FR-HSR-0040-11-01-00

Knowledge Corridor Restore Vermonter Project


Tim Doherty, MassDOT
Cherron Riddick
will enable Amtrak's Vermonter train to again travel the historic 50-mile
MA, and
Northfield , MA. The Project will utilize a $75 million Federal Railroad Administration (FRA) grant from the American Recovery and Reinvestment Act
to undertake rail improvements in the Pioneer Valley in Western Massachusetts. The Project also includes bicycle/pedestrian improvements in the City
Nnrth"rr'nt<1n , MA with the construction of an underpass that runs under the rail line. An additional benefit of the rail line rehabilitation will be improved freight
for customers along the line and within western Massachusetts.
The improvements to the Knowledge Corridor will occur on the Connecticut River mainline of the Pan Am Southern (PAS) railroad , a joint venture between Pan
Am Railways and Norfolk Southern. MassDOT, through its Rail and Transit Division, has designated the Massachusetts Bay Transportation Authority's (MBTA)
Design and Construction Department to oversee the implementation of the Project through final design and construction and has entered into a Construction
Agreement with Pan Am Southern, LLC to construct the Project.
-KNOWLEDGE CORRIDOR STATION AND UNDERPASS- 100% Design completed and distributed for review and comments. PS&E documents expected by
1/31/14. MBTA will issue a single construction contract for these elements of work.
-KNOWLEDGE CORRIDOR PAN AM -Continue to receive new track materials@ South Deerfield Yard . Salvage contractor hired by PAS and mobilized for
retrieval. Grade crossings track work north of Greenfield completed pending signal procurement. Grade crossing signal packages are on the street for bids.
Balance of signal package designs ongoing .

Cumulative Financial Trends

Project Progress

4500 0
0%

20%

40%

60%

80%

100%

120%

4000 0
3500 0

3000 0

iii
2500 c:;

2000

-;;

----

...

15000
10000

500 0
0

July

August

_ . _ Estimated

:\' Planned ..

Actual % ..

i
panels for turnouts at CPR-38 , CPR-16, & CPR-9.
I>A6<:<:nnT- Provide additional funding for the project. Continue with procurement of bridge repair contract.
- Advertise & Procure Stations and Underpass. Continue material procurement.
URS - Continue Program and Construction Management.

Actual

Sept

Oct

Nov

Dec