Professional Documents
Culture Documents
Construction Process: Study Site:comprehensive Holdings
Construction Process: Study Site:comprehensive Holdings
Plumbing
Finish materials
Electric cable system
False ceiling
Paint application
Plumbing
Kitchen water input and waste water disposal
Toilet water input (hot and cold)
solid waste and waste water disposal
Rain water disposal on semi open space
(veranda)
Kitchen
Water input - hot
Source : from nearby geezer
Water input cold
Source : from the duct
Kitchen
Water input points:
1. Sink (hot and cold)
2. Downwash (minimum one point needed)
3. Water purifier
Waste water output points:
1. Sink + downwash
Toilet
Water input source : cold
From the main lines through the duct
Toilet
Hot water input from
Geezer
Waste water disposal
(white pipe)
Solid waste disposal
(grey pipe)
Toilet
Water input points:
1. Wash basin (hot and cold )
2. Water closet a . flush
b . hand shower
3.Bath area: a. tap (hot and cold )
b. hot and cold mixture point
c. shower (hot and cold )
Toilet
Waste water disposal
a. Disposal through dry zone
b. Disposal through wet zone
Solid waste disposal
- through water closet
water input
shower
water input
hot and cold mixture
water source tap
water disposal wet zone
R
rain water disposal pipe is connected to the water
disposal pipes in the toilet
Finish material
1.
2.
3.
4.
Terrazzo mosaic
mixture process
Stone chips
white cement
Terrazzo mosaic
mixture process
Terrazzo mosaic
mixture process
Terrazzo mosaic
mixture process
Terrazzo mosaic
application process (wall surface)
Marble strip
on the wall
Terrazzo mosaic
application process (wall surface)
Terrazzo mosaic
application process (wall surface)
Terrazzo mosaic
application process (wall surface)
Terrazzo mosaic
application process (wall surface)
False ceiling
frame
Detail of the
connective
piece
Paint
application technique (pudding)
The pudding
Applying at corners