Colony, Nongmali

.03im

.045bn

Greater Shillong Water Supply Project (Phase III)

GoM:PHED

GoM : Phed

Length of pipe line required diameterwise


Zone VI
Area of Coverage : Pasteur Institute, Lawmali, Part of Mawlai Mawroh, Polo Bazar, Polo Hills, Forest Colony, Nongmali.
Sl.
No.

Pipe No.

Node No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)


187

From

To

500

450

400

200

150

100

1.

55.00

2.

93.00

3.

46.00

4.

84.00

5.

47.00

6.

10

10

131.00

7.

11

11

94.00

8.

11

12

12

158.00

9.

12

13

15

212.00

10.

13

14

16

94.00

11.

13

15

17

98.00

12.

15

16

18

106.00

13.

16

17

19

123.00

14.

17

18

20

240.00

15.

18

19

21

138.00

16.

19

20

22

281.00

17.

20

21

23

178.00

18.

21

22

24

187.00

19.

15

23

25

69.00

20.

23

24

26

130.00

21.

24

25

27

128.00

22.

25

26

28

161.00

23.

26

27

29

78.00

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

200

150

30

199.00

29

31

103.00

29

30

32

280.00

27.

30

31

33

367.00

28.

31

32

34

321.00

29.

32

33

35

187.00

30.

29

34

36

57.00

31.

34

35

37

148.00

32.

35

36

38

56.00

33.

36

37

39

130.00

34.

37

38

40

58.00

35.

38

39

41

52.00

36.

39

41

43

79.00

37.

41

42

44

74.00

38.

42

43

45

65.00

39.

43

44

46

234.00

40.

44

45

47

153.00

41.

45

46

48

60.00

42.

46

47

49

211.00

43.

47

48

50

275.00

44.

48

49

51

368.00

45.

45

50

52

49.00

46.

50

51

53

78.00

47.

50

52

54

91.00

48.

52

53

55

108.00

49.

51

41

57

148.00

From

To

24.

23

28

25.

28

26.

100

188

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

200

150

100

58

140.00

56

59

120.00

56

57

60

210.00

53.

57

58

61

148.00

54.

58

59

62

99.00

55.

59

60

63

83.00

56.

60

36

64

73.00

57.

58

61

65

75.00

58.

57

62

66

123.00

59.

62

63

67

160.00

60.

35

64

68

157.00

61.

64

65

69

153.00

62.

65

66

70

111.00

63.

65

67

71

153.00

64.

67

68

72

169.00

65.

68

69

73

198.00

66.

69

70

74

243.00

67.

70

71

75

127.00

68.

71

72

76

147.00

69.

70

73

77

210.00

70.

73

74

78

350.00

71.

74

75

79

416.00

72.

75

76

80

85.00

73.

76

77

81

71.00

74.

77

78

82

66.00

75.

76

80

84

134.00

From

To

50.

46

55

51.

55

52.

189

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

200

150

100

85

114.00

82

86

176.00

82

75

87

120.00

79.

81

83

88

179.00

80.

83

84

89

170.00

81.

84

85

90

208.00

82.

85

86

91

174.00

83.

86

87

92

160.00

84.

87

88

93

116.00

85.

81

89

94

116.00

86.

89

90

95

139.00

87.

90

91

96

107.00

88.

91

92

97

170.00

89.

92

82

99

52.00

90.

94

95

101

146.00

91.

95

96

102

77.00

92.

96

97

103

74.00

93.

97

98

104

92.00

94.

95

99

105

165.00

95.

99

100

106

159.00

96.

100

101

107

116.00

97.

101

102

108

33.00

98.

102

99

109

103.00

99.

99

103

110

93.00

100.

103

105

112

84.00

101.

105

106

113

108.00

From

To

76.

80

81

77.

81

78.

190

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

200

150

100

13

117.00

15

14

71.00

34

28

114

71.00

105.

51

38

115

106.00

106.

53

37

116

50.00

107.

91

94

100

123.00

108.

22

10

117

100.00

109.

17

118

125.00

110.

18

27

119

150.00

111.

49

78

120

150.00

112.

61

65

121

100.00

113.

66

106

122

150.00

114.

106

33

123

150.00

115.

100

98

124

120.00

116.

72

99

125

150.00

117

63

74

126

150.00

118

49

88

127

250.00

From

To

102.

14

103.

43

104.

Total :

55

309

487

413

2274

480

12269

191

ZONE -VI
'PROPOSED PIPELlNE ROUTE:

(?~

88

AREA OF COVERAGE:

1. Pasteur Institute
2. Lawmali

3. Part of Mawlai Mawroh


4. Polo Bazar
5. Polo Hills
6. Forest Colony
7. Nongmali

'0

'4

101
10:

0"

103

27

GoM :Phed

!6

DPR of GSWSP (phase III)

192

N
Elevation

Zone VI (Law Mali, Polo Bazar, Forest Colony etc.)

88
87

25.00

1439

50.00

1438

75.00

85

100.00

49

1444
48
1444

83

47
1444
46

56
52

1442

22
1440

10
1442

1442

1448

1438

1441

1439
14

13

1446

1442

42

63

38

37

1440

1440

20
1442

16

59

36

60

1438

1438

1446

1439

1442

17
1442

19
1440

1440
18

25

1439
27

26
1440

1440

24
1440

35

1440

34

23

1438

1440

69

58

1440

1444

15

91
94

1442

1440

1439
65

67

1439

97

1439

1440

1442

99

100

1438

1446

1438
105

1438

98
1445

103

1442

1438

1442

1441

68
61

96

95

72

1441

1441

102

101

1442

1440

1438
66

1438

106

1441

1439

28
1438

1442

1446

1440
71
70

1441

64
1455

1438

1442

1439

1442

73

1442
39

90

1442

1441

1440

53

51

43

1446

21

57

89

1443
92

74

1441

1442

44

82

62

41

1439

1445

1441

50

12

1442

1442

1442

1447

81

75

45

1439

76

55

1441

11

1446

1445

1442

1442

80

77

1438

1440

84
78

86

29
1438

33
30
1438

1439
31
1438

32
1438

1442

GoM : Phed

DPR of GSWSP (Phase III)

193

Page 1
6/18/2008 6:15:44 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone VI Lawmali.net
Zone VI (Law Mali, Polo Bazar, Forest Colony etc.)
Link - Node Table:
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------1
0
1
55
400
4
1
4
93
100
5
4
5
46
100
8
5
8
84
100
9
1
9
47
250
10
9
10
131
100
11
9
11
94
200
12
11
12
158
200
15
12
13
212
200
16
13
14
94
350
17
13
15
98
350
18
15
16
106
100
19
16
17
123
100
20
17
18
240
100
21
18
19
138
150
22
19
20
281
100
23
20
21
178
100
24
21
22
187
100
25
15
23
69
300
26
23
24
130
100
27
24
25
128
100
28
25
26
161
100
29
26
27
78
100
30
23
28
199
300
31
28
29
103
100
32
29
30
280
100
33
30
31
367
100
34
31
32
321
100
35
32
33
187
100
36
29
34
57
100
37
34
35
148
300
38
35
36
56
250
39
36
37
130
100
40
37
38
58
100
41
38
39
52
100
43
39
41
79
100
44
41
42
74
100

GoM : Phed

DPR of GSWSP (Phase-III)

194

Page 2 Zone VI (Law Mali, Polo Bazar, Forest Colony etc.)


Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------45
42
43
65
100
46
43
44
234
100
47
44
45
153
100
48
45
46
60
100
49
46
47
211
100
50
47
48
275
100
51
48
49
368
100
52
45
50
49
100
53
50
51
78
100
54
50
52
91
100
55
52
53
108
100
57
51
41
148
100
58
46
55
140
100
59
55
56
120
100
60
56
57
210
100
61
57
58
148
100
62
58
59
99
100
63
59
60
83
100
64
60
36
73
100
65
58
61
75
100
66
57
62
123
100
67
62
63
160
100
68
35
64
157
250
69
64
65
153
250
70
65
66
111
100
71
65
67
153
200
72
67
68
169
200
73
68
69
198
200
74
69
70
243
200
75
70
71
127
100
76
71
72
147
100
77
70
73
210
200
78
73
74
350
200
79
74
75
416
200
80
75
76
85
100
81
76
77
71
100
82
77
78
66
100
84
76
80
134
100
85
80
81
114
100
86
81
82
176
100
87
82
75
120
150
88
81
83
179
100
89
83
84
170
100
90
84
85
208
100
91
85
86
174
100
92
86
87
160
100
93
87
88
116
100

GoM : Phed

DPR of GSWSP (Phase-III)

195

Page 3 Zone VI (Law Mali, Polo Bazar, Forest Colony etc.)


Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------94
81
89
116
100
95
89
90
139
100
96
90
91
107
100
97
91
92
170
150
99
92
82
52
150
101
94
95
146
100
102
95
96
77
100
103
96
97
74
100
104
97
98
92
100
105
95
99
165
100
106
99
100
159
100
107
100
101
116
100
108
101
102
33
100
109
102
99
103
100
110
99
103
93
100
112
103
105
84
100
113
105
106
108
100
13
14
1
117
350
14
43
15
71
200
114
34
28
71
300
115
51
38
106
100
116
53
37
50
100
100
91
94
123
100
117
22
10
100
100
118
8
17
125
100
119
18
27
150
100
120
49
78
150
100
121
61
65
100
100
122
66
106
150
100
123
106
33
150
100
124
100
98
120
100
125
72
99
150
100
126
63
74
150
100
127
49
88
250
100
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------1
0.00
1454.98
6.98
4
0.46
1454.89
8.89
5
0.46
1454.86
12.86
8
0.15
1454.83
12.83
9
1.03
1454.98
8.98
10
0.09
1454.91
12.91
11
0.94
1454.96
7.96

GoM : Phed

DPR of GSWSP (Phase-III)

196

Page 4 Zone VI (Law Mali, Polo Bazar, Forest Colony etc.)


Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------12
0.94
1454.93
15.93
13
0.00
1454.91
12.91
14
0.94
1454.94
8.94
15
1.15
1454.87
14.87
16
1.04
1454.80
15.80
17
0.91
1454.79
14.79
18
0.78
1454.74
15.74
19
0.65
1454.74
14.74
20
0.52
1454.76
12.76
21
0.26
1454.80
12.80
22
0.13
1454.87
14.87
23
5.80
1454.84
14.84
24
0.88
1454.76
14.76
25
0.44
1454.74
14.74
26
0.22
1454.74
14.74
27
0.11
1454.74
12.74
28
0.00
1454.78
16.78
29
0.00
1454.75
16.75
30
1.12
1454.48
16.48
31
0.56
1454.39
16.39
32
0.28
1454.37
16.37
33
0.14
1454.37
15.37
34
0.00
1454.76
16.76
35
0.00
1454.73
16.73
36
0.00
1454.72
16.72
37
0.00
1454.67
14.67
38
0.00
1454.67
14.67
39
0.00
1454.67
10.67
41
0.00
1454.68
12.68
42
1.80
1454.72
15.72
43
0.00
1454.86
15.86
44
1.80
1454.56
16.56
45
0.00
1454.54
12.54
46
0.00
1454.42
13.42
47
0.36
1454.37
10.37
48
0.24
1454.34
12.34
49
0.12
1454.32
10.32
50
0.00
1454.60
12.60
51
0.00
1454.65
13.65
52
0.46
1454.61
12.61
53
0.00
1454.65
12.65
55
1.80
1454.29
13.29
56
1.80
1454.29
13.29
57
0.00
1454.39
14.39
58
0.00
1454.49
13.49
59
1.80
1454.49
14.49
60
1.80
1454.55
16.55

GoM : Phed

DPR of GSWSP (Phase-III)

197

Page 5
Zone VI (Law Mali, Polo Bazar, Forest Colony etc.)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------61
0.11
1454.55
15.55
62
0.23
1454.38
13.38
63
0.11
1454.38
13.38
64
0.69
1454.68
16.68
65
0.60
1454.64
16.64
66
0.09
1454.52
13.52
67
0.52
1454.58
12.58
68
0.52
1454.54
14.54
69
0.43
1454.49
13.49
70
0.34
1454.43
14.43
71
0.17
1454.34
15.34
72
0.09
1454.25
15.25
73
0.17
1454.41
14.41
74
0.09
1454.38
16.38
75
0.00
1454.35
12.35
76
0.00
1454.33
12.33
77
0.00
1454.33
9.33
78
0.05
1454.33
10.33
80
0.31
1454.31
8.31
81
0.00
1454.31
9.31
82
0.00
1454.32
11.32
83
0.28
1454.30
15.30
84
0.23
1454.29
12.29
85
0.18
1454.29
14.29
86
0.14
1454.30
16.30
87
0.09
1454.30
16.30
88
0.05
1454.31
15.31
89
0.31
1454.30
12.30
90
0.31
1454.30
12.30
91
0.00
1454.30
12.30
92
0.00
1454.32
12.32
94
0.90
1454.20
8.20
95
0.90
1454.16
13.16
96
0.14
1454.15
12.15
97
0.09
1454.15
12.15
98
0.05
1454.14
9.14
99
0.00
1454.17
16.17
100
0.94
1454.13
8.13
101
0.94
1454.13
14.13
102
0.94
1454.13
12.13
103
0.42
1454.21
16.21
105
0.28
1454.27
16.27
106
0.14
1454.37
15.37
0
-43.83
1455.00
0.00

GoM : Phed

DPR of GSWSP (Phase-III)

198

Page 6 Zone VI (Law Mali, Polo Bazar, Forest Colony etc.)


Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
43.83
0.35
0.30
Open
4
2.22
0.28
1.02
Open
5
1.76
0.22
0.67
Open
8
1.30
0.17
0.38
Open
9
8.34
0.17
0.14
Open
10
1.50
0.19
0.50
Open
11
5.81
0.19
0.21
Open
12
4.87
0.16
0.15
Open
15
3.93
0.13
0.10
Open
16
-32.33
0.34
0.33
Open
17
36.26
0.38
0.41
Open
18
1.74
0.22
0.65
Open
19
0.70
0.09
0.12
Open
20
0.94
0.12
0.21
Open
21
0.15
0.01
0.00
Open
22
-0.50
0.06
0.06
Open
23
-1.02
0.13
0.24
Open
24
-1.28
0.16
0.37
Open
25
27.54
0.39
0.51
Open
26
1.64
0.21
0.59
Open
27
0.76
0.10
0.14
Open
28
0.32
0.04
0.03
Open
29
0.10
0.01
0.00
Open
30
20.10
0.28
0.29
Open
31
1.15
0.15
0.30
Open
32
2.15
0.27
0.96
Open
33
1.03
0.13
0.24
Open
34
0.47
0.06
0.06
Open
35
0.19
0.02
0.01
Open
36
-0.99
0.13
0.23
Open
37
17.96
0.25
0.23
Open
38
4.94
0.10
0.05
Open
39
1.40
0.18
0.43
Open
40
0.18
0.02
0.01
Open
41
-0.62
0.08
0.09
Open
43
-0.62
0.08
0.10
Open
44
-1.52
0.19
0.51
Open
45
-3.32
0.42
2.16
Open
46
2.50
0.32
1.27
Open
47
0.70
0.09
0.12
Open
48
3.16
0.40
1.96
Open
49
1.02
0.13
0.24
Open
50
0.66
0.08
0.11
Open
51
0.42
0.05
0.05
Open
52
-2.46
0.31
1.24
Open
53
-1.70
0.22
0.63
Open
54
-0.76
0.10
0.14
Open

GoM : Phed

DPR of GSWSP (Phase-III)

199

Page 7 Zone VI (Law Mali, Polo Bazar, Forest Colony etc.)


Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------55
-1.22
0.16
0.34
Open
57
-0.91
0.12
0.20
Open
58
2.13
0.27
0.95
Open
59
0.33
0.04
0.03
Open
60
-1.47
0.19
0.48
Open
61
-1.83
0.23
0.72
Open
62
0.06
0.01
0.00
Open
63
-1.74
0.22
0.65
Open
64
-3.54
0.45
2.43
Open
65
-1.89
0.24
0.76
Open
66
0.36
0.05
0.04
Open
67
0.13
0.02
0.01
Open
68
13.02
0.27
0.31
Open
69
12.33
0.25
0.28
Open
70
2.26
0.29
1.06
Open
71
7.46
0.24
0.33
Open
72
6.94
0.22
0.29
Open
73
6.43
0.20
0.25
Open
74
6.00
0.19
0.22
Open
75
1.83
0.23
0.71
Open
76
1.66
0.21
0.60
Open
77
3.83
0.12
0.10
Open
78
3.65
0.12
0.09
Open
79
3.59
0.11
0.09
Open
80
0.95
0.12
0.21
Open
81
0.24
0.03
0.02
Open
82
0.24
0.03
0.02
Open
84
0.71
0.09
0.13
Open
85
0.40
0.05
0.04
Open
86
-0.61
0.08
0.09
Open
87
-2.64
0.15
0.19
Open
88
0.47
0.06
0.06
Open
89
0.19
0.02
0.01
Open
90
-0.04
0.00
0.00
Open
91
-0.22
0.03
0.01
Open
92
-0.36
0.05
0.04
Open
93
-0.45
0.06
0.05
Open
94
0.54
0.07
0.07
Open
95
0.23
0.03
0.01
Open
96
-0.09
0.01
0.00
Open
97
-2.03
0.11
0.12
Open
99
-2.03
0.11
0.12
Open
101
1.04
0.13
0.25
Open
102
0.69
0.09
0.12
Open
103
0.56
0.07
0.08
Open
104
0.46
0.06
0.06
Open
105
-0.55
0.07
0.08
Open

GoM : Phed

DPR of GSWSP (Phase-III)

200

Page 8
Zone VI (Law Mali, Polo Bazar, Forest Colony etc.)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------106
1.02
0.13
0.24
Open
107
0.49
0.06
0.06
Open
108
-0.45
0.06
0.05
Open
109
-1.39
0.18
0.43
Open
110
-1.38
0.18
0.43
Open
112
-1.80
0.23
0.70
Open
113
-2.08
0.27
0.91
Open
13
-33.27
0.35
0.34
Open
14
-5.82
0.19
0.21
Open
114
-18.95
0.27
0.26
Open
115
-0.80
0.10
0.15
Open
116
-1.22
0.16
0.34
Open
100
1.94
0.25
0.80
Open
117
-1.41
0.18
0.44
Open
118
1.15
0.15
0.30
Open
119
0.01
0.00
0.00
Open
120
-0.19
0.02
0.01
Open
121
-2.01
0.26
0.85
Open
122
2.18
0.28
0.99
Open
123
-0.05
0.01
0.00
Open
124
-0.42
0.05
0.05
Open
125
1.57
0.20
0.54
Open
126
0.02
0.00
0.00
Open
127
0.50
0.06
0.06
Open

GoM : Phed

DPR of GSWSP (Phase-III)

201

g,

,
i

Legends
Pipeline
Road
Zone Boundary

Reservoir

Distribution Network - Zone - VII: Pynthorumkhrah, Pynthorbah

.03im

.045bn

Greater Shillong Water Supply Project (Phase III)

GoM:PHED

GoM : Phed

Length of pipe line required diameterwise


Zone : VII
Area of coverage : Pynthorumkhrah, Pynthorbah, Lyngkien Shyiap.
Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

200

150

100

22.90

184.00

165.10

4.

260.70

5.

265.80

6.

281.37

7.

173.53

8.

158.00

9.

10

129.20

10.

10

11

10

69.43

11.

12

11

127.10

12.

12

13

12

81.50

13.

13

14

13

90.40

14.

14

15

14

143.60

15.

15

16

15

173.70

16.

14

18

17

116.60

17.

18

19

18

94.95

18.

19

19

95.30

19.

20

20

98.80

20.

20

21

21

143.68

21.

21

22

22

100.72

22.

22

23

23

144.10

From

To

1.

2.

3.

203

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

24

191.10

25

25

206.16

25

26

26

165.80

26.

26

27

27

130.60

27.

27

28

28

141.60

28.

28

29

29

145.90

29.

29

30

30

158.60

30.

30

20

31

119.40

31.

28

31

32

119.36

32.

31

32

33

233.80

33.

32

33

34

42.10

34.

33

34

35

99.74

35.

34

28

36

137.90

36.

33

35

37

195.64

37.

35

25

38

239.29

38.

33

36

39

200.10

39.

36

35

40

185.88

40.

36

37

41

49.40

41.

37

38

42

157.31

42.

38

39

43

164.80

43.

39

40

44

184.00

44.

42

46

138.13

45.

42

18

47

40.00

46.

42

43

48

284.77

47.

43

44

49

189.70

From

To

23.

23

24

24.

24

25.

204

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

50

132.50

46

51

150.30

46

47

52

103.50

51.

47

48

53

100.00

52.

48

49

54

159.10

53.

49

50

55

99.79

54.

50

37

56

175.20

55.

48

51

57

162.00

56.

51

52

58

223.50

57.

52

53

59

89.70

58.

53

54

60

131.60

59.

54

55

61

147.00

60.

55

49

62

236.48

61.

47

56

63

166.98

62.

56

57

64

165.98

63.

57

58

65

59.76

64.

58

59

66

73.44

65.

59

60

67

192.10

66.

60

61

68

199.27

67.

61

62

69

149.30

68.

62

63

70

137.00

69.

63

64

71

161.78

70.

64

57

72

235.76

71.

58

65

73

97.19

From

To

48.

44

45

49.

45

50.

205

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

74

173.10

66

75

36.50

66

67

76

200.00

75.

67

68

77

162.74

76.

68

69

78

184.21

77.

69

70

79

201.38

78.

70

71

80

183.95

79.

71

72

81

1422.00

80.

72

66

82

159.20

81.

49

45

83

183.00

82.

40

54

16

120.00

83.

12

16

45

150.00

84.

11

84

100.00

576.00

650.60

127.10

430.90

1710.15

1446.84

8925.28

From

To

72.

65

59

73.

56

74.

Total:

206

N
Elevation
10

25.00

Zone VII (Pynthorbah-Pynthorumkhrah)

1458

50.00
9

75.00
8

100.00
m

7
1

1463

1469

12

15
61
62

60

1421

1420

59

43

63

1421

1421

1430
1424

1421

46

1421

66
1424
1424

1420

1420

29

48

1460

28

23

1452

1455

1460

1448

49
1427

1422

1428

51
52

1426
53
1426

37

1448

27

1437

24

1448
26
1448

1448
36

55

35

1452
25
1450

1448

38

1428
54

33

50
1430

1425

22

31

32

1420
71

1463
30
21

34

47

72
70

1456

1428

1427

69

20

42

45

56
67

1465

1453
1430

68

1474

1464

1424
1423

1462
44

57

1463

1434

58

65

1465

1467
1460

64

1472

146718

1458

1485

1470 19

14

1421

1423

13

1467

11

1495
16

1458

1458

1435
39

1429

40
1426

1429
1426

GoM : Phed

DPR of GSWSP (Phase III)

208

Page 1
7/25/2008 3:20:11 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone VII pynthorumkhrah-pynthorbah.net

Link - Node Table:


---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------1
1
2
22.9
350
2
2
3
184
350
3
3
4
165.10
250
4
4
5
260.70
350
5
5
6
265.80
250
6
6
7
281.37
200
7
7
8
173.53
100
8
8
9
158.00
100
9
9
10
129.20
100
10
10
11
69.43
100
11
3
12
127.10
300
12
12
13
81.50
100
13
13
14
90.40
100
14
14
15
143.60
100
15
15
16
173.70
100
17
14
18
116.60
200
18
18
19
94.95
100
19
19
4
95.30
150
20
4
20
98.80
200
21
20
21
143.68
200
22
21
22
100.72
200
23
22
23
144.10
200
24
23
24
191.00
150
25
24
25
206.16
150
26
25
26
165.80
150
27
26
27
130.60
200
28
27
28
141.60
200
29
28
29
145.90
100
30
29
30
158.60
150
31
30
20
119.40
200
32
28
31
119.36
100
33
31
32
233.80
100
34
32
33
42.10
100
35
33
34
99.74
200
36
34
28
137.90
200
37
33
35
195.64
200
38
35
25
239.29
100

GoM : Phed

DPR of GSWSP (Phase-III)

209

Page 2
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------39
33
36
200.10
100
40
36
35
185.88
100
41
36
37
49.40
100
42
37
38
157.31
100
43
38
39
164.80
100
44
39
40
184.00
100
46
4
42
138.13
150
47
42
18
40.00
150
48
42
43
284.77
150
49
43
44
189.70
400
50
44
45
132.50
400
51
45
46
150.30
400
52
46
47
103.50
400
53
47
48
30.60
100
54
48
49
159.10
100
55
49
50
99.79
100
56
50
37
175.20
100
57
48
51
162.00
100
58
51
52
223.50
100
59
52
53
89.70
100
60
53
54
131.60
100
61
54
55
147.00
100
62
55
49
236.48
100
63
47
56
166.98
150
64
56
57
165.98
100
65
57
58
59.76
100
66
58
59
73.44
100
67
59
60
192.10
100
68
60
61
199.27
100
69
61
62
149.30
100
70
62
63
137.00
100
71
63
64
161.78
100
72
64
57
235.76
100
73
58
65
97.19
100
74
65
59
173.10
100
75
56
66
36.50
100
76
66
67
200
100
77
67
68
162.74
100
78
68
69
184.21
100
79
69
70
201.38
100
80
70
71
183.95
100
81
71
72
1422
100
82
72
66
159.20
100
83
49
45
183
350
16
40
54
120
100
45
12
16
150
100
84
11
9
100
100

GoM : Phed

DPR of GSWSP (Phase-III)

210

Page 3
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------2
0.00
1494.70
9.70
3
0.00
1492.30
18.30
4
0.00
1484.63
17.63
5
2.40
1484.59
19.59
6
2.40
1484.46
19.46
7
1.80
1484.15
21.15
8
1.80
1479.72
21.72
9
3.60
1476.69
18.69
10
3.60
1476.40
18.40
11
3.60
1476.41
18.41
12
0.00
1492.15
20.15
13
7.50
1485.02
15.02
14
0.00
1481.00
14.00
15
7.50
1481.29
14.29
16
7.50
1484.57
15.57
18
0.00
1480.75
20.75
19
6.75
1483.76
20.76
20
0.00
1479.81
16.81
21
6.00
1477.51
13.51
22
6.00
1476.18
16.17
23
6.00
1474.64
14.64
24
6.00
1468.16
16.16
25
0.00
1462.87
12.87
26
4.80
1460.50
12.50
27
4.80
1460.18
12.18
28
0.00
1459.95
9.95
29
12.00
1474.15
21.15
30
12.00
1478.48
16.48
31
7.50
1458.65
8.65
32
7.50
1458.63
10.63
33
0.00
1458.99
10.99
34
18.00
1459.15
11.15
35
0.00
1458.99
10.99
36
0.00
1455.77
18.77
37
0.00
1452.80
17.80
38
3.00
1449.09
20.09
39
3.00
1446.80
17.80
40
3.00
1445.59
19.59
42
0.00
1479.84
23.84
43
7.50
1450.64
16.64
44
7.50
1450.51
20.51
45
0.00
1450.43
20.43
46
9.00
1450.37
22.37
47
0.00
1450.34
23.34
48
0.00
1449.95
22.95
49
0.00
1450.42
22.42

GoM : Phed

DPR of GSWSP (Phase-III)

211

Page 4
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------50
3.00
1450.88
20.88
51
7.50
1445.88
19.88
52
7.50
1444.85
19.85
53
1.50
1444.96
18.96
54
0.00
1445.36
19.36
55
10.50
1445.39
17.39
56
0.00
1446.50
22.50
57
0.00
1437.31
13.31
58
0.00
1436.26
12.26
59
0.00
1435.80
12.80
60
3.30
1433.86
13.86
61
3.30
1433.16
12.16
62
3.30
1433.12
12.12
63
3.30
1433.27
12.27
64
3.30
1434.17
13.17
65
2.64
1435.92
12.92
66
0.00
1445.13
21.13
67
2.58
1442.26
21.26
68
2.58
1440.98
19.98
69
2.58
1440.40
20.40
70
2.58
1440.30
20.30
71
2.58
1440.35
20.35
72
2.58
1444.03
22.03
1
-236.67
1495.00
0.00
Reservoir
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
236.67
2.46
13.05
Open
2
236.67
2.46
13.05
Open
3
193.94
3.95
46.48
Open
4
19.20
0.20
0.12
Open
5
16.80
0.34
0.50
Open
6
14.40
0.46
1.12
Open
7
12.60
1.61
25.51
Open
8
10.80
1.38
19.18
Open
9
3.36
0.43
2.20
Open
10
-0.24
0.03
0.02
Open
11
42.73
0.60
1.16
Open
12
24.51
3.12
87.52
Open
13
17.01
2.17
44.50
Open
14
-3.22
0.41
2.04
Open
15
-10.72
1.37
18.91
Open
17
20.23
0.64
2.10
Open
18
-14.17
1.81
31.71
Open

GoM : Phed

DPR of GSWSP (Phase-III)

212

Page 5
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------19
-20.92
1.18
9.05
Open
20
110.65
3.52
48.75
Open
21
60.69
1.93
16.03
Open
22
54.69
1.74
13.22
Open
23
48.69
1.55
10.66
Open
24
42.69
2.42
33.93
Open
25
36.69
2.08
25.63
Open
26
26.83
1.52
14.35
Open
27
22.03
0.70
2.45
Open
28
17.23
0.55
1.56
Open
29
-25.95
3.31
97.28
Open
30
-37.95
2.15
27.29
Open
31
-49.95
1.59
11.18
Open
32
7.99
1.02
10.97
Open
33
0.49
0.06
0.06
Open
34
-7.01
0.89
8.62
Open
35
-17.20
0.55
1.55
Open
36
-35.20
1.12
5.84
Open
37
0.36
0.01
0.00
Open
38
-9.87
1.26
16.22
Open
39
9.82
1.25
16.09
Open
40
-10.22
1.30
17.32
Open
41
20.05
2.55
60.30
Open
42
12.07
1.54
23.57
Open
43
9.07
1.16
13.88
Open
44
6.07
0.77
6.60
Open
46
43.17
2.44
34.63
Open
47
-34.40
1.95
22.75
Open
48
77.57
4.39
102.54
Open
49
70.07
0.56
0.71
Open
50
62.57
0.50
0.58
Open
51
52.20
0.42
0.41
Open
52
43.20
0.34
0.29
Open
53
8.58
1.09
12.52
Open
54
-3.93
0.50
2.94
Open
55
-4.98
0.63
4.57
Open
56
-7.98
1.02
10.94
Open
57
12.51
1.59
25.16
Open
58
5.01
0.64
4.62
Open
59
-2.49
0.32
1.27
Open
60
-3.99
0.51
3.04
Open
61
-0.92
0.12
0.20
Open
62
-11.42
1.46
21.28
Open
63
34.62
1.96
23.01
Open
64
19.14
2.44
55.34
Open
65
10.28
1.31
17.49
Open
66
5.91
0.75
6.27
Open

GoM : Phed

DPR of GSWSP (Phase-III)

213

Page 6
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------67
7.64
0.97
10.09
Open
68
4.34
0.55
3.54
Open
69
1.04
0.13
0.25
Open
70
-2.26
0.29
1.06
Open
71
-5.56
0.71
5.61
Open
72
-8.86
1.13
13.30
Open
73
4.37
0.56
3.59
Open
74
1.73
0.22
0.65
Open
75
15.48
1.97
37.35
Open
76
9.24
1.18
14.37
Open
77
6.66
0.85
7.83
Open
78
4.08
0.52
3.16
Open
79
1.50
0.19
0.50
Open
80
-1.08
0.14
0.27
Open
81
-3.66
0.47
2.58
Open
82
-6.24
0.79
6.94
Open
83
-10.37
0.11
0.04
Open
16
3.07
0.39
1.87
Open
45
18.22
2.32
50.52
Open
84
-3.84
0.49
2.83
Open

GoM : Phed

DPR of GSWSP (Phase-III)

214

g,

,
i

Legends
Pipeline
Road
Zone Boundary

Reservoir

Distribution Network - Zone - VIII: Mawlai


o

'"
~

u.

.05km

.075bn

Greater Shillong Water Supply Project (Phase III)

GoM:PHED

GoM : Phed

Length of pipe line required diameterwise


Zone : VIII
Area of coverage : Mawlai
Node No.
Sl.
No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

200

150

100

221.00

93.00

73.00

4.

78.00

5.

26.00

6.

160.00

7.

10

96.00

8.

10

11

10

121.00

9.

11

13

12

182.00

10.

13

14

13

113.00

11.

13

15

14

336.00

12.

15

16

15

225.00

13.

16

18

17

220.00

14.

10

19

18

199.00

15.

19

20

19

239.00

16.

20

21

20

60.00

17.

21

23

22

179.00

18.

23

24

23

201.00

19.

20

26

25

85.00

20.

26

27

26

156.00

21.

27

27

179.00

22.

28

28

162.00

From

To

1.

MR1

2.

3.

216

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

From

To

500

450

400

200

150

100

23.

28

29

29

80.00

24.

29

31

31

38.00

25.

31

33

33

118.00

26.

33

26

34

167.00

27.

28

34

35

44.00

28.

34

35

36

75.00

29.

35

37

38

52.00

30.

37

38

39

29.00

31.

38

39

40

73.00

32.

37

41

42

98.00

33.

41

43

44

80.00

34.

43

46

47

39.00

35.

46

48

49

101.00

36.

48

51

52

153.00

37.

51

52

53

1477.00

38.

52

53

54

53.00

39.

53

56

133.00

40.

51

55

57

112.00

41.

55

56

58

83.00

42.

56

57

59

130.00

43.

57

59

61

106.00

44.

59

60

62

66.00

45.

60

62

64

60.00

46.

62

59

65

92.00

47.

62

63

66

226.00

217

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

From

To

500

450

400

200

150

100

48.

63

64

67

150.00

49.

64

66

69

9.00

50.

66

69

72

38.00

51.

64

72

75

79.00

52.

72

73

76

112.00

53.

72

74

77

37.00

54.

74

75

78

77.00

55.

75

76

79

45.00

56.

76

77

80

35.00

57.

73

77

82

75.00

58.

73

69

83

105.00

59.

77

79

84

64.00

60.

79

80

85

76.00

61.

80

81

86

73.00

62.

81

82

87

32.00

63.

82

83

88

44.00

64.

83

84

89

77.00

65.

84

85

90

52.00

66.

85

86

91

84.00

67.

86

87

92

100.00

68.

87

89

94

22.00

69.

89

56

95

62.00

70.

89

90

96

63.00

71.

90

91

97

59.00

72.

91

92

98

115.00

218

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

From

To

500

450

400

200

150

100

73.

92

93

99

70.00

74.

92

94

100

40.00

75.

94

96

102

57.00

76.

96

MR2

104

363.00

77.

96

82

105

59.00

78.

93

98

106

118.00

79.

98

99

107

127.00

80.

99

93

108

114.00

81.

93

101

110

123.00

82.

101

102

111

95.00

83.

102

103

112

50.00

84.

102

104

113

50.00

85.

104

105

114

102.00

86.

105

110

119

60.00

87.

110

112

121

61.00

88.

112

113

122

93.00

89.

113

114

123

62.00

90.

114

115

124

103.00

91.

115

117

126

86.00

92.

117

119

128

21.00

93.

119

122

131

108.00

94.

122

123

132

141.00

95.

122

124

133

60.00

96.

124

125

134

119.00

97.

115

126

135

20.00

219

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

From

To

500

450

400

200

150

100

98.

126

127

136

61.00

99.

127

129

138

61.00

100.

126

131

140

50.00

101.

114

131

141

60.00

102.

131

132

142

71.00

103.

132

133

143

33.00

104.

133

129

144

33.00

105.

133

134

145

86.00

106.

134

135

146

133.00

107.

135

136

147

137.00

108.

136

137

148

37.00

109.

137

113

149

41.00

110.

136

112

150

80.00

111.

135

138

151

86.00

112.

138

139

152

64.00

113.

139

140

153

63.00

114.

140

141

154

58.00

115.

141

142

155

71.00

116.

142

143

156

20.00

117.

143

112

157

63.00

118.

143

144

158

60.00

119.

144

142

159

62.00

120.

144

145

160

29.00

121.

145

147

162

67.00

122.

147

148

163

65.00

220

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

From

To

500

450

400

200

150

100

123.

148

149

164

65.00

124.

149

150

165

58.00

125.

150

151

166

99.00

126.

151

104

167

102.00

127.

150

152

168

99.00

128.

152

154

170

180.00

129.

154

155

171

167.00

130.

155

156

172

95.00

131.

156

157

173

56.00

132.

157

159

175

22.00

133.

159

161

177

64.00

134.

161

162

178

59.00

135.

162

163

179

34.00

136.

163

164

180

42.00

137.

164

165

181

46.00

138.

165

166

182

53.00

139.

166

167

183

39.00

140.

167

168

184

40.00

141.

168

147

185

76.00

142.

167

169

186

65.00

143.

169

170

187

56.00

144.

170

140

188

33.00

145.

170

168

189

1458.00

146.

171

172

190

69.00

147.

172

173

192

73.00

221

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

From

To

500

450

400

200

150

100

148.

173

174

193

72.00

149.

174

175

194

77.00

150.

175

176

195

117.00

151.

176

177

196

118.00

152.

177

178

197

17.00

153.

178

179

198

26.00

154.

179

169

200

87.00

155.

174

177

201

86.00

156.

178

181

202

130.00

157.

181

182

203

112.00

158.

182

183

204

81.00

159.

183

176

205

153.00

160.

183

184

206

350.00

161.

184

185

207

100.00

162.

185

187

209

88.00

163.

187

188

210

87.00

164.

188

182

211

74.00

165.

187

189

212

69.00

166.

189

190

213

94.00

167.

190

182

214

94.00

168.

190

191

215

77.00

169.

191

193

217

58.00

170.

193

195

219

92.00

171.

195

196

220

12.00

172.

197

198

221

98.00

222

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

From

To

500

450

400

200

150

100

173.

198

199

223

66.00

174.

199

200

224

114.00

175.

200

189

225

128.00

176.

198

201

226

72.00

177.

201

202

227

26.00

178.

202

155

228

49.00

179.

196

156

229

76.00

180.

202

203

230

54.00

181.

203

204

231

43.00

182.

204

205

232

87.00

183.

205

206

233

58.00

184.

204

208

235

67.00

185.

208

209

236

25.00

186.

209

211

238

88.00

187.

211

205

240

68.00

188.

205

213

241

64.00

189.

213

214

242

51.00

190.

214

215

243

56.00

191.

215

218

246

109.00

192.

218

220

248

51.00

193.

220

222

250

123.00

194.

222

224

252

28.00

195.

185

226

254

87.00

196.

226

228

256

66.00

197.

228

230

258

53.00

223

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

From

To

500

450

400

200

150

100

198.

230

231

259

65.00

199.

231

232

260

149.00

200.

232

233

261

112.00

201.

233

234

262

137.00

202.

234

235

263

108.00

203.

235

236

264

165.00

204.

236

237

265

85.00

205.

237

238

266

81.00

206.

238

239

267

163.00

207.

239

230

268

232.00

208.

238

240

269

39.00

209.

238

241

270

19.00

210.

241

242

271

131.00

211.

242

243

272

90.00

212.

243

244

273

82.00

213.

244

241

274

154.00

214.

243

245

275

82.00

215.

245

246

276

35.00

216.

246

247

277

68.00

217.

247

248

278

49.00

218.

247

249

279

81.00

219.

249

250

280

56.00

220.

250

172

281

51.00

221.

250

248

282

134.00

222.

248

245

283

136.00

224

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

From

To

500

450

400

200

150

100

223.

244

251

284

115.00

224.

251

252

285

64.00

225.

252

253

286

126.00

226.

253

254

287

55.00

227.

254

255

288

84.00

228.

256

257

289

154.00

229.

257

258

293

95.00

230.

258

240

291

137.00

231.

259

260

294

75.00

232.

260

261

297

140.00

233.

261

262

298

124.00

58.00

234.

262

263

299

157.00

235.

263

264

300

66.00

236.

264

265

301

37.00

237.

265

266

302

70.00

238.

266

267

303

76.00

239.

267

268

304

81.00

240.

268

269

305

69.00

241.

269

270

306

42.00

242.

270

271

307

52.00

243.

271

272

308

89.00

244.

272

273

309

66.00

245.

273

274

310

41.00

246.

274

262

311

141.00

247.

273

276

313

90.00

225

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

From

To

500

450

400

200

150

100

248.

276

270

314

91.00

249.

276

277

315

97.00

250.

277

265

316

113.00

251.

272

260

317

94.00

252.

271

235

318

100.00

253.

269

233

319

155.00

254.

264

278

320

96.00

255.

278

279

321

95.00

256.

279

281

322

117.00

257.

281

282

323

64.00

258.

282

280

324

38.00

259.

280

279

325

67.00

260.

280

283

326

137.00

261.

283

265

327

101.00

262.

283

284

328

75.00

263.

284

266

329

82.00

264.

284

285

330

80.00

265.

285

286

331

90.00

266.

286

287

332

42.00

267.

287

288

333

36.00

268.

288

289

334

143.00

269.

289

286

335

84.00

270.

289

290

336

82.00

271.

290

291

337

17.00

272.

291

292

338

168.00

226

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

339

116.00

267

340

116.00

292

448

341

87.00

276.

448

232

342

18.00

277.

252

447

343

75.00

278.

447

258

344

122.00

279.

448

294

345

84.00

280.

294

295

346

94.00

281.

295

296

347

54.00

282.

295

297

349

194.00

283.

297

298

350

89.00

284.

298

299

351

80.00

285.

448

296

352

126.00

286.

296

298

353

221.00

287.

299

291

354

176.00

288.

299

300

355

141.00

289.

302

301

356

194.00

290.

301

298

358

185.00

291.

302

303

360

72.00

292.

303

304

361

68.00

293.

305

306

362

87.00

294.

304

307

364

135.00

295.

306

309

365

153.00

296.

307

308

366

112.00

297.

308

309

367

114.00

From

To

273.

292

293

274.

293

275.

227

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

368

138.00

291

369

148.00

306

308

370

117.00

301.

307

311

371

105.00

302.

311

312

372

226.00

303.

312

313

373

183.00

304.

312

314

374

40.00

305.

314

315

376

80.00

306.

314

316

377

82.00

307.

311

317

378

105.00

308.

317

319

380

40.00

309.

319

320

381

72.00

310.

320

321

382

97.00

311.

321

322

383

12.00

312.

322

323

384

32.00

313.

322

324

385

88.00

314.

326

327

386

64.00

315.

327

329

388

32.00

316.

326

332

392

154.00

317.

332

333

393

133.00

318.

333

335

395

17.00

319.

335

336

396

27.00

320.

336

337

397

86.00

321.

337

338

398

113.00

322.

338

339

399

100.00

From

To

298.

309

310

299.

310

300.

228

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

400

153.00

342

402

41.00

342

344

404

87.00

326.

344

346

406

149.00

327.

346

336

407

52.00

328.

317

349

410

181.00

329.

349

350

411

131.00

330.

350

351

412

1480.00

331.

351

352

413

86.00

332.

352

353

414

60.00

333.

353

354

415

20.00

334.

354

355

416

58.00

335.

355

356

417

81.00

336.

356

351

418

33.00

337.

356

357

419

33.00

338.

357

358

420

61.00

339.

358

359

421

59.00

340.

359

354

422

70.00

341.

359

360

423

33.00

342.

360

MR3

424

61.00

343.

360

361

425

88.00

344.

361

362

426

182.00

345.

362

357

427

71.00

346.

324

325

428

94.00

30.00

347.

325

319

429

82.00

From

To

323.

339

340

324.

340

325.

229

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

430

89.00

363

431

220.00

363

281

432

77.00

351.

329

364

433

224.00

352.

364

365

34

278.00

353.

365

366

35

58.00

354.

366

368

37

248.00

355.

366

373

38

118.00

356.

373

369

39

101.00

357.

369

370

40

24.00

358.

370

371

41

90.00

359.

371

372

42

100.00

360.

372

365

43

151.00

361.

368

369

44

278.00

362.

370

377

45

121.00

363.

372

374

46

138.00

364.

374

375

47

88.00

365.

375

376

48

104.00

366.

376

377

49

27.00

367.

376

378

450

84.00

368.

378

379

451

173.00

369.

379

380

452

57.00

370.

380

303

453

21.00

371.

380

381

454

104.00

372.

381

374

455

121.00

From

To

348.

362

288

349.

360

350.

230

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

456

77.00

383

457

139.00

383

384

458

134.00

376.

384

385

459

60.00

377.

385

382

460

37.00

378.

386

386

461

61.00

379.

386

387

462

82.00

380.

387

377

463

56.00

381.

387

388

464

41.00

382.

338

389

465

123.00

383.

323

335

467

164.00

384.

353

339

468

129.00

385.

282

287

469

181.0

386.

390

392

470

139.00

387.

392

393

471

23.00

388.

388

390

474

115.00

389.

393

389

475

44.00

390.

389

386

476

39.00

391.

392

396

477

160.00

392.

396

397

478

62.00

393.

398

399

479

37.00

394.

399

400

481

100.00

395.

400

398

482

59.00

396.

398

397

483

152.00

397.

398

402

485

132.00

From

To

373.

378

382

374.

382

375.

231

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

487

404

488

208.00

383

406

490

220.00

401.

406

297

491

210.00

402.

294

407

492

127.00

403.

407

408

493

146.00

404.

408

297

494

114.00

405.

408

409

495

203.00

406.

409

410

496

108.00

407.

410

404

497

190.00

108.

410

411

498

131.00

409.

411

413

500

141.00

410.

415

416

501

84.00

411.

416

418

502

62.00

412.

418

419

503

68.00

413.

419

420

507

76.00

414.

420

421

508

37.00

415.

414

425

512

41.00

416.

425

426

513

65.00

417.

426

425

514

87.00

418.

420

427

515

113.00

419.

427

428

16

172.00

420.

428

429

17

126.00

421.

429

430

18

40.00

422.

430

432

520

95.00

From

To

398.

402

384

399.

383

400.

200

150

100
37.00

232

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

522

111.00

435

523

70.00

435

436

524

50.00

426.

436

429

525

62.00

427.

436

437

526

98.00

428.

437

435

527

67.00

429.

437

438

528

20.00

430.

438

428

529

63.00

431.

428

439

530

95.00

432.

439

440

431

140.00

433.

440

441

532

140.00

434.

441

437

533

30.00

435.

441

442

534

148.00

436.

442

444

536

171.00

437.

444

445

537

94.00

438.

444

446

538

201.00

439.

256

255

290

152.00

440.

447

254

292

115.00

441.

337

321

348

128.00

442.

324

323

539

118.00

443.

325

326

540

176.00

444.

379

382

541

137.00

445.

407

418

542

81.00

446.

413

418

543

168.00

447.

414

417

544

65.00

From

To

423.

432

434

424.

434

425.

233

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

545

78.00

409

546

123.00

438

439

359

57.00

451.

231

421

389

242.00

452.

240

237

504

76.00

453.

237

259

505

108.00

454.

171

139

506

65.00

455.

103

81

547

68.00

456.

80

104

548

83.00

457.

208

205

550

76.00

458.

52

93

115

115.00

459.

132

137

191

134.00

460.

147

162

551

89.00

461.

74

86

552

55.00

462.

74

84

553

117.00

463.

76

83

554

36.00

464.

91

85

555

78.00

465.

290

284

556

380.00

466.

161

149

557

74.00

467.

197

195

558

87.00

468.

165

196

559

76.00

469.

187

224

560

166.00

470.

198

206

561

85.00

471.

257

259

222

-133.00

472.

302

300

295

185.00

From

To

448.

417

415

449.

417

450.

234

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

296

126.00

304

357

126.00

416

408

363

70.00

476.

399

397

375

100.00

477.

167

163

480

38.00

478.

39

24

16

101.00

479.

14

18

562

45.00

480.

123

125

563

95.00

481.

446

445

564

65.00

482.

316

315

565

45.00

36.00

700.00

3461.00

2205.00

7833.00

35711.00

From

To

473.

303

305

474.

313

475.

Total :

235

C?)

ZONE - VIII
*PROPOSED PIPELINE ROUTE:
AREA OF COVERAGE:

1. Mawlai.

'"

"

,-

.'

GoM :Phed

DPR of GSWSP (phase ill)

236

N
Zone VIII (Mawlai)
14
18
1470

16

15

1471
11
13

1470 1471
19
1472 1474

399
10

400

8
27
1478 1481
1472
26
1483
1475
7
1468 1468
1468 1468
331470
31
1485
5
29
3
39
1475
1476
MR1 1491
28
1477
34
1495
2
1468 38 37
35
53
1478 1508
98
1475
1500
52
14691469 1471
1492
41
93
1493
48 51
99
1492
46
92
431469
1494
94
1478
55 1484
101
1492
91
1475
MR21493
1471
60 59 57
1498
96
56
90 1486
1490
1492
89
62
1512
87 86 85 84
14841485 1487 1488
1488
83 821500
1487
63
1485
1491
1492
103 102
1493
1494
1495
152
811495
1486
64
74
1486
75
72
66
1488
1477
76
80 1493
691490
73
1492
77
1493 79
1491
1491
1494
1492
14921493 1494
1491
151
104
150
1485 1484
1482
24

23

Elevation
25.00
50.00
75.00
100.00
m

21

20

426
446

445

434

1471
425

1464

1463

397
1463

1463392
1464
393

398
1463

396

402

1465 389
1467
386

390

368

1465
388

1468

1467
387

369

373

370
1463 384 385
366
1471
1460 1460
432
1466
435 1461
1464377
413 411
444
371
1472
1465
430
414
1463 1464
1470
378 376
442
410 404
1459
1462 436
383 382 1463
365
1464
1472
1460
1471
441 437
4171470
429
375
1461
1473
1467
1464
1460
1463
409
1468
438
1465 1464 1464
1471
415
372
406
1461 1465
1466
1463
379
1466
374
428
1469
364
1466
1466
1470
440 439
427
408
381
416
1468
380
1467
1468
1465
1472
301
302
1465 1468
1466
420 419 1468
1470 297
1469 315
418
1469
313
303
329
314
300
1470298 1473
1473
1467 421
1468
407
1470
1470
295
1472
312
316
1468
1473
1470
211
1474 305 304
1472
296 1473
215
209
1468
327
299
1473
306
311
1471
1469
294
1470 1470
213 214
307
325
1476
20814591459
1460
205
308
1474
1475
317
1471
231
1472
319
326
232
1475 448
1459 1459 218
1471
324
1476
309 1472
204
1459 1459
206
292
1474 1475
332
1475
1459
2301467 1475
310
1477
349
1476
291
203
220
1474
320
1460
228
322 323 333
233
1459
1477
1465
293 1479 290
1476
1476
350
202
1480
1462
1459226 1464 234 1473
1476 321
1478 1476 1479
201
222
154
351
268 1475
1477
1463
1485
155
1463
289
224
1471
356
1478
267 266
1462
198
1459
269
1470
335
1492 352
1476
185
288
286
284
357
235
1465
187
1489
1459
199
355
362
1491
14731484
285
287
1459 200 189
1475 277
1493
265
1479
1462
1490 1491 358
337
1490
1487
1469
197
1460
149
276
270
1459
1492
353
1491
156
1489
1489
336
14591459 188
338
271
1475 1478
361 1494
157
283
1481
184
236
354
1460
105
1479
239
1470
282
1469
359
196 195
1494
1467
190 1458
1479
280
346
1482
1469
1496
1469
193 191
264
274
1486
159
1461
1468
360
1493
339
278
1481
182
1463
273
263
1488
148
1496
14621461
1458
272
1487
1480
344
1460 1459
183
279 281 363 1498
161
1484
1479
1472
1485340 342
181 1458
1486
1478 262
1483
1475
110
1477
1481
163
147
162
241 238 237
1458
1487 1490 1494
1473
MR3
164
176
242
1483 1482
1781458
261
1482
1478
166
260
1468165
1472 167
1471
177
1464 1465
2401467
145168
243
244
1465
1458
1463
1458
1479
1520
144
1478
115 114
143
14681469 1465179
1460
259
112
175
1466
113
1468
1464
1463 258
117
1462170
169
123
1470
245
251
174
142
1458
1468
1472
126
1470
1469
119
257
1475 136
1460
447
1465
140 1460
1311472
1468
141 1463
1461
246
1463
1463
1466
173 1461
137
252
122 1461
1467
248
1468
1470
1465 256
1460
1470
1462
247
124
139
1462
132
171
135 138
1462
1464
1464
1461
1467
1462
127
172 250 249
134
1462
125 1462
1465 1464
255
1461
253
1460
1460
133
254
1465
146314611461
1461
1462
1464 1465 1466
129 1462
1461

GoM : Phed

DPR of GSWSP (Phase III)

237

Page 1
6/24/2008 8:24:55 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone VIII Mawlai.NET
Zone VIII (Mawlai)
Link - Node Table:
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------1
MR1
2
221
250
2
2
3
93
150
4
3
5
73
150
6
5
7
78
150
7
7
8
26
100
8
8
9
160
100
9
9
10
96
100
10
10
11
121
100
12
11
13
182
100
13
13
14
113
100
14
13
15
336
100
15
15
16
225
100
17
16
18
220
100
18
10
19
199
100
19
19
20
239
100
20
20
21
60
100
22
21
23
179
100
23
23
24
201
100
25
20
26
85
100
26
26
27
156
100
27
27
8
179
100
28
7
28
162
100
29
28
29
80
100
31
29
31
38
100
33
31
33
118
100
34
33
26
167
100
35
28
34
44
100
36
34
35
75
100
38
35
37
52
100
39
37
38
29
100
40
38
39
73
100
42
37
41
98
100
44
41
43
80
100
47
43
46
39
100
49
46
48
101
100
52
48
51
153
100
53
51
52
1477
100

GoM : Phed

DPR of GSWSP (Phase-III)

238

Page 2
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------54
52
53
53
200
56
53
2
133
200
57
51
55
112
100
58
55
56
83
100
59
56
57
130
100
61
57
59
106
100
62
59
60
66
100
64
60
62
60
100
65
62
59
92
100
66
62
63
226
100
67
63
64
150
100
69
64
66
9
100
72
66
69
38
100
75
64
72
79
100
76
72
73
112
100
77
72
74
37
100
78
74
75
77
100
79
75
76
45
100
80
76
77
35
100
82
73
77
75
100
83
73
69
105
100
84
77
79
64
100
85
79
80
76
100
86
80
81
73
150
87
81
82
32
250
88
82
83
44
150
89
83
84
77
150
90
84
85
52
150
91
85
86
84
150
92
86
87
100
150
94
87
89
22
150
95
89
56
62
100
96
89
90
63
100
97
90
91
59
100
98
91
92
115
100
99
92
93
70
250
100
92
94
40
250
102
94
96
57
250
104
96
MR2
36
350
105
96
82
59
250
106
93
98
118
100
107
98
99
127
100
108
99
93
114
100
110
93
101
123
150
111
101
102
95
150
112
102
103
50
200
113
102
104
50
200

GoM : Phed

DPR of GSWSP (Phase-III)

239

Page 3
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------114
104
105
102
150
119
105
110
60
150
121
110
112
61
150
122
112
113
93
100
123
113
114
62
100
124
114
115
103
100
126
115
117
86
100
128
117
119
21
100
131
119
122
108
100
132
122
123
141
100
133
122
124
60
100
134
124
125
119
100
135
115
126
20
100
136
126
127
61
100
138
127
129
61
100
140
126
131
50
100
141
114
131
60
100
142
131
132
71
100
143
132
133
33
100
144
133
129
33
100
145
133
134
86
100
146
134
135
133
100
147
135
136
100
100
148
136
137
37
100
149
137
113
37
100
150
136
112
41
100
151
135
138
80
200
152
138
139
86
200
153
139
140
64
100
154
140
141
63
100
155
141
142
58
100
156
142
143
71
100
157
143
112
20
100
158
143
144
63
100
159
144
142
60
100
160
144
145
62
100
162
145
147
29
100
163
147
148
67
100
164
148
149
65
100
165
149
150
58
200
166
150
151
99
200
167
151
104
102
250
168
150
152
99
100
170
152
154
180
100
171
154
155
167
100
172
155
156
95
100
173
156
157
56
200

GoM : Phed

DPR of GSWSP (Phase-III)

240

Page 4
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------175
157
159
22
200
177
159
161
64
200
178
161
162
59
100
179
162
163
34
100
180
163
164
42
100
181
164
165
46
100
182
165
166
53
100
183
166
167
39
100
184
167
168
40
100
185
168
147
76
100
186
167
169
65
100
187
169
170
56
100
188
170
140
33
100
189
170
168
1458
100
190
171
172
69
200
192
172
173
73
150
193
173
174
72
150
194
174
175
77
150
195
175
176
117
150
196
176
177
118
150
197
177
178
17
100
198
178
179
26
150
200
179
169
87
150
201
174
177
86
150
202
178
181
130
100
203
181
182
112
100
204
182
183
81
100
205
183
176
153
150
206
183
184
350
150
207
184
185
100
150
209
185
187
88
150
210
187
188
87
100
211
188
182
74
100
212
187
189
69
150
213
189
190
94
100
214
190
182
94
100
215
190
191
77
100
217
191
193
58
100
219
193
195
92
100
220
195
196
12
150
221
197
198
98
150
223
198
199
66
150
224
199
200
114
150
225
200
189
128
150
226
198
201
72
150
227
201
202
26
150
228
202
155
49
100

GoM : Phed

DPR of GSWSP (Phase-III)

241

Page 5
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------229
196
156
76
100
230
202
203
54
100
231
203
204
43
100
232
204
205
87
100
233
205
206
58
100
235
204
208
67
100
236
208
209
25
100
238
209
211
88
100
240
211
205
68
100
241
205
213
64
100
242
213
214
51
100
243
214
215
56
100
246
215
218
109
100
248
218
220
51
100
250
220
222
123
100
252
222
224
28
100
254
185
226
87
150
256
226
228
66
150
258
228
230
53
150
259
230
231
65
150
260
231
232
149
250
261
232
233
112
100
262
233
234
137
100
263
234
235
108
100
264
235
236
165
100
265
236
237
85
100
266
237
238
81
100
267
238
239
163
100
268
239
230
232
100
269
238
240
39
100
270
238
241
19
100
271
241
242
131
100
272
242
243
90
100
273
243
244
82
250
274
244
241
154
100
275
243
245
82
250
276
245
246
35
250
277
246
247
68
200
278
247
248
49
100
279
247
249
81
200
280
249
250
56
200
281
250
172
51
200
282
250
248
134
100
283
248
245
136
100
284
244
251
115
250
285
251
252
64
250
286
252
253
126
250

GoM : Phed

DPR of GSWSP (Phase-III)

242

Page 6
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------287
253
254
55
250
288
254
255
84
250
289
256
257
154
250
293
257
258
95
100
291
258
240
137
100
294
259
260
75
250
297
260
261
140
250
298
261
262
124
250
299
262
263
157
250
300
263
264
66
250
301
264
265
37
100
302
265
266
70
100
303
266
267
76
100
304
267
268
81
100
305
268
269
69
100
306
269
270
42
100
307
270
271
52
100
308
271
272
89
100
309
272
273
66
100
310
273
274
41
100
311
274
262
141
100
313
273
276
90
100
314
276
270
91
100
315
276
277
97
100
316
277
265
113
100
317
272
260
94
100
318
271
235
100
100
319
269
233
155
100
320
264
278
96
250
321
278
279
95
250
322
279
281
117
250
323
281
282
64
100
324
282
280
38
100
325
280
279
67
100
326
280
283
137
100
327
283
265
101
100
328
283
284
75
100
329
284
266
82
100
330
284
285
80
100
331
285
286
90
100
332
286
287
42
100
333
287
288
36
150
334
288
289
143
300
335
289
286
84
100
336
289
290
82
250
337
290
291
17
250
338
291
292
168
250

GoM : Phed

DPR of GSWSP (Phase-III)

243

Page 7
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------339
292
293
116
100
340
293
267
116
100
341
292
448
87
250
342
448
232
18
250
343
252
447
75
100
344
447
258
122
100
345
448
294
34
250
346
294
295
94
150
347
295
296
54
100
349
295
297
194
150
350
297
298
89
100
351
298
299
80
100
352
448
296
126
100
353
296
298
221
100
354
299
291
176
100
355
299
300
141
100
356
302
301
194
100
358
301
298
185
100
360
302
303
72
100
361
303
304
68
150
362
305
306
87
100
364
304
307
135
150
365
306
309
153
100
366
307
308
112
150
367
308
309
114
150
368
309
310
138
150
369
310
291
148
150
370
306
308
117
100
371
307
311
105
150
372
311
312
226
100
373
312
313
183
100
374
312
314
40
100
376
314
315
80
100
377
314
316
82
100
378
311
317
105
150
380
317
319
40
100
381
319
320
72
100
382
320
321
97
100
383
321
322
12
100
384
322
323
32
100
385
322
324
88
100
386
326
327
64
100
388
327
329
32
100
392
326
332
154
100
393
332
333
133
100
395
333
335
17
100
396
335
336
27
100

GoM : Phed

DPR of GSWSP (Phase-III)

244

Page 8
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------397
336
337
86
100
398
337
338
113
100
399
338
339
100
100
400
339
340
153
100
402
340
342
41
100
404
342
344
87
100
406
344
346
149
100
407
346
336
52
100
410
317
349
181
100
411
349
350
131
100
412
350
351
1480
100
413
351
352
86
100
414
352
353
60
100
415
353
354
20
150
416
354
355
58
150
417
355
356
81
150
418
356
351
33
300
419
356
357
33
300
420
357
358
61
150
421
358
359
59
150
422
359
354
70
150
423
359
360
33
200
424
360
MR3
61
300
425
360
361
88
300
426
361
362
182
300
427
362
357
71
300
428
324
325
30
100
429
325
319
82
100
430
362
288
89
300
431
360
363
220
200
432
363
281
77
200
433
329
364
224
100
434
364
365
278
100
435
365
366
58
100
437
366
368
248
100
438
366
373
118
100
439
373
369
101
100
440
369
370
24
100
441
370
371
80
100
442
371
372
100
100
443
372
365
151
150
444
368
369
278
100
445
370
377
121
100
446
372
374
138
150
447
374
375
88
150
448
375
376
104
100
449
376
377
27
150

GoM : Phed

DPR of GSWSP (Phase-III)

245

Page 9
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------450
376
378
84
150
451
378
379
173
100
452
379
380
57
100
453
380
303
21
150
454
380
381
104
150
455
381
374
121
150
456
378
382
77
150
457
382
383
139
150
458
383
384
134
100
459
384
385
60
100
460
385
382
37
100
461
385
386
61
100
462
386
387
82
100
463
387
377
56
150
464
387
388
41
100
465
388
389
123
100
467
323
335
164
100
468
353
339
129
150
469
282
287
181
100
470
390
392
139
100
471
392
393
23
100
474
388
390
115
100
475
393
389
44
100
476
389
386
99
100
477
392
396
160
100
478
396
397
62
100
479
398
399
37
100
481
399
400
100
100
482
400
398
59
100
483
398
397
152
100
485
398
402
132
100
487
402
384
37
100
488
383
404
208
150
490
383
406
220
150
491
406
297
218
150
492
294
407
127
250
493
407
408
146
100
494
408
297
114
100
495
408
409
203
100
496
409
410
108
150
497
410
404
190
150
498
410
411
131
100
500
411
413
141
100
501
415
416
84
150
502
416
418
62
150
503
418
419
68
200
507
419
420
76
200

GoM : Phed

DPR of GSWSP (Phase-III)

246

Page 10
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------508
420
421
37
150
512
414
425
41
100
513
425
426
65
100
514
426
425
87
100
515
420
427
113
150
516
427
428
192
150
517
428
429
126
100
518
429
430
40
100
520
430
432
95
100
522
432
434
111
100
523
434
435
70
100
524
435
436
50
100
525
436
429
62
100
526
436
437
98
100
527
437
435
67
100
528
437
438
20
100
529
438
428
63
100
530
428
439
95
100
531
439
440
140
100
532
440
441
140
100
533
441
437
30
100
534
441
442
148
100
536
442
444
171
100
537
444
445
94
100
538
444
446
201
100
290
256
255
152
250
292
447
254
115
100
348
337
321
128
100
539
324
323
118
100
540
325
326
176
100
541
379
382
137
100
542
407
418
81
250
543
413
414
168
100
544
414
417
65
100
545
417
415
78
150
546
417
409
123
150
359
438
439
57
100
389
231
421
242
150
504
240
237
76
100
505
237
259
108
100
506
171
139
65
200
547
103
81
68
200
548
80
104
83
150
550
208
205
76
100
115
52
93
115
250
191
132
137
134
100
551
147
162
89
150

GoM : Phed

DPR of GSWSP (Phase-III)

247

Page 11
Zone VIII (Mawlai)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------552
74
86
55
100
553
74
84
117
100
554
76
83
36
100
555
91
85
78
100
556
290
284
380
100
557
161
149
74
200
558
197
195
87
150
559
165
196
76
100
560
187
224
166
100
561
198
206
85
100
222
257
259
133
250
295
302
300
185
100
296
303
305
126
100
357
313
304
126
100
363
416
408
70
100
375
399
397
100
100
480
167
163
38
100
16
39
24
101
100
562
14
18
45
100
563
123
125
95
100
564
446
445
65
100
565
316
315
45
100
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------2
0.00
1507.75
7.75
3
2.78
1502.73
7.73
5
2.78
1499.16
8.16
7
4.84
1495.70
10.70
8
5.16
1493.47
10.47
9
3.05
1488.63
7.63
10
3.05
1486.81
8.81
11
0.20
1486.79
12.79
13
0.15
1486.78
14.78
14
0.05
1486.78
15.78
15
0.10
1486.78
15.78
16
0.10
1486.78
16.78
18
0.05
1486.78
16.78
19
3.05
1485.07
13.07
20
3.10
1484.34
16.34
21
0.10
1484.40
16.40
23
0.05
1484.62
16.62
24
0.05
1484.86
16.86
26
5.16
1484.16
14.16

GoM : Phed

DPR of GSWSP (Phase-III)

248

Page 12
Zone VIII (Mawlai)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------27
5.16
1484.17
9.17
28
4.84
1485.81
7.81
29
2.16
1484.88
7.88
31
2.16
1484.63
8.63
33
2.11
1484.28
9.28
34
2.73
1485.43
10.43
35
2.78
1485.16
14.16
37
2.83
1485.13
16.13
38
0.10
1485.09
16.09
39
0.05
1484.99
16.99
41
2.78
1485.42
16.42
43
2.83
1486.05
15.05
46
2.78
1486.64
11.64
48
2.83
1489.10
11.10
51
4.53
1494.57
10.57
52
4.53
1508.53
16.53
53
2.78
1508.28
16.28
55
1.80
1497.29
11.29
56
3.75
1499.90
11.90
57
2.00
1499.88
12.87
59
2.11
1499.91
14.91
60
0.21
1499.94
15.94
62
2.11
1499.97
14.97
63
1.95
1501.26
15.26
64
2.31
1502.74
12.74
66
0.36
1502.77
11.77
69
0.36
1502.89
10.89
72
2.89
1503.28
12.28
73
0.94
1503.27
10.27
74
2.89
1503.87
11.87
75
1.26
1504.09
11.09
76
2.04
1504.30
10.30
77
1.46
1503.57
9.57
79
0.78
1503.26
12.26
80
1.95
1502.98
10.98
81
2.81
1506.92
13.92
82
2.11
1507.98
12.98
83
1.88
1506.16
11.16
84
1.41
1505.02
11.02
85
1.09
1504.65
11.65
86
2.57
1503.89
11.89
87
2.31
1503.27
12.27
89
4.06
1503.17
16.17
90
2.11
1503.86
15.86
91
2.58
1504.86
12.86
92
3.13
1509.63
16.63
93
2.97
1508.86
14.86

GoM : Phed

DPR of GSWSP (Phase-III)

249

Page 13
Zone VIII (Mawlai)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------94
1.38
1510.26
12.26
96
0.00
1511.18
11.18
98
0.31
1508.86
15.86
99
0.36
1508.86
16.86
101
0.86
1504.88
14.88
102
2.03
1501.91
15.91
103
2.03
1503.99
15.99
104
3.67
1498.13
13.13
105
2.65
1490.35
9.35
110
2.55
1486.10
8.10
112
3.21
1482.10
7.10
113
0.86
1479.00
7.00
114
1.09
1477.65
7.65
115
0.36
1477.26
9.26
117
0.25
1477.25
12.25
119
0.20
1477.25
16.25
122
0.15
1477.25
16.25
123
0.05
1477.25
16.25
124
0.05
1477.25
15.25
125
0.05
1477.25
15.25
126
2.34
1477.22
10.22
127
2.08
1477.08
12.08
129
2.08
1477.06
16.06
131
3.12
1477.27
7.27
132
3.12
1477.27
16.27
133
2.34
1477.06
15.06
134
0.31
1476.92
15.92
135
0.94
1476.74
16.74
136
1.02
1479.33
9.33
137
1.17
1478.96
14.96
138
0.63
1476.65
16.65
139
2.97
1476.57
11.57
140
4.22
1476.52
16.52
141
1.88
1477.88
15.88
142
2.19
1479.55
13.55
143
3.44
1480.69
8.69
144
4.06
1479.91
9.91
145
3.80
1479.93
11.93
147
4.22
1480.07
8.07
148
2.81
1483.24
8.24
149
5.47
1487.28
8.28
150
5.16
1489.87
7.87
151
2.50
1495.94
11.94
152
2.71
1486.51
9.51
154
2.66
1482.34
12.34
155
3.21
1479.90
14.90
156
3.84
1483.83
16.83

GoM : Phed

DPR of GSWSP (Phase-III)

250

Page 14
Zone VIII (Mawlai)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------157
2.71
1484.35
15.35
159
3.65
1484.57
12.57
161
3.60
1485.32
12.32
162
1.10
1480.12
9.12
163
0.87
1478.27
10.27
164
0.71
1477.86
12.86
165
2.18
1477.49
12.49
166
1.55
1477.51
8.51
167
2.02
1477.56
9.56
168
1.72
1478.06
16.06
169
4.12
1475.44
15.44
170
3.90
1476.04
13.04
171
2.34
1476.54
12.54
172
8.28
1476.52
13.52
173
8.28
1475.27
13.27
174
9.22
1474.60
13.60
175
6.88
1474.47
14.47
176
8.29
1474.46
16.46
177
4.69
1474.56
14.56
178
5.22
1474.71
16.71
179
3.86
1474.83
16.83
181
2.88
1474.59
16.59
182
4.28
1474.60
16.60
183
8.44
1474.46
16.46
184
7.03
1474.81
13.81
185
7.08
1475.20
13.20
187
5.46
1475.03
15.03
188
0.00
1474.80
16.80
189
5.07
1475.03
16.03
190
2.48
1474.92
16.92
191
2.22
1475.20
16.20
193
2.22
1475.65
15.65
195
2.72
1476.86
15.86
196
2.65
1477.04
15.04
197
1.25
1476.36
16.36
198
5.94
1475.88
16.88
199
4.76
1475.50
16.50
200
4.76
1475.17
16.17
201
1.18
1476.14
14.14
202
1.18
1476.26
13.26
203
0.63
1475.78
13.78
204
0.72
1475.46
15.46
205
4.87
1475.31
16.31
206
4.74
1475.33
16.33
208
0.18
1475.35
16.35
209
0.13
1475.35
16.35
211
0.13
1475.33
16.33

GoM : Phed

DPR of GSWSP (Phase-III)

251

Page 15
Zone VIII (Mawlai)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------213
0.00
1475.28
16.28
214
0.00
1475.25
16.25
215
0.05
1475.21
15.21
218
0.10
1475.15
16.15
220
0.15
1475.12
16.12
222
0.20
1475.07
16.07
224
0.25
1475.06
16.06
226
5.99
1476.68
13.68
228
5.99
1478.27
14.27
230
7.82
1479.97
14.97
231
3.13
1483.28
16.28
232
4.30
1484.21
9.21
233
3.83
1484.11
11.11
234
2.66
1483.55
12.55
235
3.83
1483.46
14.46
236
3.05
1481.64
13.64
237
2.11
1481.25
14.25
238
2.97
1479.82
14.82
239
7.82
1479.32
16.32
240
1.25
1480.60
14.60
241
7.50
1479.19
15.19
242
6.41
1478.55
15.55
243
6.41
1478.59
14.59
244
1.56
1479.08
16.08
245
6.88
1478.20
15.20
246
0.94
1478.09
16.09
247
1.88
1477.53
15.53
248
7.82
1477.23
15.23
249
0.94
1477.06
16.06
250
6.88
1476.76
15.76
251
1.09
1479.77
16.77
252
1.40
1480.16
16.16
253
0.31
1480.83
16.83
254
1.40
1481.12
16.12
255
1.09
1481.64
15.64
256
0.00
1482.62
15.62
257
2.03
1483.61
15.61
258
2.03
1481.31
13.31
259
2.11
1484.84
15.84
260
1.72
1485.81
7.81
261
0.55
1487.70
8.70
262
1.10
1489.39
7.39
263
0.55
1491.98
8.98
264
0.86
1493.08
9.08
265
1.57
1492.99
14.99
266
1.49
1493.07
9.07
267
2.50
1486.49
13.49

GoM : Phed

DPR of GSWSP (Phase-III)

252

Page 16
Zone VIII (Mawlai)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------268
1.72
1485.67
9.67
269
2.50
1485.24
10.24
270
1.64
1485.31
16.31
271
2.26
1485.06
16.06
272
2.03
1485.81
8.81
273
1.41
1486.68
8.68
274
1.45
1487.16
8.16
276
1.41
1486.75
16.75
277
1.10
1489.40
14.40
278
0.31
1494.80
8.80
279
0.54
1496.51
9.51
280
1.32
1496.81
9.81
281
0.70
1498.48
8.48
282
0.70
1498.32
10.32
283
1.25
1494.60
8.60
284
2.19
1494.63
7.63
285
1.25
1497.19
8.19
286
1.33
1500.55
10.55
287
1.33
1503.35
14.35
288
2.50
1504.22
14.22
289
2.50
1500.25
11.25
290
3.20
1494.63
9.63
291
4.99
1493.49
13.49
292
3.04
1487.29
8.29
293
1.95
1486.72
11.72
448
3.67
1484.35
7.35
447
2.18
1480.77
15.77
294
1.57
1484.04
9.04
295
0.87
1483.31
10.31
296
1.80
1483.31
7.31
297
6.10
1481.93
11.93
298
4.45
1482.28
9.28
299
3.04
1483.41
8.41
300
1.95
1482.11
8.11
301
2.81
1481.37
8.37
302
3.98
1481.15
8.15
303
5.08
1480.96
12.96
304
1.41
1481.60
11.60
305
0.94
1482.38
12.38
306
2.34
1483.58
12.58
307
3.36
1482.84
11.84
308
3.12
1483.79
11.79
309
2.35
1485.38
11.38
310
3.12
1488.99
12.99
311
1.41
1482.88
10.88
312
1.04
1482.05
11.05
313
1.41
1481.69
9.69

GoM : Phed

DPR of GSWSP (Phase-III)

253

Page 17
Zone VIII (Mawlai)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------314
0.10
1482.05
12.05
315
0.05
1482.05
12.05
316
0.05
1482.05
13.05
317
3.98
1483.12
9.12
319
1.25
1483.83
8.83
320
1.40
1484.32
8.32
321
1.63
1485.29
7.29
322
0.62
1485.27
7.27
323
0.62
1485.33
9.33
324
0.70
1484.69
8.69
325
1.25
1484.26
8.26
326
1.25
1484.01
9.01
327
0.99
1483.17
9.17
329
1.04
1482.84
9.84
332
0.31
1485.49
8.49
333
0.36
1486.86
7.86
335
0.54
1487.05
8.05
336
0.70
1488.18
9.18
337
1.79
1488.58
7.58
338
1.56
1495.03
13.03
339
1.56
1501.62
16.62
340
0.52
1496.78
13.78
342
0.52
1495.57
13.57
344
0.57
1493.18
12.18
346
0.47
1489.40
9.40
349
3.03
1483.57
7.57
350
3.03
1484.58
7.58
351
3.29
1507.59
15.59
352
1.34
1507.67
14.67
353
1.34
1507.81
13.81
354
0.53
1508.45
15.45
355
0.53
1508.08
16.08
356
2.48
1507.59
16.59
357
2.48
1507.59
16.59
358
0.53
1510.23
16.23
359
0.53
1512.82
16.82
360
0.00
1514.39
16.39
361
0.72
1512.13
16.13
362
0.67
1507.49
16.49
363
0.47
1502.58
8.58
364
0.94
1481.03
9.03
365
1.64
1479.33
8.33
366
1.53
1479.06
9.06
368
0.78
1478.96
10.96
369
1.48
1478.93
12.93
370
1.33
1478.93
13.93
371
1.33
1479.04
8.04

GoM : Phed

DPR of GSWSP (Phase-III)

254

Page 18
Zone VIII (Mawlai)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------372
2.27
1479.33
9.33
373
1.48
1478.94
7.94
374
1.57
1479.50
11.50
375
1.18
1479.42
13.42
376
0.71
1478.99
14.99
377
0.79
1478.90
14.90
378
0.47
1479.10
15.10
379
2.58
1479.59
12.59
380
1.49
1480.63
11.63
381
1.49
1480.06
11.06
382
0.78
1479.14
15.14
383
5.70
1479.45
14.45
384
2.19
1478.54
15.54
385
2.35
1478.64
14.64
386
2.35
1478.48
15.48
387
0.00
1478.73
14.73
388
0.00
1478.28
11.28
389
3.60
1477.96
10.96
390
1.45
1477.90
12.90
392
3.29
1477.70
13.70
393
3.39
1477.72
12.72
396
1.88
1477.61
14.61
397
2.04
1477.62
14.62
398
2.12
1477.66
14.66
399
0.24
1477.65
14.65
400
0.13
1477.66
13.66
402
1.93
1478.24
15.24
404
3.41
1479.79
12.79
406
5.39
1480.32
12.32
407
1.97
1483.38
11.38
408
4.70
1482.01
12.01
409
4.50
1480.81
11.81
410
3.91
1480.37
12.37
411
0.60
1480.49
10.49
413
0.55
1480.69
8.69
414
0.55
1481.03
8.03
415
0.69
1481.74
15.74
416
1.18
1482.33
14.33
418
1.84
1483.07
13.07
419
1.25
1482.88
14.88
420
1.25
1482.68
15.68
421
1.30
1482.74
14.74
425
0.16
1481.02
9.02
426
0.16
1481.02
10.02
427
0.00
1480.70
14.70
428
0.94
1477.34
12.34
429
3.44
1475.41
12.41

GoM : Phed

DPR of GSWSP (Phase-III)

255

Page 19
Zone VIII (Mawlai)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------430
3.02
1475.22
14.22
432
3.02
1475.14
16.14
434
2.97
1475.16
14.16
435
3.13
1475.37
13.37
436
3.60
1475.40
12.40
437
2.51
1475.72
10.72
438
2.51
1476.11
10.11
439
2.35
1476.18
8.18
440
1.88
1475.83
10.83
441
0.15
1475.73
14.73
442
0.15
1475.73
15.73
444
0.10
1475.73
15.73
445
0.05
1475.73
15.73
446
0.05
1475.73
15.73
417
1.14
1481.23
15.23
MR1
-26.18
1508.00
0.00
Reservoir
MR2
-320.35
1512.00
0.00
Reservoir
MR3
-452.92
1520.00
0.00
Reservoir
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
26.18
0.53
1.14
Open
2
54.84
3.11
53.94
Open
4
52.06
2.95
48.99
Open
6
49.28
2.79
44.25
Open
7
24.26
3.09
85.83
Open
8
13.81
1.76
30.24
Open
9
10.76
1.37
19.05
Open
10
0.65
0.08
0.11
Open
12
0.45
0.06
0.05
Open
13
0.18
0.02
0.01
Open
14
0.12
0.02
0.00
Open
15
0.02
0.00
0.00
Open
17
-0.08
0.01
0.00
Open
18
7.06
0.90
8.73
Open
19
4.01
0.51
3.06
Open
20
-2.30
0.29
1.10
Open
22
-2.40
0.31
1.19
Open
23
-2.45
0.31
1.23
Open
25
3.21
0.41
2.03
Open
26
-0.13
0.02
0.00
Open
27
-5.29
0.67
51.99
Open
28
20.18
2.57
61.04
Open
29
8.25
1.05
11.64
Open

GoM : Phed

DPR of GSWSP (Phase-III)

256

Page 20
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------31
6.09
0.78
6.63
Open
33
3.93
0.50
2.95
Open
34
1.82
0.23
0.71
Open
35
7.09
0.90
8.80
Open
36
4.36
0.56
3.58
Open
38
1.58
0.20
0.55
Open
39
2.65
0.34
1.43
Open
40
2.55
0.33
1.33
Open
42
-3.90
0.50
2.91
Open
44
-6.68
0.85
7.88
Open
47
-9.51
1.21
15.16
Open
49
-12.29
1.57
24.37
Open
52
-15.12
1.93
35.77
Open
53
-7.37
0.94
9.45
Open
54
31.44
1.00
4.74
Open
56
28.66
0.91
3.99
Open
57
-12.28
1.56
24.33
Open
58
-14.08
1.79
31.34
Open
59
0.83
0.11
0.16
Open
61
-1.17
0.15
0.31
Open
62
-1.45
0.18
0.46
Open
64
-1.66
0.21
0.60
Open
65
1.84
0.23
0.72
Open
66
-5.60
0.71
5.69
Open
67
-7.55
0.96
9.89
Open
69
-3.69
0.47
2.63
Open
72
-4.05
0.52
3.11
Open
75
-6.18
0.79
6.81
Open
76
0.69
0.09
0.12
Open
77
-9.76
1.24
15.89
Open
78
-3.82
0.49
2.81
Open
79
-5.08
0.65
4.75
Open
80
11.29
1.44
20.82
Open
82
-4.66
0.59
4.03
Open
83
4.41
0.56
3.65
Open
84
5.17
0.66
4.91
Open
85
4.39
0.56
3.62
Open
86
-54.84
3.11
53.94
Open
87
-161.19
3.29
33.00
Open
88
47.53
2.69
41.38
Open
89
27.23
1.54
14.75
Open
90
18.30
1.04
7.07
Open
91
20.91
1.18
9.05
Open
92
17.04
0.96
6.19
Open
94
14.73
0.83
4.73
Open
95
18.66
2.38
52.78
Open
96
-7.99
1.02
10.96
Open

GoM : Phed

DPR of GSWSP (Phase-III)

257

Page 21
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------97
-10.10
1.29
16.92
Open
98
-16.38
2.09
41.47
Open
99
88.64
1.81
10.90
Open
100
-108.15
2.20
15.76
Open
102
-109.53
2.23
16.13
Open
104
-320.35
3.33
22.87
Open
105
210.82
4.30
54.25
Open
106
0.33
0.04
0.03
Open
107
0.02
0.00
0.00
Open
108
-0.34
0.04
0.03
Open
110
41.66
2.36
32.43
Open
111
40.80
2.31
31.20
Open
112
-101.51
3.23
41.56
Open
113
140.28
4.47
75.65
Open
114
66.13
3.74
76.30
Open
119
63.48
3.59
70.73
Open
121
60.93
3.45
65.56
Open
122
14.57
1.86
33.40
Open
123
11.53
1.47
21.66
Open
124
4.51
0.57
3.80
Open
126
0.75
0.10
0.14
Open
128
0.50
0.06
0.06
Open
131
0.30
0.04
0.02
Open
132
0.06
0.01
0.00
Open
133
0.09
0.01
0.00
Open
134
0.04
0.00
0.00
Open
135
3.40
0.43
2.25
Open
136
3.41
0.43
2.26
Open
138
1.33
0.17
0.40
Open
140
-2.35
0.30
1.14
Open
141
5.94
0.76
6.33
Open
142
0.47
0.06
0.06
Open
143
5.96
0.76
6.38
Open
144
0.75
0.10
0.14
Open
145
2.87
0.37
1.64
Open
146
2.56
0.33
1.33
Open
147
-12.70
1.62
25.89
Open
148
7.60
0.97
10.02
Open
149
-2.18
0.28
0.99
Open
150
-21.32
2.72
67.60
Open
151
14.32
0.46
1.11
Open
152
13.69
0.44
1.02
Open
153
1.90
0.24
0.77
Open
154
-11.54
1.47
21.69
Open
155
-13.42
1.71
28.68
Open
156
-9.83
1.25
16.13
Open
157
-21.82
2.78
70.56
Open

GoM : Phed

DPR of GSWSP (Phase-III)

258

Page 22
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------158
8.55
1.09
12.44
Open
159
5.78
0.74
6.02
Open
160
-1.29
0.16
0.37
Open
162
-5.09
0.65
4.76
Open
163
-17.58
2.24
47.29
Open
164
-20.39
2.60
62.23
Open
165
-105.42
3.36
44.57
Open
166
-125.26
3.99
61.34
Open
167
-127.76
2.60
21.46
Open
168
14.68
1.87
33.87
Open
170
11.97
1.53
23.21
Open
171
9.31
1.19
14.57
Open
172
-16.35
2.08
41.34
Open
173
-44.98
1.43
9.20
Open
175
-47.69
1.52
10.26
Open
177
-51.34
1.64
11.76
Open
178
24.62
3.14
88.24
Open
179
18.95
2.41
54.34
Open
180
7.47
0.95
9.70
Open
181
6.76
0.86
8.06
Open
182
-1.14
0.15
0.30
Open
183
-2.69
0.34
1.47
Open
184
-8.52
1.09
12.36
Open
185
-12.85
1.64
26.45
Open
186
14.41
1.84
32.72
Open
187
-7.93
1.01
10.83
Open
188
-9.22
1.17
14.31
Open
189
-2.61
0.33
1.38
Open
190
6.48
0.21
0.25
Open
192
29.54
1.67
17.15
Open
193
21.26
1.20
9.33
Open
194
8.38
0.47
1.66
Open
195
1.50
0.08
0.07
Open
196
-5.98
0.34
0.89
Open
197
-7.01
0.89
8.61
Open
198
-14.36
0.81
4.51
Open
200
-18.22
1.03
7.01
Open
201
3.66
0.21
0.36
Open
202
2.13
0.27
0.95
Open
203
-0.75
0.10
0.14
Open
204
2.94
0.37
1.73
Open
205
0.81
0.05
0.02
Open
206
-6.31
0.36
0.98
Open
207
-13.34
0.76
3.93
Open
209
9.04
0.51
1.91
Open
210
3.72
0.47
2.67
Open
211
3.72
0.47
2.66
Open

GoM : Phed

DPR of GSWSP (Phase-III)

259

Page 23
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------212
0.78
0.04
0.02
Open
213
2.35
0.30
1.14
Open
214
4.25
0.54
3.41
Open
215
-4.37
0.56
3.60
Open
217
-6.59
0.84
7.69
Open
219
-8.81
1.12
13.16
Open
220
-27.86
1.58
15.39
Open
221
15.08
0.85
4.94
Open
223
16.17
0.92
5.62
Open
224
11.41
0.65
2.95
Open
225
6.65
0.38
1.08
Open
226
-12.98
0.74
3.74
Open
227
-14.16
0.80
4.40
Open
228
-22.45
2.86
74.37
Open
229
-24.79
3.16
89.33
Open
230
7.11
0.91
8.84
Open
231
6.48
0.83
7.44
Open
232
2.92
0.37
1.70
Open
233
-1.22
0.15
0.34
Open
235
2.84
0.36
1.62
Open
236
1.12
0.14
0.29
Open
238
0.99
0.13
0.23
Open
240
0.86
0.11
0.18
Open
241
1.66
0.21
0.60
Open
242
1.66
0.21
0.60
Open
243
1.66
0.21
0.60
Open
246
1.61
0.21
0.57
Open
248
1.51
0.19
0.50
Open
250
1.36
0.17
0.42
Open
252
1.16
0.15
0.31
Open
254
-29.46
1.67
17.07
Open
256
-35.45
2.01
24.04
Open
258
-41.44
2.35
32.11
Open
259
-53.09
3.01
50.80
Open
260
-65.95
1.34
6.31
Open
261
2.12
0.27
0.94
Open
262
4.69
0.60
4.09
Open
263
2.03
0.26
0.87
Open
264
8.00
1.02
11.01
Open
265
4.95
0.63
4.53
Open
266
10.36
1.32
17.75
Open
267
3.99
0.51
3.04
Open
268
-3.83
0.49
2.81
Open
269
-11.08
1.41
20.10
Open
270
14.47
1.84
32.96
Open
271
5.15
0.66
4.86
Open
272
-1.26
0.16
0.36
Open

GoM : Phed

DPR of GSWSP (Phase-III)

260

Page 24
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------273
-64.36
1.31
6.03
Open
274
-1.82
0.23
0.71
Open
275
56.69
1.16
4.76
Open
276
43.49
0.89
2.92
Open
277
42.55
1.36
8.30
Open
278
5.82
0.74
6.10
Open
279
34.85
1.11
5.74
Open
280
33.91
1.08
5.45
Open
281
31.35
1.00
4.72
Open
282
-4.32
0.55
3.51
Open
283
-6.32
0.80
7.10
Open
284
-64.10
1.31
5.98
Open
285
-65.19
1.33
6.17
Open
286
-59.84
1.22
5.27
Open
287
-60.15
1.23
5.32
Open
288
-65.57
1.34
6.24
Open
289
-66.66
1.36
6.43
Open
293
12.26
1.56
24.24
Open
291
5.32
0.68
5.17
Open
294
-97.57
1.99
13.02
Open
297
-99.46
2.03
13.50
Open
298
-100.01
2.04
13.63
Open
299
-110.85
2.26
16.50
Open
300
-111.40
2.27
16.65
Open
301
3.63
0.46
2.55
Open
302
-2.32
0.30
1.11
Open
303
6.96
0.89
86.50
Open
304
7.65
0.97
10.11
Open
305
5.93
0.75
6.31
Open
306
-2.97
0.38
1.76
Open
307
5.12
0.65
4.82
Open
308
-6.94
0.88
8.46
Open
309
-8.81
1.12
13.14
Open
310
-8.29
1.06
11.74
Open
311
-9.74
1.24
15.83
Open
313
-1.93
0.25
0.79
Open
314
9.74
1.24
15.83
Open
315
-13.08
1.67
27.32
Open
316
-14.18
1.81
31.73
Open
317
-0.17
0.02
0.01
Open
318
9.81
1.25
16.04
Open
319
6.40
0.82
7.27
Open
320
-115.89
2.36
17.91
Open
321
-116.20
2.37
18.00
Open
322
-111.86
2.28
16.78
Open
323
3.53
0.45
2.42
Open
324
16.02
2.04
39.81
Open

GoM : Phed

DPR of GSWSP (Phase-III)

261

Page 25
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------325
4.88
0.62
4.40
Open
326
9.82
1.25
16.08
Open
327
9.79
1.25
16.00
Open
328
-1.22
0.16
0.34
Open
329
10.77
1.37
19.07
Open
330
-14.23
1.81
31.96
Open
331
-15.48
1.97
37.36
Open
332
-21.16
2.70
66.66
Open
333
-35.68
2.02
24.34
Open
334
237.34
3.36
27.80
Open
335
-4.35
0.55
3.56
Open
336
239.19
4.88
68.54
Open
337
236.04
4.81
66.89
Open
338
171.33
3.49
36.94
Open
339
5.14
0.65
4.84
Open
340
3.19
0.41
2.00
Open
341
163.15
3.33
33.75
Open
342
72.37
1.48
7.49
Open
343
-6.75
0.86
8.03
Open
344
-4.91
0.63
4.45
Open
345
80.27
1.64
9.07
Open
346
19.25
1.09
7.76
Open
347
-0.01
0.00
0.00
Open
349
18.39
1.04
7.13
Open
350
-4.60
0.59
3.95
Open
351
-9.18
1.17
14.19
Open
352
6.84
0.87
8.24
Open
353
5.04
0.64
4.67
Open
354
-19.50
2.48
57.26
Open
355
7.28
0.93
9.23
Open
356
-2.35
0.30
1.14
Open
358
-5.16
0.66
4.89
Open
360
3.70
0.47
2.64
Open
361
-21.37
1.21
9.42
Open
362
-9.03
1.15
13.77
Open
364
-21.01
1.19
9.13
Open
365
-8.32
1.06
11.82
Open
366
-20.27
1.15
8.54
Open
367
-26.44
1.50
13.97
Open
368
-37.11
2.10
26.17
Open
369
-40.23
2.28
30.39
Open
370
-3.05
0.39
1.85
Open
371
-4.10
0.23
0.44
Open
372
4.42
0.56
3.67
Open
373
3.18
0.41
1.99
Open
374
0.20
0.03
0.01
Open
376
0.05
0.01
0.00
Open

GoM : Phed

DPR of GSWSP (Phase-III)

262

Page 26
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------377
0.05
0.01
0.00
Open
378
-9.94
0.56
2.28
Open
380
-10.33
1.32
17.67
Open
381
-6.21
0.79
6.87
Open
382
-7.61
0.97
10.02
Open
383
3.40
0.43
2.26
Open
384
-3.26
0.42
2.09
Open
385
6.04
0.77
6.54
Open
386
8.80
1.12
13.12
Open
388
7.81
0.99
10.51
Open
392
-7.42
0.95
9.57
Open
393
-7.73
0.98
10.33
Open
395
-8.09
1.03
11.23
Open
396
-16.42
2.09
41.67
Open
397
-5.04
0.64
4.68
Open
398
-19.47
2.48
57.13
Open
399
-21.03
2.68
65.89
Open
400
14.16
1.80
31.66
Open
402
13.64
1.74
29.54
Open
404
13.12
1.67
27.49
Open
406
12.55
1.60
25.32
Open
407
12.08
1.54
23.59
Open
410
-3.58
0.46
2.48
Open
411
-6.61
0.84
7.73
Open
412
-9.64
1.23
15.55
Open
413
-2.09
0.27
0.91
Open
414
-3.43
0.44
2.29
Open
415
-41.52
2.35
32.21
Open
416
17.31
0.98
6.37
Open
417
16.78
0.95
6.02
Open
418
10.85
0.15
0.09
Open
419
3.45
0.05
0.01
Open
420
-48.61
2.75
43.14
Open
421
-49.14
2.78
44.02
Open
422
59.35
3.36
62.45
Open
423
-109.02
3.47
47.43
Open
424
-452.92
6.41
92.00
Open
425
227.33
3.22
25.67
Open
426
226.61
3.21
25.52
Open
427
-49.58
0.70
1.53
Open
428
9.25
1.18
14.40
Open
429
5.38
0.68
5.27
Open
430
275.52
3.90
36.64
Open
431
116.56
3.71
53.68
Open
432
116.09
3.70
53.28
Open
433
6.77
0.86
8.07
Open
434
5.83
0.74
6.12
Open

GoM : Phed

DPR of GSWSP (Phase-III)

263

Page 27
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------435
5.04
0.64
4.68
Open
437
1.36
0.17
0.41
Open
438
2.16
0.27
0.97
Open
439
0.68
0.09
0.11
Open
440
-0.23
0.03
0.01
Open
441
-2.58
0.33
1.36
Open
442
-3.91
0.50
2.92
Open
443
0.86
0.05
0.02
Open
444
0.58
0.07
0.08
Open
445
1.03
0.13
0.25
Open
446
-7.04
0.40
1.20
Open
447
5.94
0.34
0.88
Open
448
4.76
0.61
4.20
Open
449
11.65
0.66
3.06
Open
450
-7.60
0.43
1.39
Open
451
-3.82
0.49
2.80
Open
452
-10.56
1.34
18.38
Open
453
-28.08
1.59
15.62
Open
454
16.04
0.91
5.54
Open
455
14.55
0.82
4.62
Open
456
-4.25
0.24
0.47
Open
457
-9.80
0.55
2.22
Open
458
6.15
0.78
6.76
Open
459
-2.85
0.36
1.62
Open
460
-8.93
1.14
13.48
Open
461
3.73
0.48
2.68
Open
462
-3.99
0.51
3.03
Open
463
-11.88
0.67
3.18
Open
464
7.90
1.01
10.74
Open
465
3.72
0.47
2.66
Open
467
-7.79
0.99
10.47
Open
468
36.75
2.08
47.93
Open
469
-13.19
1.68
27.78
Open
470
2.73
0.35
1.50
Open
471
-2.09
0.27
0.92
Open
474
4.18
0.53
3.31
Open
475
-5.48
0.70
5.46
Open
476
-5.36
0.68
5.25
Open
477
1.53
0.20
0.52
Open
478
-0.35
0.04
0.03
Open
479
1.06
0.14
0.26
Open
481
-0.43
0.05
0.05
Open
482
-0.56
0.07
0.08
Open
483
1.14
0.14
0.30
Open
485
-4.88
0.62
4.40
Open
487
-6.81
0.87
8.16
Open
488
-8.29
0.47
1.63
Open

GoM : Phed

DPR of GSWSP (Phase-III)

264

Page 28
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------490
-13.36
0.76
3.95
Open
491
-18.75
1.06
7.39
Open
492
59.44
1.21
5.20
Open
493
7.34
0.93
9.37
Open
494
1.86
0.24
0.74
Open
495
5.72
0.73
5.92
Open
496
13.56
0.77
4.06
Open
497
11.70
0.66
3.08
Open
498
-2.05
0.26
0.88
Open
500
-2.65
0.34
1.42
Open
501
-18.23
1.03
7.02
Open
502
-24.36
1.38
12.00
Open
503
23.94
0.76
2.86
Open
507
22.69
0.72
2.59
Open
508
-8.43
0.48
1.69
Open
512
0.32
0.04
0.03
Open
513
0.10
0.01
0.00
Open
514
-0.06
0.01
0.00
Open
515
29.87
1.69
17.51
Open
516
29.87
1.69
17.51
Open
517
9.57
1.22
15.32
Open
518
5.08
0.65
4.75
Open
520
2.06
0.26
0.89
Open
522
-0.96
0.12
0.22
Open
523
-3.93
0.50
2.94
Open
524
-1.65
0.21
0.59
Open
525
-1.04
0.13
0.25
Open
526
-4.20
0.54
3.34
Open
527
5.41
0.69
5.33
Open
528
-10.87
1.39
19.41
Open
529
-10.91
1.39
19.52
Open
530
8.46
1.08
12.20
Open
531
3.63
0.46
2.55
Open
532
1.75
0.22
0.66
Open
533
1.25
0.16
0.35
Open
534
0.35
0.04
0.03
Open
536
0.20
0.03
0.01
Open
537
0.06
0.01
0.00
Open
538
0.04
0.01
0.00
Open
290
66.66
1.36
6.43
Open
292
-4.02
0.51
3.08
Open
348
12.64
1.61
25.66
Open
539
-3.91
0.50
5.45
Open
540
2.63
0.33
1.40
Open
541
4.16
0.53
3.27
Open
542
50.14
1.02
3.79
Open
543
-3.20
0.41
2.01
Open

GoM : Phed

DPR of GSWSP (Phase-III)

265

Page 29
Zone VIII (Mawlai)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------544
-4.07
0.52
3.14
Open
545
-17.54
0.99
6.54
Open
546
12.34
0.70
3.40
Open
359
-2.48
0.32
1.25
Open
389
9.73
0.55
2.20
Open
504
-7.01
0.89
8.60
Open
505
-14.52
1.85
33.17
Open
506
-8.82
0.28
0.45
Open
547
-103.54
3.30
43.11
Open
548
57.28
3.24
58.48
Open
550
1.54
0.20
0.52
Open
115
-43.34
0.88
2.90
Open
191
-8.61
1.10
12.61
Open
551
-4.57
0.26
0.54
Open
552
-1.30
0.17
0.38
Open
553
-7.52
0.96
9.82
Open
554
-18.41
2.35
51.52
Open
555
3.70
0.47
2.64
Open
556
-0.05
0.01
0.00
Open
557
-79.56
2.53
26.47
Open
558
-16.33
0.92
5.72
Open
559
5.73
0.73
5.93
Open
560
-0.91
0.12
0.20
Open
561
5.96
0.76
6.37
Open
222
-80.95
1.65
9.22
Open
295
-5.33
0.68
5.18
Open
296
-8.09
1.03
11.23
Open
357
1.77
0.23
0.67
Open
363
4.95
0.63
4.52
Open
375
1.25
0.16
0.35
Open
480
-10.61
1.35
18.55
Open
16
2.50
0.32
1.28
Open
562
0.13
0.02
0.00
Open
563
0.01
0.00
0.00
Open
564
-0.01
0.00
0.00
Open
565
0.00
0.00
0.00
Open

GoM : Phed

DPR of GSWSP (Phase-III)

266

g,

,
i

Laitlror PF

Legends
Pipeline
Road
Zone Boundary

Reservoir

Distribution Network - Zone - IX: Laban, Bishnupur, Rilbong & Kench's Trace
o

.04lm

.06km

Greater Shillong Water Supply Project (Phase III)

GoM:PHED

GoM : Phed

Length of pipe line required diameterwise


Zone IX
Area Coverage : Laban Bishnupur
Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
450
400
350

DPR of GSWSP (Phase III)

700

650

600

550

500

268

300

250

200

150

100

46.35

97.40

67.60

4.

76.40

5.

93.69

6.

39.84

7.

10

10

91.84

8.

10

11

11

59.00

9.

11

12

12

74.92

10.

12

13

13

40.72

11.

13

14

14

64.00

12.

14

15

15

71.76

13.

15

16

16

56.40

14.

16

11

17

56.00

15.

14

17

18

61.30

16.

17

18

19

44.90

17.

18

19

20

100.30

18.

19

20

21

49.31

19.

20

21

22

101.60

20.

21

22

23

60.28

21.

22

23

24

5.26

22.

23

24

25

7.75

23.

24

25

26

63.80

From

To

1.

2.

3.

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
450
400
350

DPR of GSWSP (Phase III)

700

650

600

550

500

300

250

200

150

100

27

78.86

27

28

27

28

29

43.10

27.

28

29

30

96.08

28.

29

30

31

65.70

29.

30

31

32

87.40

30.

31

32

33

73.75

31.

32

33

34

46.80

32.

33

34

35

101.50

33.

34

35

36

49.40

34.

35

36

37

73.70

35.

36

37

38

45.10

36.

37

38

39

129.80

37.

38

39

40

139.60

38.

39

40

41

131.10

39.

40

41

42

26.10

40.

41

42

43

32.40

41.

42

43

44

50.82

42.

43

44

45

48.10

43.

44

45

46

151.10

44.

45

46

47

190.73

45.

46

47

48

65.10

46.

47

48

49

123.20

47.

48

49

50

168.50

48.

49

50

51

135.98

49.

50

51

52

82.00

From

To

24.

25

26

25.

26

26.

47.67

269

GoM : Phed

Sl.
No.

Node No.

Pipe No.

DPR of GSWSP (Phase III)

700

650

600

550

500

53

59.09

53

54

53

54

55

53.

54

55

56

54.

55

56

57

55.

56

57

58

56.

57

58

59

57.

58

59

60

58.

59

60

59.

60

60.

From

To

50.

51

52

51.

52

52.

Length of pipes diameterwise


RM
450
400
350

300

250

200

150

100

36.28

71.50

131.42

69.62

120.00

58.80

74.78

61

57.45

61

62

45.30

61

62

63

127.80

61.

62

63

64

39.50

62.

63

64

65

75.10

63.

64

65

66

36.80

64.

65

66

67

65.86

65.

66

02

68

47.40

66.

57

67

69

66.57

67.

67

68

70

54.80

68.

68

69

71

39.70

69.

69

70

72

49.40

70.

70

71

73

98.53

71.

71

72

74

35.00

72.

72

73

75

73.70

73.

73

74

76

133.60

74.

74

75

77

72.70

75.

75

76

78

52.00

270

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
450
400
350

DPR of GSWSP (Phase III)

700

650

600

550

500

300

250

200

150

100

79

85.80

78

80

92.00

78

79

81

46.10

79.

79

80

82

55.40

80.

80

81

83

33.30

81.

81

82

84

46.10

82.

81

83

85

35.80

83.

83

84

86

57.50

84.

84

85

87

82.70

85.

85

86

88

74.08

86.

86

22

89

20.10

87.

61

87

90

91.70

88.

87

88

91

19.47

89.

88

89

92

31.23

90.

89

90

93

84.30

91.

90

91

94

67.80

92.

91

92

95

70.83

93.

92

96

109.20

94.

93

97

38.70

95.

93

94

98

96.26

96.

94

95

99

83.80

97.

95

96

100

104.78

98.

96

97

101

70.60

99.

97

89

102

85.43

100.

97

98

103

37.58

101.

98

99

104

28.00

From

To

76.

76

77

77.

77

78.

271

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
450
400
350

DPR of GSWSP (Phase III)

700

650

600

550

500

300

250

200

150

100

105

13.70

101

106

84.70

101

73

107

36.40

105.

72

102

108

24.50

106.

102

103

109

61.00

107.

103

78

110

121.90

108.

72

104

111

79.23

109.

104

54

112

101.66

110.

55

105

113

61.50

111.

105

51

114

96.31

112.

51

106

115

64.60

113.

106

107

116

65.20

114.

107

108

117

55.70

115.

108

109

118

54.10

116.

109

110

119

77.40

117.

110

111

120

31.30

118.

111

112

121

55.00

119.

112

35

122

120.10

120.

110

33

123

103.10

121.

39

113

124

61.59

122.

113

38

125

84.70

123.

42

114

126

65.80

124.

114

115

127

84.80

125.

115

116

128

64.20

126.

116

117

129

84.80

127.

117

118

130

18.10

From

To

102.

98

100

103.

100

104.

272

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
450
400
350

DPR of GSWSP (Phase III)

700

650

600

550

500

300

250

150

100

131

28.62

120

132

129.90

120

121

133

37.97

131.

121

122

134

31.93

132.

122

123

135

15.00

133.

123

127

139

60.30

134.

127

128

140

69.60

135.

128

36

141

39.40

136.

122

129

142

48.20

137.

129

130

143

73.92

138.

130

131

144

63.80

139.

131

132

145

59.10

140.

132

34

146

107.30

141.

32

133

147

83.00

142.

133

134

148

77.80

143.

134

135

149

120.80

144.

135

136

150

40.80

145.

136

137

151

55.20

146.

137

138

152

32.00

147.

138

139

153

77.80

148.

139

140

154

102.68

149.

140

141

155

20.20

150.

141

130

156

44.30

151.

140

142

157

85.60

152.

142

143

158

72.20

153.

143

133

159

From

To

128.

118

119

129.

119

130.

200

53.90

273

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
450
400
350

DPR of GSWSP (Phase III)

700

650

600

550

500

274

300

250

200

150

100

160

55.60

145

161

42.60

145

146

162

75.40

157.

146

147

163

68.60

158.

147

148

164

50.00

159.

148

149

165

40.74

160.

149

150

166

43.00

161.

150

151

167

37.70

162.

151

152

168

49.20

163.

152

153

169

36.90

164.

153

154

170

35.40

165.

154

155

171

41.60

166.

155

156

172

31.00

167.

156

157

173

34.10

168.

157

161

177

45.15

169.

161

162

178

29.20

170.

162

163

179

40.30

171.

163

164

180

68.00

172.

164

165

181

49.90

173.

165

166

182

44.50

174.

166

167

183

25.10

175.

167

168

184

37.30

176.

168

169

185

33.52

177.

169

23

186

60.40

178.

169

170

187

114.10

179.

170

171

188

42.90

180.

171

172

189

34.70

From

To

154.

134

144

155.

144

156.

GoM : Phed

Sl.
No.

Node No.

Pipe No.
700

DPR of GSWSP (Phase III)


275

600

550

500

191

80

192

28

174

193

69.60

185.

174

175

194

44.80

186.

175

145

195

93.90

187.

147

176

196

30.10

188.

176

177

197

52.40

189.

177

178

198

20.20

190.

178

179

199

79.63

191.

179

180

200

60.90

192.

180

167

201

42.60

193.

164

181

202

50.20

194.

181

182

203

49.90

195.

182

178

204

46.20

196.

177

183

205

197.

183

184

206

66.80

198.

184

185

207

70.00

199.

185

161

208

36.75

200.

154

186

209

201.

156

187

210

51.70

202.

187

188

211

55.70

203.

188

189

212

46.60

204.

189

190

213

205.

190

191

214

23.70

206.

191

192

215

35.10

207.

190

193

216

79.95

From

To

181.

172

146

190

182.

28

173

183.

173

184.

650

Length of pipes diameterwise


RM
450
400
350

300

250

200

150

100
120.00

124.00
54.10

48.00

47.41

44.33

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
450
400
350

DPR of GSWSP (Phase III)

700

650

600

550

500

300

250

200

218

64.30

195

219

29.90

195

196

220

40.00

211.

196

197

221

12.00

212.

197

198

222

69.20

213.

198

199

223

56.90

214.

199

149

224

41.10

215.

197

200

225

216.

200

201

226

217.

201

202

227

218.

202

137

228

219.

200

203

229

220.

203

204

230

221.

203

205

231

222.

205

206

232

223.

206

207

233

224.

207

208

234

225.

208

209

235

226.

209

210

236

227.

210

211

228.

210

229.

From

To

208.

193

194

209.

194

210.

150

100

49.57

276

51.90

22.30

14.30

101.16

87.18

86.25

101.90

88.00

41.50

54.29

237

48.06

212

238

86.50

212

213

239

48.56

230.

213

214

240

42.13

231.

214

188

241

42.50

232.

204

196

242

233.

203

215

243

103.70

234.

215

216

244

73.86

62.00

86.00

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
450
400
350

DPR of GSWSP (Phase III)

700

650

600

550

500

300

250

200

150

100

245

93.80

218

246

17.88

218

219

247

73.50

238.

219

220

248

30.00

239.

220

221

249

42.0

240.

221

222

250

49.10

241.

222

223

251

115.0

242.

223

224

252

58.80

243.

224

225

253

79.80

244.

225

226

254

83.58

245.

226

211

255

2.72

246.

226

227

256

54.60

247.

227

228

257

44.70

248.

228

229

258

82.10

249.

229

230

259

67.90

250.

230

231

260

63.60

251.

231

232

261

27.70

252.

232

233

262

62.61

253.

233

234

263

254.

234

235

264

255.

235

236

265

80.70

256.

236

237

266

45.90

257.

237

238

267

33.46

258.

238

239

268

57.60

259.

239

240

269

65.38

260.

240

241

270

51.40

From

To

235.

216

217

236.

217

237.

64.00
48.87

277

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
450
400
350

DPR of GSWSP (Phase III)

700

650

600

550

500

271

242

272

242

243

273

264.

243

244

274

265.

244

245

275

266.

245

208

276

267.

236

246

277

268.

246

247

278

269.

247

248

270.

248

271.

From

To

261.

241

222

262.

219

263.

300

250

200

150

100

16.95

66.40

68.20

124.07

72.70

86.05

20.83

74.90

279

37.08

248

280

76.73

249

250

281

76.70

272..

250

251

282

65.10

273.

251

252

283

68.60

274.

252

253

284

36.80

275.

253

254

285

73.20

276.

254

255

286

74.60

277.

255

256

287

81.90

278.

256

250

288

27.81

279.

256

257

289

32.00

280.

257

258

290

24.20

281.

258

259

291

56.40

282.

259

260

292

55.82

283.

260

261

293

161.75

284.

261

262

294

51.92

285.

262

263

295

50.00

286.

263

264

296

54.77

278

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
450
400
350

DPR of GSWSP (Phase III)

700

650

600

550

500

300

250

297

266

298

266

218

299

290.

266

267

300

291.

267

268

301

90.80

292.

268

269

302

126.84

293.

269

270

303

113.90

294.

270

271

304

49.70

295.

261

250

305

38.00

296.

263

272

306

27.40

297.

272

273

307

62.29

298.

273

274

308

12.10

299.

274

275

309

61.99

300.

275

276

310

30.60

301.

276

277

311

52.62

302.

277

281

315

58.68

303.

281

282

316

14.70

304.

282

283

317

305.

283

284

318

306.

284

275

319

307.

283

285

320

308.

285

286

321

309.

286

287

322

310.

287

288

323

311.

288

289

324

312.

289

217

325

From

To

287.

264

265

288.

265

289.

200

150

100

51.00

90.10

16.80

18.10

69.00

23.50

73.40

95.60

43.90

48.70

98.80

75.26

93.10

279

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
450
400
350

DPR of GSWSP (Phase III)

700

650

600

550

500

300

250

326

291

327

61.10

291

292

328

85.81

316.

292

293

329

27.07

317.

293

294

330

60.59

318.

294

295

331

29.50

319.

295

296

332

50.90

320.

296

296

333

65.00

321.

297

298

334

66.80

322.

298

299

335

91.90

323.

299

300

336

27.80

324.

300

289

337

87.09

325.

299

301

338

54.10

326.

301

302

339

69.00

327.

302

303

340

74.70

328.

303

304

341

68.50

329.

304

305

342

64.90

330.

305

306

343

27.30

331.

306

307

344

35.80

332.

307

308

345

55.80

333.

308

309

346

76.70

334.

309

310

347

135.70

35.

310

311

348

65.60

336.

311

312

349

104.80

337.

312

42

350

8.00

338.

312

313

351

63.30

From

To

313.

282

290

314.

290

315.

200

150

100
28.60

280

GoM : Phed

Sl.
No.

Node No.

Pipe No.

DPR of GSWSP (Phase III)

700

650

600

550

300

250

200

150

100

352

66.80

315

353

100.00

315

316

354

47.06

342.

316

317

355

53.90

343.

317

318

356

35.10

344.

318

319

357

47.60

345.

319

320

358

105.92

346.

320

321

359

32.22

347.

321

322

360

99.40

348.

322

323

361

70.87

349.

323

324

362

69.60

350.

324

325

363

64.80

351.

325

326

364

56.70

352.

326

300

365

42.75

353.

326

327

366

15.30

354.

327

328

367

56.50

355.

328

323

368

120.54

356.

321

329

369

357.

329

121

370

41.20

358.

329

330

371

40.10

359.

330

331

372

122.20

360.

331

332

373

132.20

361.

332

333

374

31.20

362.

333

138

375

118.40

363.

331

334

376

27.00

364.

334

335

377

36.90

From

To

339.

313

314

340.

314

341.

500

Length of pipes diameterwise


RM
450
400
350

69.20

281

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
450
400
350

DPR of GSWSP (Phase III)

700

650

600

550

500

300

250

150

100

378

69.60

333

379

97.60

335

337

380

57.44

368.

337

42

386

49.70

369.

342

328

386

15.10

370.

342

343

387

69.70

371.

343

344

388

74.70

372.

344

216

389

58.68

373.

17

346

391

45.00

374.

346

347

392

40.26

375.

347

83

393

38.61

376.

91

64

394

102.40

377.

192

150

216

19.00

378.

306

321

395

76.50

379.

120.00

380.

120.00

772.33

2246.59

2030.10

54.10

2492.99

4471.39

11861.10

From

To

365.

335

336

366.

336

367.

Total :

59.09

200

282

C;j
ZONE -IX
PROPOSED PIPEUNE ROUTE

AREA OF COVERAGE:
1. Laban

2. Bishnapur

3. Rilbong.
4. Kench's Trace

Main reservoir

GoM:Phed

DPR ofGSWSP (phase III)

283

Zone IX (Laban, Bishnupur etc.)

253

234 233

230
231

227

211

212

213

214

188

1614 228
226
1610 1610
232 1613
1629
1622
1625
1621
229
235
193 1629
1616 1621
210
1616
225
1610
1612
187 186
1610
1615
1610
1610
194 1634
189
1621
209
224
155 156
1620
248
190
255
237
1630 1630154
157
251
236
161
208
238
1634
1629
1622
195
1620
153
1640 1642
1610
223
1637 1640
1610
1612
1610
240
191 1632
184
1610
1643
152
183
1614
245 1628 207
185
247
196
1634
1636
206
151
222
1626
162
192
256
1616
1635
1646
1636
1628
246
239
1646
1543
1645
1610
1634
178
257
1628
1636
1623
1645
244
241
1610
204
198 1636
182
1614
1615
197
221
271
205
150 177
163
250
1647
1610
181
149
1540
199
1620
258
1636
1645
220
1646
1642
1625
1610
243
1629
1637 1647 179 180 167
1645
Elevation
1610
1647
1642
1645
203
1610
1625
200
1646
164
1540
267
176
259
219
25.00
148
16461646 166 165
242 215
268
270
218
1638 1643
169 168
170
147
1624
1646
1646 1646 1646
1610
1623
1629 202 201 1648
50.00
1623
1624
260
1610
1624
1646
217
216
146
1711647
1646
21
1648
269
1644
172
75.00
23
1643
1610
20
261
1625
266
1629
1646
1647
344
1662
1610
22
1652
289
26
100.00
265
137
24 1657
19 1662
1620
1624
17
1637
175 174 27
145
138
343
1662
262
1625
1667
m
1625 288
1643
1666
1662
18
136 1657 16571658
1668
1667
1643
342
1637
86
1622
139
264
25
1622
1667
337
1650
14
287
28
263
135 144
277 276
140
275
1642
1667
300
173
13
1647
1625
1666
327
29 1667
1642
1662
1655
1622
286 1620
85
335
1655
1624 1625 1625
336
1657
346
1628
333
142
1667
1667 10
141
1635
1667
274 273
284
272
1623
30
1667
326
328
1642
134
84
12
281
334
1642
1665
1642
347
1657
15
1657
1668
16251625
143
299
1623
1622
31
1667
129 130
81
1635
1642 331
1660
1667
1625
1642 332
122
82 1667
325
1667
282
83
11
285
80
1667
8
1657133
1635
301 324
16
1667
1656
1667
298
1656
1667
1642
1642
1656
1635
94
1625
330
1667
9
123
131
1670
1624
1668 76
1660
1674
79
1640 1635
1668
283
121
93
7
1635
32
302
290
297
1675
1642
1675
323
1658
1657
166975
120
1668 77
1625
296
305
1650
101
322
1668
1675
95
132
295
303
304
1665
78
1640
33
2911625 294
96
1630
74 1675
321
1642 329
1650
127
100
92
119
307
1628
1669
1645
1678
1642
90
1673
1658 34
6
1645 1640
1670
1665
1625
292 1630 1630
1669
117
1668
1642
1642
73
1660
1671
1677
306
103
1645
118 1650
110
97
89 1674
1660
1676
293
320
99
1625
318
98
1669
116 1650
1645
1671
128
319
1650
71
1665
309
102 72
91 5
1677 1676
111
308
1630
1643
1675 1678
1646
1648
115
109
1660
1645
1678
1645
1675 1675
88
16761678
112 1665
1645
114
69
108
317
35
113
36
70
316
1646
1668
104
3
1674
1665
1646
1670
87
4
1666
1643
38 37
1658
310
1654
1658
1670
107
1642
68
314
1674
1681
39
315
42
41
1658
1673
1679
1654
53
1645
67
40
1670
106
54
1674
61
1644
1654
1642
164843
1648
63 64
52 1673
313
1669
1648
50
1673
1674
55
1675
44
48
311
1674 66
59
312
46
1648
62 1675 65
1675
60
1644
105
2
57
1671
56
58
51
1675
45
49
1676
1649
1670
1646
1679
1675
1648
1668
47
1
1675
1675
1674
1678
1673 1676 1670
1673
1666
1670
1668
1696
254

GoM : Phed

1610

252

249

DPR of GSWSP (Phase III)

284

Page 1
7/25/2008 9:15:35 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone IX Laban, Bishnupur.NET

Link - Node Table:


---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------4
3
4
46.35
400
5
4
5
97.4
400
6
5
6
67.6
400
7
6
7
76.4
100
8
7
8
93.69
100
9
8
9
39.84
100
10
9
10
91.84
300
11
10
11
59
300
12
11
12
74.92
100
13
12
13
40.72
100
14
13
14
64
100
15
14
15
71.76
100
16
15
16
56.4
100
17
16
11
56
100
18
14
17
61.3
300
19
17
18
44.9
100
20
18
19
100.3
100
21
19
20
49.31
100
22
20
21
101.6
100
23
21
22
60.28
100
24
22
23
5.26
150
25
23
24
7.75
100
26
24
25
63.8
100
27
25
26
78.86
100
28
26
27
47.67
100
29
27
28
43.1
150
30
28
29
96.08
150
31
29
30
65.7
150
32
30
31
87.4
150
33
31
32
73.75
150
34
32
33
46.8
200
35
33
34
101.5
200
36
34
35
49.4
200
37
35
36
73.7
200
38
36
37
45.1
150
39
37
38
129.8
100
40
38
39
139.6
100

GoM : Phed

DPR of GSWSP (Phase-III)

285

Page 2
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------41
39
40
131.1
100
42
40
41
26.1
100
43
41
42
32.4
100
44
42
43
50.82
100
45
43
44
48.1
100
46
44
45
151.1
100
47
45
46
190.73
100
48
46
47
65.1
300
49
47
48
123.2
300
50
48
49
168.5
300
51
49
50
135.98
300
52
50
51
82
300
53
51
52
59.09
500
54
52
53
36.28
350
55
53
54
71.5
350
56
54
55
131.42
400
57
55
56
69.62
350
58
56
57
120
350
59
57
58
58.8
350
60
58
59
74.78
350
61
59
60
57.45
350
62
60
61
45.3
350
63
61
62
127.8
350
64
62
63
39.5
400
65
63
64
75.1
350
66
64
65
36.8
400
67
65
66
65.86
400
68
66
2
47.4
400
69
57
67
66.57
350
70
67
68
54.8
350
71
68
69
39.7
350
72
69
70
49.4
350
73
70
71
98.53
350
74
71
72
90
350
75
72
73
73.7
300
76
73
74
133.6
300
77
74
75
72.7
300
78
75
76
52
300
79
76
77
85.8
300
80
77
78
92
300
81
78
79
46.1
300
82
79
80
55.4
300
83
80
81
33.3
150
84
81
82
46.1
150
85
82
83
35.8
150
86
83
84
57.5
150
87
84
85
82.7
150

GoM : Phed

DPR of GSWSP (Phase-III)

286

Page 3
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------88
85
86
74.08
100
89
86
22
20.1
100
90
61
87
91.7
350
91
87
88
19.47
350
92
88
89
31.23
350
93
89
90
84.3
300
94
90
91
67.8
300
95
91
92
70.83
400
96
92
6
109.2
400
97
9
93
38.7
100
98
93
94
96.26
100
99
94
95
83.8
100
100
95
96
104.78
150
101
96
97
70.6
200
102
97
89
85.43
350
103
97
98
37.58
300
104
98
99
28
300
105
99
100
13.7
300
106
100
101
84.7
300
107
101
73
36.4
300
108
72
102
24.5
300
109
102
103
61
300
110
103
78
121.9
300
111
72
104
79.23
350
112
104
54
101.6
350
113
55
105
61.5
350
114
105
51
96.31
350
115
51
106
64.6
350
116
106
107
65.2
350
117
107
108
55.7
350
118
108
109
54.1
350
119
109
110
77.4
350
120
110
111
31.3
200
121
111
112
55
200
122
112
35
120.1
200
123
110
33
103.1
250
124
39
113
61.59
100
125
113
38
84.7
100
126
42
114
65.8
150
127
114
115
84.8
150
128
115
116
64.2
150
129
116
117
84.8
150
130
117
118
18.1
150
131
118
119
28.62
150
132
119
120
129.9
150
133
120
121
37.97
150
134
121
122
51.93
150

GoM : Phed

DPR of GSWSP (Phase-III)

287

Page 4
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------135
122
123
38.8
150
139
123
127
60.3
150
140
127
128
69.6
150
141
128
36
39.4
150
142
122
129
48.2
150
143
129
130
73.92
150
144
130
131
63.8
200
145
131
132
59.1
200
146
132
34
107.3
200
147
32
133
83
200
148
133
134
77.8
200
149
134
135
120.8
200
150
135
136
40.8
200
151
136
137
55.2
150
152
137
138
32
150
153
138
139
77.8
150
154
139
140
102.68
150
155
140
141
20.2
100
156
141
130
44.3
100
157
140
142
85.6
150
158
142
143
72.2
150
159
143
133
53.9
200
160
134
144
55.6
200
161
144
145
42.6
200
162
145
146
75.4
200
163
146
147
68.6
200
164
147
148
50
150
165
148
149
40.74
150
166
149
150
43
150
167
150
151
37.7
100
168
151
152
49.2
100
169
152
153
36.9
100
170
153
154
35.4
100
171
154
155
41.6
100
172
155
156
31
100
173
156
157
34.1
100
177
157
161
45.15
150
178
161
162
29.2
100
179
162
163
40.3
100
180
163
164
68
150
181
164
165
49.9
100
182
165
166
44.5
150
183
166
167
25.1
150
184
167
168
37.3
150
185
168
169
33.52
150
186
169
23
150
150
187
169
170
114.1
100

GoM : Phed

DPR of GSWSP (Phase-III)

288

Page 5
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------188
170
171
42.9
100
189
171
172
34.7
100
190
172
146
120
100
191
28
173
124
200
192
173
80
54.1
250
193
28
174
69.6
200
194
174
175
44.8
200
195
175
145
93.9
200
196
147
176
30.1
150
197
176
177
52.4
150
198
177
178
20.2
150
199
178
179
79.73
100
200
179
180
60.9
100
201
180
167
42.6
100
202
164
181
50.2
100
203
181
182
49.9
100
204
182
178
46.2
100
205
177
183
48
150
206
183
184
66.8
100
207
184
185
70
100
208
185
161
36.75
100
209
154
186
47.41
150
210
186
187
51.7
100
211
187
188
55.7
100
212
188
189
46.6
100
213
189
190
44.33
150
214
190
191
23.7
100
215
191
192
35.1
100
217
190
193
78.95
100
218
193
194
64.3
100
219
194
195
29.9
100
220
195
196
40
100
221
196
197
12
150
222
197
198
69.2
100
223
198
199
56.9
100
224
199
149
41.1
100
225
197
200
49.57
100
226
200
201
51.9
150
227
201
202
22.3
200
228
202
137
14.3
200
229
200
203
101.16
150
230
203
204
62
100
231
203
205
87.18
150
232
205
206
86.25
150
233
206
207
101.9
150
234
207
208
88
150
235
208
209
41.5
100

GoM : Phed

DPR of GSWSP (Phase-III)

289

Page 6
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------236
209
210
54.29
100
237
210
211
48.06
150
238
210
212
86.5
150
239
212
213
48.56
150
240
213
214
42.13
150
241
214
188
42.5
150
242
204
196
86
100
243
203
215
103.7
150
244
215
216
73.86
150
245
216
217
93.8
150
246
217
218
17.88
150
247
218
219
73.5
150
248
219
220
30
300
249
220
221
42
300
250
221
222
49.1
150
251
222
223
115
100
252
223
224
58.5
100
253
224
225
79.8
100
254
225
226
83.58
100
255
226
211
2.72
150
256
226
227
54.6
100
257
227
228
44.7
100
258
228
229
82.1
100
259
229
230
67.9
100
260
230
231
63.6
100
261
231
232
27.7
100
262
232
233
62.61
100
263
233
234
64
100
264
234
235
48.87
100
265
235
236
80.7
100
266
236
237
45.9
100
267
237
238
33.46
100
268
238
239
57.6
100
269
239
240
65.38
100
270
240
241
51.4
100
271
241
222
16.95
150
272
219
242
66.4
100
273
242
243
68.2
100
274
243
244
124.07
100
275
244
245
72.7
100
276
245
208
86.05
100
277
236
246
20.83
100
278
246
247
74.9
100
279
247
248
37.08
100
280
248
249
76.73
100
281
249
250
76.7
100
282
250
251
65.1
100

GoM : Phed

DPR of GSWSP (Phase-III)

290

Page 7
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------283
251
252
68.6
100
284
252
253
36.8
100
285
253
254
73.2
100
286
254
255
74.6
100
287
255
256
81.9
100
288
256
250
27.81
100
289
256
257
32
100
290
257
258
24.2
100
291
258
259
56.4
100
292
259
260
55.82
100
293
260
261
161.75
100
294
261
262
51.92
100
295
262
263
50
100
296
263
264
54.77
100
297
264
265
51
100
298
265
266
90.1
100
299
266
218
16.8
150
300
266
267
18.1
150
301
267
268
90.8
100
302
268
269
126.84
100
303
269
270
113.9
100
304
270
271
49.7
100
305
271
250
38
100
306
263
272
27.4
100
307
272
273
62.29
100
308
273
274
12.1
100
309
274
275
61.99
100
310
275
276
30.6
100
311
276
277
52.62
100
315
277
281
58.68
100
316
281
282
14.7
100
317
282
283
69
100
318
283
284
93.1
100
319
284
275
23.5
100
320
283
285
73.4
100
321
285
286
95.6
100
322
286
287
43.9
100
323
287
288
48.7
100
324
288
289
98.8
100
325
289
217
75.26
150
326
282
290
28.6
100
327
290
291
61.1
100
328
291
292
85.81
100
329
292
293
27.07
100
330
293
294
60.59
100
331
294
295
29.5
100
332
295
296
50.9
100

GoM : Phed

DPR of GSWSP (Phase-III)

291

Page 8
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------333
296
297
65
100
334
297
298
66.8
100
335
298
299
91.9
100
336
299
300
27.8
100
337
300
289
87.09
150
338
299
301
54.1
150
339
301
302
100
150
340
302
303
100
150
341
303
304
68.5
150
342
304
305
64.9
150
343
305
306
27.3
200
344
306
307
100
100
345
307
308
100
100
346
308
309
100
100
347
309
310
100
100
348
310
311
100
100
349
311
312
100
100
350
312
42
8
150
351
312
313
63.3
100
352
313
314
66.8
200
353
314
315
81.4
100
354
315
316
47.06
100
355
316
317
53.9
100
356
317
318
35.1
100
357
318
319
47.6
100
358
319
320
105.92
100
359
320
321
32.22
100
360
321
322
99.4
100
361
322
323
70.87
100
362
323
324
69.6
100
363
324
325
64.8
100
364
325
326
56.7
100
365
326
300
42.75
150
366
326
327
15.3
100
367
327
328
56.5
100
368
328
323
120.54
100
369
321
329
69.2
150
370
329
121
41.2
150
371
329
330
40.1
100
372
330
331
122.2
100
373
331
332
132.2
100
374
332
333
31.2
100
375
333
138
118.4
100
376
331
334
27
150
377
334
335
36.9
150
378
335
336
69.6
100
379
336
333
97.6
100

GoM : Phed

DPR of GSWSP (Phase-III)

292

Page 9
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------380
335
337
51.44
150
385
337
342
49.7
150
386
342
328
15.1
150
387
342
343
69.7
100
388
343
344
74.7
100
389
344
216
58.68
100
391
17
346
45
100
392
346
347
40.26
100
393
347
83
38.61
100
394
91
64
102.40
350
216
192
150
19
150
395
306
321
76.5
150
1
1
2
120
400
2
1
3
120
400
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------2
0.00
1694.87
16.87
3
2.40
1695.33
14.33
4
2.40
1695.08
16.08
5
2.40
1694.56
16.56
6
0.00
1694.21
18.21
7
1.56
1690.12
15.12
8
1.56
1685.85
11.85
9
0.00
1684.33
9.33
10
2.10
1684.29
16.29
11
0.00
1684.27
14.27
12
2.10
1682.51
15.51
13
2.10
1681.85
14.85
14
0.00
1681.17
19.17
15
1.20
1682.14
15.14
16
1.20
1683.10
15.10
17
0.00
1681.15
13.15
18
1.80
1679.08
12.08
19
1.80
1675.30
13.30
20
1.80
1673.82
11.82
21
1.80
1671.47
9.47
22
0.00
1670.44
8.44
23
0.00
1670.32
13.32
24
2.70
1670.39
4.39
25
2.70
1671.49
5.49
26
2.70
1673.59
6.59
27
2.70
1675.40
8.40
28
0.00
1675.70
8.70

GoM : Phed

DPR of GSWSP (Phase-III)

293

Page 10
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------29
1.20
1675.47
8.47
30
1.20
1675.41
8.41
31
1.20
1675.36
8.36
32
0.00
1675.33
10.33
33
0.00
1677.51
12.51
34
0.00
1676.43
16.43
35
0.00
1676.47
18.47
36
0.00
1675.42
17.42
37
1.80
1675.16
17.16
38
0.00
1670.83
16.83
39
0.00
1669.63
15.63
40
1.80
1666.21
18.21
41
1.80
1665.69
17.69
42
0.00
1665.24
17.24
43
0.30
1667.31
19.31
44
0.30
1669.34
20.34
45
0.30
1675.93
9.93
46
0.30
1684.52
16.52
47
0.30
1684.54
16.54
48
0.30
1684.57
14.57
49
0.36
1684.61
14.61
50
0.60
1684.64
13.64
51
0.00
1684.66
11.66
52
1.50
1684.71
9.71
53
1.50
1684.87
11.87
54
0.00
1685.21
11.21
55
0.00
1685.24
10.24
56
0.90
1685.69
12.69
57
0.00
1686.48
10.48
58
0.90
1687.38
17.38
59
0.90
1688.53
9.53
60
0.90
1689.43
14.43
61
0.00
1690.13
15.13
62
0.90
1692.02
17.02
63
1.80
1692.33
17.33
64
0.00
1693.46
19.46
65
0.90
1693.80
18.80
66
0.90
1694.42
18.42
67
2.40
1686.32
17.32
68
2.40
1686.19
12.19
69
2.40
1686.11
16.11
70
2.40
1686.01
16.01
71
2.40
1685.81
7.81
72
0.00
1685.64
10.64
73
0.00
1686.06
17.06
74
2.40
1685.63
17.63
75
1.20
1685.41
10.41

GoM : Phed

DPR of GSWSP (Phase-III)

294

Page 11
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------76
1.20
1685.26
16.26
77
1.20
1685.02
16.02
78
0.00
1684.77
14.77
79
1.20
1684.20
16.20
80
0.00
1683.52
15.52
81
1.20
1682.82
15.82
82
1.20
1681.91
14.91
83
0.00
1681.25
14.25
84
1.05
1680.37
13.37
85
1.05
1679.21
12.21
86
1.05
1672.20
5.20
87
1.20
1690.13
17.13
88
1.20
1690.14
16.14
89
0.00
1690.14
14.14
90
1.20
1691.96
17.96
91
0.00
1693.44
17.44
92
2.40
1693.74
16.74
93
1.20
1684.95
16.95
94
1.20
1686.85
11.85
95
1.20
1688.85
15.85
96
1.20
1689.26
20.26
97
0.00
1689.34
12.34
98
1.80
1688.70
10.70
99
1.80
1688.23
13.23
100
1.80
1688.01
17.01
101
1.80
1686.64
8.64
102
1.20
1685.53
10.53
103
1.20
1685.27
14.27
104
2.40
1685.45
11.45
105
1.50
1685.01
11.01
106
1.26
1683.84
10.84
107
1.26
1683.03
13.03
108
1.26
1682.33
16.33
109
1.26
1681.67
13.67
110
0.00
1680.73
15.73
111
1.20
1680.05
15.05
112
1.20
1678.90
13.90
113
1.80
1670.00
16.00
114
0.90
1665.22
19.22
115
0.90
1665.21
19.21
116
0.90
1665.21
17.21
117
0.90
1665.21
15.21
118
0.90
1665.21
15.21
119
0.90
1665.21
15.21
120
0.90
1665.23
15.23
121
0.00
1665.25
15.25
122
0.00
1669.74
13.74

GoM : Phed

DPR of GSWSP (Phase-III)

295

Page 12
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------123
1.80
1670.66
12.66
127
1.80
1672.23
12.23
128
1.80
1674.20
14.20
129
1.80
1670.90
14.90
130
0.00
1672.87
16.87
131
1.20
1673.81
16.81
132
1.20
1674.72
16.72
133
0.00
1671.22
11.22
134
0.00
1668.95
8.95
135
1.20
1666.76
11.76
136
1.20
1666.05
16.05
137
0.00
1662.27
19.27
138
0.00
1662.60
19.60
139
1.80
1665.20
18.20
140
0.00
1668.92
11.92
141
1.80
1670.02
13.02
142
1.20
1670.01
13.01
143
1.20
1671.02
14.02
144
1.20
1668.85
13.85
145
0.00
1668.78
11.78
146
0.00
1665.38
19.38
147
0.00
1662.39
14.39
148
3.60
1658.43
10.43
149
0.00
1655.51
13.51
150
0.00
1653.61
16.61
151
3.90
1651.03
15.03
152
3.90
1648.70
12.70
153
3.90
1647.60
11.60
154
0.00
1647.04
10.04
155
3.30
1648.47
8.47
156
3.30
1650.02
10.02
157
3.30
1652.34
10.34
161
0.00
1652.89
9.89
162
7.80
1653.75
8.75
163
7.80
1656.48
11.48
164
0.00
1657.62
11.62
165
3.60
1661.29
15.29
166
3.60
1661.89
15.89
167
0.00
1662.32
16.32
168
0.90
1663.42
17.42
169
0.00
1665.35
19.35
170
1.20
1665.28
18.28
171
1.20
1665.28
18.28
172
1.20
1665.28
13.28
173
1.05
1682.50
15.50
174
2.10
1673.28
15.28
175
2.10
1671.78
14.78

GoM : Phed

DPR of GSWSP (Phase-III)

296

Page 13
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------176
2.10
1661.63
15.63
177
0.00
1660.43
13.43
178
0.00
1660.38
13.38
179
3.60
1660.51
14.51
180
3.60
1660.97
14.97
181
3.60
1658.04
11.04
182
3.60
1658.94
12.94
183
4.05
1659.90
13.90
184
4.05
1656.17
10.17
185
4.05
1653.64
8.64
186
8.67
1646.46
16.46
187
4.20
1644.42
14.42
188
0.00
1643.18
14.18
189
4.05
1647.57
18.57
190
0.00
1648.33
16.33
191
2.40
1650.12
15.12
192
2.70
1653.32
17.32
193
2.70
1648.99
14.99
194
2.70
1649.98
15.98
195
2.70
1650.70
16.70
196
0.00
1652.11
18.11
197
0.00
1652.30
10.30
198
3.60
1652.97
7.97
199
3.60
1654.12
9.12
200
0.00
1655.40
12.40
201
1.80
1661.20
17.20
202
1.80
1661.84
18.84
203
0.00
1648.79
10.79
204
3.00
1649.81
13.81
205
3.00
1646.65
17.65
206
3.00
1644.86
16.86
207
3.00
1643.08
15.08
208
0.00
1641.83
13.83
209
6.30
1640.08
18.08
210
0.00
1639.14
18.14
211
0.00
1637.94
16.94
212
3.75
1640.31
18.31
213
3.75
1641.15
16.15
214
3.75
1642.06
13.06
215
3.60
1646.35
17.35
216
0.00
1644.93
15.93
217
0.00
1641.70
16.70
218
0.00
1640.02
16.02
219
0.00
1638.04
15.04
220
3.00
1638.01
13.01
221
3.00
1637.97
12.97
222
0.00
1636.84
13.84

GoM : Phed

DPR of GSWSP (Phase-III)

297

Page 14
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------223
6.30
1635.72
9.72
224
6.30
1635.70
15.70
225
6.30
1636.09
16.09
226
0.00
1637.87
16.87
227
3.60
1633.00
17.00
228
3.60
1630.02
14.02
229
3.60
1626.15
11.15
230
3.60
1624.05
10.05
231
3.60
1622.92
9.92
232
0.60
1622.70
10.70
233
3.60
1622.27
12.27
234
3.60
1622.19
12.19
235
3.60
1622.20
12.20
236
0.00
1622.52
12.52
237
3.00
1623.64
11.64
238
3.00
1624.85
10.85
239
3.00
1627.78
12.78
240
3.00
1632.17
16.17
241
3.00
1636.59
16.59
242
1.80
1638.17
15.17
243
1.80
1638.47
98.47
244
1.80
1639.44
99.44
245
1.80
1640.33
97.33
246
3.60
1622.31
8.31
247
3.60
1622.08
12.08
248
3.60
1622.08
12.08
249
3.60
1622.23
12.23
250
0.00
1622.85
12.85
251
2.70
1622.29
12.29
252
2.70
1622.05
12.05
253
2.70
1622.03
12.03
254
2.70
1622.05
12.05
255
2.70
1622.26
12.26
256
0.00
1622.88
12.88
257
1.05
1623.28
13.28
258
1.05
1623.65
13.65
259
1.05
1624.71
14.71
260
1.05
1625.95
15.95
261
1.05
1630.18
10.18
262
1.05
1631.75
9.75
263
0.00
1633.48
11.48
264
2.40
1634.59
9.59
265
2.40
1636.06
11.06
266
0.00
1639.60
15.60
267
1.80
1639.44
15.44
268
1.80
1634.67
10.67
269
1.80
1629.16
19.16

GoM : Phed

DPR of GSWSP (Phase-III)

298

Page 15
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------270
1.50
1625.14
15.14
271
1.80
1623.70
13.70
272
1.80
1633.56
11.56
273
1.80
1633.91
8.91
274
1.80
1634.02
9.02
275
0.00
1634.90
9.90
276
0.60
1635.00
10.00
277
0.60
1635.22
11.22
281
0.60
1635.53
10.53
282
0.00
1635.62
10.62
283
0.00
1635.68
10.68
284
1.35
1635.01
12.01
285
1.35
1636.55
12.55
286
1.35
1638.06
15.06
287
1.35
1638.93
18.93
288
1.35
1640.14
18.14
289
0.00
1643.11
18.11
290
1.35
1635.71
10.71
291
1.35
1636.02
11.02
292
1.35
1636.69
11.69
293
1.35
1636.99
6.99
294
1.35
1637.89
7.89
295
1.35
1638.44
8.44
296
1.35
1639.64
11.64
297
1.35
1641.50
11.50
298
1.35
1643.79
8.79
299
0.00
1647.49
12.49
300
0.00
1646.32
18.32
301
1.80
1648.60
8.60
302
1.80
1650.88
10.88
303
1.80
1653.38
13.38
304
1.80
1655.26
10.26
305
1.80
1657.19
12.19
306
0.00
1657.41
12.41
307
0.45
1658.40
13.40
308
0.45
1659.51
14.51
309
0.45
1660.73
15.73
310
0.45
1662.07
17.07
311
0.45
1663.55
17.55
312
0.00
1665.15
17.15
313
0.90
1663.52
19.52
314
0.90
1663.47
19.47
315
0.90
1661.89
19.89
316
1.80
1661.11
19.11
317
0.90
1660.49
17.49
318
0.90
1660.16
14.16
319
0.90
1659.82
14.82

GoM : Phed

DPR of GSWSP (Phase-III)

299

Page 16
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------320
0.90
1659.24
16.24
321
0.00
1659.12
17.12
322
1.80
1654.11
12.11
323
0.00
1651.17
9.17
324
1.20
1649.37
14.37
325
1.20
1647.98
12.98
326
0.00
1646.99
11.99
327
1.20
1647.74
12.74
328
0.00
1650.85
8.85
329
0.00
1661.99
19.99
330
1.80
1659.65
17.65
331
0.00
1653.67
11.67
332
1.80
1655.04
13.04
333
0.00
1655.52
13.52
334
1.80
1653.32
11.32
335
0.00
1652.89
10.89
336
1.80
1653.77
11.77
337
1.80
1651.84
9.84
342
0.00
1650.93
8.93
343
1.80
1648.39
11.39
344
1.80
1646.23
9.23
346
1.20
1681.15
16.15
347
1.20
1681.18
14.18
1
-494.19
1696.00
0.00
Reservoir
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------4
209.44
1.67
5.43
Open
5
207.04
1.65
5.32
Open
6
204.64
1.63
5.20
Open
7
18.80
2.39
53.52
Open
8
17.24
2.20
45.59
Open
9
15.68
2.00
38.24
Open
10
25.44
0.36
0.45
Open
11
23.34
0.33
0.38
Open
12
12.02
1.53
23.40
Open
13
9.92
1.26
16.40
Open
14
7.82
1.00
10.56
Open
15
-8.92
1.14
13.46
Open
16
-10.12
1.29
17.00
Open
17
-11.32
1.44
20.92
Open
18
16.74
0.24
0.38
Open
19
17.35
2.21
46.14
Open
20
15.55
1.98
37.66
Open

GoM : Phed

DPR of GSWSP (Phase-III)

300

Page 17
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------21
13.75
1.75
29.99
Open
22
11.95
1.52
23.13
Open
23
10.15
1.29
17.09
Open
24
34.66
1.96
23.06
Open
25
-7.50
0.95
9.76
Open
26
-10.20
1.30
17.24
Open
27
-12.90
1.64
26.63
Open
28
-15.60
1.99
37.87
Open
29
-18.30
1.04
7.07
Open
30
7.29
0.41
2.39
Open
31
6.09
0.34
0.92
Open
32
4.89
0.28
0.61
Open
33
3.69
0.21
0.36
Open
34
-107.87
3.44
46.51
Open
35
48.61
1.55
10.62
Open
36
-11.93
0.38
0.79
Open
37
56.94
1.81
14.24
Open
38
16.36
0.93
5.74
Open
39
14.56
1.85
33.34
Open
40
7.01
0.89
8.62
Open
41
12.76
1.63
26.11
Open
42
10.96
1.40
19.70
Open
43
9.16
1.17
14.13
Open
44
-16.23
2.07
40.78
Open
45
-16.53
2.11
42.19
Open
46
-16.83
2.14
43.62
Open
47
-17.13
2.18
45.07
Open
48
-17.43
0.25
0.22
Open
49
-17.73
0.25
0.23
Open
50
-18.03
0.26
0.23
Open
51
-18.39
0.26
0.24
Open
52
-18.99
0.27
0.26
Open
53
-132.79
0.68
0.79
Open
54
-134.29
1.40
4.57
Open
55
-135.79
1.41
4.66
Open
56
-41.74
0.33
0.27
Open
57
-162.24
1.69
6.49
Open
58
-163.14
1.70
6.55
Open
59
-258.06
2.68
15.32
Open
60
-258.96
2.69
15.42
Open
61
-259.86
2.70
15.52
Open
62
-260.76
2.71
15.62
Open
63
-253.00
2.63
14.77
Open
64
-253.90
2.02
7.76
Open
65
-255.70
2.66
15.06
Open
66
-280.55
2.23
9.33
Open
67
-281.45
2.24
9.39
Open

GoM : Phed

DPR of GSWSP (Phase-III)

301

Page 18
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------68
-282.35
2.25
9.44
Open
69
94.92
0.99
2.40
Open
70
92.52
0.96
2.29
Open
71
90.12
0.94
2.19
Open
72
87.72
0.91
2.08
Open
73
85.32
0.89
1.97
Open
74
82.92
0.86
1.87
Open
75
-101.12
1.43
5.72
Open
76
74.05
1.05
3.21
Open
77
71.65
1.01
3.02
Open
78
70.45
1.00
2.93
Open
79
69.25
0.98
2.84
Open
80
68.05
0.96
2.75
Open
81
153.24
2.17
12.36
Open
82
152.04
2.15
12.19
Open
83
33.07
1.87
21.14
Open
84
31.87
1.80
19.74
Open
85
30.67
1.74
18.39
Open
86
27.67
1.57
15.19
Open
87
26.62
1.51
14.14
Open
88
25.57
3.26
94.59
Open
89
24.52
3.12
87.53
Open
90
-7.76
0.08
0.02
Open
91
-8.96
0.09
0.03
Open
92
-10.16
0.11
0.04
Open
93
-207.09
2.93
21.59
Open
94
-208.29
2.95
21.83
Open
95
-183.44
1.46
4.25
Open
96
-185.84
1.48
4.35
Open
97
-9.77
1.24
15.92
Open
98
-10.97
1.40
19.73
Open
99
-12.17
1.55
23.91
Open
100
-13.37
0.76
3.95
Open
101
-14.57
0.46
1.14
Open
102
-196.93
2.05
9.29
Open
103
182.36
2.58
17.06
Open
104
180.56
2.56
16.75
Open
105
178.76
2.53
16.45
Open
106
176.96
2.50
16.14
Open
107
175.16
2.48
15.84
Open
108
87.59
1.24
4.39
Open
109
86.39
1.22
4.28
Open
110
85.19
1.21
4.17
Open
111
96.45
1.00
2.47
Open
112
94.05
0.98
2.36
Open
113
120.50
1.25
3.74
Open
114
119.00
1.24
3.65
Open

GoM : Phed

DPR of GSWSP (Phase-III)

302

Page 19
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------115
232.80
2.42
12.66
Open
116
231.54
2.41
12.53
Open
117
230.28
2.39
12.41
Open
118
229.02
2.38
12.28
Open
119
227.76
2.37
12.15
Open
120
71.28
2.27
21.59
Open
121
70.08
2.23
20.92
Open
122
68.88
2.19
20.26
Open
123
156.48
3.19
31.24
Open
124
-5.75
0.73
5.96
Open
125
-7.55
0.96
9.87
Open
126
2.89
0.16
0.23
Open
127
1.99
0.11
0.11
Open
128
1.09
0.06
0.04
Open
129
0.19
0.01
0.00
Open
130
-0.71
0.04
0.02
Open
131
-1.61
0.09
0.08
Open
132
-2.51
0.14
0.18
Open
133
-3.41
0.19
0.31
Open
134
-70.77
4.01
86.50
Open
135
-35.18
1.99
23.72
Open
139
-36.98
2.09
26.01
Open
140
-38.78
2.20
28.40
Open
141
-40.58
2.30
30.89
Open
142
-35.58
2.01
24.21
Open
143
-37.38
2.12
26.53
Open
144
-58.14
1.85
14.80
Open
145
-59.34
1.89
15.38
Open
146
-60.54
1.93
15.96
Open
147
111.56
3.55
49.49
Open
148
83.92
2.67
29.21
Open
149
64.82
2.06
18.11
Open
150
63.62
2.03
17.49
Open
151
62.42
3.53
68.57
Open
152
-22.45
1.27
10.32
Open
153
-42.40
2.40
33.50
Open
154
-44.20
2.50
36.18
Open
155
-18.96
2.42
54.38
Open
156
-20.76
2.64
64.33
Open
157
-25.24
1.43
12.82
Open
158
-26.44
1.50
13.97
Open
159
-27.64
0.88
3.74
Open
160
19.09
0.61
1.88
Open
161
17.89
0.57
1.67
Open
162
106.03
3.38
45.05
Open
163
104.07
3.31
43.51
Open
164
67.53
3.82
79.31
Open

GoM : Phed

DPR of GSWSP (Phase-III)

303

Page 20
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------165
63.93
3.62
71.66
Open
166
49.24
2.79
44.19
Open
167
21.48
2.74
68.54
Open
168
17.58
2.24
47.30
Open
169
13.68
1.74
29.73
Open
170
9.78
1.25
15.97
Open
171
-14.81
1.89
34.41
Open
172
-18.11
2.31
49.95
Open
173
-21.41
2.73
68.10
Open
177
-24.71
1.40
12.32
Open
178
-13.56
1.73
29.24
Open
179
-21.36
2.72
67.83
Open
180
-29.16
1.65
16.75
Open
181
-22.31
2.84
73.51
Open
182
-25.91
1.47
13.46
Open
183
-29.51
1.67
17.12
Open
184
-39.62
2.24
29.55
Open
185
-40.52
2.29
57.44
Open
186
-42.16
2.39
33.15
Open
187
1.64
0.21
0.58
Open
188
0.44
0.06
0.05
Open
189
-0.76
0.10
0.14
Open
190
-1.96
0.25
0.81
Open
191
-117.92
3.76
54.84
Open
192
-118.97
2.43
18.80
Open
193
92.33
2.94
34.87
Open
194
90.23
2.87
33.41
Open
195
88.13
2.81
31.99
Open
196
36.54
2.07
25.43
Open
197
34.44
1.95
22.79
Open
198
11.14
0.63
2.82
Open
199
-2.91
0.37
1.69
Open
200
-6.51
0.83
7.51
Open
201
-10.11
1.29
31.65
Open
202
-6.85
0.87
8.25
Open
203
-10.45
1.33
18.04
Open
204
-14.05
1.79
31.22
Open
205
23.30
1.32
11.05
Open
206
19.25
2.45
55.92
Open
207
15.20
1.94
36.10
Open
208
11.15
1.42
20.34
Open
209
24.59
1.39
12.21
Open
210
15.92
2.03
39.36
Open
211
11.72
1.49
22.32
Open
212
-25.50
3.25
94.14
Open
213
-29.55
1.67
17.17
Open
214
-22.66
2.89
75.64
Open

GoM : Phed

DPR of GSWSP (Phase-III)

304

Page 21
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------215
-25.06
3.19
91.15
Open
217
-6.89
0.88
8.35
Open
218
-9.59
1.22
15.39
Open
219
-12.29
1.57
24.37
Open
220
-14.99
1.91
35.20
Open
221
-27.93
1.58
15.47
Open
222
-7.49
0.95
9.73
Open
223
-11.09
1.41
20.13
Open
224
-14.69
1.87
33.89
Open
225
-20.45
2.60
62.54
Open
226
-81.27
4.60
111.78
Open
227
-83.07
2.65
28.67
Open
228
-84.87
2.70
29.83
Open
229
60.83
3.44
65.36
Open
230
-9.94
1.27
16.45
Open
231
35.78
2.03
24.46
Open
232
32.78
1.86
20.80
Open
233
29.78
1.69
17.41
Open
234
26.78
1.52
14.30
Open
235
16.52
2.10
42.13
Open
236
10.22
1.30
17.31
Open
237
36.19
2.05
24.99
Open
238
-25.97
1.47
13.51
Open
239
-29.72
1.68
17.35
Open
240
-33.47
1.90
21.62
Open
241
-37.22
2.11
26.32
Open
242
-12.94
1.65
26.81
Open
243
34.99
1.98
23.47
Open
244
31.39
1.78
19.19
Open
245
43.06
2.44
34.47
Open
246
73.98
4.19
93.91
Open
247
37.67
2.13
26.91
Open
248
40.73
0.58
1.06
Open
249
37.73
0.53
0.92
Open
250
34.73
1.97
23.15
Open
251
7.47
0.95
9.69
Open
252
1.17
0.15
0.32
Open
253
-5.13
0.65
4.83
Open
254
-11.43
1.46
21.30
Open
255
-36.19
2.05
24.95
Open
256
24.76
3.15
89.17
Open
257
21.16
2.70
66.66
Open
258
17.56
2.24
47.20
Open
259
13.96
1.78
30.86
Open
260
10.36
1.32
17.77
Open
261
6.76
0.86
8.06
Open
262
6.16
0.79
6.79
Open

GoM : Phed

DPR of GSWSP (Phase-III)

305

Page 22
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------263
2.56
0.33
1.34
Open
264
-1.04
0.13
0.25
Open
265
-4.64
0.59
4.01
Open
266
-12.26
1.56
24.27
Open
267
-15.26
1.94
36.39
Open
268
-18.26
2.33
50.74
Open
269
-21.26
2.71
67.25
Open
270
-24.26
3.09
85.87
Open
271
-27.26
1.54
14.79
Open
272
-3.06
0.39
1.86
Open
273
-4.86
0.62
4.37
Open
274
-6.66
0.85
7.84
Open
275
-8.46
1.08
12.21
Open
276
-10.26
1.31
17.44
Open
277
7.63
0.97
10.07
Open
278
4.03
0.51
3.09
Open
279
0.43
0.05
0.05
Open
280
-3.17
0.40
1.98
Open
281
-6.77
0.86
8.08
Open
282
6.99
0.89
8.58
Open
283
4.29
0.55
3.48
Open
284
1.59
0.20
0.55
Open
285
-1.11
0.14
0.28
Open
286
-3.81
0.48
2.78
Open
287
-6.51
0.83
7.50
Open
288
2.06
0.26
0.89
Open
289
-8.57
1.09
12.48
Open
290
-9.62
1.23
15.47
Open
291
-10.67
1.36
18.74
Open
292
-11.72
1.49
22.30
Open
293
-12.77
1.63
26.14
Open
294
-13.82
1.76
30.26
Open
295
-14.87
1.89
34.65
Open
296
-11.10
1.41
20.17
Open
297
-13.50
1.72
28.98
Open
298
-15.90
2.03
39.24
Open
299
-36.30
2.06
25.13
Open
300
20.41
1.16
8.64
Open
301
18.61
2.37
52.52
Open
302
16.81
2.14
43.50
Open
303
15.01
1.91
35.27
Open
304
13.51
1.72
29.02
Open
305
11.71
1.49
22.27
Open
306
-3.77
0.48
2.73
Open
307
-5.57
0.71
5.62
Open
308
-7.37
0.94
9.45
Open
309
-9.17
1.17
14.16
Open

GoM : Phed

DPR of GSWSP (Phase-III)

306

Page 23
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------310
-4.16
0.53
3.26
Open
311
-4.76
0.61
4.19
Open
315
-5.36
0.68
5.22
Open
316
-5.96
0.76
6.37
Open
317
-1.99
0.25
0.83
Open
318
6.36
0.81
7.19
Open
319
5.01
0.64
4.62
Open
320
-8.35
1.06
11.92
Open
321
-9.70
1.24
15.73
Open
322
-11.05
1.41
20.02
Open
323
-12.40
1.58
24.78
Open
324
-13.75
1.75
30.01
Open
325
30.92
1.75
18.67
Open
326
-3.97
0.51
3.00
Open
327
-5.32
0.68
5.16
Open
328
-6.67
0.85
7.84
Open
329
-8.02
1.02
11.04
Open
330
-9.37
1.19
14.73
Open
331
-10.72
1.37
18.90
Open
332
-12.07
1.54
23.55
Open
333
-13.42
1.71
28.65
Open
334
-14.77
1.88
34.22
Open
335
-16.12
2.05
40.24
Open
336
16.50
2.10
42.05
Open
337
44.67
2.53
36.90
Open
338
-32.62
1.85
20.60
Open
339
-34.42
1.95
22.76
Open
340
-36.22
2.05
25.02
Open
341
-38.02
2.15
27.37
Open
342
-39.82
2.25
29.82
Open
343
-41.62
1.33
7.97
Open
344
-7.57
0.96
9.92
Open
345
-8.02
1.02
11.04
Open
346
-8.47
1.08
12.22
Open
347
-8.92
1.14
13.45
Open
348
-9.37
1.19
14.73
Open
349
-9.82
1.25
16.07
Open
350
-22.50
1.27
10.34
Open
351
12.68
1.62
25.81
Open
352
11.78
0.38
0.77
Open
353
10.88
1.39
19.44
Open
354
9.98
1.27
16.57
Open
355
8.18
1.04
11.46
Open
356
7.28
0.93
9.23
Open
357
6.38
0.81
7.23
Open
358
5.48
0.70
5.46
Open
359
4.58
0.58
3.91
Open

GoM : Phed

DPR of GSWSP (Phase-III)

307

Page 24
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------360
18.19
2.32
50.34
Open
361
16.39
2.09
41.50
Open
362
12.68
1.62
25.81
Open
363
11.48
1.46
21.47
Open
364
10.28
1.31
17.50
Open
365
28.17
1.60
15.71
Open
366
-17.89
2.28
48.85
Open
367
-19.09
2.43
55.09
Open
368
-3.71
0.47
2.65
Open
369
-47.65
2.70
41.58
Open
370
-67.36
3.81
78.94
Open
371
19.70
2.51
58.40
Open
372
17.90
2.28
48.91
Open
373
-7.74
0.99
10.35
Open
374
-9.54
1.22
15.25
Open
375
-19.95
2.54
59.77
Open
376
25.65
1.45
13.20
Open
377
23.85
1.35
11.54
Open
378
-8.61
1.10
12.61
Open
379
-10.41
1.33
17.92
Open
380
32.46
1.84
20.42
Open
385
30.66
1.74
18.37
Open
386
15.39
0.87
5.13
Open
387
15.27
1.95
36.42
Open
388
13.47
1.72
28.87
Open
389
11.67
1.49
22.14
Open
391
-0.60
0.08
0.09
Open
392
-1.80
0.23
0.70
Open
393
-3.00
0.38
1.80
Open
394
-24.85
0.26
0.20
Open
216
-27.76
1.57
15.28
Open
395
-34.05
1.93
22.31
Open
1
282.35
2.25
9.44
Open
2
211.84
1.69
5.55
Open

GoM : Phed

DPR of GSWSP (Phase-III)

308

g,

,
i

Legends
Pipeline
Road
Zone Boundary

Reservoir

Distribution Network - Zone - X : Mawprem, Jaiaw, Mawkhar, South East Mawkhar, Barapathar
o
w

.03im

.045bn

Greater Shillong Water Supply Project (Phase III)

GoM:PHED

GoM : Phed

Length of pipe line required diameterwise


Zone : X
Area of coverage : Mawprem, Jaiaw, Mawkhar, South East Mawkhar, Barapathar.
Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

200

150

100

77.00

79.00

14.00

4.

30.00

5.

54.00

6.

11

10

47.00

7.

11

13

12

28.00

8.

13

16

15

35.00

9.

16

18

17

36.00

10.

18

19

18

52.00

11.

20

19

86.00

12.

20

21

20

59.00

13.

21

23

22

39.00

14.

23

24

23

80.00

15.

24

27

26

78.00

16.

27

28

27

62.00

17.

28

30

29

91.00

18.

30

33

32

22.00

19.

33

34

33

99.00

20.

34

35

34

48.00

21.

35

36

35

79.00

22.

35

37

36

38.00

23.

37

38

37

70.00

From

To

1.

2.

3.

310

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

38

86.00

40

39

74.00

40

42

41

33.00

27.

42

43

42

54.00

28.

43

44

48

61.00

29.

44

45

44

27.00

30.

37

49

48

35.00

31.

49

50

49

45.00

32.

52

50

52

43.00

33.

52

33

53

41.00

34.

52

53

54

27.00

35.

53

54

55

40.00

36.

54

30

56

40.00

37.

53

55

57

50.00

38.

55

56

58

70.00

39.

56

58

60

78.00

40.

58

57

61

80.00

41.

27

59

62

25.00

42.

59

60

63

56.00

43.

60

61

64

28.00

44.

61

62

65

17.00

45.

62

64

67

56.00

46.

64

66

69

53.00

47.

66

68

71

32.00

48.

68

70

73

48.00

49.

70

71

74

12.00

50.

71

72

75

50.00

From

To

24.

38

39

25.

37

26.

311

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

76

40.00

74

77

30.00

74

75

78

33.00

54.

75

76

79

45.00

55.

76

73

80

92.00

56.

76

77

81

98.00

57.

77

61

82

100.00

58.

71

79

84

78.00

59.

79

80

85

49.00

60.

80

82

87

57.00

61.

82

84

89

112.00

62.

84

85

90

205.00

63.

85

87

92

111.00

64.

87

88

93

41.00

65.

88

89

94

120.00

66.

89

79

95

132.00

67.

88

90

96

61.00

68.

90

92

97

117.00

69.

92

93

99

118.00

70.

93

94

100

105.00

71.

94

95

101

106.00

72.

95

96

102

107.00

73.

96

97

103

108.00

74.

97

98

104

61.00

75.

98

99

105

62.00

76.

99

100

106

34.00

77.

100

101

107

22.00

From

To

51.

72

73

52.

73

53.

312

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

108

18.00

103

109

138.00

103

104

110

140.00

81.

104

106

112

123.00

82.

106

70

113

120.00

83.

106

107

114

68.00

84.

107

108

115

70.00

85.

108

109

116

59.00

86.

109

102

117

60.00

87.

101

110

118

140.00

88.

110

111

119

224.00

89.

111

112

120

112.00

90.

112

108

121

168.00

91.

111

113

122

85.00

92.

113

114

123

65.00

93.

114

115

124

31.00

94.

115

116

125

91.00

95.

116

117

126

340.00

96.

117

118

127

339.00

97.

118

60

128

335.00

98.

116

119

129

99.00

99.

119

120

130

100.00

100.

120

121

131

84.00

101.

121

122

132

83.00

102.

120

123

133

45.00

103.

123

125

135

86.00

104.

125

130

140

41.00

From

To

78.

101

102

79.

102

80.

313

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

141

89.00

132

142

95.00

132

133

143

111.00

108.

133

59

144

115.00

109.

132

134

145

121.00

110.

134

135

146

122.00

111.

135

130

147

81.00

112.

135

137

149

97.00

113.

137

138

150

98.00

114.

138

141

153

64.00

115.

141

142

154

70.00

116.

115

146

159

186.00

117.

146

147

160

187.00

118.

147

148

161

188.00

119.

148

149

162

185.00

120.

149

150

163

190.00

121.

150

151

164

120.00

122.

151

152

165

123.00

123.

152

115

166

125.00

124.

151

153

167

48.00

125.

153

154

168

104.00

126.

154

114

169

155.00

127.

154

155

170

56.00

128.

155

155

171

89.00

129.

155

156

172

30.00

130.

156

151

173

125.00

131.

156

157

174

150.00

From

To

105.

130

131

106.

131

107.

314

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

175

153.00

159

176

69.00

159

160

177

104.00

135.

160

161

178

105.00

136.

161

162

179

105.00

137.

162

163

180

46.00

138.

163

164

181

80.00

139.

163

165

182

82.00

140.

165

166

183

112.00

141.

166

167

184

115.00

142.

167

113

185

164.00

143.

167

168

186

120.00

144.

168

169

187

125.00

145.

169

170

188

65.00

146.

170

171

189

60.00

147.

171

99

190

49.00

148.

100

172

191

159.00

149.

172

113

192

149.00

150.

169

174

194

80.00

151.

174

175

195

90.00

152.

175

97

196

85.00

153.

175

176

197

55.00

154.

176

179

198

55.00

155.

179

177

200

28.00

156.

179

181

202

140.00

157.

181

95

203

120.00

158.

181

182

204

61.00

From

To

132.

157

158

133.

158

134.

315

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

205

101.00

185

207

90.00

185

93

208

29.00

162.

185

187

210

130.00

163.

187

188

211

152.00

164.

188

189

212

143.00

165.

189

190

213

33.00

166.

190

191

214

148.00

167.

191

193

216

89.00

168.

193

195

218

130.00

169.

195

196

219

65.00

170.

196

197

220

83.00

171.

197

182

221

85.00

172.

196

177

222

92.00

173.

195

198

223

73.00

174.

198

199

224

18.00

175.

199

176

225

55.00

176.

199

165

226

143.00

177.

198

200

227

85.00

178.

200

201

228

86.00

179.

201

202

229

26.00

180.

202

193

231

55.0

181.

201

204

232

57.00

182.

204

205

233

30.00

183.

205

207

235

147.00

184.

207

208

286

51.00

185.

208

209

237

99.00

From

To

159.

182

183

160.

183

161.

316

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

238

100.00

210

239

67.00

210

211

240

87.00

189.

211

212

241

88.00

190.

212

161

242

129.00

191.

212

213

243

15.00

192.

213

214

244

36.00

193.

214

215

245

80.00

194.

213

159

246

98.00

195.

215

216

247

85.00

196.

216

217

248

48.00

197.

217

218

249

41.00

198.

218

219

250

73.00

199.

219

214

251

56.00

200.

219

220

252

80.00

201.

220

221

253

85.00

202.

221

222

254

92.00

203.

222

223

255

80.00

204.

223

158

256

85.00

205.

222

224

257

60.00

206.

224

225

258

71.00

207.

225

151

259

129.00

208.

225

226

260

108.00

209.

226

150

261

90.00

210.

226

227

262

74.00

211.

227

228

263

78.00

212.

228

229

264

60.00

From

To

186.

209

162

187.

208

188.

317

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

265

221

266

62.00

229

231

267

32.00

216.

231

228

268

64.00

217.

231

232

269

87.00

218.

232

233

270

52.00

219.

233

234

271

81.00

220.

234

235

272

85.00

221.

235

236

273

104.00

222.

236

237

274

184.00

223.

237

238

275

283.00

224.

238

239

276

140.00

225.

239

228

277

162.00

226.

232

242

280

77.00

227.

242

229

281

56.00

228.

242

243

282

46.00

229.

243

244

283

46.00

230.

244

245

284

40.00

231.

245

217

285

43.00

232.

218

230

286

146.00

233.

245

246

287

114.00

234.

246

216

288

80.00

235.

246

247

289

64.00

236.

247

210

290

68.00

237.

210

248

291

66.00

238.

248

249

292

48.00

239.

249

250

293

From

To

213.

229

230

214.

230

215.

200

150

100

60.00

61.00

318

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

294

36.00

252

295

32.00

252

253

296

73.00

243.

253

246

297

75.00

244.

252

254

298

88.00

245.

254

244

299

90.00

246.

254

255

300

68.00

247.

255

256

301

70.00

248.

256

257

302

80.00

249.

257

258

303

44.00

250.

258

259

304

64.00

251.

259

256

305

145.00

252.

259

243

306

28.00

253.

258

233

307

39.00

254.

233

260

308

83.00

255.

260

257

309

85.00

256.

260

235

310

166.00

257.

260

261

311

118.00

258.

261

262

312

19.00

259.

261

255

313

45.00

260.

262

263

314

62.00

261.

263

251

315

65.00

262.

262

264

316

55.00

263.

264

265

317

42.00

264.

264

267

319

100.00

265.

267

268

320

75.00

266.

268

269

321

70.00

From

To

240.

250

251

241.

251

242.

319

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

322

65.00

271

323

48.00

271

265

324

239.00

270.

272

270

326

76.00

271.

272

273

327

132.00

272.

273

274

328

130.00

273.

274

235

329

133.00

274.

269

275

330

41.00

275.

275

281

336

103.00

276.

281

283

338

63.00

277.

283

284

339

98.00

278.

284

286

341

91.00

279.

286

287

342

92.00

280.

287

289

344

68.00

281.

289

291

346

70.00

282.

291

292

347

69.00

283.

292

293

348

98.00

284.

293

294

349

70.00

285.

294

295

350

121.00

286.

295

249

351

100.00

287.

295

296

352

70.00

288.

296

298

354

70.00

289.

298

267

355

70.00

290.

298

250

356

117.00

291.

295

299

357

131.00

292.

299

300

358

135.00

293.

300

207

359

57.00

From

To

267.

269

270

268.

270

269.

320

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

360

96.00

207

361

70.00

301

302

362

51.00

297.

302

248

363

52.00

298.

300

303

364

87.00

299.

303

304

365

88.00

300.

304

306

367

73.00

301.

306

190

368

86.00

302.

306

307

369

84.00

303.

307

308

370

120.00

304.

308

309

371

125.00

305.

309

300

372

95.00

306.

309

310

373

89.00

307.

310

311

374

90.00

308.

311

312

375

93.00

309.

312

307

376

90.00

310.

312

313

377

57.00

311.

313

314

378

70.00

312.

314

315

379

70.00

313.

315

316

380

72.00

314.

316

311

381

55.00

315.

316

317

382

147.00

316.

317

319

384

116.00

317.

319

320

385

118.00

318.

320

291

386

66.00

319.

315

321

387

84.00

320.

321

322

388

85.00

From

To

294.

300

301

295.

301

296.

321

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

389

83.00

324

390

43.00

324

321

391

124.00

324.

323

326

393

55.00

325.

326

329

396

50.00

326.

329

331

398

26.00

327.

331

335

402

159.00

328.

335

342

409

66.00

329.

342

343

410

53.00

330.

343

344

411

54.00

331.

344

348

415

100.00

332.

348

350

417

102.00

333.

350

352

419

100.00

334.

352

353

420

99.00

335.

353

354

421

171.00

336.

354

190

422

60.00

337.

354

306

423

86.00

338.

353

355

424

130.00

339.

355

189

425

69.00

340.

353

357

427

35.00

341.

357

359

429

52.00

342.

359

360

430

40.00

343.

360

361

431

38.00

344.

361

344

432

100.00

345.

360

363

434

84.00

346.

363

365

436

65.00

From

To

321.

322

323

322.

323

323.

322

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

437

80.00

367

438

72.00

367

369

440

95.00

350.

369

370

441

96.00

351.

370

372

443

95.00

352.

366

373

445

90.00

353.

373

374

446

92.00

354.

374

376

448

28.00

355.

376

378

450

76.00

356.

378

379

451

80.00

357.

379

342

452

82.00

358.

320

292

455

91.00

359.

313

353

456

102.00

360.

381

156

45.00

361.

381

142

457

58.00

362.

204

163

98

95.00

363.

237

228

460

208.00

364.

267

283

454

106.00

365.

372

359

444

96.00

366.

135

145.00

367.

19

36

146.00

368.

39

45

11

210.00

369.

122

115

13

120.00

Total :

553

2905

282

1225

1836

24872

From

To

347.

365

366

348.

366

349.

323

((j

ZONE -X
*PROPOSED PIPELlNE ROUTE

AREA OF COVERAGE:

1. Mawprem

2. Jaiaw
3. Mawkhar
4. South East Mawkhar
5. Barapathar

'87

"

GoM:Phed

DPR of GSWSP (phase Ill)

324

Elevation

367

ZONE-X (Mawprem)

25.00
370

50.00

1471

75.00
100.00
m

366

373

3691473 1475
3651474
1472
372

374

1472
363

376
1476
378
1478
1479
379

342 335
343 1480
344
187
1472
331
185
359
14791477
85
93
14721473
87
1479
1481 92
1480
329
1479188
348
1476
1480
1473
1484
88
357
1483
355
1480 1479 183
350
1478 189
94
326 1475
84
1480
1482
1474
352
1477
1481
82
190
1479
353
1478
322 1474
89
1480 182
323
1485
80
197
95
354
1479
313
1486
1478
1475
314
191
1474 1473
1489 79 1490
1482 1481 196
315 321
1482 181
324
74
1477
1474
306
312 1473
195 1931479
1496
71
1482
1483
179 177
75
1472 1471
316
317 1472
1496
307
96
72
311
1485
1476
1475
1481
304
1496
176 1483
198
1484
291 289
1494 73
106
1480 319
1478
202
1476
308 310
199
148497 175
1495 70
1479
76
292
104
200
1477
1484
1487
1477 1476
1496
303
320
1479
1493
1486
309 1480
1475
287
1489
201
1495
1495
1485
1485
98
1478
293
68
103
1485
174
107 1495
204
1478 3001481 299
294
1480
1484
2861475
164
99
1488
163
205
1479
1494
109
1493
171
66
56
1485165
284
44
1494
170
1482
1481
42
108
102
1477
1476295
43
301
1474
1483
1490
169
100
207
55
1481
1480
1493
1489
1493
162
283 1473
1485
1492
77
1493
64
302
296
1487 168
1474
101
1493
1492
1491 1492
1475
45
209
40
1485
1487
1478
208
50
531491
1480
298
1472
1492
248
172
281 275
1492
1486
1474
1474
166
52
62
161
1489
249
49
58
1495
212
1479
1491
112
1479
210
211
1491
1490
1475 268 1473
1476 250
110
1487 167
54
39 38 37
269 1474
1486
1492
1478
160
247
61
1474
267
1490 1490
1493
113
1477
1491
213
1478
159
1476
1487
60
35 34 33
1491
1476270
14961497 1490
1472
251
1475
30149128
1480
1477
1493118
215
59
111
1489
263 2641473 271
114
1479
214
36
27
246253
1482
1494
2521473
149114901491 1492
158
1476
272
216
117 1493
133
219 1478
1493
1495
157
1472 1472
1493
265 1478
1479
1491
1494
1475
1476
116 115 1490
262
223
254
1475
1479
1476
218 217
220 1475
1477245244
1492
155 1480
1494
255
24
119
154
1480
132
1491 1490
1473
1476
1475
122
222 1476 14741479 1478
256 1473 261
1490 156
1493134
1492
221
1493
153
1474
273
1495
120 121
243
19
123
230
131
152
224
1491
1475
1482
257
1488
18
23 1496
259
1475
1477
125
1490
242 1485
1475
21
1492
16
1493 1492 1476
1476
225
260
1494
1490 151
258
229
1477
146
130
1474
1493
13
1494
274
1495
1480 1474
1494
1489150
1493
11
1479 227
228 1475231 232 233
20
1474
1480
135 1497
226
1489
1493
1474
8
234
1494
7 1494
147
1476
1479 1478 1475
1487
235
1495
1475
149
1476
1494 4
3
239
237 14781473
1496
1488
2
148
1486
236
1495
1495
1477
1475
1 1497
1487
238
1474
137
1512
381
1476
1494
142
1495
141
1496
138
1495
90

1471
360 361

1496

GoM : Phed

DPR of GSWSP (Phase III)

325

Page 1
6/21/2008 7:54:51 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone X Mawprem, Jaiaw, Mawkhar.NET
ZONE-X (Mawprem)
Link - Node Table:
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------1
1
2
77
350
2
2
3
79
300
3
2
4
14
350
6
4
7
30
350
7
7
8
54
100
10
8
11
47
100
12
11
13
28
100
15
13
16
35
100
17
16
18
36
100
18
18
19
52
100
19
7
20
86
300
20
20
21
59
300
22
21
23
39
300
23
23
24
80
300
26
24
27
78
300
27
27
28
62
100
29
28
30
91
100
32
30
33
22
100
33
33
34
99
100
34
34
35
48
100
35
35
36
79
100
36
35
37
38
100
37
37
38
70
100
38
38
39
86
100
39
37
40
74
100
41
40
42
33
100
42
42
43
54
100
43
43
44
61
100
44
44
45
27
100
48
37
49
35
100
49
49
50
45
100
52
52
50
43
100
53
52
33
41
100
54
52
53
27
100
55
53
54
40
100
56
54
30
40
100
57
53
55
50
100

GoM : Phed

DPR of GSWSP (Phase-III)

326

Page 2
ZONE-X (Mawprem)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------58
55
56
70
100
60
56
58
78
100
61
58
27
80
100
62
27
59
25
300
63
59
60
56
300
64
60
61
28
300
65
61
62
17
300
67
62
64
56
300
69
64
66
53
300
71
66
68
32
300
73
68
70
48
300
74
70
71
12
150
75
71
72
50
100
76
72
73
40
100
77
73
74
30
100
78
74
75
33
100
79
75
76
45
100
80
76
73
92
100
81
76
77
98
100
82
77
61
100
100
84
71
79
78
150
85
79
80
49
100
87
80
82
57
100
89
82
84
112
100
90
84
85
205
100
92
85
87
111
100
93
87
88
41
100
94
88
89
120
100
95
89
79
132
100
96
88
90
61
100
97
90
92
117
100
99
92
93
118
100
100
93
94
105
100
101
94
95
106
100
102
95
96
107
100
103
96
97
108
100
104
97
98
61
150
105
98
99
62
200
106
99
100
34
200
107
100
101
22
150
108
101
102
18
150
109
102
103
138
150
110
103
104
140
150
112
104
106
123
150
113
106
70
120
150
114
106
107
68
100
115
107
108
70
100

GoM : Phed

DPR of GSWSP (Phase-III)

327

Page 3
ZONE-X (Mawprem)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------116
108
109
59
150
117
109
102
60
150
118
101
110
140
150
119
110
111
224
150
120
111
112
112
150
121
112
108
168
150
122
111
113
85
150
123
113
114
65
250
124
114
115
31
250
125
115
116
91
250
126
116
117
340
300
127
117
118
339
300
128
118
60
335
300
129
116
119
99
300
130
119
120
100
300
131
120
121
84
200
132
121
122
83
200
133
120
123
45
300
135
123
125
86
300
140
125
130
41
300
141
130
131
89
300
142
131
132
95
250
143
132
133
111
300
144
133
59
115
300
145
132
134
121
300
146
134
135
122
300
147
135
130
81
300
149
135
137
97
350
150
137
138
98
350
153
138
141
64
350
154
141
142
70
350
159
115
146
186
100
160
146
147
187
100
161
147
148
188
100
162
148
149
185
100
163
149
150
190
100
164
150
151
120
100
165
151
152
123
100
166
152
115
125
100
167
151
153
48
100
168
153
154
104
100
169
154
114
155
150
170
154
155
56
100
171
155
153
89
100
172
155
156
30
100
173
156
151
125
100
174
156
157
150
100

GoM : Phed

DPR of GSWSP (Phase-III)

328

Page 4
ZONE-X (Mawprem)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------175
157
158
153
100
176
158
159
69
100
177
159
160
104
100
178
160
161
105
100
179
161
162
105
100
180
162
163
46
100
181
163
164
80
100
182
164
165
82
100
183
165
166
112
200
184
166
167
115
200
185
167
113
164
200
186
167
168
120
100
187
168
169
125
100
188
169
170
65
100
189
170
171
60
100
190
171
99
49
100
191
100
172
159
200
192
172
113
149
200
194
169
174
80
100
195
174
175
90
100
196
175
97
85
100
197
175
176
55
100
198
176
179
55
100
200
179
177
28
100
202
179
181
140
100
203
181
95
120
100
204
181
182
61
100
205
182
183
106
100
207
183
185
90
100
208
185
93
29
100
210
185
187
130
100
211
187
188
152
100
212
188
189
143
100
213
189
190
33
100
214
190
191
148
100
216
191
193
89
100
218
193
195
130
100
219
195
196
65
100
220
196
197
83
100
221
197
182
85
100
222
196
177
92
100
223
195
198
73
100
224
198
199
18
100
225
199
176
55
100
226
199
165
143
200
227
198
200
85
100
228
200
201
86
100

GoM : Phed

DPR of GSWSP (Phase-III)

329

Page 5
ZONE-X (Mawprem)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------229
201
202
26
100
231
202
193
55
100
232
201
204
57
100
233
204
205
30
100
235
205
207
147
100
236
207
208
51
100
237
208
209
99
100
238
209
162
100
100
239
208
210
67
100
240
210
211
87
100
241
211
212
88
100
242
212
161
129
100
243
212
213
15
100
244
213
214
36
100
245
214
215
80
100
246
213
159
98
100
247
215
216
85
100
248
216
217
48
100
249
217
218
41
100
250
218
219
73
100
251
219
214
56
100
252
219
220
80
100
253
220
221
85
100
254
221
222
92
100
255
222
223
80
100
256
223
158
85
100
257
222
224
60
100
258
224
225
71
100
259
225
151
129
100
260
225
226
108
100
261
226
150
90
100
262
226
227
74
100
263
227
228
78
100
264
228
229
60
100
265
229
230
60
150
266
230
221
62
100
267
229
231
32
100
268
231
228
64
100
269
231
232
87
100
270
232
233
52
100
271
233
234
81
100
272
234
235
85
100
273
235
236
104
100
274
236
237
184
100
275
237
238
283
100
276
238
239
140
100
277
239
228
162
100

GoM : Phed

DPR of GSWSP (Phase-III)

330

Page 6
ZONE-X (Mawprem)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------280
232
242
77
100
281
242
229
56
100
282
242
243
46
100
283
243
244
46
100
284
244
245
40
100
285
245
217
43
100
286
218
230
146
100
287
245
246
114
100
288
246
216
80
100
289
246
247
64
100
290
247
210
68
100
291
210
248
66
100
292
248
249
48
100
293
249
250
61
150
294
250
251
36
100
295
251
252
32
100
296
252
253
73
100
297
253
246
75
100
298
252
254
88
100
299
254
244
90
100
300
254
255
68
100
301
255
256
70
100
302
256
257
80
100
303
257
258
44
100
304
258
259
64
100
305
259
256
145
100
306
259
243
28
100
307
258
233
39
100
308
233
260
83
100
309
260
257
85
100
310
260
235
166
100
311
260
261
118
100
312
261
262
19
100
313
261
255
45
100
314
262
263
62
100
315
263
251
65
100
316
262
264
55
100
317
264
265
42
100
319
264
267
100
100
320
267
268
75
100
321
268
269
70
100
322
269
270
65
100
323
270
271
48
100
324
271
265
239
100
326
272
270
76
100
327
272
273
132
100
328
273
274
130
100

GoM : Phed

DPR of GSWSP (Phase-III)

331

Page 7
ZONE-X (Mawprem)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------329
274
235
133
100
330
269
275
41
100
336
275
281
103
100
338
281
283
63
100
339
283
284
98
100
341
284
286
91
100
342
286
287
92
100
344
287
289
68
100
346
289
291
70
100
347
291
292
69
100
348
292
293
98
100
349
293
294
70
100
350
294
295
121
100
351
295
249
100
100
352
295
296
70
100
354
296
298
70
100
355
298
267
70
100
356
298
250
117
100
357
295
299
131
100
358
299
300
135
100
359
300
207
57
100
360
300
301
96
100
361
301
207
70
100
362
301
302
51
100
363
302
248
52
100
364
300
303
87
100
365
303
304
88
100
367
304
306
73
100
368
306
190
86
100
369
306
307
84
100
370
307
308
120
100
371
308
309
125
100
372
309
300
95
100
373
309
310
89
100
374
310
311
90
100
375
311
312
93
100
376
312
307
90
100
377
312
313
57
100
378
313
314
70
100
379
314
315
70
100
380
315
316
72
100
381
316
311
55
100
382
316
317
147
100
384
317
319
116
100
385
319
320
118
100
386
320
294
66
100
387
315
321
84
100

GoM : Phed

DPR of GSWSP (Phase-III)

332

Page 8
ZONE-X (Mawprem)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------388
321
322
85
100
389
322
323
83
100
390
323
324
43
100
391
324
321
124
100
393
323
326
55
100
396
326
329
50
100
398
329
331
26
100
402
331
335
159
100
409
335
342
66
100
410
342
343
53
100
411
343
344
54
100
415
344
348
100
100
417
348
350
102
100
419
350
352
100
100
420
352
353
99
100
421
353
354
171
100
422
354
190
60
100
423
354
306
86
100
424
353
355
130
100
425
355
189
69
100
427
353
357
35
100
429
357
359
52
100
430
359
360
40
100
431
360
361
38
100
432
361
344
100
100
434
360
363
84
100
436
363
365
65
100
437
365
366
80
100
438
366
367
72
100
440
367
369
95
100
441
369
370
96
100
443
370
372
95
100
445
366
373
90
100
446
373
374
92
100
448
374
376
28
100
450
376
378
76
100
451
378
379
80
100
452
379
342
82
100
455
320
292
91
100
456
313
353
102
100
156
1
381
45
350
457
381
142
58
350
98
204
163
95
100
460
237
228
208
100
454
267
283
106
100
444
372
359
96
100
8
135
3
145
300

GoM : Phed

DPR of GSWSP (Phase-III)

333

Page 9
ZONE-X (Mawprem)
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------9
19
36
146
100
11
39
45
210
100
13
122
115
120
200
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------2
0.00
1511.36
14.36
3
1.14
1511.06
16.06
4
0.00
1511.32
16.32
7
0.00
1511.24
15.24
8
0.00
1510.71
16.71
11
0.00
1510.25
16.25
13
0.00
1509.98
16.98
16
0.00
1509.64
16.64
18
0.32
1509.29
16.29
19
0.12
1508.82
16.82
20
0.70
1510.79
16.79
21
0.00
1510.48
16.48
23
0.22
1510.28
16.28
24
1.58
1509.87
16.87
27
0.00
1509.48
15.48
28
0.00
1508.52
15.52
30
0.00
1507.11
15.11
33
0.00
1506.99
15.99
34
3.12
1506.86
16.86
35
0.00
1506.87
15.87
36
0.06
1507.55
16.55
37
0.00
1506.59
16.59
38
0.82
1506.48
9.48
39
0.20
1506.40
10.40
40
2.64
1506.26
15.26
42
2.14
1506.22
14.22
43
1.40
1506.22
15.22
44
0.20
1506.24
13.24
45
0.36
1506.26
11.26
49
3.12
1506.60
16.60
50
0.00
1506.77
15.77
52
0.00
1506.93
16.93
53
0.00
1506.95
16.95
54
2.94
1506.96
15.96
55
5.46
1506.95
15.95
56
0.00
1507.37
15.37
58
5.46
1507.84
14.84
59
0.00
1509.41
14.41

GoM : Phed

DPR of GSWSP (Phase-III)

334

Page 10
ZONE-X (Mawprem)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------60
0.00
1508.90
14.90
61
0.00
1508.80
15.80
62
0.00
1508.75
16.75
64
0.00
1508.58
16.58
66
0.00
1508.43
15.43
68
0.00
1508.33
14.33
70
0.00
1508.19
13.19
71
0.00
1507.83
11.83
72
4.16
1507.58
12.58
73
0.00
1507.57
14.57
74
4.36
1507.54
11.54
75
0.00
1507.57
13.57
76
0.00
1507.61
12.61
77
4.16
1507.82
15.82
79
0.00
1506.00
10.00
80
0.00
1504.25
15.25
82
0.00
1502.21
16.21
84
8.04
1498.22
13.22
85
0.00
1496.42
12.42
87
8.04
1495.45
12.45
88
0.00
1495.46
13.46
89
8.04
1498.18
8.18
90
8.96
1494.28
13.28
92
0.00
1494.20
14.20
93
0.00
1494.11
15.11
94
8.96
1494.15
14.15
95
0.00
1496.02
14.02
96
8.96
1497.19
13.19
97
0.00
1501.95
16.95
98
4.10
1502.81
14.81
99
0.00
1503.09
13.09
100
0.00
1503.34
16.34
101
0.00
1503.50
14.50
102
0.00
1503.60
11.60
103
8.96
1503.94
10.94
104
0.00
1505.03
10.03
106
0.00
1505.99
9.99
107
3.12
1504.57
10.57
108
0.00
1503.76
10.76
109
3.12
1503.65
10.65
110
5.38
1503.53
12.53
111
0.00
1503.87
10.87
112
5.48
1503.77
12.77
113
0.00
1504.24
15.24
114
0.00
1505.09
15.09
115
0.00
1505.80
15.80
116
0.00
1507.56
16.56

GoM : Phed

DPR of GSWSP (Phase-III)

335

Page 11
ZONE-X (Mawprem)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------117
5.48
1507.91
15.91
118
5.48
1508.36
15.36
119
2.50
1507.93
15.93
120
0.00
1508.33
16.33
121
0.72
1507.57
31.57
122
0.40
1506.84
15.84
123
0.00
1508.73
15.73
125
0.00
1509.49
14.49
130
0.00
1509.85
12.85
131
2.50
1509.85
15.85
132
0.00
1509.86
14.86
133
2.50
1509.63
15.63
134
2.50
1510.18
14.18
135
0.00
1510.52
15.52
137
1.06
1510.83
16.83
138
2.74
1511.16
15.16
141
2.74
1511.38
16.38
142
0.00
1511.63
15.63
146
4.36
1499.23
10.23
147
4.36
1495.74
7.74
148
4.36
1494.41
7.41
149
4.36
1494.26
8.26
150
0.00
1494.49
7.49
151
0.00
1497.52
8.52
152
4.06
1500.56
10.57
153
0.00
1498.82
8.82
154
6.34
1501.33
8.33
155
0.00
1498.83
8.83
156
0.00
1497.60
9.60
157
6.34
1492.69
12.69
158
0.00
1490.98
11.98
159
0.00
1490.48
8.48
160
0.30
1490.45
10.45
161
0.00
1490.44
12.44
162
0.00
1490.71
10.71
163
4.68
1491.75
10.75
164
4.68
1494.68
11.68
165
0.00
1499.59
14.59
166
6.34
1500.62
14.62
167
0.00
1501.97
14.97
168
2.50
1501.47
15.47
169
0.00
1501.33
16.33
170
5.72
1501.50
14.50
171
0.00
1502.37
13.37
172
5.72
1503.71
16.71
174
2.50
1500.83
15.83
175
0.00
1500.63
15.63

GoM : Phed

DPR of GSWSP (Phase-III)

336

Page 12
ZONE-X (Mawprem)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------176
0.00
1499.14
15.14
179
0.00
1497.42
13.42
177
0.00
1497.19
14.19
181
0.00
1496.16
13.16
182
0.00
1495.90
13.90
183
0.00
1494.90
13.90
185
0.00
1494.05
14.05
187
2.56
1491.62
12.62
188
2.56
1489.92
11.92
189
0.00
1489.13
10.13
190
0.00
1489.13
11.13
191
0.00
1491.77
12.77
193
0.00
1493.35
8.35
195
0.00
1496.38
15.38
196
0.00
1496.42
14.42
197
2.56
1496.02
15.02
198
0.00
1497.64
10.64
199
0.00
1499.15
10.15
200
2.40
1495.10
10.10
201
0.00
1493.31
9.31
202
0.00
1493.32
7.32
204
2.68
1491.78
9.78
205
0.00
1491.37
11.37
207
0.00
1489.33
11.33
208
0.00
1489.37
10.37
209
5.00
1489.57
10.57
210
0.00
1489.35
11.35
211
1.18
1489.58
13.58
212
0.00
1489.97
12.97
213
0.00
1489.97
10.97
214
0.00
1489.81
10.81
215
0.46
1489.64
11.64
216
0.00
1489.49
12.49
217
0.00
1489.50
10.50
218
0.00
1489.63
15.63
219
0.00
1489.78
14.78
220
0.72
1489.84
13.84
221
0.00
1489.96
12.96
222
0.00
1490.91
15.91
223
0.74
1490.93
14.93
224
5.38
1491.41
14.41
225
0.00
1493.11
14.11
226
0.50
1492.97
16.97
227
1.08
1491.21
16.21
228
0.40
1489.65
13.65
229
0.00
1489.62
14.62
230
0.00
1489.65
13.65

GoM : Phed

DPR of GSWSP (Phase-III)

337

Page 13
ZONE-X (Mawprem)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------231
0.30
1489.60
10.60
232
0.00
1489.39
11.39
233
0.00
1489.21
14.21
234
0.30
1489.13
11.13
235
0.00
1489.07
16.07
236
1.64
1489.07
15.07
237
0.00
1489.22
14.22
238
3.28
1489.12
13.12
239
1.64
1489.24
12.24
242
0.00
1489.41
9.41
243
0.30
1489.30
4.30
244
0.00
1489.30
15.30
245
0.00
1489.37
11.37
246
0.00
1489.35
14.35
247
1.18
1489.34
12.34
248
0.00
1489.10
13.10
249
0.00
1488.93
14.93
250
0.00
1488.93
16.93
251
0.00
1488.99
15.99
252
0.00
1489.09
14.09
253
0.92
1489.18
13.18
254
0.56
1489.13
14.13
255
0.56
1489.11
16.11
256
0.00
1489.16
7.16
257
0.30
1489.16
15.16
258
0.00
1489.21
9.21
259
0.00
1489.24
15.24
260
0.00
1489.14
15.14
261
0.00
1489.05
14.05
262
0.00
1488.98
15.98
263
0.92
1488.98
16.98
264
0.00
1488.79
16.79
265
0.00
1488.77
8.77
267
0.00
1488.66
15.66
268
0.70
1488.62
12.62
269
0.00
1488.61
13.61
270
0.00
1488.62
12.62
271
0.84
1488.63
10.63
272
0.84
1488.62
12.62
273
1.40
1488.63
13.63
274
1.40
1488.75
14.75
275
0.00
1488.59
14.59
281
0.00
1488.55
15.55
283
0.00
1488.52
16.52
284
0.00
1488.23
15.23
286
2.70
1487.96
13.96
287
0.00
1487.93
12.93

GoM : Phed

DPR of GSWSP (Phase-III)

338

Page 14
ZONE-X (Mawprem)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------289
0.00
1487.90
11.90
291
2.70
1487.88
10.88
292
0.00
1487.91
9.91
293
0.56
1487.96
8.96
294
0.00
1488.03
7.03
295
0.00
1488.61
14.61
296
0.84
1488.63
14.63
298
0.00
1488.69
13.69
299
3.12
1488.61
12.61
300
0.00
1488.88
11.88
301
0.00
1489.11
14.11
302
0.76
1489.10
15.10
303
2.70
1488.78
10.78
304
0.00
1488.78
11.78
306
0.00
1488.79
12.79
307
0.00
1488.43
12.43
308
2.70
1488.40
13.40
309
0.00
1488.47
7.47
310
0.60
1488.28
8.28
311
0.00
1488.16
9.16
312
0.00
1488.20
13.20
313
0.00
1488.14
14.14
314
2.08
1488.00
15.00
315
0.00
1487.97
15.97
316
0.00
1487.99
7.99
317
3.26
1487.68
9.68
319
3.12
1487.68
8.68
320
0.00
1487.91
7.91
321
0.00
1487.90
16.90
322
0.60
1487.88
13.88
323
0.00
1487.88
14.88
324
0.69
1487.88
15.88
326
0.09
1487.87
13.87
329
0.00
1487.86
12.86
331
0.00
1487.86
11.86
335
0.00
1487.85
10.85
342
0.00
1487.84
8.84
343
0.92
1487.84
8.84
344
0.00
1487.87
7.87
348
0.00
1487.93
7.93
350
0.00
1488.00
10.00
352
0.64
1488.06
9.06
353
1.34
1488.17
13.17
354
0.70
1488.79
11.79
355
0.76
1488.74
11.74
357
0.70
1488.03
14.03
359
0.64
1487.89
14.89

GoM : Phed

DPR of GSWSP (Phase-III)

339

Page 15
ZONE-X (Mawprem)
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------360
0.00
1487.87
15.87
361
0.00
1487.87
14.87
363
0.00
1487.83
16.83
365
0.92
1487.79
15.79
366
0.00
1487.78
12.78
367
0.00
1487.78
14.78
369
0.92
1487.78
15.78
370
0.00
1487.80
16.80
372
0.92
1487.82
15.82
373
0.92
1487.78
13.78
374
0.00
1487.78
11.78
376
0.00
1487.78
9.78
378
0.92
1487.78
8.78
379
0.00
1487.81
7.81
381
0.00
1511.84
16.84
1
-303.20
1512.00
0.00
Reservoir
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
185.13
1.93
8.28
Open
2
81.36
1.15
3.83
Open
3
103.77
1.08
2.83
Open
6
103.77
1.08
2.84
Open
7
7.50
0.96
9.75
Open
10
7.50
0.96
9.76
Open
12
7.50
0.96
9.75
Open
15
7.50
0.96
9.75
Open
17
7.50
0.96
9.76
Open
18
7.18
0.91
9.00
Open
19
96.27
1.36
5.23
Open
20
95.57
1.35
5.16
Open
22
95.57
1.35
5.16
Open
23
95.35
1.35
5.14
Open
26
93.77
1.33
4.98
Open
27
9.64
1.23
15.54
Open
29
9.64
1.23
15.54
Open
32
5.30
0.68
5.13
Open
33
2.54
0.32
1.32
Open
34
-0.58
0.07
0.09
Open
35
-7.00
0.89
8.58
Open
36
6.42
0.82
7.32
Open
37
2.83
0.36
1.61
Open
38
2.01
0.26
0.85
Open
39
4.93
0.63
4.48
Open

GoM : Phed

DPR of GSWSP (Phase-III)

340

Page 16
ZONE-X (Mawprem)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------41
2.29
0.29
1.08
Open
42
0.15
0.02
0.01
Open
43
-1.25
0.16
0.35
Open
44
-1.45
0.19
0.47
Open
48
-1.34
0.17
0.40
Open
49
-4.46
0.57
3.73
Open
52
4.46
0.57
3.72
Open
53
-2.76
0.35
1.53
Open
54
-1.70
0.22
0.63
Open
55
-1.40
0.18
0.43
Open
56
-4.34
0.55
3.54
Open
57
-0.30
0.04
0.02
Open
58
-5.76
0.73
5.99
Open
60
-5.76
0.73
5.99
Open
61
-11.22
1.43
20.59
Open
62
72.91
1.03
3.13
Open
63
129.37
1.83
9.04
Open
64
78.25
1.11
3.56
Open
65
70.75
1.00
2.95
Open
67
70.75
1.00
2.96
Open
69
70.75
1.00
2.95
Open
71
70.75
1.00
2.95
Open
73
70.75
1.00
2.95
Open
74
40.14
2.27
30.26
Open
75
5.17
0.66
4.91
Open
76
1.01
0.13
0.24
Open
77
2.32
0.30
1.11
Open
78
-2.04
0.26
0.87
Open
79
-2.04
0.26
0.88
Open
80
1.30
0.17
0.38
Open
81
-3.35
0.43
2.19
Open
82
-7.51
0.96
9.77
Open
84
34.96
1.98
23.44
Open
85
15.11
1.92
35.70
Open
87
15.11
1.92
35.71
Open
89
15.11
1.92
35.70
Open
90
7.07
0.90
8.74
Open
92
7.07
0.90
8.74
Open
93
-0.97
0.12
0.22
Open
94
-11.82
1.51
22.65
Open
95
-19.86
2.53
59.24
Open
96
10.84
1.38
19.32
Open
97
1.88
0.24
0.76
Open
99
1.88
0.24
0.75
Open
100
-1.37
0.17
0.42
Open
101
-10.33
1.32
17.67
Open
102
-7.97
1.01
10.91
Open

GoM : Phed

DPR of GSWSP (Phase-III)

341

Page 17
ZONE-X (Mawprem)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------103
-16.93
2.16
44.07
Open
104
-26.56
1.50
14.09
Open
105
-30.66
0.98
4.53
Open
106
-40.00
1.27
7.41
Open
107
-18.69
1.06
7.35
Open
108
-16.09
0.91
5.56
Open
109
-10.33
0.58
2.45
Open
110
-19.29
1.09
7.79
Open
112
-19.29
1.09
7.79
Open
113
-30.61
1.73
18.32
Open
114
11.32
1.44
20.92
Open
115
8.20
1.04
11.51
Open
116
8.88
0.50
1.85
Open
117
5.76
0.33
0.83
Open
118
-2.60
0.15
0.19
Open
119
-7.98
0.45
1.52
Open
120
6.16
0.35
0.94
Open
121
0.68
0.04
0.02
Open
122
-14.14
0.80
4.38
Open
123
-97.24
1.98
12.94
Open
124
-132.85
2.71
23.06
Open
125
-120.81
2.46
19.35
Open
126
-40.15
0.57
1.03
Open
127
-45.63
0.65
1.31
Open
128
-51.11
0.72
1.62
Open
129
-80.66
1.14
3.77
Open
130
-83.16
1.18
3.99
Open
131
44.64
1.42
9.07
Open
132
43.92
1.40
8.81
Open
133
-127.80
1.81
8.83
Open
135
-127.80
1.81
8.83
Open
140
-127.80
1.81
8.84
Open
141
-4.67
0.07
0.02
Open
142
-7.17
0.15
0.10
Open
143
58.96
0.83
2.11
Open
144
56.46
0.80
1.95
Open
145
-66.13
0.94
2.61
Open
146
-68.63
0.97
2.79
Open
147
123.12
1.74
8.24
Open
149
-111.53
1.16
3.24
Open
150
-112.59
1.17
3.30
Open
153
-115.33
1.20
3.45
Open
154
-118.07
1.23
3.60
Open
159
15.01
1.91
35.30
Open
160
10.65
1.36
18.70
Open
161
6.29
0.80
7.06
Open
162
1.93
0.25
0.79
Open

GoM : Phed

DPR of GSWSP (Phase-III)

342

Page 18
ZONE-X (Mawprem)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------163
-2.43
0.31
1.21
Open
164
-12.51
1.59
25.19
Open
165
-12.41
1.58
24.79
Open
166
-16.47
2.10
41.88
Open
167
-13.02
1.66
27.11
Open
168
-12.23
1.56
24.14
Open
169
-35.61
2.02
24.24
Open
170
17.04
2.17
44.60
Open
171
0.79
0.10
0.15
Open
172
16.25
2.07
40.84
Open
173
1.83
0.23
0.72
Open
174
14.42
1.84
32.74
Open
175
8.08
1.03
11.19
Open
176
6.40
0.81
7.27
Open
177
1.05
0.13
0.26
Open
178
0.75
0.10
0.14
Open
179
-3.65
0.47
2.58
Open
180
-11.82
1.51
22.66
Open
181
-15.30
1.95
36.57
Open
182
-19.98
2.55
59.95
Open
183
-44.96
1.43
9.20
Open
184
-51.30
1.63
11.74
Open
185
-56.08
1.79
13.85
Open
186
4.78
0.61
4.23
Open
187
2.28
0.29
1.07
Open
188
-3.61
0.46
2.53
Open
189
-9.33
1.19
14.64
Open
190
-9.33
1.19
14.64
Open
191
-21.31
0.68
2.31
Open
192
-27.03
0.86
3.58
Open
194
5.89
0.75
6.24
Open
195
3.39
0.43
2.24
Open
196
-9.64
1.23
15.54
Open
197
13.03
1.66
27.15
Open
198
14.06
1.79
31.24
Open
200
6.89
0.88
8.34
Open
202
7.17
0.91
8.98
Open
203
2.37
0.30
1.15
Open
204
4.80
0.61
4.27
Open
205
7.38
0.94
9.47
Open
207
7.38
0.94
9.47
Open
208
-3.26
0.41
2.08
Open
210
10.63
1.35
18.63
Open
211
8.07
1.03
11.19
Open
212
5.51
0.70
5.52
Open
213
-0.11
0.01
0.00
Open
214
-10.37
1.32
17.80
Open

GoM : Phed

DPR of GSWSP (Phase-III)

343

Page 19
ZONE-X (Mawprem)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------216
-10.37
1.32
17.80
Open
218
-11.98
1.53
23.25
Open
219
-1.75
0.22
0.66
Open
220
5.14
0.65
4.84
Open
221
2.58
0.33
1.35
Open
222
-6.89
0.88
8.34
Open
223
-10.23
1.30
17.35
Open
224
-23.95
3.05
83.81
Open
225
1.03
0.13
0.25
Open
226
-24.97
0.80
3.10
Open
227
13.72
1.75
29.85
Open
228
11.32
1.44
20.91
Open
229
-1.61
0.21
0.56
Open
231
-1.61
0.21
0.57
Open
232
12.93
1.65
26.75
Open
233
9.05
1.15
13.83
Open
235
9.05
1.15
13.83
Open
236
-1.85
0.24
0.73
Open
237
-3.16
0.40
1.97
Open
238
-8.16
1.04
11.42
Open
239
1.31
0.17
0.39
Open
240
-3.72
0.47
2.67
Open
241
-4.90
0.62
4.44
Open
242
-4.41
0.56
3.65
Open
243
-0.49
0.06
0.06
Open
244
4.85
0.62
4.35
Open
245
3.35
0.43
2.20
Open
246
-5.34
0.68
5.21
Open
247
2.89
0.37
1.67
Open
248
-0.18
0.02
0.01
Open
249
-4.10
0.52
3.19
Open
250
-3.33
0.42
2.17
Open
251
-1.50
0.19
0.49
Open
252
-1.84
0.23
0.72
Open
253
-2.56
0.33
1.33
Open
254
-7.76
0.99
10.41
Open
255
-0.94
0.12
0.21
Open
256
-1.68
0.21
0.61
Open
257
-6.83
0.87
8.20
Open
258
-12.21
1.56
24.06
Open
259
-14.74
1.88
34.13
Open
260
2.54
0.32
1.31
Open
261
-10.09
1.29
16.90
Open
262
12.13
1.54
23.76
Open
263
11.05
1.41
19.99
Open
264
1.70
0.22
0.62
Open
265
-4.44
0.25
0.51
Open

GoM : Phed

DPR of GSWSP (Phase-III)

344

Page 20
ZONE-X (Mawprem)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------266
-5.21
0.66
4.97
Open
267
1.69
0.22
0.62
Open
268
-2.06
0.26
0.89
Open
269
3.45
0.44
2.32
Open
270
4.35
0.55
3.56
Open
271
2.14
0.27
0.96
Open
272
1.84
0.23
0.72
Open
273
-0.33
0.04
0.03
Open
274
-1.97
0.25
0.82
Open
275
1.28
0.16
0.37
Open
276
-2.00
0.26
0.85
Open
277
-3.64
0.46
2.56
Open
280
-0.89
0.11
0.19
Open
281
-4.44
0.57
3.70
Open
282
3.55
0.45
2.44
Open
283
0.10
0.01
0.00
Open
284
-3.01
0.38
1.80
Open
285
-3.93
0.50
2.95
Open
286
-0.77
0.10
0.14
Open
287
0.92
0.12
0.20
Open
288
-3.07
0.39
1.86
Open
289
0.60
0.08
0.09
Open
290
-0.58
0.07
0.09
Open
291
4.45
0.57
3.71
Open
292
4.34
0.55
3.54
Open
293
0.26
0.01
0.00
Open
294
-3.00
0.38
1.79
Open
295
-3.87
0.49
2.87
Open
296
-2.47
0.31
1.25
Open
297
-3.39
0.43
2.24
Open
298
-1.41
0.18
0.44
Open
299
-3.10
0.40
1.90
Open
300
1.14
0.14
0.30
Open
301
-1.89
0.24
0.76
Open
302
-0.26
0.03
0.02
Open
303
-1.67
0.21
1.13
Open
304
-1.52
0.19
0.51
Open
305
1.63
0.21
0.58
Open
306
-3.15
0.40
1.96
Open
307
-0.15
0.02
0.01
Open
308
2.06
0.26
0.89
Open
309
-1.11
0.14
0.29
Open
310
1.33
0.17
0.39
Open
311
1.85
0.24
0.73
Open
312
4.31
0.55
3.49
Open
313
-2.46
0.31
1.24
Open
314
0.05
0.01
0.00
Open

GoM : Phed

DPR of GSWSP (Phase-III)

345

Page 21
ZONE-X (Mawprem)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------315
-0.87
0.11
0.18
Open
316
4.26
0.54
3.43
Open
317
1.66
0.21
0.60
Open
319
2.61
0.33
1.38
Open
320
1.45
0.18
0.46
Open
321
0.75
0.10
0.14
Open
322
-0.67
0.09
0.11
Open
323
-0.82
0.10
0.16
Open
324
-1.66
0.21
0.60
Open
326
-0.14
0.02
0.01
Open
327
-0.70
0.09
0.12
Open
328
-2.10
0.27
0.92
Open
329
-3.50
0.45
2.37
Open
330
1.42
0.18
0.45
Open
336
1.42
0.18
0.45
Open
338
1.42
0.18
0.45
Open
339
3.95
0.50
2.97
Open
341
3.95
0.50
2.97
Open
342
1.25
0.16
0.35
Open
344
1.25
0.16
0.35
Open
346
1.25
0.16
0.35
Open
347
-1.45
0.19
0.47
Open
348
-1.57
0.20
0.54
Open
349
-2.13
0.27
0.94
Open
350
-5.14
0.66
4.85
Open
351
-4.08
0.52
3.16
Open
352
-1.05
0.13
0.26
Open
354
-1.89
0.24
0.76
Open
355
1.37
0.17
0.42
Open
356
-3.26
0.42
2.09
Open
357
-0.01
0.00
0.00
Open
358
-3.13
0.40
1.94
Open
359
-6.75
0.86
8.03
Open
360
-3.51
0.45
2.39
Open
361
-4.15
0.53
3.27
Open
362
0.65
0.08
0.11
Open
363
-0.11
0.01
0.01
Open
364
2.31
0.29
1.10
Open
365
-0.39
0.05
0.04
Open
367
-0.39
0.05
0.04
Open
368
-4.66
0.59
4.04
Open
369
4.77
0.61
4.22
Open
370
1.11
0.14
0.29
Open
371
-1.59
0.20
0.55
Open
372
-4.82
0.61
4.30
Open
373
3.23
0.41
2.05
Open
374
2.63
0.34
1.40
Open

GoM : Phed

DPR of GSWSP (Phase-III)

346

Page 22
ZONE-X (Mawprem)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------375
-1.44
0.18
0.46
Open
376
-3.65
0.47
2.57
Open
377
2.21
0.28
1.02
Open
378
3.27
0.42
2.10
Open
379
1.19
0.15
0.32
Open
380
-0.82
0.10
0.16
Open
381
-4.07
0.52
3.15
Open
382
3.25
0.41
2.08
Open
384
-0.01
0.00
0.00
Open
385
-3.13
0.40
1.93
Open
386
-3.02
0.38
1.80
Open
387
2.01
0.26
0.85
Open
388
1.06
0.14
0.26
Open
389
0.46
0.06
0.06
Open
390
-0.26
0.03
0.02
Open
391
-0.95
0.12
0.21
Open
393
0.72
0.09
0.13
Open
396
0.63
0.08
0.10
Open
398
0.63
0.08
0.10
Open
402
0.63
0.08
0.10
Open
409
0.63
0.08
0.10
Open
410
-0.61
0.08
0.10
Open
411
-1.53
0.20
0.52
Open
415
-1.69
0.22
0.62
Open
417
-1.69
0.22
0.62
Open
419
-1.69
0.22
0.62
Open
420
-2.33
0.30
1.12
Open
421
-4.41
0.56
3.64
Open
422
-5.61
0.71
5.69
Open
423
0.50
0.06
0.07
Open
424
-4.86
0.62
4.38
Open
425
-5.62
0.72
5.73
Open
427
4.54
0.58
3.85
Open
429
3.84
0.49
2.82
Open
430
1.39
0.18
0.43
Open
431
-0.16
0.02
0.01
Open
432
-0.16
0.02
0.01
Open
434
1.55
0.20
0.52
Open
436
1.55
0.20
0.53
Open
437
0.63
0.08
0.10
Open
438
0.03
0.00
0.00
Open
440
0.03
0.00
0.00
Open
441
-0.89
0.11
0.19
Open
443
-0.89
0.11
0.19
Open
445
0.60
0.08
0.09
Open
446
-0.32
0.04
0.03
Open
448
-0.32
0.04
0.03
Open

GoM : Phed

DPR of GSWSP (Phase-III)

347

Page 23
ZONE-X (Mawprem)
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------450
-0.32
0.04
0.03
Open
451
-1.24
0.16
0.35
Open
452
-1.24
0.16
0.35
Open
455
-0.11
0.01
0.00
Open
456
-1.06
0.13
0.26
Open
156
118.07
1.23
3.60
Open
457
118.07
1.23
3.60
Open
98
1.19
0.15
0.32
Open
460
-3.24
0.41
2.07
Open
454
2.52
0.32
1.30
Open
444
-1.81
0.23
0.70
Open
8
-80.22
1.14
3.73
Open
9
7.06
0.90
8.72
Open
11
1.81
0.23
0.70
Open
13
43.52
1.39
8.66
Open

GoM : Phed

DPR of GSWSP (Phase-III)

348

g,

,
i

Legends
Pipeline
Road
Zone Boundary

Reservoir

Distribution Network - Zone - XI: Nongmynsong


o

.05km

.075bn

Greater Shillong Water Supply Project (Phase III)

GoM:PHED

GoM : Phed

Length of pipe line required diameterwise


Zone XI
Area of Coverage : Nongmynsong, Ishyrwat, Mawpat & Lyngkien.
Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

200

150

100

26.00

81.00

10

95.00

4.

10

11

10

128.00

5.

11

12

11

253.00

6.

12

13

12

130.00

7.

13

14

13

92.00

8.

14

15

14

56.00

9.

15

16

15

132.00

10.

16

12

16

62.00

11.

16

17

17

32.00

12.

15

17

18

143.00

13.

17

18

19

68.00

14.

18

19

20

22.00

15.

19

20

21

200.00

16.

20

21

22

84.00

17.

21

22

23

81.00

18.

22

19

24

75.00

19.

18

23

25

97.00

20.

23

24

26

217.00

21.

24

25

27

72.00

22.

25

26

28

198.00

From

To

1.

2.

3.

350

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

351

200

150

100

29

108.00

28

30

106.00

28

29

31

102.00

26.

29

20

39

218.00

27.

29

30

32

74.00

28.

30

31

33

124.00

29.

31

32

34

203.00

30.

32

33

35

242.00

31.

33

34

36

260.00

32.

34

35

37

60.00

33.

35

16

38

166.00

34.

25

36

40

172.00

35.

36

37

41

252.00

36.

37

38

42

295.00

37.

30

40

44

142.00

38.

40

41

45

20.00

39.

41

42

46

94.00

40.

42

43

47

285.00

41.

43

44

48

132.00

42.

44

45

49

250.00

43.

45

46

50

250.00

44.

44

47

51

158.00

45.

47

48

52

31.10

46.

48

49

53

12.40

47.

49

50

54

138.00

From

To

23.

26

27

24.

27

25.

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

352

200

150

100

55

163.00

52

56

100.00

52

54

58

120.00

51.

54

55

59

198.00

52.

55

56

60

148.00

53.

56

57

61

1532.00

54.

57

58

62

123.00

55.

58

59

63

100.00

56.

59

60

64

185.00

57.

60

61

65

410.00

58.

61

62

66

79.00

59.

62

63

67

156.00

60.

63

64

68

191.00

61.

64

65

69

222.00

62.

65

66

70

100.00

63.

66

67

71

128.00

64.

67

68

72

86.00

65.

68

69

73

120.00

66.

69

70

74

196.00

67.

70

71

75

111.00

68.

71

72

76

187.00

69.

72

73

77

113.00

70.

73

74

78

116.00

71.

74

75

79

155.00

72.

77

59

83

250.00

From

To

48.

50

51

49.

51

50.

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

200

150

100

84

250.00

74

86

250.00

46

83

90

433.00

76.

89

98

57.00

77.

89

99

1000.00

78.

88

89

100

279.00

79.

86

88

341.00

80.

83

85

92

254.00

81.

85

86

93

655.00

82.

86

87

94

238.00

83.

87

42

95

386.00

84.

75

60

100.00

85.

36

38

120.00

Total :

1107.00

1153.00

6229.50

809.00

1644.00

2582.00

2396.00

From

To

73.

77

78

74.

78

75.

353

({j
ZONE -XI
'PROPOSED PIPEUNE ROUTE:
AREA OF COVERAGE:
1. Nongmynsong
!04
25

3:

"
26

"

.,

54,

GoM:Phed

DPR of GSWSP (phase ill)

----r,

354

N
Elevation

ZONE XI (Nongmynsong)

25.00

13
14

50.00
75.00
100.00
m
23
24
38

25

36

1556

1584
16

1583

1582

1582

27

1613

1587
1581

1580

32

1564
1560

1580

28
1572

29
31

30
1579

1579

1578
40

41
157642

63
64

681435

55

57
75
77

72

73

1465

1468

71

56

1480

74

1550

86

1580

1582

1577
85

1555
48
1560

43
1574

44

47

1570

1545
1568

1541

1581

45

46

83

1577

1579

1581

60

1435
1433

1440

1443

52
54

66

1438
69
70

51

1444

65
67

146561
1455
1468

87

1575

49
1552

88

33

1580

26

62

1580 1580

20

50

1582

1600
1

21

1557

1596

19158022

1578

35

1581 18

1587

1591
1587

1585
34

1565

37

10

11

17

1559

1558

151583

89

12

1583

1475
78

1479

1482

59

1536

1535

58 1490

1485 1488

1480

1448

GoM : Phed

DPR of GSWSP (Phase III)

355

Page 1
6/21/2008 8:12:41 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: Zone XI Nongmynsong.NET
ZONE XI

Nongmynsong

Link - Node Table:


---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------1
1
2
26
450
5
2
6
81
450
9
7
10
95
350
10
10
11
128
350
11
11
12
253
350
12
12
13
130
150
13
13
14
92
150
14
14
15
56
150
15
15
16
132
150
16
16
12
62
300
17
16
17
32
150
18
15
17
143
150
19
17
18
68
150
20
18
19
22
100
21
19
20
200
100
22
20
21
84
100
23
21
22
81
100
24
22
19
75
100
25
18
23
97
150
26
23
24
217
100
27
24
25
72
100
28
25
26
198
100
29
26
27
108
100
30
27
28
106
100
31
28
29
102
100
39
29
20
218
100
32
29
30
74
100
33
30
31
124
300
34
31
32
203
300
35
32
33
242
300
36
33
34
260
300
37
34
35
60
300
38
35
16
166
300
40
25
36
172
100
41
36
37
252
100
42
37
38
295
100

GoM : Phed

DPR of GSWSP (Phase-III)

356

Page 2
ZONE XI
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------44
30
40
142
150
45
40
41
20
150
46
41
42
94
150
47
42
43
285
300
48
43
44
132
300
49
44
45
250
300
50
45
46
250
300
51
44
47
158
300
52
47
48
311
300
53
48
49
124
300
54
49
50
138
300
55
50
51
163
300
56
51
52
100
300
58
52
54
120
300
59
54
55
198
300
60
55
56
148
300
61
56
57
1532
300
62
57
58
123
300
63
58
59
100
300
64
59
60
185
250
65
60
61
410
200
66
61
62
79
150
67
62
63
156
150
68
63
64
191
150
69
64
65
222
150
70
65
66
100
150
71
66
67
128
150
72
67
68
86
150
73
68
69
120
150
74
69
70
196
150
75
70
71
111
150
76
71
72
187
150
77
72
73
113
200
78
73
74
116
200
79
74
75
155
200
83
77
59
250
200
84
77
78
250
200
86
78
74
250
200
90
46
83
433
300
98
7
89
57
350
99
89
6
1000
450
100
88
89
279
350
6
86
88
341
350
92
83
85
254
300
93
85
86
655
300
94
86
87
238
250
95
87
42
386
250

GoM : Phed

DPR of GSWSP (Phase-III)

357

Page 3
ZONE XI
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------2
75
60
100
200
3
36
38
120
100
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
Quality
ID
LPS
m
m
---------------------------------------------------------------------2
0.00
1612.76
12.76
0.00
6
0.56
1612.01
16.01
0.00
7
0.00
1602.38
11.38
0.00
10
0.26
1601.69
14.69
0.00
11
0.26
1600.76
15.76
0.00
12
0.00
1598.92
14.92
0.00
13
4.20
1598.12
15.12
0.00
14
4.20
1597.78
14.78
0.00
15
8.40
1597.68
14.68
0.00
16
8.40
1598.14
16.14
0.00
17
4.20
1597.17
16.17
0.00
18
0.00
1594.25
14.25
0.00
19
0.00
1593.11
13.11
0.00
20
0.00
1591.35
11.35
0.00
21
7.04
1591.23
11.23
0.00
22
7.04
1591.52
11.52
0.00
23
9.36
1592.54
14.54
0.00
24
9.36
1578.71
13.71
0.00
25
0.00
1575.91
16.91
0.00
26
9.36
1574.64
14.64
0.00
27
9.36
1575.60
11.60
0.00
28
9.36
1582.10
10.10
0.00
29
0.00
1590.55
11.55
0.00
30
0.00
1594.75
16.75
0.00
31
7.04
1594.98
15.98
0.00
32
7.04
1595.47
15.47
0.00
33
7.04
1596.16
15.16
0.00
34
7.04
1597.06
15.06
0.00
35
10.40
1597.30
15.30
0.00
36
2.34
1573.14
15.14
0.00
37
2.34
1572.95
15.95
0.00
38
2.34
1572.96
16.96
0.00
40
0.08
1591.17
14.17
0.00
41
0.08
1590.67
14.67
0.00
42
0.08
1588.31
13.31
0.00
43
1.16
1585.57
11.57
0.00
44
0.00
1584.32
14.32
0.00
45
0.06
1585.96
8.96
0.00
46
0.06
1587.61
8.61
0.00

GoM : Phed

DPR of GSWSP (Phase-III)

358

Page 4
ZONE XI
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
Quality
ID
LPS
m
m
---------------------------------------------------------------------47
1.16
1579.77
11.77
0.00
48
1.56
1570.90
10.90
0.00
49
1.56
1567.41
12.41
0.00
50
1.56
1563.56
11.56
0.00
51
1.56
1559.08
9.08
0.00
52
0.00
1556.36
11.36
0.00
54
1.56
1553.10
12.10
0.00
55
1.56
1547.79
11.79
0.00
56
1.56
1543.87
8.87
0.00
57
1.56
1503.77
13.77
0.00
58
1.56
1500.59
12.59
0.00
59
0.00
1498.04
13.04
0.00
60
16.20
1491.59
11.59
0.00
61
10.92
1479.50
11.50
0.00
62
13.18
1472.18
7.18
0.00
63
13.18
1462.17
7.17
0.00
64
13.18
1454.40
10.40
0.00
65
13.18
1449.49
14.49
0.00
66
15.62
1448.60
15.60
0.00
67
15.62
1448.52
13.52
0.00
68
18.42
1448.74
10.74
0.00
69
13.72
1450.72
10.72
0.00
70
13.72
1457.36
14.36
0.00
71
13.72
1463.67
15.67
0.00
72
15.92
1479.57
14.57
0.00
73
15.92
1483.02
15.02
0.00
74
0.00
1487.88
8.88
0.00
75
13.56
1489.74
14.74
0.00
77
5.28
1494.05
12.05
0.00
78
5.28
1490.68
10.68
0.00
83
0.00
1590.47
9.47
0.00
85
0.06
1592.15
11.15
0.00
86
0.00
1596.47
14.47
0.00
87
0.06
1593.36
13.36
0.00
88
0.06
1599.95
12.95
0.00
89
0.00
1602.79
15.79
0.00
1
-380.45
1613.00
0.00
0.00 Reservoir

GoM : Phed

DPR of GSWSP (Phase-III)

359

Page 5
ZONE XI
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
380.45
2.39
9.24
Open
5
380.45
2.39
9.24
Open
9
172.75
1.80
7.29
Open
10
172.49
1.79
7.26
Open
11
172.23
1.79
7.24
Open
12
17.03
0.96
6.19
Open
13
12.83
0.73
3.66
Open
14
8.63
0.49
1.76
Open
15
-12.42
0.70
3.45
Open
16
-155.20
2.20
12.66
Open
17
40.06
2.27
30.15
Open
18
12.65
0.72
3.57
Open
19
48.51
2.75
42.98
Open
20
18.49
2.36
51.93
Open
21
7.09
0.90
8.80
Open
22
2.68
0.34
1.45
Open
23
-4.36
0.56
3.58
Open
24
-11.40
1.45
21.21
Open
25
30.01
1.70
17.67
Open
26
20.65
2.63
63.72
Open
27
11.29
1.44
38.85
Open
28
4.27
0.54
6.42
Open
29
-5.09
0.65
8.87
Open
30
-14.45
1.84
61.29
Open
31
-23.81
3.03
82.89
Open
39
-4.41
0.56
3.66
Open
32
-19.39
2.47
56.70
Open
33
-55.77
0.79
1.90
Open
34
-62.81
0.89
2.37
Open
35
-69.85
0.99
2.88
Open
36
-76.89
1.09
3.45
Open
37
-83.93
1.19
4.06
Open
38
-94.33
1.34
5.03
Open
40
7.02
0.89
16.10
Open
41
1.92
0.24
0.78
Open
42
-0.42
0.05
0.05
Open
44
36.37
2.06
25.22
Open
45
36.30
2.06
25.12
Open
46
36.22
2.05
25.02
Open
47
133.91
1.90
9.63
Open
48
132.75
1.88
9.48
Open
49
-109.07
1.54
6.59
Open
50
-109.13
1.54
6.59
Open
51
241.82
3.42
28.78
Open
52
240.66
3.41
28.52
Open
53
239.10
3.38
28.18
Open
54
237.54
3.36
27.84
Open

GoM : Phed

DPR of GSWSP (Phase-III)

360

Page 6
ZONE XI
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------55
235.98
3.34
27.50
Open
56
234.42
3.32
27.17
Open
58
234.42
3.32
27.17
Open
59
232.86
3.30
26.83
Open
60
231.30
3.27
26.50
Open
61
229.74
3.25
26.17
Open
62
228.18
3.23
25.84
Open
63
226.62
3.21
25.52
Open
64
166.06
3.38
34.87
Open
65
84.35
2.69
29.49
Open
66
73.43
4.16
92.63
Open
67
60.25
3.41
64.21
Open
68
47.07
2.67
40.65
Open
69
33.89
1.92
22.12
Open
70
20.71
1.17
8.89
Open
71
5.09
0.29
0.66
Open
72
-10.53
0.60
2.54
Open
73
-28.95
1.64
16.52
Open
74
-42.67
2.42
33.89
Open
75
-56.39
3.19
56.80
Open
76
-70.11
3.97
85.02
Open
77
-86.03
2.74
30.59
Open
78
-101.95
3.25
41.89
Open
79
-51.95
1.65
12.02
Open
83
-60.56
1.93
15.96
Open
84
55.28
1.76
13.48
Open
86
50.00
1.59
11.20
Open
90
-109.19
1.55
6.60
Open
98
-172.75
1.80
7.28
Open
99
-379.89
2.39
9.22
Open
100
-207.14
2.15
10.20
Open
6
-207.08
2.15
10.19
Open
92
-109.19
1.55
6.60
Open
93
-109.25
1.55
6.61
Open
94
97.83
1.99
13.09
Open
95
97.77
1.99
13.07
Open
2
-65.51
2.09
18.47
Open
3
2.76
0.35
1.53
Open

GoM : Phed

DPR of GSWSP (Phase-III)

361

g,

,
i

Legends
Pipeline
Road
Zone Boundary

Reservoir

Distribution Network - Zone - xn : Madanrting, Happy Valley Areas


o
w

.osm.

.llkm

Greater Shillong Water Supply Project (Phase III)

GoM:PHED

GoM : Phed

Length of pipe line required diameterwise


Zone : XII
Area of coverage : Madanriting, Happy Valley areas, Mawshabuit.
Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

DPR of GSWSP (Phase III)

500

450

400

200

150

100

25.00

85.00

10

142.00

4.

10

11

10

77.00

5.

11

12

11

82.00

6.

12

13

12

14.00

7.

13

14

13

52.00

8.

14

15

14

33.00

9.

15

16

15

47.00

10.

16

17

16

51.00

11.

17

18

17

24.00

12.

18

19

18

53.00

13.

19

11

19

39.00

14.

13

20

20

38.00

15.

20

21

21

38.00

16.

21

14

22

32.00

17.

21

22

23

22.00

18.

22

23

24

19.00

19.

23

24

25

25.00

20.

24

25

26

24.00

21.

25

26

27

-51.00

22.

26

27

28

47.00

23.

27

28

29

18.00

From

To

1.

2.

3.

363

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

30

18.00

31

32

45.00

31

32

33

103.00

27.

32

35

36

141.00

28.

35

36

37

76.00

29.

36

37

38

65.00

30.

37

38

39

56.00

31.

38

39

40

200.00

32.

39

40

41

32.00

33.

40

12

42

70.00

34.

10

41

43

96.00

35.

41

42

44

86.00

36.

42

43

45

96.00

37.

43

46

34.00

38.

42

44

47

61.00

39.

44

45

48

93.00

40.

45

38

49

72.00

41.

31

46

50

63.00

42.

46

47

51

31.00

43.

47

48

52

59.00

44.

49

50

54

23.00

45.

50

29

55

14.00

46.

48

51

56

111.00

47.

51

52

57

51.00

48.

52

53

58

155.00

49.

53

54

59

131.00

50.

54

55

60

285.00

From

To

24.

28

29

25.

24

26.

364

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

61

71.00

57

62

103.00

57

46

63

136.00

54.

56

58

64

62.00

55.

58

62

68

14.00

56.

62

63

69

84.00

57.

63

64

70

73.00

58.

64

65

71

39.00

59.

65

66

72

57.00

60.

66

67

73

56.00

61.

67

68

74

57.00

62.

68

69

75

42.00

63.

69

70

76

32.00

64.

70

71

77

64.00

65.

71

46

78

78.00

66.

67

75

82

181.00

67.

75

76

83

198.00

68.

76

66

84

97.00

69.

76

77

85

148.00

70.

77

78

86

256.00

71.

78

84

92

59.00

72.

84

85

93

73.00

73.

85

86

94

20.00

74.

86

87

95

598.00

75.

87

88

96

71.00

76.

88

89

97

74.00

77.

89

90

98

139.00

From

To

51.

51

56

52.

56

53.

365

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

99

54.00

91

100

67.00

91

64

101

19.00

81.

87

92

102

752.00

82.

92

93

103

52.00

83.

94

95

105

94.00

84.

95

96

106

48.00

85.

96

97

107

93.00

86.

97

98

108

58.00

87.

98

99

109

91.00

88.

99

100

110

145.00

89.

100

95

111

31.00

90.

100

101

112

90.00

91.

101

102

113

178.00

92.

102

103

114

97.00

93.

103

104

115

452.00

94.

104

105

116

148.00

95.

105

106

117

245.00

96.

106

107

118

259.00

97.

62

108

119

48.00

98.

108

94

120

95.00

99.

108

109

121

8.00

100.

109

111

123

128.00

101.

111

112

124

30.00

102.

112

113

125

161.00

103.

113

114

126

99.00

104.

114

1115

127

22.00

From

To

78.

90

78

79.

86

80.

366

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

128

14

117

129

58

117

118

130

74

108.

117

217

131

58

109.

217

98

132

299

110.

99

229

133

70

111.

229

103

134

176

112.

113

119

135

108

113.

119

214

136

58

114.

214

114

137

47

115.

119

120

138

74

116.

120

131

139

104

117.

121

112

140

152

118.

111

122

141

54

119.

122

123

142

107

120.

111

124

143

108

121.

124

125

144

140

122.

125

126

145

26

123.

126

127

146

23

124.

127

128

147

274

125.

123

184

148

59

126.

184

183

149

113

127.

183

120

150

103

128.

128

155

151

277

129.

155

161

152

26

130.

161

126

153

102

131.

155

156

154

437

From

To

105.

115

116

106.

116

107.

367

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

155

434.00

158

156

461.00

128

162

159

87.00

135.

162

163

160

153.00

136.

163

144

161

85.00

137.

144

141

162

127.00

138.

141

130

165

514.00

139.

130

129

166

217.00

140.

129

232

167

88.00

141.

232

128

168

376.00

142.

130

131

170

443.00

143.

131

132

171

51.00

144.

132

133

173

56.00

145.

133

136

175

16.00

146.

136

137

176

39.00

147.

237

134

178

27.00

148.

234

135

179

104.00

149.

135

136

180

77.00

150.

135

176

181

129.00

151.

176

181

182

38.00

152.

181

154

183

65.00

153.

154

153

184

12.00

154.

153

152

185

34.00

155.

152

127

186

133.00

156.

152

125

187

103.00

157.

153

180

188

82.00

158.

180

123

189

97.00

From

To

132.

156

157

133.

157

134.

368

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

190

76.00

177

191

43.00

177

176

192

97.00

162.

177

178

193

38.00

163.

178

179

194

69.00

164.

179

123

195

187.00

165.

179

230

196

264.00

166.

230

185

197

77.00

167.

185

184

198

99.00

168.

184

213

199

128.00

169.

213

212

200

140.00

170.

119

212

201

26.00

171.

212

205

202

42.00

172.

205

206

203

22.00

173.

206

207

204

18.00

174.

206

210

207

93.00

175.

210

211

208

26.00

176.

211

215

209

152.00

177.

215

115

210

52.00

178.

207

216

211

187.00

179.

216

116

212

143.00

180.

118

218

213

45.00

181.

218

108

214

148.00

182.

118

221

217

431.00

183.

221

223

219

240.00

184.

223

224

220

240.00

185.

224

225

221

282.00

From

To

159.

181

182

160.

182

161.

369

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

222

170.00

227

223

236.00

227

228

224

418.00

189.

94

234

225

35.00

190.

93

234

104

11.00

191.

179

202

226

349.00

192.

202

203

227

377.00

193.

203

204

228

369.00

194.

177

186

229

559.00

195.

186

200

230

559.00

196.

200

201

231

328.00

197.

134

175

232

31.00

198.

175

187

233

275.00

199.

187

231

234

100.00

200.

231

186

235

111.00

201.

144

145

236

38.00

202.

145

164

237

70.00

203.

164

147

238

268.00

204.

147

148

239

595.00

205.

145

146

241

86.00

206.

146

147

242

403.00

207.

148

150

243

96.00

208.

150

151

244

239.00

209.

151

165

245

459.00

210.

151

172

249

20.00

211.

172

171

250

32.00

212.

171

170

251

70.00

From

To

186.

225

226

187.

226

188.

370

GoM : Phed

Sl.
No.

Node No.

Pipe No.

Length of pipes diameterwise


RM
350
300
250

500

450

400

DPR of GSWSP (Phase III)

200

150

100

252

69.00

168

253

23.00

168

165

254

58.00

216.

172

169

255

77.00

217.

187

197

256

63.00

218.

197

196

257

242.00

219.

196

199

258

107.00

220.

199

168

259

48.00

221.

175

173

260

47.00

222.

173

170

262

88.00

223.

170

198

263

43..00

224.

198

197

264

48.00

225.

72.00

226.

111

97

285

118.00

227.

93

101

286

256.00

228.

236

151

287

214.00

229.

150

236

248

229.00

230.

55

156

120.00

231.

201

204

30.00

232.

107

228

100.00

233.

158

162

100.00

234.

17

157

100.00

235.

19

48

31

100.00

433.00

627.00

1844.00

7882.00

17175.00

From

To

213.

170

169

214.

169

215.

Total:

371

({N)

ZONE - XII
'PROPOSEO PIPELINE ROlJTE :
AREA OF COVERAGE:

,224

1. Madanryting
2B

2. Happy Valley Areas


218

~8'

176

135

GoM:Phed

DPR of GSWSP (phase

nn

372

N
Elevation

zone XII (Madanryting)

25.00
50.00

228

75.00

226

1675

1675

107

106

225
224
1675
1675
223

1675

100.00
m

227

105

104

1676
221

216

207

218
118
1682
1680
1679 1682 1683
206
210
103
1677
215
1681 1680
102
211 1680 1681
117
1688
116 115 1682
88
205
1690
229
89
101
217 1683
214 1680
1683
1683
90
1690
1681
1691
114
98
87
1690
119 212
1692
1682
99 1684
92
78
1690
85
100
1683
93
97
84
113
1683 1682
1692 1692
86 1692 1693
1692
213
96
120
1694
1694 95
234
1695
77
1693
1692
1685
1695
91
1694
121 1684 1680
169694 1695 111 112
203 204
1696
183
63
76
1697
62
64
65
185 230
75
1692 1686
109
1670 1669
1682
1081697
1692
201
202
1701 17001698 1699
122
179
1700
184
56
66
1676
1675
68170367
58 1698 1698
124
69
1667
57
1689
1674 1673
1678
1706
200
1702
178
123
51 1702
1687
1711 1709
71 1705
1709
46
125
70
1861665 231
1672
48 1708
1685
180
177
182
1714 1714 47
52
1687
1713
31
1662
1661
1709
152 1683
126
135
1678 1675
24 1712
53
153
1706
154
49
176
32
134
1715
181
187
1685
1687
1664
35
1716
1704
1684
23
25 26
1684
137
1710
54
175
161
1674
127
1720
1663
1680
1659
50
132
133 136
1725
27
131
1718 17161715
1665
1702
155 1685
129
1661
1691
197
22
232
21
173
36
1712
55
1669 1669 1667
29
1714
1670
128
1692
1670
28
1719
1675
198 1658
172014
1660
20
1732
130
1713 1700 156
15
1687
196
37
13
1657
1724 1713
1724
1672
1698
170
172416
141
236
1656
1735
1728
157
171
40
12
39
38
1664
162
17
1675
1658
1716158
1723
1663
169
151
172
1732
1730
19
146
150
18 1723
45 1736 1734
1686
199
11
1690
1662
16571665
165
168
10
1731
1668
1660
1727
148
1736
164
1658
41
1733
163
1658
1660
1736
147
1662
44
1667
1673 144 145
42 1739
1665
1739
1670
9
1742
1671
43
1739
1745
3
zr
2
1742
1761 1744
1677

GoM : Phed

DPR of GSWSP (Phase III)

373

Page 1
6/21/2008 4:17:38 PM
**********************************************************************
*
E P A N E T
*
*
Hydraulic and Water Quality
*
*
Analysis for Pipe Networks
*
*
Version 2.0
*
**********************************************************************
Input File: madanryting.net
Zone XII
Link - Node Table:
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------1
zr
2
25
250
2
2
3
85
250
9
9
10
142
250
10
10
11
77
300
11
11
12
82
200
12
12
13
14
250
13
13
14
52
250
14
14
15
33
150
15
15
16
47
150
16
16
17
51
150
17
17
18
24
200
18
18
19
53
200
19
19
11
39
200
20
13
20
38
150
21
20
21
38
150
22
21
14
32
250
23
21
22
22
250
24
22
23
19
250
25
23
24
25
250
26
24
25
24
200
27
25
26
51
200
28
26
27
47
200
29
27
28
18
200
30
28
29
18
150
32
24
31
45
200
33
31
32
103
200
36
32
35
141
200
37
35
36
76
200
38
36
37
65
200
39
37
38
56
200
40
38
39
200
200
41
39
40
32
200
42
40
12
70
200
43
10
41
96
200
44
41
42
86
200
45
42
43
96
300
46
43
zr
34
300

GoM : Phed

DPR of GSWSP (Phase-III)

374

Page 2
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------47
42
44
61
300
48
44
45
93
300
49
45
38
72
300
50
31
46
63
250
51
46
47
31
200
52
47
48
59
150
54
49
50
23
150
55
50
29
14
150
56
48
51
111
200
57
51
52
51
100
58
52
53
155
100
59
53
54
131
100
60
54
55
285
100
61
51
56
71
200
62
56
57
103
200
63
57
46
136
200
64
56
58
62
250
68
58
62
14
250
69
62
63
84
150
70
63
64
73
150
71
64
65
39
150
72
65
66
57
150
73
66
67
56
150
74
67
68
57
150
75
68
69
42
150
76
69
70
32
200
77
70
71
64
200
78
71
46
78
200
82
67
75
181
100
83
75
76
198
100
84
76
66
97
100
85
76
77
148
100
86
77
78
256
100
92
78
84
59
100
93
84
85
73
100
94
85
86
20
100
95
86
87
598
100
96
87
88
71
100
97
88
89
74
100
98
89
90
139
100
99
90
78
54
100
100
86
91
67
100
101
91
64
19
150
102
87
92
752
100
103
92
93
52
100
105
94
95
94
200
106
95
96
48
100

GoM : Phed

DPR of GSWSP (Phase-III)

375

Page 3
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------107
96
97
93
100
108
97
98
58
100
109
98
99
91
100
110
99
100
145
100
111
100
95
31
100
112
100
101
90
100
113
101
102
178
100
114
102
103
97
100
115
103
104
452
100
116
104
105
148
100
117
105
106
245
100
118
106
107
259
100
119
62
108
48
200
120
108
94
95
200
121
108
109
8
200
123
109
111
128
200
124
111
112
30
150
125
112
113
161
100
126
113
114
99
100
127
114
115
22
100
128
115
116
14
100
129
116
117
58
100
130
117
118
74
100
131
117
217
58
100
132
217
98
299
100
133
99
229
70
100
134
229
103
176
100
135
113
119
108
100
136
119
214
58
100
137
214
114
47
100
138
119
120
74
100
139
120
121
104
100
140
121
112
152
100
141
111
122
54
150
142
122
123
107
150
143
111
124
108
100
144
124
125
140
100
145
125
126
26
150
146
126
127
23
150
147
127
128
274
150
148
123
184
59
100
149
184
183
113
100
150
183
120
103
100
151
128
155
277
100
152
155
161
26
150
153
161
126
102
150
154
155
156
437
200

GoM : Phed

DPR of GSWSP (Phase-III)

376

Page 4
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------155
156
157
434
150
156
157
158
461
150
159
128
162
87
100
160
162
163
153
150
161
163
144
85
150
162
144
141
127
150
165
141
130
514
150
166
130
129
217
100
167
129
232
88
100
168
232
128
376
100
170
130
131
443
150
171
131
132
51
150
173
132
133
56
150
175
133
136
16
150
176
136
137
39
150
178
137
134
27
100
179
134
135
104
100
180
135
136
77
100
181
135
176
129
100
182
176
181
38
150
183
181
154
65
150
184
154
153
12
150
185
153
152
34
150
186
152
127
133
150
187
152
125
103
150
188
153
180
82
150
189
180
123
97
150
190
181
182
76
100
191
182
177
43
100
192
177
176
97
100
193
177
178
38
100
194
178
179
69
100
195
179
123
187
100
196
179
230
264
100
197
230
185
77
100
198
185
184
99
100
199
184
213
128
100
200
213
212
140
100
201
119
212
26
100
202
212
205
42
100
203
205
206
22
100
204
206
207
18
100
207
206
210
93
100
208
210
211
26
100
209
211
215
152
100
210
215
115
52
100
211
207
216
187
100

GoM : Phed

DPR of GSWSP (Phase-III)

377

Page 5
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------212
216
116
143
100
213
118
218
45
100
214
218
104
148
100
217
118
221
431
100
219
221
223
240
100
220
223
224
240
100
221
224
225
282
100
222
225
226
170
100
223
226
227
236
100
224
227
228
418
100
225
94
234
35
100
104
93
234
11
100
226
179
202
349
150
227
202
203
377
150
228
203
204
369
150
229
177
186
559
100
230
186
200
559
150
231
200
201
328
150
232
134
175
31
150
233
175
187
275
100
234
187
231
100
100
235
231
186
111
100
236
144
145
38
150
237
145
164
70
150
238
164
147
268
150
239
147
148
595
150
241
145
146
86
100
242
146
147
403
100
243
148
150
96
150
244
150
151
239
150
245
151
165
459
100
249
151
172
20
100
250
172
171
32
100
251
171
170
70
100
252
170
169
69
100
253
169
168
23
100
254
168
165
58
100
255
172
169
77
100
256
187
197
63
100
257
197
196
242
100
258
196
199
107
100
259
199
168
48
100
260
175
173
47
100
262
173
170
88
100
263
170
198
43
100
264
198
197
48
100
8
3
9
72
250

GoM : Phed

DPR of GSWSP (Phase-III)

378

Page 6
Link - Node Table: (continued)
---------------------------------------------------------------------Link
Start
End
Length Diameter
ID
Node
Node
m
mm
---------------------------------------------------------------------285
111
97
118
100
286
93
101
256
100
287
236
151
214
100
248
150
236
229
100
3
55
156
120
100
4
201
204
30
150
5
107
228
100
100
6
158
162
100
150
7
17
157
100
200
31
49
48
100
150
Node Results:
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------2
0.00
1760.03
16.03
3
0.00
1756.71
14.71
9
1.40
1753.90
14.90
10
0.00
1748.45
12.45
11
0.00
1745.80
12.80
12
0.00
1740.14
10.14
13
0.00
1739.37
11.37
14
0.00
1737.59
13.59
15
0.94
1737.67
13.67
16
0.94
1737.79
14.79
17
0.94
1737.95
14.95
18
0.94
1739.55
12.55
19
0.94
1743.13
12.13
20
3.74
1737.76
13.76
21
0.00
1736.38
16.38
22
3.12
1735.10
16.10
23
3.12
1734.03
16.03
24
0.00
1732.66
16.66
25
1.88
1732.13
16.13
26
1.88
1731.07
16.07
27
1.88
1730.14
16.14
28
1.88
1729.80
16.80
29
2.06
1728.49
15.49
31
0.00
1729.25
14.25
32
0.00
1733.86
13.86
35
3.12
1740.18
15.18
36
3.12
1743.77
11.77
37
3.12
1747.00
12.00
38
0.00
1749.94
13.94
39
6.88
1742.93
8.93
40
6.88
1741.96
9.96

GoM : Phed

DPR of GSWSP (Phase-III)

379

Page 7
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------41
5.16
1751.74
12.74
42
0.00
1755.00
13.00
43
1.40
1759.42
14.42
44
3.76
1753.59
14.59
45
3.76
1751.50
15.50
46
0.00
1724.70
10.70
47
6.56
1721.69
9.69
48
0.00
1719.97
10.97
49
1.88
1726.05
16.05
50
1.88
1727.54
15.54
51
4.84
1715.66
7.66
52
0.16
1715.08
9.08
53
0.12
1713.38
9.38
54
0.08
1711.98
9.98
55
0.04
1708.99
8.99
56
0.00
1713.55
7.55
57
12.50
1717.77
8.77
58
8.00
1710.89
8.89
62
0.00
1710.33
10.33
63
12.50
1709.54
10.54
64
0.00
1709.41
11.41
65
14.08
1709.91
9.91
66
0.00
1711.56
9.56
67
0.00
1713.89
8.89
68
7.82
1716.99
8.00
69
8.12
1719.92
8.92
70
7.82
1720.61
7.61
71
7.82
1722.28
8.28
75
0.62
1712.08
9.08
76
0.00
1710.40
9.40
77
6.26
1704.98
8.98
78
6.74
1701.44
9.44
84
9.38
1701.44
9.44
85
9.38
1702.62
8.62
86
0.00
1703.74
8.74
87
0.00
1702.06
10.06
88
3.12
1701.52
11.52
89
3.12
1701.35
11.35
90
3.12
1701.35
11.35
91
10.94
1708.99
11.99
92
0.00
1703.19
10.19
93
0.00
1703.26
8.26
94
0.00
1704.84
7.84
95
0.00
1704.33
9.33
96
3.12
1702.47
8.47
97
0.00
1700.07
7.07
98
0.00
1699.29
7.29

GoM : Phed

DPR of GSWSP (Phase-III)

380

Page 8
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------99
0.00
1699.50
7.50
100
0.00
1702.86
8.86
101
0.00
1702.32
10.32
102
3.12
1699.29
9.29
103
0.00
1698.45
10.45
104
3.30
1691.91
8.91
105
0.18
1691.79
9.79
106
0.12
1691.63
12.63
107
0.06
1691.48
14.48
108
0.00
1705.90
7.90
109
0.00
1705.54
7.54
111
0.00
1699.74
7.74
112
0.00
1699.13
7.13
113
0.00
1692.60
7.60
114
0.00
1691.41
8.41
115
0.00
1691.20
8.20
116
0.00
1691.20
8.20
117
0.00
1691.49
8.49
118
0.00
1691.45
11.45
217
5.62
1691.95
7.95
229
6.24
1698.64
7.64
119
0.00
1691.48
8.48
214
3.74
1691.40
9.40
120
0.00
1691.67
7.67
121
7.08
1693.08
7.08
122
18.02
1696.11
7.11
123
0.00
1692.31
7.31
124
12.50
1695.36
8.36
125
0.00
1694.69
7.69
126
0.00
1694.96
7.96
127
0.00
1694.71
9.71
128
0.00
1694.71
7.71
184
0.00
1691.14
13.14
183
5.82
1691.13
9.13
155
3.62
1700.09
8.09
161
3.12
1698.94
7.94
156
0.50
1707.75
9.75
157
0.40
1732.42
16.42
158
0.30
1701.58
11.58
162
3.12
1694.95
8.95
163
3.12
1686.82
13.82
144
0.00
1682.78
11.78
141
0.00
1682.12
7.12
130
0.00
1679.48
7.48
129
17.18
1679.18
9.18
232
0.00
1682.13
7.13
131
0.00
1677.86
7.86

GoM : Phed

DPR of GSWSP (Phase-III)

381

Page 9
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------132
12.50
1677.67
8.67
133
0.00
1677.67
8.67
136
0.00
1677.67
10.67
137
1.84
1677.56
12.56
212
0.00
1691.15
9.15
205
3.12
1690.67
9.67
206
0.00
1690.57
9.57
207
2.04
1690.57
10.57
134
0.00
1677.18
14.18
135
0.00
1679.11
15.11
176
0.00
1687.81
13.81
181
0.00
1688.59
8.59
154
0.00
1691.22
7.22
153
0.00
1691.70
7.70
152
0.00
1693.24
8.24
180
20.30
1691.69
8.69
182
9.36
1686.06
8.06
177
0.00
1685.85
10.85
178
7.80
1685.51
13.51
179
8.22
1685.52
11.52
230
1.56
1688.17
13.17
185
1.56
1689.26
13.26
213
0.30
1691.14
11.14
210
4.68
1690.08
10.08
211
4.68
1690.07
10.07
215
4.68
1690.53
8.53
216
1.56
1690.78
8.78
218
3.60
1691.45
10.45
221
1.06
1691.10
14.10
223
0.80
1691.06
15.06
224
0.64
1691.06
16.06
225
0.48
1691.08
16.08
226
0.32
1691.12
16.12
227
0.16
1691.21
16.21
228
0.08
1691.42
16.42
234
9.36
1703.36
7.36
202
0.42
1684.03
11.03
203
0.28
1682.51
12.51
204
0.14
1681.08
12.08
201
0.24
1680.97
13.97
200
0.48
1679.76
14.76
186
8.28
1677.85
15.85
175
0.00
1676.93
15.93
187
5.58
1674.16
15.16
231
7.80
1674.71
13.71
145
0.00
1681.84
11.84
164
3.12
1681.14
14.14

GoM : Phed

DPR of GSWSP (Phase-III)

382

Page 10
Node Results: (continued)
---------------------------------------------------------------------Node
Demand
Head Pressure
ID
LPS
m
m
---------------------------------------------------------------------147
0.00
1679.12
14.12
148
12.68
1674.06
12.06
146
12.50
1679.26
11.26
150
0.00
1673.93
13.93
151
0.00
1673.73
16.73
165
3.32
1673.22
15.22
172
0.00
1673.65
8.65
171
3.12
1673.64
10.64
170
0.00
1673.70
9.70
169
0.00
1673.47
11.47
168
0.00
1673.23
13.23
197
0.00
1673.54
15.54
196
6.18
1672.75
16.75
199
4.68
1672.85
14.85
173
0.00
1675.80
15.80
198
9.36
1673.43
16.43
236
0.60
1673.79
15.79
zr
-489.52
1761.00
0.00
Reservoir
Link Results:
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------1
176.37
3.60
38.99
Open
2
176.37
3.60
38.99
Open
9
174.97
3.57
38.42
Open
10
266.43
3.77
34.44
Open
11
133.51
4.25
69.03
Open
12
212.32
4.33
54.97
Open
13
164.21
3.35
34.16
Open
14
-9.81
0.56
2.22
Open
15
-10.75
0.61
2.64
Open
16
-11.69
0.66
3.08
Open
17
-131.04
4.17
66.68
Open
18
-131.98
4.20
67.57
Open
19
-132.92
4.23
68.46
Open
20
48.11
2.72
42.33
Open
21
44.37
2.51
36.44
Open
22
-174.02
3.55
38.03
Open
23
218.39
4.45
57.91
Open
24
215.27
4.39
56.38
Open
25
212.15
4.32
54.89
Open
26
71.85
2.29
21.91
Open
27
69.97
2.23
20.86
Open
28
68.09
2.17
19.83
Open
29
66.21
2.11
18.84
Open

GoM : Phed

DPR of GSWSP (Phase-III)

383

Page 11
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------30
64.33
3.64
72.49
Open
32
140.30
4.47
75.67
Open
33
-105.68
3.37
44.77
Open
36
-105.68
3.37
44.77
Open
37
-108.80
3.47
47.25
Open
38
-111.92
3.56
49.79
Open
39
-115.04
3.66
52.39
Open
40
92.57
2.95
35.04
Open
41
85.69
2.73
30.37
Open
42
78.81
2.51
26.01
Open
43
-91.45
2.91
34.25
Open
44
-96.61
3.08
37.92
Open
45
-311.75
4.41
46.06
Open
46
-313.15
4.43
46.45
Open
47
215.13
3.05
23.17
Open
48
211.37
2.99
22.43
Open
49
207.61
2.94
21.70
Open
50
245.98
5.01
72.19
Open
51
45.89
1.46
97.20
Open
52
39.33
2.23
29.15
Open
54
-60.39
3.42
64.48
Open
55
-62.27
3.53
68.26
Open
56
97.84
3.12
38.81
Open
57
8.16
1.04
11.40
Open
58
8.00
1.02
10.99
Open
59
7.88
1.00
10.68
Open
60
7.80
0.99
10.48
Open
61
84.84
2.70
29.81
Open
62
-100.83
3.21
41.04
Open
63
-113.33
3.61
50.96
Open
64
185.67
3.78
42.88
Open
68
177.67
3.62
39.52
Open
69
21.36
1.21
9.41
Open
70
8.86
0.50
1.84
Open
71
-25.16
1.42
12.74
Open
72
-39.24
2.22
29.02
Open
73
-47.60
2.70
41.50
Open
74
-55.18
3.12
54.56
Open
75
-63.00
3.57
69.74
Open
76
-71.12
2.27
21.50
Open
77
-78.94
2.51
26.08
Open
78
-86.76
2.76
31.07
Open
82
7.58
0.97
9.95
Open
83
6.96
0.89
8.49
Open
84
-8.36
1.07
11.94
Open
85
15.32
1.95
36.64
Open
86
9.06
1.15
13.85
Open

GoM : Phed

DPR of GSWSP (Phase-III)

384

Page 12
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------92
-0.49
0.06
0.06
Open
93
-9.87
1.26
16.23
Open
94
-19.25
2.45
55.93
Open
95
3.83
0.49
2.81
Open
96
6.55
0.83
7.60
Open
97
3.43
0.44
2.29
Open
98
0.31
0.04
0.03
Open
99
-2.81
0.36
1.58
Open
100
-23.08
2.94
78.26
Open
101
-34.02
1.93
22.29
Open
102
-2.72
0.35
1.49
Open
103
-2.72
0.35
1.49
Open
105
33.47
1.07
5.33
Open
106
15.81
2.01
38.84
Open
107
12.69
1.62
25.85
Open
108
8.89
1.13
13.37
Open
109
-3.45
0.44
2.32
Open
110
-11.95
1.52
23.13
Open
111
-17.66
2.25
47.70
Open
112
5.71
0.73
5.90
Open
113
10.14
1.29
17.05
Open
114
7.02
0.89
8.63
Open
115
9.28
1.18
14.47
Open
116
1.94
0.25
0.80
Open
117
1.76
0.22
0.67
Open
118
1.64
0.21
0.59
Open
119
156.31
4.98
92.44
Open
120
49.98
1.59
11.19
Open
121
106.33
3.39
45.30
Open
123
106.33
3.39
45.29
Open
124
32.21
1.82
20.14
Open
125
16.18
2.06
40.56
Open
126
8.42
1.07
12.10
Open
127
7.39
0.94
9.51
Open
128
-1.27
0.16
0.36
Open
129
-5.20
0.66
4.95
Open
130
1.52
0.19
0.51
Open
131
-6.72
0.86
7.96
Open
132
-12.34
1.57
24.54
Open
133
8.50
1.08
12.31
Open
134
2.26
0.29
1.06
Open
135
7.76
0.99
10.40
Open
136
2.71
0.35
1.49
Open
137
-1.03
0.13
0.25
Open
138
-3.61
0.46
2.52
Open
139
-8.95
1.14
13.54
Open
140
-16.03
2.04
39.85
Open

GoM : Phed

DPR of GSWSP (Phase-III)

385

Page 13
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------141
61.75
3.50
67.20
Open
142
43.73
2.48
35.47
Open
143
16.17
2.06
40.50
Open
144
3.67
0.47
4.85
Open
145
-22.84
1.29
10.65
Open
146
23.22
1.31
10.97
Open
147
-0.08
0.00
0.00
Open
148
11.02
1.40
19.92
Open
149
0.48
0.06
0.06
Open
150
-5.34
0.68
5.20
Open
151
-10.88
1.39
19.43
Open
152
49.17
2.78
44.08
Open
153
46.05
2.61
39.04
Open
154
-63.67
2.03
17.52
Open
155
-56.42
3.19
56.85
Open
156
61.60
3.49
66.90
Open
159
-3.80
0.48
2.76
Open
160
54.38
3.08
53.11
Open
161
51.26
2.90
47.61
Open
162
15.42
0.87
5.15
Open
165
15.42
0.87
5.15
Open
166
2.59
0.33
1.36
Open
167
-14.59
1.86
33.47
Open
168
-14.59
1.86
33.47
Open
170
12.83
0.73
3.66
Open
171
12.83
0.73
3.66
Open
173
0.33
0.02
0.01
Open
175
0.33
0.02
0.00
Open
176
11.00
0.62
2.76
Open
178
9.16
1.17
14.14
Open
179
-10.62
1.35
18.60
Open
180
10.67
1.36
18.76
Open
181
-21.30
2.71
67.44
Open
182
-32.42
1.84
20.39
Open
183
-46.97
2.66
40.49
Open
184
-46.97
2.66
40.48
Open
185
-49.81
2.82
45.14
Open
186
-23.30
1.32
11.05
Open
187
-26.51
1.50
14.04
Open
188
2.84
0.16
0.22
Open
189
-17.46
0.99
6.47
Open
190
14.54
1.85
33.28
Open
191
5.18
0.66
4.92
Open
192
-11.13
1.42
20.27
Open
193
7.09
0.90
8.80
Open
194
-0.71
0.09
0.12
Open
195
-15.25
1.94
36.33
Open

GoM : Phed

DPR of GSWSP (Phase-III)

386

Page 14
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------196
-7.61
0.97
10.04
Open
197
-9.17
1.17
14.18
Open
198
-10.73
1.37
18.96
Open
199
-0.19
0.02
0.01
Open
200
-0.49
0.06
0.06
Open
201
8.66
1.10
12.75
Open
202
8.17
1.04
11.43
Open
203
5.05
0.64
4.69
Open
204
-0.32
0.04
0.03
Open
207
5.37
0.68
5.26
Open
208
0.69
0.09
0.12
Open
209
-3.99
0.51
3.03
Open
210
-8.67
1.10
12.76
Open
211
-2.36
0.30
1.15
Open
212
-3.92
0.50
2.94
Open
213
-0.43
0.06
0.05
Open
214
-4.03
0.51
3.09
Open
217
1.96
0.25
0.81
Open
219
0.90
0.11
0.19
Open
220
0.10
0.01
0.00
Open
221
-0.54
0.07
0.08
Open
222
-1.02
0.13
0.24
Open
223
-1.34
0.17
0.40
Open
224
-1.50
0.19
0.50
Open
225
16.51
2.10
42.07
Open
104
-7.15
0.91
8.93
Open
226
13.93
0.79
4.27
Open
227
13.51
0.77
4.03
Open
228
13.23
0.75
3.88
Open
229
9.22
1.17
14.31
Open
230
-12.37
0.70
3.42
Open
231
-12.85
0.73
3.67
Open
232
19.79
1.12
8.17
Open
233
7.62
0.97
10.06
Open
234
-5.51
0.70
5.52
Open
235
-13.31
1.70
28.26
Open
236
35.84
2.03
24.53
Open
237
22.09
1.25
10.01
Open
238
18.97
1.07
7.55
Open
239
20.22
1.14
8.50
Open
241
13.75
1.75
30.01
Open
242
1.25
0.16
0.36
Open
243
7.54
0.43
1.37
Open
244
5.84
0.33
0.85
Open
245
2.33
0.30
1.12
Open
249
4.61
0.59
3.97
Open
250
1.12
0.14
0.29
Open

GoM : Phed

DPR of GSWSP (Phase-III)

387

Page 15
Link Results: (continued)
---------------------------------------------------------------------Link
Flow Velocity Headloss
Status
ID
LPS
m/s
m/km
---------------------------------------------------------------------251
-2.00
0.25
0.84
Open
252
4.23
0.54
3.37
Open
253
7.72
0.98
10.30
Open
254
0.99
0.13
0.23
Open
255
3.49
0.45
2.37
Open
256
7.56
0.96
9.90
Open
257
4.13
0.53
3.24
Open
258
-2.05
0.26
0.88
Open
259
-6.73
0.86
7.98
Open
260
12.16
1.55
23.90
Open
262
12.16
1.55
23.90
Open
263
5.94
0.76
6.33
Open
264
-3.42
0.44
2.28
Open
8
176.37
3.60
38.99
Open
285
-3.80
0.48
2.77
Open
286
4.42
0.56
3.67
Open
287
1.10
0.14
0.28
Open
248
1.70
0.22
0.63
Open
3
7.76
0.99
10.38
Open
4
-13.09
0.74
3.80
Open
5
1.58
0.20
0.55
Open
6
61.30
3.47
66.30
Open
7
118.41
3.77
55.27
Open
31
58.51
3.31
60.82
Open

GoM : Phed

DPR of GSWSP (Phase-III)

388

Chainage ( m)

GoM:Phed
Scour Valve
Airvalve
Horizontal 1:50
Vertical

DPR of GSWSP (Phase III)


Scale : As indicated

1838.00

1830.00

1835.00

1832.00

1838.00

1828.00

1835.00

1837.00
1825.00

1730.00

1910.00

1960.00

2100.00

2180.00

2240.00

2290.00

2360.00
2370.00

1847.00

1834.00

2630.00

1834.00
1831.00

1430.00
1440.00
1450.00

1829.00

1831.00

1300.00

2580.00

1836.00

1190.00

1813.00

886.00

1830.00

1802.00

862.00

1130.00

1784.00
850.00

1828.00

1769.00
1778.00
1781.00
807.00
818.00
823.00

1050.00

1747.00

1832.00

1729.00
780.00

1010.00

1711.00

756.00
768.00

1830.00

1714.00

738.00

986.00

1707.00

722.00

1832.00

1694.00
705.00

971.00

1689.00
687.00

1818.00

1662.00
1666.00
1677.00

647.00
659.00
662.00

1824.00
1822.00
1828.00

1657.00

628.00

912.00
920.00
927.00

1642.00
1644.00
1645.00
605.00
608.00
613.00

901.00

1629.00
1638.00

1608.00
508.00

574.00
582.00

1596.00
1596.00
1603.00
471.00
476.00
478.00

1612.00

1585.00

424.00

1617.00

1595.00
1591.00
404.00
413.00

522.00

1592.00

362.00

Proposed site for


construction of intake
well and pump house
for Stage I pumping
station

533.00

1607.00

324.00

1607.00

214.00

1607.00

1610.00

195.00

285.00

1611.00

1592.00

1589.00

168.00

135.00

22.00

1576.00

Reduced Level (m)

0.00

Inlet to Treatment
Plant

Proposed site for


construction of RCC
sump and pump
house for
Stage II pumping station

Datum : 1400.00

1:100

Long Section of Raw Water Rising Main

Greater Shillong Water Supply Project (Phase III) GoM:PHED


389

I----~-------I

Gangway bridge

=~===================================
o

===================================

=r=

~~

11

y\.
f~
~'--r0

/r

OJ
Co

===========.....$.

.,"'
.,'"

~1

//

f5

===========

~\~I

T
o

"

"'

t
~

Hill Side: Elevation

""'

1,.11

.",

IIit

!I IS

II

'T"a

Ifb

1~.20

--.L

1J

'""'"

Raw water Stage-I Pumping System: Pump House layout plan & elevation

Scale : 1:200
GoM:Phed

Greater Shillong Water Supply Project (phase III)


DPR of GSWSP (Phase ill)

GoM:PHED
390

9000mm
7.5 ton capacity

30000mm

Original Ground

10000mm

6000mm
MCC

Rl: 1585.60m

Road

Rl: 1583.20m

center Line Pipe Rl:1584.00

Section At EE
1577.00m Water Level

Rl :1575.00m
Sluice Gate

400mm

8200mm

400mm

Rl: 1567.00m
Sluice Gate

1547.00m

Raw Water Stage-I Pumping System : Intake Structure, Pump House, Inlets & Typical Pump Installations

Scale - 1:500
GoM : Phed

Greater Shillong Water Supply Project (Phase III)


DPR of GSWSP (Phase-III)

GoM : PHED
391

--

115DD

---

I
I
I
I

Plan

Raw water Stage-II Pumping System: Layout plan of pump house, RCC sump and pumping installations

Scale: 1:100
GoM:Phed

Greater Shillong Water Supply Project (Phase III)


DPR of GSWSP (phase III)

GoM:PHED
392

SectIonIIIE_tIon

""',"ow

DO

RL : 1772.00m

EIB""tIon DfRCC SUmp

EfBlRltIon DfCleilr

w._

PumpingSiation

Raw water Stage II pumping system: Elevation and pumping installations

Scale: 1:100
GoM:Phed

Greater Shillong Water Supply Project (phase III)


DPR of GSWSP (phase III)

GoM:PHED
393

RCC Cover
slab

Flow meter
Pulley
RCC cover
slab

PVC float operated stainless steel valve

Thread

Orifice

1860.00

1000

1220

1858.00

Steel shaft

1200

Alum solution
A

A'

Stainless steel tappered needle valve

Constant head dosing tank

Stainless steel orifice

RCC cover
slab

Constant head dosing tank

1856.00

Section at A- A'
Scale 1:40

Scale 1:20

1854.00
1852.00

Parshall flume

(+) 1845.79 (W.L.)


(AT OUTLET POINT)

1850.00
(+) 1847.00 (W.L.)

1848.00

(+) 1846.20(W.L.)

GL

1846.00

(+) 1844.40(W.L.)
(AT INLET POINT OF FILTER HOUSE)

30000

(+) 1846.50(W.L.)

(+) 1846.00(W.L.)

31150

(+) 1844.10(W.L.)

(+) 1844.85(G.L.)
(+) 1842.90 GL

1844.00

(+) 1843.30 (GL)

Inlet stilling chamber

(+) 1841.15

(+) 1841.90(GL)

1842.00

(+) 1840.80
TO SLUDGE PIT

FLASH MIXER

1840.00

CLARIFLOCCULATOR

FILTER HOUSE

(+) 1837.15

35000

(+) 1836.90 (W.L.)

1838.00
Scale 1:200

TO DISTRIBUTION
NETWORK

1836.00
1834.00

(+) 1834.50
(+)1834.00 GL

GL

1832.00

CLEAR WATER RESERVOIR

1830.00
1828.00
1826.00
1824.00
1822.00
Datum 1820.00

Hydraulic Flow Diagram of Water Treatment Plant


Scale : As indicated

GoM:Phed

DPR of GSWSP (Phase III)

Greater Shillong Water Supply Project (Phase III)

GoM : PHED
394

Diameter:

30.00m~,i,

't-

750 wide walkway channel

CLEAR WATER RESERVOIR

Raw water inlet channel

Inlet stilling chamber ~

Parshall ftume

Channel

.-I

From intennediate_~ _ _ !!
pumpIng 5tatl~--~

III:::I

CHEMICAL HOUSE, CONTROL.,


LABORATORY AND ELECTRICAL
ROOM.

ol:

.
w

!:i
~

FIOCCUI.tor~;,

IL

FLASH MIXER
Inlet stilling chamber

Raw water inlet channel

Parshall flume

CLARIFLOCCULATOR

Design consideration
. : Civil structure including treatment unit considered for intermediate stage
: Civil structure excluding treatment unit considered for ultimate stage

Water Treatment Plant of 32.97 Mgd : Layout plan

Scale : 1 :500
GoM:Phed

Greater Shillong Water Supply Project (Phase III)


DPR of GSWSP (phase III)

GoM:PHED
395

f--------4775

4800

1500

4500

4500

- - - - - - - -L - - - - - - ~~b~~~ - - - - c!y
700
D$J f250
rDi"1
D$J
0 1
Ll' L[J
=u

!Ll

:J;~.~

1500

----

"U

4800

4775-----------1

r - - - - - - - IJ!bI
L

[!i

500.0000

walkwav

"

"""

f+'"

750,.750 haunch

Op=ting Platfonn

-151

II I

""

1'1

In1inc booster pmnp

lifO

In1ine booster

1 200

~I

80

Back wash pumps indication

::

Iw.j

D, ,

Iw.j

'W,

I 0.

''''

W>

t
t
t
t
t
t
t

t
t
t
t
t
t
t

JK.

: Civil structure including treatment unit considered for intennediate stage

t
t
t
t
t
t
t

t
t
t
t
t
t
t

t
t
t
t
t
t
t

t
t
t
t
t
t
t

t
t
t
t
t
t
t

,~

~tJ
Clear water channel

"
"

"

r'OO

",0

ti

t t
.L
t t
t t
t t
t t
t t
t t

'00

t
t
t
t
t
t
t

J.J.

t
t
t
t
t
t

150- j--- -100


10DD -

::
t
t
t
t
t
t
t

t
t
t
t
t
t
t

"

t
t
t
t
t
t

~'8OD""

"

-- D

t=* D

t t

1.01,-

I'"

"
"

'

200

t
t
t
t
t
t
t

lir ~

"
" 00

t
t
t
t
t
t

,L,

t t
t
t
t
t
t
t

rl~a

"

:;'1

j-t t
150- j-- - j--1"
r----&!>10DD
t t
t t
t t
t t

~.

::

--nr

I :

Design consideration

::

..

::

j
",0

,,001 t}T
From back wash tank

::
t
t
t
t
t
t
t

:t:10DD

100

'"
!.

I~ ~

1000 I--

Scale: 1:100

+.:

f"" OJ

tw.1

Scale : 1:200

channel

Plan
Platform
- of
-- Oneratin
-,...-----..... --------

Clearwater

In1inc booater

Fwi1

,,,--I--I-ooo-J.,,,..J.oo 1----",,---1 "'" 1--,,,,,,--1 "'" 1--",,1-- '00 1---"66---1 "'" 1--"10--1 "'" 1--,,00--1 "'" 1-2088--1 "'" 1--",,1-- .,.J-j..".

80

To back
w..btmk

750*750 haunch

t t
t t

I---'\'T

t
t
t
t
t

150~

~~"

t
t
t
t
t
t

t
t
t
t
t

t t

10DD r----M

t
t
t
t
t
t

700

Plan showing Filter without Gutter

Civil structure excluding treatment unit considered for ultimate stage

Scale : 1:200

Water Treatment Plant of 32.97 Mgd : Layout plan of Filter House

Scale : As indicated
GoM:Phed

Greater Shillong Water Supply Project (Phase III)


DPR of GSWSP (phase III)

GoM:PHED
396

25

----l

\\

Diameter =800cm
Height = 300cm

250.00

Office

:>

.7 T
1-

280.00

~10~ ~ 45.40

lJ

l-------

~
I

'!i

~~
~.

280.00

ZI\

17

I
I

ML _______

~./!

..;i
I]!

"'T

'C../

NO.6

_No.2

t<:::::..

~ld"

.
~

375-----,

Rolling Shutter

'GI

"

250

---fj

==1

750

/ Gate valve

o of pump

Q~

No.1

7
-I
"'T

250.00

Toilet

W/C

250

W
*300 dnr

Rolling Shutter

/)

Plan

Clear water pump house and RCC sump: Layout plan

Scale: 1:100
GoM:Phed

Greater Shillong Water Supply Project (Phase III)


DPR of GSWSP (Phase IT!)

GoM:PHED
398

SectIonIIIE_tIon

""',"ow

DO

RL : 1772.00m

EIB""tIon DfRCC SUmp

EfBlRltIon DfCleilr

w._

PumpingSiation

Clear water pump house and RCC sump : Elevation

Scale: 1:100
GoM:Phed

Greater Shillong Water Supply Project (phase III)


DPR of GSWSP (phase III)

GoM:PHED
399

Laltkor
RI:1930 m

Pumping main

6570 Rm
Madanrltlng
(Zone XII)

BOOO Rm

Nongthymmal
(Zone - V)
RI:1656 m

Upper Nongtttymmal
7.44 LG
RI:1471
200 mm
--- -

"0

Shillong CIIntonmant Board ArBII


Rhino

Upper Malld
3.85 LG

Lumshylap
(Zone-VII)
RI:14!15 m

Upper Lumpartng
LG
Nongmynsong
(Zone-XI)
RI:1610 m

Nongrimmaw
0.13 LG

Farro cement
0.10 LG

50 mm.

100

mm

mm

St. Edmund's ComplltX


0.50 LG

300mm
Lower Malld
4.40 LG

Upper Lachumelre
0.43 LG

250 mm

Proposed WTP

6th Mile
III 1 ) ( Upper Shiliong

LG

1000/900 mm "
0.1. water main

300 mm

250mm

200

350 mm

RI:1834
6 Mile Upper Shiliong
Bifurcation Point
RI:1775 m

300mm

~
Complex 0.75 LG

LG(PII)

Bara Bazaar

Mawlal
PIIawroh
1.50 LG

41/. Mile Upper


Shillong 6.40 LG
RI:1714 m

2.64 LG

750 mm " C.I. water main


of GSWSP (Phase I a. II)
proposed to be replaced.

~
3
3

150 mm I/J

RI:140B m

760Rm

146Rm

OH
PIIawlai Nongitwar
(Part of Zone-VDI)
RI:1442 m

100 mm"

Mawlal Iewrynghep
(Part of Zone-VIII)
RI:1434 m

4180 Rm

2730 Rm
150 mm

150 mm"
0.50 LG

~
3
3

1x500 mm " MS r1slng main


lengttt: 2500 m

0.66 LG (M)
PIIawpram

Banlpathar
0.75 LG

ZX600mm I/J MS r1slng main


length: 2100 m

stillge II pumping stilltlon


RI:1664 m

stage II pum~~~~tI::.n

""m

Legends:

ZX600 mm " MS r1slng


length: 320 m

_ U ~ wRiver_

Components Executed under GSWSP (Phase I & II)


Components Proposed under GSWSP (Phase III)

Schematic single line diagram of components executed under GSWSP (Phase I & II) and components proposed under GSWSP (phase III)

Scale: not to scale


GoM :Phed

Greater Shillong Water Supply Project (Phase III)


DPR of GSWSP (Phase III)

GoM:PHED
400

2.3

Environmental
measures

2.3.1

The river Umiew, the source of the Greater Shillong Water Supply Project originates at an
altitude of 1849m. The catchment boundary extends from longitudes 91-46 to
91-56 E and latitudes 25-27 to 25-32 N approximately. The catchment in the
upper most reaches, drains to the southern slope of the Shillong peak which is the
highest peak in the Khasi Hills having an altitude of 1964m (6441 ft). The river initially
flows in the easternly direction for about 10Km, then it flows towards the west upto its
confluence with its major tributaries, the river Umtyngngar and river Umjyllieng. The river
flows towards the south below the confluence along the southern slope of the Khasi Hills
and enters Bangladesh beyond Shella in the Indo-Bangladesh border and joins the Surma.
There are some paddy fields in the flat areas. The catchment areas upto the dam site, at
Mawphlang is 115 sq.km.

2.3.2

Silt content in Umiew river water is abnormally high throughout the year and rises to a
maximum in a storm turning the otherwise clear water into a muddy water. The source of
the Umiew river is not muddy, it turns muddy at its middle reaches after it confluence with
its major tributaries the river Umtyngngar and river Umjyllieng on account of human
activity through stone and sand quarrying along its major tributaries.

GoM:Phed

compliance/

protection

DPR of GSWSP (Phase III)

measures/

improvement

401

2.3.3

Though with the construction of the dam across the river Umiew, sufficient water is
available for pumping by the system, the high rate of siltation/sedimentation may have a far
reaching effect on the life of the Dam as silt trapped behind dams often leads to their
premature closure.

Mass gravity concrete dam of the GSWSP (Phase I & II) commissioned in 2003

Stage I pumping station of GSWSP (Phase I & II) commissioned in 1986


Umiew river water condition during the monsoon months

GoM:Phed

DPR of GSWSP (Phase III)

402

2.3.4

Sustainability of the river Umiew is vital for the project and remedial measure both short
term and long term is called for to protect the major water shed of the river. For short term
measures, construction of silt retention dam across the Umiew river and its tributaries
provides control on the flow of silt from vulnerable areas of the catchment into the dam.
Few silt retention dam constructed by the state Phed under the scheme sanctioned and
funded by the state government appears to be quite useful. The silt carried away by storm
water from the quarries, are retained by the dam and after the storm water receeded, the
villagers collect the sand accumulated for commercial use. Providing long term solution to
the problem would however depends on the response of the villagers residing in
the catchment and their willingness to adopt the remedial measures for a long term
solution. Such measures are :

Bench terracing on steeply sloping and unduly land where intensive farming is practice.

Providing series of check bunds/ponds of suitable size in each micro Catchment Area to retain silt.

Providing of staggered contour trenches across the slope of dykes and bunds across drainage ways. For agriculture
land, subsidiary bunds along field boundaries in conjunction with provision for one or more small storage in the
lowest reaches of every small Catchment.

Adoption of organic system of farming which are both productive and ecologically sustainable.

Intensive afforestation to increase the forest cover in the Catchment Areas. Natural regeneration in the interim.

Conversion of existing forests into village reserved forests/protected forests.

Suitable steps for checking hazardous exploitation of minerals like stones and sand within the Catchment.

Ban on charcoal burning within the Catchment Areas and strict fire protection measures to stop degradation of
dryness of the Catchment.

Possibility of taking over of catchment Area by the State Government (Forest or PHE Department) to ensure that
forest cover is maintained & enhanced should be explored.

Possibility of declaration of areas as Catchment area under section 5 of the Protection of Catchment Areas Act.
1990 should be explored.

Training & awareness campaign for the villagers residing in the catchment.

2.4

Rehabilitation and Resettlement.

2.4.1

Sizeable area of land was donated by the Hima of Mawphlang at the Intake site and at the
WTP site where Intake & Intermediate structure and WTP were constructed respectively.
The land which is under the control of State Phed has enough area for creating additional
infrastructure for generation and treatment of water. In addition to, State Phed has under its
control an area of about 60 acres of land at Mawphlang near the source. Housing facility for
officers & staff, administrative offices, stores and stockyards are all constructed and
established in this area of land. The area has enough space for additional construction of
buildings and offices considered under the project. Gravity feeder main, distribution
systems are proposed to be laid by the side of state roads, lanes and national highway.

2.4.2

Though implementation of different components of the project may involve payment in


respect of acquisition of land and/or compensation for restoration work of damaged
structure viz. roads, lanes etc. on account of pipe trenching, it is expected that there may not
be any cases of rehabilitation and resettlement since no settlement is proposed to be shifted
on account of implementation of the project.

GoM:Phed

DPR of GSWSP (Phase III)

403

2.5

Specialised procured services for design, independent supervision and


quality assurance.

2.5.1

State Phed which is a well structured organization with proper hierarchy and has at its
disposal technical competent engineers in the cadre with well acquired experience in project
design, project execution & supervision, project management including O&M services of
major water supply system. For implementation of different components of the project
under consideration, State Phed shall take the responsibility of providing services for
design, execution & supervision, project management including O&M services on post
commissioning of the project.

2.5.2

Feasibility study on raising the height of the mass gravity concrete dam for possible
increase of live storage of the dam constructed under Phase II of the GSWSP, State Phed
recommend that Central Water Commission (CWC) be requested to provide the necessary
service. CWC as a consultant, provided the necessary design and supervision for the
construction of mass gravity concrete dam at Mawphlang under Phase II of GSWSP.

2.6

Other information.

2.6.1

Detail surveys and investigations have been carried out in respect of different components
considered under the project and according to the assessment, no major utilities are required
to be shifted for implementation of different components of the project.

2.6.2

Necessary clearance shall be required from the State Public Works Department for laying of
feeder main/distribution system along the side of the state roads and from Ministry of
Surface Transport (MoST) for laying of feeder main/distribution system along the side of
national highway and from the Ministry of Forest and Environment for laying of portion of
feeder main along some portion of the forest land.

2.6.3

The project area lies in the seismic region. The basic performance requirements and
compliance criteria for design and construction of building and civil engineering works
including basic rules for the seismic design of the structural aspects of integrated facilities,
composed of pipeline systems and of storage tanks of different types and established
requirements, criteria and rules for the seismic design of tall, slender structures like Intake
towers shall be followed with the sole objectives that human lives are protected, damage is
limited; and structures of vital importance for the system remain operational in the event
of earthquakes. Cost for these special design and construction has been included in the
estimate.

GoM:Phed

DPR of GSWSP (Phase III)

404

3.

Project Cost.
Sl.No
3.01
3.02
I
i)
ii)
iii)
iv)
v)
II
i)
III
i)
ii)
IV
i)
ii)
V
i)
VI
3.03
3.04
3.05
3.06
3.07

3.08
3.09
3.10
1.
2.
3.
4.
3.11
3.12

Unit : Rs.
Amount
1,30,91,884.00

Specific components
Land acquisition/site development.
Physical infrastructure component-wise cost
Source development
Type of source
0
Diversion structure
0
Intake & Intermediate structure
6,54,39,807.00
Plant and machinery (raw water pumps, motors, electrical, instrumentation)
7,18,14,900.00
Other structure (staff quarter, approach roads, etc..)
1,58,98,316.00
Raw water transmission system
Raw water transmission main (pumping/gravity)
4,79,26,000.00
Water treatment plant
Civil works, plants & machineries, electrical, etc.
5,67,76,681.00
Laboratory equipments
24,35,814.00
Clear water transmission system
Transmission main (pumping/gravity)
57,27,63,200.00
Booster stations and control rooms
3,67,66,154.00
Service reservoirs
Overhead service reservoirs
21,10,23,600.00
Distribution system
Distribution pipeline
68,30,85,400.00
Environmental compliance cost
0
Rehabilitation & resettlement cost
0
Cost of surveys & investigations
0
Cost of shifting utilities
0
Cost of consultancy services
0
2) Design
0
b) Supervision
0
c) Quality assurance
Other statutory compliance costs if applicable
0
Finance/interest cost during construction
0
Any other:
Electromagnetic Flow meter including UFW assessment and leak deduction
59,53,107.00
programme
Instrumentation, Automation Control & Visualisation System including SCADA
3,00,00,000.00
Chlorinators
15,64,915.00
Consumers meters.
5,50,00,000.00
Total : 1,86,95,39,778.00
Contingency @3%
5,60,86,193.00
Cost for establishing project implementation mechanism and for consultancy charges
towards project preparation (as per CSMC approval in the 25th Meeting on 5.3.2007) at
93,47,699.00
0.5% of the project cost.
Grand Total : 1,93,49,73,670.00

(T.G. Abraham)
Chief Engineer, PHE.,
Meghalaya, Shillong

GoM:Phed

(S.K. Sunn)
Addl. Chief Engineer, PHE.,
Zone-I, Meghalaya, Shillong

DPR of GSWSP (Phase III)

405

3.12 Cost Estimation.


3.12.1 Estimation on the probable cost of different components of the Project was arrived at based
on the PHE Schedule of Rates 2007-08, Plinth Area Rates for Building works of
Superintending Engineer PWD (Building) Circle, Shillong for 2004-05. Cost data 1997-98
of State Electricity Board and prevailing market rate wherever applicable. In respect of
land, estimation on cost of land required for acquisition was arrived at on the basis of
registration value of land fixed by District authority.

3.12.2 Land Acquisition/Compensation.


1.

Cost of Land acquisition.


1.1

Land Acquisition
Total :

1.1

Rs.
Rs.

1,30,91,884.00
1,30,91,884.00

Detailed estimate.
Ref : As per current registration value of land fixed by Deputy Commissioner, East Khasi Hills District, Shillong, Meghallaya.

Station
Sl.
No

From

Component of
the Project
To

Area and rate of land to be


acquired
Rate
Area
m2

1.

Stage I

WTP

Part of Rising
Main

2.

WTP

Mawkriah

3.

Mawkriah

Sadew

Amount

Rs.

Rs.

4000

215.00

8,60,000.00

Clear Water
main

12,188

269.00

32,78,572.00

Clear Water
Main

23,812

376.00

89,53,312.00

Total :

1,30,91,884.00

3.12.3 Physical infrastructure - Detail Estimates.


2.

Cost of source development.


1.3

Structure - Intake and Intermediate

1.4

Plant and machinery

1.5

Other structures

Rs.
Rs.
Total :
Say :

GoM:Phed

DPR of GSWSP (Phase III)

Rs.
Rs.
Rs.

6,54,39,807.00
7,18,14,900.00
1,58,98,316.00
15,31,53,023.00
15,31,53,100.00

406

1.2

Diversion structure.
Diversion structure

1.3

Structure Intake & Intermediate

1.3.1

Intake structure.
Sl.
Description
Unit
No.
1
2
3
1. Earthwork in excavation in foundation trenches,
including dressing of sides and ramming of the
bottom including stacking of serviceable stones,
disposal and removal of excavated earth within a
lead of 50m and lift of 1.50m complete as
directed.
e) Hard rock.
M
2. Capacity of twin intake well

Rate
(Rs.)
5

Amount
(Rs.)
6

6000.00

168.00

10,08,000.00

28,27,440.00

10.00

2,82,74,400.00

@ 20%
3. Construction of pump house on top of intake
well. Plinth area of pump house
18.00x10.40
= 187.20m
M
187.20
8100.00
Add cost of internal electrifications of pump house @15%
Add price escalation from 2005-06 to 2008-09 @ 6% p.a. : i.e 24% for item 3
only
4. Construction of approach steel bridge of 40m
span connecting the road with the intake
structure and pump house. The bridge shall have
two parts, the upper part in level with the pump
floor and the lower part in level with pipe
delivery floor. The lower part shall carry the
delivery pipe of MS emerging out of the pump
house and the upper part shall provide walkway
for transportation of machineries, equipments
and personnel. The bridge shall be designed to
carry a load of 10 tons.

56,54,880.00

1x(10.00)x36.00
= 28,27,440.00 Lts
4
Add mechanical works like sluice gates and
penstock, etc

Lts

Qnty.
4

5. Installation of 10 tons capacity H.O.T crane


Total :
Say :

GoM:Phed

DPR of GSWSP (Phase III)

15,16,320.00
2,27,448.00
4,18,504.32

70,00,000.00
12,00,000.00
4,52,99,552.32
4,52,99,552.00

407

1.3.2

Intermediate structure.
Sl.
Description
Unit
Qnty.
Rate
No.
(Rs)
1
2
3
4
5
1. Construction of RCC Circular sump of
dia : 10.50m and height of 3.30m
20.00
Ltrs. 8,39,750.00
Capacity : 8,39,750Ltrs.
2. Construction of Pump House for raw
water pumps on RCC framed
construction (RCC Roof) in brick
walling with normal specifications.
Plinth area :
273.00 8,100.00
M
13.00mx21.00m
= 273.00m
Add cost for sanitary fittings @ 7%
(+)
Add cost for internal Electrifications of pump house 15%
(+)
Add price escalation from 2005-06 to 2008-09 @ 6% p.a i.e. 24% for item 3
(+)
Total
:
Say
:

1.4

Plant & machinery.

1.4.1

Raw water pumps.


Sl.
No.
1
1.

2.

Particulars
2
Supply, installation, testing & commissioning of vertical turbine pumps of reputed make
viz. Voltas Ltd., Kirloskar Bros. Ltd., Jyoti Ltd., etc. capable of lifting 70Lps of water
against a total head of 112m coupled to 200Kw high tension vertical motors mounted on
a motor stool/pump housing with operating power supply of AC 3 phase, 6.6Kv 10%,
50Hz 5%, complete with foundation bolts, and sets of accessories comprising of
column and bowl assembly with strainer, coupling, ratchet pin housing, ratchet pin etc.
butterfly valve and non-return valve of suitable pressure rating for individual unit
including priming arrangement but excluding motor control center and pump foundation.
For compatibility with VVVF drives, the HT motors shall have phase segregated neutral
terminal box and shall also be suitable for use with VVVF drives i.e. A.C. drives with
speed variation 50% to 100% and with variable torque. The motors shall also have RTDs
and BTDs for winding temperature and bearing temperature measurement. These RTDs
signals will be connected to the PLC for condition monitoring of the HT motors.
@ Rs. 13,000/Kw for 3x170 Kw.
Supply, installation, testing & commissioning of high tension motor control center for
3x170Kw comprising of 1 incoming feeder unit fitted with bus coupler, circuit breaker
and 3 outgoing feeder unit fitted with isolator switches, D.O.L. Starters, voltmeter,
ammeter, sets of pilot lamp including cabling from MCC to motors. The HT panel
board for motors shall be capable to provide the following signals/data to the PLC for
automation/visualization.
Voltage on either side of the bus coupler, current for each outgoing feeder, energy consumed as well as

Amount
(Rs.)
6

1,67,95,000.00

22,11,300.00
1,54,791.00
3,31,695.00
6,47,468.64
2,01,40,254.64
2,01,40,255.00

Amount
(Rs.)
3

66,30,000.00

incoming frequency.

3.
4.

GoM:Phed

The HT panel board shall be capable for switching on/off from local (pump house) or remote (i.e. from PLC
via the MMI).
Basic information of each breaker such as breaker on/off/trip, in test/service position etc. to be informed to
PLC.

Pump foundation, cable trench, cable trays, chequered plate over cable trench etc
Add cost of submersible 20Kw desilting pump coupled with discharge pipe,
submersible cable and MCC

DPR of GSWSP (Phase III)

70,00,000.00
25,00,000.00
5,00,000.00

408

5.

6.

Supply, installation, testing & commissioning of horizontal pumps of reputed make viz.
Voltas Ltd., Jyoti Ltd., KSB, Mather & Plat etc. capable of lifting 70Lps of water against
a total head of 190m coupled to 315Kw high tension Horizontal motors mounted on a
common base plate with operating power supply of AC 3 phase, 6.6Kv 10%, 50 Hz.
5%, complete with coupling, coupling guards, foundation bolts, set of accessories
comprising of butterfly valve on both suction and delivery side including non-return
valve with bypass arrangement of suitable pressure rating for individual unit excluding
motor control center and pump foundation. For compatibility with VVVF drives, the HT
motors shall have phase segregated neutral terminal box and shall also be suitable for use
with VVVF drives i.e. A.C. drives with speed variation 50% to 100% and with variable
torque. The motors shall also have RTDs and BTDs for winding temperature and bearing
temperature measurement. These RTDs signals will be connected to the PLC for condition
monitoring of the HT motors.
@ Rs. 13,000/Kw for 3x315Kw.
Supply, installation, testing & commissioning of high tension motor control center for
3x315Kw comprising of 1 incoming feeder unit fitted with bus coupler circuit breaker and
3 outgoing feeder unit fitted with isolator
switches, D.O.L. starter, voltmeter,
ammeter,
sets of pilot lamp including cabling from MCC to motors. The HT panel
board for motors shall be capable to provide the following signals/data to the PLC for
automation/visualization.
Voltage on either side of the bus coupler, current for each outgoing feeder, energy consumed as well as

1,22,85,000.00

incoming frequency.

7.

1.4.2

The HT panel board shall be capable for switching on/off from local (pump house) or remote (i.e. from PLC
via the MMI).
Basic information of each breaker such as breaker on/off/trip, in test/service position etc. to be informed to
PLC.

Pump foundation, cable trench, cable trays, chequered plate over cable trench etc
Total

1,00,00,000.00
25,00,000.00
4,14,15,000.00

Electric power.
Sl.
No.
1
1.
2.
3.
4.

5.

6.

7.

Particulars

Amount

2
Construction of 33/6.6Kv sub:station
@ Rs. 78,83,725.00/each
Installations of 1 no. 33/6.6kv 2.5Mva transformer
@ Rs. 45,47,800.00/each
Installations of 1 no. 33/0.433kv 500Kva transformer
@ Rs. 18,15,120.00/each
Laying of 6.6Kv, 150mm 3 core XLPE underground cable for intake
pumping station.
@ Rs. 4,163.44 for 2x800m
Laying of 6.6Kv, 150mm 3 core XLPE underground cable for intermediate
pumping station.
@ Rs. 4,163.44 for 2x800m
Laying of 3 core 120mm 1.1Kv armoured PVC cable for supply of low
tension power to Intake pump house.
@ Rs. 1099.73/Rm for 800Rm
Laying of 3 core 150mm 1.1Kv armoured PVC cable for supply of low
tension power to Intermediate pump house.
@ Rs. 1295.16/Rm for 800Rm
Total
:

Add price escalation from 2007-08 to 2008-09 for item 4 to 7 @ 6% p.a.

Total
Say

GoM:Phed

:
:

DPR of GSWSP (Phase III)

(+)

78,83,725.00
45,47,800.00
18,15,120.00

66,61,504.00

66,61,504.00

8,79,784.00

10,36,128.00
2,94,85,565.00
9,14,335.20
3,03,99,900.20
3,03,99,900.00

409

33/6.6Kv sub:station.

1.4.2.1

Ref : MeSEB Cost data 1997-98.


Sl.No

Material Description

1
2
Preliminary works
1A
Plan alignments etc.
Civil works
2A
Leveling of S/S retaining wall, fencing
2B
Construction of Control Room building
150Sqm
@ Rs. 8100/m
2C
Water supply and sanitary installation @
7% on 2B
2D
Electrification & S/S lighting @ 10% on
2B
Add 6% p.a. from 2005-06 to 2008-09 i.e. 24%
Construction of 33/6.6Kv 2.5Mva S/S
3 i)
33Kv lightning arrester

Unit

Rate
(Rs.)
5

Amount
(Rs)
6

L.S

25,000.00

L.S

1,65,000.00
12,15,000.00

85,050.00

1,21,500.00

(+)

3,41,172.00

3.00

Set

41,250.00

1,23,750.00

3 ii)

33Kv isolator with earth blade

2.00

Nos.

39,600.00

79,200.00

3 iii)

33Kv isolator without earth blade

2.00

Nos.

34,100.00

68,200.00

3 iv)

33Kv current transformer 2 sets

3.00

Nos.

33,000.00

99,000.00

3 v)

33Kv potential transformer 1 set

3.00

Nos.

14,300.00

42,900.00

3 vi)
3 vii)

33Kv circuit breakers SF6


a) 33Kv C&R panel for transformer
b) 33Kv C&R panel for feeder
a) 6.6Kv indoor panel
b) 0.433Kv panel for low tension supply
Sub-station structure:

1.00
1.00
1.00
1.00
1.00

Nos.
Nos.
Nos.
Nos.
Nos.

2,86,000.00
1,00,000.00
1,00,000.00
3,00,000.00
3,00,000.00

2,86,000.00
1,00,000.00
1,00,000.00
3,00,000.00
3,00,000.00

a) Steel structures

14.80

MT

30552.00

4,52,169.00

3 viii)
3 ix)

3 x)
3 xi)
3 xii)

GoM:Phed

Qty.

Busbars, clamps, connection jumpers &


post insulators
Grounding switchyard lightning

LS

91,000.00

LS

1,98,000.00

Sundries (Al.paint, red-oxide, nuts &


bolts, Grndg wire

LS

15,000.00

A
B

Transportation Charge @ 5% on the cost of equipments

3,07,958.00

Erection charge @ 10% on the cost of equipments

6,15,916.10

Grouting of poles @ 8% on the cost of equipments

4,92,732.80

Insurance charge @ 1% on the cost of equipments

61,591.60

Central & Sales tax charge @ 4% on the cost of equipments.


Total
:
Say
:

DPR of GSWSP (Phase III)

(+)

42,07,941.00
19,51,219.00
61,59,160.00

Add price escalation from 1997-98 to 2008-09 @ 6% p.a. for item 3


Total cost of equipments.

2,46,366.40
78,83,724.80
78,83,725.00

410

33/6.6Kv 2.5Mva transformer

1.4.2.2

Ref: Budget Price of SIEMENS Ltd.

Sl
No

Item Description

Qty.

Unit

1
a)

2
Supply of 33/6.6Kv, 2.5Mva, ONAN power transformer

3
1

4
No.

b)

Supply of erection & earthing material

Lot

c)

Design & Engineering

Lot

d)

Ex-works price

e)

Excise duty

f)

Sales tax

g)

Transportation

h)

Erection, installation, testing & commissioning


item (a) to (c)]

i)

Total Price
(Rs)
5

37,20,000.00
2,79,000.00
37,200.00
1,11,600.00
[for
1

Total for destination price [item (a) to (h)]


Total

Lot

4,00,000.00
45,47,800.00
45,47,800.00

33/0.433Kv 500Kva transformer.

1.4.2.3

Ref: Budget Price of SIEMENS Ltd.

Sl
No

Item Description

Unit

Total Price
(Rs)
5

1
a)

2
Supply of 33/0.433Kv, 500Kva, ONAN power
transformer

3
1

4
No.

b)

Supply of erection & earthing material

Lot

c)

Design & Engineering

Lot

d)

Ex-works price

e)

Excise duty

f)

Sales tax

14,880.00

g)

Transportation

44,640.00

h)

Erection, installation, testing & commissioning


item (a) to (c)]

i)

Total for destination price [item (a) to (h)] Rupees


Fourteen Lakhs Eighty Four Thousand only.

14,88,000.00
1,11,600.00

Total

GoM:Phed

Qty.

DPR of GSWSP (Phase III)

[for

Lot

1,56,000.00

18,15,120.00
18,15,120.00

411

6.6Kv 120mm 3 core XLPE underground cable for intake pumping station.

1.4.2.4

Ref: PHE Schedule of rates 2007-08.

Sl No.
1
1.

Description
2
Laying of 6.6Kv 120mm 3 core XLPE underground cable in
trench including trenching and refilling of trench
@ Rs. 4163.44 for 2x800m
Total :

Amount (Rs.)
3

66,61,504.00
66,61,504.00

6.6Kv 120mm 3 core XLPE underground cable for intermediate pumping station.

1.4.2.5

Ref: PHE Schedule of rates 2007-08.

Sl No.
1
1.

Description
2
Laying of 6.6Kv 120mm 3 core XLPE underground cable in
trench including trenching and refilling of trench
@ Rs. 4163.44 for 2x800m
Total :

Amount (Rs.)
3

66,61,504.00
66,61,504.00

3 core 120mm 1.1Kv armoured PVC cable for intake pump house.

1.4.2.6

Ref: PHE Schedule of rates 2007-08.

Sl No.
1
1.

Description
2
Laying 3 core 120mm 1.1Kv armoured PVC cable for supply of
low tension power to intake pump house.
@ Rs. 1099.73/Rm for 800Rm
Total :

Amount
(Rs.)
3

8,79,784.00
8,79,784.00

3 core 150mm 1.1Kv armoured PVC cable for intermediate pump house.

1.4.2.7

Ref: PHE Schedule of rates 2007-08.

Sl.
No.
1.

GoM:Phed

Description
Laying 3 core 150mm 1.1Kv armoured PVC cable for supply of low
tension power to intermediate pump house.
@ Rs. 1295.16/Rm for 800Rm
Total :

DPR of GSWSP (Phase III)

Amount
(Rs.)

10,36,128.00
10,36,128.00

412

1.4.3

External electrification to intake pumping station.


Sl.
No

Description

Amount
(Rs.)

1. Supply, dragging, erecting and grouting of steel swaged street lighting pole 9.5m
height as per given designed including excavation of poles pit and foundation
complete.
@ Rs. 13,271.32/Each for 12 Nos.
2. Excavation, foundation concrete preservative treatment etc.
@ Rs. 1000/each for 12 Nos.
3. Supply, laying, testing & commissioning of underground cable of 1100V grade PVC
(aluminium) armoured cable including cost of digging of trenches, sand cushioning
and refilling the same in layers. 3 core x 25mm
@ Rs. 345.47/Rm for 3000Rm
4. Supply, fitting, fixing and commissioning of main road, lighting lanterns on street
lighting pole including commissioning complete with all accessories
250W HPSV BJMIP 50SV
@ Rs. 9,296.74/each for 24 Nos.
5. Supply, fitting and fixing load kontaket miniature circuit breakers (MCB) single
pole 0.05-4 Amp single pole MCB.
@ Rs. 864.06/Each for 12 Nos.
6. Supply, fitting & fixing sheet metal enclosures for DBs when MCB to be used
single pole and neutral
12 way with 200amp rated busbar.
@ Rs. 1210.49/each for 4 Nos.
7. Supply, fitting, fixing isolator single pole with neutral.
@ Rs. 587.88/each for 1 No.
Add price escalation from 2007-08 to 2008-09 @ 6% p.a
Total
Say

1.4.4

(+)
:
:

1,59,255.84
12,000.00

10,36,410.00

2,23,121.76

10,368.72

4,841.96
587.88
14,46,586.16
86,795.17
15,33,381.33
15,33,381.00

External electrification to intermediate pumping station.


Sl.
No

1
1.

2.
3.

4.

GoM:Phed

Description

Amount
(Rs.)

2
Supply, dragging, erecting and grouting of steel swaged street lighting pole
9.5m height as per given designed including excavation of poles pit and
foundation complete.
@ Rs. 13,271.32/Each for 25Nos.
Excavation, foundation concrete preservative treatment etc.
@ Rs. 1000/each for 25 Nos.
Supply, laying, testing & commissioning of underground cable of 1100V grade
PVC (aluminium) armoured cable including cost of digging of trenches, sand
cushioning and refilling the same in layers.
3 core x 25mm
@ Rs. 345.47/Rm for 2500Rm
Supply, fitting, fixing and commissioning of main road, lighting lanterns on
street lighting pole including commissioning complete with all accessories
250W HPSV BJMIP 50SV
@ Rs. 9,296.74/each for 50 Nos.

DPR of GSWSP (Phase III)

3,31,783.00
25,000.00

8,63,675.00

4,64,837.00

413

1
5.

6.

7.

2
Supply, fitting and fixing load kontaket miniature circuit breakers (MCB) single
pole 0.05-4 Amp single pole MCB.
@ Rs. 864.06/Each for 25 Nos.
Supply, fitting & fixing sheet metal enclosures for DBs when MCB to be used
single pole and neutral
12 way with 200amp rated busbar.
@ Rs. 1210.49/each for 4 Nos.
Supply, fitting, fixing isolator single pole with neutral.
@ Rs. 587.88/each for 1 No.
Add price escalation. from 2007-08 to 2008-09 @ 6% p.a
Total
Say

1.5

Other structures.

1.5.1

Approach road to pumping station, etc..


Sl. No.

(+)
:
:

Description

21,601.50

4,841.96
587.88
17,12,326.34
1,02,739.58
18,15,065.92
18,15,100.00

Amount

1. Construction of approach road of approximately 1 Km


@ Rs. 60,48,766.56/km for 1km

Rs.

60,48,766.56

Rs.

60,48,766.56

Rs.

10,88,777.98

Total :

Rs.

71,37,545.54

Say :

Rs.

71,37,546.00

Total :
Add price escalation from 2006-07, 2007-08 to 2008-09 @ 6% p.a.

(+)

Analysis of rate for construction of approach road.


(1) Formation width
7.50m
(2) Metalled width
3.75m
(3) Soling coat
15cms
(4) Inter & top coat
Each 8cms thick
(6) Seal coat
2 cms
1. Jungle clearance per km
Jungle clearance 10.0m wide (5.0m on either side of the centre line of the
proposed road in plains and in through cutting) or 4.0m on down hill side,
measured from the outer edge of the proposed road (in hill side cutting) including
cutting muli bamboo, bamboo clumps and uprooting stumps and trees below
50cm girth, and removing outside the roadway limit complete as directed.
a) Light jungle (occurring in grazing areas).
2. Earthwork
Earthwork in excavation to the proper grade including light dressing, providing
cambering and superelevation as directed, and removal of spoils upto 30m lead
and all lift.

Specification

Assuming maximum depth of cutting 4m & the section to be full in cutting.


d) Soft or laminated rock or medium shale.
Earth work per Km = x9.00x5x1000
= 22500.00m
@ Rs. 47.00/m

GoM:Phed

DPR of GSWSP (Phase III)

1,631.00

10,57,500.00

414

3. Masonry Works including HP Culvert


(a) Providing regular stone masonry in returning walls, breast walls and wing walls
with hammer dressed or blunt chisel dressed stones of heavy section (size not
less than 25cmx25cmx30cm), with proper key stones each not less than
25cmx25cmx75cm, in cement mortar 1:6 including of stone within 200m and
filling in trenches, and filling in trenches and providing weep holes at 1.2 to 1.5m
apart (staggered), complete as directed (a height of wall for every 1.0m should be
exposed, till inspected by the supervising officer).
03M high retaining wall including Hume pipe culvert in 1:6 cm (bottom width
1.5m & top width 0.75m for 100m stretch/km).
1750.00cum @ Rs. 824.00/m
(b) Carriage of 8/9x437.50cum
@ Rs. 49.00 per cum
(c) Cutting roadside drain including dressing, grading and removal of spoil upto
15.0m complete as directed.
d) In soft rock.
i) 60cmx60cm
@ Rs. 39.00/Rm for 1000 Rm
(d) Cost of Kilometer (1 No. @ Rs. 320 each) and Hectometer stones.
@ Rs. 320 each for 9 nos.
4. Metalling & Black topping
(a) Soling
(i) Collection and supply of hard stone soling 75mm to 150mm size conforming to
all tests as per I.S. 2386 PT IV, including carriage within 200m and stacking in
measurable stacks etc. complete as directed.
Area = 3750.00m
Soling coat @ 25cm
= 937.50m
@ Rs.178.00/m
(ii) Collection and supply of broken stone metals (aggregates) 45mm to 90mm size
graded as per I.S. 2386 Pt IV, including carriage within 200m and stacking in
measurable stacks after proper screening from dirt, dust and other impurities
(stacks should be uniformly distributed or as directed).
Area = 3750.00m
Required qnty @ 0.13m/m
= 487.50m
@ Rs.270.00/m
(iii) Collection and supply of broken stone metals (aggregates) 20mm to 60mm size,
not necessarily graded but free from impurities, including carriage within 200m
and stacking in measurable stacks. Each stacks not exceeding 6.00m complete
only for graveled roads and for shoulders of black topped roads.
Area = 3750.00m
Required qnty @ 0.20m/m
= 750.00m
@ Rs.251.00/m
(iv) Collection and supply of blindage of non-plastic material of size 12mm and
down, having liquid limit as plasticity index of 20 and 6 respectively. The
fraction passing through 75-micron sieve should not exceed 10%. The material is
to be free from impurities, cohesive materials like clay, earth and black cotton
soil. Including carriage within 200m and stacking in measurable stacks. (stacks
should be uniformly distributed or as directed).
Qnty of metal
= 1687.50m
@ Rs.204.00/m

GoM:Phed

DPR of GSWSP (Phase III)

14,42,000.00

19,055.00

39,000.00
2,880.00

1,66,875.00

1,31,625.00

1,88,250.00

3,44,250.00

415

(v) Labour for laying soling stone of size 75mm to150mm uniformly to the proper
grade and camber, including filling the interstices with stone chippings. The rate
is also inclusive of applying blindage and earth edging including rolling with 8 to
10 tones roller, complete as directed. Extra for carriage of soling aggregates,
chips, screenings and crusher dust, beyond the initial lead of 200m is payable
under the relevant item of carriage.

Qnty. of metal
= 937.50m
@ Rs.142.00/m
(vi) Consolidation of hard broken stone metals (making water bound macadam)
including rolling the road sub grade to the proper camber, super elevation and
grade using templates, straight edges and spirit levels, in layers not exceeding
100mm to 130mm thick. Dry and wet rolling is then commenced with 8 to 10
tones roller, beginning from the lower edges, including earth-edging 30cm wide
on both sides of the specified quantity. The rate is also inclusive of the
local carriage of all grades of metal, screening and binding materials thereafter
wet rolling again with copious quantity of water complete as directed
(a) With 45mm-90mm metal
Qnty = 487.50m
@ Rs.250.00/m

(b) With 45mm-63mm metal


Qnty = 750.00m
@ Rs.271.00/m
(b) Premix coat.
(i) Providing 20mm thick premix carpet (open grade) with 0.18m/10m of 13.2mm
chips and 0.09m/10m of 11.2mm chips including thorough cleaning of the
surface and screening of chips and preheating the stone chips to the required
temperature thoroughly in a heating device/mixing drum with binder @
14.6Kg/10m and including laying the premix materials uniformly to the proper
grade line and cross section and applying of tack coat at specified quantity
including rolling with power roller including cost of stone chips and bitumen and
carriage of stone chips within 200 meters and carriage of binder up to work site
complete as directed.
Area = 3750m
(a) Over water bound macadam @ Rs.97.00/m
(c) Sealing coat.
(i) Providing premix seal coat on black top surface using 6.7mm chips
@ 0.06m/10m including thoroughly clearing the surface, screening and
cleaning preheating stone chips mixing thoroughly with the heated bitumen @
6.8Kg/10m in a heating Device or mixing drum etc. laying the premixed
materials uniformly over the surface to proper line, grade and camber and rolling
by roller 8-10 tons. Including carriage, cost of chips, bitumen and carriage of
chips within 200meters and bitumen up to work site complete as directed.
Area
@ Rs.44.00/m

GoM:Phed

1,33,125.00

1,21,875.00

2,03,250.00

3,63,750.00

= 3750.00m
1,65,000.00

DPR of GSWSP (Phase III)

416

(ii) Extra for carriage of earth and stone aggregates stone chips building stones, thup
stones blindage etc. beyond the initial lead of 200 meters including loading and
unloading.
Quarry of stone chip from Laitkor
Distance = 13.00Km.
Qnty. @ 100 %
=
487.50m
Qnty. @ 100 %
=
750.00m
12mm@ 0.18m/10m
=
675.00m
10mm@ 0.09m/10m
=
337.50m
6mm@ 0.18m/10m
=
675.00m
=
2925.00m
@ Rs. (49+9x13) / m
= Rs. 754.00/m
Total :

1.5.4

Staff Quarter
Sl.
Description
No.
1
2
1. Construction of 10 nos. staff quaters with (RCC frame and roof construction)
normal specification.
Total plinth area : 510.00m
@ Rs. 8,100/m
Total
:
Add cost of sanitary fitting @ 7%
(+)
Add cost of electrification @ 10%
(+)
Total
:

1.5.5

22,05,450.00
60,48,766.56

Amount
(Rs)
3

41,31,000.00
41,31,000.00
2,89,170.00
4,13,100.00
48,33,270.00

External electrification of Staff Quarter.


Sl.
Description
No
1
2
1. Supply, erection, fitting & fixing of steel swaged type street lighting pole 9.5m
height with welded base plate of MS based plate of 300x300x6mm and welded top
cap with single street lighting bracket.
@ Rs. 13,271.32/Each for 83Nos.
2. Excavation, foundation concrete preservative treatment etc.
@ Rs. 1000/each for 83 Nos.
3. Supply, laying, testing & commissioning of underground cable of 1100V grade
PVC (aluminium) armoured cable including cost of digging of trenches, sand
cushioning and refilling the same in layers.
3 core x 25mm
@ Rs. 345.47/Rm for 800Rm
4. Supply, fitting, fixing and commissioning of main road, lighting lanterns on street
lighting pole including commissioning complete with all accessories
250W HPSV BJMIP 50SV
@ Rs. 9,296.74/each for 83 Nos.

GoM:Phed

DPR of GSWSP (Phase III)

Amount
(Rs.)
3

11,01,519.56
83,000.00

2,76,376.00

7,71,629.42

417

1
2
5. Supply, fitting and fixing load kontaket miniature circuit breakers (MCB) single
pole & neutral 5 to 30 Amp.
@ Rs. 864.06/Each for 83 Nos.
6. Supply, fitting & fixing sheet metal enclosures for DBs when MCB to be used
single pole and neutral
12 way with 200amp rated busbar.
@ Rs. 1210.49/each for 7 Nos.
7. Supply, fitting, fixing isolator single pole with neutral.
@ Rs. 587.88/each for 1 No.
:
Add price escalation from 2007-08 to 2008-09 @6 % p.a.
(+)
Total
:
Say
:

1.5.6

71,716.98

8,473.43
587.88
23,13,303.27
1,38,798.20
24,52,101.47
24,52,200.00

Security fencing for intake & intermediate pumping station.


Sl.
Description
No.
1
2
1. Supplying, fitting, fixing chain link security fencing 1.83m gate with
7.5cm mesh of 10SWC G.I. wire quality as per IS 2721 1061 with
3 stirrups of double plug 125WG GI B/Wire onward moreover portion
in the top with MS Angle intermediate post of 50x50x60mmx2.73m
long including 45cm onward lineable on top 2.3cm cc with corner post,
straining post of MS Angle 65mmx65mmx6mmx2.73m with necessary
staged. The straining post is to be provided at 10m cc corner post at
every corner including digging foundation for MS Angle post and
filling up the sides after completed of work with 0.45x0.45x0.60m c.c.
base for corner straining and end post in c.c. in prop 1:2:4 complete as
directed.
(a) Intake pumping station
(b) Intermediate pumping station

:
:

200.00Rm
200.00Rm
400.00Rm

@ Rs. 896.00/Rm for 400 Rm


2. Providing fitting and fixing in position steel gates with RSJ posts
(100mmx5mm) with label frame and diagonally brand with MS Angles
(25mmx25mmx6mm) and gasket plate of 100mmx100mmx6m with
chain link wire netting of 10SWGI wire 100mmx100mm diamond mesh
including bolts, nuts hooks etc complete.
@ Rs. 3432.40/m for 20m
Total
Add price escalation from 2007-08 to 2008-09 @ 6% p.a.
Total
Say

GoM:Phed

Amount

DPR of GSWSP (Phase III)

(+)

3,58,400.00

68,648.00
4,27,048.00
25,622.88
4,52,670.88
4,52,700.00

418

1.5.7

Security fencing for staff quarter.


Sl.
No.
1
1

(f)
2.

Description

Amount

2
Supplying, fitting, fixing chain link security fencing 1.83m gate with 7.5cm
mesh of 10SWC G.I. wire quality as per IS 2721 1061 with 3 stirrups of double
plug 125WG GI B/Wire onward moreover portion in the top with MS Angle
intermediate post of 50x50x60mmx2.73m long including 45cm onward lineable
on top 2.3cm cc with corner post, straining post of MS Angle
65mmx65mmx6mmx2.73m with necessary staged. The straining post is to be
provided at 10m cc corner post at every corner including digging foundation for
MS Angle post and filling up the sides after completed of work with
0.45x0.45x0.60m c.c. base for corner straining and end post in c.c. in prop
1:2:4 complete as directed.
Residential colony
: 1000.00Rm
@ Rs. 896.00/Rm for 1000 Rm
Providing fitting and fixing in position steel gates with RSJ posts
(100mmx5mm) with label frame and diagonally brand with MS Angles
(25mmx25mmx6mm) and gasket plate of 100mmx100mmx6m with chain link
wire netting of 10SWGI wire 100mmx100mm diamond mesh including bolts,
nuts hooks etc complete.
@ Rs. 3432.40/m for 20m

Add price escalation from 2007-08 to 2008-09 @ 6% p.a.


Total
Say

3.

68,648.00
9,64,648.00
57,878.00
10,22,526.88
10,22,600.00

Raw water transmission system.


3.1

3.1

(+)

8,96,000.00

Raw water transmission main (pumping/gravity)

Rs. 4,79,26,000.00

Raw water pumping transmission main.


Sl.
No
1
1.

d)
2.

GoM:Phed

Particulars

Unit

Qnty.

2
Earthwork in excavation to the proper level and
grade including light dressing & stacking of
serviceable stone as directed.
2560.00x2.00x1.50
= 7680.00m
Soft or laminated rock
30% of the total length for 7680.00m
Laying of ERW Mild Steel Pipes conforming to
IS: 3589 and having a thickness of 9.5mm below
ground or above ground. The work is inclusive of
carriage of pipes from stockyard to the site within a
distance of 8km, fabrication of all bends and Tees
including supply and fabrication of flanges for
keeping provision for installation of isolation valves,
scour valves and air valves wherever found
necessary. Trenching, sand filling, earth filling,
providing pipe supports, anchor blocks and supply &
installation of valves is exclusive and shall be paid
extra.
500mm dia.

7680.00

83.00

6,37,440.00

Rm

3200.00

7736.98

2,47,58,336.00

DPR of GSWSP (Phase III)

Rate
Rs.
5

Amount
Rs.
6

419

1
3.

5.

2
Add cost of specials & valves for installation of
different location of the main viz. non-return valves,
isolation valves, scour valves, air valves, pressure
reducing valves, etc..
@ 15% for Item No.2
Add cost for installation of protective device against
surge pressure for Stage I and Stage II rising main
Construction of valve chamber

6.

4.

7.

8.

9.

`
-

37,13,750.40

90,00,000.00

@ 3% for item No. 2


Construction of supporting pillars/anchor block

7,42,750.00

@ 5% for item No. 2


Sand filling in trenches and in plinth in 20cm layers
each including ramming, watering, consolidation
complete as directed.
Coating and wrapping on the outside faces of Mild
Steel Pipes laid underground in trenches after
cleaning the outside surface including removal of
spoils and rust, providing priming coat of drying
enamel paint at atmosphere temperature and
wrapping with fiber glass paper all complete as
directed.

12,37,916.80

1050.00

629.00

6,60,450.00

4576.18

950.00

43,47,371.21

Qtl./Km

5440.32

1.65

(0.569x2560) = 4576.18m
Carriage of MS pipe from PHE store to work site
500mm dia.
MS pipe: 3500.00Rm
@ 152.39Kg/Rm
Add 2% for specials

10.

= 5333.65 qtl.
= 106.67 qtl.
= 5440.32 qtl.
By truck load : 6Km
= 5440.32 qtl.
Compensation to PWD for making the road damage
due to laying of pipeline state road/village road
Black topped road.

4.

Rm
100.00
612.50
Total
:
Add price escalation from 2007-08 to 2008-09 @ 6% p.a. (+)
Total
:
Say
:

53,859.17

61,250.00
4,52,13,123.58
27,12,787.41
4,79,25,910.99
4,79,26,000.00

Water Treatment Plant.


4.1

Civil structure of 8Mld. WTP including treatment units

Rs.

4,36,00,000.00

4.2

Electric power to WTP

Rs.

55,92,420.00

4.3

External electrification to WTP

Rs.

65,61,661.00

4.4

Security fencing around WTP complex

Rs.

10,22,600.00

4.5

Laboratory equipments

Rs.

24,35,814.00

Total

GoM:Phed

DPR of GSWSP (Phase III)

Rs.

5,92,12,495.00

420

4.1

Civil structure of 8Mld WTP including treatment units excluding power.


Sl
No.
1.

2.

Descriptions

Amount
(Rs)

Construction of Civil structure of 8Mld WTP excluding plants & machineries and
equipments but including sludge well and drain for desludging of sludge to safe place
@ Rs. 35,00,000/Mld for 8 Mld.
Construction of overhead reservoirs with sufficient staging for storage of water for
backwashing of filter beds
@ Rs. 20.00/Lts. for 50Kl.
As the WTP is proposed for installation with automation control and visualization
system for compatibility with existing WTP, all the plants & machineries and
equipments proposed under new WTP shall be compatible for automation control
system.

2,80,00,000.00

10,00,000.00

Plants

& machineries and equipments viz. clariflocculator bridge fitted with


scrapper including 1 no. drive unit comprising of 1 no. motor with reducing gearbox,
4nos. flocculator paddles with 4 nos. flocculator drive units comprising of 4 nos.
motors with 4 nos. reducing gearboxs, flash mixer paddle including drive unit
comprising of 1 no. motor with reducing gearbox, 2 nos. alum mill including 2 nos
.drive units comprising of 2 nos. motor with 2 nos. reducing gearboxs, 2 nos. lime mill
including 2 nos. drive units comprising of 2 nos. motor with 2 nos. reducing gearboxs,
2 sets of backwash pump, air blower, inlet, outlet, drain, wash valves, air valves fitted
with motorised actuator and point indicators including piping all complete along with
cabling.

Motor control center for drives comprising of 1 incoming feeder unit fitted with
MCB, ammeter, voltmeter and sets of pilot lamps, bus bar section comprising of bus
bar with RYB and neutral bus and outgoing feeder units totaling 13 in numbers. Each
outgoing feeder unit shall be fitted with isolator switch/MCB, DOL starter, ammeter
and sets of pilot. The MCC for drives shall be capable to provide the following
signals/data to the PLC for automation/visualization.
Voltage on either side of the bus coupler, current for each outgoing feeder, energy consumed as well as
incoming frequency.

3.

4.2

The panel board shall be capable for switching on/off from local (control room) or remote (i.e. from PLC
via the MMI).
Basic information of each breaker such as breaker on/off/trip, in test/service position etc. to be informed
to PLC.

(+)
Total :

56,00,000.00
2,01,00,080.00

Total :

90,00,000.00
4,36,00,000.00

Construction of clear water reservoir.


@ of Rs. 18.00/Lts. for 500Kl.

Electric power to WTP.


Sl.
No.
1.
2.
3.

Particulars
Construction of control room building with panel boards
@ Rs. 30,90,866.00/each
Installations of 1 no. 33/0.433kv 500 Kva transformer
@ Rs. 18,15,120.00/each
Laying of 3 core 150mm 1.1Kv armoured PVC cable for supply of low
tension power.
@ Rs. 1295.16/Rm for 500Rm
Add price escalation from 2007-08 to 2008-09 @ 6% p.a. for item 3
Total
:
Say
:

GoM:Phed

Amount

DPR of GSWSP (Phase III)

(+)

30,90,866.00
18,15,120.00

6,47,580.00
55,53,566.00
38,854.80
55,92,420.80
55,92,420.00

421

4.2.1.

33/0.433Kv control room.


Sl.No

Material Description

Qty.

Unit

Rate
(Rs.)

L.S

Amount
(Rs)

Preliminary works
1A
Plan alignments etc.
Civil works

Construction of Control Room building


150Sqm
@ Rs. 8100.00/m
2B
Water supply and sanitary installation
@ 7% for 2A
2C
Electrification & S/S lighting @ 10%
for 2A
Add 6% p.a. price escalation from 2005-06 to 2008-09 i.e. 24%
Panel Board

25,000.00

2A

3 i)
3 ii)

4.2.2.

c) 33Kv C&R panel for transformer


d) 33Kv C&R panel for feeder
c) 0.433Kv panel for low tension
supply

12,15,000.00

85,050.00

1,21,500.00
3,41,172.00

1.00
1.00

Nos.
Nos.

1,00,000.00
1,00,000.00

1,00,000.00
1,00,000.00

1.00

Nos.

3,00,000.00

3,00,000.00
22,87,722.00
2,88,000.00
25,75,722.00

Add price escalation from 1997-08 to 2008-09 @ 6% p.a. for item 3


Total cost of equipments.

Transportation Charge @ 5% on the cost of equipments

1,28,786.10

Erection charge @ 10% on the cost of equipments

2,57,572.20

Insurance charge @ 1% on the cost of equipments

25,757.22

Central & Sales tax charge @ 4% on the cost of equipments.


Total
:
Say
:

1,03,028.88
30,90,866.40
30,90,866.40

33/0.433Kv 500Kva transformer.


Ref: Budget Price of SIEMENS Ltd.

Sl
No
a)
b)
c)
d)
e)
f)
g)
h)
i)

GoM:Phed

Item Description
Supply of 33/0.433Kv, 500Kva, ONAN power transformer
Supply of erection & earthing material
Design & Engineering
Ex-works price
Excise duty
Sales tax
Transportation
Erection, installation, testing & commissioning [for item
(a) to (c)]
Total for destination price [item (a) to (h)]
Total

DPR of GSWSP (Phase III)

Qty.

Unit

1
1
1

No.
Lot
Lot

Total Price
(Rs)

14,88,000.00
1,11,600.00
48,000.00
44,640.00
1,56,000.00

Lot

18,15,120.00
18,15,120.00

422

4.2.3.

3 core 150mm 1.1Kv armoured PVC cable


Ref: PHE Schedule of rates 2007-08.

Sl.No.
Description
1.
Laying 3 core 150mm 1.1Kv armoured PVC cable for supply of low
tension power to water treatment plant.
@ Rs. 1295.16/Rm for 500Rm
Total :

4.3

Amount

Rs. 6,47,580.00
Rs. 6,47,580.00

External electrification to WTP.


Sl.
Description
No
1
2
1. Supply, dragging, erecting and grouting of steel swaged street lighting pole 9.5m
height as per given designed including excavation of poles pit and foundation
complete.
@ Rs. 13,271.32/Each for 50Nos.
2. Excavation, foundation concrete preservative treatment etc.

6,63,566.00

@ Rs. 1000/each for 50 Nos.


3. Supply, laying, testing & commissioning of underground cable of 1100V grade
PVC (aluminium) armoured cable including cost of digging of trenches, sand
cushioning and refilling the same in layers.
3 core x 25mm
@ Rs. 345.47/Rm for 13000Rm
4. Supply, fitting, fixing and commissioning of main road, lighting lanterns on
street lighting pole including commissioning complete with all accessories
250W HPSV BJMIP 50SV
@ Rs. 9,296.74/each for 100 Nos.
5. Supply, fitting and fixing load kontaket miniature circuit breakers (MCB) single
pole 0.05-4 Amp single pole MCB.
@ Rs. 864.06/Each for 50 Nos.
6. Supply, fitting & fixing sheet metal enclosures for DBs when MCB to be used
single pole and neutral

7.

12 way with 200amp rated busbar.


@ Rs. 1210.49/each for 10 Nos.
Supply, fitting, fixing isolator single pole with neutral.

GoM:Phed

DPR of GSWSP (Phase III)

50,000.00

44,91,110.00

9,29,674.00

43,203.00

12,104.90

@ Rs. 587.88/each for 1 No.


Add price escalation from 2007-08 to 2008-09 @ 6% p.a.
Total
Say

Amount
(Rs.)
3

:
:

587.88
61,90,245.78
3,71,414.75
65,61,660.53
65,61,661.00

423

4.4

Security fencing around WTP complex.


Sl.
No.
1
1
.

(c)

2.

Description

Amount

2
Supplying, fitting, fixing chain link security fencing 1.83m gate with
7.5cm mesh of 10SWC G.I. wire quality as per IS 2721 1061 with
3 stirrups of double plug 125WG GI B/Wire onward moreover
portion in the top with MS Angle intermediate post of
50x50x60mmx2.73m long including 45cm onward lineable on top
2.3cm cc with corner post, straining post of MS Angle
65mmx65mmx6mmx2.73m with necessary staged. The straining
post is to be provided at 10m cc corner post at every corner including
digging foundation for MS Angle post and filling up the sides after
completed of work with 0.45x0.45x0.60m c.c. base for corner
straining and end post in c.c. in prop 1:2:4 complete as directed.

Water treatment
complex

plant

1000.00Rm

8,96,000.00

@ Rs. 896.00/Rm for 1000 Rm


Providing fitting and fixing in position steel gates with RSJ posts
(100mmx5mm) with label frame and diagonally brand with MS
Angles
(25mmx25mmx6mm)
and
gasket
plate
of
100mmx100mmx6m with chain link wire netting of 10SWGI wire
100mmx100mm diamond mesh including bolts, nuts hooks etc
complete.

68,648.00
9,64,648.00
57,878.88
10,22,526.88
10,22,600.00

@ Rs. 3432.40/m for 20m


Add price escalation from 2007-08 to 2008-09 @ 6% p.a.
Total
:
Say
:

4.5

(+)

Laboratory equipments.
Sl.
No.
1
1.

Details of Equipments

Name

Description :

Make
Model

GoM:Phed

:
:

2
Lovibond Spectro photometric
colorimeters
Lovibond
RYBN,
AOCSTintometer,
Gardner,
PtCo/Hazen/APHA, FAC, beta
Carotenem, Iodine, Hess-Ives
Units, Klett (blue filter KS 42), Kreis value Chlorophyll
A&B,
CIE Values, Spectral
England.
Lovibond, England
PFX995

Distributor/
Manufacturer
3
The
Tintometer
Ltd. (UK) Sunjay
Technologies
a
Scientific
Corporation Sunjay
Technologies Pvt.
Ltd., Wadala
Mumbai 400 031

DPR of GSWSP (Phase III)

Rate
(Rs)
4

Qnty

8,00,000.00

1 No.

Amount
(Rs.)
6

8,00,000.00

424

1
2.

3.

2
Name
: Cyber scan pH Meter
Description : Colour touch screen cyber
scan PH
6500-2 channel PH/
H
P FET/mV/Ion RS 232,USB,
IRDA meter with PH electrode
EC 6201 30, ATC probe,
electrode holder & universal
power adapter (U.S., U.K.,
Euro, Japan) ORP electrode not
included.
Make
Model
Name

: Singapore
: pH 6500; pH 6000
: Deluxe Bench & Water proof
Turbidity Meters
Description : Cyber scan TB 1000 infrared
Turbidity bench meter
(NTU) with Calibration Kit
(ECTBDIRCALKT)
220V
AC
power
adapter
(EC220ADA800)
Make
Model

: Singapore
: Cyber scan TB1000; TN100

Name

: Conductivity/TDS
meters

Bench

Description : Cyber
scan
Con
6000
conductivity/TDS/Resistivity/
Salinity bench meter with USB,
RJ45,1rDA, SD card reader,
RS232C meter with 4-cell
electrode, integral
electrode
holder, conductivity sachets &
SMPS power adapter.

5.

Make

: Singapore

Model

: Cyber scan CON 6000

1,60,650.00

1 No.

1,60,650.00

1,14,000.00

1 No.

1,14,000.00

1,52,550,.00

1 No.

1,52,550,.00

1,21,800.00

1 No.

1,21,800.00

Eutech Instruments,
International trade
links, Kandi Vali
(E)
Mumbai 400 101

Eutech Instruments,
International trade
links, Kandi Vali
(E)
Mumbai 400 101

Name

: Horizontal
Laminar
flow Narang
Scientific
Cabinet
Works Pvt. Ltd.,
Description : With Acrylic glass door and New Delhi 64.
U.V. light complete structure
made
of stainless steel 304
qlty. With cock for gas or
vacuum line.
Size Inside
LFH 2(S/S) 600x600x600mm
Make
Model

GoM:Phed

3
Eutech Instruments,
International Trade
Links, Kandi Vali
(E)
Mumbai 400 101

: India
: NSW 201

DPR of GSWSP (Phase III)

425

1
6.

2
3
Name
: Incubator Universal
Narang
Scientific
Description : Temperature upto
70oC. Works Pvt. Ltd.,
Heating elements are placed in New Delhi 64
ribs at the bottom and sides.
Double walled inside anodized
Aluminium/Stainless Steel, the
door has synthetic

Make
Model

8.

GoM:Phed

rubber gasket. Outside


Mild
steel
painted in epoxy
powder
coating
with
perforated adjustable shelves,
two indicators and
on/off
switch. To work on 220/230
volts A.C. With one number
Air circulating Fan & Digital
Temperature Controller Cum
Indicator.
ISS-7-605x605x910mm 336ltrs.
: India
: NSW 151 Super deluxe

69,900.00

1 No.

69,900.00

Name
: Oven Universal
Narang
Scientific
Description : Temperature range few degree Works Pvt. Ltd.,
above ambient to 250oC. New Delhi 64
Heating elements are placed in
ribs at the bottom and sides.
Double walled inside anodized
Aluminium/ stainless steel. The
door has synthetic rubber
gasket. Outside mild steel
painted in Epoxy powder
coating
with
perforated
adjustable
shelves,
two
indicators and on/off switch. To
work on 220/230 volts A.C.
With one number air circulating
fan & digital temperature
controller cum-Indicator.
Aluminium Inside
Size inside chamber
OSA-2-355x355x355mm-45
Ltrs
Make
: India
Model
: NSW-143 Super deluxe

24,600.00

1 No.

24,600.00

Name
: Rectangular Muffle Furnace
Description : Outer casing of mild steel
sheet painted in epoxy powder
coating. Working temperature
maximum 900oC. Temperature
control by energy regulator,
with indicators, pyrometer,
thermocouple, silver fuse etc..

16,900.00

1 No.

16,900.00

Narang Scientific
Works Pvt. Ltd.,
New Delhi 64

DPR of GSWSP (Phase III)

426

9.

Make
Model

2
Heating elements made of
Kanthal wire special high
temperature alloy to ensure
uniform distribution of heat. To
work on 220/230 volt A.C.
Chamber size inside
MF-1-100x100x225-1.6KW
: India
: NSW-101

Name

: Vertical Autoclave

Description : These autoclaves are fitted with


automatic cut off devices for
element for general safety.
Inside and outside chamber and
all structure made of stainless
steel 304 qlty. Fitted with
Indfoss Piezostat. To set stream
of pressure between 15 to 22
PSI (adjustable). Sterilizers are
fitted
with
water
level
arrangement to indicate water
position inside the boiler.
Pressure
gauge,
air/steam
release cock two safety valve
are also provided

Narang Scientific
Works Pvt. Ltd.,
New Delhi 64

Dia. Depth
VA-3-355x550mm 50 ltrs.

10.

Make

: India

Model
Name

: NSW-227
: Perfit Water Distillation

Description : Automatic Electrically Heated


All Glass Distillation Apparatus
Perfit Heater embedded in
spiral glass tube complete with
metallic stand, plug and board
etc. 10 Litre Double Distillation
without cut off.

11

Make

: India

Model
Name

: 202/08
: Analytical Balance

Description : Capacity 220g


Accuracy 0.001g
Make
Model

GoM:Phed

91,400.00

1 No.

91,400.00

29,500.00

1 No.

29,500.00

85,000.00

1 No.

85,000.00

Gupta
Scientific
Industries Ambala
Cantt-133001

Sunjay
Technologies Pvt.
Ltd., Wadala
Mumbai 400 031

: Shimadzu, Japan
: XB220

DPR of GSWSP (Phase III)

427

1
12.

Name

2
: Flame Phometer

Description : Micro-controller
based
automation
for
ease
of
operation. Determination upto
four elements with single
aspiration (Na,K,Li and Ca).
Curve fitting correction for nonlinear emission characteristics
of
element,
at
higher
concentration; maximum five
point
calibration.
Storing
facility for Set-Ups and results
(date wise & batch wise,
maximum 700 results); the
same can be recalled whenever
need arise. Four line 20characters
LCD
readout.
Facility for re-standardization
with single standard. Multi
standard graph in dot matrix
print out. Built-in real time
clock for date and time of
analysis. Centronics printer port
provided for print out of results
(simultaneous with analysis or
recalled) on EPSON compatible
Dot Matrix printer; supply of
printer is optional. Printout
facility
for
individual
sample, batch sample, total
days; samples, or entire results
in the memory (700 max.). Air
compressor with built-in air
regulator and air filter. PC Link
software for transferring data to
computer & manipulation of
data in computer using RS232(Optional).

13.

Make
Model
Name

:
:
:

Description :

Make
Model

GoM:Phed

India
FPH
Hot Plate
This is for general purpose
having maximum temperature
370oC with Thermostat and
Pyrometer
Size 455x605mm

3
Loba Chemic Pvt.
Ltd..
Mumbai 400 005

92,150.00

1 No.

92,150.00

22,000

1 No.

22,000

Narang Scientific
Works Pvt. Ltd.
New Delhi - 64

: India
: NSW-225

DPR of GSWSP (Phase III)

428

1
14.

15.

2
Water Bath Rectangular (Double
Wall) Thermostatic Control
Description : Temperatures range from few
degree
above
ambient
temperature
to
100oC.
Thermostatic control with an
accuracy of plus minus 0.5oC.
Double walled inside stainless
steel 304 qlty and outside Mild
Steel sheet painted in epoxy
powder coating. Top of the bath
and concentric rings are also of
stainless steel. To work on
220/230 volts A.C.
BRS-2-355x405x100mm size
Make
: India
Model
: NSW-128
Name
: Jar Testing (Floculator)
Description : Stirrer-6
Nos.
: Flocculator has been specially
designed for use in water
treatment plants as Jar Testing
Apparatus to correctly estimate
the dosing of alum and such other
coagulants for treatment of water
and sewage. It provides identical
test conditions for all samples, it
is suitable for continuous run in
any busy laboratory. Illuminator
base consists of fluorescent tube
mounted
below
translucent
plastic plate to provide diffused
cold light through floc samples.
Flocculator consists of geared
continuous run heavy duty 1/20
H.P. variable speed motor
from 10 to 100 RPM with built in
speed control. Stainless steel
stirring rods are provided with
adjustable spacers to adjust the
depth of stirring paddles. The
stirring shaft can be removed
without disturbing other stirrers.
It
is supplied with either
two, four or six stirrers working
on 220 volts A.C. This
unit
is supplied without beakers.
Make
: India
Model
: 11-198
Name

Narang
Scientific Works
Pvt. Ltd.
New Delhi-64

11,400.00

1 No.

11,400.00

25,000.00

1 No.

25,000.00
18,38,350.00
2,29,793.75
1,37,876.25

Macro Scientific
Works,
New
Delhi - 110007

Add VAT @ 12.5%


Add cost for making necessary arrangement for installation of different equipments
@ 7.5%
Add cost for furnishing @ 5%
Say
Add price escalation from 2007-08 to 2008-09@ 6% p.a.
Total
Say

GoM:Phed

DPR of GSWSP (Phase III)

(+)
(+)
(+)
:
(+)
:
:

91,917.50
22,97,938.00
1,37,876.28
24,35,814.28
24,35,814.00

429

5.

Clear Water Transmission System.


5.1 Transmission Main Pumping and gravity
5.2 Booster stations and Control Rooms
Total :

5.1

Transmission main

5.1.1

Clear water gravity transmission main.


Sl.
No.
1
1.

d)
2.

3.
4.
5.
6.

7.

GoM:Phed

Description

Unit

2
Earthwork in excavation to the proper level
and grade including light dressing and
stacking of serviceable stone as directed and
removal of spoils upto 30m and all lift.
For 1000mm dia.
70% of the total length
i.e. 70% of 13500 = 9450.00Rm
b) Soft or laminated rock
9450x1.50x2.00
= 28,350.00m
DI :
44563.00x1.50x1.00
= 66,844.50m
= 95,194.50m
Soft or laminated rock
Supplying & laying in trenches including
carrying in line and level socket & spigot
centrifugally cost ductile iron pipes
conforming to IS 8329/94 including clearing
the inside surface of the pipe all complete as
directed.
1000mm
900mm
750mm
300mm
250mm
200mm
150mm
100mm
Add cost of DI specials & valves @ 15% for
item No. 2
Construction of valve chamber @ 3% for item
No.2
Construction of supporting pillars/anchor
blocks @ 5% for item No.2
(iii) Sand filling trenches and in plinth in
20cm layers each including ramming
watering, consolidation complete as directed.
PWD compensation
= 58,063.00
5) Considering 2/3 of total as side berm
portion
(i) Considering 1/3 of total as black topped
portion

Rs.
Rs.
Rs.

Qnty.

Rate
Rs.
4

83.00

95,194.50

Rm
Rm
Rm
Rm
Rm
Rm
Rm
Rm

23,618.30
19,258.36
14,045.74
3,567.05
2,789.93
2,089.29
1,429.22
1,014.09

2976.00
7724.00
2800.00
9530.00
12170.00
9047.00
13270.00
546.00

57,27,63,200.00
3,67,66,154.00
60,95,29,354.00

Amount
Rs.
6

79,01,143.50

7,02,88,060.80
14,87,51,572.60
3,93,28,072.00
3,39,93,986.50
3,39,53,448.10
1,89,01,806.63
1,89,65,749.40
5,53,693.14
36,47,36,388.40
5,47,10,458.20

1,09,42,091.64

1,82,36,819.40

629.00

17,418.90

1,09,56,488.10

Rm

126.00

38,708.67

48,77,292.42

Rm

1,018.00

19,354.33

1,97,02,707.94

DPR of GSWSP (Phase III)

430

1
8.

5.1.2

2
3
4
Carriage of DI pipes from PHE store to work
site
5) 1000mm dia. DI pipe: 13500.00Rm
Distance : 13.50Km
@ 421.62 Kg/m
Qtl./Km
1.65
Qnty.
: 56918.70 qtl.
ii) Carriage of cement, rod pipes and fittings
etc. from the PHE store to the work site
including loading and unloading all complete
as directed.
By truck load
Distance : 25km
Qtl/km
1.65
By head load
Distance : 3km
Qtl/km
45.00
Total
:
Add price escalation from 2007-08 to 2008-09@ 6% p.a.
Total
:
Say
:

56918.70

12,67,864.04

19,336.43

7,97,627.74

19,336.43

26,10,418.05
49,67,39,298.50
2,98,04,357.90
52,65,43,656.40
52,65,43,700.00

(+)

Clear water pumping transmission main.


Sl.
No
1
1.

2.

3.

4.
5.
6.
7.

GoM:Phed

Particulars

Unit

Qnty.

2
Earthwork in excavation to the proper level and
grade including light dressing & stacking of
serviceable stone as directed.

5250.00

Rm

7500.00

44,12,126.20

30,00,000.00

8,82,425.25

14,70,708.75

5250.00

629.00

33,02,250.00

70% of the total length


i.e. 70% of 7500
= 5250.00Rm
b) Soft or laminated rock
5250x1.00x1.00
= 5250.00M
Supplying & laying in trenches including
carrying in line and level socket & spigot
centrifugally cost ductile iron pipes conforming
to IS 8329/94 including clearing the inside
surface of the pipe all complete as directed.
300mm dia.
Supplying, fitting, fixing of DI specials as per
approved quality of the department including
jointing materials etc. @ 15% for Item No.2
Add cost of installation of protective device
against surge pressure.
Construction of valve chamber @ 3% for item
No. 2
Construction of supporting pillars/anchor block
@ 5% for item No. 2
Sand filling in trenches and in plinth in 20cm
layers each including ramming, watering,
consolidation complete as directed.

DPR of GSWSP (Phase III)

Rate
Rs.
5

83.00

Amount
Rs.
6

4,35,750.00

3921.89 2,94,14,175.00

431

8.

Carriage of DI pipes from PHE store to work


site

9.

5678.25

1.65

Rm

126.00

750.00

94,500.00

Rm
Rm

612.50
52.00

5.00
3926.25

3,062.50
2,04,165.00
4,36,03,296.61
26,16,197.78
4,62,19,494.09
4,62,19,500.00

300mm dia. DI pipe: 7500.00Rm


Distance : 41Km
Qtl./Km
Qnty.
: 5678.25qtl.
Compensation to PWD for making the road
damage due to laying of pipeline
National highway
Side berm
State road/village road
Black topped road
Side berm

Add price escalation from 2007-08 to 2008-09 @ 6% p.a.


Total
Say

5.2

(+)
:
:

3,84,133.61

Booster station and Control room.

5.2.1 Clear water pump house.


Ref : Plinth Area Rate 2004-2005.

Sl.
Description
No
1
2
1. Construction of Pump House for clear water
pumps on RCC framed construction (RCC
Roof) in brick walling with normal
specifications.
Plinth area :
16.30mx11.05m = 180.12m
Add: 7% for sanitary fittings

Unit

Qnty.

180.12

Rate
(Rs)
5

8100.00

Add: 10% for Electrifications

Amount
(Rs.)
6

14,58,972.00
1,02,128.04
1,45,897.20

2. Providing and placing of chequered plate on


top of cable trench supported by MS channel
placed on 0.75m interval.
Area :
4{1.20x0.50} = 2.40m
9.60x0.80 = 7.68m
3.50x0.80 = 2.80m
1.20x5.00 = 6.00m
6,383.00
18.88
M
Total =18.88m
Add price escalation from 2005-06 to 2008-09 @ 6% p.a i.e.24% :
3. Construction of RCC sump
Capacity : 1,00,000 ltrs.

GoM:Phed

Ltrs.

DPR of GSWSP (Phase III)

100000

20.00
Total :
Say :

1,20,511.04
4,38,601.99

20,00,000.00
42,66,110.23
42,66,200.00

432

5.2.2

Clear water pumps.


Sl.
No.
1

Particulars

1.

Supply, installation, testing & commissioning of horizontal pumps of reputed make


viz. Voltas Ltd., Jyoti Ltd., KSB, Mather & Plat etc. capable of lifting 40Lps of
water against a total head of 184m coupled to 170Kw high tension Horizontal
motors mounted on a common base plate with operating power supply of AC 3
phase, 6.6Kv 10%, 50 Hz. 5%, complete with coupling, coupling guards,
foundation bolts, set of accessories comprising of butterfly valve on both suction
and delivery side including non-return valve with bypass arrangement of suitable
pressure rating for individual unit excluding motor control center and pump
foundation. For compatibility with VVVF drives, the HT motors shall have phase
segregated neutral terminal box and shall also be suitable for use with VVVF drives
i.e. A.C. drives with speed variation 50% to 100% and with variable torque. The
motors shall also have RTDs and BTDs for winding temperature and bearing
temperature measurement. These RTDs signals will be connected to the PLC for
condition monitoring of the HT motors.
@ Rs. 13,000/Kw for 2x170Kw.
Supply, installation, testing & commissioning of high tension motor control center
for 2x170Kw comprising of 1 incoming feeder unit fitted with bus coupler circuit
breaker and 2 outgoing feeder unit fitted with isolator switches, D.O.L. starter,
voltmeter, ammeter, sets of pilot lamp including cabling from MCC to motors.
The HT panel board for motors shall be capable to provide the following
signals/data to the PLC for automation/visualization.
Voltage on either side of the bus coupler, current for each outgoing feeder, energy consumed as well

2.

Amount
(Rs.)
3

44,20,000.00

as incoming frequency.

3.

5.2.3

The HT panel board shall be capable for switching on/off from local (pump house) or remote (i.e.
from PLC via the MMI).
Basic information of each breaker such as breaker on/off/trip, in test/service position etc. to be
informed to PLC.

Pump foundation, cable trench, cable trays, chequered plate over cable trench etc
Total :

70,00,000.00
25,00,000.00
1,39,20,000.00

Electric power.
Sl.
No.
1
1.
2.
3.
4.
5.
6.

Particulars

Amount

2
Drawal of power line with ACSR raccoon conductor @
Rs. 15,14,766.00/Km for 2 Km.
Construction of 33/6.6KV Sub-Station. @ Rs. 78,83,725.00/each
Installations
of
1 no. 33/6.6kv 500KVA transformer @
Rs. 22,32,000.00/each
Installations of 1 no. 33/0.433kv 250KVA transformer @
Rs. 8,85,560.00/each
Laying of 6.6Kv 150mm 3 core XLPE underground cable for energizing
the motor @ Rs. 4163.44 for 500m
Laying of 3 core 150mm 1.1Kv armoured PVC cable for auxiliary
supply @ Rs. 1295.16/Rm for 500Rm

Add price escalation from 2007-08 to 2008-09 @ 6% p.a. for item No. 1, 5,
&6
(+)
Total
:
Say
:

GoM:Phed

DPR of GSWSP (Phase III)

30,29,532.00
78,83,725.00
22,32,000.00
8,85,560.00
20,81,720.00
6,47,580.00
1,67,60,117.00
3,45,529.92
1,71,05,646.92
1,71,05,647.00

433

5.2.3.1

Drawal of power line with ACSR Raccoon conductor.


Ref: PHE SOR 2007-08
Sl.No

Item Description

Qty.

Unit

1
1.
2.

3
26.00

4
Nos.

8.00

Nos.

2493.52

19,948.16

18.00
66.00
24.00

Nos.
Nos.
Nos.

874.42
806.56
10546.34

15,739.56
53,232.96
2,53,112.16

7.
8.

2
Steel tabular pole-SP-39/9.5M.H/D
33Kv
channel
X-ARM,100*50*6*3050mm
33Kv Y X-ARM, with 75*15*6mm
angle X-ARM
33Kv pin insulator with H/W fitting
33Kv Disc insulator with H/W fitting
HT stay set, with 7/10SWG stay wire
and guy insulator
d)
ACSR Raccoon conductor
Pole Clamp with flat iron (40*6)mm

Rate
(Rs.)
5
12411.17

22.00
3.15
52.00

Set
Km
Nos.

672.83
115676.04
144.27

14,802.26
3,64,379.53
7,502.04

9.

Pole & Stay foundation & grouting

14.80

LS

10,000.00

10.

Bracing set For D.P. structure 40*


40* 5mm
Guarding
Earthing
Sundries (Clamp, nut & bolts, paint,
barbed wire, DGR plate)

4.00
2.00
26.00

Set
Nos.
Nos.

1400.12
12241.82
1385.92

5,600.48
24,483.64
36,033.92

3.
4
5.
6.

11.
12.
13.

A
B
C
D
E
F
G

5.2.3.2

LS

Total cost of equipments.


Transportation Charge @ 5% on the cost of equipments
Erection charge @ 10%
Insurance charge @ 1% on the cost of equipments
Central & Sales tax charge @ 4% on the cost of equipments.
Contingency charge @ 3%
Stock maintenance charges @ 10.75%
Total
Say

5,000.00
11,32,535.13
11,32,535.13
56,626.76
1,13,253.51
11,325.35
45,301.40
33,976.05
1,21,747.53
15,14,765.73
15,14,766.00

33/6.6Kv sub:station.
Sl.No

Material Description

Qty.

Unit

1
2
3
Preliminary works
1A
Plan alignments etc.
L.S
Civil works
2A
Leveling of S/S retaining wall, fencing
L.S
2B
Construction of Control Room building
150Sqm
@ Rs. 8,100/m
2C
Water supply and sanitary installation
@ 7%
2D
Electrification & S/S lighting @ 10%
Add price escalation from 2005-06 to 2008-09 @ 6% p.a i.e. 24%

GoM:Phed

:
:

Amount
(Rs)
6
3,22,690.42

DPR of GSWSP (Phase III)

Rate
(Rs.)
4

Amount
(Rs)
5

25,000.00

1,65,000.00

12,15,000.00
85,050.00

(+)

1,21,500.00
3,41,172.00

434

1
2
Construction of 500Kva S/S
3 i)
33Kv lightning arrester
3 ii)
33Kv isolator with earth blade
3 iii)
33Kv isolator without earth blade
3 iv)
33Kv current transformer 2 sets
3 v)
33Kv potential transformer 1 set
3 vi)
33Kv circuit breakers SF6
3 vii)
e) 33Kv C&R panel for transformer
f) 33Kv C&R panel for feeder
3 viii)
e) 6.6Kv indoor panel 4 panel
f) 0.433Kv panel for low tension
supply
3 ix)
Sub-station structure:
a) Steel structures
3 x)
3 xi)
3 xii)

A
B
C
D
E
F

5.2.3.1

3.00
2.00
2.00
3.00
3.00
1.00
1.00
1.00
1.00

Set
Nos.
Nos.
Nos.
Nos.
No.
No.
No.
No.

41,250.00
39,600.00
34,100.00
33,000.00
14,300.00
2,86,000.00
1,00,000.00
1,00,000.00
3,00,000.00

1,23,750.00
79,200.00
68,200.00
99,000.00
42,900.00
2,86,000.00
1,00,000.00
1,00,000.00
3,00,000.00

1.00

No.

3,00,000.00

3,00,000.00

14.80

MT

30552.00

452169.60

Busbars, clamps, connection jumpers &


post insulators
Grounding switchyard lightning

LS

91000.00

LS

198000.00

Sundries (All paint, red-oxide, nuts &


bolts, Grand wire

LS

15000.00

Add price escalation from 1997-98 to 2008-09 @ 6% p.a for item No. 3
Total cost of equipments.
Transportation Charge @ 5% on the cost of equipments
Erection charge @ 10% on the cost of equipments
Grouting charge @ 8% on the cost of equipment
Insurance charge @ 1% on the cost of equipments
Central & Sales tax charge @ 4% on the cost of equipments.
Total
:
Say
:

(+)

42,07,941.00
19,51,219.00
61,59,160.00
3,07,958.00
6,15,916.00
4,92,732.80
61,591.60
2,46,366.40
78,83,724.80
78,83,725.00

33/6.6Kv 500Kva transformer.


Ref: Budget Price of SIEMENS Ltd.

Sl
No
1
a)
b)
c)
d)
e)
f)
g)
h)
i)

GoM:Phed

Item Description

Qty.

Unit

2
Supply of 33/6.6Kv, 500Kva, ONAN power transformer
Supply of erection & earthing material
Design & Engineering
Ex-works price
Excise duty
Sales tax
Transportation
Erection, installation, testing & commissioning [for
item (a) to (c)]
Total for destination price [item (a) to (h)]
Total
:

3
1
1
1

4
No.
Lot
Lot

DPR of GSWSP (Phase III)

Total Price
(Rs)
5

18,00,000.00
1,26,000.00
18,000.00
54,000.00
2,34,000.00
1

Lot
22,32,000.00
22,32,000.00

435

5.2.3.4

33/0.433Kv 500Kva transformer.


Ref: Budget Price of SIEMENS Ltd.

Sl
No
1
a)
b)
c)
d)
e)
f)
g)
h)

Item Description
2
Supply of 33/0.433Kv, 500Kva, ONAN power transformer
Supply of erection & earthing material
Design & Engineering
Ex-works price
Excise duty
Sales tax
Transportation
Erection, installation, testing & commissioning [for item
(a) to (c)]
Total for destination price [item (a) to (h)]
Total
:

i)

5.2.3.5

Qty.

Unit

3
1
1
1

4
No.
Lot
Lot

Total Price
(Rs)
5

7,44,000.00
55,800.00
7,440.00
22,320.00
1

Lot

56,000.00
8,85,560.00
8,85,560.00

6.6Kv 120mm 3 core XLPE underground cable.


Ref: PHE Schedule of rates 2007-08.

Sl No.
1
1.

Description
2
Laying of 6.6Kv 120mm 3 core XLPE underground cable in trench
including trenching and refilling of trench

Amount (Rs.)
3

20,81,720.00
20,81,720.00

@ Rs. 4163.44 for 500m


Total :

5.2.3.6

3 core 150mm 1.1Kv armoured PVC cable.


Ref: PHE Schedule of rates 2007-08.

Sl No.
1
1.

5.2.4

Description
2
Laying 3 core 150mm 1.1Kv armoured PVC cable for supply of low
tension power.
@ Rs. 1295.16/Rm for 500Rm
Total :

Amount (Rs.)
3

External electrification.
Sl.
Description
No
1
2
1. Supply, dragging, erecting and grouting of steel swaged street lighting pole 9.5m
height as per given designed including excavation of poles pit and foundation
complete.
@ Rs. 13,271.32/Each for 8Nos.
2. Excavation, foundation concrete preservative treatment etc.
@ Rs. 1000/each for 8 Nos.

GoM:Phed

6,47,580.00
6,47,580.00

DPR of GSWSP (Phase III)

Amount
(Rs.)
3

1,06,170.56
8,000.00

436

1
2
3. Supply, laying, testing & commissioning of underground cable of 1100V grade
PVC (aluminium) armoured cable including cost of digging of trenches, sand
cushioning and refilling the same in layers.
3 core x 25mm
@ Rs. 345.47/Rm for 2000Rm
4. Supply, fitting, fixing and commissioning of main road, lighting lanterns on street
lighting pole including commissioning complete with all accessories
250W HPSV BJMIP 50SV
@ Rs. 9,296.74/each for 16 Nos.
5. Supply, fitting and fixing load kontaket miniature circuit breakers (MCB) single
pole 0.05-4 Amp single pole MCB.
@ Rs. 864.06/Each for 8 Nos.
6. Supply, fitting & fixing sheet metal enclosures for DBs when MCB to be used
single pole and neutral
12 way with 200amp rated busbar.
@ Rs. 1210.49/each for 2 Nos.
7. Supply, fitting, fixing isolator single pole with neutral.
@ Rs. 587.88/each for 1 No.
Add price escalation from 2007-08 to 2008-09@ 6% p.a.
Total
Say

5.2.5

:
:

6,90,940.00

1,48,747.84

6,912.48

2,420.98
587.88
9,63,779.74
57,826.78
10,21,606.52
10,21,607.00

Security fencing.
Sl.
Description
No.
1
2
1. Supplying, fitting, fixing chain link security fencing 1.83m gate with
7.5cm mesh of 10SWC G.I. wire quality as per IS 2721 1061 with
3 stirrups of double plug 125WG GI B/Wire onward moreover portion
in the top with MS Angle intermediate post of 50x50x60mmx2.73m
long including 45cm onward lineable on top 2.3cm cc with corner post,
straining post of MS Angle 65mmx65mmx6mmx2.73m with necessary
staged. The straining post is to be provided at 10m cc corner post at
every corner including digging foundation for MS Angle post and
filling up the sides after completed of work with 0.45x0.45x0.60m c.c.
base for corner straining and end post in c.c. in prop 1:2:4 complete as
directed.
(d) 6 mile pumping station
: 400.00Rm
@ Rs. 896.00/Rm for 400 Rm
2. Providing fitting and fixing in position steel gates with RSJ posts
(100mmx5mm) with label frame and diagonally brand with MS Angles
(25mmx25mmx6mm) and gasket plate of 100mmx100mmx6m with
chain link wire netting of 10SWGI wire 100mmx100mm diamond mesh
including bolts, nuts hooks etc complete.
@ Rs. 3432.40/m for 20m
Add price escalation from 2007-08 to 2008-09@ 6% p.a.
Total
Say

GoM:Phed

DPR of GSWSP (Phase III)

(+)
:
:

Amount
3

3,58,400.00

68,640.00
4,27,040.00
25,622.40
4,52,662.40
4,52,700.00

437

6.

Service reservoirs
6.1

Master balancing reservoir

6.2

Ground level service reservoirs {5(ii)a+5(ii)b)

6.3

Overhead service reservoirs

6.4

Booster Stations/Control
Equipment)

Rs. 21,10,23,546.00
0

Rooms

(Civil,

Plant,
Total :
Say :

6.1

0
Rs. 21,10,23,546.00
Rs. 21,10,23,600.00

Master balancing reservoir.


Master balancing reservoir

6.2

Overhead service reservoirs.

6.2.1

Service reservoirs.

Sl.
Description
No.
1. Construction of service reservoirs of capacity 11.64Mld.
@ Rs. 18/Lt for 1,16,40,000lts.

6.2.2

Amount

Rs. 20,95,20,000.00

Security fencing for storage reservoirs.


Sl.
Description
No.
1
2
1. Supplying, fitting, fixing chain link security fencing 1.83m gate with 7.5cm
mesh of 10SWC G.I. wire quality as per IS 2721 1061 with
3 stirrups
of double plug 125WG GI B/Wire onward moreover portion in the top with MS
Angle intermediate post of 50x50x60mmx2.73m long including 45cm onward
lineable on top 2.3cm cc with corner post, straining post of MS Angle
65mmx65mmx6mmx2.73m with necessary staged. The straining post is to be
provided at 10m cc corner post at every corner including digging foundation for
MS Angle post and filling up the sides after completed of work with
0.45x0.45x0.60m c.c base for corner straining and end post in c.c in prop 1:2:4
complete as directed.
(e) Storage reservoirs
: 1200.00Rm
@ Rs. 896.00/Rm for 1200 Rm
2. Providing fitting and fixing in position steel gates with RSJ posts
(100mmx5mm) with label frame and diagonally brand with MS Angles
(25mmx25mmx6mm) and gasket plate of 100mmx100mmx6m with chain link
wire netting of 10SWGI wire 100mmx100mm diamond mesh including bolts,
nuts hooks etc complete.
@ Rs. 3432.40/m for 100m
Add price escalation from 2007-08 to 2008-09 @ 6% p.a.
Total
Say

GoM:Phed

DPR of GSWSP (Phase III)

(+)
:
:

Amount
3

10,75,200.00

3,43,240.00
14,18,440.00
85,106.40
15,03,546.40
15,03,546.00

438

6.3

Ground Level service reservoir.

Ground level service reservoir

6.4

Booster Stations/Control Rooms (Civil, Plant, Equipment).

Booster Stations/Control Rooms (Civil, Plant, Equipment)

7.

Distribution system.
7.1

7.1

Distribution networks for Zone I to Zone XII

Rs. 68,30,85,400.00

Distribution networks.
Sl.
No.
1
1.

Description

Unit

2
Earthwork in excavation to the proper level
and grade including light dressing and
stacking of serviceable stone as directed and
removal of spoils upto 30m and all lift.

For 350mm upto 500mm


9,768.99x1.70x1.50
=

a)

b)

c)

GoM:Phed

Rate
Rs.
4

Qnty.
5

Amount
Rs.
6

24,910.92m

For 100mm upto 300mm


2,63,090.94x1.50x1.50 = 5,91,954.62m
= 6,16,865.54m
In ordinary soil.
40% of total
Hard soil or soil mixed with moorum gravel
boulder upto one man size (above 0.03 cubic
meter each)

39.00

2,46,746.20

96,23,102.75

30% of total
Loose boulder above one size or soil mixed
with boulder above one man size of soft shale.

54.00

1,85,059.66

99,93,221.75

30% of total

63.00

1,85,059.66

1,16,58,758.58

DPR of GSWSP (Phase III)

439

1
2.

2
Supplying and lying in trenching including
carriage within 8km of ISI marked
centrifugally cast (spun) Ductile Iron pipes
with socket and spigot end conforming to IS
829/2000 in standard length of 4.00mt to
6.00mt suitable for push on join (rubber gasket
D.join) complete.

500mm
450mm
400mm
350mm
300mm
250mm
200mm
150mm
100mm

3.
4.

5.
6.

7.

8.

Rm
Rm
Rm
Rm
Rm
Rm
Rm
Rm
Rm

Deduct 5% for existing CI/GI pipes


Add cost of DI specials & valves @ 15% for
item No. 2
Construction of valve chamber for GI pipe
with 150mm thick cement concrete wall in
prop 1:2:4 with 6mm thick MS plate cover
with hinges and locking arrangement
including earthwork in excavation in
foundation and 75mm thick RCC in prop 1:3:6
in foundation all complete as per drawing and
direction @ 3% for item No.2
Construction of supporting pillars/anchor
blocks @ 5% for item No. 2
(iii) Sand filling trenches and in plinth in
20cm layers each including ramming
watering, consolidation complete as directed.
PWD compensation
Total length : 2,72,859.93
(i) Considering 70% of total as side berm
portion
(i) Considering 30% of total as black topped
portion
Carriage of cement, rod pipes and fittings etc.
from the PHE store to the work site including
loading and unloading all complete as
directed.

7,736.98
6,531.84
5,456.17
4,445.31
3,567.05
2,789.93
2,089.29
1,429.22
1,014.09

59.00
1,107.11
3,010.69
5,592.19
13,776.77
7,384.70
23,427.14
36,826.23
1,81,676.10

4,56,481.82
72,31,465.38
1,64,26,836.46
2,48,59,018.13
4,91,42,427.43
2,06,02,796.07
4,89,46,089.33
5,26,32,784.44
18,42,35,916.20

(-)
-

40,45,33,815.20
2,02,26,690.75
6,06,80,072.25

1,21,36,014.45

2,02,26,690.76

629.00

53,870.40

3,38,84,481.60

Rm

126.00

1,91,001.95

2,40,66,245.70

Rm

1,018.00

81,851.98

8,33,31,393.10

1.65

85,164.47
:
(+)
:
:

35,13,034.39
64,44,20,134.80
3,86,65,208.00
68,30,85,342.90
68,30,85,400.00

By truck load
Distance : 25km
Qtl/km
Total
Add price escalation from 2007-08 to 2008-09@ 6% p.a.
Total
Say

GoM:Phed

DPR of GSWSP (Phase III)

440

3.12.4 Any other detail estimates.


1.

Supply & installation of electromagnetic induction flow meter including UFW


assessment and leak deduction programme.
Sl.
No.
1
1.

Particulars

Location

2
Supply,
installation,
testing
and
commissioning
of
electromagnetic
induction flow meter with accessories
comprising expander-reducer, remote
panel based display and tantalizer
including inter connecting cables complete
as directed.

a)

DN-1000

b)

Qnty. :
1 no.
@ Rs. 4,77,000/each
DN-400

c)

Qnty. :
1 no.
@ Rs. 2,31,000/each
DN-350

d)

Qnty. :
1 no.
@ Rs. 2,20,000/each
DN-300

e)

Qnty. :
7 nos.
@ Rs. 2,05,000/each
DN-250

f)

Qnty. :
1 no.
@ Rs. 1,70,000/each
DN-200

3
1000mm dia feeder main at 6th Mile

4,77,000.00

i)

Bifurcation point between Zone IX and


Zone III, Zone IV and Zone V.
2,31,000.00

Bifurcation point at 3 mile

2,20,000.00

i)

Bifurcation point at 6 Mile transfer


main to Laitkor.
ii) Bifurcation point at 3 Mile.
iii) Bifurcation point between Zone II &
Zone I, Zone VIII & Zone VI.
iv) Bifurcation point between Zone III &
Zone IV.
v) Bifurcation point between Zone III,
Zone IV and
Zone V.
vi) Bifurcation point between Zone III &
Zone V.
vii) Upper Malki reservoir.

14,35,000.00

Bifurcation point between transfer point to


Mawprem and Bara Bazaar.

1,70,000.00
Bifurcation point between Zone I, Zone VI
& Zone VIII.

Qnty. :
1 no.
@ Rs. 1,09,000/each

GoM:Phed

Amount (Rs.)

1,09,000.00

DPR of GSWSP (Phase III)

441

1
2.

3.

2
Construction of metering room for housing
the inverters and its accessories at different
installations of size 3.00mx3.00m.
Qnty. : 12 nos. x 9m
: 108.00m
@ Rs. 8100.00/m
Add 7% electrification
Add 10% water and sanitation

8,74,800.00
61,236.00
87,480.00

(+)
(+)

Supplying, installation, testing and


commissioning of electro inverters of
reputed make including batteries.
1. Make-INDO-Hongkong
Capacity : 625VA
Battery : 1x(12volts/180AH)
Qnty. :
1 no.
@ Rs. 17,400.00/set

i)

2.

i)

Make-INDO-Hongkong
Capacity : 800 VA
Battery : 1x(12volts/180AH)
Qnty. :
10 nos.
@ Rs. 19,200.00/set

1000mm dia. feeder main at 6th Mile.

17,400.00
Bifurcation point at 6 mile transfer
main to Laitkor .

ii) Bifurcation point between Zone IX,


Zone III, Zone IV and Zone V.
1,92,000.00

iii) Bifurcation point at 3 mile.


iv) Bifurcation point between Zone II,
Zone I, Zone VIII and Zone VI.

v)

Bifurcation point between Zone III


and Zone IV.

vi) Bifurcation point between Zone III,


Zone IV and Zone V.

vii) Bifurcation point between Zone III


and Zone V.

viii) Bifurcation point between transfer


point to Mawprem and Bara Bazaar.

ix) Bifurcation point between Zone I,


Zone VI, and Zone VIII.

x)
3.

Make-Sukam
Capacity : 1400 VA
Battery : 2x(12volts/180AH)
Qnty. : 1 no.
@ Rs. 38,880.00/set

Upper Malki reservoir.

Water treatment plant complex

Add UFW assessment and leak deduction programme


Add price escalation per annum from 2005-06 to 2008-09 @ 6% i.e. 24%
Total
Say

2.

(+)
:
:

38,880.00
39,13,796.00
11,00,000.00
2,34,827.76
52,48,623.76
52,48,700.00

Supply and installation of automation Control and visualization system.


Sl.
No.
1.

GoM:Phed

Particulars

Location

Supply, installation, testing and commissioning of instrumentation, automation control


and visualization system including SCADA for water supply scheme
Total :

DPR of GSWSP (Phase III)

Amount (Rs.)

3,00,00,000.00
3,00,00,000.00

442

3.

Supply and installation of chlorinators including civil works.


Sl.
No.
1

Particulars

Location

A m o u n t (Rs.)

1.

Supply,
installation,
testing
and
commissioning of chlorination meter with
capacity of 5Kg/hr. including supply of toners
complete as directed..
a) Flow rate
: 2.57ml/hr
Qnty.
: 1 nos.
@ Rs. 1,00,000/each

b)

c)

d)

2.

WTP at Mawphlang GSWSP (Phase


I&II)

No. of toners
: 2 nos.
@ Rs. 36,500.00/each
Flow rate
: 0.40ml/hr
Qnty.
: 1 no.
@ Rs. 1,00,000.00/each
No. of toners
: 1 nos.
@ Rs. 36,500.00/each
Flow rate
: 2.97ml/hr
Qnty.
: 1 no.
@ Rs. 1,00,000.00/each
No. of toners
: 2 nos.
@ Rs. 36,500.00/each
Flow rate
: 1.99ml/hr
Qnty.
: 1 no.
@ Rs. 1,00,000.00/each

73,000.00
WTP at Mawphlang GSWSP (Phase
III)
1,00,000.00

36,500.00
1000mm dia. gravity feeder main of
GSWSP (Phase III) at 6th mile Upper
Shillong

1,00,000.00

73,000.00
4 mile reservoir
(Phase I & II)

of

GSWSP
1,00,000.00

No. of toners
: 2 no.
@ Rs. 36,500.00/each
Construction of metering room for housing the
chlorination meter and its accessories
complete as directed of size 4.00mx4.00m.
Qnty. : 4 nos. x 16m
: 64.00m
@ Rs. 8100.00/m for 64m
Add 7% electrification
Add 10% water and sanitation
Total
Add price escalation from 2005-06 to 2008-09 @ 6% p.a i.e. 24%
Total
Say

4.

1,00.000.00

73,000.00

(+)
(+)
:
:
:

5,18,400.00
36,288.00
51,840.00
12,62,028.00
3,02,886.72
15,64,914.72
15,64,915.00

Providing consumer meters to house service connections.


Sl.No.

Description

Amount
(Rs.)

Providing consumer meters to House Service Connection.


@ Rs. 1250.00/each for 44,000 nos.
Total :

GoM:Phed

DPR of GSWSP (Phase III)

5,50,00,000.00
5,50,00,000.00

443

4.

Project Institution framework for construction.

4.1

Roles of different institutions involved in the construction phase of the


project.

4.1.1

State Phed is a well structured organization with proper hierarchy and which has at its
disposal technical competent engineers in the cadre with well acquired experiences in
project design, project execution & supervision, project management including O&M
services of major urban water supply system, shall undertake the responsibility for various
phases of construction of the project.

4.1.2

State Phed comes under the administrative control of Commissioner & Secretary. At the
directorate/operational level, Chief Engineer is the head of Phed and is responsible for
overall management. The office of Chief Engineer, Phed; comprise of 2 wings
viz. Administrative Wing and Technical Wing. In addition to, there are Monitoring Cell,
Human Resource Development and Sanitation Cell. Pheds operations are divided into
Zones and Circles. Each zone is headed by Additional Chief Engineer and each Circle is
headed by Superintending Engineer. Under the Circles, there are Divisions and under the
Division, there are Sub:Divisions. While the Divisions are controlled by the Executive
Engineers, the Sub:Divisions are controlled by the Sub:Divisional Officers.

4.1.3

Providing water supply to all urban areas in the state is the responsibility of State Phed. The
Greater Shillong Water Supply Project (Phase I & II) was implemented by State Phed and
falls under the purview of Additional Chief Engineer, Zone-I. Under Additional Chief
Engineer, Zone-I, the Superintending Engineer, Greater Shillong Circle is responsible for
water supply services and Superintending Engineer, Electrical Circle is responsible for
production from Umiew river which includes pumping and treatment. An organization
chart of Phed structure to be involved in construction phases of the project is given in
Fig.4.1.
Minister
i/c PHE Department

Principal Secretary
PHE Department

Chief Engineer

EE
Planning : Design Cell

EE
Investigations : Planning

EE
Monitoring

Addl. C.E., Zone-I

S.E.
G.S. Circle, Shillong

E.E.
GSWS Division I
Shillong

S.D.O.
Colony Sub:Division
Shillong

S.D.O.
Water Main Sub:Division
Shillong

EE
Resource Management

CAO cum VO

S.E.
Electrical Circle, Shillong

E.E.
GSWS Division II
Mawphlang

S.D.O.
Dam Sub:Division
Mawphlang

S.D.O.
Reservoir Sub:Division
Mawphlang

E.E.
Electrical Division
Mawphlang

E.E.
Electrical Division
Shillong

S.D.O.
Electrical Sub:Division
Mawphlang

S.D.O.
Electrical Sub:Division
Shillong

Figure : 4.1

GoM:Phed

DPR of GSWSP (Phase III)

444

4.1.4

The project shall be implemented by State Public Health Engineering Department through
State Level Nodal Agency (MUDA). For improved co-ordination and/or working
arrangement, the state government in the UAD has notified a mission team of JNNURM,
Shillong, for identification, review and monitoring the projects of JNNURM as well as
review of implementation of the reforms agenda as required under the programme. The
team under the Chairmanship of Secretary, UAD comprise among others officers from
UAD, MUDA, C.E./Addl. C.E, Phed and PWD.

4.2

Manner of undertaking construction works.

4.2.1

Construction works under the project are envisaged to be tendered out under the
supervision/management of state Phed. For the purpose of tendering, different components
of the project shall be brought under different packages.

4.2.2

The contract for procurement of pipes viz. MS, DI & GI is proposed to be tendered
separately under separate package and the contract for other packages shall include turnkey
jobs comprising components of civil works, machineries/equipments, erection and
commissioning. Tenders shall be invited in accordance with competitive bidding
procedures.

4.3

Involvement of the construction entity in the subsequent O&M


activities.

4.3.1

State Phed shall provide the necessary services required for O&M on post commissioning
period of the project.

4.4

Areas of involvement of the private sector in the construction phase.

4.4.1

State Phed which is a well structured organization with proper hierarchy and has at its
disposal technical competent engineers in the cadre with well acquired experiences in
project design, project execution & supervision, project management including O&M
services of major urban water supply system shall undertake the responsibility for the entire
construction phases of the project.

4.4.2

Areas of involvement of the private sector in the construction phases is indicated table 4.4.2.
Table 4.4.2
Project Feasibility Study
Project Engineering Design
Specialized Surveys
Construction Works
Supervision Consultants
Quality Assurance Consultants
Any other

GoM:Phed

x
x
x
x
x
x
Feasibility study on raising the height of the mass gravity concrete dam for
possible increase of live storage of the dam constructed under Phase II of
the GSWSP, State Phed recommend that Central Water Commission
(CWC) be requested to provide the necessary service. CWC as a consultant,
provided the necessary design and supervision for the construction of mass
gravity concrete dam at Mawphlang under Phase II of GSWSP.

DPR of GSWSP (Phase III)

445

4.5

Construction packages for works construction.

4.5.1

Brief description of strategy for the overall works programme including information on
indicative packages for tendering is indicated in table 4.5.1.
Table 4.5.1

Project implementation planning :Package-wise contracting relationships


Sl.
No.

GoM:Phed

List of tender
packages

Package Description

Amount
Rs.in lakhs

1.

Package No.1

Construction of approach road to different work sites.

2.

Package No.2

Procurement of Pipes (MS & DI)

9019.93

3.

Package No.3

Construction of intake & intermediate structure and pump houses; laying


of raw water MS rising main; raw water pumping machineries for both
Stage I & Stage II pumping system, installation of VVVF drives and
automation control & visualization system including flow metering
system for pumping system; construction of 33/6.6Kv sub:station
including sub:station structure, 1x2.5Mva transformer, 33/0.4Kv 500Kva
transformer, protection & metering system & earthing for sub:station etc.
including appurtenant works all complete.

2503.71

4.

Package No.4

Construction of 8Mld WTP comprising of raw water inlet stilling


chamber, parshall flume, chemical dosing system and equipments, rapid
mixing, clariflocculator, rapid filtration plant & building, clear water
reservoir, valves, drives, measuring instrument, machineries &
equipments, automation control and visualization system; construction of
33/0.4Kv, 500Kva sub:station, sub:station structure, 500Kva transformer
protection & metering system, earthing including appurtenant works all
complete.

1289.14

5.

Package No.5

Laying of gravity feeder main comprises of DI pipes of sizes


1000mm to 100mm .

2290.10

6.

Package No.6

Construction of pump house, laying of 300mm DI clear water rising


main, clear water pumping machineries, flow metering system,
construction of 33/6.6Kv 500Kva sub:station including sub:station
structure, 1x500Kv transformer, protection and metering system &
earthing for sub:station etc. including appurtenant all complete.

1132.99

7.

Package No.7

Laying of distribution system for Zone I to Zone XIII comprising of DI


pipes of sizes varying from 500mm . to 100mm .

3839.72

8.

Package No.8

Construction of service reservoir

2343.04

9.

Package No.9

Installation of water meters including providing back up supply through


inverters.

59.53

10.

Package No.10

Installation of chlorinators.

15.65

11.

Package No.11

Construction of buildings

48.33

12.

Package No.12

Providing 44,000 numbers of consumers meters.

DPR of GSWSP (Phase III)

71.38

550.00

446

5.

Project Financial Structuring.

5.1

Overall financial structuring of the project.

5.1.1

The overall financial structuring of the project is indicated in table 5.1.1.


Table 5.1.1

Sl
No

1.
2.

Govt.

Central
State

3
4.
5.
6.
7
8.
9.

ULB/
Parastatal

Project contribution source

Amount
(Rs.lakhs)

% share
by
specific
source
90.00
9.80

ACA Grant
Grant towards its share in
project
Loan taken by state govt.
towards its share in project
Devolved funds
Own surplus resources
Debt/term loan taken from
state govt.
Debt /term loan taken from
bank/FI
Debt from accessing capital
market

21889.34
2383.51

Private
equity/community
resource funding; others.

48.64

0.20

24321.49

100%

% share by
govt. entity

Remarks on when
and how stage and
ULB shares would be
arranged.
Not applicable

5.1.2

SCB is one of the beneficiary. SCB may be requested to finance a part of the cost of the
project say for an amount of Rs. 46.64 lakhs which works out to 0.2% of the cost. The
balance 9.8% of the cost being the state share, MoDONER may be requested to finance.

5.2

Review of options for institutional debt and/or private sector


participation.

5.2.1

The GSWSP (Phase I & II) was implemented with the budgetary allocation under the state
plan outlay. The project implementation which commenced in the year 1978-79 dragged on
for almost 3 decades to complete the project on account of resource constraint under the
state plan. Availing loan from financial institutions to finance part of the cost for
implementation of project was only possible in 1983 where a one time loan of Rs. 250 lakhs
was extended by LIC. Though sincere efforts were made to explore the possibility of
availing additional plan loan, LIC expressed extreme difficulty to extend additional plan
loan on account of huge outstanding dues payable by the state government who stands
guarantor on behalf on State Electricity Board. Loan from other financial institutions
viz. HUDCO though applied and sincerely pursued in 1999-2000, did not materialize.
Completion of the GSWSP (Phase I & II) was only possible when the project was included
for finance under Non-Lapsable Central Pool of Resources (NLCPR) by MoDONER in
1998-99. DoNER finance a total amount of Rs. 3579.00 lakhs for the project. SCB is one of
the beneficiary.

GoM:Phed

DPR of GSWSP (Phase III)

447

5.2.2

Like any other state government departments and/or state government undertakings MUDA
is mainly dependent upon the grants provided by the state budget for their operation.
Likewise, SMBs financial position is in precarious condition and could barely manage their
establishment. The endeavours made by the Board to augment their revenues will take
sometime to fructify. Under the circumstances, considering the credit worthiness of the
agencies at this juncture, availing loan from financial institutions to finance part of the cost
for implementation of the project would be met with negative response.

5.2.3

In this part of the country, water is considered as a free gift of nature. As such, charging for
water is not liked by the people. Providing water supply was not considered to be a
commercial or even a no-profit-no-loss activity. Considering the present scenerio, there is
very little chance for private sector to participate in financing construction of infrastructure
project.

5.2.4

Having examined the scope and options for institutional debts and/or private sector
participation, Shillong Cantonment Board being one of the main beneficiary, may be
persuaded to finance some amount towards the cost of the project. For remaining percentage
of State share towards the cost of the project, MoDONER may be approached to finance the
same.

6.

Project phasing.

6.1

Schedule for tendering/selection for procurement of services

6.1.1

The project implementation planning and packagewise contracting relationship is given in


Annexure :2

6.1.2

The responsibility for various phases of construction of the project shall be undertaken by
the State Phed. Schedule for tendering/selection for procurement of other services viz.
consultant/firms for supervision etc. is not further required.

6.2

Schedule for bringing in State level and ULB level contributions to the
project.

6.2.1

As mentioned in Para 5.1.2, SCB is one of the beneficiary. SCB may be requested to furnish
a part of the cost of the project for an amount of Rs. 50.00 lakhs which is 0.02% of the cost.
The balance 9.8% of the cost being the state share which works out to Rs.2459.01,
MoDONER may be requested to finance.

6.2.2.

The schedule for financial contribution and sources is given in Annexure:3.

GoM:Phed

DPR of GSWSP (Phase III)

448

6.3

Schedule for obtaining all clearances.

6.3.1

Necessary clearance shall be required from the State Public Works Department for laying of
feeder main/distribution system along the side of the state roads and from Ministry of
Surface Transport (MoST) for laying of feeder main/distribution system along the side of
national highway and from the Ministry of Forest and Environment for laying of portion of
feeder main along some portion of the forest land. The schedule for obtaining clearances are
indicated in table 6.3.1.
Table 6.3.1
Sl
No.

Clearance date

List of clearance to be

2008-09
Q3
1.

Mo Forest & Environment

2.

MoST

3.

State PWD

2009-10
Q4

Q1

Q2

6.4

Schedule for shifting utilities.

6.4.1

Detail surveys and investigations have been carried out in respect of different components
considered under the project and according to the assessment, no major utilities are required
to be shifted for implementation of different components of the project.

6.5

Project infrastructure component-wise implementation.

6.5.1

Project infrastructure componentwise implementation is given in table 6.5.1.

GoM:Phed

DPR of GSWSP (Phase III)

449

Table 6.5.1
Tender packages
Package description

Package
No.

Source development

i)

Type of source

ii)

Diversion structure

iii)

Intake structure

iv)

Plant and machinery (raw water pumps, motors, electrical,


instrumentation piping)

v)

Other structure

Offices, housing
Roads, etc..
II

Raw water transmission system

i)

Raw water transmission main (pumping/gravity)

III
i)

Water treatment (civil works, plant and machinery)


Inlet works

ii)

Primary treatment (aeration, clarification)

iii)

Chemical house and dosing systems

iv)

Rapid mixing

v)

Filter house, and associated plant and equipments

vi)

Clear water reservoir and pumping station

vii)

Chlorine house and chlorination systems

viii)

Control room and laboratory

IV

Clear water transmission system

i)

Transmission main (pumping/gravity)

ii)

Booster stations and control rooms

Service reservoirs

i)

Master balancing reservoir

ii)

Ground level service reservoirs

iii)

Overhead service reservoirs

iv)

Booster stations/control rooms (civil, plant, equipment)

VI

Distribution system

i)

Distribution pipeline

Release
date
2008-09
Q2

Tendering
Award date
2008-09
Q3
Q4

2009-10
Q1
Q2

Completion
Schedule date
Q1

2008-2009
Q2
Q3

Q4

Q1

2009-2010
Q2
Q3

Q4

Q1

2010-2011
Q2
Q3

Q4

7.

Project O&M planning.

7.1

Institution framework (organization & operation) strategy.

7.1.1

The State Phed which is responsible for project design, project execution & supervision and
project management shall also be engaged in O&M services of the created infrastructure
assets/enhanced infrastructure assets. Re-organisation of available technical man power and
staff under State Phed shall be carried out for the purpose.

7.1.2

Cost recovery is being implemented from consumers provided with individual service
connection to households and other institutions through unmetered supply as well as bulk
supply. The extent of cost recovery is not satisfactory as realization of charges from all
bulk consumers could not be effected. The extent of cost recovery during the last 5 years
has already been indicated in table 1.5.2.

7.1.3

Despite the high cost of production of water as a result of very high electricity charges
levied on public water works in the state water is supplied to some bulk consumers free of
cost without any charges. Under the project, the strategy for cost recovery aims at recovery
expenditure for O&M charges, shall be fully implemented. Therefore, to incorporate proper
financial discipline in cost recovery measures, institutional and financial performance
described here below are under serious considerations.

To realize the cost of production and supply of water from the consumers as per the new tariff.
Metering and consumer survey programme : to undertake a time bound metering programme for all
Industrial, Commercial & Industrial users and also to introduce production meters and zonal meters.
Management water users: To stress the importance of a proper meter reading, billing collection and
repair programme to ensure cash flow.
Periodical revision of water tariff : to stress the importance of periodical revision of the water tariff for
all category of supply to ensure that the tariff rates are applicable to meet the cost of O&M.

7.1.4

Community participation in the final stage of distribution of water, O&M of distribution


system including realization of cost of supply to consumers within the community area
shall be explored.

7.1.5

The annual requirement of man power, energy, spares and consumable etc. for O&M of the
project on the basis of existing usage norm has been worked out and explicitly defined.

7.1.5.1

Requirement of man power has been considered on the basis that each personnel is to work for 8
hrs. a day. The pumping stations, water treatment plants are designed for operation 24 hrs. a day.
Technical personnel and helpers shall be deployed to operate and monitor the performance of
the machineries and other associated equipments. A group of technicians and helpers shall be
assigned for different stations and each group shall work for 8 hrs. a day. For 24 hrs. operation
of the plant, the number of groups required for each station would be 4. The duty shall be on
roaster basis i.e. morning, evening, night and off after performing 2 night duty continuously.

GoM:Phed

DPR of GSWSP (Phase III)

451

The arrangement of shift duty for a particular station with 4 groups of technicians and helper is
indicated in Table 7.1.5.1
Table 7.1.5.1
Grouping of operating
personnel

Day
1

Group I

Group II

Group III

Group IV

M : Morning; E : Evening; N : Night; O : Off

7.1.5.2

On the basis of the above arrangement, the requirement of manpower for consideration under
the project is indicated in table 7.1.2.
Table 7.1.2
Designation of
technical personnel

33/6.6Kv
Sub:station

Stage I pumping
system

Stage II pumping
system

WTP

Clear water
pumping system

1. Tech. Gr.I

2. Helper/Khalasi

3. Security Guard

For 4 groups
Tech. Gr.I
Helper
Security Guard
Staff for shift duty requirement
Staff for non shift duty requirement
Staff for laboratory
Total

7.1.5.3

:
:
:
:
:
:
:

4 x 5 = 20
4 x 7 = 28
4 x 4 = 16
64
3
1
68

Requirement of power required under the project (Phase III) is indicated in table below:
Table 7.1.3

GoM:Phed

Period

Year

Water requirement
Mld

Demand
Kva

Energy consumption per month


Kwh

Initial

2011

49.06

4112

23,68,238

Intermediate

2021

58.06

4728

27,23,436

Ultimate

2026

62.88

5058

29,13,653

DPR of GSWSP (Phase III)

452

7.1.5.4

Spares required for fast moving items of plant and machineries shall be assessed and required to
be kept in stock to meet emergency requirement. Consumables and lubricants for machineries
including chemicals for treatment of water. Detailed calculation on the requirement of chemicals
was arrived at and indicated in the design for WTP.

7.2

Tariff and user cost recovery.

7.2.1

The steep increase in O&M of water works vis--vis inapplicability of the existing rates of
water charges to commensurate with the expenditure necessitated state Phed to reframe the
water tariff, revising and refixing the standard rates and charges for different category of
supply. The revised water tariff as finalized has already been indicated in Table 1.5.3.

7.2.2.

Experiences, indicate that SEB revised its electricity tariff every year since 2001. The
corresponding increase in electricity tariff is about 10 to 15%. To keep pace with the
increased cost of energy and other inputs, the water tariff is proposed to be revised in every
alternate year @30% to ensure the project self sustainability.

Project financial viability & sustainability.

8.1

Overall project perspective.

8.1.1

The complete supporting project cash flow projections alongwith underlying assumptions
have been presented in Annexures. The likely O&M cost, status of water supply, water
supply tariff and expected revenue generation from the project upto 2024-25 has been
bought out and indicated in Annexures. The graph of O&M cost versus expected revenue to
be generated, established the self sustainability of the project during the next 15 years
including recovering the capital cost. Following Annexures provide information on
financial viability and sustainability.

Annexure 4a

Project cash flow for JNNURM

Annexure 4c

Detail of O&M charges.

Annexure 4d

O&M cost, status of supply, tariff and revenue generation.

Annexure 4e

Water tariff, standard rates and charges and propose hike in rates.

GoM:Phed

DPR of GSWSP (Phase III)

453

9.

Project benefits assessment.

9.1

A list of benefits from societal perspective.

9.1.1

The project benefit assessment is indicate in table 9.1.1


Table 9.1.1
Sl.
Societal benefits
No.
1.
Access
2.
Coverage
3.
Service quality
4.
Income for poorer sections
5.
Supply continuity
6.
Safety
7.
Cost savings
8.
Improved efficiency
9.
Time savings
10. Environment improvement
11. Employment
12. Improved quality of life

Comments
Yes
Yes
To improve
To improve
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

Quantitative impacts &


underlying assumptions
Good
Large area
A lot
Great extent
24 hrs.
Water hygienically safe
Significantly
Great extent
Great extent
Significantly
Some extent
To large extent

9.2

A list of negative externalities.

9.2.1

The proposed project would influence the environment in two distinct phases.

During construction phases which would be temporary and short term.


During the operation phase which would have long term effects.

Identification of adverse impacts facilitates planning for possible counter measures and also
recognize possible trade-offs in taking up the project. The project dis-benefit assessment is
indicated in table 9.2.1
Table 9.2.1
Sl.
Societal adverse impacts
No.
1.
Pollution; environmental distortions

GoM:Phed

Comments
Little or no effect

Quantitative impacts &


underlying assumptions
No impact

2.

Reduced green cover

Negligible

Negligible impact

3.

Reduced access to any specific user


segments

Do not foresee

No impact

4.

Supply interruptions (especially during


project construction phases)

With proper planning there is


little
chance
for
supply
interruptions

Little chances

5.

Displacement of inhabitants

No displacement of inhabitant

6.

Disruption in livelihood / reduced


employment/ labour redundancy

No

7.

Possible
haphazard
development
around/ adjacent project site areas
(e.g. Resulting in slums)

With proper planning. Avoidance


of haphazard development would
be possible.

DPR of GSWSP (Phase III)

No impact
Possibility is ruled out.

454

Annexure : 2

Project implementation planning : Packagewise contracting relationship.


Tender packages
Package
No.

Package description

Contract
type
Unit/rate/
turnkey
percentage/
others

Construction of approach road to different work sites.

Procurement of Pipes (MS & DI)

Unit rate

Construction of intake & intermediate structure and pump


houses; laying of raw water MS rising main; raw water
pumping machineries for both Stage I & Stage II pumping
system, installation of VVVF drives and automation control &
visualization system including flow metering system for
pumping system; construction of 33/6.6Kv sub:station
including sub:station structure, 1x2.5Mva transformer,
33/0.4Kv 500Kva transformer, protection & metering system &
earthing for sub:station etc. including appurtenant works all
complete.

Percentage

Cost

Tendering

Flow of fund.
2008-09

2010-11

4019.93

5000.00

Turnkey

1000.00

1000.00

503.71

Construction of 8Mld WTP comprising of raw water inlet


stilling chamber, parshall flume, chemical dosing system and
equipments, rapid mixing, clariflocculator, rapid filtration
plant & building, clear water reservoir, valves, drives,
measuring instrument, machineries & equipments, automation
control and visualization system; construction of 33/0.4Kv,
500Kva sub:station, sub:station structure, 500Kva transformer
protection & metering system, earthing including appurtenant
works all complete.

Turnkey

1000.00

289.14

Laying of gravity feeder main comprising of DI pipes of sizes


1000mm to 100mm .

Percentage

Construction of pump house, laying of 300mm DI clear water


rising main, clear water pumping machineries, flow metering
system, construction of 33/6.6Kv 500Kva sub:station including
sub:station structure, 1x500Kva transformer, protection and
metering system & earthing for sub:station etc. including
appurtenant works all complete.

Turnkey

1000.00

132.99

Construction of reservoir

Percentage

2300.00

43.04

Laying of distribution system for Zone I to Zone XII


comprising of DI pipes of sizes 500mm , to 100mm ..

Percentage

3800.00

39.72

Installation of water meters including providing back up


supply through inverters.

Unit rate

59.33

10

Installation of chlorinators.

Unit rate

15.65

11

Construction of buildings

Percentage

48.33

12

Providing 44,000 numbers of water meter.

Percentage

50.00

500.00

16273.31

1508.60

Total :

GoM:Phed

71.38

2009-10

290.10

5381.41

2000.00

Release
date
2008-09
Q2

Completion

Award date
2008-09
Q3
Q4

2009-10
Q1
Q2

Schedule date
Q1

2008-2009
Q2 Q3

Q4

Q1

2009-2010
Q2
Q3

Q4

Q1

2010-2011
Q2 Q3

Q4

DPR of GSWSP (Phase III)

455

Annexure : 3
Schedule for financial contribution and sources
Sl
No

Sources
Q1

Q2

FY 08-09
Q3

Q4

Total

Q1

Schedule month and amount


1

GoI

State

ULB

Others

Total

Q2

FY 09-10
Q3

Q4

Schedule month and amount


6566.80
-

48.64

6566.80

FY 09-10

FY 10-11

Total

Schedule amount

Schedule amount

Schedule amount

Total

5472.33

5472.33

10944.66

10944.66

4377.87

21889.33

1191.75

1191.75

2383.51

2383.51

2383.51

48.64

48.64

13328.17

13328.17

4377.87

6615.44

24323.48

Note (for filling table)


1.

GoM:Phed

For year of sanction of project and following year, provide quarterly schedule (month-year and amount). For subsequent years provide annual schedule month-year and amount.

DPR of GSWSP (Phase III)

456

Annexure 4a
Unit: Rs. in lakhs
Particulars

Project Cash Flow for JNNURM


Block 1 Duration
2008

2009

Block 1I Duration

2010

2011

4377.87

2026

2041

2691.05

4400.32

Cash Flow during construction phase


Inflows
Central Government Grant - JNNURM

6566.80

State Government Grant

5472.33

5472.33

1191.76

1191.76

ULBs own contribution


Loans from banks/Fis
Debentures/Bonds
Beneficiary contribution
Others (Please specify)

48.64

Sub Total (A)

6615.44

6664.09

6664.09

4377.87

6605.44

6654.09

6654.09

4367.87

10.00

10.00

10.00

10.00

6615.44

6664.09

6664.09

4377.87

Outflows
Capital expenditure (Note 1)
Interest during construction
Project related Establishment charges
Others (Please specify)

Sub Total (B)


Net cash flow during construction phase (A-B)(C)

Cash Flow during O & M phase


Inflows
User charges

34.87

34.87

34.87

1535.34

Revenue Grant from State Government

1252.13

1293.13

1418.13

56.66

1287.00

1328.00

1453.00

1595.00

1287.00

1328.00

1453.00

1595.00

2587.00

4044.00

1287.00

1328.00

1453.00

1595.00

2587.00

4044.00

104.05

356.32

104.05

356.32

Other income (Please specify)


Income earmarked for the project (Note 2)
Others (Please specify)
Sub Total (D)
Outflows
Establishment Charges
O & M charges (Note 3)
Loan repayments (Principle)
Interest
Others (Please specify)
Sub Total (E)
Net cash flow during O & M phase (D-E) (F) (Note
4)
NPV and IRR (O & M )
Net cash flow during construction and O & M phase
(C+F) (G)
NPV and Project IRR (overall)
Note :
1.
Provide details in Annexure 4B (optional)
2.
Income earmark for the project includes those own sources of income for the organisation which is earmarked for O &M or loan repayment of the project
3.
Provide details in Annexures 4C (optional)
4.
NPV and IRR (O&M) should be calculated after adding back the amount of Loan repayments (Principal).

GoM:Phed

DPR of GSWSP (Phase III)

457

Annexure 4c

Details of Operation & Maintenance Charges


Unit : Rs. in lakhs

Particulars
1

2008

2011

2026

2041

Electricity

600

750

1560

2784

Petrol, Oil and Lubricants

10

13

20

25

Rent, Rate and Taxes

Consultancy/Professional charges

Office Maintenance

Communication Expenses

10

Billing and Collection

Printing and Stationery

Insurance

Consumption of Stores

150

200

350

450

Repairs and Maintenance

142

184

200

300

Annual maintenance charges

Patents and Royalties

Bank charges

Establishment charges (Salary of officers


and staff)

380

442

450

475

Total :

1287

1595

2587

4044

GoM:Phed

DPR of GSWSP (Phase III)

458

Annexure 4d

Statement showing O&M cost, rate of supply, water tariff and expected revenue generation.
The proposed tariff and revenue generation has been considered keeping in view the high cost of water
production on account of high cost of electricity charges. As available sources of water are diminishing and
judicious use of water is called for, the tariff provides higher rate at higher consumption and subsidised rate
at lower consumption.
A. Year 2011 : Population : 3.16 Lakhs

Generation : 55.75Mld

Percentage of population consuming water in a prescribed


slab of consumption
Percentage of
population

Population

Slab of
consumption per
month

In Lakhs

Kl

Available Supply: 47.39 Mld

Total monthly water


consumption

Proposed water tariff

Proposed yearly
revenue generation.

Kl

Rs./Kl

Rs. In Lakhs

60

1.90

5,70,000

8.00

547.20

25

0.79

3-5

3,95,000

9.50

450.30

10

0.32

5-7

1,98,000

12.00

285.12

0.16

78
and above

1,17,000

18.00

252.72

Monthly consumption

B. Year 2026 : Population : 4.05 Lakhs

12,80,000

Generation : 62.88Mld

Yearly Revenue

1535.34

Yearly Expenditure

1595.00

Available Supply: 54.67 Mld

60

2.43

7,29,000

11.00

962.28

25

1.01

3-5

4,84,800

13.00

756.29

10

0.41

5-7

2,66,500

16.00

511.68

0.20

78
and above

1,60,000

24.00

460.80

Monthly consumption

B. Year 2041 : Population : 5.12 Lakhs

16,40,300

Generation : 79.49Mld.

Yearly Revenue

2691.05

Yearly Expenditure

2587.00

Available Supply: 69.12 Mld

60

3.07

9,21,000

14.00

1547.28

25

1.28

3-5

6,40,000

17.00

1305.60

10

0.51

5-7

GoM:Phed

0.26

3,06,000

21.00

771.12

78
and above

2,06,000

31.00

776.32

Monthly consumption

20,73,000

DPR of GSWSP (Phase III)

Yearly Revenue

4400.32

Yearly Expenditure

4044.00

459

Annexure : 4e

Water supply tariff : Existing standard rates & charges and proposed hike in the
rates.
Standard rates and charges

Category of supply

Category I

2008

2011

2026

2041

: Domestic unmetered

15mm

: Rs. per connection per month

194

194

258

345

20mm

: Rs. per connection per month

388

388

516

686

25mm

: Rs. per connection per month

581

581

775

1031

: Rs. per kl

11

15

Category III : Commercial metered

: Rs. per kl

12

12

16

21

Category IV : Commercial metered

: Rs. per kl

18

18

24

32

Bulk supply

: Rs. per kl

9.5

9.5

13

17

Category II

GoM:Phed

: Domestic metered

: Commercial metered

DPR of GSWSP (Phase III)

460

Appendix : 1

Constituents of Shillong Urban Agglomeration.


Sl.
No.
1
1.

Name of town/village

Classification

2
Shillong (M)

3
Urban

Total No. of House hold


as per 2001 census
4
26,929

2.

Shillong Cantt. (CB)

Urban

2,476

12,396

3.

Mawlai (CT)

Urban

6,878

38,303

4.

Pynthorumkhrah (CT)

Urban

4,423

22,115

5.

Nongmynsong (CT)

Urban

2,307

11,371

6.

Nongthymmai (CT)

Urban

7,287

34,292

7.

Madanrting (CT)

Urban

3,220

16,318

Total :

2,67,662

GoM:Phed

DPR of GSWSP (Phase III)

Total Population under SUA


as per 2001 census
5
1,32,867

461

Appendix : 2

## POPULATION FORECASTING ##
@@ Using Six

methods of calculation @@

Name of the Scheme

::

Shillong Urban Agglomeration WSS

Date of Print out

::

13.06.2008
DATA

Prospective year of the Scheme

2007

Ultimate year of the Scheme

2022

Initial year of the population

1961

Final year of the population

2001

No. of decades under consideration


SL.NO
1

5
POPULATION
3
102398
122752
174703
223366
267662

DECADE
2
1961
1971
1981
1991
2001

1.
2.
3.
4.
5.

RESULTS
PROSPECTIVE
POPULATION
3

ULTIMATE
POPULATION
4

1. Arithmetic Mean

292451

354425

2. Geometric Mean

307634

435666

3. Incremental Increase

296282

380402

4. Yearly Variation

308601

440478

5. Semi Log (Analytical)

322281

470351

6. Wahids AVD Method

305630

418420

SL.NO

METHOD

It is suggested that :
The Prospective Population for the year 2007 may be taken as 296000.
The Ultimate
Population for the year 2022 may be taken as 380000.

GoM:Phed

DPR of GSWSP (Phase III)

462

## POPULATION FORECASTING ##
@@ Using Six

methods of calculation @@

Name of the Scheme

::

Shillong Urban Agglomeration WSS

Date of Print out

::

13.06.2008
DATA

Prospective year of the Scheme

2011

Ultimate year of the Scheme

2026

Initial year of the population

1961

Final year of the population

2001

No. of decades under consideration


SL.NO
1
1.
2.
3.
4.
5.

DECADE
2
1961
1971
1981
1991
2001

POPULATION
3
102398
122752
174703
223366
267662
RESULTS
PROSPECTIVE
POPULATION
3

ULTIMATE
POPULATION
4

1. Arithmetic Mean

308978

370952

2. Geometric Mean

337546

478027

3. Incremental Increase

316958

405867

4. Yearly Variation

339316

484319

5. Semi Log (Analytical)

356466

520242

6. Wahids AVD Method

332286

455205

SL.NO

METHOD

It is suggested that :
The Prospective Population for the year 2011 may be taken as 316000.
The Ultimate Population for the year 2026 may be taken as 405000.

GoM:Phed

DPR of GSWSP (Phase III)

463

## POPULATION FORECASTING ##
@@ Using Six

methods of calculation @@

Name of the Scheme

::

Shillong Urban Agglomeration WSS

Date of Print out

::

13.06.2008
DATA

Prospective year of the Scheme

2021

Ultimate year of the Scheme

2036

Initial year of the population

1961

Final year of the population

2001

No. of decades under consideration


SL.NO
1
1.
2.
3.
4.
5.

DECADE
2
1961
1971
1981
1991
2001

POPULATION
3
102398
122752
174703
223366
267662
RESULTS
PROSPECTIVE
POPULATION
3

ULTIMATE
POPULATION
4

1. Arithmetic Mean

350294

412268

2. Geometric Mean

425676

602836

3. Incremental Increase

374236

475115

4. Yearly Variation

430153

613974

5. Semi Log (Analytical)

458645

669366

6. Wahids AVD Method

409718

562872

SL.NO

METHOD

It is suggested that :
The Prospective Population for the year 2021 may be taken as 374000.
The Ultimate Population for the year 2036 may be taken as 475000.

GoM:Phed

DPR of GSWSP (Phase III)

464

## POPULATION FORECASTING ##
@@ Using Six

methods of calculation @@

Name of the Scheme

::

Shillong Urban Agglomeration WSS

Date of Print out

::

13.06.2008
DATA

Prospective year of the Scheme

2031

Ultimate year of the Scheme

2046

Initial year of the population

1961

Final year of the population

2001

No. of decades under consideration


SL.NO
1
1.
2.
3.
4.
5.

DECADE
2
1961
1971
1981
1991
2001

POPULATION
3
102398
122752
174703
223366
267662
RESULTS
PROSPECTIVE
POPULATION
3

ULTIMATE
POPULATION
4

1. Arithmetic Mean

391610

453584

2. Geometric Mean

536817

760231

3. Incremental Increase

439494

552344

4. Yearly Variation

545307

778338

5. Semi Log (Analytical)

590112

861235

6. Wahids AVD Method

506019

698041

SL.NO

METHOD

It is suggested that :
The Prospective Population for the year 2031 may be taken as 439000.
The Ultimate Population for the year 2046 may be taken as 552000.

GoM:Phed

DPR of GSWSP (Phase III)

465

## POPULATION FORECASTING ##
@@ Using Six

methods of calculation @@

Name of the Scheme

::

Shillong Urban Agglomeration WSS

Date of Print out

::

13.06.2008
DATA

Prospective year of the Scheme

2041

Ultimate year of the Scheme

2056

Initial year of the population

1961

Final year of the population

2001

No. of decades under consideration


SL.NO
1
1.
2.
3.
4.
5.

DECADE
2
1961
1971
1981
1991
2001

POPULATION
3
102398
122752
174703
223366
267662
RESULTS
PROSPECTIVE
POPULATION
3

ULTIMATE
POPULATION
4

1. Arithmetic Mean

432926

494900

2. Geometric Mean

676975

958721

3. Incremental Increase

512732

637554

4. Yearly Variation

691288

986703

5. Semi Log (Analytical)

759264

1108102

6. Wahids AVD Method

626573

868564

SL.NO

METHOD

It is suggested that :
The Prospective Population for the year 2041 may be taken as 512000.
The Ultimate
Population for the year 2056 may be taken as 637000.

GoM:Phed

DPR of GSWSP (Phase III)

466

Appendix : 3

Zone wise breakup of population of areas under Shillong Urban Agglomeration.


Sl
No.

Zonewise
Classification

1.

2.

II

Areas of Coverage

Population
as per
2001
census

Area in
Hectare

Police Bazaar

1529

9.9

1574

1594

2488

2637

3125

4371

Jail Road

4988

73.49

5140

5213

6268

6534

7276

8452

&
Oakland
Assembly Areas
Total
Zone I :

4261

70.28

4413

4483

5389

5578

6456

7482

11127

11290

14145

14749

16857

20305

10778

2007

2011

Projected population
2021
2026

2031

2041

Lachumiere

6133

53.05

6763

7178

9621

11531

12049

15474

Secretariat

4753

77.92

4923

5011

5914

6112

6766

8021

11686

12189

15535

17643

18815

23495

16695

18175

22405

24090

27610

34477

Total

Zone II :

10886

3.

III

Laitumkhrah

16695

18175

22405

24090

27610

34477

4.

IV

Malki

7494

46.73

7986

9393

10247

10896

12046

14646

Dhankheti Areas

3413

18.57

3637

3822

5121

5481

6276

8122

Total

Zone III :

Total
5.

15140

Zone IV :

Nongthymmai
Pohkseh
Total

6.

VI

Zone V :

18322

22768

35224

37496

38138

39742

6264

53.44

6372

6699

7207

8034

8914

10404

37142

38085

42431

45530

47052

50146

34292

529

609

782

Lawmali

640

9.43

660

670

818

853

941

1127

820

12.13

849

861

1018

1058

1149

1343

1150

17.08

1196

1213

1384

1434

1530

1709

Polo Hills

730

10.78

755

765

918

955

1045

1235

Forest Colony

420

6.10

427

433

571

600

685

861

Nongmali

428

6.13

429

435

574

602

635

863

4674

4741

5777

6031

6594

7920

16967

161.59

20469

21870

27574

29712

30709

31784

5148

49.41

6254

6757

8850

9545

10944

12092

26723

28627

36424

39257

41653

43876

614

41858

42748

46090

48012

49128

50756

41858

42748

46090

48012

49128

50756

Mawlai

Zone VI :

Pynthorumkhrah

Zone VII :

Mawlai
Zone VIII :

Laban

Rilbong & Kenchs


Trace
Total

4536

22115
38303

Bishnupur

GoM:Phed

16377

31386

494

Total
IX

15368

30770

364

Total

9.

13215

239.56

358

Pynthorbah

VIII

10907

5.06

Total

8.

11623

28028

348

Polo Bazar

VII

15140

Pasteur Institute

Part
of
Mawroh

7.

131.65

Zone IX :

38303
22769

225.26

24599

25979

32015

34608

37772

45384

3589

32.43

3709

3741

4707

4891

5517

6775

12052
38410

49.10

13615
41923

15335
45055

DPR of GSWSP (Phase III)

20840
57562

24350
63849

28289
71578

39589
91748

467

Sl
No.

Zonewise
Classification

10.

Areas of Coverage

Population
as per
2001
census

Area in
Hectare

Mawprem

10620

39.52

11440

12319

15466

17236

19406

25253

Jaiaw

11115

56.20

11521

11858

13536

14104

15053

17190

8200

30.60

8385

8537

9709

10011

10693

12186

Mawkhar
South
Mawkhar

East

Barapathar
Total
11.

XI

12.

XII

8900
Zone X :

Nongmynsong
Total

Zone XI :

Madanriting
Happy Valley areas
Total

13.

XIII

GoM:Phed

Zone XII :

Shillong
Cantonment Area
Total

3375

Zone XIII :
Grand Total :

11.25
36.33

42210
11371

1034

11371
14037

173.30

2281

28.70

16318
12396
12396
267662

184

2007

3449

2011

3517

Projected population
2021
2026

4487

4685

2031

5262

2041

6534

10053

14841

15606

18230

21268

29907

44848

51072

58804

64266

71682

91070

15613

16057

18077

18943

21380

22941

15613

16057

18077

18943

21380

22941

16757

18388

22586

23799

24087

25617

2669

2730

3161

4277

4941

6466

19426

21118

25747

28076

29028

32083

12662

13628

15635

18177

19301

20415

12662
296000

13628
316000

15635
374000

18177
405000

19301
439000

20415
512000

DPR of GSWSP (Phase III)

468

Appendix: 4
GoM : Phed

Zone wise breakup of population of areas under Shillong Urban Agglomeration.


Sl No.

Zonewise
Classifica
tion

1.

Areas of Coverage

Police Bazar
Jail Road
Oakland & Assembly
Areas
Total
Zone I :

2.

II

DPR of GSWSP (phase III)

III

IV

2021

2026

2031

2041

2007

2011

2021

2026

2031

2041

1529

154

159

161

251

266

316

442

1574

1594

2488

2637

3125

4371

73.49

4988

68

70

71

85

89

99

115

5140

5213

6268

6534

7276

8452

70.28

4261

61

63

64

77

79

92

106

4413

4483

5389

5578

6456

7482

11127

11290

14145

14749

16857

20305

10778
135

181

217

227

292

6763

7178

9621

11531

12049

15474

Secretariat

77.92

4753

61

63

64

76

78

87

103

4923

5011

5914

6112

6766

8021

11686

12189

15535

17643

18815

23495

16695

18175

22405

24090

27610

34477

16695

18175

22405

24090

27610

34477

7986

9393

10247

10896

12046

14646

Zone II :

Laitumkhrah

10886
131.65

Zone III :

Malki

18.57

Zone IV :

Nongthymmai

15140

115

127

138

170

183

210

262

15140
46.73

Total
VI

2011

9.9

127

Pohkseh

6.

2007

Projected population

116

Total
V

Projected Population Density


PPH

6133

Dhankheti Areas

5.

Populat
ion
Density
in PPH
2001

53.05

Total
4.

Population
as per 2001
census

Lachumiere

Total
3.

Area in
Hectare

7494

160

171

201

219

233

258

313

3413

184

196

206

276

295

338

437

10907

3637

3822

5121

5481

6276

8122

11623

13215

15368

16377

18322

22768

239.56

28028

117

128

131

147

157

159

166

30770

31386

35224

37496

38138

39742

53.44

6264

117

119

125

135

150

167

195

6372

6699

7207

8034

8914

10404

37142

38085

42431

45530

47052

50146

Pasteur Institute

5.06

348

69

71

72

98

105

120

155

358

364

494

529

609

782

Lawmali

9.43

640

68

70

71

87

90

100

120

660

670

818

853

941

1127

Part of Mawlai Mawroh

12.13

820

68

70

71

84

87

95

111

849

861

1018

1058

1149

1343

Polo Bazar

17.08

1150

67

70

71

81

84

90

100

1196

1213

1384

1434

1530

1709

Polo Hills

10.78

730

68

70

71

85

89

97

115

755

765

918

955

1045

1235

Forest Colony

6.10

420

69

70

71

94

98

112

141

427

433

571

600

685

861

Nongmali

6.13

428

70

70

71

94

98

104

141

429

435

574

602

635

863

4674

4741

5777

6031

6594

7920

Total

Zone V :

Zone VI :

34292

4536

469

GoM : Phed

Sl No.

7.

Zonewise
Classifica
tion

VII

Areas of Coverage

Pynthorumkhrah
Pynthorbah
Total

8.

VIII

Mawlai

IX

DPR of GSWSP (phase III)

Rilbong
Trace

&

Total
10.

Kenchs

2041

2007

2011

2021

2026

2031

2041

135

171

184

190

197

20469

21870

27574

29712

30709

31784

49.41

5148

104

127

137

179

193

221

245

6254

6757

8850

9545

10944

12092

26723

28627

36424

39257

41653

43876

41858

42748

46090

48012

49128

50756

41858

42748

46090

48012

49128

50756

22115
38303

62

68

70

75

78

80

83

38303
225.26

22769

101

109

115

142

154

168

201

24599

25979

32015

34608

37772

45384

32.43

3589

111

114

115

145

151

170

209

3709

3741

4707

4891

5517

6775

12052

245

277

312

424

495

576

806

49.10

38410

13615

15335

20840

24350

28289

39589

41923

45055

57562

63849

71578

91748

289

312

391

436

491

640

11440

12319

15466

17236

19406

25253

Jaiaw

56.20

11115

198

205

211

241

251

268

306

11521

11858

13536

14104

15053

17190

Mawkhar

30.60

8200

268

274

279

317

327

349

398

8385

8537

9709

10011

10693

12186

3375

300

307

313

399

416

468

580

3449

3517

4487

4685

5262

6534

8900

245

277

408

430

502

585

823

10053

14841

15606

18230

21268

29907

44848

47555

58804

64266

71682

91070

15613

16057

18077

18943

21380

22941

15613

16057

18077

18943

21380

22941

Zone X :

Total

42210
1034

Zone XI :

Madanriting

Shillong
Area

11.25
36.33

Nongmynsong

Total
XIII

2031

269

Happy Valley areas

13.

2026

10620

Total
XII

2021

39.52

Total

12.

2011

Mawprem

Barapathar

XI

2007

Projected population

127

Zone IX :

South East Mawkhar

11.

Projected Population Density


PPH

105

Zone VIII :

Bishnupur

Populat
ion
Density
in PPH
2001

16967

614

Laban

Population
as per 2001
census

161.59

Zone VII :

Total
9.

Area in
Hectare

Zone XIII :
Grand Total :

11

15

16

17

18

21

22

11371
173.30

14037

81

97

106

130

137

139

148

16757

18388

22586

23799

24087

25617

28.70

2281

79

93

95

110

149

172

225

2669

2730

3161

4277

4941

6466

19426

21118

25747

28076

29028

32083

67

69

74

85

99

105

111

12662

13628

15635

18177

19301

20415

12662
296000

13628
316000

15635
374000

18177
405000

19301
439000

20415
512000

Zone XII :
Cantonment

11371

16318
184

12396
12396
267662

470

Appendix : 5
Zone wise breakup of water requirement under Shillong Urban Agglomeration.
Sl.
Zonewise classification
No
Zone I

2007

2011

Projected Year
2021
2026

2031

2041

11127

11290

14145

14749

16857

20305

Water requirement @ 135 Lpcd

1502145

1524150

1909575

1991115

2275695

2741175

Total water requirement with


15% UFW

1727467

1752773

2196011

2289782

2617049

3152351

Total Zone I :

1727467

1752773

2196011

2289782

2617049

3152351

11686

12189

15535

17643

18815

23485

1.

Population

2.
3.

Zone II
1.

Population

2.

Water requirement @ 135 Lpcd

1577610

1645515

2097225

2381805

2540025

3170475

3.

Total water requirement with


15% UFW

1814252

1892342

2411809

2739076

2921029

3646046

Total Zone II :

1814252

1892342

2411809

2739076

2921029

3646046

16695

18175

22405

24090

27610

34477

Zone III
1.

Population

2.

Water requirement @ 135 Lpcd

2253825

2453625

3024675

3252150

3727350

4654395

3.

Total water requirement with


15% UFW

2591899

2821669

3478376

3739973

4286453

5352554

Total Zone III :

2591899

2821669

3478376

3739973

4286453

5352554

11623

13215

15368

16377

18322

22768

Zone IV
1.

Population

2.

Water requirement @ 135 Lpcd

1569105

1784025

2074680

2210895

2473470

3073680

3.

Total water requirement with


15% UFW

1804471

2051629

2385882

2542529

2844491

3534732

Total Zone IV :

1804471

2051629

2385882

2542529

2844491

3534732

37142

38085

42431

45530

47052

50146

Zone V

GoM:Phed

1.

Population

2.

Water requirement @ 135 Lpcd

5014170

5141475

5728185

6146550

6352020

6769710

3.

Total water requirement with


15% UFW

5766296

5912696

6587413

7068533

7304823

7785167

Total Zone V :

5766296

5912696

6587413

7068533

7304823

7785167

DPR of GSWSP (Phase III)

471

Zone VI
1.

Population

4674

4741

5777

6031

6594

7920

2.

Water requirement @ 135 Lpcd

630990

640035

779895

814185

890190

1069200

3.

Total water requirement with


15% UFW

725639

736040

896879

936313

1023719

1229580

Total Zone VI :

725639

736040

896879

936313

1023719

1229580

26723

28627

36424

39257

41653

43876

Zone VII
1.

Population

2.

Water requirement @ 135 Lpcd

3607605

3864645

4917240

5299695

5623155

5923260

3.

Total water requirement with


15% UFW

4148746

4444342

5654826

6094649

6466628

6811749

Total Zone VII :

4148746

4444342

5654826

6094649

6466628

6811749

41858

42748

46090

48012

49128

50756

Zone VIII
1.

Population

2.

Water requirement @ 135 Lpcd

5650830

5770980

6222150

6481620

6632280

6852060

3.

Total water requirement with


15% UFW

6498455

6636627

7155473

7453863

7627122

7879869

Total Zone VIII :

6498455

6636627

7155473

7453863

7627122

7879869

41923

45055

57562

63849

71578

91748

Zone IX
1.

Population

2.

Water requirement @ 135 Lpcd

5659605

6082425

7770870

8619615

9663030

12385980

3.

Total water requirement with


15% UFW

6508546

6994789

8936501

9912557

11112485

14243877

Total Zone IX :

6508546

6994789

8936501

9912557

11112485

14243877

44848

51072

58804

64266

71682

91070

Zone X
1.

Population

2.

Water requirement @ 135 Lpcd

6054480

6894720

7938540

8675910

9677070

12294450

3.

Total water requirement with


15% UFW

6962652

7928928

9129321

9977297

11128631

14138618

Total Zone X :

6962652

7928928

9129321

9977297

11128631

14138618

15613

16057

18077

18943

21380

22941

Zone XI

GoM:Phed

1.

Population

2.

Water requirement @ 135 Lpcd

2107755

2167695

2440395

2557305

2886300

3097035

3.

Total water requirement with


15% UFW

2423918

2492849

2806454

2940901

3319245

3561590

Total Zone XI :

2423918

2492849

2806454

2940901

3319245

3561590

DPR of GSWSP (Phase III)

472

Zone XII
1.

Population

19426

21118

25747

28076

29028

32083

2.

Water requirement @ 135 Lpcd

2622510

2850930

3475845

3790260

3918780

4331205

3.

Total water requirement with


15% UFW

3015887

3278570

3997222

4358799

4506597

4980886

Total Zone XII :

3015887

3278570

3997222

4358799

4506597

4980886

12662

13628

15635

18177

19301

20415

Zone XIII

GoM:Phed

1.

Population

2.

Water requirement @ 135 Lpcd

1709370

1839780

2110725

2453895

2605635

2756025

3.

Total water requirement with


15% UFW

1965776

2115747

2427334

2821979

2996480

3169429

Total Zone XIII :

1965776

2115747

2427334

2821979

2996480

3169429

Grand Total :

45954004

49059001

58063501

62876251

68154752

79486448

DPR of GSWSP (Phase III)

473

Appendix : 6

Statement on pipe requirement for distribution network.


Zonewise

Length of pipes in RM diameterwise in mm


700

650

600

550

500

450

400

350

300

250

Zone I

20.00

99.00

1208.00

8687.00

Zone II

118.00

91.00

324.00

2975.00

22579.00

Zone III

564.00

479.00

4976.00

2751.00

9397.00

Zone IV

504.00

671.00

2018.00

8950.00

Zone V

157.00

228.00

268.00

1461.00

1343.00

18967.00

Zone - VI

55.00

591.00

487.00

413.00

2774.00

480.00

12155.67

Zone - VII

576.00

650.60

127.10

430.90

1710.15

Zone - VIII

886.36

36.00

700.00

3461.00

3205.00

7833.00

35711.00

Zone IX

2246.59

2030.10

2492.99

4471.39

11861.10

Zone X

835.00

2905.00

539.70

1725.00

1836.00

24872.00

Zone - XI

1061.11

1153.00

5765.57

809.00

2144.00

2582.00

2396.00

Zone - XII

433.00

627.00

2516.00

7882.00

17175.00

59.00

1107.11

3010.69

5592.19

13776.77

7384.70

23427.14

36826.23

Total :

46.00

59.00

772.33

Total length of all size of pipes for distribution network :

GoM:Phed

60.00
20.00
-

54.10

200

150

1446.84

100

8925.28

181676.10

2,72,859.93 Rm.

DPR of GSWSP (Phase III)

474

Appendix : 7

Statement on pipe requirement for clear water gravity mains.


Location

Diameter of pipes in mm

1000

900

750

300

250

200

150

100

2976

7724

2800

Reservoir at 6th mile to Jc bifur at Lumshyiap

9530

Jc bifur at Lumshyiap to reservoir at Lumshyiap (VII)

337

Jc bifur at Lumshyiap to reservoir at Nongmynsong (XI)

4170

Reservoir at 6th mile to reservoir at Nongthymmai site (V)

8000

Reservoir at 6th mile to Rilbong

4750

Rilbong to Jhalupara

400

Rilbong to Rhino area (XIX)

5600

Reservoir at 4 mile to JN to Jhalupara

2730

JN to Jhalupara to JN to Iewrynghep

4180

JN to Iewrynghep to reservoir at Nongkwar site.

760

JN to Iewrynghep to reservoir at Iewrynghep site.

146

Reservoir at Laitkor to reservoir at Madanrting (XII)

3960

2976

7724

2800

9530

12170

9047

13270

546

WTP Mawphlang to 4 Mile

Total :

Total length of all size of pipes for clear water gravity mains

GoM:Phed

DPR of GSWSP (Phase III)

58,063 Rm.

475

Appendix : 8

Statement on pipe requirement for the whole project.


Sl.
No.

Description

1.

Length of pipes in RM diameterwise in mm


1000

900

750

600

550

500

450

400

350

300

250

200

150

100

Raw water rising


main

3200

3200

2.

Clear
water
gravity main

2976

7724

2800

9530

12170

9047

13270

546

58063

3.

Clear
water
rising main

7500

7500

4.

Distribution
system

59

1107

3011

5592

13777

7385

23427

36826

181676

GoM:Phed

DPR of GSWSP (Phase III)

Total

272860

476

Appendix : 9

Source reliability study and report on Umiew River

1. The source of GSWSP (Phase I & II) is the river Umiew originating from Shillong Peak
RL 1964m above mean sea level. A mass gravity concrete dam was constructed across the river at
Mawphlang. The dam which is 135m wide and about 50m high, provide 9.145MCM of live storage.

2. The GSWSP (Phase I & II) is designed to lift about 51.30Mld and till September 2007, about
34.0 Mld was lifted by the system. Following the commissioning of the replacement works of
pumping machineries for both stage I and Stage II raw water pumping system in October 2007, the
system started lifting about 51.30Mld from the dam.

3. River Umiew is one of the major river in the state perennially flowing through out the year. The
existing GSWSP (Phase I & II) cover only a part of SUA. For coverage of the remaining area of
SUA including area earmarked under GSPA, the existing infrastructure available under GSWSP at
Mawphlang requires to be enhanced to meet the additional demand.
4. For meeting the additional demand, possibility of exploiting another source of supply has been
under investigation by the state PHED. The source is the river Umngot which is situated about
25Km east of the city. Investigation was carried out for comparison of the cost effectiveness of
developing the source at Umngot with that of enhancement of the available infrastructure at Umiew
river at Mawphlang to meet the additional demand.

5. Comparative study, indicate that construction cost of developing of productive system including
operational cost of production at Umngot would not be cheaper than Umiew. Further, large area of
land will have to be acquired for developing the source at Umngot. In all probability, for the same
quantity of production, augmentation of the source at Mawphlang, would be less costly, as compared
to developing another source at Umngot river.

6. For ascertaining the reliability of the existing source viz. river Umiew to meet the additional
supply, a study on spilling of water from the dam was conducted. For spilling of water, 3 nos. of
radial gates each of 9m wide were installed. Depending on the incoming flow, and the desire to
maintain required level, water is spilled with the height of opening of gates adjusted accordingly.
The record on spilling of water for the period from July 2006 to September 2007 is attached.
Summary of the record is reproduced in table herein below.

GoM:Phed

DPR of GSWSP (Phase III)

477

Table : Summary report of spilling of water from Dam of GSWSS.


Month

Least quantity
of water spilled
in a day during
the month
Ml
2

In flow into the


dam
(2+5)

Ml

Average
quantity of
water spilled in
a day during
the month
Ml

Average quantity
of water lifted by
the system in a
day during the
month
Ml

Maximum quantity
of water spilled in
a day during the
month

Mld

Jul

2006

75

292

113

34

109

Aug

2006

71

160

97

34

105

Sep

2006

72

283

142

34

106

Oct

2006

71

214

119

34

105

Nov

2006

71

199

111

34

105

Dec

2006

69

100

77

34

103

Jan

2007

62

81

70

34

96

Feb

2007

63

71

64

34

97

Mar

2007

66

110

80

34

100

Apr

2007

72

110

83

34

106

May

2007

72

110

85

34

106

Jun

2007

95

3547

410

34

129

Jul

2007

80

1129

259

34

114

Aug

2007

72

169

104

34

106

Sep

2007

86

817

200

34

120

7. The least quantity of water spilled in a day during the month varies from 71Mld to 95Mld for
the monsoon months and from 62Mld to 71Mld during the non-monsoon months.

8. GSWSP (Phase I & II) lifted about 34Mld of water for supply to consumers. The inflow into the
dam is, therefore, the sum of water lifted by the system and the water spilled by the dam. For
computing the inflow, the least Quantity of water spilled in any day during the month has been taken
as the basis for consideration. It could be seen, the inflow during the monsoon months exceeded
100Mld and in the non-monsoon months is about 96Mld.

9. Considering the inflow of 96 Mld in the lean season and the available storage of 9.145MCM,
the source could be relied upon to provide the additional supply of 51.30Mld.

10. Feasibility study to raise the height of the dam which is 8.60m below pump floor level, is,
however necessary. Possible increase in the height of the dam by 3m would provide considerable
quantity of additional storage.



GoM:Phed

DPR of GSWSP (Phase III)

478

Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of July 2006.
Date

Duration of spilling

Spilling details

Height of opening of gates


(m)
Gate
No. I

Gate
No. II

Gate
No. III

Qnty. of water spilled


Q=2.21 x B x H3/2 m/sec

Total qnty. spilled during


the day

(Hrs.)

Gate
No. I

01.07.2006

0.20

23

02.07.2006

0.13

0.15

24

03.07.2006

0.14

04.07.2006

Gate
No. II

Gate
No. III

M/sec

M/hr.

ML

1.779

6404.45

147302.49

147.00

2.080

7516.03

175769.52

176.00

24

1.040

3744.00

89856.00

90.00

0.13

24

0.930

3356.00

80550.00

81.00

05.07.2006

0.13

23

0.930

3356.23

77193.40

77.00

06.07.2006

0.18

24

1.518

5468.22

131237.30

131.00

07.07.2006

0.10

4.516

16251.60

292204.80

292.00

08.07.2006

0.15

23

1.155

4159.81

95675.78

96.00

09.07.2006

0.14

24

1.040

3744.00

89856.00

90.00

10.07.2006

0.18

0.08

1.970

7068.00

86880.00

87.00

11.07.2006

0.10

3.108

11214.80

123683.13

124.00

12.07.2006

0.15

23

1.155

4159.81

95675.78

96.00

13.07.2006

0.15

23

1.155

4159.81

95675.78

96.00

14.07.2006

0.15

22

1.155

4159.81

91515.82

92.00

15.07.2006

0.15

24

1.150

4140.00

99360.00

99.00

16.07.2006

0.21

24

1.910

6876.00

158148.00

158.00

17.07.2006

0.15

24

1.150

4159.81

99835.60

99.00

18.07.2006

0.13

24

0.930

3356.00

80550.00

81.00

19.07.2006

0.13

24

0.930

3356.00

80550.00

81.00

20.07.2006

0.14

21.07.2006

22.07.2006

0.17

23.07.2006
24.07.2006

0.10

0.30

0.25

24

23

24

24

23

17

24

1.040

3744.00

74880.00

75.00

1.740

6268.77

103366.99

103.00

15

1.390

5004.00

75068.00

75.00

0.30

24

3.260

11765.74

282377.70

282.00

0.13

24

0.930

3348.00

80352.00

80.00

25.07.2006

0.15

24

1.155

4158.00

99792.00

100.00

26.07.2006

0.13

23

0.930

3348.00

77004.00

77.00

27.07.2006

0.13

23

0.930

3348.00

77004.00

77.00

28.07.2006

0.17

24

1.390

5018.92

120454.18

120.00

29.07.2006

0.17

30.07.2006

0.10

31.07.2006

0.13

0.05

0.18

13

17

24
0.10

24

24

24

1.390

5018.92

120454.18

120.00

1.250

4528.62

108686.88

109.00

0.930

3348.00

80352.00

80.00

Total quantity spilled during the month :

3491.00

Average quantity spilled per day during the month :

113.00

No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.

GoM : Phed

DPR of GSWSP (Phase-III)

479

Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of August 2006.
Date

Duration of spilling

Spilling details

Height of opening of gates


(m)
Gate
No. I

Gate
No. II

Gate
No. III

Qnty. of water spilled


Q=2.21 x B x H3/2 m/sec

Total qnty. spilled during


the day

(Hrs.)

Gate
No. I

Gate
No. II

Gate
No. III

M/sec

M/hr.

ML

01.08.2006

0.18

20

1.520

5472.00

109440.00

109.00

02.08.2006

0.15

20

1.150

4160.00

83200.00

83.00

03.08.2006

0.14

21

1.040

3744.00

78624.00

78.00

04.08.2006

0.12

24

0.820

2976.00

71424.00

71.00

05.08.2006

0.12

24

0.820

2976.52

71436.53

71.00

06.08.2006

0.13

24

0.930

3348.00

80352.00

80.00

07.08.2006

0.13

24

0.930

3348.00

80352.00

80.00

08.08.2006

0.17

20

1.390

5004.00

10080.00

100.00

09.08.2006

0.13

24

0.930

3348.00

80352.00

80.00

10.08.2006

0.14

20

1.040

3751.00

75020.00

75.00

11.08.2006

0.05

1.375

4450.00

114889.00

115.00

12.08.2006

0.12

23

0.930

3348.00

77004.00

77.00

13.08.2006

0.12

24

0.820

2976.52

71436.50

71.00

14.08.2006

0.12

24

0.820

2976.52

71436.50

71.00

15.08.2006

0.13

24

0.930

3348.00

80352.00

80.00

16.08.2006

0.14

19

1.040

3751.00

71269.00

71.00

17.08.2006

0.14

19

1.040

3751.00

71269.00

71.00

18.08.2006

0.05

1.370

4932.00

118368.00

118.00

19.08.2006

0.18

24

1.518

5468.22

131237.00

131.00

20.08.2006

0.25

18

2.480

8951.0

160704.00

160.00

21.08.2006

0.20

15

1.700

6120.00

91800.00

92.00

22.08.2006

0.16

2.150

6203.00

148877.00

149.00

23.08.2006

0.15

24

1.150

4159.80

99895.50

100.00

24.08.2006

0.12

23

0.930

3348.00

77004.00

77.00

25.08.2006

0.19

24

1.650

5930.17

142324.00

142.00

26.08.2006

0.14

24

1.041

3750.84

90020.00

90.00

27.08.2006

0.17

24

1.390

5004.00

120096.00

120.00

28.08.2006

0.16

24

1.270

4582.60

109983.00

110.00

29.08.2006

0.16

23

1.270

4582.00

105386.00

105.00

30.08.2006

0.17

24

1.300

5018.00

120454.00

120.00

31.08.2006

0.15

24

1.150

4159.80

0.15

0.15

0.08

24

24

24

23

24

24

99835.00

100.00

Total quantity spilled during the month :

2997.00

Average quantity spilled per day during the month :

97.00

No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.

GoM : Phed

DPR of GSWSP (Phase-III)

480

Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of September 2006.
Date

Duration of spilling

Spilling details

Height of opening of gates


(m)
Gate
No. I

Gate
No. II

Gate
No. III

Qnty. of water spilled


Q=2.21 x B x H3/2 m/sec

Total qnty. spilled during


the day

(Hrs.)

Gate
No. I

Gate
No. II

Gate
No. III

M/sec

M/hr.

ML

01.09.2006

0.14

24

1.040

3750.00

90020.00

90.00

02.09.2006

0.14

24

1.040

3750.00

90020.00

90.00

03.09.2006

0.15

24

1.150

4160.00

99840.00

100.00

04.09.2006

0.16

24

1.270

4572.00

109728.00

110.00

05.09.2006

0.12

22

0.830

2988.00

71712.00

72.00

06.09.2006

0.15

22

1.150

4140.00

91080.00

91.00

07.09.2006

0.15

23

1.150

4140.00

9522.00

95.00

08.09.2006

0.19

24

1.650

5930.17

142324.00

142.00

09.09.2006

0.25

24

2.490

8964.00

215136.00

215.00

10.09.2006

0.23

24

2.190

7898.00

189552.00

189.00

11.09.2006

0.17

24

1.39

5004.00

120096.00

120.00

12.09.2006

0.15

24

1.155

4159.81

99835.60

100.00

13.09.2006

0.28

24

2.950

10608.99

254615.00

255.00

14.09.2006

0.30

24

3.270

11765.73

282377.00

283.00

15.09.2006

0.14

24

1.040

3750.00

90020.00

90.00

16.09.2006

0.16

20

1.270

4583.00

91660.00

92.00

17.09.2006

0.18

24

1.518

5468.22

131237.00

131.00

18.09.2006

0.22

20

2.050

7389.00

147780.00

148.00

19.09.2006

0.25

24

2.486

8950.00

214812.00

215.00

20.09.2006

0.18

24

1.510

5436.00

130464.00

130.00

21.09.2006

0.21

24

1.910

6890.75

165377.00

165.00

22.09.2006

0.26

18

2.640

9504.00

171072.00

171.00

23.09.2006

0.23

15

2.190

7898.00

118470.00

118.00

24.09.2006

0.18

24

1.518

5468.22

131237.00

131.00

25.09.2006

0.16

24

1.270

4572.00

109728.00

110.00

26.09.2006

0.15

24

1.150

4160.00

99840.00

100.00

27.09.2006

0.15

24

1.150

4160.00

99840.00

100.00

28.09.2006

0.25

24

2.486

8950.50

214812.00

215.00

29.09.2006

0.25

24

2.486

8950.50

214812.00

215.00

30.09.2006

0.22

23

2.050

7380.00

169740.00

170.00

Total quantity spilled during the month :

4253.00

Average quantity spilled per day during the month :

142.00

No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.

GoM : Phed

DPR of GSWSP (Phase-III)

481

Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of October 2006.
Date

Duration of spilling

Spilling details

Height of opening of gates


(m)
Gate
No. I

Gate
No. II

Gate
No. III

Qnty. of water spilled

Total qnty. spilled during

Q=2.21 x B x H3/2 m/sec

the day

(Hrs.)

Gate
No. I

Gate
No. II

Gate
No. III

M/sec

M/hr.

ML

01.10.2006

0.13

23

0.930

3348.00

77004.00

77.00

02.10.2006

0.13

24

0.930

3348.00

80352.00

80.00

03.10.2006

0.25

20

2.480

8951.00

179020.00

179.00

04.10.2006

0.25

20

2.480

8951.00

179020.00

179.00

05.10.2006

0.18

20

1.520

5472.00

109440.00

109.00

06.10.2006

0.15

20

1.150

4140.00

82800.00

83.00

07.10.2006

0.16

24

1.212

4528.00

109983.00

109.00

08.10.2006

0.15

24

1.150

4140.00

99360.00

99.00

09.10.2006

0.18

24

1.518

5468.22

131237.00

131.00

10.10.2006

0.14

23

1.040

3744.00

86112.00

86.00

11.10.2006

0.14

22

1.040

3744.00

82368.00

82.00

12.10.2006

0.13

13.10.2006

0.30

14.10.2006

0.15

15.10.2006

24

0.930

3356.0

80549.00

81.00

2.300

8280.00

194580.00

194.00

24

1.150

4140.00

99360.00

99.00

0.18

21

1.520

5472.00

114912.00

114.00

16.10.2006

0.14

24

1.040

3751.00

90024.00

90.00

17.10.2006

0.14

24

1.040

3751.00

90024.00

90.00

18.10.2006

0.17

24

1.390

5004.00

120096.00

120.00

19.10.2006

0.16

24

1.15

4572.00

109728.00

110.00

20.10.2006

0.15

24

1.150

4140.00

99360.00

99.00

21.10.2006

0.15

18

1.150

4140.00

74520.00

74.00

22.10.2006

0.18

2.450

8820.00

191592.00

192.00

23.10.2006

0.25

19

2.300

8418.00

202053.00

202.00

24.10.2006

0.25

24

2.190

7898.00

189557.00

189.00

25.10.2006

0.25

24

2.480

8928.00

214272.00

214.00

26.10.2006

0.25

24

2.480

8928.00

214272.00

214.00

27.10.2006

0.14

24

1.040

3750.00

20020.00

90.00

28.10.2006

0.13

24

0.900

3356.00

80549.00

80.00

29.10.2006

0.13

19

0.900

3356.00

80549.00

80.00

30.10.2006

0.12

24

0.820

2976.00

71436.00

71.00

31.10.2006

0.10

24

0.820

2976.00

0.15

0.13

24

24

23

18

71436.00

71.00

Total quantity spilled during the month :

3688.00

Average quantity spilled per day during the month :

119.00

No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.

GoM : Phed

DPR of GSWSP (Phase-III)

482

Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of November 2006.
Date

Duration of spilling

Spilling details

Height of opening of gates


(m)
Gate
No. I

Gate
No. II

Gate
No. III

Qnty. of water spilled


Q=2.21 x B x H3/2 m/sec

Total qnty. spilled during


the day

(Hrs.)

Gate
No. I

Gate
No. II

Gate
No. III

M/sec

M/hr.

ML

01.11.2006

0.20

24

1.800

6480.00

155520.00

155.00

02.11.2006

0.15

24

1.150

4156.81

99835.50

100.00

03.11.2006

0.15

24

1.150

4156.81

99835.50

100.00

04.11.2006

0.15

24

1.150

4156.00

99835.00

100.00

05.11.2006

0.15

24

1.150

4159.80

99835.00

100.00

06.11.2006

0.15

22

1.150

4140.00

91088.00

91.00

07.11.2006

0.15

22

1.150

4140.00

91088.00

91.00

08.11.2006

0.10

09.11.2006

0.13

10.11.2006

0.12

24

11.11.2006

0.14

24

12.11.2006

0.14

13.11.2006

0.15

24

14.11.2006

0.15

15.11.2006

0.15

16.11.2006

0.20

17.11.2006

0.16

18.11.2006

0.10

0.18

24

19.11.2006

0.10

0.18

24

20.11.2006

0.16

24

21.11.2006

0.15

22.11.2006
23.11.2006

0.10

24

1.250

4529.00

108696.00

108.00

24

0.930

3348.00

80352.00

80.00

0.830

2976.00

71436.00

71.00

1.040

3751.00

90024.00

90.00

2.190

7911.00

164900.00

164.00

1.150

4140.00

99360.00

99.00

24

1.150

4140.00

99360.00

99.00

24

1.150

4140.00

99360.00

99.00

2.420

8741.00

198993.00

199.00

1.390

5004.00

120096.00

120.00

24

2.140

7700.00

184807.00

184.00

24

2.140

7700.00

184807.00

184.00

1.390

5004.00

120096.00

120.00

24

1.150

4140.00

99360.00

99.00

0.15

23

1.150

4140.00

95220.00

95.00

0.14

24

1.040

3744.00

89856.00

90.00

24.11.2006

0.14

24

1.040

3751.00

62965.00

90.00

25.11.2006

0.30

24

0.930

3356.0

90021.00

80.00

26.11.2006

0.13

24

0.930

3356.00

80550.00

80.00

27.11.2006

0.16

24

1.300

4680.00

80550.00

112.00

28.11.2006

0.15

1.870

6752.00

112320.00

162.00

29.11.2006

0.14

24

1.040

3751.00

162048.00

90.00

30.11.2006

0.14

24

1.040

3751.00

90021.00

90.00

Total quantity spilled during the month :

3342.00

Average quantity spilled per day during the month :

111.00

0.15

0.10

24

24

24

18

20

24

0.11

24

10

No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.

GoM : Phed

DPR of GSWSP (Phase-III)

483

Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of December 2006.
Date

Duration of spilling

Spilling details

Height of opening of gates


(m)
Gate
No. I

Gate
No. II

Gate
No. III

Qnty. of water spilled


Q=2.21 x B x H3/2 m/sec

Total qnty. spilled during


the day

(Hrs.)

Gate
No. I

Gate
No. II

Gate
No. III

M/sec

M/hr.

ML

01.12.2006

0.14

24

1.040

3750.00

90020.00

90.00

02.12.2006

0.13

24

0.930

3356.00

80549.00

81.00

03.12.2006

0.12

24

0.830

2988.00

71712.00

72.00

04.12.2006

0.12

24

0.830

2988.00

71712.00

72.00

05.12.2006

0.12

24

0.830

2988.00

71712.00

72.00

06.12.2006

0.12

24

0.830

2988.00

71712.00

72.00

07.12.2006

0.15

24

1.150

4160.00

99840.00

100.00

08.12.2006

0.11

1.450

5225.00

80352.00

80.00

09.12.2006

0.13

23

0.930

3348.00

77004.00

77.00

10.12.2006

0.13

23

0.930

3348.00

77004.00

77.00

11.12.2006

0.13

23

0.930

3348.00

77004.00

77.00

12.12.2006

0.13

13.12.2006

0.11

14.12.2006

0.14

15.12.2006

0.11

24

23

0.930

3348.00

77004.00

77.00

1.170

4232.00

78897.00

79.00

24

1.040

3750.00

90020.00

90.00

0.15

24

1.150

4160.00

99840.00

100.00

16.12.2006

0.14

24

1.040

3750.00

90020.00

90.00

17.12.2006

0.13

24

0.930

3356.00

80549.00

81.00

18.12.2006

0.12

24

0.830

2988.00

71712.00

72.00

19.12.2006

0.12

24

0.830

2988.00

71712.00

72.00

20.12.2006

0.12

24

0.830

2988.00

71712.00

72.00

21.12.2006

0.12

24

0.830

2988.00

71712.00

72.00

22.12.2006

0.12

24

0.830

2988.00

71712.00

72.00

23.12.2006

0.12

24

0.830

2988.00

71712.00

72.00

24.12.2006

0.12

24

0.830

2988.00

71712.00

72.00

25.12.2006

0.12

23

0.830

2988.00

68678.00

69.00

26.12.2006

0.12

23

0.830

2988.00

68678.00

69.00

27.12.2006

0.12

23

0.830

2988.00

68678.00

69.00

28.12.2006

0.12

23

0.830

2988.00

68678.00

69.00

29.12.2006

0.12

23

0.830

2988.00

68678.00

69.00

30.12.2006

0.12

23

0.830

2988.00

68678.00

69.00

31.12.2006

0.12

23

0.830

2988.00

68678.00

0.80

24

10

69.00

Total quantity spilled during the month :

2374.00

Average quantity spilled per day during the month :

77.00

No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.

GoM : Phed

DPR of GSWSP (Phase-III)

484

Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of January 2007.
Date

Duration of spilling

Spilling details

Height of opening of gates


(m)
Gate
No. I

Gate
No. II

Gate
No. III

Qnty. of water spilled


Q=2.21 x B x H3/2 m/sec

Total qnty. spilled during


the day

(Hrs.)

Gate
No. I

Gate
No. II

Gate
No. III

M/sec

M/hr.

ML

01.01.2007

0.13

24

0.930

3348.00

80352.00

80.00

02.01.2007

0.13

24

0.930

3348.00

80352.00

80.00

03.01.2007

0.12

24

0.83

2988.00

71712.00

72.00

04.01.2007

0.12

24

0.83

2988.00

71712.00

72.00

05.01.2007

0.12

24

0.83

2988.00

71712.00

72.00

06.01.2007

0.12

24

0.83

2988.00

71712.00

72.00

07.01.2007

0.12

24

0.83

2988.00

71712.00

72.00

08.01.2007

0.12

24

0.83

2988.00

71712.00

72.00

09.01.2007

0.12

24

0.83

2988.00

71712.00

72.00

10.01.2007

0.12

24

0.83

2988.00

71712.00

72.00

11.01.2007

0.13

24

0.930

3356.00

80550.00

81.00

12.01.2007

0.12

24

0.830

2988.00

71712.00

71.00

13.01.2007

24

0.830

2988.00

71712.00

71.00

14.01.2007

0.12
0.12

24

0.830

2988.00

71712.00

71.00

15.01.2007

0.12

24

0.830

2988.00

71712.00

71.00

16.01.2007

0.12

24

0.830

2988.00

71712.00

71.00

17.01.2007

0.12

24

0.830

2988.00

71712.00

71.00

18.01.2007

0.12

24

0.830

2988.00

71712.00

71.00

19.01.2007

0.12

24

0.830

2988.00

71712.00

71.00

20.01.2007

0.12

24

0.830

2988.00

71712.00

71.00

21.01.2007

0.12

24

0.830

2988.00

71712.00

71.00

22.01.2007

0.12

24

0.830

2988.00

71712.00

71.00

23.01.2007

0.12

24

0.830

2988.00

71712.00

71.00

24.01.2007

0.12

24

0.830

2988.00

71712.00

71.00

25.01.2007

0.11

24

0.720

2592.00

62208.00

62.00

26.01.2007

0.11

24

0.720

2592.00

62208.00

62.00

27.01.2007

0.11

24

0.720

2592.00

62208.00

62.00

28.01.2007

0.11

24

0.720

2592.00

62208.00

62.00

29.01.2007

0.11

24

0720

2592.00

62208.00

62.00

30.01.2007

0.11

24

0.720

2592.00

62208.00

62.00

31.01.2007

0.11

24

0.720

2592.00

62208.00

62.00

Total quantity spilled during the month :

2174.00

Average quantity spilled per day during the month :

70.00

No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.

GoM : Phed

DPR of GSWSP (Phase-III)

485

Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of February 2007.
Date

Duration of spilling

Spilling details

Height of opening of gates


(m)
Gate
No. I

Gate
No. II

Gate
No. III

Qnty. of water spilled


Q=2.21 x B x H3/2 m/sec

Total qnty. spilled during


the day

(Hrs.)

Gate
No. I

Gate
No. II

Gate
No. III

M/sec

M/hr.

ML

01.02.2007

0.11

24

0.720

2612.00

62688.00

63.00

02.02.2007

0.11

24

0.720

2612.00

62688.00

63.00

03.02.2007

0.11

24

0.720

2612.00

62688.00

63.00

04.02.2007

0.11

24

0.720

2612.00

62688.00

63.00

05.02.2007

0.12

24

0.830

3976.00

71436.00

71.00

06.02.2007

0.11

24

0.720

2612.00

62696.00

63.00

07.02.2007

0.11

24

0.720

2612.00

62696.00

63.00

08.02.2007

0.11

24

0.720

2612.00

62696.00

63.00

09.02.2007

0.11

24

0.720

2612.00

62696.00

63.00

10.02.2007

0.11

24

0.720

2612.00

62696.00

63.00

11.02.2007

0.11

24

0.720

2612.00

62696.00

63.00

12.02.2007

0.11

24

0.720

2612.00

62696.00

63.00

13.02.2007

0.11

24

0.720

2612.00

62696.00

63.00

14.02.2007

0.11

24

0.720

2612.00

62696.00

63.00

15.02.2007

0.11

24

0.720

2612.00

62696.00

63.00

16.02.2007

0.14

24

1.040

3751.00

90020.00

90.00

17.02.2007

0.11

24

0.730

2628.00

63072.00

63.00

18.02.2007

0.13

24

0.730

2628.00

63072.00

63.00

19.02.2007

0.13

24

0.730

2628.00

63072.00

63.00

20.02.2007

0.13

24

0.730

2628.00

63072.00

63.00

21.02.2007

0.13

24

0.730

2628.00

63072.00

63.00

22.02.2007

0.11

24

0.720

2612.00

62696.00

63.00

23.02.2007

0.11

24

0.720

2612.00

62696.00

63.00

24.02.2007

0.11

24

0.720

2612.00

62696.00

63.00

25.02.2007

0.11

24

0.720

2612.00

62696.00

63.00

26.02.2007

0.11

24

0.720

2612.00

62696.00

63.00

27.02.2007

0.11

24

0.720

2612.00

62696.00

63.00

28.02.2007

0.11

24

0.720

2612.00

62696.00

63.00

Total quantity spilled during the month :

1799.00

Average quantity spilled per day during the month :

64.00

No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.

GoM : Phed

DPR of GSWSP (Phase-III)

486

Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of March 2007.
Date

Duration of spilling

Spilling details

Height of opening of gates


(m)
Gate
No. I

Gate
No. II

Gate
No. III

Qnty. of water spilled


Q=2.21 x B x H3/2 m/sec

Total qnty. spilled during


the day

(Hrs.)

Gate
No. I

Gate
No. II

Gate
No. III

M/sec

M/hr.

ML

01.03.2007

0.12

22

0.830

2988.00

65736.00

66.00

02.03.2007

0.12

22

0.830

2988.00

65736.00

66.00

03.03.2007

0.12

22

0.830

2988.00

65736.00

66.00

04.03.2007

0.12

22

0.830

2988.00

65736.00

66.00

05.03.2007

0.12

24

0.820

2952.00

70848.00

71.00

06.03.2007

0.11

24

0.720

2612.00

62696.00

71.00

07.03.2007

0.11

24

0.720

2612.00

62696.00

71.00

08.03.2007

0.11

24

0.720

2612.00

62696.00

71.00

09.03.2007

0.11

24

0.720

2612.00

62696.00

71.00

10.03.2007

0.11

24

0.720

2612.00

62696.00

71.00

11.03.2007

0.13

24

0.930

3348.00

80352.00

71.00

12.03.2007

0.12

24

0.830

2988.00

71712.00

72.00

13.03.2007

0.12

24

0.830

2988.00

71712.00

72.00

14.03.2007

0.12

24

0.830

2988.00

71712.00

72.00

15.03.2007

0.12

24

0.830

2988.00

71712.00

72.00

16.03.2007

0.12

24

0.830

2988.00

71712.00

72.00

17.03.2007

0.12

24

0.830

2988.00

71712.00

72.00

18.03.2007

0.12

24

0.830

2988.00

71712.00

72.00

19.03.2007

0.15

24

0.150

4140.00

99360.00

99.00

20.03.2007

0.12

24

0.82.

2952.00

70848.00

71.00

21.03.2007

0.12

24

0.820

2952.00

70848.00

71.00

22.03.2007

0.13

0.930

80352.00

80.00

23.03.2007

0.15

18

1.150

4160.00

99840.00

100.00

24.03.2007

0.14

24

1.040

3751.00

90024.00

90.00

25.03.2007

0.14

24

1.040

3751.00

90024.00

90.00

26.03.2007

0.14

24

1.040

27.03.2007

0.14

24

1.040

28.03.2007

0.14

24

1.040

29.03.2007

0.16

24

30.03.2007

0.16

31.03.2007

0.16

3348.00

3751.00

90024.00

90.00

90024.00

90.00

3751.00

90024.00

90.00

1.270

4583.00

109984.00

110.00

24

1.270

4583.00

109984.00

110.00

24

1.270

4583.00

109984.00

110.00

Total quantity spilled during the month :

2466.00

Average quantity spilled per day during the month :

80.00

3751.00

No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.

GoM : Phed

DPR of GSWSP (Phase-III)

487

Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of April 2007.
Date

Duration of spilling

Spilling details

Height of opening of gates


(m)
Gate
No. I

Gate
No. II

Gate
No. III

Qnty. of water spilled


Q=2.21 x B x H3/2 m/sec

Total qnty. spilled during


the day

(Hrs.)

Gate
No. I

Gate
No. II

Gate
No. III

M/sec

M/hr.

ML

01.04.2007

0.15

24

1.150

4160.00

99840.00

100.00

02.04.2007

0.15

24

1.150

4160.00

99840.00

100.00

03.04.2007

0.15

24

1.150

4160.00

99840.00

100.00

04.04.2007

0.15

24

1.150

4160.00

99840.00

100.00

05.04.2007

0.15

24

1.150

4160.00

99840.00

100.00

06.04.2007

0.15

24

1.150

4160.00

99840.00

100.00

07.04.2007

0.15

24

1.150

4160.00

99840.00

100.00

08.04.2007

0.16

24

1.270

4583.00

109984.00

110.00

09.04.2007

0.14

24

1.040

3751.00

90024.00

90.00

10.04.2007

0.15

24

1.150

4160.00

99840.00

100.00

11.04.2007

0.12

24

0.830

2988.00

71712.00

72.00

12.04.2007

0.13

24

0.930

3356.00

80544.00

81.00

13.04.2007

0.13

24

0.930

3356.00

80544.00

81.00

14.04.2007

0.13

24

0.930

3356.00

80544.00

81.00

15.04.2007

0.12

24

0.830

2988.00

71712.00

72.00

16.04.2007

0.12

24

0.830

2988.00

71712.00

72.00

17.04.2007

0.12

24

0.830

2988.00

71712.00

72.00

18.04.2007

0.12

24

0.830

2988.00

71712.00

72.00

19.04.2007

0.12

24

0.830

2988.00

71712.00

72.00

20.04.2007

0.12

24

0.830

2988.00

71712.00

72.00

21.04.2007

0.12

24

0.830

2988.00

71712.00

72.00

22.04.2007

0.12

24

0.830

2988.00

71712.00

72.00

23.04.2007

0.12

24

0.830

2988.00

71712.00

72.00

24.04.2007

0.12

24

0.830

2988.00

71712.00

72.00

25.04.2007

0.12

24

0.830

2988.00

71712.00

72.00

26.04.2007

0.13

24

0.930

3348.00

80352.00

80.00

27.04.2007

0.12

24

0.830

2988.00

71712.00

72.00

28.04.2007

0.12

24

0.830

2988.00

71712.00

72.00

29.04.2007

0.12

24

0.830

2988.00

71712.00

72.00

30.04.2007

0.12

24

0.830

2988.00

71712.00

72.00

Total quantity spilled during the month :

2475.00

Average quantity spilled per day during the month :

83.00

No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.

GoM : Phed

DPR of GSWSP (Phase-III)

488

Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of May 2007.
Date

Duration of spilling

Spilling details

Height of opening of gates


(m)
Gate
No. I

Gate
No. II

Gate
No. III

Qnty. of water spilled

Total qnty. spilled during

Q=2.21 x B x H3/2 m/sec

the day

(Hrs.)

Gate
No. I

Gate
No. II

Gate
No. III

M/sec

M/hr.

ML

01.05.2007

0.12

24

0.83

2988.00

71712.00

72.00

02.05.2007

0.12

24

0.83

2988.00

71712.00

72.00

03.05.2007

0.15

24

1.150

4160.00

99840.00

100.00

04.05.2007

0.12

24

0.830

2988.00

71712.00

72.00

05.05.2007

0.13

22

0.930

3356.00

73832.00

74.00

06.05.2007

0.16

24

1.270

4583.00

109984.00

110.00

07.05.2007

0.12

24

0.830

2986.00

71712.00

72.00

08.05.2007

0.13

24

0.930

3356.00

80550.00

81.00

09.05.2007

0.12

24

0.830

2988.00

71712.00

72.00

10.05.2007

0.12

24

0.830

2988.00

71712.00

72.00

11.05.2007

0.13

24

0.830

3356.00

80550.00

81.00

12.05.2007

0.12

24

0.830

2988.00

71712.00

72.00

13.05.2007

0.14

24

1.040

3744.00

89856.00

90.00

14.05.2007

0.15

24

1.150

4160.00

99840.00

100.00

15.05.2007

0.16

24

1.270

4583.00

109984.00

110.00

16.05.2007

0.14

24

1.040

3744.00

89856.00

90.00

17.05.2007

0.13

24

0.930

3356.00

80550.00

81.00

18.05.2007

0.13

24

0.930

3356.00

80550.00

81.00

19.05.2007

0.12

24

0.830

2988.00

71712.00

72.00

20.05.2007

0.15

24

1.150

4160.00

99840.00

100.00

21.05.2007

0.15

24

1.150

4160.00

99840.00

100.00

22.05.2007

0.14

24

1.040

3744.00

89856.00

90.00

23.05.2007

0.16

24

1.270

4583.00

109984.00

110.00

24.05.2007

0.13

24

0.930

3356.00

80550.00

81.00

25.05.2007

0.12

24

0.830

2988.00

71712.00

72.00

26.05.2007

0.12

24

0.830

2988.00

71712.00

72.00

27.05.2007

0.13

24

0.930

3356.00

80550.00

81.00

28.05.2007

0.13

24

0.930

3356.00

80550.00

81.00

29.05.2007

0.13

24

0.930

3356.00

80550.00

81.00

30.05.2007

0.14

24

0.930

3356.00

80550.00

81.00

31.05.2007

0.15

24

1.150

4160.00

99840.00

100.00

Total quantity spilled during the month :

2623.00

Average quantity spilled per day during the month :

85.00

No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.

GoM : Phed

DPR of GSWSP (Phase-III)

489

Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of June 2007.
Date

Duration of spilling

Spilling details

Height of opening of gates


(m)
Gate
No. I

Gate
No. II

Gate
No. III

Qnty. of water spilled


Q=2.21 x B x H3/2 m/sec

Total qnty. spilled during


the day

(Hrs.)

Gate
No. I

Gate
No. II

Gate
No. III

M/sec

M/hr.

ML

01.06.2007

0.15

24

1.150

4160.00

99840.00

100.00

02.06.2007

0.15

24

1.150

4160.00

99840.00

100.00

03.06.2007

0.16

24

1.270

4572.00

109728.00

110.00

04.06.2007

0.16

24

1.270

4572.00

109728.00

110.00

05.06.2007

0.16

24

1.270

4572.00

109728.00

110.00

06.06.2007

0.15

24

1.150

4160.00

99840.00

100.00

07.06.2007

0.50

24

7.030

25315.83

607580.08

608.00

08.06.2007

0.15

0.15

24

20

4.600

8280.00

182160.00

183.00

09.06.2007

0.55

0.48

24

24

14.710

53018.70

1272450.00

1272.00

10.06.2007

1.15

0.85

24

24

40.110

144421.28

3466110.00

3466.00

11.06.2007

1.20

1.00

24

18

46.03

165708.00

3597368.00

3547.00

12.06.2007

0.18

24

1.510

5468.22

131237.30

131.00

13.06.2007

0.50

24

7.030

25315.80

607580.00

608.00

14.06.2007

0.20

24

1.780

6404.45

153706.90

154.00

15.06.2007

0.20

24

1.780

6404.45

153706.90

154.00

16.06.2007

0.22

24

2.050

7388.75

177330.00

177.00

17.06.2007

0.15

23

1.150

4140.00

95220.00

95.00

18.06.2007

0.15

23

1.150

4140.00

95220.00

95.00

19.06.2007

0.15

23

1.150

4140.00

95220.00

95.00

20.06.2007

0.15

23

1.150

4140.00

95220.00

95.00

21.06.2007

0.15

24

1.150

4159.81

99835.90

100.00

22.06.2007

0.19

24

1.650

5930.17

142324.25

142.00

23.06.2007

0.15

24

1.150

4140.00

95220.00

95.00

24.06.2007

0.15

24

1.150

4140.00

95220.00

95.00

25.06.2007

0.15

24

1.150

4140.00

95220.00

95.00

26.06.2007

0.15

22

1.150

4140.00

95220.00

95.00

27.06.2007

0.15

24

1.150

4140.00

95220.00

95.00

28.06.2007

0.15

24

1.150

4140.00

95220.00

95.00

29.06.2007

0.15

24

1.150

4140.00

95220.00

95.00

30.06.2007

0.15

24

1.150

4140.00

95220.00

95.00

Total quantity spilled during the month :

12312.00

Average quantity spilled per day during the month :

410.00

No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.

GoM : Phed

DPR of GSWSP (Phase-III)

490

Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of July 2007.
Date

Duration of spilling

Spilling details

Height of opening of gates


(m)
Gate
No. I

Gate
No. II

01.07.2007

0.10

02.07.2007

Qnty. of water spilled


Q=2.21 x B x H3/2 m/sec

Total qnty. spilled during


the day

(Hrs.)

Gate
No. I

Gate
No. II

Gate
No. III

0.09

24

24

1.170

0.10

0.10

24

24

03.07.2007

0.13

0.12

04.07.2007

0.14

05.07.2007

0.07

06.07.2007

0.22

07.07.2007

0.22

08.07.2007

0.11

0.08

24

09.07.2007

0.11

0.08

10.07.2007

0.11

0.08

11.07.2007

0.11

12.07.2007
13.07.2007
14.07.2007

0.25

15.07.2007

ML

4212.00

101088.00

101.00

1.250

4500.00

108000.00

108.00

24

1.760

6336.00

110232.00

110.00

24

1.040

3744.00

89856.00

90.00

6.360

22896.00

139104.00

139.00

24

2.050

7388.75

177120.00

177.00

24

2.050

7388.75

177120.00

177.00

18

1.170

4212.00

91368.00

91.00

24

18

1.170

4212.00

91368.00

91.00

24

18

1.170

4212.00

91368.00

91.00

0.08

24

18

1.170

4212.00

91368.00

91.00

0.11

0.08

24

18

1.170

4212.00

91368.00

91.00

0.11

0.08

24

18

1.170

4212.00

91368.00

91.00

18

2.480

8928.00

160704.00

160.00

0.23

18

2.190

7884.00

189216.00

189.00

16.07.2007

0.25

24

2.480

8950.50

214812.00

215.00

17.07.2007

0.25

24

2.480

8928.00

214272.00

214.00

18.07.2007

0.26

24

2.630

9468.00

227232.00

227.00

19.07.2007

0.25

0.15

24

3.630

13068.00

247392.00

247.00

20.07.2007

0.34

0.05

24

4.160

14996.21

346299.00

346.00

21.07.2007

0.15

24

1.150

4159.81

99835.90

100.00

22.07.2007

0.16

24

1.270

4572.00

109728.00

110.00

23.07.2007

0.13

24

0.930

3348.00

80352.00

80.00

24.07.2007

0.33

24

3.770

13572.00

326728.00

326.00

25.07.2007

0.60

0.40

24

18

14.270

54372.00

1124280.00

1129.00

26.07.2007

0.40

0.30

24

24

8.290

298.50

716412.00

715.00

27.07.2007

0.17

0.20

24

24

3.170

11426.00

274224.00

274.00

28.07.2007

0.20

1.780

6408.00

153792.00

153.00

29.07.2007

0.50

0.27

24

24

9.820

35361.50

848678.39

849.00

30.07.2007

0.48

0.33

24

24

10.380

37368.00

897268.00

897.00

31.07.2007

0.15

0.29

24

21

4.255

15342.19

0.45

Gate
No. III

24

24

M/sec

M/hr.

334665.00

335.00

Total quantity spilled during the month :

8014.00

Average quantity spilled per day during the month :

259.00

No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.

GoM : Phed

DPR of GSWSP (Phase-III)

491

Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of August 2007.
Date

Duration of spilling

Spilling details

Height of opening of gates


(m)
Gate
No. I

Gate
No. II

01.08.2007

0.09

02.08.2007

0.09

03.08.2007

0.13

04.08.2007

0.15

05.08.2007

Qnty. of water spilled


Q=2.21 x B x H3/2 m/sec

Total qnty. spilled during


the day

(Hrs.)

Gate
No. I

Gate
No. II

Gate
No. III

0.15

24

24

1.680

0.25

24

13

ML

6068.00

145632.00

146.00

3.010

10883.00

162748.00

169.00

24

0.930

3356.23

80519.63

81.00

24

1.150

4160.00

99840.00

100.00

0.15

24

1.150

4160.00

99840.00

100.00

06.08.2007

0.20

24

1.800

6480.00

155520.00

156.00

07.08.2007

0.19

24

1.270

4572.00

109728.00

110.00

08.08.2007

0.13

24

0.930

3348.00

80352.00

80.00

09.08.2007

0.13

24

0.930

3348.00

80352.00

80.00

10.08.2007

0.18

24

1.520

5472.00

131328.00

131.00

11.08.2007

0.16

24

1.270

4572.00

109728.00

110.00

12.08.2007

0.17

24

1.390

5019.00

120456.00

120.00

13.08.2007

0.20

24

1.780

6404.45

153792.00

154.00

14.08.2007

0.18

24

1.520

5468.22

131237.29

131.00

15.08.2007

016

0.08

24

1.900

6840.00

121068.00

121.00

16.08.2007

0.16

0.08

24

1.900

6840.00

121068.00

121.00

17.08.2007

0.16

24

1.270

4572.00

109728.00

110.00

18.08.2007

0.13

24

0.930

3356.23

80549.60

81.00

19.08.2007

0.15

24

1.150

4140.00

99360.00

99.00

20.08.2007

0.15

24

1.150

4140.00

99360.00

99.00

21.08.2007

0.14

24

1.040

3751.00

90024.00

90.00

22.08.2007

0.14

24

1.040

3751.00

90024.00

90.00

23.08.2007

0.14

24

1.040

3751.00

90024.00

90.00

24.08.2007

0.14

24

1.040

3751.00

90024.00

90.00

25.08.2007

0.17

24

1.390

5019.00

120456.00

120.00

26.08.2007

0.13

24

0.930

3356.23

80549.60

81.00

27.08.2007

0.12

24

0.830

2988.30

71712.60

72.00

28.08.2007

0.12

24

0.830

2988.30

71712.60

72.00

29.08.2007

0.12

24

0.830

2988.30

71712.60

72.00

30.08.2007

0.12

24

0.830

2988.30

71712.60

72.00

31.08.2007

0.12

24

0.830

2988.30

Gate
No. III

M/sec

M/hr.

71712.60

72.00

Total quantity spilled during the month :

3220.00

Average quantity spilled per day during the month :

104.00

No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.

GoM : Phed

DPR of GSWSP (Phase-III)

492

Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of September 2007.
Date

Duration of spilling

Spilling details

Height of opening of gates


(m)
Gate
No. I

Gate
No. II

Gate
No. III

Qnty. of water spilled


Q=2.21 x B x H3/2 m/sec

Total qnty. spilled during


the day

(Hrs.)

Gate
No. I

Gate
No. II

Gate
No. III

M/sec

M/hr.

ML

01.09.2007

0.14

24

1.040

3744.00

89856.00

90.00

02.09.2007

0.14

24

1.040

3744.00

86112.00

86.00

03.09.2007

0.15

1.040

3751.00

90024.00

90.00

04.09.2007

0.20

0.95

24

10

20.710

72705.80

816720.00

817.00

05.09.2007

0.27

0.48

24

9.400

33857.00

383971.00

384.00

06.09.2007

0.30

0.50

24

08.30

37080.00

459684.00

460.00

07.09.2007

0.35

0.25

24

24

6.590

23724.00

569376.00

569.00

08.09.2007

0.35

0.25

24

24

6.590

23724.00

569376.00

569.00

09.09.2007

0.30

24

3.270

11765.73

282377.00

282.00

10.09.2007

0.18

24

1.520

5468.22

131237.29

131.00

11.09.2007

0.21

0.17

24

17

3.300

11909.66

250699.60

251.00

12.09.2007

0.25

0.33

24

24

6.250

22524.50

347257.00

347.00

13.09.2007

0.14

0.10

24

24

1.661

6015.14

144363.00

144.00

14.09.2007

0.08

0.10

24

24

1.070

3884.51

93228.70

93.00

15.09.2007

0.14

1.040

3744.00

89856.00

90.00

16.09.2007

0.05

0.12

24

24

1.040

3777.07

90649.84

91.00

17.09.2007

0.17

0.07

19

19

1.758

6345.04

120555.9

121.00

18.09.2007

0.16

24

1.270

4572.00

109728.00

109.00

19.09.2007

0.15

24

1.150

4140.00

99360.00

99.00

20.09.2007

0.16

24

1.270

4582.65

109983.70

110.00

21.09.2007

0.14

24

1.040

3744.00

89856.00

90.00

22.09.2007

0.22

15

2.050

7388.75

110931.30

111.00

23.09.2007

0.20

24

1.800

6480.00

155520.00

155.00

24.09.2007

0.18

24

1.510

5436.00

130464.00

130.00

25.09.2007

0.17

23

1.390

5004.00

115092.00

115.00

26.09.2007

0.16

20

1.270

4572.00

91440.00

91.00

27.09.2007

0.16

20

1.270

4572.00

91440.00

91.00

28.09.2007

0.16

20

1.270

4572.00

91440.00

91.00

29.09.2007

0.16

24

1.270

4572.00

91440.00

91.00

30.09.2007

0.15

24

1.040

3751.00

90024.00

90.00

Total quantity spilled during the month :

5988.00

Average quantity spilled per day during the month :

200.00

24

24

No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.

GoM : Phed

DPR of GSWSP (Phase-III)

493

Statement on spilling of water from the Dam of Greater Shillong water supply scheme at
Mawphlang for the month of October 2007.
Date

Duration of spilling

Spilling details

Height of opening of gates


(m)
Gate
No. I

Gate
No. II

Gate
No. III

Qnty. of water spilled


Q=2.21 x B x H3/2 m/sec

Total qnty. spilled during


the day

(Hrs.)

Gate
No. I

Gate
No. II

Gate
No. III

M/sec

M/hr.

ML

01.10.2007

0.15

24

1.150

4140.00

99360.00

99.00

02.10.2007

0.15

24

1.150

4140.00

99360.00

99.00

03.10.2007

0.15

24

1.150

4140.00

99360.00

99.00

04.10.2007

0.14

24

1.040

3744.00

89856.00

90.00

05.10.2007

0.13

24

0.930

3240.00

77760.00

78.00

06.10.2007

0.16

24

1.270

4572.00

109728.00

110.00

07.10.2007

0.17

24

1.390

5004.00

120096.00

120.00

08.10.2007

0.45

24

6.000

21615.04

518760.90

519.00

09.10.2007

0.15

24

1.150

4140.00

99360.00

99.00

10.10.2007

0.17

24

1.390

5004.00

120096.00

120.00

11.10.2007

0.14

24

1.041

3750.85

90020.33

90.00

12.10.2007

0.15

24

1.150

4159.80

99835.59

100.00

13.10.2007

0.14

24

1.041

3750.85

90020.33

90.00

14.10.2007

0.11

24

0.725

2612.31

62695.67

93.00

Total quantity spilled during the month :

1806.00

Average quantity spilled per day during the month :

120.00

No. of gates installed : 3 nos. ; B : width of gate ; Width of each gate : 9.0m ; H : height opening of gate.

GoM : Phed

DPR of GSWSP (Phase-III)

494

Appendix : 10

MEGHALAYA STATE POLLUTION CONTROL BOARD


CENTRAL LABORATORY
"ARDEN", LUMPYNGNGAD, SHlLLONG -793014
ANALYSIS REPORT
I.

Sender's name & address

E.E. (PHE) Electrical Division, Mawphlang.

2.

Sender's reference

3.

Name of source & place of


Co llection of sample

No .EE/PHE/ElectlTB-145(Pt-I)/200S-09/4SI
Dated 24th June 200S
Raw water (Dam of GSWSS Mawphlang)
Co ll ected by P.H.E Dept!.

4.

Purpose of analytical study

Physical, Chemical & Bacteriological

5.

Time & date of receipt of the


sample

24.6.0S.

6.

Laboratory reference

G/137/0S

6.7

Desirable Limits for


driukiug water
(Indian Standard)
6.5-8 .5

Turbidity (NTU)

735.0

5.0

3.

Conductivity (~mho/cm)

20.S

SOO.O

4.

Chloride (mg/I)

4.0

250.0

5.

Total Hardness (mg/I)

S.O

300.0

6.

Alkalinity (mgl1)

S.O

200.0

7.

[ron (mg/I)

0.6

0.3

8.

Total Coliform (MPNIlOOml)

920

10

SINo

Parameters

I.

pH

2.

Results

Remarks: As the Turbidity and Total Coliform (MPN/ IOOml) is above the permissible limit the
water has to be treated before supplying to the consumer

l?". N~

~ated, Shillong,

The 27' hJune 2008

Sr.Sci~

Meghalaya State Pollution Control Board,

S>E

Mem~y\

Meghalaya State Pollution Control Board,


Shillong
GoM:Phed

DPR of GSWSP (Phase III)

495

Dated 20th June 2008

GoM:Phed

DPR of GSWSP (Phase III)

467

496

Dated 18th June 2008

GoM:Phed

DPR of GSWSP (Phase III)

451

497

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN ' LUMPYNGNGAD,
SHILLONG - 793014

PHONE

email: mspcb@sancharneUn

TELEFAX

A.

Sender's Name & Address

B.

Source of water

C.

Place of collection

D.

Date & time of collection

E.

Date of receipt

: 0364 - 2521217

2521764
2521 514
0364 - 2521533

13 ..f!' JV~~7
Fkhu:a.I ,Qit74-WJrL/ &. ~lAkI'
!(aw- ~/Vt
~.A.N,<C< M~/1'
:;:s. tflt77. at 9. t:JOa?n .
,(;5 oj.

~r

PHYSICAL CHARACTERISTICS
l.

Turbidity

2.

Odour

3.

PH

fQZ-er. oo N7U.

CHEMICAL CHARACTERISTICS
4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

8.

Total Iron

BACTERIOLOGICAL TEST

Probable number of coliform baccilli in 100ml of water is __ _ _1_8


;:..0=--7-_
as per Mac Crady.

Date of Report

GoM:Phed

_ _

Member Secretary
Meghalaya State Pollution Control Board
Shillong

DPR of GSWSP (Phase III)

498

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN' LUMPYNGNGAD,
SHILLONG -793014

email : mspcb@sancharnet.in

A.

Sender's Name & Address

B.

Source of water

C.

Place of collection

D.

Date & time of collection

E.

Date of receipt

PHONE

TELEFAX:

0364 - 2521217
2521764
2521514
0364 - 2521533

g. g. 6 7

PHYSICAL CHARACTERISTICS
I.

Turbidity

2.

Odour

3.

PH
CHEMICAL CHARACTERISTICS

4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

8.

Total Iron

,
BACTERIOLOGICAL TEST
Probable number of coliform baccilli in IOOml of water is _ __ I,-t=-O
",--_+_
as per Mac Crady.

Date of Report

GoM:Phed

PI 8 Cr .

_ _

Member Secretary
Meghalaya State Pollution Control Board
Shillong

DPR of GSWSP (Phase III)

499

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN ' L UMPYNGNGAD,
SHILLONG - 793014

PHONE

email : mspcb@sancharnet.in

/3.

TELEFAX:

0364 - 2521217
2521764
2521514
0364 - 2521533

g. ,1VU'a~.

/u/;U;ciI j)iw;U;/L ) '/}/ !1~ 7 '

A.

Sender's Name & Address

B.

Source of water

C.

Place of collection

g, S . fj.~ . S.

D.

Date & time of collection

/().6 'f .6'1;

E.

Date of receipt

106 r 0 "7 .

1aw-

JJalM
jvfa-N~7 '

cJ

1-Z.'t>O(N)

PHYSICAL CHARACTERISTICS
I.

Turbidity

2.

Odour

3.

PH

I () '10 00 /l it.!

CHEMICAL CHARACTERISTICS
4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

8.

Total Iron

BACTERIOLOGICAL TEST

Probable number of coliform baccilli in IOOml of water is


/ g () fas per Mac Crady.
- ---'-.::....::...- --

Date of Report

GoM:Phed

Member Secretary
Meghalaya State Pollution Control Board
Shillong

DPR of GSWSP (Phase III)

500

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN ' LUMPYNGNGAD,
SHILLONG -793014

PHONE

TELEFAX:

email: mspcb@sancharneUn

A.

Sender's Name & Address

B.

Source of water

C.

Place of collection

D.

Date & time of collection

/9.

E.

Date of receipt

1<1. ()r;. 07

Nar:;PMal,'

S.H.5.S.,
()6 0'7

0364 - 2521217
2521764
2521514
0364 - 2521533

a.f

J30

,&7- .

PHYSICAL CHARACTERISTICS
I.

Turbidity

2.

Odour

3.

PH
CHEMICAL CHARACTERISTICS

II /

4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

8.

Total Iron

If

6 5 .?

#fn

,
BACTERIOLOGICAL TEST
Probable number of coliform baccilli in 100ml of water is _ _ ...:.-/...::g:....:{)=---f-~_ _
as per Mac Crady.

Date of Report

GoM:Phed

ht

"<:'7/6

Member Secretary
Megbalaya State Pollution Control Board
Sbillong

DPR of GSWSP (Phase III)

501

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN' LUMPYNGNGAD,
SHILLONG -793014

PHONE

email: mspcb@sancharnet.in

TELEFAX :

0364 - 2521217
2521764
2521514
0364 - 2521533

/?} ~ ~: ,7a~ia rL(f


A.

Sender's Name & Address

B.

Source of water

C.

Place of collection

D.

Date & time of collection

E.

Date of receipt

l/uJl-ucal IJilrii6/b)
Ifa+v lJaJV-t

jJh'E Na~AJr:;7J1

/!. S. N S,S'J Maw;P-MaJ7J'


PI. 5. t.?l ai /00 ,f~ .
/15 at

PHYSICAL CHARACTERISTICS

I.

Turbidity

2.

Odour

3.

PH

'loa DO

N7U

7/

CHEMICAL CHARACTERISTICS

4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

8.

Total Iron

BACTERIOLOGICAL TEST

Probable number of coliform baccilli in IOOml of water is


as per Mac Crady.
- -

/6D

Date of Report

22/5 J0
f

GoM:Phed

'

r.

--

Member Secretary
Meghalaya State Pollution Control Board
Shillong

DPR of GSWSP (Phase III)

502

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN' LUMPYNGNGAD,
SHILLONG -793014

PHONE

email: mspcb@sancharnet.in

TELEFAX

0364 - 2521217
2521764
2521514
0364 - 2521533

CU~~~.f'-ff
ttl ed-~ t//v-i'..&WI1.; Pf/ ftZa MJI'J.ia.

J3 . .. - I
A.

Sender' s Name & Address

B.

Source of water

M t!r

fJeV-Vi

4 s .II .[;,.$.

C. Place of collection

.Met Np IJa; 'flI

D.

Date & time of collection

;C/; . /-j . 07 ctJ /,00 ;;'11-:"-

E.

Date of receipt

;;Zli- il '

a7

PHYSICAL CHARACTERISTICS
1.

Turbidity

2.

Odour

3.

PH

;:;~/)() . 0 0

/'II 7 L/

CHEMICAL CHARACTERISTICS

1// f/,hv

4.

Total hardness

5.

Carbonate hardness

6",6 Ap;r...

6.

Non-Carbonate hardness

1-;, 6- It tho

7.

Chloride

6 1 ffh--v

8.

Total Iron

(). 8 PPf-r-....-

Ii

BACTERIOLOGICAL TEST

oi
t

Fe
II /', /\ )

Probable number of coliform baccilli in IOOml of water is _---'--'c='--'=


,'--''-----_ _
as per Mac Crady,

Date of Report

GoM:Phed

0-1/.61D7

I'

Member Secretary
Meghalaya State Pollution Control Board
Shillong

DPR of GSWSP (Phase III)

503

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN' LUMPYNGNGAD,
SHILLONG -793014

PHONE

email: mspcb@sancharnet.in

TELEFAX :

0364 - 2521217
2521764
2521514
0364 - 2521533

.8 . -fl.

/Ci..n t 4. f'f!
/{,/edr'-UCd ~ &~ , PJlI:, /Y!av,,/2J-.il7

A.

Sender's Name & Address

B.

Source of water

C.

Place of collection

D.

Date & time of collection

13- ..3

E.

Date of receipt

13 3. 6 7

;fa tv N C?;/&t-1}$ . H ,$' ~, ,Ma t1't-J.a'7!


07

4J

Lj t7 0

4H

PHYSICAL CHARACTERISTICS

1.

Turbidity

2.

Odour

3.

PH

/ 9 8

{JO

IY Tf-I

tJd t>?vt/U<f.
67

CHEMICAL CHARACTERISTICS

4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

8.

Total Iron

/m..-

15 ' 5

8 g
!

rn.

G 7 fflrv

#hv

7 I-;
I
tJ .5S fj?m.

BACTERIOLOGICAL TEST

r
{

Fe
I

Probable number of coliform baccilli in IOOml of water is _ _ 18-=--"o::........:.


-r-_ _ _ _
as per Mac Crady.

Date of Report

GoM:Phed

;2 ~/~/o 7

Member Secretary
Meghalaya State Pollution Control Board
Shillong

DPR of GSWSP (Phase III)

504

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN' LUMPYNGNGAD,
SHILLONG - 793014

PHONE

email : mspcb@sanchamet.in

TELEFAX

A.

Sender's Name & Address

B.

Source of water

C.

Place of collection

D.

Date & time of collection

E.

Date of receipt

CJ ~ .

61 c:J
0(' . 0 .2 - CJ 7' .
06-

0364 - 2521217
2521764
2521514
0364 - 2521533

(
/J ()

/fA! .

PHYSICAL CHARACTERISTICS
I.

Turbidity

;:.3 6

CJD N I II

2.

Odour

odo W

-t..le.S

3.

PH

6 8

CHEMICAL CHARACTERISTICS

13 2>

/?f 'l-r.

4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

0 It Ifl

8.

Total Iron

() ' 35 !ph)..

It. it f-"'f~
g. "1#h-v
r"...

BACTERIOLOGICAL TEST
Probable number of coliform baccilli in IOOml of water is
as per Mac Crady.

Date of Report /;C/.z/~ 1


?

GoM:Phed

Fe
' ,t:;".o ,

_ - 'v'-'l _

_ _ __

M ber Secretary
Meghalaya State Pollution Control Board
Shillong

DPR of GSWSP (Phase III)

505

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN' LUMPYNGNGAD,
SHILLONG -793014

PHONE

TELEFAX :

email : mspcb@sancharnetin

0364 - 2521217
2521764
2521514
0364 - 2521533

/.3 . -f/. /0t1C ~ ~

;f1ef~~l J'ft ~, Pft JY(p_~hLtt(}

A.

Sender's Name & Address

B.

Source of water

,fa ,4'

C.

Place of collection

-G.'!;.u$ S
Z,3. ()/.{)

D. Date & time of collection


E.

H afe/t.-

!l1c.Vv j:'/,)?/LC)c

'1 af

(j

I;< : {)O (,IV)

-<.3 . 6/ - 07

Date ofreceipt
PHYSICAL CHARACTERISTICS

1.

Turbidity

2.

Odour

3.

PH

'iZo, ()()

N 7L/

CHEMICAL CHARACTERISTICS

8 ff !fin,.
It If ,? fin.

4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

7 5

#m

8.

Total Iron

67

If"'"

tI

4 . 1; It~

Fe-

BACTERIOLOGICAL TEST
t .~ )
Probable number of coliform baccilli in 100ml of water is _-==..J~_
as per Mac Crady.

Date of Report

GoM:Phed

3()/ /; /0 7
;

____

Member Secretary
Meghalaya State Pollution Control Board
Shillong

DPR of GSWSP (Phase III)

506

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN ' LUMPYNGNGAD ,
SHILL ONG - 793014

PHONE

email : mspcb@sancharnet.in

A.

Sender's Name & Address

B.

Source of water

C.

Place of collection

TELEFAX :

D. Date & time of collection

Ie;. 12 '()6

E.

19 IJ; . '0 6

Date of receipt

0364 - 2521217
2521764
2521514
0364 - 2521533

41 1,:3 :00 "ko

PHYSICAL CHARACTERISTICS

1.

Turbidity

./ r)6 t) ()

2.

Odour

tJdok'tlU6

3.

PH

Nrt.l

65

CHEMICAL CHARACTERISTICS

//. / ,P;knv

4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

6 . .5 ,p/? '"'"

8.

Total Iron

() , .z !tin.

klfl t m.
II

{, . 7 ,P,P 1YJ..,

1 Fe .

BACTERIOLOGICAL TEST
Probable number of coliform baccilli in lOOml of water is
as per Mac Crady.

Date of Report

GoM:Phed

5r/1/0
7
,

_ --''=-_
'''-:> ' ___ _
I

~k

Meghalaya State Pollution Control Board


Shillong

DPR of GSWSP (Phase III)

507

KING EDWARD VII MEMORIAL PASTEUR INSTITUTE


AND MEDICAL RESEARCH INSTITUTE. MEGHAILAYA
SHILLONG - 793001

Regn. No. _ _-'-I."S"LI _ _ __


A.

Sender's Name & Address

B.

Source of water

C.

Place of collection

D.

Date & time of collection

E.

Date of receipt

PHYSICAL CHARACTERISTICS

l.

Appearance

2.

Odour

PH
CHEMICAL CHARACTERISTICS

4.

Total hardness

I~,

5.

Carbonate hardness

02, $

6.

Non-Carbonate hardness

7.

Chloride

8.

Total Iron

-.-vV

J'7 ~

~ ;lf::: 1 6<

BACTERIOLOGICAL TEST

Regn. No.

37

r-'-l.:g,.:c .O::::-7'_'~_____

Probable number of coliform baccilli in lOOml of water is _ _ _ _


as per Mac Crady.

~~, ~~ ~'V ~~.(ok.-,


~
d<=i"'~, '..o'~

Date of Report

. .

'fUb~ "

Gove~ent of Meghalaya

Pasteur Institute, Shillong.


Prinl~'d

31 lhe Dirc(:lornlC of Prill tillIt & Stationery, Mcghalaya, SlliUong 12412005 Hcahh., 5,QOO.24.ll .2005

GoM:Phed

DPR of GSWSP (Phase III)

508

KING EDWARD VII MEMORIAL PASTEUR INSTITUTE


AND MEDICAL RESEARCH INSTITUTE. MEGHALAYA
SHILLONG - 793001

~f~
4~o~ ___

Regn. No. _ _

A.

Sender's Name & Address ---"fJ...L.:...' -"G'-''----"


To.
..::;C\'-'.n-".~=l~,--,s.-=~

B.

Source of water

C.

Place of collection

J.a.vv . N~Y
.b ~
qS

7:

&Vl~

'2-~
I

A).5 S .

!>?~~

D. Date & time of collection ' _ _c::dW~_:..J6",----~O~


BC-.-_ _ _ _ _ _ _ _ __
E.

-=
O_~

Date of receipt

PHYSICAL CHARACTERISTICS

l.

Appearance

2.

Odour

PH

oJ.

ocku....y ( t.V.KJ

CHEMICAL CHARACTERISTICS

l7 ' O ~

4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

vvv
.3 , 5 11rvv
{J 9 lfrv

8.

Total Iron

O. 6 ~

/3 , S

:j- Fe-

BACTERIOLOGICAL TEST
Regn. No._---'. ~/3
~--'5~
.-_ _

) 0+ 1
1 <'15-"-=-_
Probable number of coliform baccilli in 100ml of water is _ _ _--"
_~_~_ _ _
as per Mac Crady.

R~ ~. :'\RKS

Date of Report

~ ~
~ ;J :.o

~d~ '~f:r L~ ~~ .
y~ ~

c!21f ' OG ' 08

,r

4~U~
' fubhc Arialyst
Govet0ment of Meghalaya
Pasteur Institute, Shillong.

Printed allhc Dircctornlc orPrinling & Stationery, Mcghalaya, Shillong 124/2005 Health, ~ .OOO.24. 11.2005

GoM:Phed

DPR of GSWSP (Phase III)

509

KING EDWARD VII MEMORIAL PASTEUR INSTITUTE


AND MEDICAL RESEARCH INSTITUTE. MEGHALAYA
SHILLONG -793001

Regn. N o.

.t '

_~,-/v
,,-,I _ _ _ __

A.

Sender's Name & Address

B.

Source of water

C.

Place of collection

D.

Date & time of collection

E.

Date of receipt

6L'To24 ~
?i:

1JC4v-v

gSIJSS ,

~\W~ , PJlF,flJ7?
1lZ~

/ 8 ' ,f, , 08

PHYSICAL CHARACTERISTICS

I.

Appearance

2.

Odour

PH

J.

b~

b'7

CHEMICAL CHARACTERISTICS

4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

8.

Total Iron

BACTERIOLOGICAL TEST

Regn. No.

/17

r
1. )

/ 8 0 _ _ _ __
Probable number of coliform baccilli in 100ml of water is _ _ _ _ _--'~~
as per Mac Crady.

~~~~'

r-tlnwJ~

f4.-~
~

Vublic ~

Date of Report

Gov<tnment of Meghalaya
Pasteur Institute, Shillong.
Printed althe Dircct()ralC ofPrinling & Stationery, McgllllJaya, SlIiUol1g )24nOOS Hcahh, 5,000-24.11 .2005

GoM:Phed

DPR of GSWSP (Phase III)

510

MEGHALAYA STATE POLLUTION CONTROL BOARD


CENTRAL LABORATORY
"ARDEN", LUMPYNGNGAD, SIDLLONG -793014
ANALYSIS REPO RT

1.

Sender's name & address

E.E. (PHE) Electrical Division, Mawphlang.

2.

Sender's reference

3.

Name of source & place of


Collection of sample

No.EE/PHE/ElectlTB- 145(Pt-I)12008-09/481
Dated 24th June 2008
Treated water (Reservoir of GSWSS
Mawphlang)

4.

Purpose of analytical study

Physical, Chemical & Bacteriological

5.

Time & date of receipt of the


sample

24.6.08.

6.

Laboratory reference

G/138/08

SI No

Parameters

Results

Desirable Limits for


drinking water
(Ind ian Standard)

1.

pH

8.0

6.5-8.5

2.

Turbidity (NTU)

0.5

5.0

3.

Conductivity ( ~ mho/cm)

86.1

800.0

4.

Chloride (mgll)

6.0

250.0

S.

Total Hardness (mgll)

22.0

300.0

6.

Alkalinity (mgll)

12.0

200.0

7.

Iron (mgll)

0.06

0.3

8.

Total Coliform (MPNIIOOml)

10

Rema rks : The water is fit for drinking.

Dated, Shillong,
The 27'hJ une 2008

~ N

L.

Sr.Sc~-

Meghalaya State Pollution Con trol Board,

Shm'~
/II.

o~ '
~
s.,
1

Wtlh.IO. St.,. P. -,tiM ."".I",.n


t.

GoM:Phed

DPR of GSWSP (Phase III)

511

Dated 20th June 2008

467

GoM:Phed

DPR of GSWSP (Phase III)

512

451

th

Dated 18 June 2008

GoM:Phed

DPR of GSWSP (Phase III)

513

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN' LUMPYNGNGAD,
SHILLONG - 793014

PHONE

TELEFAX :

email: mspcb@sancharnet.in

A.

Sender's Name & Address

B.

Source of water

C.

Place of collection

D.

Date & time of collection

E.

Date of receipt

0364 - 2521217
2521764
2521514
0364 - 2521533

PHYSICAL CHARACTERISTICS
I.

Turbidity

2.

Odour

3.

PH

6 '1

CHEMICAL CHARACTERISTICS
4.

Total hardness

2.;(,

fj; 9n

5.

Carbonate hardness

/9. q

?;pm

6.

Non-Carbonate hardness

fm

7.

Chloride

,z 3
"1 ./j

8.

Total Iron

().:/

#J7V

BACTERIOLOGICAL TEST
Probable number of coliform baccilli in lOOml of water is
as per Mac Crady.

Date of Report

()3;!o/0 7
/

GoM:Phed

n -rn

1 ~e-
I

>

()

Member Secretary
Meghalaya State Pollution Control Board
Shillong

DPR of GSWSP (Phase III)

514

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN' LUMPYNGNGAD,
SHILLONG -793014

email: mspcb@sancharnet.in

A.

Sender's Name & Address

B.

Source of water

C.

Place of collection

D.

Date & time of collection

E.

Date of receipt

g . S . 6 ",
'3. '3. {) 7 .

at

PHONE

TELEFAX

0364 - 2521217
2521764
2521514
0364 - 2521533

cr..Or) am

PHYSICAL CHARACTERISTICS
l.

Turbidity

2.

Odour

3.

PH
CHEMICAL CHARACTERISTICS

3/ 0

4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

8.

Total Iron

IPjzrn-

BACTERIOLOGICAL TEST

I A'

Probable number of coliform baccilli in lOOml of water is _ _ _...cLJ~_


as per Mac Crady.

Date of Report

GoM:Phed

/,1.

g. 6 '1- .

Member Secretary
Meghalaya State Pollution Control Board
Shillong

DPR of GSWSP (Phase III)

515

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN' L UMPYNGNGAD,
SHILLONG - 793014

PHONE

email : mspcb@sancharnet.in

A.

Sender' s Name & Address

B.

Source of water

C.

Place of collection

D.

Date & time of collection

E.

Date of receipt

TELEFAX :

q. 5. /-I. S ..5/
!(). () -;:. 0

7.

0364 - 2521217
2521764
2521514
0364 - 2521533

Iv1cuvrfiJa;if
aI 1;::,.' t:?O (N)

PHYSICAL CHARACTERISTICS
I.

Turbidity

2.

Odour

3.

PH

(). SO

N7tf

CHEMICAL CHARACTERISTICS

4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

8.

Total Iron

BACTERIOLOGICAL TEST
Probable number of coliform baccilli in 100ml of water is
as per Mac Crady.

Date of Report

GoM:Phed

18/01/0 t
J

_ _

--'-0_ ___

Membe
eretary
Megbalaya Slta e Pollution Control Board
Sbillong

DPR of GSWSP (Phase III)

516

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN' LUMPYNGNGAD,
SHILLONG - 793014

PHONE

TELEFAX :

email: mspcb@sancharnet.in

A.

Sender's Name & Address

B.

Source of water

C.

Place of collection

q..C;. H .s. ~C;"


/'J. () 6. 6 -:(

D. Date & time of collection


E.

0364 - 2521217
2521764
2521514
0364 - 2521533

;vj~a-J1

at

/.30 ;P?7'Z>
,

Date of receipt
PHYSICAL CHARACTERISTICS

I.

Turbidity

2.

Odour

3.

PH

o f)()

N1!1

CHEMICAL CHARACTERISTICS

4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

8.

Total Iron
BACTERIOLOGICAL TEST

Probable number of coliform baccilli in 1OOml of water is


'L! .
as per Mac Crady.
- - - -=--- - -

Date of Report

~!.:~,

21/b jo t
I

Meghalaya State Pollution Control Board


Shillong

GoM:Phed

DPR of GSWSP (Phase III)

517

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN' LUMPYNGNGAD,
SHILLONG - 793014

PHONE

TELEFAX:

email : mspcb@sancharnet.in

A.

Sender' s Name & Address

B.

Source of water

C.

Place of collection

D.

Date & time of collection

E.

Date of receipt

0364 - 2521217
2521 764
2521 514
0364 - 2521533

!i.e:;. f.J. .5./ /vJCVru;PA-Ia--1vJ'


/1 ..5 07' ai' f {)O t rrv

PHYSICAL CHARACTERISTICS
1.

Turbidity

2.

Odour

3.

PH

alo

#7U

7 3 .

CHEMICAL CHARACTERISTICS

37.

4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

8.

Total Iron

C;

33.3
b. b

35

BACTERIOLOGICAL TEST

I () J

Probable number of coliform baccilli in 100ml of water is


as per Mac Crady.

Date of Report

22/5/01.
I
I

GoM:Phed

Member Secretary
Meghalaya State Pollution Control Board
Shillong

DPR of GSWSP (Phase III)

518

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN' LUMPYNGNGAD,
SHILLONG - 793014

email : mspcb@sancharnet.in

A.

Sender's Name & Address

B.

Source of water

C.

Place of collection

D.

Date & time of collection

E.

Date of receipt

-41.$. /./. $ . $.
-</-;' /f . {) 7
;2),;. 1; . {) 7

PHONE

TELEFAX

0364 - 2521217
2521764
2521514
0364 - 2521533

MaNjdv/ei"j

cd I e{) 0 F~

PHYSICAL CHARACTERISTICS

7 {) N'7C/

1.

Turbidity

y) .

2.

Odour

octo [{hIV,Yi

3.

PH

7, /

CHEMICAL CHARACTERISTICS
4.

3 3 3

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

3 / CJ
~. 3

11,

7. Chloride
8.

I7Pfh

#rr..fttr-

f;Pff>

tJ tJ 5

Total Iron

m. 1 re

BACTERIOLOGICAL TEST

Probable number of coliform baccilli in 100ml of water is


as per Mac Crady.

Date of Report

GoM:Phed

()

,.

Member Secretary
Meghalaya State Pollution Control Board
Shillong

DPR of GSWSP (Phase III)

519

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN' LUMPYNGNGAD,
SHILLONG - 793014

email : mspcb@sancharnet.in

PHONE

TELEFAX

0364 - 2521217
2521764
2521 514
0364 - 2521533

A.

Sender's Name & Address

;S . 4 . -rw~
luI.L~ /J [y/&;or., PRIf iY!a.W/J,Ja"!

B.

Source of water

1h Ci..JeA

C.

Place of collection

-{}. .s. I-/.$ . $ .

D.

Date & time of collection

13 ,3 .

CJ

hiq}Ot

MOt 'vj>Aio.7
1 cd 9. CJc; /M/

13 ;3 {)7

E. Date of receipt
PHYSICAL CHARACTERISTICS
I.

Turbidity

2.

Odour

3.

PH

(J 70

N T!.;

/"1

CHEMICAL CHARACTERISTICS

Itg& PfMI
;39. 9 # hv

4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

13

8.

Total Iron

() ,

8 1/;b /'rv

1#
tJ 5 # f>-. -

In.

BACTERIOLOGICAL TEST
Probable number of coliform baccilli in IOOml of water is
as per Mac Crady.

Date of Rep ort

GoM:Phed

;2.! /22/07
7

l'

Fe
10 I

~.

Member Secretary
Meghalaya State Pollution Control Board
Shillong

DPR of GSWSP (Phase III)

520

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN' LUMlPYNGNGAD,
SHILLONG; - 793014

PHONE

email : mspcb@sancharneUn

Sender's Name & Address

B.

Source of water

C.

Place of collection

~'::-1-,Lz~C~/ Jj';yr~~1 Pm

MaW;Aki

/h~.L.f--ed ..-z'./aJe--'1.
-fJ"$' . H~!!.

(J,b ' ~~,

D. Date & time of collection


E.

TELEFAX :

0364 - 2521217
2521764
2521514
0364 - 2521533

/OH-<a.~

13. 1/,
A.

Mcuuf AjJI."(J

cU- '1. CJo 41-1

'1

Date of receipt
PHYSICAL CHARACTERISTICS

1.

Turbidity

2.

Odour

3.

PH

.0 , 70

/yjL!

7-1

CHEMICAL CHARACTERISTICS

,<-'=""
bc.:.,-'6
"'--;,f::.
/i'
F hv
:...:.-"._ _ _ _ _ _ _ _

4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

8.

Total Iron

.~
A~'''<

Ir rn,
.~

BACTERIOLOGICAL TEST
Probable number of coliform baccilli in lOOml of water is
as per Mac Crady.

Date of Report

IZ/-<"/tJ7
7

GoM:Phed

(0

- --

- --

MeJ2::.ry
Meghalaya State Pollution Control Board
Shillong

DPR of GSWSP (Phase III)

521

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN' LUMPYNGNGAD,
SHILLONG -793014

email : mspcb@sancharneUn

PHONE

TELEFAX

0364 - 2521217
2521764
2521514
0364 - 2521533

k 5. -{} . 7"CUt.-L4. JJ;

A.

Sender's Name & Address

/ec.J"-c~W

B.

Source of water

;;'1 ~e4 H cdvt

C.

Place of collection

{}:;.w ,s .c

D.

Date & time of collection

;;2'3, () /'

E.

Date of receipt

;(.,3, ()/' (J 7

(J

"1

/J ['vis-Im-..

'p'H

/J1a"flJ..a(J

MGt?W l'if
cd

1;C: (JO (N)

PHYSICAL CHARACTERISTICS

(), 7CJ

/Y l tj

l.

Turbidity

2.

Odour

.Od crw-dvU

3.

PH

0 -7

CHEMICAL CHARACTERISTICS

4.

Total hardness

2Z -<.

5.

Carbonate hardness

17, 7

6.

Non-Carbonate hardness

7.

Chloride

8.

Total Iron

It , s1 (J,8
L') , CJ5

# t-rv
'P/'m-

If rr...

/1?h-t..-

# Ih. t;f

BACTERIOLOGICAL TEST
Probable number of coliform baccilli in lOOml of water is
as per Mac Crady.

Date of Report

GoM:Phed

3 D/I/D 7
'1

Fe.

'0'

~,

Member Secretary
Meghalaya State Pollution Control Board
Shillong

DPR of GSWSP (Phase III)

522

MEGHALAYA STATE POLLUTION CONTROL BOARD


'ARDEN' LUMPYNGNGAD,
SHILLONG - 793014

PHONE

email: mspcb@sancharnet.in

T ELEFAX :

0364 - 2521217
2521764
2521514
0364 - 2521533

A.

Sender's Name & Address

;;~Z:d ;Oir(~J PH. frl~7~d

B.

Source of water

~A.J-e.d trfcJV1..

C.

Place of collection

D.

Date & time of collection

19.

E.

Date of receipt

11/;;2 . 0 6 .

'061 cd

/ ,R .

1?"; tJ O ~

PHYSICAL CHARACTERISTICS
I.

Turbidity

2.

Odour

3.

PH

' 0-

70 NIlI

7,a

CHEMICAL CHARACTERISTICS

II{; . 8'

/# m-

4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

,?fm.IG .Z /t r-r-. .

8.

Total Iron

0 .05 Pj?Jn.

;Z 7 0
;

# rrv

/9 g

BACTERIOLOGICAL TEST

Fe
10 )

Probable number of I~oliform baccilli in lOOml of water is _ --":::_ _ _ __ _


as per Mac Crady.

DateofReport~O 7

GoM:Phed

Member Secretary
Meghalaya State Pollution Control Board
Shillong

DPR of GSWSP (Phase III)

523

KING EDWARD VII MEMORIAL PASTEUR INSTITUTE


AND MEDICAL RESEARCH INSTITUTE. MEGHALAYA
SHILLONG - 793001

/ S-O

Regn. No.

A.

Sender's Name & Address

B.

Source of water

C.

Place of collection

D.

Date & time of collection

E.

Date of receipt

PHYSICAL CHARACTERISTICS

I.

Appearance

2.

Odour

3..

PH

~/Y

CHEMICAL CHARACTERISTICS

G 1VV'v
t 8 .~t~

~6.

4.

Total hardness

5.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

9 ~

8.

Total Iron

O o S-

"'It:
!fr"
/

p/F~

BACTERIOLOGICAL TEST

Regn. No.

/ 3G
~O )

.
Probable number of coliform baccilli in IOOml of water is _ _--'--'~
_ _~_ _ _ _ _
as per Mac Crady.

F rfr

R~ ~. L\RKS:

Date of Report

\tu~

() 1/07/0R
I

~ ~d-u.:" ..

Gove\1ment of Megba\aya
Pasteur InstiMe, Sbillong.

P:inted lithe Din:ctOI'llIC of Printing & SlIuioAl."'f)', Megllalroya., Shitklll8 12412005 HClhh, S,000-24.ll.2005

GoM:Phed

DPR of GSWSP (Phase III)

524

KING EDWARD VII MEMORIAL PASTEUR INSTIT UTE


AND MEDICAL RESEARCH INSTITUTE. MEGHALAYA
,
SHILLONG - 793001

I 9(lQ
,
Regn. No. _ _ ----'--""
-"'--'-_ _ _
A.

Sender's Name & Address

B.

Source of water

C.

Place of collection

D.

Date & time of collection

E.

Date of receipt

PHYSICAL CHARACTERISTICS

dc.o..y

1. . Appearance

2.

Odour

~
~.

PH

O~
7- 1

CHEMICAL CHARACTERISTICS

4.

Total hardness

/ Q o.

5.

Carbonate hardness

l oS

6.

Non-Carbonate hardness

5-4~

1'1 ' ~J #

rvv

7 0 . 0 ~

7. . Chloride

8.

oft.-vv

O I 05 ~

Total Iron

~Fe..

BACTERIOLOGICAL TEST

Regn. No.

I al 't

Probable number of coliform baccilli in 100ml of water is _ _ _ _O


-=-__~ _____
as per Mac Crady.

~Prfr~~ '
\public Analyst
Gover\ment of Mcghalaya
Pasteur Institute, Shillong.
Primed al the Dirtclor'lc of Prinlillg & StaliorlCry. Mcghalaya, Shilklllg 124/2005 HCllhh. 5,000-24.1] .2005

GoM:Phed

DPR of GSWSP (Phase III)

525

. KING EDWARD VII MEMORIAL PASTEUR INSTITUTE


AND MEDICAL RESEARCH INSTITUTE. MEGHALAYA
SHILLONG"': 793001

(Z8

Regn. No.

A. Sender's Name & Address


B.

Source of water

C.

Place of collection

D.

Date & time of collection

E.

Date of receipt

l3 .cq . Ta71~'1! Ii~

T'rgp,kj~ M1vc

--,-!G~~V('J;i::. : : 1 fr'-$ h(;S

~ '

/~ .

6 . oR
I S' . h . Q 8

. PHYSICAL CHARACTERISTICS

I.

Appearance

2.

Odour

PH

J .

~
O~
~9

CHEMICAL CHARACTERISTICS

4.

Total hardness

S.

Carbonate hardness

6.

Non-Carbonate hardness

7.

Chloride

8.

Total Iron

1NV

i:L ,9

vvv

0 - V 5 Jpw
.

ft/ Ec

BACTERIOLOGICAL TEST

Regn. No.

/IG

-=__~_____

Probable number of coliform baccilli in IOOml of water is _ _ _ _ '0

as per Mac Crady.

R~ M.ARKS:
Date of Report

~
~ 'i . 06

~ Pr ~~
~-e?~

~ublicAna~

. 08
.

Gove~ent of Meghalaya
Pasteur Institute, Shillong.

Printed al the Din:ctor.tc o( Pril1l ing &. Salionery, Meghalaya. SlImo", 12412005 Healt h. 5,000-24.1 1.2005

GoM:Phed

DPR of GSWSP (Phase III)

526

You might also like